needs anal ysis report - rustenburg · 2.2.1 organisation ... (mrf) for reclamation of ... this...
TRANSCRIPT
KfW B
EntwicPalme60325GERM
Fea
Julius64293Germ
www.
Bankengru
cklungsbanengartenstr.5 Frankfurt aMANY
asibility
s-Reiber-Stras3 Darmstadt
many
.iu-info.de
Ger
ppe
nk . 5 – 9 a. M.
Nestudy foSystem
sse 17
rman Finan
eeds or an Advfor Rust
ncial Coope
Analvanced Itenburg L
April
eration wit
lysis ntegrateLocal Mu
2014
h South Af
Ruste
Solid Waste
Repod Solid Wunicipalit
frica
enburg Loc
e Managem156 B
S
ort Waste Mty (RLM)
cal Municip
ment DepartBethlehem
RustenSOUTH AF
anageme)
25 Scott Waverley
South
www.pdna
pality
tmentDrivenburgRICA
ent
Street, 2090Africa
a.co.za
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx I
TABLE OF CONTENT
0 Introduction .............................................................................................................. 1
Part 1 Project Alignment with Strategic Objectives ................................................... 5
1.1 Mission Statement of Rustenburg Local Municipality ................................................. 5
1.2 Vision .......................................................................................................................... 5
1.3 Summary of the Municipal Strategic Objectives ......................................................... 5
1.4 Rustenburg Waste Management ................................................................................ 8
Part 2 Status Quo Analysis ........................................................................................... 9
2.1 Project Area ................................................................................................................ 9
2.2 Preliminary Assessment of Current Waste Management Service Delivery .............. 10
2.2.1 Organisation........................................................................................................ 12
2.2.2 Education and Awareness .................................................................................. 13
2.2.3 Recycling ............................................................................................................ 13
2.2.4 Refuse Removal (Collection) .............................................................................. 15
2.2.5 Sweeping ............................................................................................................ 19
2.2.6 Garden Waste Sites and Transfer Stations ........................................................ 20
2.2.7 Disposal .............................................................................................................. 22
2.2.8 Waste Amounts and Waste Characteristics ........................................................ 24
Part 3 The Project ........................................................................................................ 28
3.1 Technical Concept of the Plant for Biological Drying................................................ 28
3.2 The Site .................................................................................................................... 31
Part 4 Budget Analysis ................................................................................................ 32
4.1 Operational Expenditures ......................................................................................... 32
4.2 Revenues ................................................................................................................. 32
4.3 Capital Expenditures ................................................................................................ 33
4.4 Assessment of the Financial Status ......................................................................... 33
4.5 Costs of the MBT ...................................................................................................... 36
Part 5 Capacity and Commitment ............................................................................... 38
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx II
5.1 Project Officer and Project Team ............................................................................. 38
5.1.1 Roles and Responsibilities .................................................................................. 38
5.2 Capacity in Project Team ......................................................................................... 41
5.3 Skills Transfer Plan .................................................................................................. 42
5.4 Key Stakeholders ..................................................................................................... 43
5.5 Stakeholder Engagement Plan ................................................................................. 45
Part 6 Project Outputs ................................................................................................. 47
6.1 Activity to be Undertaken ......................................................................................... 47
6.2 Outputs Required to Deliver the Activity ................................................................... 47
6.3 Minimum Standards for the Outputs ......................................................................... 48
6.4 Assessment of the Output Specifications ................................................................. 50
6.5 Key Indicators for Performance Monitoring .............................................................. 51
6.6 Service Interface Expectations ................................................................................. 52
6.7 BEE and Socioeconomic Targets for the Project ..................................................... 53
Part 7 Project Scope .................................................................................................... 55
7.1 Project Scope ........................................................................................................... 55
7.2 How the Project Objectives will Address the Institution’s Strategic Objectives ........ 55
7.3 List of Significant Government Assets for the Project .............................................. 57
