ngycp_cp3-1 national gaurd youth program

68
30 September 2010 ChalleNGe Publication 3-1 Doctrine for the National Guard Youth ChalleNGe Program

Upload: mysterb

Post on 28-Mar-2015

205 views

Category:

Documents


2 download

TRANSCRIPT

Page 1: NGYCP_CP3-1 National Gaurd Youth Program

30 September 2010

ChalleNGe Publication 3-1

Doctrine for theNational Guard Youth ChalleNGe Program

Page 2: NGYCP_CP3-1 National Gaurd Youth Program

Intentionally blank

Page 3: NGYCP_CP3-1 National Gaurd Youth Program

ChalleNGe Publication CP 3-1, National Guard Youth ChalleNGe Program Startup is the guiding document for the successful launch of a new ChalleNGe program. This publication incorporates more than eighteen years of national and state experiences and lessons learned. It integrates wisdom accumulated by ChalleNGe startups in thirty-one states, leveraging the many successes and paying solemn attention to challenges these programs have faced. It also reflects the changing nature of our political landscape, our culture, and youth, tempered by timeless values of honor, courage, and commitment.

CP 3-1 policy guidance to be integrated provides authoritative direction and allows for the judgment required to tactically execute the direct mission. This document provides clear direction, as the success of the National Guard Youth ChalleNGe Program hinges on the important work done at the local level.

It is in that spirit that ChalleNGe, like the National Guard itself, must always respect its state primacy and federal oversight. The dual-natured connectivity of the National Guard organization brings with it a heavy responsibility to do things right the first time. A successful startup and the demonstrated success of our current programs are the very best arguments for further program expansion. Every new program must start successfully if we are to meet our stated long-range vision to be recognized as America’s premier voluntary program for sixteen- to eighteen-year-old high school dropouts.

CP 3-1 provides guidance for all those who are contemplating or participating in the establishment of a ChalleNGe program. The practices set forth in this document are born of the years of experience of leaders at the national and state levels of ChalleNGe. In a strategic environment where resources are scarce, we need to make certain we avoid all preventable pitfalls and exploit well-documented best practices for a ChalleNGe launch. With this startup guide in hand, all future ChalleNGe leaders have a tremendous advantage in creating a smooth launch.

Good luck as you honorably serve this nation as part of the National Guard Youth ChalleNGe Program!

LOUIS A. CABRERAComptroller and Director, Administration and ManagementNational Guard Bureau

mab
Placed Image
Page 4: NGYCP_CP3-1 National Gaurd Youth Program

Intentionally blank

Page 5: NGYCP_CP3-1 National Gaurd Youth Program

i CP 3-1

PREFACE

1. Scope

This publication will be used to establish a National Guard Youth ChalleNGe program. It provides a foundation of understanding, fundamental principles and essential background to guide primary stakeholders as they organize and build a ChalleNGe program.

2. Purpose

a. This publication is designed to assist “builders” in developing an appropriate model to shape the very character of their successful program.

b. CP 3-1 interprets many years of hard-won wisdom in unambiguous guidance to assist program construction in all stages and mitigate foreseeable problems, with the goal of a successful and sustainable startup.

3. Application

This publication is an authoritative organizational guide, but requires judgment in its application. It provides the fundamental principles by which new programs can guide actions into a successful startup. This publication provides a common point of reference and provides a knowledge base for making strategic decisions.

Page 6: NGYCP_CP3-1 National Gaurd Youth Program

Intentionally blank

Page 7: NGYCP_CP3-1 National Gaurd Youth Program

iii CP 3-1

TABLE OF CONTENTS

IntroduCtIon v

ChaPter I: aPPlICatIon and PlannIng

Strartup Planning and Assessment . . . . . . . . . . . . . . . . . . . . . . . . . . . I-1

Resource Verification and Program Planning . . . . . . . . . . . . . . . . . . . . . . . . I-5

Program Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-6

Marketing Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-7

Creating a State Plan . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-7

ChaPter II: CandIdate Program aCtIon PlannIng

Key Staff Hires . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II-1

Logistics . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II-1

Facility Upgrades . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II-2

Core Component Curriculum Development . . . . . . . . . . . . . . . . . . . . . . . . II-3

Program Policies and SOPs . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II-4

Cadet Recruitment Plan and Outreach . . . . . . . . . . . . . . . . . . . . . . . . . . II-5

Marketing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II-7

Staff Professional Development . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II-7

Jump Start Assistance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II-8

Program Budget . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II-9

Finalized Training Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II-9

Preparing For Cadet Mentor Operations . . . . . . . . . . . . . . . . . . . . . . . . . . II-10

Data and Reporting Requirements Training . . . . . . . . . . . . . . . . . . . . . . . . II-10

First Residential Phase Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . II-11

Post-Residential Operations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . II-12

aPPendIx A: Startup Timeline . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A-1

B: ChalleNGe Site Suitability and Readiness Assessment . . . . . . . . . . . . . . . . . . . B-1

C: Management Checklist . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . C-1

D: SAMPLE Organization Chart . . . . . . . . . . . . . . . . . . . . . . . . . . . . . D-1

E: SAMPLE ChalleNGe Program Staffing Model . . . . . . . . . . . . . . . . . . . . . . E-1

F: SAMPLE Cadet Supply List . . . . . . . . . . . . . . . . . . . . . . . . . . . . . F-1

G: SAMPLE Timeline For Facility Equipment Purchases . . . . . . . . . . . . . . . . . . . . G-1H: SAMPLE Cadet Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . H-1

Page 8: NGYCP_CP3-1 National Gaurd Youth Program

iv CP 3-1

I: SAMPLE Mentor Application . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . I-1

J: SAMPLE Training Schedule . . . . . . . . . . . . . . . . . . . . . . . . . . . . . J-1

glossaryPart I: Abbreviations and Acronyms . . . . . . . . . . . . . . . . . . . . . . . . . . . GL-1

Part II: Terms and Definitions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . GL-2

TABLE OF CONTENTS

Page 9: NGYCP_CP3-1 National Gaurd Youth Program

v CP 3-1

INTRODUCTION

Initial decisions have profound long-term implications on the success of a ChalleNGe program.Furthermore, strategic decisions at all levels have potential long-term and far-reaching implications for programs, new and old, across the nation. The operational decisions around funding, facilities, and staffing shape long-term character and constraints of the new program. In the initial stages of a program start, the most minute of daily tactical decisions can have enormous and long-lasting consequences. This document is designed to help decision makers through the startup process and assist them through providing guidance and context for making these decisions.

BUILDING A GOOD FRANCHISE

Starting a National Guard Youth ChalleNGe Program can be properly viewed as building a new franchise of an already-successful national enterprise. Franchising is actually a very old idea, best understood in reference to the fast food and retail industries. By using the business principles of franchising as a model for ChalleNGe, the following become readily apparent:

¾ ChalleNGe has an instantly recognizable military brand that it derives from the National Guard. Our military brand, and the trust of the American people it represents, is our most valuable commodity.

¾ ChalleNGe has an extensive national knowledge base regarding its customer and market.

¾ ChalleNGe has a documented history of results that it can point to when attracting new customers as part of its sales (recruiting) strategy, allowing it to position itself as an expert in the industry.

¾ ChalleNGe already has successful documented systems, operational processes, and risk management measures in place nationally for replicating at new locations.

¾ Successful franchises have far-reaching implications for the national chain.

¾ Failing franchises can severely degrade public goodwill and harm program reputation at the national level, which could severely affect future funding.

New ChalleNGe programs are joining a larger network of established programs. Using smart franchising principles, especially when leveraging the lessons from the past, is good business.

startup Plan(state Plan submitted)

state Plan

application Process Jump start Process

startup agreement myCPa

startup Budget Program Budget

Application Phase: APPLICANT PROGRAM

Startup Phase: CANDIDATE PROGRAM

Program Phase: OPERATIONAL PROGRAM

Month -18/-24 Month -12 Month 0 Month +12

Page 10: NGYCP_CP3-1 National Gaurd Youth Program

Intentionally blank

Page 11: NGYCP_CP3-1 National Gaurd Youth Program

I-1 CP 3-1

CHAPTER I

aPPliCation and Planning

THE STRATEGIC VALUE OF TIME

Effective planning and disciplined execution are the cornerstones of a successful start. Taking time to build federal, state, and local support, new programs will avoid many pitfalls which occur when a program is rushed into existence. Facilities, staffi ng, recruitment, and political support efforts must be carefully cultivated and nourished. Adhering to the following timeline prevents poor decision-making from being driven by political and fi nancial expediency.

1. Startup Planning and Assessment

A. The application and startup process focuses on the planning and preparation in the startup window of a new program, which will begin as early as M-24.1 This process begins with the state identifying a need for a ChalleNGe program and collaborating with the National Guard Bureau (NGB) to complete the ChalleNGe Site Suitability and Readiness Assessment (CSSRA), located in Appendix B. The state is briefed on the expectations and the requirements placed upon it in the startup process. NBG assigns an established program as a mentor to provide valuable insight in designing a new program. The state verifi es its resources, secures a facility, and develops a startup budget. It is recommended that the state devise a mechanism for receiving donations and/or grants. Finally, the state develops a State Plan and signs a Startup Agreement with NGB. Not surprisingly, the focused approach taken by ChalleNGe is the result of a clear doctrinal foundation. Two key elements, the 1992 Center for Strategic and International Studies (CSIS) report “Forging a Military Youth Corps -- A Military-Youth Service Partnership for High School Dropouts,” and the Donohue Intervention Model represent the original doctrinal core of ChalleNGe.

1 Key to timeline: M = month in which the fi rst class of cadets is registered. Months before M month would be “M minus #” or “M-#.”

gate

The CSSRA is to be completed NLT M-12 prior to the start of the fi rst class and is verifi ed upon completing a site visit. The pro-gram may then receive approval to enter the startup process.

Page 12: NGYCP_CP3-1 National Gaurd Youth Program

I-2 CP 3-1

B. ChalleNGe Site Suitability and Readiness Assessment. The CSSRA is designed to guide states in their preparation to launch a new ChalleNGe program and is the first step in the application process. In addition, this assessment provides NGB with a data-based tool to determine the overall suitability of a proposed program site and its readiness to enter startup activities. The CSSRA examines five key areas:

¾ Demand

¾ Funding

¾ Facility

¾ Personnel

¾ Political Support

C. Program Mentoring begins. If the candidate program is located in a state to which ChalleNGe is new, NGB will assign the candidate a mentor program during the startup process. States expanding to an additional program site may not be required to have a mentor program. The mentor program is one of the critical elements that can help new programs and new leaders with startup. Mentor programs provide valuable insight to new states in designing their programs. Often legislators, educators, and The Adjutant General (TAG) will visit the mentor programs prior to determining which design is the right fit for their new program. Experienced programs provide valuable insight of program operations, promising practices, and recommendations as new programs are in development. Mentor programs also provide opportunities for candidate programs to send staff for job shadowing, onsite immersion training at the mentor program. Programs can refer to the Mentor Program Handbook to aid in the successful development of a productive relationship. The handbook provides assistance to both partners by offering:

¾ Clarity of roles and responsibilities

¾ Discussion of the expected stages in the relationship

¾ Opportunities to identify potential challenges or inhibitors

¾ Proven solutions to such challenges

The mentor program will be identified by NGB and assigned as soon as the state’s CSSRA is verified and the candidate program begins the planning process.

D. Key Program Elements

1. Initial Target and Steady State Program Size Resources are allocated according to projected program graduation targets. NGB will assign candidate programs an initial graduation target number for their first class. In conjunction with NGB, the program will increase its program graduation target to a steady state number over the first several classes.

