NO. 1 TO THE DRAWINGS AND THE PROJECT MANUAL PROJECT NAME: MULTI-CAMPUS RENOVATIONS CLIENT NAME: CLEAR CREEK INDEPENDENT SCHOOL DISTRICT LOCATION: League City, Texas PROJECT NUMBER: 01778-01-01 PROPOSAL DATE: Thursday February 28, 2019 at 2:00PM ADDENDUM DATE: Friday, February 22, 2019 22, 2019 For additional information regarding this project, contact Angel Rivera at [email protected]. THIS ADDENDUM INCLUDES: Electrical Items 8 Pages Technology Items 1 Page AND ALL ATTACHED REVISED DRAWING REFERENCES IN THE ADDENDUM 2/22/19

Upload: phamminh

Post on 02-Mar-2019

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

NO. 1

TO THE DRAWINGS AND THE PROJECT MANUAL

PROJECT NAME: MULTI-CAMPUS RENOVATIONS

CLIENT NAME: CLEAR CREEK INDEPENDENT SCHOOL DISTRICT

LOCATION: League City, Texas

PROJECT NUMBER: 01778-01-01

PROPOSAL DATE: Thursday February 28, 2019 at 2:00PM

ADDENDUM DATE: Friday, February 22, 2019 22, 2019

For additional information regarding this project, contact Angel Rivera at

[email protected].

THIS ADDENDUM INCLUDES:

Electrical Items 8 Pages

Technology Items 1 Page

AND ALL ATTACHED REVISED DRAWING REFERENCES IN THE ADDENDUM

2/22/19

Page 2: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Project Name: Multi-Campus Renovations

Client: Clear Creek ISD

League City, Texas

Project Number: 01778-01-01

Architectural Items For

Addendum No. 1

Page 1 of 6

ARCHITECTURAL ITEMS FOR ADDENDUM NO. 1 NOTICE TO PROPOSERS:

A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it had

been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary

data differ from those of the original contract documents, this Addendum shall govern and take precedence.

B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this

Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications and

supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal

form. Failure to do so may subject Proposer to disqualification.

REFERENCE IS MADE TO THE DRAWINGS AND PROJECT MANUAL AS NOTED:

SUPLIMENTAL INFORMATION:

Pre-Bid Conference Sign In Sheet:

See attached Sign In Sheet from Pre-Proposal meeting held on 02.21.19

PROJECT MANUAL:

AD No 1, Arch. Item 1: To the Project Manual, Section 00 10AB “INSTRUCTIONS TO OFFERORS,”

1) Replace Paragraph 1.1 – Qualified Offerors (A.) with the following:

Competitive Sealed Proposals will be accepted from qualified Offerors (General Contractors) only for

the entire scope of work described in the Contract Documents. As a prerequisite to an Offeror's

qualifying for the award of contract on this work, the Offeror must complete each item of the

Contractor Information and Experience Statement (AIA Document A305). The Statement forms may

be obtained from the Houston Chapter of the American Institute of Architects, 315 Capitol, Suite 120,

Houston, Texas 77002, (713) 520-0155. In addition to the information contained in the Statement

form, Offerors shall also address the selection criteria issues (Safety Record, Financial Condition,

Proposed Team, etc.) listed under the paragraph below for Determination of Successful Respondent

and Award of Contract. Two (2) copies of The “Statement of Qualifications” documents shall be

delivered to HUCKABEE office at 1800 HUGHES LANDING BOULEVARD, SUITE 701, THE

WOODLANDS, TEXAS 77380 on or before 2:00pm on Wednesday, February 27, 2019.

AD No 1, Arch. Item 2: To the Project Manual, Section 00 0115 “LIST OF DRAWING SHEETS,”

1) Replace 1.02 TITLE OF DRAWINGS with the following:

BAUERSCHLAG

G1.1 Cover Sheet and General Data

A1.1 Master Plan

C0.01.1 Miscellaneous Details

C1.02.1 Bauerschlag Elementary School Site Plan

C1.03.1 Bauerschlag Elementary School Alternate No. 7 Track and Drainage Improvements

C1.04.1 Miscellaneous Details E0.0.1 Bauerschlaug Electrical Symbols and Abbreviations

2/22/19

Page 3: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Project Name: Multi-Campus Renovations

Client: Clear Creek ISD

League City, Texas

Project Number: 01778-01-01

Architectural Items For

Addendum No. 1

Page 2 of 6

EL2.1.1 Bauerschlaug Level 1 Lighting Plan

EP2.1.1 Bauerschlaug Level 1 Power Plan

E3.1.1 Bauerschlaug Electrical Details

E4.1.1 Bauerschlaug Electrical Details

E5.1.1 Bauerschlaug One-Line Diagram

E6.1.1 Bauerschlaug Electrical Schedules P2.1.1 Bauerschlaug Level 1 Plumbing Plan

P2.4.1 Bauerschlaug Plumbing Riser Diagram

TS0.0.1 Technology Notes & Ledends - Bauerschlaug

TS1.1.1 Level 1 Technology Routing Plan - Bauerschlaug

TS2.1.1 Level 1 Technology & Security Plan - Bauerschlaug

TS3.1.1 MDF/IDF Enlarged Floor Plans – Bauerschlaug

TS5.1.1 Technology Details – Bauerschlaug

GILMORE

G1.1 Cover Sheet and General Data

A1.1 Master Plan

C0.01.2 Miscellaneous Details

C1.01.2 Gilmore Elementary School Site Plan

C1.02.2 Gilmore Elementary School Walk Path Plan (Alternate No. 8)

C1.03.2 Miscellaneous Details

TS0.0.2 Technology Notes & Legends – Gilmore

TS2.1.2 Level 1 Technology & Security Plan – Gilmore

TS5.1.2 Technology Details – Gilmore

GOFORTH

G1.1 Cover Sheet and General Data

A1.1 Master Plan

C0.01.3 Miscellaneous Details

C1.01.3 Goforth Elementary School Site Plan

C1.02.3 Goforth Elementary Alternate No. 9 Track and Drainage Improvements

C1.03.3 Miscellaneous Details E0.0.3 Goforth Electrical Symbols and Abbreviations

EL2.1.3 Goforth Level 1 Lighting Plan

EP2.1.3 Goforth Level 1 Power Plan

E3.1.3 Goforth Electrical Details

E4.1.3 Goforth Electrical Details

E5.1.3 Goforth One-Line Diagram

E6.1.3 Goforth Electrical Schedules

P2.1.3 Goforth Level 1 Plumbing Plan

P2.4.3 Goforth Plumbing Riser Diagram

TS0.0.3 Technology Notes & Legends - Goforth

TS2.1.3 Level 1 Technology & Security Plan – Goforth

TS5.1.3 Technology Details – Goforth

Page 4: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Project Name: Multi-Campus Renovations

Client: Clear Creek ISD

League City, Texas

Project Number: 01778-01-01

Architectural Items For

Addendum No. 1

Page 3 of 6

FALCON PASS

G1.1 Cover Sheet and General Data

A1.1 Master Plan

C0.01.4 Miscellaneous Details

C1.04 Flacon Pass Elementary School Site Plan

C1.02.4 Miscellaneous Details E0.0.4 Falcon Pass Electrical Symbols and Abbreviations

EL2.1.4 Falcon Pass Level 1 Lighting Plan

EP2.1.4 Falcon Pass Level 1 Power Plan

E3.1.4 Falcon Pass Electrical Details

E4.1.4 Falcon Pass Electrical Details

E5.1.4 Falcon Pass One-Line Diagram

E6.1.4 Falcon Pass Electrical Schedules

P2.1.4 Falcon Pass Level 1 Plumbing Plan

P2.4.4 Falcon Pass Plumbing Riser Diagram

TS0.0.4 Technology Notes & Ledends - Falcon Pass

TS2.1.4 Level 1 Technology & Security Plan – Falcon Pass

TS5.1.4 Technology Details – Falcon Pass

ROBINSON

G1.1 Cover Sheet and General Data

A1.1 Master Plan

A1.2 Signage Schedule

A1.3 Signage Plan

A1.4 Sign Types

TS0.0.5 Technology Notes & Legends - Robinson

TS1.1.5 Level 1 Technology Routing Plan - Robinson

TS2.1.5 Level 1 Technology & Security Plan - Robinson

TS3.1.5 MDF/IDF Enlarged Floor Plans – Robinson

TS5.1.5 Technology Details – Robinson

WEBER

G1.1 Cover Sheet and General Data

A1.1 Master Plan

C0.01.6 Miscellaneous Details

C1.01.6 Weber Elementary School Site Plan

C1.02.6 Weber Elementary Alternate No. 10 Track and Drainage Improvements

C1.03.6 Miscellaneous Details

M2.1.6 Weber Level 1 Mechanical Plan

E0.0.6 Weber Electrical Symbols and Abbreviations

EL2.1.6 Weber Level 1 Lighting Plan

EP2.1.6 Weber Level 1 Power Plan

E3.1.6 Weber Electrical Details

Page 5: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Project Name: Multi-Campus Renovations

Client: Clear Creek ISD

League City, Texas

Project Number: 01778-01-01

Architectural Items For

Addendum No. 1

Page 4 of 6

E4.1.6 Weber Electrical Details

E5.1.6 Weber One-Line Diagram

E6.1.6 Weber Electrical Schedules

P2.1.6 Weber Level 1 Plumbing Plan

P2.4.6 Weber Plumbing Riser Diagram

TS0.0.6 Technology Notes & Legends - Weber

TS2.1.6 Level 1 Technology & Security Plan - Weber

TS5.1.6 Technology Details – Weber

DRAWINGS:

AD No 1, Arch. Item 3: To the Drawings, Sheet Volume 1 G1.1, “COVER SHEET AND GENERAL DATA,”

1) Index of Sheets shall read as follows:

BAUERSCHLAG

G1.1 Cover Sheet and General Data

A1.1 Master Plan

C0.01.1 Miscellaneous Details

C1.02.1 Bauerschlag Elementary School Site Plan

C1.03.1 Bauerschlag Elementary School Alternate No. 7 Track and Drainage Improvements

C1.04.1 Miscellaneous Details E0.0.1 Bauerschlaug Electrical Symbols and Abbreviations

EL2.1.1 Bauerschlaug Level 1 Lighting Plan

EP2.1.1 Bauerschlaug Level 1 Power Plan

E3.1.1 Bauerschlaug Electrical Details

E4.1.1 Bauerschlaug Electrical Details

E5.1.1 Bauerschlaug One-Line Diagram

E6.1.1 Bauerschlaug Electrical Schedules P2.1.1 Bauerschlaug Level 1 Plumbing Plan