7.4 Project Structure ....................................................................................................... 57
LIST OF TABLES
Table 1 Population forecast for Rustenburg Local Municipality and Bojanala Platinum district .......................................................................................... 10
Table 2 Planned transfer stations ............................................................................ 20
Table 3 Waste amounts registered at Townlands landfill from 2010 to 2013 .......... 25
Table 4 Comparison of results of sorting analysis ................................................... 26
Table 5 Operational expenditures of the RLM waste management unit .................. 32
Table 6 Revenues for RLM waste management services ....................................... 32
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx III
Table 7 Excerpt of the RLM refuse removal tariffs 2013/2014 ................................ 33
Table 8 Capital expenditures for the last 5 years .................................................... 33
Table 9 Balance of annual costs and revenues for the last five years .................... 34
Table 10 Estimated dynamic unit costs [ZAR/ ton] for different scenarios of the future RLM SWM system (project period of 20 years, with contingencies and costs of implementation consultant) ............................. 36
Table 11 Roles of the transaction advisory team ...................................................... 41
Table 12 Measures for improvement of the efficiency of municipal SWM services ...................................................................................................... 42
Table 13 Proposed Key Stakeholders ....................................................................... 43
Table 14 Composition of RDF ................................................................................... 49
Table 15 BBBEE Scorecard ...................................................................................... 53
Table 16 Achievement of RLMs strategic objectives ................................................. 56
TABLE OF FIGURES
Figure 1 Stages of a municipal PPP feasibility study .................................................. 3
Figure 2 Rustenburg Local Municipality ...................................................................... 9
Figure 3 Waste management infrastructure in RLM ................................................. 11
Figure 4 Planned recycling activities in RLM ............................................................ 14
Figure 5 Service areas internal and external service providers ................................ 16
Figure 6 Proposed general layout of the transfer stations (BKS) ............................. 21
Figure 7 Layout plan of Waterval landfill ................................................................... 23
Figure 8 Construction of Waterval landfill during August 2013 ................................. 24
Figure 9 Waste composition of RLM general waste according to Review of the Integrated Waste Management Plan; Consolidated Report (January 2014) .......................................................................................................... 26
Figure 10 Mass balance of aerobic drying MBT process (including MRF) ................. 29
Figure 11: Options for the use of RDF ......................................................................... 30
Figure 12 Project officer and project team .................................................................. 38
Figure 13 Service interfaces ....................................................................................... 52
Figure 14 Project structure ......................................................................................... 57
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx IV
ABBREVIATIONS
AISWMS Advanced Integrated Solid Waste Management System
BBBEE Broad-Based Black Economic Empowerment
BPDM Bojanala Platinum District Municipality
CBD City Business Development or Central Business District
DEA South African Department of Environmental Affairs
EPWP Expanded Public Works Programme
FS Feasibility study
GIS Geographical information system
IWMP Integrated Waste Management Plan
KfW KfW Entwicklungsbank (German Development Bank)
IU INFRASTRUKTUR & UMWELT
MBT Mechanical biological treatment
MIG Municipal Infrastructure Grant
MPPP Municipal Service Delivery and PPP Guidelines
MRF Material recovery facility
MSW Municipal solid waste
NWMS National Waste Management Strategy
PPP Public Private Partnership
RDF Refuse derived fuel
RLM Rustenburg Local Municipality
SMMEs Small, Medium and Micro Enterprises
SWMU Solid Waste Management Unit of RLM
TA Technical assistance
UAWEC Urban Agricultural and Waste Education Centre
WDC Waste drop-off centre
ZAR South African Rand (Exchange rate: 14 ZAR = 1 EUR)
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 1
0 Introduction
As part of South African-German co-operation, Rustenburg Local Municipality (RLM) and
KfW Entwicklungsbank (KfW) agreed to explore the feasibility of an Advanced Integrated
Solid Waste Management System (AISWMS) for RLM. The main aims of the AISWMS are
Adoption of the South African National Waste Policies with regard to utilization of waste as a resource (recyclables, energy recovery) by applying innovative waste treatment technologies
Increasing the quality and efficiency of waste management services in RLM
A Feasibility Study was undertaken in 2008/2009 developing and evaluating different
waste treatment options from fairly simple technologies up to very sophisticated state of
the art technologies. As a result of this assessment a waste treatment facility, comprising
the following two components has been identified as the most favourable solution for
RLM:
Material Recovery Facility (MRF) for reclamation of recyclables (which is already included in the present plans for construction of the new Waterval Landfill), and
MBT with biological drying to produce refuse derived fuel (RDF).