2. Educational Model

a. The core of ChalleNGe is reclaiming the lives of adolescents who have dropped out of high school. A critical first step for states is to determine their education model. Selection of the model varies

Page 13: NGYCP_CP3-1 National Gaurd Youth Program

I-3 CP 3-1

by state and is largely dependent on the fit of the goals of the specific program, the needs of the potential cadets in the area, and the level of collaboration and integration possible with the education community in the host state. In some cases the decision will also be made depending on resources and staffing. Selecting an education model is an important step as it will determine curriculum development and guide the hiring of instructional staff. The state-selected curriculum must result in an improvement of Tests of Adult Basic Education (TABE) scores and may also result in one or more of the following:

¾ General Educational Development (GED)

¾ High school diploma

¾ Alternative high school diploma

¾ High school credit recovery

b. Operation of the various educational models depends on state requirements. ChalleNGe programs should seek guidance from their state Department of Education. Additionally, the high school diploma model may require working closely with the local school district to implement staffing.

3. Staffing

a. The success of a ChalleNGe program is significantly influenced by the organizational structure, staffing levels, and the skills, knowledge, and abilities of the staff members. In addition to the parameters set by the Startup Agreement, organizational structure and staffing levels are driven by the statutory requirements and the physical structure of the facilities. A well-considered leadership philosophy is crucial to building the right staff and mitigates enormous problems in the future.

b. Previous successful startups have learned some valuable (and painful) lessons:

¾ Do not hire a potential staff member who may be considered the best out of a weak field.

¾ If the applicant pool is not impressive, re-advertise.

¾ If a staff hire does not fit, terminate early (preferably during the probationary period). If the staff member can be aligned, efforts should be made to do so, but not at the expense of the team.

¾ One bad hire can significantly damage a fledging organization.

Shaping organizational culture early (as well as human resource policy) sets a high standard of accountability and allows the program leadership the ability to get the right people on staff without protracted human resource misery. A successful staff will embrace and operationally use the concepts and philosophy of ChalleNGe Publication 1 (CP1), the primary organizational doctrine for all National Guard Youth ChalleNGe Programs (NGYCP), which provides the foundation of understanding and fundamental principles that guide ChalleNGe program directors in the conduct of their state ChalleNGe program. Careful attention should be paid to the parameters of the Startup Agreement and the advice and lessons learned from the mentor program.

c. Funding for ChalleNGe program staff is dependent on graduation target. Typically, new programs will start with a goal of 100 graduates, and staff funding is authorized accordingly. The staffing model included in Appendix E identifies the number of funded positions per the target number of

Page 14: NGYCP_CP3-1 National Gaurd Youth Program

I-4 CP 3-1

cadet graduates. New programs may align the positions to the statutory requirements and physical structure of the facility while remaining within the limit authorized by the staffing model at their level of organization (graduation target number of 100, 144, 175, etc.). Each funding level includes discretionary support positions programs may use to customize their staffing models to meet their respective needs. These positions must be identified and included in the model sent to NGB for approval. Modifications to a new program’s staffing model will be sent to NGB for review and approval.

d. For program startup purposes, the program director is hired no later than the signing of the Startup Agreement. The program director develops the organizational structure and is responsible for the hiring of all staff members. Critical positions (deputy director, budget officer, administrative/log specialists, recruiters, lead teacher, cadre supervisor/commandant, and lead counselor) will be hired as soon as possible. Hiring processes vary by state; it is the program director’s responsibility to ensure staff members are hired in accordance with the startup timeline. Upon being hired, new program staff should be assigned to job shadow at the mentor program site immediately. Observing and learning from another ChalleNGe program is critical to developing strong staff members. A well-prepared staff leads to a successful program startup. A sample organization structure is included in Appendix D.

e. Staffing and the Quasi-Military Environment: When interviewing potential staff, it should be noted early and often that ChalleNGe is a quasi-military environment; it is neither a military nor a correctional environment. This is especially true of cadre applicants but also important to note with counselors, instructors, and other staff members. An applicant who has difficulty understanding the essential differences between training soldiers, supervising prisoners, and guiding youth for a productive life will be a problematic and potentially dangerous employee. There is a difference between forcing compliance and encouraging change. Do not hire any staff member without thoroughly exploring his/her motivations and understanding of a quasi-military youth-serving organization.

f. Collectively, cadre staff should have significant military experience, combined with the desire to work with high school dropouts. While some of the very best individuals have never served a day as a uniformed military member, the best programs have a large percentage of military-experienced cadre. Provided they have a complete understanding of the mission of ChalleNGe, hiring individuals with a military background, especially trainers, such as drill instructors, helps establish a healthy quasi-military environment. Programs should also consider the hiring of a variety of military affiliated individuals, including but not limited to:

¾ Retirees

¾ Veterans

¾ Guard or Reserve members

Page 15: NGYCP_CP3-1 National Gaurd Youth Program

I-5 CP 3-1

2. Resource Verification and Program Planning

A. Current Department of Defense authorization allows for a federal/state cost sharing for the ChalleNGe program. The state funding match must be secured no later than the signing of the Startup Agreement in order to receive federal funds for the startup budget. The startup budget funds M-12 through the M-1 of starting up a program. The program budget funds a fully operational program based on the NGB-specified graduation target number. A state may make its contribution in cash or limited services, products, or a combination thereof. The TAG is required to make certification of both the cash and non-cash contributions. Prior to doing so, the United States Property and Fiscal Office (USPFO) will review the appraisal of the non-cash contributions and provide certification to the TAG. The appraisal must be conducted in accordance with the Startup Agreement and state law and included in the budget. All non-cash contributions must be assessed at a price that is fair market value and reasonable. Reference the Startup Agreement and Master Youth Programs Cooperative Agreement (MYPCA) for further guidance.

B. The startup budget consists mainly of onetime expenses, such as the purchasing of equipment, furnishings, supplies, clothing, etc.

Most startup costs are associated with four main categories:

¾ Staffing

¾ Facilities

¾ Dining

¾ Miscellaneous

The startup budget falls mostly under Facilities and Miscellaneous. Purchases under Miscellaneous include supplies, equipment, clothing, information technology (IT) and communication infrastructure, and so on. Food supplies should not be purchased until a month prior to cadets starting classes; therefore, dining costs are at a minimum in the initial budget. Staff funding is budgeted according to the hiring timeline established within this document.

C. Candidate programs will develop their program budgets in coordination with NGB. The ChalleNGe program uses three templates for budget reporting purposes.

The three report types and their uses are:

¾ Program Fiscal Year Budget Report—used to submit initial fiscal year operating budget.

¾ Budget Change Report—used when modifying the approved initial fiscal year operating budget.

¾ Quarterly Budget Report—tracks operating budget obligations/expenditures by calendar quarter.

Funding cannot be released or obligated until the Startup Agreement for a candidate program is signed. After NGB approves the budget, the state USPFO receives a Funding Authorization Document (FAD) which releases funds to the state. Additionally, programs receive a memo from NGB stipulating the approved budget, target graduation number, and the effective date for the determined budget. Program directors and budget officers will coordinate with their state resource manager (SRM) and grant officer representative (GOR) to execute the budget.

Page 16: NGYCP_CP3-1 National Gaurd Youth Program

I-6 CP 3-1

D. Programs may also consider establishing a nonprofi t 501(c)(3) support entity. New programs should contact the appropriate regulatory agency in their state, usually the offi ce of the secretary of state or attorney general, which can provide information regarding the appropriate process for establishing a nonprofi t support entity.

3. Program Site

A. The site location must be confi rmed in the CSSRA and approved during an NGB site verifi cation visit. Any site license or memorandum of agreement (MOA) with the host site agency must be secured twelve months prior to the start of the fi rst class. This ensures suffi cient time to make any necessary modifi cations to the facility to fi t the needs of the program. Types of site locations include:

¾ Federal military installation

¾ State military installation

¾ State non-military installation

¾ Non-governmental (civilian) location

While federal funds may not be used for new construction, states may contribute state funds to develop or refurbish facilities. Reference the Startup Agreement and MYPCA for further guidance.

Construction projects for ChalleNGe program facilities resulting in the erection, installation, or assembly of a new real property facility, including the relocation of an existing facility, are prohibited. Repair or minor construction to a ChalleNGe program building is addressed in the MYPCA and may require additional NGB coordination and subsequent approval.

B. The candidate program is authorized and encouraged to enter into an agreement with its host installation to cover the following items:

i. Actual utilities consumed

ii. Actual costs for maintenance and repair, including Operation and Maintenance National Guard (OMNG) minor construction projects conducted by contract to ChalleNGe facilities, provided such projects have received prior approval, as specifi ed above

iii. Actual costs for supplies for maintenance and repair, including OMNG minor construction projects conducted by installation employees to candidate program facilities, provided such projects have received prior approval

iv. Employee costs for installation employees working on ChalleNGe facilities based on actual time spent

v. Employee costs for those installation employees providing operational support to ChalleNGe facilities or activities based on actual time spent by employees (these are to be direct costs)

gate

The following action must be completed by M-12:

Startup Agreement signed NGB approves the candidate program startup budget

Program director hired Education model selected

Page 17: NGYCP_CP3-1 National Gaurd Youth Program

I-7 CP 3-1

vi. Proportional share, based on usage, of utility, maintenance and repair, and OMNG minor construction costs for facilities and land that ChalleNGe jointly occupies, but does not exclusively occupy, on the installation

vii. Cost of other direct services, specified by service, which the installation provides to the ChalleNGe program

If at all possible, academy facilities’ overhead expenses should be free or at a reduced consumption rate. A TAG can authorize this at any National Guard facility.

C. Considerations for having proper accommodations for housing, dining, and academics should be made when selecting the facilities. Additionally, the surrounding area will need to have enough space for platoon physical training and drill as well as ceremony. An alternative indoor facility such as a field house is recommended for inclement weather.

4. Marketing Plan

Developing a marketing plan is a key part of planning for a new ChalleNGe program. Marketing is simply getting the word out and communicating. It is necessary to constantly and effectively promote new programs to many different audiences. Effective marketing will bolster community support, encourage integration, and often bring in additional resources. When crafting a marketing plan, first identify all of your audiences. Potential youth applicants, mentors, volunteers, educators, and stakeholders such as legislative leaders are all audiences critical to the success of a new program. Then develop a message tailored specifically to that audience and determine the best way to deliver the message. Ways to market the program include:

¾ Media channels including newspapers, magazines, billboards, radio, and television

¾ Public service announcements

¾ Open house events for politicians, business people, and other community leaders to attend and see the program

¾ Programs designed for civic organizations, schools, or interest groups

¾ Word of mouth—encourage staff to share with family and friends information such as:

� NGYCP statistics � Success stories � Annual reports � Service to the community

It is essential that programs consistently communicate about ChalleNGe to the entire community and state. Marketing is an ongoing effort essential to program success.

5. Creating the State Plan

The State Plan is a goal-focused implementation plan developed by each state and approved by NGB. At a minimum, State Plans shall include details on application and selection procedures, number of cadets trained,

Page 18: NGYCP_CP3-1 National Gaurd Youth Program

I-8 CP 3-1

staffi ng, staff training, curriculum, facilities and services, state public and private services to be provided, the post-residential program, and a detailed budget. State Plans must also include a master calendar which identifi es the responsible department, event, and week each activity occurs. Events include orientation, academic studies, core component activities, and mentor visits. The following appendices should be included with the State Plan:

¾ Master Calendar

¾ Cadet Handbook

¾ Staff Handbook

¾ Mentor Handbook

¾ Data Validation SOP

¾ Logistics SOP

¾ Medical SOP

¾ Operations SOP

¾ Acclimation Period SOP

¾ Case Management SOP

¾ P-RAP

Candidate programs must develop a State Plan for submission to NGB and development begins at M-11 and submitted no later than M-3 for approval. The template for the State Plan is provided by NGB. Technical assistance is also provided by NGB to the program director upon the completion of the plan. During the development of the State Plan, mentor programs should provide their valuable feedback and insight to the new programs.

gate

The State Plan must be submitted NLT M -3 with the program budget.