P2.4.1 Bauerschlaug Plumbing Riser Diagram

TS0.0.1 Technology Notes & Ledends - Bauerschlaug

TS1.1.1 Level 1 Technology Routing Plan - Bauerschlaug

TS2.1.1 Level 1 Technology & Security Plan - Bauerschlaug

TS3.1.1 MDF/IDF Enlarged Floor Plans – Bauerschlaug

TS5.1.1 Technology Details – Bauerschlaug

AD No 1, Arch. Item 4: To the Drawings, Sheet Volume 2 G1.1, “COVER SHEET AND GENERAL DATA,”

1) Index of Sheets shall read as follows:

GILMORE

G1.1 Cover Sheet and General Data

A1.1 Master Plan

C0.01.2 Miscellaneous Details

C1.01.2 Gilmore Elementary School Site Plan

C1.02.2 Gilmore Elementary School Walk Path Plan (Alternate No. 8)

C1.03.2 Miscellaneous Details

Page 6: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Project Name: Multi-Campus Renovations

Client: Clear Creek ISD

League City, Texas

Project Number: 01778-01-01

Architectural Items For

Addendum No. 1

Page 5 of 6

TS0.0.2 Technology Notes & Legends – Gilmore

TS2.1.2 Level 1 Technology & Security Plan – Gilmore

TS5.1.2 Technology Details – Gilmore

AD No 1, Arch. Item 5: To the Drawings, Sheet Volume 3 G1.1, “COVER SHEET AND GENERAL DATA,”

1) Index of Sheets shall read as follows:

GOFORTH

G1.1 Cover Sheet and General Data

A1.1 Master Plan

C0.01.3 Miscellaneous Details

C1.01.3 Goforth Elementary School Site Plan

C1.02.3 Goforth Elementary Alternate No. 9 Track and Drainage Improvements

C1.03.3 Miscellaneous Details E0.0.3 Goforth Electrical Symbols and Abbreviations

EL2.1.3 Goforth Level 1 Lighting Plan

EP2.1.3 Goforth Level 1 Power Plan

E3.1.3 Goforth Electrical Details

E4.1.3 Goforth Electrical Details

E5.1.3 Goforth One-Line Diagram

E6.1.3 Goforth Electrical Schedules

P2.1.3 Goforth Level 1 Plumbing Plan

P2.4.3 Goforth Plumbing Riser Diagram

TS0.0.3 Technology Notes & Legends - Goforth

TS2.1.3 Level 1 Technology & Security Plan – Goforth

TS5.1.3 Technology Details – Goforth

AD No 1, Arch. Item 6: To the Drawings, Sheet Volume 4 G1.1, “COVER SHEET AND GENERAL DATA,”

1) Index of Sheets shall read as follows:

FALCON PASS

G1.1 Cover Sheet and General Data

A1.1 Master Plan

C0.01.4 Miscellaneous Details

C1.04 Flacon Pass Elementary School Site Plan

C1.02.4 Miscellaneous Details E0.0.4 Falcon Pass Electrical Symbols and Abbreviations

EL2.1.4 Falcon Pass Level 1 Lighting Plan

EP2.1.4 Falcon Pass Level 1 Power Plan

E3.1.4 Falcon Pass Electrical Details

E4.1.4 Falcon Pass Electrical Details

E5.1.4 Falcon Pass One-Line Diagram

E6.1.4 Falcon Pass Electrical Schedules

P2.1.4 Falcon Pass Level 1 Plumbing Plan

P2.4.4 Falcon Pass Plumbing Riser Diagram

Page 7: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Project Name: Multi-Campus Renovations

Client: Clear Creek ISD

League City, Texas

Project Number: 01778-01-01

Architectural Items For

Addendum No. 1

Page 6 of 6

TS0.0.4 Technology Notes & Ledends - Falcon Pass

TS2.1.4 Level 1 Technology & Security Plan – Falcon Pass

TS5.1.4 Technology Details – Falcon Pass

AD No 1, Arch. Item 7: To the Drawings, Sheet Volume 5 G1.1, “COVER SHEET AND GENERAL DATA,”

1) Index of Sheets shall read as follows:

ROBINSON

G1.1 Cover Sheet and General Data

A1.1 Master Plan

A1.2 Signage Schedule

A1.3 Signage Plan

A1.4 Sign Types

TS0.0.5 Technology Notes & Legends - Robinson

TS1.1.5 Level 1 Technology Routing Plan - Robinson

TS2.1.5 Level 1 Technology & Security Plan - Robinson

TS3.1.5 MDF/IDF Enlarged Floor Plans – Robinson

TS5.1.5 Technology Details – Robinson

AD No 1, Arch. Item 8: To the Drawings, Sheet Volume 6 G1.1, “COVER SHEET AND GENERAL DATA,”

1) Index of Sheets shall read as follows:

WEBER

G1.1 Cover Sheet and General Data

A1.1 Master Plan

C0.01.6 Miscellaneous Details

C1.01.6 Weber Elementary School Site Plan

C1.02.6 Weber Elementary Alternate No. 10 Track and Drainage Improvements

C1.03.6 Miscellaneous Details

M2.1.6 Weber Level 1 Mechanical Plan

E0.0.6 Weber Electrical Symbols and Abbreviations

EL2.1.6 Weber Level 1 Lighting Plan

EP2.1.6 Weber Level 1 Power Plan

E3.1.6 Weber Electrical Details

E4.1.6 Weber Electrical Details

E5.1.6 Weber One-Line Diagram

E6.1.6 Weber Electrical Schedules

P2.1.6 Weber Level 1 Plumbing Plan

P2.4.6 Weber Plumbing Riser Diagram

TS0.0.6 Technology Notes & Legends - Weber

TS2.1.6 Level 1 Technology & Security Plan - Weber

TS5.1.6 Technology Details – Weber

END OF ARCHITECTURAL ADDENDUM

Page 8: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01

Electrical Items For Addendum No. 1

Page 1 of 2

DBR Engineering Consultants TBPE Firm Registration No. 2234 ELECTRICAL ITEMS FOR ADDENDUM NO. 1

NOTICE TO PROPOSERS:

A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it

had been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original contract documents, this Addendum shall govern and take

precedence. B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this

Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications

and supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal form. Failure to do so may subject Proposer to disqualification.

REFERENCE IS MADE TO THE DRAWINGS AND THE PROJECT MANUAL AS NOTED:

PROJECT MANUAL:

AD No 1, Elec. Item 1: To the Project Manual, Section 26 32 13, “(80) Natural Gas Engine Driven Standby

Engine Generating System.,” A. Replace generator specification with new specification attached in its entirety.

DRAWINGS: AD No 1, Elec. Item 1: To the Drawing, Sheet EL2.1.X, “LEVEL 1 LIGHTING PLAN – Bauerschlag, Goforth,

Falcon Pass and Weber” (All elementary schools listed) 1) Modified keyed note #1 as shown in red and italics to add the following to the keyed note: “LOCATE EXISTING

EMERGENCY BATTERY BACKUP FIXTURES AND REPLACE WITH NEW GENERATOR TRANSFER DEVICE CIRCUIT FOR EMERGENCY LIGHTING BACK UP THRU GENERATOR. RETROFIT, CLEAN AND RE-LAMP LIGHTS AS

REQUIRED. REPLACE EXISTING BALLASTS WITH NEW. TRANSFER DEVICES SHALL BE “BODINE” 20 AMP GTD DEVICE – UL 1008. PROVIDE A BODINE DEVICE PER EMERGENCY FIXTURE. BODINE DEVICE TO BE MOUNTED TO STRUCTURE, NEAR LIGHTING FIXTURE. TYPICAL FOR ALL EMEREGENCY LIGHTING.

2) CLARIFICATION ON KEYED NOTE 2. LIGHTING FIXTURE SHOWN IS A NEW EMERGENCY LED WALL PACK, AN

EXISTING FIXTURE DID NOT EXIST AT THESE LOCATIONS.

AD No 1, Elec. Item 2: To the Drawing, Sheet E5.1.1, “ELECTRICAL ONE-LINE DIAGRAM – Bauerschlag, Goforth,

Falcon Pass and Weber”

3) Changed 125kw gen set to a 80kw with 70 amp and 100 amp output breakers.

4) Changed disconnect sizes upstream of both ATS devices to 100 amp. One with 100 amp fuse, the other with 70

amp fuse.

5) Changed Transformer TSBEL2 from a 30 to a 15KVA.

6) Revised Generator Load Analysis.

Page 9: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01

Electrical Items For Addendum No. 1

Page 2 of 2

7) Changed #16 breaker on MSB from 125 amp to 70 amp.

AD No 1, Elec. Item 2: To the Drawing, Sheet E6.1.1, “ELECTRICAL SCHEDULES – Bauerschlag, Goforth, Falcon Pass and Weber”

1) Revised various breakers and loads on panels.

END OF ELECTRICAL ADDENDUM

Page 10: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01

Technology Items for Addendum No. 1

Page 1 of 2

DBR Engineering Consultants TBPE Firm Registration No. 2234

TECHNOLOGY ITEMS FOR ADDENDUM NO. 1 NOTICE TO PROPOSERS:

A. This Addendum shall be considered part of the contract documents for the above-mentioned project as though it

had been issued at the same time and incorporated integrally therewith. Where provisions of the following supplementary data differ from those of the original contract documents, this Addendum shall govern and take

precedence. B. Proposers are hereby notified that they shall make any necessary adjustments in their estimate on account of this

Addendum. It will be construed that each Proposer’s proposal is submitted with full knowledge of all modifications

and supplemental data specified therein. Acknowledge receipt of this addendum in the space provided on the proposal form. Failure to do so may subject Proposer to disqualification.

REFERENCE IS MADE TO THE DRAWINGS AND THE PROJECT MANUAL AS NOTED:

DRAWINGS: AD No 1, Tech. Item 1: To the Drawings, Sheet TS0.0.1 thru TS0.0.6, “TECHNOLOGY NOTES & LEGENDS – ALL CAMPUSES,”

1) Add “E” to the “Typical Subscripts Legend”, which shall read as follows: Indicates the locations of an existing devise that is to remain and be functional upon completion of the project.

2) Add ‘D’ to the “Typical Subscripts Legend,” which shall read as follows:

Indicates the locations of an existing devise that is to be removed in its entirety. Patch, Paint, and provide cover

plates as required.

AD No 1, Tech. Item 2: To the Drawings, Sheet TS2.1.1, “TECHNOLOGY & SECURITY PLAN – BAUERSCHLAG 1) Revised keyed note no. 6 to say “Not Used”.