It has been proposed to realize both components in one central facility at the entrance of
the new Waterval Landfill. In March 2010 the RLM council approved the results of the
Feasibility Study and requested further assistance from KfW regarding project
implementation. KfW agreed with RLM to conduct an expert mission to Rustenburg in
order to verify and update the results of the Feasibility Study done in 2009 and develop a
roadmap on how to proceed. An expert team was assigned for this mission comprising of
Dipl.-Ing. Gernod Dilewski for investigation of the technical issues and MBA Johan Louw
for investigation of financial and institutional aspects. The main tasks of the experts were:
review and update of the current situation on waste management in RLM;
verification of results of the FS regarding the utilization of RDF;
propose organizational setup for development and operation of the Waste Treatment Facilities;
develop a model for project financing;
based on the recommendations develop a plan for project implementation;
specify supporting measures to capacitate RLM to successfully implement the project; and
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 2
specify supporting measures for nationwide dissemination of information and project results for advanced Solid Waste Management.
The updated feasibility study was concluded in 2012 and focused on the implementation
of the new waste treatment facility and strengthening of waste management service
delivery.
In November 2013 the consulting companies INFRASTRUKTUR & UMWELT, PDNA and
UTHO (“Consultant”) were assigned to support the implementation of the proposed waste
treatment plant in RLM for a period of three years (until end of 2016). This consultancy is
a component of the Waste Management Program, financed by the German Development
Bank (KfW) and headed by the South African Department of Environmental Affairs (DEA).
The consultancy services are divided into two components:
I. Improvement of Efficiency of Solid Waste Management Services in the RLM
II. Implementation of a Waste Treatment (waste to energy) Plant at Waterval Landfill (including transaction advisory services)
Both components will be complementary to each other and contribute to the overall
project objective of establishing an integrated, environmentally sound and efficient waste
management system in RLM.
In order to move the project forward, National Treasury approval is required for the
feasibility study in the PPP framework.
This report is the Needs Report which comprises the first report in the feasibility study.
The full feasibility study process includes the following:
AdvanImple
P:\1576 KfW R
Figur
nced Solid Wamentation Con
RLM Implementation\
re 1 Stag
aste Managemnsultant for M
\Bericht\03 - Needs A
ges of a mun
ment for RLMBT Facility
Analysis\0 - Drafts\ne
nicipal PPP
ew headline\RLM AIS
feasibility s
SWM Needs Analysis
study
s_v04_new.docx
Need
s Analysis
33
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 4
The Needs Analysis Report comprises the following:
• Part 1: Project Alignment with Strategic Objectives
• Part 2: Status Quo Analysis
• Part 3: The Project
• Part 4: Budget Analysis
• Part 5: Capacity and Commitment
• Part 6: Project Outputs
• Part 7: Project Scope
The next report will be the Options Analysis in terms of the process indicated in the
diagram above.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 5
Part 1 Project Alignment with Strategic Objectives
1.1 Mission Statement of Rustenburg Local Municipality
The mission of Rustenburg Local Municipality is to:
"To continuously improve the quality of life, economic growth and eradicate poverty
through best practice, sustainability and inclusive governance".
1.2 Vision
The vision for RLM is to be:
"A world class city where all communities enjoy a high quality of life".
1.3 Summary of the Municipal Strategic Objectives
Following table summarises the strategic objectives of the Rustenburg Local Municipality.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 6
PRIORITY OBJECTIVES
Efficient provision of quality basic services and infrastructure within a well-planned spatial structure Supporting vision components:
A logical and well planned spatial structure supported and sustained by high quality infrastructure
Citizens enjoy high quality of Life.
Accelerated delivery and maintenance of quality basic and essential services to all Communities Improved service delivery through provision of high quality, reliable and cost effective infrastructure based on integrated spatial planning Develop and implement educational/awareness programmes to obtain community in and ownership in the use and protection of community and municipal facilities Implementation of a City Business Development (CBD) Regeneration Strategy Improved public transport infrastructure
Drive diversified economic growth and job creation Supporting vision components:
A diversified and resilient economy
Consolidated Rustenburg minerals index, value production and economic growth path quantification and impact Revive and expedite development of alternative high value adding economic growth sectors - agriculture, manufacturing, transportation services and products Build and support broad-based black economic empowerment and sustainable Small, Medium and Micro Enterprises (SMMEs) business development Create an enabling environment for the attraction, retention and expansion of foreign and local investments Stimulate and facilitate sustainable tourism development and marketing of Rustenburg City as a world-class destination Development of an integrated human resources that empowers communities skills development Development of an institutional integrated human resources capability that enhances institutional competence
Ensure municipal financial viability and management Supporting vision components:
A city well governed by municipal administration providing decisive leadership.