Page 19: NGYCP_CP3-1 National Gaurd Youth Program

II-1 CP 3-1

CHAPTER II

Candidate Program aCtion Planning

After the application period is complete and resources are secured, the candidate program moves into a critical period of starting up the organization and developing the operational components. This chapter provides candidate programs a description of the actions necessary to prepare for commencing cadet operations through the first class cycle.

1. Key Staff Hires

Between the M-10 and M-9, candidate programs complete hiring for all lead staff members: the Program director, RPM and recruiter, deputy director, budget officer, cadre supervisor/commandant, lead counselor, lead teacher, recruiters, and administrative/log specialists. Lead staff members are hired to contribute to the startup efforts while the remainder of the staff should be hired by M-2.

2. Logistics

A. Program sites are responsible for providing the materiel and equipment support necessary for operating a ChalleNGe program. The program director may appoint a supply officer to supervise and oversee the operation of the program logistics system. The supply officer is responsible for developing a logistics SOP and ordering all of the initial equipment and supplies for the candidate program. A sample timeline for ordering office equipment and a sample of an itemized cadet supply list is included in Appendix F. Candidate programs may get a comprehensive supply list from their mentor programs. Some common supply considerations include:

¾ Cadet uniforms

¾ Billeting furniture

¾ Linens and bedding

¾ Hygiene products

Page 20: NGYCP_CP3-1 National Gaurd Youth Program

II-2 CP 3-1

¾ Classroom and audio/visual equipment

¾ Office supplies

¾ Medical supplies

¾ Dining facility equipment and supplies

¾ Athletic equipment

¾ Cleaning equipment and products

¾ Office furniture

¾ Tables, stoves, ovens, refrigerators, freezers, dishwashers, and so on

Logistic timelines vary by program due to different resource availability and requirements of the facilities. Backwards planning is an effective method for developing a logistics timeline. Candidate programs should assess the end state for facility readiness and then set milestones and subordinate tasks. Other significant events must be factored into the timeline, such as timing of equipment delivery, staff training requirements, and multiple deliveries. All equipment must be delivered and the facility ready for program start no later than one month prior to the start of the first class (M-1). Program mentors can provide insight and share lessons learned.

B. Additionally, a logistics specialist is required to maintain the day-to-day supply needs of all departments. All materiel and equipment purchased with funding through ChalleNGe is subject to state and federal property regulations. All equipment purchased by the federal government will be considered military equipment and will be carried on the USPFO property books in accordance with the appropriate regulations. The federal government maintains property accountability of this equipment. Further guidance can be found in the MYPCA regarding the procedures for property handling differences between federal- and state-owned property.

3. Facility Upgrades

A. Conducting facility upgrades is a significant step in meeting full operational capability by the start of the first class. Candidate programs should determine what upgrades are necessary and reasonable based on available funds and contact their state facilities management officer for guidance. It is necessary for candidate programs to ensure the preparedness of the facilities prior to accepting cadets. For example, if a memorandum of understanding (MOU) was not signed to contract dining services, the in-house lead cook’s responsibility is to have the dining facility plan complete and ready to order provisions no later than M-1.The Startup Agreement and MYPCA stipulate cost allocations. Reimbursement to the state from the federal government for food services will not exceed $20 per day per cadet. Cadre, who will be with the cadets at all times during the course of their duties, may be provided meals as part of their employment. Only cadre or other staff members directly supervising cadets should be included in this category.

B. Physical security and security monitoring upgrades will vary depending on the existing technical infrastructure at the facility. At a minimum, three levels of security should be considered: inside program buildings, inside the program compound, and the installation. Candidate programs should check with their states/program sites regarding any communication and security requirements. Security requirements should be factored in when making facility upgrades. In addition, it is important to determine program

Page 21: NGYCP_CP3-1 National Gaurd Youth Program

II-3 CP 3-1

telecommunication requirements prior to establishing an MOU or contracting services.

C. Prior to selecting a hand-held radio system, new program sites located on a military installation will need to gain approval from the Information Management Office so power output and radio frequencies are de-conflicted with other possible users in the area.

D. For those programs using an online GED education tool, a computer lab with internet is necessary. Recommended computer lab size will seat an average of thirty cadets per class of 100. Internet access also provides cadets opportunities to stay in communication with their mentors, conduct job searches, fill out online applications for educational opportunities, and search for financial assistance. Seek guidance on federal and state regulations regarding internet usage.

Programs should follow the recommended timeline for the following actions:

¾ Phones, fax machines, scanners, copiers: M-12

¾ Internet access: M-12

¾ Email infrastructure: M-12

¾ Website: M-6

¾ Two-way radios: M-1

¾ Computer set-up/LAN: as staff hired

¾ Classroom set-up: M-1

¾ Surveillance systems: optional

4. Core Component Curriculum Development

Curriculum must be developed for each of the eight core components which are the foundation of ChalleNGe. An overview of the eight core components can be found in ChalleNGe Publication 1 (CP1). Tasks, conditions, and standards for the eight core components are included in the Core Component Performance Measurement Guide for Cadets located in the MYPCA.

A. While the cadets are working toward successful completion of the eight core components, they are also developing their Post-Residential Action Plans (P-RAP) to be executed in the Post-Residential Phase. The P-RAP is a dynamic, written plan created by the cadet through an integrated process providing a bridge to his or her future. The document may be customized to meet the needs of the candidate program; however, it must meet the criteria identified within the MYPCA and the Post-Residential Operations Manual. Candidate programs should develop P-RAP curriculum in conjunction with the core component curriculum. The P-RAP workbook may be used as a format for the document if a program-specific plan is not developed.

B. Program Directors are responsible for developing and approving curriculum for each of the seven non-academic core components:

¾ Leadership/Followership

¾ Responsible Citizenship

Page 22: NGYCP_CP3-1 National Gaurd Youth Program

II-4 CP 3-1

¾ Service to the Community

¾ Life-Coping Skills

¾ Physical Fitness

¾ Health and Hygiene

¾ Job Skills

When developing core component curriculum, candidate programs must identify the condition under which the task is performed and the standards for evaluating cadet performance for each task. The individual tasks associated with each core component are standardized by NGB; however, programs customize their own curriculum and determine the necessary activities to accomplish each task. Curriculum must be based on the Experiential Learning Model as identifi ed in CP1. In this model, the learner goes through direct experiences in which tasks are accomplished. Considerations for creating curriculum should include planning for core component activities such as transportation to and from service to the community projects, equipment for physical fi tness activities, and computers for job searches.

C. The eighth core component is related to academics.Depending on the educational model, curriculum may be gathered from affi liated local and state educational entities. The GED curriculum used should be a nationally recognized and marketed GED preparatory program. Whether in preparation for GED testing, earning a high school diploma, or preparing for reentry into high school, all cadets must strive for increases in math performance and reading comprehension as evaluated by improving Tests of Adult Basic Education (TABE) scores. When working with local and state educational entities to determine curriculum, candidate programs should consider the additional coordination elements such as buses, teachers, administering the Armed Services Vocational Aptitude Battery (ASVAB), and testing.

5. Program Policies and Standard Operating Procedures (SOPs)

The new program receives assistance from NGB and its mentor program to develop program policies and SOPs. Written policies and procedures help staff and cadets know what is expected of them and what to expect from the program. SOPs clarify how a program operates so everyone is in alignment. The SOPs provide a consistent and fair means of requiring accountability. Staff and cadet handbooks are developed by key staff.

A. Sound, comprehensive policies and procedures are the fi rst line of defense in risk management. In the event of accusations or lawsuits, programs can refer to policies and procedures. Laws concerning minors under the supervision of adults vary greatly from one legal jurisdiction to the next. Each program is responsible for setting policies to fi t local laws and any unique features of the local program. While operating policies and procedures vary by state, the following SOPs are recommended for programs to develop; however it is not all inclusive:

¾ Cadet recruiting

¾ Cadet and staff discipline

gate

Curriculum is complete and ready by M -1.

Page 23: NGYCP_CP3-1 National Gaurd Youth Program

II-5 CP 3-1

¾ Hands-off leadership

¾ Cadet and staff crisis management (serious incident reporting, Public Affairs Office notification, police notification)

¾ Emergency 1. Medical (parent notification, epidemics, police notification) 2. Natural disasters

¾ Medical (non-emergency)

¾ Reporting and data

¾ Classroom procedures

¾ P-RAP case management

¾ Security

¾ Logistics

¾ Hiring

¾ Transportation

¾ Volunteers/mentors

Candidate programs can refer to their mentor programs for copies of their policies and SOPs as a reference point for developing their own.

6. Cadet Recruitment Plan and Outreach

A. Cadet recruitment throughout the catchment area is critical to program success. The number of applications received per class directly relates to the quality and quantity of cadet candidates selected. On average, a candidate program needs 2.4 completed applications to graduate one cadet. Factors that affect a program’s ability to reach and recruit qualified applicants include geography, state population, state dropout rate, program or department structure, political climate, and state law. Application and selection procedures will, to the fullest extent possible, attempt to reach and include economically and educationally disadvantaged groups. The application is just one part of the application process, and careful consideration should be made as to what type of information the application will collect. The least complicated applications collect only demographic information about the candidate, the mentor (if identified), and a legal guardian. A sample application is included in Appendix H. Through the means of an application, program staff members learn about the candidate, at least on paper. It is possible, due to geography or any number of factors that staff may not personally interact with the candidate until orientation or a scheduled interview. Programs may schedule both, although this is not always feasible. Orientation may be conducted in the field by having groups of program staff travel to regions within the state, or it may be conducted on the program site. Orientation has multiple benefits, including the mitigation of culture shock during the first days of the acclimation period. The application process may include interviews, orientations, and written applications. Applicants will meet the following minimum eligibility standards:

Page 24: NGYCP_CP3-1 National Gaurd Youth Program

II-6 CP 3-1

¾ Sixteen to eighteen years of age at time of entry into the program

¾ A high school dropout is defined as a youth who is no longer attending any school and who has not received a secondary school diploma or certificate from a program, or equivalency for such diploma

¾ A citizen or legal resident of the United States and resident of the state in which the program is operated or with whom the program has a memorandum of agreement

¾ Unemployed or underemployed

¾ Not currently on parole or probation for other than juvenile status offenses, not awaiting sentencing, and not under indictment, charges, or convicted of a felony.

¾ Free from use of illegal drugs and substances

¾ Physically and mentally capable to participate in the program with reasonable accommodation for physical and other disabilities

B. While the methods program sites use to solicit applications varies, here are some recommended practices programs should consider when developing their recruiting plan.

i. Fine tune the program message. Programs benefit by clearly and concisely articulating their unique philosophies and attributes in marketing materials and recruitment messages.

ii. iSet definite goals and assign accountability standards for achieving them. These goals include external contacts, orientation attendance numbers, and professional presentations help to ensure recruitment is systematically organized and goal-driven, resulting in sufficient enrollment numbers on intake day.

iii. Everyone on staff is a de facto recruiter and therefore needs to understand the goals and requirements of the program. Programs that involve all staff in recruiting efforts can create a united front when interacting with potential applicants.

iv. Create a formal and calculated screening process. Programs that embed a controlled, structured, and repeatable screening process in their recruitment efforts have a clear understanding of which applicants will best fit the program and enjoy consistent, high-quality results. Seek guidance on recruitment processes from NGB, training, and the mentor program.

C.Website

1. A website is a valuable recruiting and marketing tool. All ChalleNGe programs are required to maintain a website with current information hosted by NGB. ChalleNGe program websites are linked from the main ChalleNGe website which is hosted on a central server. Each site is also directly accessible through its own URL. Candidate programs will coordinate with NGB to establish their program website no later than M-6.