2) Revised keyed note no. 9 to say “Not Used”. 3) Revised keyed note no. 11 to say “Not Used”.

AD No 1, Tech. Item 3: To the Drawings, Sheet TS2.1.2, “LEVEL 1 TECHNOLOGY & SECURITY PLAN – GILMORE

1) Revised keyed note no. 4 to say “Not Used”. 2) Revised keyed note no. 8 to say “Not Used”.

3) Revised keyed note no. 9 to say “Not Used”.

4) Revised keyed note no. 12 to say “Not Used”.

AD No 1, Tech. Item 4: To the Drawings, Sheet TS2.1.3, “LEVEL 1 TECHNOLOGY & SECURITY PLAN – GOFORTH

1) Revised keyed note no. 4 to say “Not Used”.

Page 11: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01

Technology Items for Addendum No. 1

Page 2 of 2

2) Revised keyed note no. 9 to say “Not Used”.

AD No 1, Tech. Item 5: To the Drawings, Sheet TS2.1.4, “LEVEL 1 TECHNOLOGY & SECUIRTY PLAN – FALCON PASS

1) Replace Technology Keyed Note No. 8 designation, near Zone 4 designation in the Cafeteria, with Technology

Keyed Note No. 7.

AD No 1, Tech. Item 6: To the Drawings, Sheet TS2.1.5, “LEVEL 1 TECHNOLOGY & SECURITY PLAN – ROBINSON

1) Revised keyed note no. 9 to say “Not Used”. 2) Revised keyed note no. 12 to say “Not Used”.

3) Revised keyed note no. 14 to say “Not Used”.

4) Add Technology Keyed Note No. 7 to existing microphone C01, located in Cafeteria 150. 5) Delete IP Intercom Keyed Note No. 4 in its entirety.

AD No 1, Tech. Item 7: To the Drawings, Sheet TS3.1.5, “MDF/IDF ENLARGED FLOOR PLANS – ROBINSON

6) Revised keyed note no. 1 to say “Not Used”.

AD No 1, Tech. Item 8: To the Drawings, Sheet TS5.1.5 TECHNOLOGY DETAILS – ROBINSON (ATTACHED)

1) Revise detail sheet, adding the “ABOVE CEILING STANDALONE IP SPEAKER OUTLET” detail.

END OF TECHNOLOGY ADDENDUM

Page 12: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1
Page 13: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Clear Creek ISD – Multi-Campus Renovations (1778-01-01)

DBR Engineering Consultants, Inc. (200) NATURAL GAS ENGINE DRIVEN STANDBY ENGINE GENERATING SYSTEM

SECTION 26 32 13 16

NATURAL GAS ENGINE-DRIVEN STANDBY ENGINE GENERATING SYSTEM – FIRE STATION

PART 1 – GENERAL 1.01 GENERAL REQUIREMENTS

A. The requirements of the General Conditions and Supplementary Conditions apply to all

work herein. B. SCOPE

1. Provide a standby electric generating system manufactured by Cummins C80 N6 series electric set rated for continuous standby service at 80 kW, 100 kVA at 0.8 power factor, 3-phase, 480V/277 VAC, 60 cycle. The system shall be a package of new and current equipment consisting of: a. A natural gas engine driven electric plant in a weather-protective

housing to provide emergency electric power. Automatic transfer switch(es) to provide automatic starting and stopping of the plant and switching of the load for separate transfer switch section.

b. Mounted accessories as specified. c. Control wiring. d. Alternator oversized as shown.

1.02 PERMITS, TEST INSPECTIONS

A. This system shall be completely built, tested and shipped by a manufacturer who has been regularly engaged in the production of such equipment for the past ten years and who has parts and service facilities locally available so there is one source of supply and responsibility. The performance of the electric plant shall be certified by an independent testing laboratory as to the plant's full power rating and voltage and frequency regulation. The complete system shall bear a seal showing that it is prototype test supported.

1.03 REQUIREMENTS

A. Level 1 applications are legally-required emergency systems.

B. The electric generating system must meet all requirements of NFPA 110 including design specification, prototype tests, one-step full-load pickup, and installation acceptance. Engine-generator system to provide source of power for Level 1 applications.

1.04 STANDARDS

A. Equipment shall meet the latest versions of the following codes:

Page 14: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Clear Creek ISD – Multi-Campus Renovations (1778-01-01)

DBR Engineering Consultants, Inc. (200) NATURAL GAS ENGINE DRIVEN STANDBY ENGINE GENERATING SYSTEM

1. N.E.C. 2. NFPA 101, 110, 37, 99, 30 3. IEEE - 446, 587 4. NEMA - MG1, ICS 5. ANSI 6. UL – 1008 7. MIL-STD 461 C – Part 9, IEC 801.2, IEC 801.3, IEC 801.5, IEC 1000-4-2,3,6

– RFI and EMI Performance. 8. UL 2200

1.05 SUBMITTALS

A. Shop drawings shall include but not be limited to: 1. Catalog cut sheets with all equipment, fuel tank, accessories and devices

including all ratings. 2. Interconnection wiring diagrams. 3. Complete bill of materials. 4. Certified performance tests.

B. Operation and Maintenance Data

1. Submit under provisions of Division One. 2. Furnish three copies of the manuals and books listed below in substantial three-

ring binders for each unit: a. Operating Instructions: Describe and illustrate all switchgear controls

and indicators and engine and general controls. Include instructions for operating transfer switch equipment under normal and emergency conditions when engine generator is running.

b. Parts Books: Illustrate and list all assemblies, subassemblies and components, except standard fastening hardware (nuts, bolts, washers, etc.).

c. Preventative Maintenance Instructions: Describe the daily, weekly, monthly biannual and annual maintenance requirements and include a complete lubrication chart.

d. Routine Test Procedures: Describe procedure for engine, radiator, all electronic and electrical circuits, and the generator.

e. Troubleshooting Chart: Describe and list all troubles, probable causes, and suggested remedies.

f. Recommended Spare Parts List: List all consumables anticipated to be required during routing maintenance and testing. List special tools, maintenance materials and replacement parts.

g. Wiring Diagrams and Schematics: Show function of all electrical components.

1.06 DELIVERY, STORAGE AND HANDLING

A. Deliver, store, protect and handle products to site under provisions of Division One.

Page 15: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Clear Creek ISD – Multi-Campus Renovations (1778-01-01)

DBR Engineering Consultants, Inc. (200) NATURAL GAS ENGINE DRIVEN STANDBY ENGINE GENERATING SYSTEM

B. Accept units on site on skids. Inspect for damage.

C. Protect equipment from dirt and moisture by securely wrapping in heavy plastic.

1.07 ACCEPTABLE MANUFACTURERS

A. Provide products complying with these specifications and produced by one of the following: 1. Cummins 2. Kohler

1.08 ACCEPTABLE SUPPLIERS

A. All equipment provided shall be supplied by an authorized distributor of the manufacturer who has been continuously engaged in the distribution of industrial grade Power System products for a minimum of 15 years. The supplier shall provide initial start-up services, conduct field acceptance testing, and warranty service. The supplier be authorized to perform warranty service on all products provided.

B. Within 50 mile of the job site, the supplier shall maintain; a minimum of 6 factory

trained and qualified field technicians; a proper supply of spare parts for the supplied equipment; a shop with overhaul capabilities; and be able to provide 24 hour, 7 day per week, 365 day per year field service capability.

PART 2 – PRODUCTS 2.01 ENGINE

A. The engine shall be radiator cooled, natural gas fueled, 4 cycle, 6 cylinder. It shall have

a total piston displacement of not less than 359 cubic inches and develop not less than 162.7.0 brake horsepower at its operating speed. A radiator air discharge duct flange shall be provided for a connecting duct to allow all heated air and gases to be discharged out of the building or enclosure through one opening. The radiator cooling system shall be rated at 40 degrees C. ambient against an external restriction of 0.5 inch water column. Engine cooling air requirements shall not exceed 8,000 CFM.

B. The engine shall be of 1-piece cast alloy iron construction with cast alloy iron heads.

Valves shall be overhead and free to rotate. Valves shall be hard chrome-cobalt alloy faced with replaceable valve seat inserts of solid chrome-cobalt alloy. The crankshaft shall be forged steel with main bearings between all cylinders. The connecting rods shall be forged steel with connecting rod bearings. Fuel injection system with automatic fuel shut-off, automatic positive head maintained on injectors, and a reusable air element air cleaner; mechanical fuel transfer pump with filters. Provide full-flow, replaceable, oil filter with bypass; oil pressure gauge shall be included.

Page 16: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Clear Creek ISD – Multi-Campus Renovations (1778-01-01)

DBR Engineering Consultants, Inc. (200) NATURAL GAS ENGINE DRIVEN STANDBY ENGINE GENERATING SYSTEM

C. The engine shall be equipped with adjustable isochronous electronic governor (speed regulation 0.25 percent, no load to full load); main output circuit breaker, fuel carburetor system with automatic fuel shut-off and a reusable air element air cleaner; natural gas fuel train. Provide full-flow, replaceable oil filter with bypass; oil pressure gauge shall be included. Provide 12 volt electrical system and starting shall be a 12 volt electric starter.

D. 120 VAC thermostatically controlled water jacket heater system (1500 watts) shall be provided. Contractor shall install normal power to the heater.

E. Provide the following safety shutdown fault devices:

1. Low oil pressure 2. Over-speed 3. Over-crank 4. High temperature (with low water level)

F. Provide the following alarms:

1. Low engine temperature (indicating jacket heater malfunction) 2. Marginally high engine temperature 3. Marginally low oil pressure 4. Flashing for control switch in "Stop" position.

