Programme Management LimitedBracken House, One Friday Street, EC4M 9JA.

08454 137 111 [email protected] pml Facilities Management Planned Preventative Maintenance Construction Management Building Services Management &

Installation Fit-out Works Refurbishment Works

Page 2: New brochure 240311

Our Core Team

John Francis C.Eng.M.I.C.E. ChairmanA Civil Engineer with over 40 years experience in all aspects of Construction and Facilities Management, John has secured the procurement and delivery of projects of all sizes, from small office fit outs to, most recently, the Construction of the Dubai Metro System.

David Robbins M.C.I.B.S.E. Managing DirectorOriginally trained as a Mechanical and Electrical Services Engineer, and with 30 years of experience in both the building refurbishment and building services areas of the construction industry, David oversees the operation of the Construction Department and the Facilities Management Department.

George Mason—General ManagerFacilities ManagementGeorge joins PML after many years of working with Multi National TFM providers. His experience will help to develop our FM offering and enable us to provide our customers with a high level of service providing a quality solution across all Sectors.

Gerard Beare - General Manager ProjectsA very experienced Mechanical and Electrical Engineer, Gerard specialises in complex building service installations. With over 25 years in the industry he has, for many years, managed a multi-disciplined team of engineers on major projects, and now leads our Projects / Construction Management Team.

James Gates—General ManagerBusiness DevelopmentJames joins PML after spending many years delivering large complex FM contracts to a multitude of industry sectors. His consultative approach enables him to focus on the specific needs of our clients, delivering a unique service package every time. The relationships forged continue through the contract lifecycle ensuring our clients receive the service levels agreed and that PML preserve our 100% contract retention rate.

“Our people are our most valuable asset” – John Francis, Chairman, PML.

Page 3: New brochure 240311

Introduction Programme Management Ltd (PML) is a team of professional Project Managers with extensive experience in Projects, Construction and Facilities Management (FM). Formed in 2004 around a core team who originally worked for one of the largest Japanese Construction companies, the Obayashi Corporation, PML brings together an impressive range of expertise and skill, providing clients with tailored services of exceptional quality.

PML is committed to providing customers with high quality and individually tailored solutions, meeting economic, safety and efficiency requirements. Our expertise in Facilities Management and Construction Projects enables us to consistently meet PML’s key objectives which are to effectively identify and then resolve customers’ problems. With extensive experience in budget preparation and procurement, as well as an impressive record of completing projects to time and budget, we have consistently provided our London based and international clientele with a service that is second to none.

Page 4: New brochure 240311

Facilities ManagementPML’s Facilities Management Department, headed by George Mason, is a growing team of skilled professionals with significant experience in hard and soft Facilities Management (FM) services. Delivering both Whole Building and Part Building contracts, the FM Department is committed to identifying and understanding clients’ individuals needs – and to providing a high quality and cost-effective service which meets these requirements.

Construction Management The Construction Management Department is managed by Gerard Beare who heads up a team of well experienced and highly motivated individuals who together form our project teams. Our philosophy is to be aware of and plan for every reasonable eventuality. We assess each project individually; each having particular features, needs or operational constraints. Our experience has taught us that in the majority of situations any problems that arise have invariably been encountered on previous projects and can therefore be avoided subsequently.

Page 5: New brochure 240311

Case Study - Facilities Management – Whole Building Location : River Plate House 7 - 11 Finsbury Circus London EC2M 7DH

Client : Mizuho Corporate Bank, Ltd

Contract Value: £2,000,000 p.a. (approx.)

Services Provided

Routine and planned preventative maintenance of all mechanical and electrical services.

Daily office cleaning and specialist cleaning services.

Provision of the building access control and security service, including the employment of all security staff.

Waste control and removal, including secure waste and recycled waste disposal.

Provision of all wash room and toilet supplies.

24 hour 365 day manned site with specialist emergency call out provision and maximum 2 hour response time.