2. Candidate program sites will maintain the website on an ongoing basis. Candidate programs’ designated web administrators receive technical assistance from NGB either onsite or remotely to establish the candidate program websites. Function-specific training is also available for web administrators through NGB. All ChalleNGe program websites contain the following pages at a minimum:

Page 25: NGYCP_CP3-1 National Gaurd Youth Program

II-7 CP 3-1

¾ About Us

¾ How to Apply

¾ Mentor Resources

¾ News and Events

¾ Frequently Asked Questions

¾ Contact Us

¾ Bulletin Board

¾ Photo Galleries

3. The content within these pages is tailored to each individual program and includes information such as FAQs, a program description, when classes start, pictures of the facility, applications and how to apply, directions to facilities, staff listings, videos and awards, and cadet success stories.

7. Marketing

The key to marketing is repetition. Candidate programs need to identify strategic ways to keep repeating the message. It is important to emphasize what distinguishes ChalleNGe from other youth programs in the community and repeat the message. While a marketing plan was established prior to entering the startup phase, it is still essential for candidate programs to evaluate and update their plans, assess how the plan is working, and make modifi cations as necessary. Considerations include:

¾ Engage and connect to the community through new media outlets

¾ Host an additional visit for politicians, leadership, and the community after the facilities are updated

¾ Conduct orientation meetings in the community

Candidate programs must maintain current information and keep stakeholders abreast of startup activities.

8. Staff Professional Development

A. Professional development is provided through job shadowing with the mentor program, new staff orientation, and formal training from NGB. Staff members begin job shadowing with the mentor program as soon as possible. Job shadowing is a proven method to orient new hires and provides both critical information and a sense of connection to the organization. Job shadowing also provides a support structure for new hires entering into new roles and responsibilities. New hire orientation curriculum and e-learning modules are available to programs for use. All new hires should have access to NGB-sanctioned materials that highlight the history, structure, and national operating philosophy of the program. Doctrinal documents and white papers will be provided by NGB and reviewed by staff.

gateRecruitment – Cadet graduation target of 100 requires 240 applications.

25% of the target applications must be received no later than M-4

50% of the target applications must be received no later than M-2

75% of the target applications must be received no later than M-1

Program budgets will be adjusted based on actual applications received.

Page 26: NGYCP_CP3-1 National Gaurd Youth Program

II-8 CP 3-1

B. Immediately following their hire, staff members are to attend function-specifi c and leadership training, as available. This is a critical part of ChalleNGe staff member professional development. Function-specifi c courses are specially tailored to address identifi ed needs of each functional area and provide participants with the skills, knowledge, and networks that will most positively impact their work at their ChalleNGe program site. Staff members are required to attend function-specifi c training within a year of hire and once every three years thereafter. The leadership courses provide ChalleNGe program leaders with the institutional and organizational knowledge needed to drive their program toward excellence. Leaders attend the Supervisors Course, the Program Directors Workshop, and the Annual Workshop. Programs assign a staff member responsible for ensuring all staff members attend the required trainings offered by NGB. New program sites should refer to the annual course catalog for training offerings.

C. In addition to the function-specifi c professional development, candidate programs receive the Jump Start Basic Course at their new program site. The Jump Start Basic Course provides staff at programs with the skills, knowledge, and networks necessary to successfully launch program operations and positively intervene in the lives of ChalleNGe cadets. Additionally, Jump Start Basic training is an opportunity for new staff members to participate in team building and enhance their communication skills. Improved staff integration and communication impacts both the cadet experience and initial program success. Jump Start Basic Course training is delivered not later than M-1. All staff members are required to attend. Those staff members hired at a later date shall attend the standard Basic Course offered by NGB.

D. In-house staff training such as fi rst aid, CPR, gang awareness, and confl ict resolution are also imperative to staff readiness. Further, new programs should check with their states for any training requirements regarding residential youth programs. Mentor programs may also provide recommendations for in-house training.

9. Jump Start Assistance

NGB provides candidate programs with targeted organizational and operational support during the startup process. This technical assistance and customized training is part of a Jump Start package designed to facilitate a successful program launch and integration into the national ChalleNGe community. Technical assistance is customized to meet the unique needs represented at the program site and leverage the resources that exist within the local community.

The Jump Start package includes:

¾ A leadership staff summit

¾ An onsite Jump Start Basic Course prior to class operations

¾ A follow-on onsite Basic Course during the fi rst class cycle break, if deemed necessary by NGB

¾ Six (6) program site visits to provide direct technical assistance

gate

80% of the candidate program staff must be hired no later than M -2.

Page 27: NGYCP_CP3-1 National Gaurd Youth Program

II-9 CP 3-1

� Recruitment � Organizational development � General program operations � Leadership � Residential Phase operations � Post-Residential Phase operations

¾ Onsite data and reporting requirement training

¾ Guidance on program mentoring

¾ Four (4) Not-For-Record Evaluations

� Two (2) Operational Evaluations � Resource management review � Post-Residential Phase Operations Evaluation

The program director will be briefed on expectations and allowed time to prepare for each visit. Staff will work collaboratively with the program to identify needs and strategies to assist in startup progress. Jump Start assistance is provided from M-12 through M+9.

10. Program Budget

A. The program director, with assistance from the budget officer, is responsible for developing the annual program budget. The federal percentage and state cost share requirements will be set at the MYPCA signing. The program budget is based upon the program’s graduation target. Typical percentage allocations range:

¾ Facility—10%

¾ Dining—11% and not to exceed $20 per day per cadet

¾ Staff—60% and not to exceed 80%

¾ Miscellaneous—13%

See the MYPCA for any current funding restrictions.

B. The budget must be developed and submitted for approval from NGB no later than ninety days prior to the start of the first class (day one, week one). Specific guidance is provided by NGB for the proposed program budget and its submission. A template provided by NGB to programs is required for budget submission and a State Plan must accompany the program budget. Once NGB approves the program budget, the program will receive funding via a Funding Authorization Document.

11. Finalized Training Schedule

A training schedule is created under the direction of the program director. The training schedule is a daily schedule which identifies hourly cadet activities. Daily wake-up will be no later than 0600 hours and lights out will to be no later than 2200 hours. Sleep hours will be uninterrupted. All non-sleep and weekend hours will be

Page 28: NGYCP_CP3-1 National Gaurd Youth Program

II-10 CP 3-1

organized with some type of activity. Daily physical fitness will be conducted. All activities will be conducted and framed within the context of a caring, disciplined, tough-love atmosphere. The training schedule activities must be adhered to strictly. The training schedule includes a time, location, cadet uniform, necessary equipment, and department lead. Candidate programs should seek assistance from their mentor program to develop a training schedule tailored to their program. An example of a daily training schedule is included in Appendix J.

12. Preparing For Cadet Mentor Operations

Part of the recruiting and cadet application process includes mentor screening. Thorough screening of prospective mentors is an essential process and lays a good foundation for the Post-Residential Phase mentoring component. The screening process for mentors includes two reference checks, a criminal record check from a credible and reputable source which includes a sex offender screening, and an interview. Every mentor must complete an application form. A sample mentor application is included in Appendix I. Additionally, programs must have a Mentor Authorization to Release Information (MARI) form included with the application prior to requesting a criminal record check on the prospective mentor. The mentor application and MARI form should be collected during the cadet application process. Candidate programs must identify how they will conduct criminal record checks and sign any necessary MOAs no later than M-6. Programs may work out an agreement with the state police or another law enforcement agency. Program may also elect to get checks done through the state National Guard. The parameters for background checking must always include:

¾ Any sex offense charges

¾ Any felony convictions within five years

¾ Any alcohol or substance abuse convictions within five years, including DWIs/DUIs

13. Data and Reporting Requirements Training

A. Program data are collected at each site throughout the Residential and Post-Residential Phases. This data provides the basis for informed decision making and validates program outcomes. The program director is responsible for ensuring timely and accurate data collection. NGB provides data collection and reporting training to all ChalleNGe programs. The training covers reporting requirements stipulated by the MYPCA, the Post-Residential Operations Manual, and NGB guidance. Additionally, candidate programs receive intensive onsite training and technical assistance on budget data entry and fiscal reporting as part of the startup process. A program data entry matrix is provided by NGB to assist ChalleNGe sites in determining what information to collect.

B. It is imperative that programs focus on accurate data entry. As with all federal programs, ChalleNGe must demonstrate its effectiveness. Data reported in the official NGB repository is used to submit reports to Congress. Therefore, all ChalleNGe programs are required to input data on a regular basis to provide an accurate and up-to-date picture of program operations.

Page 29: NGYCP_CP3-1 National Gaurd Youth Program

II-11 CP 3-1

14. First Residential Phase Operations

A. The Residential Phase depends on the full immersion of cadets in a residential environment with constant contact and reinforcement that reestablishes cadets’ sense of belonging and adherence to societal norms.

1. This phase begins with a two-week acclimation period, amounting to an extension of the cadet screening process. Cadets are considered candidates until the completion of the acclimation period. The screening element of the acclimation period is transparent to the candidates. On the first day, cadets who arrive are considered “registered” but are not fully “enrolled” in the program until they have completed this two-week acclimation period. This is often the first time staff will interact directly with the candidates apart from job shadowing with the mentor program. NGB provides technical assistance to new program sites during this intense phase to ensure program operations are successful. At the end of the acclimation period, the program director selects those applicants who will become cadets. An evaluation process for selecting cadets during the acclimation period must be defined in the State Plan.

2. Following the acclimation period, the Residential Phase focuses on the eight core components in a quasi-military environment on which the ChalleNGe curriculum is based. The eight core components are discussed previously in this document and in CP1. Additionally, during the Residential Phase cadets work on the development of their P-RAP and begin to establish a positive relationship with their mentor. Establishing, strengthening, and maintaining a purposeful quasi-military environment in the Residential Phase of NGYCP is critical to the success of the program.

B. Not-For-Record Evaluation

1. During the first class cycle, two Not-For-Record (NFR) Operational Evaluations are conducted. The first evaluation is conducted by M+2 and the second is conducted approximately at M+4. This evaluation serves as a way to ensure the program started off on the right track and also is an opportunity for the new program personnel to receive coaching and/or technical assistance. Operational Evaluations provide NGB with an assessment of the program’s functional and core competence areas as outlined in the State Plan and the MYPCA. The objectives of the evaluations are to improve overall service delivery to cadets, promote adherence to the MYPCA and guidance letter standards, and develop recommendations leading to new and effective approaches to program management.

2. The evaluation methodology includes a review of key program documents, published and approved curriculum, cadet files, and interviews with program staff and selected cadets. An in-briefing is conducted with the new program director and key program staff to provide an overview of the evaluation process and to confirm requested documentation is available. An out-briefing is conducted at the conclusion of the evaluation and program director is briefed on the observations and findings that are included in the NFR evaluation report. The major focus areas for the review include:

¾ Program documentation: State Plan, MYPCA, SOPs, organizational chart, staff roster

¾ Training schedules

¾ Staff hiring, management, training, and professional development

¾ Reporting, data entry, and data validation

¾ IT planning, infrastructure, access, and use

Page 30: NGYCP_CP3-1 National Gaurd Youth Program

II-12 CP 3-1

¾ Cadet recruiting, application, and screening process

¾ General program operations: discipline, hands-off leadership, counseling, drug testing, medical support, and facilities

¾ Residential Phase operations: published and approved core component curriculum

¾ Post-Residential Phase operations: P-RAP, mentoring, case management

¾ State Plan goal performance assessment

¾ Staff manning roster

3. After the program director conducts a review of the report, he then submits it, and it is maintained by NGB. NFR evaluations do not require a Response by Endorsement; however, normally significant findings in a report require a Response by Endorsement by TAG of the state.