Develop and implement integrated financial management systems to support municipal programmes and ensure internal financial sustainability Implement revenue management strategy to enhance municipal financial viability and sustainability Implement sound and sustainable financial management and compliance controls Develop and implement an integrated municipal core projects’ funding and acquisition model aligned with funding institutions’ terms and conditions
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 7
PRIORITY OBJECTIVES
Maintain clean, green, safe and healthy municipal environment for all Supporting vision
Sustainable use and effective management of natural resources.
Implement quality and improved health and social services to Communities Explore and implement alternative eco-friendly and conservation interventions to preserve the environment Implement integrated community safety and security strategy and measures Implement an integrated by-law enforcement programme
Transform and maintain a vibrant and sustainable rural development
Citizens enjoy high quality of Life.
Drive integrated rural development planning and infrastructural development Provide conductive environment for rural economic development through sustainable SMME’s mentoring
Uphold good governance and public participation principles
A city well governed by municipal administration providing decisive leadership.
Drive good governance and legislative compliance in all municipal processes Promote public participation and partnerships with stakeholders on municipal programmes Establish and maintain strong partnerships with local (mining) industries to oversee social
Drive optimal municipal institutional development, transformation and capacity building
appropriately skilled labour force
Develop and implement integrated internal systems and processes Develop, implement and review internal policies and procedures on regular basis Establish and inculcate a service delivery culture Establish quality management processes in the delivery of all services Maintain a positive and vibrant image and identity of the municipality Provide credible leadership in driving transformation initiatives Develop and implement internal capability model (institutional core and critical competencies, scarce skills, maintenance skills) that enhance institutional and external stakeholders' development communities and institutional capability Review, realign and implement organisational structure to support the vision and objectives
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 8
1.4 Rustenburg Waste Management
Mission and Vision on Waste: Reduce – Reuse – Recycle – Treatment – Disposal
With regard to SWM the most important plan in RLM is the Integrated Waste Management
Plan (IWMP). An update of the existing IWMP is currently under preparation. The IWMP
will provide the basis to properly plan and manage SWM services in RLM.
The main purpose of revising the IWMP is the incorporation of national policies for waste
valorisation and the assessment of alternative service delivery mechanism. “The Waste
Management Unit recognised the preceding sentiment, including the realisation that
reliance on current waste management systems and direct disposal to land should no
longer be the only option for the future (RLM, 2012). It is against this backdrop that
Council (2012) mandated the management of the municipality to explore, within the
context of the IWMP Review, alternative mechanisms for delivering waste services to the
communities of Rustenburg”1.
1 Section 1.1 of the IWMP review, consolidated report, March 2014
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 9
Part 2 Status Quo Analysis
2.1 Project Area
The project area is Rustenburg Local Municipality (RLM), a local municipality in Bojanala
Platinum District or rather the Bojanala Platinum District Municipality (BPDM) in the North
West Province. It is located in the eastern parts of the North West Province. Just recently
RLM has submitted an application for becoming a metropolitan municipality. In total RLM
comprises 38 wards.
Figure 2 Rustenburg Local Municipality
Madibeng
Mogale City
RandfonteinVentersdorp
Kgetlengrivier
Moses Kotane
Wards:
Rustenburg Town
Other wards
Rooiwal
Bethanie
Ga-Luka
Marikana
Boshoek
Phokeng
Photsaneng
Maanhaarrand
Boons
Rustenburg
Kroondal
Phatsima
Chaneng
Monnakato
TsitsingHartbeesfontein
Mfidikwe
Kanana
Lefaragatlha
Tlhabane
Meriting
Modikwe
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 10
According to the Census 2011, RLM is the most populous municipality in the North West
Province and the sixth most populous one in South Africa. In 2011 it had a total population
of 549,575 people. Since the last census in 2001 RLM’s population has risen by 162,479
people. Based on the census data, population is projected until 2035. The projection is
based on the assumptions that population development will continue in accordance with
the development of the last years.