G. The engine shall be equipped with adjustable electronic governor isochronous (speed

regulation 0.25 percent, no load to full load) with controls H. Generator main circuit breaker: set-mounted and wired, UL listed, molded case type with

electronic trip unit, rated at 100%, 125 amps, 3 pole and 480 volts. Submittals shall demonstrate that the circuit breaker provides proper protection for the alternator by a comparison of the trip characteristic of the breaker with the thermal damage characteristic of the alternator. Field circuit breakers shall not be acceptable for generator overcurrent protection. (Lugs on breaker shall match “ATS” lugs)

I. Provide 12 volt electrical system and starting shall be a 12 volt electric starter. 2.02 ALTERNATOR

A. Rating 128 kW, 160 kVA, at 0.8 power factor 105 degrees Celsius, 480/277 volts, 60 Hz at 1800 rpm.

B. The alternator shall be a single bearing revolving field type, 2/3 pitch, 4-pole and shall

be completely brush less. No commutator or commutator brushes shall be allowed. The main alternator and exciter shall be vacuum impregnated. The alternator shall be directly connected to the engine through a rigid coupling to insure permanent alignment. Voltage regulation shall be within plus or minus 1% of rated voltage, from no load to full load. Voltage recovery to rated voltage after acceptance of 100% of rated load in one step shall occur within 10 seconds. Provide a permanent magnet generator (PMG) excitation system. Motor starting capability shall be a minimum of 306 kVA. Rating for non-linear loads shall not be less than 40 kW at 0.8 power factor. The generator set shall

Page 17: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Clear Creek ISD – Multi-Campus Renovations (1778-01-01)

DBR Engineering Consultants, Inc. (200) NATURAL GAS ENGINE DRIVEN STANDBY ENGINE GENERATING SYSTEM

be capable of sustaining a minimum of 90% of rated no load voltage with the specified kVA load at near zero power factor applied to the generator set. The instantaneous voltage dip shall be less than 10% of rated voltage when full load and rated power factor is applied to the alternator. Stable or study-state operation is defined as operation with terminal voltage remaining constant within plus or minus 1% of rated voltage. Temperature rise shall be within rating as defined by NEMA MG1-22.40. Radio interference reduction shall exceed requirements for general civilian or commercial applications with TIF less than 50 and waveform deviation less than 0.06 line to line.

C. Provide a 120 volt anti-condensation heater minimum (100 watts) to prevent

condensation during non-operating periods. Heater shall be thermostatically controlled, or rated for continuous use for the frame. Provide normal power to the heater.

D. Overload Rating: Capable of withstanding a three phase load of 300% rated current for

10 seconds, 150% of rated current for 2 minutes and 110% rated current for 60 minutes with field set for normal rated load excitation, and capable of withstanding an overspeed of 125%.

E. Performance Criteria:

1. Waveform Deviation: Less than 5%. 2. Crest Factor: 1.41 +/- 0.07. 3. Form Factor: 1.11 +/-0.05. 4. Total Harmonic Distortion: 5%. 5. Single Harmonic Distortion: 3%. 6. Telephone Interference Factor: 50% maximum. 7. Dynamic Balance: Less than 1 mil displacement peak to peak.

F. Enclosure: NEMA MG1, open drip proof.

G. Neutral Ground: As shown on drawings.

2.03 CONTROLS AND INSTRUMENTS

A. Provide comprehensive monitoring and control system integral to the Generator Set control to guard the electrical integrity of the alternator and power system. Provide single and 3-phase fault current regulation, so that downstream protective devices have the maximum current available to quickly clear fault conditions, without subjecting the alternator to potentially catastrophic failure conditions. Include provisions to either prevent over voltage due to single phase faults, or to shut down the generator set if line to neutral voltage on any phase exceeds 115% for more than 0.5 seconds. Acceptable methods are a 600 volt Circuit Breaker, mounted in the generator enclosure, Square D of size as indicated on drawings with handheld programmer or inherent protection provided by microprocessor-based GenSet AmpSentry protection. Submittals shall demonstrate that the protective device provides proper protection for the alternator by a comparison of the trip characteristic of the breaker with the thermal damage characteristic of the alternator. Field circuit breakers shall not be acceptable for generator overcurrent protection.

Page 18: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Clear Creek ISD – Multi-Campus Renovations (1778-01-01)

DBR Engineering Consultants, Inc. (200) NATURAL GAS ENGINE DRIVEN STANDBY ENGINE GENERATING SYSTEM

B. An instrument panel mounted on top of the alternator shall contain the following:

1. Run-stop-remote switch 2. Lighted charge rate ammeter 3. Lighted oil pressure gauge 4. Lighted coolant temperature gauge 5. Remote start-stop terminals 6. Running time meter 7. Full A.C. instrument panel (A.C. ammeter, A.C. voltage, phase selector switch,

frequency meter, and voltage adjusting rheostat.) All parameters shall have a readout that is not less than 2.5% accuracy.

8. Red alarm lights shall be provided for each fault and alarm condition. 9. Two sets of spare terminals shall be provided for customer selected faults. 10. An Emergency Shutdown contact shall be provided through which customer's

push button or other momentary-closing switch contacts shall shutdown the generator set engine.

11. A fault reset switch contacts shall shutdown the generator set engine. 12. A fault reset switch shall be provided to clear fault indications and allow

restarting of the engine after shutdown faults. 13. The control design shall be such that the fault indication shall remain until reset.

The fault indicator memory shall not be dependent on the presence of either A-C or D-C voltage and shall retain the fault status memory even through complete removal and replacement of the starting batteries.

14. A battery warning that included load testing the battery on each crank shall be provided.

15. The fault reset function shall operate only when the RUN-STOP-REMOTE switch is in the STOP position.

16. All devices for interconnection and compatibility with digital accuracy and response shall be provided. Digital panels shall comply with electromagnetic interference requirements of Minimum Standard 461C – Part 9, and IEC Standard 801.2, 801.3 and 801.4.indication of voltage level

17. Include a full wave rectified automatic digital voltage regulation system matched and prototype tested by the engine manufacturer with the governing system provided. It shall be immune from misoperation due to load-induced voltage waveform distortion and provide a pulse width modulated output to the alternator exciter. The voltage regulation system shall be equipped with three-phase RMS sensing and shall control buildup of AC generator voltage to provide a linear rise and limit overshoot. The system shall include a torque-matching characteristic, which shall reduce output voltage in proportion to frequency below an adjustable frequency threshold. Torque matching characteristic shall be adjustable for roll-off frequency and rate, and be capable of being curve-matched to the engine torque curve with adjustments in the field.

18. The automatic voltage regulator shall be temperature compensated, solid-state design and include overvoltage and overexcitation protection functions. The voltage regulator shall be equipped with three phase RMS sensing. The regulator shall control buildup of AC generator voltage to provide a linear rise and limit overshoot. Overvoltage protection shall sense the AC generator output

Page 19: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Clear Creek ISD – Multi-Campus Renovations (1778-01-01)

DBR Engineering Consultants, Inc. (200) NATURAL GAS ENGINE DRIVEN STANDBY ENGINE GENERATING SYSTEM

voltage and in the event of regulator failure or loss of reference, shut down regulator output on a sustained overvoltage of one (1) second duration. Overexcitation protection shall sense regulator output and shutdown regulator output if overloads exceed ten (10) seconds in duration. Both overvoltage and overexcitation protection shutdowns shall be latched, requiring the AC generator to be stopped for reset.

19. The regulator shall include an under frequency rolloff torque-matching characteristics, which shall reduce output voltage in proportion to frequency below a threshold of 58-59 Hz). The torque-matching characteristic shall include differential rate of frequency change compensation to use maximum available engine torque and provide optimal transient load response. Regulators which use a fixed volts per hertz characteristic are not acceptable.

20. An electronic governor system shall provide automatic isochronous frequency regulation. The governing system dynamic capabilities shall be controlled as a function of engine coolant temperature to provide fast, stable operation at varying engine operating temperature conditions.

21. All analog and digital metering shall be true-RMS indicating, and shall not be disrupted by non-linear load generated waveform distortion.

22. Digital metering set shall indicate generator RMS voltage and current, frequency, output current, output kW, kW-hours, and power factor. Generator output voltage shall be available in line-to-line neutral voltages, and shall display all three phase voltages (line to neutral or line-to-line) simultaneously.

23. An under frequency sensing and protection system shall be provided which causes a shutdown of the generator set if true RMS frequency falls below 90% of rated for more than 20 seconds.

24. The control system provided shall withstand the surge voltage produced by a 70A DC battery charging alternator operating at full load when the battery bank is disconnected. The test shall be successfully completed without tripping protective circuit breakers or blowing fuse protective devices.

25. All switches, lamps and meters shall be oil-tight and dust-tight and the enclosure door shall be gasketed.

26. All switches shall be provided with fully illuminated back-lit labels and all metering shall be individually lighted to allow for easy reading of functions in a completely dark room.

27. The field connections shall be made on permanently labeled terminal blocks, which are designed and tested by the manufacturer of the generator set to be suitable for use without wire termination lugs. Provisions shall be made for future addition of DIN-rail mounted components.

28. Control panel and interconnection enclosures shall be UL508 listed as a unit assembly.

2.04 ELECTRIC PLANT MOUNTING

The plant shall be provided with shock or anti-vibration mounts with the plant and bolted to the concrete pad. Provide Korfund LKD spring-type isolators or type EU pads. Vibration isolation may be integrally a part of the generator set to skid packaged from the set manufacturer. The plants integral base shall have forklift sockets. Battery rack shall be integral part of plant base.

Page 20: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Clear Creek ISD – Multi-Campus Renovations (1778-01-01)

DBR Engineering Consultants, Inc. (200) NATURAL GAS ENGINE DRIVEN STANDBY ENGINE GENERATING SYSTEM

2.05 ACCESSORIES

A. All accessories needed for the proper operation of each plant shall be furnished. These

shall include but not limited to the following: 1. Critical rated side inlet silencers with installation attachments for mounting

within the set housing, flexible exhaust connection. For sets over 500 kW mount silencer on top of set housing.

2. Belt driven battery charging alternator. 3. Lead acid starting batteries 4. Battery cables. 5. Fully automatic 10 amp battery charger 120 volt, 325 watts (Onan Series

A048G602). Include in automatic transfer switch. [Unless ATS is over 50 feet from generator set.

6. Natural Gas Fuel Train consisting of: a. dry fuel strainer b. gas surge tank (25 gallon) c. 12 VDC fuel solenoid valve d. pounds-to-ounces primary gas pressure reducing regulator e. UL Listed braided metallic flexible fuel line

7. An oil drain valve with hose extension shall be provided for draining oil at the side of the plant.

8. Detailed operation and maintenance manuals with parts list. 2.06 REMOTE ALARM ANNUNCIATOR

Onan no. 541-0814-02 shall be provided for flush mounting at inside locations remote from the generator set located by the fire alarm control panel.

2.07 AUTOMATIC TRANSFER SWITCH

A. Scope 1. Provide 4 pole open transition automatic transfer switches (ATS) with the

amperage, voltage and withstand current ratings as shown on the plans. Each automatic transfer shall consist of an inherently double throw power transfer switch unit and a control module interconnected to provide complete automatic operation.