4. The first graduation is a culminating point for new programs as the first graduating class of cadets moves into the Post-Residential Phase and the second class of cadets begins the acclimation period. It is especially important to have any of the growing pains and initial problem areas resolved quickly as staff will be working at maximum effort. Technical assistance is available from NGB to assist the program director. The first official Operational Evaluation will be conducted at M+9 of program operations.

15. Post-Residential Operations

A. The one-year Post-Residential Phase begins at the graduation from the Residential Phase. Selection of the candidates with the most success, effective implementation of the ChalleNGe model, and exposure to mentors and post-residential staff throughout the Residential Phase are all crucial elements to post-residential success. During the Post-Residential Phase, graduates still receive encouragement and support in sustaining lifestyle changes from program staff and mentors. Early in the Residential Phase, the cadets learn the value of planning and how to create a P-RAP. Through a closely integrated effort between all program staff and the mentor, the P-RAP will serve as a guide during the one-year Post-Residential Phase.

B. The P-RAP is a living, working instrument that is continually updated to reflect the cadet’s post-residential goals. One important goal at the end of the Post-Residential Phase is to ensure each graduate is placed in a job, in school or college, or in a training program. It is crucial that staff at new programs invest in getting to know the cadets.

C. The ChalleNGe program must effectively support mentoring relationships and the need is especially critical beyond graduation. It is important for new programs to focus on effective case management and supporting mentors in ways that ensure productive mentoring relationships throughout the Post-Residential Phase.Mentors assist cadets in meeting the goals of their Post-Residential Action Plan and help remind cadets of some of the difficult challenges they have faced and conquered.

D. An NFR Post-Residential evaluation is conducted in the same approach as the NFR Operational Evaluations; however it includes an assessment of the Post-Residential phase. Future program funding is contingent on the capability of the program to successfully meet its goals. A formal Operational Evaluation will follow at M+9 after the two NFR evaluations and is conducted in the same manner. A technical assistance visit can be recommended by NGB in order for the program to successfully continue operations.

Page 31: NGYCP_CP3-1 National Gaurd Youth Program

a-1 CP 3-1

APPENDIX A

StartuP timeline

MONTH ACTION

M-24 to M-13

� The state: 9 Identifies the need and potential locations 9 Requests information from NGB 9 Assigns action officer

� NGB issues guidance � ChalleNGe Site Suitability and Readiness Assessment (CSSRA) � Begin marketing plan

M-13

� NGB conducts site verification visit � Program briefed on ChalleNGe startup process � Program determines the educational model, if GED, select model (who, etc.) � Staffing model submitted and approved (NGB)

M-12

� The state: 9 Verifies funding for match will be available 9 Develops initial timeline 9 Hires director 9 Identifies key personnel

� The program signs the Startup Agreement � Continue marketing plan for staff and community stakeholders � All position descriptions complete � NGB identifies mentor program � Startup budget approved

M-11 � State Plan development begins � Annual performance goals identified

M-10

� Begin working on Recruiting SOP – recruiting pool identified � Schedule attendance at training courses for key staff � Complete marketing plan � Leadership staff summit

M-9

� Complete hiring key staff (deputy, RPM, budget, MIS program coordinator, lead counselor, lead instructor, commandant)

� Begin SOP and curriculum development � First technical assistance visit (focus on recruiting)

M-7 � NGB determines the target graduation number � Recruiting SOP is complete

Page 32: NGYCP_CP3-1 National Gaurd Youth Program

a-2 CP 3-1

MONTH ACTION

M-6

� NGB to assess program readiness � Lead staff must visit peer mentor program for job shadowing � State/program website established � Complete cadet application � Process for mentor background check identified � 30% of curriculum developed

M-5 � Second technical assistance visit (focus on organizational development and program

operations) � Ongoing hiring for all budgeted positions

M-4 � NGB to assess program readiness � GATE: 25% of target applications must be received � On-site budget training

M-3

� Third technical assistance visit (focus on operations and leadership) � Second year budget developed and submitted � State Plan submitted � Master calendar complete

M-2

� NGB to assess program readiness � GATE: 80% of staff must be hired � GATE: 50% of target applications must be received � In-house staff training (first aid, CPR, gang training, NPCI)

M-1

� Jump Start Basic Course � Facility upgrades complete � 100% of curriculum, SOPs, master schedule, and training schedule complete � GATE: 75% of target applications must be received � Onsite data management training

M+1 � Acclimation Period for Class 1

M+2 � Fourth technical assistance visit (focus on operations) � 1st Not-for-Record Evaluation

M+4 � Fifth technical assistance visit (focus Post-Residential operations) � 2nd Not-for-Record Evaluation

M+6 � GRADUATE CLASS 1 � Class 1 in Post-Residential Phase

M+7

� NGB to assess Residential Phase success � Post-Residential Not-for-Record Evaluation � Sixth technical assistance visit (focus on Post-Residential) � Class 2

M+9 � Operational Evaluation

Page 33: NGYCP_CP3-1 National Gaurd Youth Program

a-B CP 3-1

APPENDIX B

CHalleNGe Site SuitaBilitY and readineSS aSSeSSment

Page 34: NGYCP_CP3-1 National Gaurd Youth Program

NATIONAL GUARD BUREAU1411 JEFFERSON DAVIS HIGHWAY

ARLINGTON VA 22202-3231

NGB-ZC MEMORANDUM FOR THE ADJUTANTS GENERAL OF ALL STATES, PUERTO RICO, THE US VIRGIN ISLANDS, GUAM, AND THE COMMANDING GENERAL OF THE DISTRICT OF COLUMBIA

SUBJECT: ChalleNGe Site Suitability and Readiness Assessment (CSSRA)

1. To define the process and criteria used to assess the suitability and readiness of a proposed National Guard Youth ChalleNGe Program site to begin start-up activities.

2. In the past, National Guard Youth ChalleNGe Programs were launched without benefit of a consistent, rigorous analysis of their overall suitability for such a site and their readiness to move forward toward full operation. As a result, several programs struggled or failed in the first year. The ChalleNGe Site Suitability and Readiness Assessment (CSSRA) is designed to guide states in their preparation to launch a new ChalleNGe program. In addition, this assessment provides the National Guard Bureau (NGB) with a consistent, factual and data-based tool to determine the overall suitability of a candidate program site and its readiness to enter start-up activities.

3. The CSSRA is designed to factually assess the proposed site’s suitability and readiness in five key result areas:

a. Demand: What is the state high school dropout situation? (percent/number)b. Funding: Is there sufficient state funding? c. Facility: Is the facility location and condition adequate? d. Personnel: Are there sufficient personnel available to fill staffing requirements? e. Political: Is there sufficient political support to make the proposal viable?

4. These key result areas are further subdivided into fifteen standards.

a. The standards are quantified by numeric scales, weighted according to criterion significance. Applicants must acquire points within all fifteen standards prior to approval and implementation of a Master Youth Programs Cooperative Agreement (MYPCA).

b. The assessment is divided into two parts: Part A addresses areas concerning suitability and readiness for the program. Part B consists of a site visit for the purpose of discussing the findings of Part A. As part of the site visit, NGB

Page 35: NGYCP_CP3-1 National Gaurd Youth Program

NGB-ZCSUBJECT: ChalleNGe Site Suitability and Readiness Assessment

representatives will also meet with key stake holders. Part A requires the applicant to submit a memorandum to NGB detailing the level of compliance outlined in Part A. The maximum Part A score an applicant program can receive is 428 points.

c. The state Adjutant General begins the application process by submitting a memorandum detailing the level of compliance in each of the fifteen Part A standards. This memorandum will detail how the state is in compliance with the standards and should be supported by documentation from the applicant state.

5. Applicants who complete Part A of the assessment and achieve points in each of the fifteen Part A standards with a cumulative minimum score of 282 may submit a memorandum to NGB indicating their desire to proceed with Part B of the application process which includes NGB visiting the proposed ChalleNGe program site. This memorandum must include the updated assessment form, additional comments as necessary, and signed by the Adjutant General.

6. Upon receipt of an applicant’s official request to proceed with Part B, NGB will schedule a site visit to the applicant site to verify Part A data.

a. States successfully completing Part A and B will be selected to start a new program based on funding availability. Programs will enter the Youth ChalleNGe Jump Start Phase (timeline detailing the necessary steps to successfully start a Youth ChalleNGe Program) according to the date NGB receives a completed CSSRA with a minimum required score. The score will be verified/adjusted during the site visit. If NGB receives multiple applications on the same date, programs with the highest score will take precedence.

b. Programs failing to meet the minimum score are encouraged to continue working with NGB to obtain a minimum score.

7. Please send the completed CSSRA to the National Guard Bureau Office of Athletics and Youth Development (NGB-AY); Col Anthony J. Kissik, 703-607-0784, DSN 327-0784; [email protected].

Encl LOUIS A. CABRERA Assistant Chief and Comptroller National Guard Bureau

Page 36: NGYCP_CP3-1 National Gaurd Youth Program

CH

all

eNG

e Si

te

Suit

aBi

lit

Y a

nd

rea

din

eSS

aSS

eSSm

ent

This

rubr

ic is

des

igne

d to

gra

de a

pplic

atio

ns s

ubm

itted

by

pros

pect

ive p

rogr

am s

tate

s. A

n ap

plic

ant s

ucce

ssfu

lly m

eetin

g Pa

rt A

requ

irem

ents

will

rece

ive N

GB s

ite v

isits

to

asse

ss in

per

son.

STA

NDA

RDSC

ORIN

G SC

ALE

1A

P2SC

ORE

Dem

and:

A s

uffic

ient

num

ber o

f hig

h sc

hool

dro

pout

s ex

ist w

ithin

the

stat

e an

d ca

tchm

ent a

rea3 to

sus

tain

pro

pose

d gr

adua

tion

targ

et.

1. T

he a

nnua

l num

ber o

f hig

h sc

hool

dro

pout

s w

ithin

the

stat

e is

suffi

cien

t to

sup

port

the

prop

osed

gra

duat

ion

targ

et.4

15 p

ts

30

pts

45 p

ts

60

pts

4000

– 1

0,00

010

,001

– 1

8,00

018

,001

– 2

8,00

0>

28,0

00

Part

A

2. T

he p

erce

ntag

e of

sta

te p

opul

atio

n w

ithin

the

catc

hmen

t are

a of

the

prop

osed

pro

gram

site

just

ifies

the

exist

ence

of a

Cha

lleN

Ge p

rogr

am.5

4 pt

s

8 pt

s

12 p

ts

16

pts

20 p

ts

<20

%20

% --

49%

50%

-- 7

2%73

% --

85%

>85

%

Part

A

3. T

he h

igh

scho

ol g

radu

atio

n ra

te w

ithin

the

catc

hmen

t are

a of

the

prop

osed

pro

gram

site

dem

onst

rate

s a

dura

ble

need

for a

pro

gram

.6

3 pt

s

6 pt

s

9 p

ts

12

pts

15 p

ts

>80

.0%

76.0

% --

79.

0%

71.0

% --

77.

0%61

.0%

-- 7

0.0%

<

60.0

%

Part

A

Fund

ing:

Suf

ficie

nt s

tate

reso

urce

s to

laun

ch a

nd s

usta

in p

ropo

sed

prog

ram

4. T

he s

tate

pos

sess

es th

e fin

anci

al re

sour

ces

to s

uppo

rt th

e re

quire

d st

ate

mat

ch a

t the

ant

icip

ated

pro

gram

mat

ch ra

te.7

60 p

ts

$0

.85

- $1.

44M

8Pa

rt A

5. A

t lea

st 9

0% o

f the

sta

te’s

mat

chin

g fu

nds

finan

cial

com

mitm

ent

cons

ists

of c

ash.