Table 1 Population forecast for Rustenburg Local Municipality and Bojanala Platinum
district
Rustenburg Local Municipality Total Bojanala Platinum District Municipality
2001 387,096 1,189,359
2011 549,575 1,507,506
2012 568,354 1,544,122
2013 587,303 1,581,311
2014 606,396 1,619,069
2015 625,607 1,657,395
…
2025 817,486 2,071,968
…
2035 984,967 2,551,133
Based on the explained assumptions, the population in RLM will rise from 549,575 in 2011
to 984,967 in 2035. In the whole BPDM the population is expected to increase from
1,507,506 in 2011 to 2,551,133 in 2035.
2.2 Preliminary Assessment of Current Waste Management Service Delivery
The following figure presents the existing and planned facilities in the RLM. The following
sections refer to the respective facilities and provide additional information.
AI
P:\157
Advanced SolImplementatio
76 KfW RLM Impleme
lid Waste Manon Consultant
entation\Bericht\03 -
Figu
nagement for Rfor MBT Facil
Needs Analysis\0 - D
ure 3 Wa
RLM lity
Drafts\new headline\
aste manage
RLM AISWM Needs
ement infras
Analysis_v04_new.d
structure in
docx
RLM
Needs Analyssis
11
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 12
2.2.1 Organisation
Within Rustenburg Local Municipality (RLM) the Waste Management Unit (SWMU) is
established as part of the Directorate “Infrastructure Development & Management”.
The SWMU is led by the Head Waste Management – Walter Senne. According to the
organogram there are five managerial positions foreseen in the SWMU:
Manager Refuse Removal
Section Manager Waste Information & GIS
Manager Landfill & Dumping
Section Manager Waste Minimisation, Education and Law Enforcement
Manager Contracts.
However, out of these five managerial positions only three positions are filled (Refuse
Removal, Landfill & Dumping, Contracts), while two are vacant (Waste Information & GIS
as well as Waste Minimisation, Education and Law Enforcement). On the foreman level
most of the foreseen positions are filled (except foreman for Landfills and Waste
Minimisation & Law Enforcement Officer).
The SWMU is only responsible for the direct solid waste management operations, but all
supportive activities like financial management, human resource management or
corporate services are handled centrally for all directorates of RLM. Because of this, the
SWMU has no influence on human resources decisions, but is dependent on decisions
taken by the central services. This has the consequence, that
decisions on hiring and selection of staff cannot be taken by the SWM unit directly;
the Unit has no direct disciplinary control on the staff; sanctioning of misconduct has to follow complicated procedures and there are limited possibilities for incentives;
the unit has no direct control on training and capacity building measures;
procedures for communication and decision making are complex and time consuming;
delivery of shared services is delayed (i.e. repair and maintenance of equipment) without direct control of the unit;
important functions like efficiency monitoring are not implemented by the waste management unit nor by any other department.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 13
As a result of the Municipal Systems Act Section 78 Report, the waste management
function in the RLM is currently being ring-fenced as a business unit. A local consultant
has been assigned to establish a waste management entity that will “have to deal with
integrated waste management within RLM proximities so as to ensure creative but
sustainable waste management solutions for the municipality.”
2.2.2 Education and Awareness
Education and awareness activities in the RLM waste management services occurs
primarily through media reports, engagement with local communities on designated
Clean-up Days in the respective communities, through information available online
(http://rlmwaste.co.za/education-and-awareness/) and via social media forums
(https://www.facebook.com/RLMWaste).
The recommendations in Report 9 (Waste Education and Awareness) are part of the
IWMP developed by Jarrod Ball and Associates in March 2006 is currently being
implemented by this department in the unit.
2.2.3 Recycling
2.2.3.1 Current Recycling Activities in RLM
The South African National Waste Management Strategy defines the following targets for
recycling, to be achieved until 2016:
25% of recyclables diverted from landfill sites for re-use, recycling or recovery.
All metropolitan municipalities, secondary cities and large towns have initiated separation at source programmes.
Achievement of waste reduction and recycling targets set in IWMPs for paper and packaging, pesticides, lighting (CFLs) and tyres industries.