B. Codes and Standards

1. UL 1008 - Standard for Automatic Transfer Switches 2. NFPA 70 - National Electrical Code 3. NFPA 99 - Essential Electrical Systems for Health Care Facilities 4. NFPA 110 - Emergency and Standby Power Systems

C. Acceptable Manufacturers 1. ASCO 2. Cummins Power Generation/Onan

Page 21: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Clear Creek ISD – Multi-Campus Renovations (1778-01-01)

DBR Engineering Consultants, Inc. (200) NATURAL GAS ENGINE DRIVEN STANDBY ENGINE GENERATING SYSTEM

D. Mechanically Held Transfer Switch 1. The transfer switch unit shall be electrically operated and mechanically held.

The switch shall be mechanically interlocked to ensure only one of two possible positions, normal or emergency.

2. All main contacts shall be silver composition. Switches rated 600 amperes and above shall have segmented, blow-on construction and be protected by separate arcing contacts.

3. Inspection of all contacts shall be possible from the front of the switch without disassembly of operating linkages and without disconnection of power conductors. A manual operating handle shall be provided for maintenance purposes.

4. Designs utilizing components of molded-case circuit breakers, contactors, or parts thereof are not acceptable.

E. Microprocessor Control Panel

1. The control panel shall direct the operation of the transfer switch. The panel's sensing and logic shall be controlled by a built-in microprocessor.

2. Operator Panel. Each transfer switch shall be provided with a control panel to allow the operator to view the status and control operation of the transfer switch. The operator panel shall be a sealed membrane panel rated NEMA 3R/IP53 or better (regardless of enclosure rating) that is permanently labeled for switch and control functions. The operator panel shall communicate with the engine generator, including display of all engine and alternator data, and other transfer switch data in the power system. The operator panel shall allow starting and stopping of the generator set via the transfer switch operator panel in both test and emergency modes.

F. Enclosure

1. The ATS shall be furnished in a NEMA type 3R enclosure.

G. Voltage and Frequency Sensing 1. The voltage of each phase of the normal source shall be monitored, with pickup

adjustable from 85% to 100% of nominal and dropout adjustable from 75% to 98% of pickup setting.

2. Single-phase voltage sensing of the emergency source shall be provided, with pickup voltage adjustable from 85% to 100% of nominal and independent frequency sensing with pickup adjustable from 90% to 100% of nominal.

H. Time Delays

1. A time delay shall be provided to override momentary normal source outages and delay all transfer and engine starting signals. Adjustable from 0 to 6 seconds.

2. A time delay shall be provided on transfer to emergency, adjustable from 0 to 5 minutes for controlled timing of transfer of loads to emergency.

3. A time delay shall be provided on retransfer to normal, adjustable from 0 to 30

Page 22: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Clear Creek ISD – Multi-Campus Renovations (1778-01-01)

DBR Engineering Consultants, Inc. (200) NATURAL GAS ENGINE DRIVEN STANDBY ENGINE GENERATING SYSTEM

minutes. Time delay shall be automatically bypassed if emergency source fails and normal source is acceptable.

4. A time delay shall be provided on shutdown of engine generator for cool down, adjustable from 0 to 60 minutes.

5. Standby system transfer switch shall be time delayed for one minute

I. Additional Features 1. A set of DPDT gold-flashed contacts rated 10 amps, 32 VDC shall be provided

for a low-voltage engine start signal. 2. A momentary-type test switch shall be provided to simulate a normal source

failure. 3. One set of auxiliary contacts, rated 10 amps, 250 VAC shall be provided. 4. Position indicating lights shall be provided. 5. An inphase monitor or delayed transition shall be provided for motor load

applications.

J. Withstand and Closing Ratings 1. The ATS shall be UL listed in accordance with UL 1008 and be labeled in

accordance with that standard's 3 cycle, long-time ratings. ATS’s that are not tested and labeled with 3 cycle (any breaker) ratings and have series, or specific breaker ratings only, are not acceptable unless the switch performance is guaranteed and UL listed for molded case circuit breakers or current limiting fuses. If current limiting fuses are utilized, provide current limiting fuses and disconnect switch mounted in or on Automatic Transfer Switch.

K. The ATS manufacturer shall maintain a national service organization of company-employed personnel located throughout the contiguous United States. The service center's personnel must be factory trained and must be on call 24 hours a day, 365 days a year.

2.08 OUTDOOR SOUND ATTENUATING WEATHER-PROTECTIVE HOUSING

A. The generator set shall be provided with a factory-installed weather protective housing to allow the generator set to operate at full rated load in the ambient conditions previously specified. Housing configuration and materials used may be of an suitable design which meets application needs, except that acoustical materials used shall be oil and water resistant. No foam materials shall be used unless they can be demonstrated to have the same durability and life as fiberglass. The enclosure shall include hinged doors for access to both sides of the engine and alternator, and the control equipment. Key-locking and pad lockable door latches shall be provided for all doors. Door hinges shall be stainless steel. The enclosure shall be provided with an exhaust silencer which is mounted inside of the enclosure, and allows the generator set package to meet specified sound level requirements. Silencer and exhaust shall include a rain cap and rain shield. All sheet metal shall be primed for corrosion protection and finish painted with the manufacturer’s standard color using a two step electro coating paint process, or equal meeting the performance requirements specified below. All surfaces of all metal parts shall be primed and painted. The painting process shall result in a coating which meets

Page 23: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Clear Creek ISD – Multi-Campus Renovations (1778-01-01)

DBR Engineering Consultants, Inc. (200) NATURAL GAS ENGINE DRIVEN STANDBY ENGINE GENERATING SYSTEM

the following requirements: 1. Primer thickness, 0.5-2.0 mils. Top coat thickness, 0.8-1.2 mils. 2. Gloss, per ASTM D523-89, 80% plus or minus 5%. Gloss retention after one

year shall exceed 50%. 3. Crosshatch adhesion, per ASTM D3359-93, 4B-5B. 4. Impact resistance, per ASTM D2794-93, 120-160 inch-pounds. 5. Salt spray, per ASTM B117-90, 1000+ hours. 6. Humidity, per ASTM D2247-92, 1000+ hours. 7. Water soak, per ASTM D2247-92, 1000+ hours.

B. Painting of hoses, clamps, wiring harnesses, and other non-metallic service parts shall

not be acceptable. Fasteners used shall be corrosion resistant, and designed to minimize marring of the painted surface when removed for normal installation or service work.

C. A 120 VAC heater with thermostat shall be provided within the generator set control

panel to eliminate condensation. Contractor shall provide 120 volt circuit from normal utility source as required.

D. Enclosure shall be constructed of sound attenuating materials to provide an average

maximum sound pressure level of 70.5 dBA at a distance of 23 feet from the face of the enclosure.

PART 3 – EXECUTION 3.01 INSTALLATION

A. Install generator on a 6 inch high reinforced concrete housekeeping pad. Provide blackouts as required.

B. Provide all power wiring, control wiring, additional contacts and relays required for a

complete installation. All conduits shall be in a two hour enclosure. Underground conduits shall be concrete encased. The wall mounted dual rate battery shall be taken off line during the starting of the generator. The generator belt driven alternator shall charge the batteries when the generator is running.

C. Install generator set and transfer switches in accordance with manufacturer’s

instructions. D. Ground and bond transfer switches under provisions of Division 16. E. Provide engraved plastic nameplates under the provisions of Section 16050.

3.02 WARRANTY

A. The complete standby electric power system, including engine-generator set equipped with set exerciser, and running time meter, shall be warranted for a period of five years

Page 24: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Clear Creek ISD – Multi-Campus Renovations (1778-01-01)

DBR Engineering Consultants, Inc. (200) NATURAL GAS ENGINE DRIVEN STANDBY ENGINE GENERATING SYSTEM

form the date of initial start-up. Multiple warranties for individual components (engine, alternator, controls, etc.) will not be acceptable. Satisfactory warranty documents must be provided. This warranty shall be as detailed in available written documents. In the judgement of the specifying authority, the manufacturer supplying the warranty for the complete system must have necessary financial strength and technical expertise with all components supplied to provide adequate warranty support. All items of the engine, generator, and controls that are warranted in the first year shall be covered for the full five year term of the warranty.

B. Extensions of warranty term up to 10 years from start-up and inclusion of comprehensive

terms shall be available for one year after start-up. 3.03 TESTS

A. Factory production model tests: Before shipment of the equipment, the generator sets shall be tested under rated load and power factor for performance and proper functioning of control and interfacing circuits. Testing at unity power factory only (resistance banks only) is not acceptable, since kW output is affected by the higher generator efficiency at unity power factor, and the kVAR for motor starting and regulation loads is not correlatable between unity and rated power factor. Other tests shall include: 1. Single step load pickup per NFPA 110. 2. Transient response and steady state governing. 3. Safety Shutdowns. 4. Prototype tests in accordance with NFPA 110 level 1 have been done on a

complete and functional set, component level type tests will not substitute for this requirement.

The engineer shall be notified in advance of this test, and shall have the option of

witnessing these tests. Certified copies of test results shall be forwarded to the engineer for review.

B. Field Test After Installation:

1. The complete installation shall be initially started and checked out for operational compliance by factory-trained representative(s) of the engine-generator set and transfer switch manufacturer. The engine lubrication oil and antifreeze, as recommended by the manufacturer for operation under environmental conditions specified shall be provided by the engine-generator set supplier.

2. Upon completion of initial start-up and system checkout, the supplier of the generator set shall perform a field test, with the engineer notified in advance, to demonstrate load carrying capability, stability, voltage, and frequency. The engineer shall be present during the field test.

3. The generator shall be run for four hours continuously with all available facilities emergency load connected to its output; in addition the generator set supplier must provide a portable load bank to supplement any existing load to enable full load testing. Load shall not exceed 50% of generator-set rating for first 1/2 hour, during first initial run for proper engine break-in. Records shall

Page 25: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

Clear Creek ISD – Multi-Campus Renovations (1778-01-01)

DBR Engineering Consultants, Inc. (200) NATURAL GAS ENGINE DRIVEN STANDBY ENGINE GENERATING SYSTEM

be maintained throughout this period to record water temperature, oil pressure, ambient air temperature, voltage, current, frequency, kilowatts, and power factor. The above data shall be recorded at 15 minute intervals throughout the test. There shall be a 10 minute unloaded run at the conclusion of the test to allow engine to cool before shutdown. Three copies of the field test data shall be furnished to the engineer. The contractor shall make all necessary hook-ups to accomplish field tests and shall furnish all fuel necessary for field test and start-up.

C. Training

1. Provide training designed for a minimum of four persons, to include: 2. Training in the system operation in all possible configurations. 3. Training in the maintenance of the system. 4. Minimum of four hours of instruction, but sufficient to cover all items specified. 5. Four sets of instruction materials.