9

8 pt

s

16 p

ts

24

pts

32 p

ts

40

pts

90%

-- 9

1%92

% --

93%

94%

-- 9

6%97

% --

98%

100%

Part

A

Page 37: NGYCP_CP3-1 National Gaurd Youth Program

CH

all

eNG

e Si

te

Suit

aBi

lit

Y a

nd

rea

din

eSS

aSS

eSSm

ent

This

rubr

ic is

des

igne

d to

gra

de a

pplic

atio

ns s

ubm

itted

by

pros

pect

ive p

rogr

am s

tate

s. A

n ap

plic

ant s

ucce

ssfu

lly m

eetin

g Pa

rt A

requ

irem

ents

will

rece

ive N

GB s

ite v

isits

to

asse

ss in

per

son.

STA

NDA

RDSC

ORIN

G SC

ALE

1A

P2SC

ORE

Dem

and:

A s

uffic

ient

num

ber o

f hig

h sc

hool

dro

pout

s ex

ist w

ithin

the

stat

e an

d ca

tchm

ent a

rea3 to

sus

tain

pro

pose

d gr

adua

tion

targ

et.

1. T

he a

nnua

l num

ber o

f hig

h sc

hool

dro

pout

s w

ithin

the

stat

e is

suffi

cien

t to

sup

port

the

prop

osed

gra

duat

ion

targ

et.4

15 p

ts

30

pts

45 p

ts

60

pts

4000

– 1

0,00

010

,001

– 1

8,00

018

,001

– 2

8,00

0>

28,0

00

Part

A

2. T

he p

erce

ntag

e of

sta

te p

opul

atio

n w

ithin

the

catc

hmen

t are

a of

the

prop

osed

pro

gram

site

just

ifies

the

exist

ence

of a

Cha

lleN

Ge p

rogr

am.5

4 pt

s

8 pt

s

12 p

ts

16

pts

20 p

ts

<20

%20

% --

49%

50%

-- 7

2%73

% --

85%

>85

%

Part

A

3. T

he h

igh

scho

ol g

radu

atio

n ra

te w

ithin

the

catc

hmen

t are

a of

the

prop

osed

pro

gram

site

dem

onst

rate

s a

dura

ble

need

for a

pro

gram

.6

3 pt

s

6 pt

s

9 p

ts

12

pts

15 p

ts

>80

.0%

76.0

% --

79.

0%

71.0

% --

77.

0%61

.0%

-- 7

0.0%

<

60.0

%

Part

A

Fund

ing:

Suf

ficie

nt s

tate

reso

urce

s to

laun

ch a

nd s

usta

in p

ropo

sed

prog

ram

4. T

he s

tate

pos

sess

es th

e fin

anci

al re

sour

ces

to s

uppo

rt th

e re

quire

d st

ate

mat

ch a

t the

ant

icip

ated

pro

gram

mat

ch ra

te.7

60 p

ts

$0

.85

- $1.

44M

8Pa

rt A

5. A

t lea

st 9

0% o

f the

sta

te’s

mat

chin

g fu

nds

finan

cial

com

mitm

ent

cons

ists

of c

ash.

9

8 pt

s

16 p

ts

24

pts

32 p

ts

40

pts

90%

-- 9

1%92

% --

93%

94%

-- 9

6%97

% --

98%

100%

Part

A

STA

NDA

RDSC

ORIN

G SC

ALE

1A

P2SC

ORE

6. B

udge

t lin

e ite

m a

lloca

tions

do

not v

ary

mor

e th

an 1

0% fr

om N

GB-

acce

pted

bud

get t

arge

ts.10

3 pt

s 6

pts

9 pt

s 12

pts

15

pts

10%

var

ianc

e7-

9% v

aria

nce

4-6%

var

ianc

e1-

3% v

aria

nce

<1%

var

ianc

e

Part

A

7. A

sta

te s

tatu

te e

xists

aut

horiz

ing

the

appr

opria

tion

and

expe

nditu

re o

f fu

nds

for t

he p

rogr

am.11

1

pt

20

pts

No s

tate

sta

tute

exis

tsSt

ate

stat

ute

exist

sPa

rt A

Faci

lity:

Phy

sical

faci

lity

is of

the

size,

con

ditio

n, a

nd lo

catio

n ne

cess

ary

to s

uppo

rt th

e pr

opos

ed p

rogr

am

8. E

ssen

tial e

mer

genc

y se

rvic

es a

re in

clo

se p

roxim

ity to

the

prop

osed

fa

cilit

y.12

�Po

lice

�Fir

e �

Ambu

lanc

e �

Emer

genc

y Ro

om

Polic

e, F

ire, A

mbu

lanc

e Re

spon

se T

ime:

Part

A

5 pt

s10

pts

20 p

ts

>20

min

utes

10-2

0 m

inut

es<

10 m

inut

es

Emer

genc

y Ro

om:

10 p

ts

20 p

ts

30 p

ts

>60

min

utes

aw

ay30

-60

min

utes

aw

ay<

30 m

inut

es a

way

9. T

he im

med

iate

env

ironm

ent s

uppo

rts th

e op

erat

ion

of a

qua

si-m

ilitar

y pr

ogra

m.13

3 pt

s 6

pts

9

pts

15 p

ts

With

in lo

cal c

ivilia

n co

mm

unity

On s

tate

-ow

ned

faci

lity

On F

eder

al c

ivilia

n in

stal

latio

n On

Nat

iona

l Gua

rd o

r Fed

eral

m

ilitar

y in

stal

latio

n

Part

A

Page 38: NGYCP_CP3-1 National Gaurd Youth Program

STA

NDA

RDSC

ORIN

G SC

ALE

1A

P2SC

ORE

10.

The

prop

osed

faci

lity

is co

nfigu

red

to o

ptim

ize p

rogr

am e

ffect

ivene

ss14

: �

Open

bay

bar

rack

s �

Plat

oon-

cent

ric b

uild

ings

�Di

ning

faci

lity

is ca

pabl

e of

sea

ting

grad

uatio

n ta

rget

+ 5

5% �

Geog

raph

ic s

epar

atio

n fro

m o

ther

pop

ulat

ions

�Se

para

te m

ale/

fem

ale

barra

cks

�T1

or b

ette

r acc

ess

to th

e in

tern

et �

LAN

inst

alle

d an

d op

erat

iona

l �

Surv

eilla

nce

secu

rity

syst

em o

pera

tiona

l �

Wat

er, s

ewag

e, a

nd u

tiliti

es a

re fu

lly o

pera

tiona

l

3 pt

s 6

pts

9 pt

s 12

pts

15

pts

1-2

crite

ria m

et3-

4 cr

iteria

met

5-6

crite

ria m

et7-

8 cr

iteria

met

All c

riter

ia m

et

Part

A

11.

The

prop

osed

faci

lity

mee

ts th

e m

inim

um s

pace

requ

irem

ents

for e

ach

of th

e fo

llow

ing

func

tiona

l are

as15

: �

Adm

in a

rea

- 200

0 sq

ft �

Med

ical

are

a - 4

00 s

q ft

�Su

pply

stor

age

- 240

0 sq

ft �

Adm

in la

trine

s - 3

00 s

q ft

�Cl

assr

oom

s - 1

000

sq ft

Audi

toriu

m -

2500

sq

ft �

Libra

ry -

600

sq ft

�PT

are

a - 1

225

sq ft

�Cl

assr

oom

latri

nes

- 400

sq

ft �

Dini

ng fa

cilit

y - 4

100

sq ft

Barra

cks

- 90

sq ft

/pp

�Ba

rrack

s la

trine

- 50

sq

ft/pp

�La

undr

y - 7

.2 s

q ft/

pp

1 pt

3

pts

6 pt

s 9

pts

12 p

ts

1-3

crite

ria m

et4-

6 cr

iteria

met

7-9

crite

ria m

et10

-12

crite

ria m

etAl

l crit

eria

met

Part

A

Page 39: NGYCP_CP3-1 National Gaurd Youth Program

STA

NDA

RDSC

ORIN

G SC

ALE

1A

P2SC

ORE

12.

The

prop

osed

faci

lity

is re

ady

for o

ccup

ancy

prio

r to

the

targ

eted

sta

rt of

the

prog

ram

.17

1 pt

2

pts

4

pts

6

pts

8

pts

>36

mon

ths

of w

ork

requ

ired

24-3

6 m

onth

s of

wor

k re

quire

d18

-24

mon

ths

of w

ork

requ

ired

12 -1

8 m

onth

s of

wor

k re

quire

d<

12 m

onth

s of

wor

k re

quire

d

Part

A

Pers

onne

l: Su

ffici

ent q

uant

ity a

nd q

ualit

y of

per

sonn

el to

laun

ch a

nd s

usta

in p

ropo

sed

prog

ram

.

13.

At le

ast 5

0,00

0 pe

ople

live

with

in o

ne h

our d

rivin

g tim

e of

pro

pose

d pr

ogra

m s

ite.18

1 pt

5 pt

s

10 p

ts 15

pts

20 p

ts

50,0

00-8

9,99

9 liv

e w

ithin

one

ho

ur90

,000

-129

,999

live

with

in o

ne

hour

130,

000-

189,

999

live

with

in o

ne

hour

190,

000-

249,

999

live

with

in o

ne

hour

250,

000

or m

ore

with

in o

ne

hour

Part

A

14.

The

prop

osed

pro

gram

dire

ctor

is fu

lly q

ualifi

ed to

lead

the

star

t up

of

the

prog

ram

19:

�Pr

evio

us m

ilitar

y le

ader

ship

exp

erie

nce

(E9

or a

bove

) �

Prev

ious

exp

erie

nce

in s

econ

dary

edu

catio

n �

Prev

ious

Cha

lleng

e pr

ogra

m m

anag

emen

t exp

erie

nce

�Gr

adua

te d

egre

e �

Evid

ence

of c

omm

unity

and

pub

lic re

latio

ns s

kills

�Re

ports

dire

ctly

to th

e TA

G

8 pt

s

16 p

ts

24 p

ts

32 p

ts

40 p

ts

1 cr

iteria

met

2 cr

iteria

met

3-4

crite

ria m

et5

crite

ria m

etAl

l crit

eria

met

Part

A

Page 40: NGYCP_CP3-1 National Gaurd Youth Program

STA

NDA

RDSC

ORIN

G SC

ALE

1A

P2SC

ORE

Polit

ical

: Suf

ficie

nt p

oliti

cal s

uppo

rt to

sus

tain

pro

pose

d pr

ogra

m

15.

The

prop

osed

pro

gram

is a

sta

ted

prio

rity

of th

e sp

onso

ring

stat

e.

�Le

tter f

rom

Gov

erno

r �

Lette

rs fr

om S

tate

Leg

islat

ive le

ader

s (li

mit

2) �

Lette

r fro

m U

.S. S

enat

ors

�Le

tters

from

U.S

. Rep

rese

ntat

ives

(lim

it 2)

�Le

tter f

rom

may

or o

f the

nea

rest

civi

lian

com

mun

ity

Lette

rs fr

om:

12 p

ts

6 pt

s 8

pts

8 pt

s 4

pts

Gove

rnor

Stat

e Le

gisla

tor (

Dist

rict)

U.S.

Sen

ator

U.S.

Rep

rese

ntat

ive (D

istric

t)Lo

cal M

ayor

Part

A

TOTA

L SC

ORE:

/428

Page 41: NGYCP_CP3-1 National Gaurd Youth Program

END NOTES

1. All numeric rounding will be to nearest even number.

2. Application Phase.

3. A catchment area is defined as a 300-mile radius from the proposed ChalleNGe site.

4. Tools for Decision Makers brief by COL. M.G. MacLaren, Summer Program Directors Workshop 2008; 2009 Center for Naval Analysis Study of NGYCP; Regionalization Working Group, August 2009; Alliance for Excellent Education (AEE) http://www.all4ed.org.

5. Summer Program Directors Workshop Front End Analysis Working Group finding, August 2009 in accordance with Alliance for Excellent Education (AEE) (http://www.all4ed.org) data integrated to MapPoint software.