Reactive and minor repairs provision including a 24 hour “handy man” service.

Manned help desk facility during office occupied hours.

Page 6: New brochure 240311

Case Study - Facilities Management – Part Building Location : 4th Floor 155 Bishopsgate London EC2M 3YX

Client : Norinchukin Bank Ltd

Contract Value: £140,000 p.a. (approx.)

Services Provided

Routine and planned preventative maintenance of all Mechanical and Electrical services installed by NBL, including UPS and emergency generator services, computer rooms, print rooms, meeting rooms and tea stations.

Daily office cleaning and specialist cleaning services within the NBL demise area.

Waste control and removal, including secure waste and recycled waste disposal.

24 Hour 365 days a year call out provision with a maximum 2 hour response time.

Reactive and minor repairs provision, as and when requested and required.

Page 7: New brochure 240311

Case Study - Facilities Management – Part Building Location : 3rd Floor Devon House St Katherine’s Dock London

Client : NTT Europe Limited

Contract Value: £110,000 p.a. (approx.)

Services Provided

Routine and planned preventative maintenance of all Mechanical and Electrical services installed by NTT, including UPS, computer rooms, general office areas and meeting rooms.

Daily office cleaning and specialist cleaning services within the NTT demise.

Minor project works which included the creation of 4 additional meeting rooms, redecorating and upgrading staff kitchen areas, meeting rooms and the main board room.

Reactive and minor repairs provision, as and when required.

Emergency 24 hour 365 days call out provision with a maximum 2 hour response.

Page 8: New brochure 240311

Case Study – Project

Location : Bracken House London EC4M 9JA

Client : Obayashi Corporation

Contract Value: £1,500,000

The Project The project consisted of the fitting out of the 5th floor centre plate and the 1st and Ground floor wings. The works involved mechanical, electrical and plumbing works in addition to partitioning and decoration. All works were required to be carried out to a high standard and to match the existing décor within the building. Following on from these works, PML’s services were further utilized when the ground floor was developed further with the construction of a boardroom, reception area, video conferencing suite and adjacent meeting rooms with specialised finishes and feature lighting.

The Achievements The project was completed on time and with a minimum of disruption to the

incumbent tenants Co-ordination of the activities of the various contractors, furniture suppliers, and

the removal operation so as to cause minimum disruption to MHCB’s business activities

The successful completion of the new boardroom and adjacent facilities.

Page 9: New brochure 240311

Case Study – Project

Location : Lombard Street London EC3V 9AJ

Client : Takenaka Europe

Contract Value: £6,000,000 (approx.)

Project Details The Project involved complex planning and programming of the replacement and upgrading of mechanical and electrical plant and services in this office building which covers six floors, housing some 200 persons; approximately one third of its capacity. The PML team was involved in the management of the design process and the production of tender documents for the specialist subcontracts. The construction phase, which PML were pleased to project manage on behalf of the Client, commenced in July 2009.

Project Achievements Working in conjunction with Takenaka to establish a cost plan which

is acceptable in terms of the Client’s budget and which enabled the necessary works to be carried out to the highest standards.

Page 10: New brochure 240311

Case Study - Construction Management

Location : Totteridge Green London N20

Client : Wrenspire Projects Ltd.

Contract Value: £14,000,000

Project Details The Project involved the completion of construction works, building fit-out and final decoration of a prestigious 18,500 square foot dwelling including the installation of a swimming pool, bowling alley, gymnasium, sauna, pavilion and 6 hole PGA Standard golf course. As would be expected, the highest quality of materials and standard of finish was required, and achieved.

Project Achievements At the time that the Wrenspire/PML team took over the Contract, it

was running some 12 months behind programme and the Works had a number of significant defects, both apparent and latent, that required resolution. We were able to resolve the various problems to the Client’s and Architect’s satisfaction and to successfully complete the Project

The project necessitated complex and sophisticated electrical and HVAC controls and installation which were carried out under the direct control of PML’s M&E Site Manager.