END OF SECTION

Page 26: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1
Page 27: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

02

/21/ 1

9

Page 28: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

02

/21/ 1

9

Page 29: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

02

/21/ 1

9

Page 30: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

713.914.0888 p 713.914.0886 f

Houston, Texas 77042

9990 Richmond AvenueSouth Building, Suite 300

TBPE Firm Registration No. 2234

DBR Project Number

Sheet No.Job No.

Drawn By:

Date:

Pro

ject

:

Copyright © 2018, Huckabee & Associates, Inc.

VOLUME 1

BM DN CB AM

180332.000

JL/HP

DBR

C:\

Use

rs\c

ber

ger

\Do

cum

ents

\180

332_

Bau

ersc

hla

g E

S_M

EP

T17

_cb

erg

erC

6MY

T.r

vt

2/21

/201

9 11

:38:

07 A

M

E6.1.1

BAUERSCHLAGELECTRICAL SCHEDULES

02/18/19

1778-01-01

MU

LTI-C

AM

PU

S R

EN

OV

ATI

ON

SB

AU

ER

SC

HLA

G E

LEM

EN

TAR

Y S

CH

OO

LFO

RC

LEA

R C

RE

EK

I.S

.D.

LEA

GU

E C

ITY

, TE

XA

S

Total Load (Diversified): 23591 VA VA = 28 A

Total Connected Load: 18873 VA VA = 23 ALocation of Panel: ELECTRICAL 40

(M)Misc. (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting 18873 VA 125.00% 23591 VA

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Space -- -- 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12

-- -- Spare -- 20 A 9 10

-- -- Spare -- 20 A 7 8

40 A 8 LSEH3 L 5719 VA

55 VA L EXIT SIGN 12 20 A 5 6

1440 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 3 4

3168 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 1 2

40 A 8 LSEH2 L 8491 VA

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

100 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 70 A MCB X Single Mounting

Existing

X NewPanelboard LSEH165000 AIC Rating

Total Load (Diversified): 10614 VA VA = 13 A

Total Connected Load: 8491 VA VA = 10 ALocation of Panel: ELECTRICAL 104

(M)Misc. (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting 8491 VA 125.00% 10614 VA

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Space -- -- 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12 -- -- Space -- --

-- -- Spare -- 20 A 9 10 -- -- Space -- --

-- -- Spare -- 20 A 7 8 -- -- Space -- --

105 VA L EXIT SIGN 12 20 A 5 6 -- -- Space -- --

4258 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 3 4 -- -- Space -- --

4128 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 1 2 -- -- Space -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

100 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MLO X Single Mounting

Existing

X NewPanelboard LSEH265000 AIC Rating

Total Load (Diversified): 7149 VA VA = 9 A

Total Connected Load: 5719 VA VA = 7 ALocation of Panel: ELECTRICAL 190

(M)Misc. (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting 5719 VA 125.00% 7149 VA

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Space -- -- 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12 -- -- Space -- --

-- -- Spare -- 20 A 9 10 -- -- Space -- --

-- -- Spare -- 20 A 7 8 -- -- Space -- --

55 VA L EXIT SIGN 12 20 A 5 6 -- -- Space -- --

2592 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 3 4 -- -- Space -- --

3072 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 1 2 -- -- Space -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

100 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MLO X Single Mounting

Existing

X NewPanelboard LSEH365000 AIC Rating

Total Load (Diversified): 21520 VA VA = 60 A

Total Connected Load: 21520 VA VA = 60 ALocation of Panel: ELECTRICAL 40

(M)Misc. 19440 VA 100.00% 19440 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 2080 VA 100.00% 2080 VA 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

17 18 -- -- -- -- --

15 16 -- -- -- -- --14400 VA M REFRIGERATION SYSTEM 8 50 A

13 14 30 A -- SPD -- --

1 1200 VA R; M LTS,DOOR HTR 12 20 A 11 12 -- -- Space -- --

600 VA M FREEZER COIL 12 20 A 9 10 20 A -- Spare -- --

600 VA M RELIEF PORT 12 20 A 7 8 20 A -- Spare -- --

600 VA M COOLING COIL 12 20 A 5 6 20 A -- Spare -- --

1440 VA M PRESSURE RELIEF PORT 12 20 A 3 4 20 A 12 F/A RPS M 480 VA

1 1200 VA R; M LTS,DOOR HTR 12 20 A 1 2 20 A 12 IT RACK R 1000 VA

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMCB

100 A BUS (Copper) Double X Surface

120/208 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MCB X Single Mounting

Existing

X NewPanelboard SBEL110000 AIC Rating

Total Load (Diversified): 3140 VA VA = 9 A

Total Connected Load: 3140 VA VA = 9 ALocation of Panel: ELECTRICAL 104

(M)Misc. 3140 VA 100.00% 3140 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Spare -- 20 A 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12 -- -- Space -- --

-- -- Spare -- 20 A 9 10 -- -- Space -- --

480 VA M F/A RPS 12 20 A 7 8 -- -- Space -- --

660 VA M FACP 12 20 A 5 6 -- -- Space -- --

1000 VA M IDF 12 20 A 3 4 -- -- Space -- --

1000 VA M IDF 12 20 A 1 2 -- -- Space -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMCB

60 A BUS (Copper) Double X Surface

120/208 Wye Volt, 3 Phase, 4 Wire Mains Type: 60 A MCB X Single Mounting

Existing

X NewPanelboard SBEL210000 AIC Rating

Total Load (Diversified): 8560 VA VA = 24 A

Total Connected Load: 8560 VA VA = 24 ALocation of Panel: ELECTRICAL 190

(M)Misc. 8560 VA 100.00% 8560 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

360 VA M QUAD RECEPTACLE 12 20 A 17 18 -- -- -- -- --

360 VA M QUAD RECEPTACLE 12 20 A 15 16 -- -- -- -- --

360 VA M QUAD RECEPTACLE 12 20 A 13 14 30 A -- SPD -- --

11 12 20 A -- Spare -- --1000 VA M MDF 12 20 A

9 10 20 A 12 F/A RPS M 480 VA

7 8 20 A 12 CEILING RECEPTACLE M 1000 VA1000 VA M MDF 12 20 A

5 6 20 A 12 CEILING RECEPTACLE M 1000 VA

3 4 20 A 12 CEILING RECEPTACLE M 1000 VA1000 VA M MDF 12 20 A

1 2 20 A 12 CEILING RECEPTACLE M 1000 VA

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMCB

100 A BUS (Copper) Double X Surface

120/208 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MCB X Single Mounting

Existing

X NewPanelboard SBEL310000 AIC Rating

PANEL SCHEDULE NOTES:1. PROVIDE G.F.C.I. BREAKER.2. FREEZER TO HAVE TO HAVE TIME DELAY.

Total Load (Diversified): 33220 VA VA = 40 A

Total Connected Load: 33220 VA VA = 40 ALocation of Panel: ELECTRICAL 40

(M)Misc. 31140 VA 100.00% 31140 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 2080 VA 100.00% 2080 VA 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

17 18 -- -- -- -- --

15 16 -- -- -- -- --8560 VA M TSBEL3 8 50 A

13 14 30 A -- SPD -- --

11 12 -- -- Space -- --

9 10 -- -- Space -- --3140 VA M TSBEL2 10 30 A

7 8 -- -- Space -- --

5 6 20 A -- Spare -- --

3 4 20 A -- Spare -- --21520 VA R; M TSBEL1 8 50 A

1 2 20 A -- Spare -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

125 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MCB X Single Mounting

Existing

X NewPanelboard SBEH165000 AIC Rating

11

1

1

1

1

1

1

1

1

Rev

isio

n /

Dat

e

10

2/2

1/ 1

9A

DD

EN

DU

M #

1

Page 31: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

713.914.0888 p 713.914.0886 f

Houston, Texas 77042

9990 Richmond AvenueSouth Building, Suite 300

TBPE Firm Registration No. 2234

DBR Project Number

Sheet No.Job No.

Drawn By:

Date:

Pro

ject

:

Copyright © 2018, Huckabee & Associates, Inc.

VOLUME 1

BM DN CB AM

180332.000

JL/HP

DBR

C:\

Use

rs\c

ber

ger

\Do

cum

ents

\180

332_

Bau

ersc

hla

g E

S_M

EP

T17

_cb

erg

erC

6MY

T.r

vt

2/21

/201

9 11

:38:

07 A

M

E6.1.1

BAUERSCHLAGELECTRICAL SCHEDULES

02/18/19

1778-01-01

MU

LTI-C

AM

PU

S R

EN

OV

ATI

ON

SB

AU

ER

SC

HLA

G E

LEM

EN

TAR

Y S

CH

OO

LFO

RC

LEA

R C

RE

EK

I.S

.D.

LEA

GU

E C

ITY

, TE

XA

S

Total Load (Diversified): 23591 VA VA = 28 A

Total Connected Load: 18873 VA VA = 23 ALocation of Panel: ELECTRICAL 40

(M)Misc. (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting 18873 VA 125.00% 23591 VA

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Space -- -- 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12

-- -- Spare -- 20 A 9 10

-- -- Spare -- 20 A 7 8

40 A 8 LSEH3 L 5719 VA

55 VA L EXIT SIGN 12 20 A 5 6

1440 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 3 4

3168 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 1 2

40 A 8 LSEH2 L 8491 VA

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

100 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 70 A MCB X Single Mounting

Existing

X NewPanelboard LSEH165000 AIC Rating

Total Load (Diversified): 10614 VA VA = 13 A

Total Connected Load: 8491 VA VA = 10 ALocation of Panel: ELECTRICAL 104

(M)Misc. (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting 8491 VA 125.00% 10614 VA

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Space -- -- 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12 -- -- Space -- --

-- -- Spare -- 20 A 9 10 -- -- Space -- --

-- -- Spare -- 20 A 7 8 -- -- Space -- --

105 VA L EXIT SIGN 12 20 A 5 6 -- -- Space -- --

4258 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 3 4 -- -- Space -- --

4128 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 1 2 -- -- Space -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

100 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MLO X Single Mounting

Existing

X NewPanelboard LSEH265000 AIC Rating

Total Load (Diversified): 7149 VA VA = 9 A

Total Connected Load: 5719 VA VA = 7 ALocation of Panel: ELECTRICAL 190

(M)Misc. (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting 5719 VA 125.00% 7149 VA

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Space -- -- 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12 -- -- Space -- --