6. Summer Program Directors Workshop Front-End Analysis Working Group finding, August 2009; Alliance for Excellent Education (AEE) (http://www.all4ed.org).

7. Required state match rates may vary between 25 and 40%. Actual state match rate will be the rate prevailing for the fiscal year for which the MYPCA is implemented.

8. Based on minimum cost of $17,000 per target graduate, a graduation target of 100, and at a minimum of 25% and a maximum of 40% for the state contribution.

9. Summer Program Directors Workshop Front End Analysis working group finding, based on NGB-AY and program director experience with in-kind resources.

10. Calculated as average variance across all four areas. The optimal target funding allocation is 66 percent for staffing, 11 percent for dining operations, 10 percent for facilities, and 13 percent for remaining requirements. These targets are based on an analysis of program budgets over a four year period. Variance is calculated on the average variance in funding levels.

11. A state statute authorizing annual appropriations for the program is a more durable commitment to long term program sustainability than year to year ad hoc funding commitments.

12. Regionalization Working Group Report, August, 2009; times are based on an average emergency speed of 50 mph.

13. Program leaders have found that federal military installations often provide the most reliable combination of essential services for the program.

14. Based upon Summer Program Working Group Front End Analysis Working Group findings and program director and NGB-AY experience.

15. Space requirements are derived from NG-PAM 415-12, Army National Guard Facilities Allowances, Chapter 6: Educational Facilities. Student Load = 100-199.

16. Program experience demonstrates that the probability of a successful program launch is linked to the overall readiness of the facility. Extensive renovation requires time and money that drives up the risks of a timely program opening. Score must be supported by appropriate engineering documentation.

17. Hiring quality staff for the various positions in the program requires a sufficient pool of qualified applicants; based on Census Bureau statistics (http://www.census.gov/population/www/cen2000/briefs/phc-t29/index.html) and Bureau of Labor and Statistics data, locations with greater than 50,000 inhabitants present the labor pool required for programmatic success. http://www.census.gov/population/www/metroareas/metroarea.html

18. Based on an analysis of the requisite expertise of successful program directors.

19. Program leaders have found that letters of support from various members of the executive and legislative branch within the state and from members of Congress are an indicator of political support for the program.

Page 42: NGYCP_CP3-1 National Gaurd Youth Program

Intentionally Blank

Page 43: NGYCP_CP3-1 National Gaurd Youth Program

a-C 1 CP 3-1

APPENDIX C

management CHeCKliSt

Candidate Program: NGB-AYPOC: POC:Email: Email:Phone: Phone:

Action Item Gate NLTReceived/Approval/

Completion DateRemarks

CSSRA 9 M-12

NGB Site Visit 9 M-12

Startup Agreement 9 M-12

Startup Budget 9 M-12

Program Director Hired 9 M-12

Education Model Identified 9 M-12

Mentor Assigned M-12

Staff Summit M-10

Logistics Timeline M-10

Marketing Plan M-10

Hire Key Staff M-9

Recruiting TA Visit M-9

Key Staff Job Shadowing M-6

Criminal Record Check Process Identified

M-6

Cadet Application M-6

Mentor Application M-6

Page 44: NGYCP_CP3-1 National Gaurd Youth Program

a-C 2 CP 3-1

Action Item Gate NLTReceived/Approval/

Completion DateRemarks

Website Established M-6

New Program Director Workshop

M-6

30% Curriculum Complete M-6

SOPs M-6

Organizational and Operations TA Visit

M-5

Budget Report Training M-4

25% Applications Received

9 M-4

Master Calendar M-3

State Plan 9 M-3

Program Budget 9 M-3

Operations and Leadership TA Visit

M-3

50% Applications Received

9 M-2

Facility Upgrades Complete

M-1

Training Schedule M-1

80% Staff Hired 9 M-2

Jump Start Basic Course M-1

75% Applications Received

9 M-1

Operational Evaluation NFR #1

M+2

Page 45: NGYCP_CP3-1 National Gaurd Youth Program

a-C 3 CP 3-1

Action Item Gate NLTReceived/Approval/

Completion DateRemarks

Operations TA Visit M+2

Operational Evaluation NFR #2

M+4

Residential Operation TA Visit

M+4

Resource and Management Review

M+4

Post-Res Operations TA Visit

M+7

Post-Residential Evaluation NFR

M+7

Operational Evaluation M+9

Page 46: NGYCP_CP3-1 National Gaurd Youth Program

Intentionally Blank

Page 47: NGYCP_CP3-1 National Gaurd Youth Program

a-d CP 3-1

APPENDIX D

SamPle organization CHart

Program Director

MIS Administrative

Budget Officer

DeputyDirector

Cadre Commandant

Lead Counselor Lead Educator Medical RPM Cadre Cadre Cadre

Cadre

Cadre

CadreCadre

Cadre

CadreCadre

Cadre

Cadre

RPM Assistant

InstructorCounselor

Page 48: NGYCP_CP3-1 National Gaurd Youth Program

Intentionally Blank

Page 49: NGYCP_CP3-1 National Gaurd Youth Program

a-e 1 CP 3-1

APPENDIX E

SamPle CHalleNGe Program Staffing model

See MYPCA for Requirements

Authorized Staffing By Graduation Target Number:

100 144 175 200 400

STAFFING POSITIONS

Support Staff (1), (2), (3) Funded Funded Funded Funded Funded

State Program Director (*17), GS14 n/a n/a n/a n/a n/a

Program Director (14) GS13/14 1 1 1 1 1

Secretary, GS6 1 1 1 1 1

Deputy Director, GS12 1 1 1 1 1

Program Coordinator, GS10 1 1 1 1 1

Lead Instructor, GS10 1 1 1 1 1

Instructor (4), GS9 5 7 9 10 20

Lead Counselor, GS10 1 1 1 1 1

Counselor (5), GS9 3 5 6 7 13

Recruit/Placement/Mentor (R/P/M) Coordinator, GS10

1 1 1 1 1

R/P/M Assistant, GS8 3 4 4 5 9

Case Managers (6), GS6 6 9 11 13 25

Nurse Practitioner, GS10 1 1 1 1 1

Medical Assistant, GS7 1 1 1 2 4

Budget Officer, GS10 1 1 1 1 1

Assistant Budget Officer, GS8 0 0 0 1 2

Management Information Specialist, GS10 1 1 1 1 1

Management Information Assistant, GS7 0 0 0 1 2

Admin/Log Specialist, GS8 1 1 1 1 1

Admin/Log Assistant, GS7 1 1 1 2 3

Public Relations Specialist, GS10 0 0 0 0 1

Discretionary Support Staff (7), (10), GS7 4 8 10 12 31

Support Staff Subtotals 34 46 53 64 121

Page 50: NGYCP_CP3-1 National Gaurd Youth Program

a-e 2 CP 3-1

Operations/Cadre Staff (1), (2), (3), (8), (10), (11)

Cadre Staff Supervisor (16), GS10/11 1 1 1 1 1

Cadre Staff Supervisor Assistant, GS9 1 1 1 1 2

Shift Supervisors, GS8 6 6 6 6 10

Team Leaders (9), GS7 22 32 38 44 88

Operations/Cadre Staff Subtotals 30 40 46 52 101

Authorized Staffing By Class Size Totals 64 86 99 116 222

Peer Mentors (12), Minimum Wage 2 3 4 4 8

All ChalleNGe personnel must be accounted for within this staffing model. This includes contract personnel but does not include dining facility personnel.

(1) Personnel filling positions must perform the stated job function.

(2) Federal ChalleNGe funding levels for staff will not exceed limits outlined in Section 1A.104.b.10. of the Master Youth Programs Cooperative Agreement.

(3) Federal ChalleNGe funds and minimum state matching funds may not be used to fund increased salary levels above those authorized in this staffing model.

(4) Ratio: One classroom instructor per 20 cadets. (Class size/20, rounded up, not including lead instructor)

(5) Ratio: One counselor per 30 cadets. (Class size/30, rounded up, not including lead counselor)

(6) Ratio: One case manager per case load of 40 cadets. (2.5 x class size/40, rounded up)

(7) May be used for additional support staff (excluding instructor positions) or operations/cadre staff.

(8) Operations/cadre staff positions may not perform support staff job functions.

(9) Ratio: One cadre team leader per 25 cadets. (5.5 x class size/25, rounded up)

(10) Additional positions may be funded from non-ChalleNGe sources or available Budget Category A (staff) funds.

(11) Except during the Acclimation Period, programs may not use direct hire, contract, or temporary hire personnel to fill any cadre staff positions without slotting them against the staffing model in the Operations/Cadre Staff section. Personnel functioning as support staff may not be slotted against a cadre staff position in any way.

(12) Temporary hire not to exceed six months; selected from previous graduating class. (Class size/50, rounded up)

(13) Exceptions to this staffing model will be determined on a case-by-case basis.

(14) GS14 salary level authorized for 400-cadet program only.

Page 51: NGYCP_CP3-1 National Gaurd Youth Program

a-e 3 CP 3-1

(15) Programs may use personnel funds to fund temporary staff and/or overtime at the equivalent of one (1) GS7 base salary at the maximum authorized step for the program per fifty (50) cadets per class. (A program providing a state benefits package with a cadet graduation target of 200 cadets per year is authorized the funding equivalent of four (4) GS7, Step 10 employees.) These funds may only be used for cadre and instructor staff to compensate for Acclimation Period staffing difficulties and to substitute for personnel who are on leave or on annual training status. Programs requiring more temporary staff and or overtime assets must have NGB approval. Failure to obtain approval will result in the federal government not reimbursing the state for these additional costs.

(16) GS11 salary level authorized for 400-cadet program only.

(17) One state program director position is authorized for states with multiple ChalleNGe programs. NGB position description highlights minimum requirement of the positions.

Page 52: NGYCP_CP3-1 National Gaurd Youth Program

Intentionally Blank

Page 53: NGYCP_CP3-1 National Gaurd Youth Program

a-F 1 CP 3-1

APPENDIX F

SamPle Cadet SuPPlY liSt

Cadet Itemized Supply List

ITEM Recoverable Non-Recoverable Total

Bag, laundry, mesh

Belt, Canteen

Belt, safety, reflective

Boots, combat, leather, black

Brush, boot

Buckle, belt, subdued

Canteen

Cap, BDU, utility

Cap, knit / stocking

Chapstick

Coat, winter, dress, color

Coat winter, color

Comb

Conditioner, hair, bottle

Cover, canteen w/2 clips

Cover, toothbrush

Dental floss

Deodorant, stick

Dish, soap

Ditty Bag

Foot powder, bottle

Gloves, leather, work

Gloves, winter, dress

Hair brush

Inserts, glove, wool, color

Lock, combination

Mat, PT

Page 54: NGYCP_CP3-1 National Gaurd Youth Program

a-F2 CP 3-1

ITEM Recoverable Non-Recoverable Total

Overshoes, rubber boots

Personal hygiene bag

Polish, boot, can

Rain coat, yellow

Razors, disposable

Rucksack

Sewing kit

Shampoo, bottle

Shaving cream, can

Shirt dress polo color

Shirt, long sleeved, color

Shoes, athletic/running

Shoes, deck, color

Shorts, PT, color(M) / color(F)

Shorts, color, sleeping

Shower shoes, pr

Soap, bar

Socks, boot type

Sweatpants, color

Sweatshirts, 2 color, 1 color

Toothbrush,

Toothpaste, tube

Towel, bath

Trousers, BDU

T-shirt, short sleeved, color

Underwear, thermal, bottoms

Underwear, thermal, tops

Wash cloth

Windbreaker, spring, color

Page 55: NGYCP_CP3-1 National Gaurd Youth Program

a-g CP 3-1

APPENDIX G

SamPle timeline for faCilitY eQuiPment PurCHaSeS

Use Your State Procurement Process Accordingly

M-11 Furniture ordered for barracks, administrative offices, and teacher cubicles

M-8 Purchase orders cut for the barracks, administrative offices, and teacher cubicles

M-6 Planning begins for classroom furniture

M-5 Office furniture is delivered and installed for teacher cubes and administrative offices

M-4 Onsite classrooms are surveyed for furniture (programs may consider starting this a month earlier)

M-3 Purchase order is cut for the classrooms

M-3 Contractor signs over the barracks and office spaces to the program

M-2 Barracks furniture is delivered and installed over a period of four days

M-2 Classroom furniture is delivered and installed

M-0 Class 01 commences

Note: Much of the furniture design and production is derived from the architectural layout and construction of the program’s barracks, administrative space, and classrooms.