To date the RLM waste management unit has not implemented any major formal recycling
activities. However, there is a vibrant recycling industry that involves all levels of informal
and private business. Present recycling activities include
Waste picking on the Townlands landfill (according to different studies between 500 and 1,000 waste pickers are working on the landfill)
Salvaging by waste pickers in urban centres
Recycling companies collecting recyclables from businesses and industries (also buying the recyclables from waste pickers)
AdvanImple
P:\1576 KfW R
R
Ther
Howe
sepa
2.2.3
The
recyc
imple
Figur
Ongo
SeinthTh
nced Solid Wamentation Con
RLM Implementation\
ecycling in
re is no data
ever, it can
arates as mu
3.2 Planne
RLM waste
cling. The d
emented.
re 4 Plan
oing and pla
eparation a each settle
he householholoana is i
aste Managemnsultant for M
\Bericht\03 - Needs A
the Royal B
a available o
be expecte
uch 10 % o
ed Formal R
e manageme
diagram belo
nned recycli
anned recyc
t source proement area lds have bemplementin
ment for RLMBT Facility
Analysis\0 - Drafts\ne
Bafokeng ar
on the over
ed that pres
f the overal
Recycling A
ent unit has
ow provides
ng activities
cling initiativ
oject (pilote5,000 hous
een providedng the proje
ew headline\RLM AIS
rea impleme
rall amount
sently, inform
ll stream of
Activities
s developed
s an overvie
s in RLM
ves include
ed by DEA +seholds ared with two s
ect
SWM Needs Analysis
ented by Te
of recyclab
mal and priv
domestic w
d various pla
ew on the d
e
+ RLM) in C taking part
separate wa
s_v04_new.docx
edcor (priva
les being co
vate sector
waste.
ans and ide
ifferent mea
Cashan and t in the projeaste contain
Need
ate company
ollected in R
recycling
eas with reg
asures that
Bethanie ect ners (2 x 12
s Analysis
14
y)
RLM.
gard to
may be
20l)
4
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 15
Buyback centres for recyclables are also established/ going to be established in Lefaragathla, Bethanie and Mfidikwe – the separate collected waste from Cashan will be transported to the Lefaragathla Buyback Centre, while the separate collected waste from Bethanie will be transported to the buyback centre in Bethanie; so far there does not exist any agreement for the marketing of recyclables from the buyback centres
Material recovery facilities (MRF) shall be implemented at the waste transfer stations in Marikana, Tsitsing and Phokeng. The projects are still at a design stage.
A funding application has been prepared for the Strumosa Urban Agricultural and Waste Education Centre (UAWEC). The project shall include a waste drop off and buy back centre, composting, agricultural activities and fish farming. Furthermore, a variety of educational and recreational activities shall be provided.
A central MRF shall be implemented at the new Waterval landfill. Recently, a separate feasibility study has been prepared for this project.
2.2.4 Refuse Removal (Collection)
2.2.4.1 General
The refuse removal services are provided by the local municipality as well as by private
operators. According to the Integrated Waste Management Plan (IWMP), from 120,000
service points in the greater Rustenburg area, about 50,000 is serviced by the municipality
itself. For the remaining service points, the CBD area and Marikana with additional 1,500
service points, the private operators are responsible (see next figure).
AdvanImple
P:\1576 KfW R
Figur
2.2.4
In ter
comm
dispo
For t
drive
have
nced Solid Wamentation Con
RLM Implementation\
re 5 Serv
4.2 Munici
rms of refus
mercial/indu
osal sites. T
the provisio
ers. There a
e a lifting de
aste Managemnsultant for M
\Bericht\03 - Needs A
vice areas in
ipal Service
se removal,
ustrial waste
The househ
n of refuse
are 12 waste
evice for the
ment for RLMBT Facility
Analysis\0 - Drafts\ne
nternal and e
es
the munici
e, separate
olds make
removal se
e collection
e mechanica
ew headline\RLM AIS
external ser
pal services
e collection o
up the majo
ervices, RLM
vehicles w
al emptying
SWM Needs Analysis
rvice provid
s cover the
of garden w
ority of the c
M has 11 pe
ith compact
of standard
s_v04_new.docx
ders
collection o
waste, and t
customers o
ermanent an
tion units. O
d containers
Need
of domestic
transport to
of the munic
nd 2 backup
Only six of th
s. Two truck
s Analysis
16
and
the
cipality.
p
hem
ks are
6
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 17
used as spare trucks. Each truck on a collection trip is accompanied by approx. 8 general
workers. Two foremen are responsible for the monitoring of the refuse removal teams.