-- -- Spare -- 20 A 9 10 -- -- Space -- --

-- -- Spare -- 20 A 7 8 -- -- Space -- --

55 VA L EXIT SIGN 12 20 A 5 6 -- -- Space -- --

2592 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 3 4 -- -- Space -- --

3072 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 1 2 -- -- Space -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

100 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MLO X Single Mounting

Existing

X NewPanelboard LSEH365000 AIC Rating

Total Load (Diversified): 21520 VA VA = 60 A

Total Connected Load: 21520 VA VA = 60 ALocation of Panel: ELECTRICAL 40

(M)Misc. 19440 VA 100.00% 19440 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 2080 VA 100.00% 2080 VA 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

17 18 -- -- -- -- --

15 16 -- -- -- -- --14400 VA M REFRIGERATION SYSTEM 8 50 A

13 14 30 A -- SPD -- --

1 1200 VA R; M LTS,DOOR HTR 12 20 A 11 12 -- -- Space -- --

600 VA M FREEZER COIL 12 20 A 9 10 20 A -- Spare -- --

600 VA M RELIEF PORT 12 20 A 7 8 20 A -- Spare -- --

600 VA M COOLING COIL 12 20 A 5 6 20 A -- Spare -- --

1440 VA M PRESSURE RELIEF PORT 12 20 A 3 4 20 A 12 F/A RPS M 480 VA

1 1200 VA R; M LTS,DOOR HTR 12 20 A 1 2 20 A 12 IT RACK R 1000 VA

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMCB

100 A BUS (Copper) Double X Surface

120/208 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MCB X Single Mounting

Existing

X NewPanelboard SBEL110000 AIC Rating

Total Load (Diversified): 3140 VA VA = 9 A

Total Connected Load: 3140 VA VA = 9 ALocation of Panel: ELECTRICAL 104

(M)Misc. 3140 VA 100.00% 3140 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Spare -- 20 A 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12 -- -- Space -- --

-- -- Spare -- 20 A 9 10 -- -- Space -- --

480 VA M F/A RPS 12 20 A 7 8 -- -- Space -- --

660 VA M FACP 12 20 A 5 6 -- -- Space -- --

1000 VA M IDF 12 20 A 3 4 -- -- Space -- --

1000 VA M IDF 12 20 A 1 2 -- -- Space -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMCB

60 A BUS (Copper) Double X Surface

120/208 Wye Volt, 3 Phase, 4 Wire Mains Type: 60 A MCB X Single Mounting

Existing

X NewPanelboard SBEL210000 AIC Rating

Total Load (Diversified): 8560 VA VA = 24 A

Total Connected Load: 8560 VA VA = 24 ALocation of Panel: ELECTRICAL 190

(M)Misc. 8560 VA 100.00% 8560 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

360 VA M QUAD RECEPTACLE 12 20 A 17 18 -- -- -- -- --

360 VA M QUAD RECEPTACLE 12 20 A 15 16 -- -- -- -- --

360 VA M QUAD RECEPTACLE 12 20 A 13 14 30 A -- SPD -- --

11 12 20 A -- Spare -- --1000 VA M MDF 12 20 A

9 10 20 A 12 F/A RPS M 480 VA

7 8 20 A 12 CEILING RECEPTACLE M 1000 VA1000 VA M MDF 12 20 A

5 6 20 A 12 CEILING RECEPTACLE M 1000 VA

3 4 20 A 12 CEILING RECEPTACLE M 1000 VA1000 VA M MDF 12 20 A

1 2 20 A 12 CEILING RECEPTACLE M 1000 VA

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMCB

100 A BUS (Copper) Double X Surface

120/208 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MCB X Single Mounting

Existing

X NewPanelboard SBEL310000 AIC Rating

PANEL SCHEDULE NOTES:1. PROVIDE G.F.C.I. BREAKER.2. FREEZER TO HAVE TO HAVE TIME DELAY.

Total Load (Diversified): 33220 VA VA = 40 A

Total Connected Load: 33220 VA VA = 40 ALocation of Panel: ELECTRICAL 40

(M)Misc. 31140 VA 100.00% 31140 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 2080 VA 100.00% 2080 VA 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

17 18 -- -- -- -- --

15 16 -- -- -- -- --8560 VA M TSBEL3 8 50 A

13 14 30 A -- SPD -- --

11 12 -- -- Space -- --

9 10 -- -- Space -- --3140 VA M TSBEL2 10 30 A

7 8 -- -- Space -- --

5 6 20 A -- Spare -- --

3 4 20 A -- Spare -- --21520 VA R; M TSBEL1 8 50 A

1 2 20 A -- Spare -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

125 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MCB X Single Mounting

Existing

X NewPanelboard SBEH165000 AIC Rating

11

1

1

1

1

1

1

1

1

Rev

isio

n /

Dat

e

10

2/2

1/ 1

9A

DD

EN

DU

M #

10

2/2

1/ 1

9

Page 32: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

713.914.0888 p 713.914.0886 f

Houston, Texas 77042

9990 Richmond AvenueSouth Building, Suite 300

TBPE Firm Registration No. 2234

DBR Project Number

Sheet No.Job No.

Drawn By:

Date:

Pro

ject

:

Copyright © 2018, Huckabee & Associates, Inc.

VOLUME 1

BM DN CB AM

180332.000

JL/HP

DBR

C:\

Use

rs\c

ber

ger

\Do

cum

ents

\180

332_

Bau

ersc

hla

g E

S_M

EP

T17

_cb

erg

erC

6MY

T.r

vt

2/21

/201

9 11

:38:

07 A

M

E6.1.1

BAUERSCHLAGELECTRICAL SCHEDULES

02/18/19

1778-01-01

MU

LTI-C

AM

PU

S R

EN

OV

ATI

ON

SB

AU

ER

SC

HLA

G E

LEM

EN

TAR

Y S

CH

OO

LFO

RC

LEA

R C

RE

EK

I.S

.D.

LEA

GU

E C

ITY

, TE

XA

S

Total Load (Diversified): 23591 VA VA = 28 A

Total Connected Load: 18873 VA VA = 23 ALocation of Panel: ELECTRICAL 40

(M)Misc. (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting 18873 VA 125.00% 23591 VA

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Space -- -- 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12

-- -- Spare -- 20 A 9 10

-- -- Spare -- 20 A 7 8

40 A 8 LSEH3 L 5719 VA

55 VA L EXIT SIGN 12 20 A 5 6

1440 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 3 4

3168 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 1 2

40 A 8 LSEH2 L 8491 VA

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

100 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 70 A MCB X Single Mounting

Existing

X NewPanelboard LSEH165000 AIC Rating

Total Load (Diversified): 10614 VA VA = 13 A

Total Connected Load: 8491 VA VA = 10 ALocation of Panel: ELECTRICAL 104

(M)Misc. (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting 8491 VA 125.00% 10614 VA

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Space -- -- 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12 -- -- Space -- --

-- -- Spare -- 20 A 9 10 -- -- Space -- --

-- -- Spare -- 20 A 7 8 -- -- Space -- --

105 VA L EXIT SIGN 12 20 A 5 6 -- -- Space -- --

4258 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 3 4 -- -- Space -- --

4128 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 1 2 -- -- Space -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

100 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MLO X Single Mounting

Existing

X NewPanelboard LSEH265000 AIC Rating

Total Load (Diversified): 7149 VA VA = 9 A

Total Connected Load: 5719 VA VA = 7 ALocation of Panel: ELECTRICAL 190

(M)Misc. (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting 5719 VA 125.00% 7149 VA

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Space -- -- 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12 -- -- Space -- --

-- -- Spare -- 20 A 9 10 -- -- Space -- --

-- -- Spare -- 20 A 7 8 -- -- Space -- --

55 VA L EXIT SIGN 12 20 A 5 6 -- -- Space -- --

2592 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 3 4 -- -- Space -- --

3072 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 1 2 -- -- Space -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

100 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MLO X Single Mounting

Existing

X NewPanelboard LSEH365000 AIC Rating

Total Load (Diversified): 21520 VA VA = 60 A

Total Connected Load: 21520 VA VA = 60 ALocation of Panel: ELECTRICAL 40

(M)Misc. 19440 VA 100.00% 19440 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 2080 VA 100.00% 2080 VA 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

17 18 -- -- -- -- --

15 16 -- -- -- -- --14400 VA M REFRIGERATION SYSTEM 8 50 A

13 14 30 A -- SPD -- --

1 1200 VA R; M LTS,DOOR HTR 12 20 A 11 12 -- -- Space -- --

600 VA M FREEZER COIL 12 20 A 9 10 20 A -- Spare -- --

600 VA M RELIEF PORT 12 20 A 7 8 20 A -- Spare -- --

600 VA M COOLING COIL 12 20 A 5 6 20 A -- Spare -- --

1440 VA M PRESSURE RELIEF PORT 12 20 A 3 4 20 A 12 F/A RPS M 480 VA

1 1200 VA R; M LTS,DOOR HTR 12 20 A 1 2 20 A 12 IT RACK R 1000 VA

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMCB

100 A BUS (Copper) Double X Surface

120/208 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MCB X Single Mounting

Existing

X NewPanelboard SBEL110000 AIC Rating

Total Load (Diversified): 3140 VA VA = 9 A

Total Connected Load: 3140 VA VA = 9 ALocation of Panel: ELECTRICAL 104

(M)Misc. 3140 VA 100.00% 3140 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Spare -- 20 A 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12 -- -- Space -- --

-- -- Spare -- 20 A 9 10 -- -- Space -- --

480 VA M F/A RPS 12 20 A 7 8 -- -- Space -- --

660 VA M FACP 12 20 A 5 6 -- -- Space -- --

1000 VA M IDF 12 20 A 3 4 -- -- Space -- --

1000 VA M IDF 12 20 A 1 2 -- -- Space -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMCB

60 A BUS (Copper) Double X Surface

120/208 Wye Volt, 3 Phase, 4 Wire Mains Type: 60 A MCB X Single Mounting

Existing

X NewPanelboard SBEL210000 AIC Rating

Total Load (Diversified): 8560 VA VA = 24 A

Total Connected Load: 8560 VA VA = 24 ALocation of Panel: ELECTRICAL 190

(M)Misc. 8560 VA 100.00% 8560 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

360 VA M QUAD RECEPTACLE 12 20 A 17 18 -- -- -- -- --

360 VA M QUAD RECEPTACLE 12 20 A 15 16 -- -- -- -- --

360 VA M QUAD RECEPTACLE 12 20 A 13 14 30 A -- SPD -- --

11 12 20 A -- Spare -- --1000 VA M MDF 12 20 A

9 10 20 A 12 F/A RPS M 480 VA

7 8 20 A 12 CEILING RECEPTACLE M 1000 VA1000 VA M MDF 12 20 A

5 6 20 A 12 CEILING RECEPTACLE M 1000 VA

3 4 20 A 12 CEILING RECEPTACLE M 1000 VA1000 VA M MDF 12 20 A

1 2 20 A 12 CEILING RECEPTACLE M 1000 VA

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMCB

100 A BUS (Copper) Double X Surface

120/208 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MCB X Single Mounting

Existing

X NewPanelboard SBEL310000 AIC Rating

PANEL SCHEDULE NOTES:1. PROVIDE G.F.C.I. BREAKER.2. FREEZER TO HAVE TO HAVE TIME DELAY.