Recommendations:

1. New programs should consider all metal bunk beds and wall lockers if at all possible. Wood is aesthetic, but is not as durable as metal.

2. New programs should look at bids for furniture if at all possible to explore contractors and bid for better quality and lower prices.

3. New programs should get warranties on furniture from manufacturer. This helps reduce repair/replacement costs during the first several years.

Page 56: NGYCP_CP3-1 National Gaurd Youth Program

Intentionally Blank

Page 57: NGYCP_CP3-1 National Gaurd Youth Program

a-h CP 3-1

APPENDIX H

SamPle Cadet aPPliCation

Social Security Number

Have you ever applied to Youth Challenge before? Yes No

Last Name

First Name Middle Initial

Date of Birth Age Gender Male Female

Ethnicity America Indian Asian or Pacific Islander Black not Hispanic Hispanic White not Hispanic Number in Household Family Income Less than $15,000 $15,000-$25,000 $25,000-$35,000

$35,000-$45,000 Greater than $45,000 Home Phone Parish

Mailing Address City State Zip Code

Legal Guardian Only

Relationship to applicant: Parent Step-parent Grandparent Sibling Other____________________________

Last Name First Name (Mother & Father) Middle Initial

Home Phone Work Phone

Pager Cell Phone

Mailing Address

City State Zip Code

Please complete the following only if you have a second legal guardian at a different address Relationship to applicant: Parent Step-parent Grandparent Sibling Other____________________________

Last Name

First Name Middle Initial

Home Phone

Work Phone

Pager

Cell Phone

Mailing Address City State Zip Code

Page 58: NGYCP_CP3-1 National Gaurd Youth Program

Intentionally Blank

Page 59: NGYCP_CP3-1 National Gaurd Youth Program

a-I 1 CP 3-1

APPENDIX I

SamPle mentor aPPliCation

(Please Print) Date

Full Name Age Date of Birth Sex Social Secu-rity No.

Number Street Apt. No. City State Zip Home Phone No.

Marital Status Spouse’s Name Age

Children Name Age

Name Age

Present Employer Business Phone No.

Address

Occupation How Long Employed? Immediate Supervisor

List other employment for the past 5 years (most recent first).

Position Employer How Long Employed Reason for Leaving

Religious Affiliation Other Volunteer Commitments

How many times have you moved in the past 5 years?

Page 60: NGYCP_CP3-1 National Gaurd Youth Program

a-I 2 CP 3-1

List past residences (most recent first).

Address City/State How Long There

Education:High School Years Attended Graduate Year

College/Univ. or Tech. Training

Years. Attended Degree

Past experience with children/youth:

Why do you wish to become a volunteer with ChalleNGe (be specific)?

Health: Poor Fair Good Excellent

Any physical limitations or special concerns?

Are you taking medication on a regular basis?

Any known allergies?

Have you ever sought counseling/therapy or treatment for any reason?

Date(s)

Describe:

Explain your present use of alcohol or any other drugs.

Explain your past use of alcohol or any other drugs.

Do you have a valid driver’s license? Yes No State Driver’s License No.

Do you have your own transportation? Yes No Car License No.

If no, do you have access to transportation? Yes No Describe

Please describe your driving record and offenses.

I will promptly report to ChalleNGe any changes in my insurance coverage or driver’s license status.

Signature Date

Have you ever been a victim of a crime? Yes No

Page 61: NGYCP_CP3-1 National Gaurd Youth Program

a-I 3 CP 3-1

If yes, please explain.

Have you ever been involved in, investigated for, arrested and/or convicted of a crime? Yes No

When?

Explain

List four references. (One present or past employer and three friends you have known at least 10 years). If you have ever been in therapy or treatment, please include the name of your therapist for one friend reference.

(1) Name Relationship

Address Work Phone ( )

Home Phone ( )

(2) Name Relationship

Address Work Phone ( )

Home Phone ( )

(3) Name Relationship

Address Work Phone ( )

Home Phone ( )

(4) Name Relationship

Address Work Phone ( )

Home Phone ( )

What attitudes and beliefs are of special importance to you?

Please list interests, hobbies, and activities you enjoy.

What special skills or talents you would be willing to share?

Please recommend others who might be interested in becoming mentors (use other side if needed):

(1) Name Work Phone ( )

Address Home Phone ( )

(2) Name Work Phone ( )

Address Home Phone ( )

This information is true and accurate to the best of my knowledge.

Signature Date

Page 62: NGYCP_CP3-1 National Gaurd Youth Program

Intentionally Blank

Page 63: NGYCP_CP3-1 National Gaurd Youth Program

a-J 1 CP 3-1

APPENDIX J

SamPle training SCHedule

06:00 - 06:30 morning Wakeup (Kitchen assistants report at 06:30)-- Bays / latrines � On line � Count off � Get dressed � Use latrine � Make beds � Morning meds lockers & bay

06:30 - 06:40 morning Colors by on-site platoon -- east side/Flagpole � Company formation � Uniform of the day

06:45 - 07:45 morning meal -- (Kitchen assistants report at 06:30)

07:30 - 08:00 silent reading -- homerooms � Silent reading in homerooms � Cadets will be ready for school/class to start at 08:00

07:30 - 08:00 supply exchange for the on-site platoon -- supply doorway � Cadets need exchange slips checked & signed by their cadre platoon leadership – Duty & Off-site platoon cadets

emergency only

08:00 - 11:45 school -- Classrooms

� All required cadets need to be seated, prepared & ready to learn at 08:00 -- Uniform of the Day

11:45 - 12:00 transition time for lunch (Kitchen assistants report by 11:50) -- Bays / latrines

12:00 - 13:00 noon meal / Journaling time -- Bays � Kitchen assistants report at 11:50 – Serving starts at 12:00 for the duty platoon – 15 minutes of the lunch hour is

to be used for journal time in the bays, before or after eating

13:00 - 15:00 school -- Classrooms � ALL required cadets need to be seated & ready at 13:00

14:00 - 15:00 group C -- Computer lab or open classroom � Case manager – cadre need to be present

Page 64: NGYCP_CP3-1 National Gaurd Youth Program

a-J 2 CP 3-1

15:00 - 15:15 transition / Change over / Prep for physical training -- Bays / latrines

15:15 - 16:50 Pt -- West side / determined by task � Make sure SAFETY comes FIRST (water, hats, inhalers and first aid pouch) � Mon, Wed & Fri Company physical training formation � Platoons will conduct physical training off of the physical training instructions

16:50 - 18:00 evening Colors / evening meal -- Flag Pole / dFaC � Kitchen assistants report at 16:45 � Company formation at Flag Pole 16:50 � First platoon in rotation lined up at 17:00 for dinner

18:00 - 18:30 Building maintenance -- designated areas depending on duty rotation � Attention to detail in latrines, bays, common areas, & classrooms etc.

18:30 - 19:30 1st Platoon - Character development -- determined by task � Character Development Class On: “Communication” -- Facilitated by: McNeil

18:30 - 19:30 2nd Platoon & 3rd Platoon -- mentee training -- Platoon homeroom � Case manager (s) will facilitate � Cadre need to be present

19:35 - 21:20 evening - Personal Business -- Bays / latrines � At 19:35 Start Rotation for snack starting with the duty platoon � Showers � Health & Hygiene Inspections � Personal Business – at least 30 minutes for Mail & Letter Writing � Fill out supply requests � Night Meds – Last Platoon Latrine Call – No unescorted cadets!

19:36 - 20:20 duty -- determined by task & cadre supervision/coverage � Duty details are focused on cleaning with attention to detail-uniform & correct equipment for the task

21:20 - 21:25 silent time -- Bays � Cadets on silence / sitting on line

21:25 - 21:30 Bedtime / lights out -- Bays � Cadets on line � Count off � Check’em � Prepare to mount � Mount � Lights Out � ADJUST – make sure the cadets are breaking the beds/covers down � No talking after lights out!

Mon Tue Wed Thu Fri Sat

1st plt A B C A B C 2nd plt B C A B C A 3rd plt C A B C A B

Page 65: NGYCP_CP3-1 National Gaurd Youth Program

gl-1 CP 3-1

GLOSSARY

Part i – aBBreViationS and aCronYmS

asVaB Armed Services Vocational Aptitude Battery

CP1 ChalleNGe Publication 1

Cssra ChalleNGe Site Suitability and Readiness Assessment

Fad Funding Authorization Document

ged General Education Development

moa Memoranda of Agreement

mou Memoranda of Understanding

myPCa Master Youth Programs Cooperative Agreement

ng National Guard

ngB National Guard Bureau

ngyCP National Guard Youth ChalleNGe Programs

osd-ra The Office of the Secretary of Defense for Reserve Affairs

P-raP Post-Residential Action Plan

srm State Resource Managers

rPm Recruitment/Placement/Mentor

soP Standing Operating Procedure

taBe Test of Adult Basic Education

tag The Adjutant General

usPFo United States Property and Fiscal Officer

Page 66: NGYCP_CP3-1 National Gaurd Youth Program

gl-2 CP 3-1

Part ii – termS and definitionS

annual performance goals. The set of performance metrics that individual sites and the national ChalleNGe community establish as annual metrics of programmatic success.

appendix 3 funding. Funding designated as 100% federal in appendix 3 of the Master Youth Programs Cooperative Agreement. The funding is for travel for national standardized training and federal initiatives that require support from local program staff.

catchment area. A 300-mile radius from the proposed ChalleNGe site in which the majority of applications are solicited.

candidate program. A program is referred to as a candidate program after the CSSRA is verified at M-12 and until they receive their first class.

cooperative agreement. Financial assistance mechanism (grant) used when substantial federal programmatic involvement with the recipient is anticipated by the funding agency during performance of the project. The nature of that involvement will always be specified in the offering or application guidance materials.

educational model. The type of educational environment upon which the individual ChalleNGe program operates (i.e. GED, high school diploma, alternative high school diploma, high school credit recovery).

high school dropout. An individual who is no longer attending any school and who has not received a secondary school diploma or a certificate from a program of equivalency for such a diploma.

jump start. The structure process of program startup running from the period of time between the initial expression of a location’s desire to have a program through the first Post-Residential Phase completion.

marketing. All of the activities around gaining stakeholders and maintaining a relationship with them.

mentor. A positive, caring adult who works with the cadet to achieve his/her Post-Residential Action Plan goals.

mentor program. An experienced program assigned by NGB to mentor the candidate program during the startup phase and first operational program year.

new program. A candidate program becomes a new program when they are fully operational and accept their first class of cadets.

post residential action plan. The contract and road map cadets establish with assistance from program staff and mentors to structure their success in the Post-Residential Phase.

post residential phase. The twelve-month period, post graduation, where cadets are actively engaged with their mentors and reporting on progress to the local program sites.

quasi-military. The structured environment established in the ChalleNGe program; built upon the tenants of developing self-responsibility in a structured environment where actions and consequences are linked.

residential phase. The twenty-two-week period of structured and experiential learning within the quasi-military environment.

Page 67: NGYCP_CP3-1 National Gaurd Youth Program

Intentionally Blank

Page 68: NGYCP_CP3-1 National Gaurd Youth Program