PML’s full-time on site Building Manager was able to oversee all remedial works and then to continue to completion to the highest quality by the various trade contractors.

Page 11: New brochure 240311

Case Study - Building Services Management and Installation Location : River Plate House 7 - 11 Finsbury Circus London EC2M 7DH

Client : Obayashi Corporation

Contract Value: £1,928,000 - M&E Works Element

Service Provided:

In conjunction with the leaseholder, Mizuho Corporate Bank Ltd., PML formulated a Forward Maintenance Plan for 2008-9, including cost planning and compilation of budget.

The Works comprised seven identified packages, and included: Replacement of the existing BMS; Overhaul of M&E plant in the Basement; and Repair and maintenance to the fabric of the building.

For each package, PML prepared the Employer’s Requirement and Tender documentation. Contracts were placed with the successful tenderers and implemented and managed by PML. Following the success of this project, PML are now preparing the Forward Maintenance Plan for 2009-13 in partnership with Obayashi Corporation UK and Japan.

Page 12: New brochure 240311

Case Study - Management Contracting Location : River Plate House 7 - 11 Finsbury Circus London EC2M 7DH

Client : Mizuho Corporate Bank, Ltd.

Contract Value: £2,500,000

Service Provided: Following the successful completion of the 2008-9 Forward Maintenance Plan works as Project Managers on behalf of Obayashi Corporation, PML were directly appointed as Management Contractors by the leaseholders, Mizuho Corporate Bank, Ltd., to carry out the 2009-10 Forward Maintenance Plan Works. The Works, with a combined value of £2.5 million, comprised seven identified packages, and included: Replacement of the existing Security Access Control System. Smoke Damper Works. Lift Repair and Refurbishment. HVAC System Overhaul. Repair and Maintenance of the Fabric of the Building.

For each package, PML were responsible for all matters from the preparation of the Employer’s Requirement through to completion of construction. PML are also now preparing the Forward Maintenance Plan for 2009-13 in partnership with Obayashi Corporation in UK and Japan.

Page 13: New brochure 240311

Generators Telephone systemsUPS systems Security SystemsChiller plant Access Control SystemsBoiler plant CCTV System Installations Air handling unit’s Partitions and GlazingWater treatment equipment Carpets and Vinyl flooringEvaporative cooling towers Painting and decoratingEssential cooling Masonry maintenanceACU down flow unit’s Floor box installation VAV/FCU Maintenance/ installation

Lighting and Lighting control systems

Foul Water Drainage HV InstallationsRain Water Drainage Critical power distributionSprinkler system maintenance LV Power distributionKitchen equipment Fire alarm systemsFire extinguisher maintenance LV power factor correction Radio communications Lift MaintenanceBuilding Management systems IT Infrastructure

Cleaning services Secure Waste RemovalSecurity services Hazardous Waste Removal Pest controls services RecyclingToilet & Sanitary Provisions Specialist / Deep Cleaning

Asbestos surveys Water treatment monitoringAir Purity Testing Energy ManagementFire Risk Assessments Thermographic SurveysFire alarm testing Fixed wiring testingHealth and Safety audits Fire extinguisher testingPortable appliance testing Black/ Dead Building Testing

Facilities Management Services

Hard Services Soft Services

Inspections

Page 14: New brochure 240311

Our Mission To fulfil our raison d’etre—to provide an outstanding service with dedication, passion, understanding and proactivity.

In order to achieve this, our values are to:

1 Create partnerships and integrate ourselves with our clients to embed their priorities into everything we do.

2 Encourage innovation through training, mentoring and rewards to create cost effective responsible and revolutionary

packages.

3 Respect the environment by evaluating the consequential impact of all business decisions.

4 Be passionate about what we do and how we do it—always being dedicated, understanding and caring to our working

environment.