Total Load (Diversified): 33220 VA VA = 40 A

Total Connected Load: 33220 VA VA = 40 ALocation of Panel: ELECTRICAL 40

(M)Misc. 31140 VA 100.00% 31140 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 2080 VA 100.00% 2080 VA 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

17 18 -- -- -- -- --

15 16 -- -- -- -- --8560 VA M TSBEL3 8 50 A

13 14 30 A -- SPD -- --

11 12 -- -- Space -- --

9 10 -- -- Space -- --3140 VA M TSBEL2 10 30 A

7 8 -- -- Space -- --

5 6 20 A -- Spare -- --

3 4 20 A -- Spare -- --21520 VA R; M TSBEL1 8 50 A

1 2 20 A -- Spare -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

125 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MCB X Single Mounting

Existing

X NewPanelboard SBEH165000 AIC Rating

11

1

1

1

1

1

1

1

1

Rev

isio

n /

Dat

e

10

2/2

1/ 1

9A

DD

EN

DU

M #

10

2/2

1/ 1

9

Page 33: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1

713.914.0888 p 713.914.0886 f

Houston, Texas 77042

9990 Richmond AvenueSouth Building, Suite 300

TBPE Firm Registration No. 2234

DBR Project Number

Sheet No.Job No.

Drawn By:

Date:

Pro

ject

:

Copyright © 2018, Huckabee & Associates, Inc.

VOLUME 1

BM DN CB AM

180332.000

JL/HP

DBR

C:\

Use

rs\c

ber

ger

\Do

cum

ents

\180

332_

Bau

ersc

hla

g E

S_M

EP

T17

_cb

erg

erC

6MY

T.r

vt

2/21

/201

9 11

:38:

07 A

M

E6.1.1

BAUERSCHLAGELECTRICAL SCHEDULES

02/18/19

1778-01-01

MU

LTI-C

AM

PU

S R

EN

OV

ATI

ON

SB

AU

ER

SC

HLA

G E

LEM

EN

TAR

Y S

CH

OO

LFO

RC

LEA

R C

RE

EK

I.S

.D.

LEA

GU

E C

ITY

, TE

XA

S

Total Load (Diversified): 23591 VA VA = 28 A

Total Connected Load: 18873 VA VA = 23 ALocation of Panel: ELECTRICAL 40

(M)Misc. (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting 18873 VA 125.00% 23591 VA

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Space -- -- 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12

-- -- Spare -- 20 A 9 10

-- -- Spare -- 20 A 7 8

40 A 8 LSEH3 L 5719 VA

55 VA L EXIT SIGN 12 20 A 5 6

1440 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 3 4

3168 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 1 2

40 A 8 LSEH2 L 8491 VA

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

100 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 70 A MCB X Single Mounting

Existing

X NewPanelboard LSEH165000 AIC Rating

Total Load (Diversified): 10614 VA VA = 13 A

Total Connected Load: 8491 VA VA = 10 ALocation of Panel: ELECTRICAL 104

(M)Misc. (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting 8491 VA 125.00% 10614 VA

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Space -- -- 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12 -- -- Space -- --

-- -- Spare -- 20 A 9 10 -- -- Space -- --

-- -- Spare -- 20 A 7 8 -- -- Space -- --

105 VA L EXIT SIGN 12 20 A 5 6 -- -- Space -- --

4258 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 3 4 -- -- Space -- --

4128 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 1 2 -- -- Space -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

100 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MLO X Single Mounting

Existing

X NewPanelboard LSEH265000 AIC Rating

Total Load (Diversified): 7149 VA VA = 9 A

Total Connected Load: 5719 VA VA = 7 ALocation of Panel: ELECTRICAL 190

(M)Misc. (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting 5719 VA 125.00% 7149 VA

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Space -- -- 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12 -- -- Space -- --

-- -- Spare -- 20 A 9 10 -- -- Space -- --

-- -- Spare -- 20 A 7 8 -- -- Space -- --

55 VA L EXIT SIGN 12 20 A 5 6 -- -- Space -- --

2592 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 3 4 -- -- Space -- --

3072 VA L EMERGENCY LIGHTING, EXIT... 12 20 A 1 2 -- -- Space -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

100 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MLO X Single Mounting

Existing

X NewPanelboard LSEH365000 AIC Rating

Total Load (Diversified): 21520 VA VA = 60 A

Total Connected Load: 21520 VA VA = 60 ALocation of Panel: ELECTRICAL 40

(M)Misc. 19440 VA 100.00% 19440 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 2080 VA 100.00% 2080 VA 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

17 18 -- -- -- -- --

15 16 -- -- -- -- --14400 VA M REFRIGERATION SYSTEM 8 50 A

13 14 30 A -- SPD -- --

1 1200 VA R; M LTS,DOOR HTR 12 20 A 11 12 -- -- Space -- --

600 VA M FREEZER COIL 12 20 A 9 10 20 A -- Spare -- --

600 VA M RELIEF PORT 12 20 A 7 8 20 A -- Spare -- --

600 VA M COOLING COIL 12 20 A 5 6 20 A -- Spare -- --

1440 VA M PRESSURE RELIEF PORT 12 20 A 3 4 20 A 12 F/A RPS M 480 VA

1 1200 VA R; M LTS,DOOR HTR 12 20 A 1 2 20 A 12 IT RACK R 1000 VA

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMCB

100 A BUS (Copper) Double X Surface

120/208 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MCB X Single Mounting

Existing

X NewPanelboard SBEL110000 AIC Rating

Total Load (Diversified): 3140 VA VA = 9 A

Total Connected Load: 3140 VA VA = 9 ALocation of Panel: ELECTRICAL 104

(M)Misc. 3140 VA 100.00% 3140 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

-- -- Space -- -- 17 18 -- -- -- -- --

-- -- Space -- -- 15 16 -- -- -- -- --

-- -- Spare -- 20 A 13 14 30 A -- SPD -- --

-- -- Spare -- 20 A 11 12 -- -- Space -- --

-- -- Spare -- 20 A 9 10 -- -- Space -- --

480 VA M F/A RPS 12 20 A 7 8 -- -- Space -- --

660 VA M FACP 12 20 A 5 6 -- -- Space -- --

1000 VA M IDF 12 20 A 3 4 -- -- Space -- --

1000 VA M IDF 12 20 A 1 2 -- -- Space -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMCB

60 A BUS (Copper) Double X Surface

120/208 Wye Volt, 3 Phase, 4 Wire Mains Type: 60 A MCB X Single Mounting

Existing

X NewPanelboard SBEL210000 AIC Rating

Total Load (Diversified): 8560 VA VA = 24 A

Total Connected Load: 8560 VA VA = 24 ALocation of Panel: ELECTRICAL 190

(M)Misc. 8560 VA 100.00% 8560 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

360 VA M QUAD RECEPTACLE 12 20 A 17 18 -- -- -- -- --

360 VA M QUAD RECEPTACLE 12 20 A 15 16 -- -- -- -- --

360 VA M QUAD RECEPTACLE 12 20 A 13 14 30 A -- SPD -- --

11 12 20 A -- Spare -- --1000 VA M MDF 12 20 A

9 10 20 A 12 F/A RPS M 480 VA

7 8 20 A 12 CEILING RECEPTACLE M 1000 VA1000 VA M MDF 12 20 A

5 6 20 A 12 CEILING RECEPTACLE M 1000 VA

3 4 20 A 12 CEILING RECEPTACLE M 1000 VA1000 VA M MDF 12 20 A

1 2 20 A 12 CEILING RECEPTACLE M 1000 VA

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMCB

100 A BUS (Copper) Double X Surface

120/208 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MCB X Single Mounting

Existing

X NewPanelboard SBEL310000 AIC Rating

PANEL SCHEDULE NOTES:1. PROVIDE G.F.C.I. BREAKER.2. FREEZER TO HAVE TO HAVE TIME DELAY.

Total Load (Diversified): 33220 VA VA = 40 A

Total Connected Load: 33220 VA VA = 40 ALocation of Panel: ELECTRICAL 40

(M)Misc. 31140 VA 100.00% 31140 VA (SP)Sub Pnl.

220.60 (F)Fans 220.5 (MT)Lrg. Motor

220.60 (H)Heating 0 VA (WH)Wat. Htr.

220.60 (C)Cooling 0 VA 620.14 (E)Elevators

220.56 (K)Kitchen (EL)Ext. Ltg.

220.44 (R)Receptacle 2080 VA 100.00% 2080 VA 210.20(a) (L)Lighting

N.E.C. (2017) Load Type Conn. Fct. Diversity N.E.C.(2017) Load Type Conn. Fct. Diversity

17 18 -- -- -- -- --

15 16 -- -- -- -- --8560 VA M TSBEL3 8 50 A

13 14 30 A -- SPD -- --

11 12 -- -- Space -- --

9 10 -- -- Space -- --3140 VA M TSBEL2 10 30 A

7 8 -- -- Space -- --

5 6 20 A -- Spare -- --

3 4 20 A -- Spare -- --21520 VA R; M TSBEL1 8 50 A

1 2 20 A -- Spare -- --

Note Load... Type Description Wire CB CKT CB Wire Description Type Load... N...

Type 1 -Nema Rating ISO. GRND. BUS Feed - Thru Flush

1 SectionMLO

125 A BUS (Copper) Double X Surface

480/277 Wye Volt, 3 Phase, 4 Wire Mains Type: 100 A MCB X Single Mounting

Existing

X NewPanelboard SBEH165000 AIC Rating

11

1

1

1

1

1

1

1

1

Rev

isio

n /

Dat

e

10

2/2

1/ 1

9A

DD

EN

DU

M #

10

2/2

1/ 1

9

Page 34: NO. 1 - huckabee-inc.com · Project Name: Multi-Campus Renovations Client: Clear Creek ISD League City, Texas Project Number: 01778-01-01 Architectural Items For Addendum No. 1