The distribution of waste bins to about 10,000 households in Waterfall East and Cashan
has been completed and now distribution will be in the CBD. The RLM has contracted a
company for the supply of the bins on an as and when needed basis for a period of three
years.
In addition to the compaction trucks, the RLM Waste Unit has 15 further vehicles including
tipper trucks, pick-ups (bakkies), a bobcat and a trailer, a front end loader and a grab lorry
(crane truck). The whole list of vehicles is given in the following table.
The waste is collected in two shifts on all days of the week, except Christmas and New
Year. The first shift begins 6 o’clock in the morning and ends 2 o’clock in the afternoon
after which the second shift begins and lasts until 10:00 o’clock in the evening. Since the
number of drivers is equal to the number of compaction trucks, it can be assumed that the
same trucks are not utilised in both shifts. As stated by the management, in some cases,
the drivers and other workers work more than eight hours, however, this cannot be the
norm.
The Refuse Removal Manager provides the waste collection routes to the drivers.
Although a geographical information system for the municipality is available, the collection
areas and routes are not available on a map.
The RLM area is divided based on whether service rendered internally by RLM or
externally through service providers. The internal services are provided in Rustenburg
CBD, while the private operators collect the waste in surrounding communities.
2.2.4.3 Efficiency of Municipal Waste Collection Services
Assessment of the available data indicates that the efficiency of waste collection services
provided by RLM is very low. The possible capacity of the equipment is three times more
than what is actually collected. Estimated unit costs for waste collection are very high as
well. The reasons for this low performance may be as follows:
there is no effective monitoring and control mechanism for the performance of collection teams: the summary of number of collection trips/deliveries in the tables above clearly shows that there are significant differences between the deliveries of different trucks and the same truck in different weeks. If the quantity of the collected waste by each truck can be registered on a weighbridge, more indicative data about the performance of waste collection can be gathered.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 18
inadequate or no preventive maintenance of the vehicles: since there is no preventive maintenance according to a maintenance plan, the trucks need repair works after sudden breakdowns. Due to the lack of a store of spare parts, waiting for parts from suppliers results in long lead times for repairs
lack of effective collection trip and schedule planning: The Refuse Removal Manager plans the collection trips (areas) for every driver. Aspects like selection of the shortest drive way with maximum quantity of collected waste are not sufficiently considered. In addition, some of the drivers cannot read and write so that they are not able to read the street names and follow the given route.
issues with personnel management: according to the Refuse Removal Manager, the absenteeism of the workers is a problem within the collection staff. Besides breakdown of trucks, the non-appearance of the workers and drivers might be the reason for low performance.
Another issue which is important for the performance of the refuse removal service is the
number of workers accompanying the collection trucks. On average eight workers are
assigned to each collection truck. On the one hand, there is no need for such a high
number of collection workers per truck. On the other hand, with this high number of
workers, it can be expected that the performance of the collection services should be very
high as well. However, as previously explained, the performance is only 30% of that what
should be expected normally. Depending on the location of the containers, usually only
two to three workers are required for the collection of waste with compaction trucks.
2.2.4.4 Private Contractor Services
The areas serviced by external service providers are shown in Figure 5.
In southern farmland areas including Boons, Mothobastad and Syferbad no services for
waste collection are provided. From time to time, these areas are cleaned through the
Expanded Public Works Programme (EPWP). The billing system does not clearly indicate
whether the service is being rendered by internal and external service providers.
RLM provides to the external service providers the refuse removal schedules in their
service areas. The private companies provide trucks and manpower. The labourers
employed by the private operators should be from the region concerned to promote job
creation.
The contract management and monitoring is carried out by the contracts manager of the
RLM Waste Unit. He inspects all regions monthly. In the contracts there are levels of
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 19
cleanliness (visual inspection) and penalties may be applied for non-compliance by
contractors.
The illegal dumping of waste takes place particularly in high density low income areas with
backyard dwellings.
2.2.4.5 Challenges
On the basis of the assessment of the current refuse removal services, the challenges can
be summarised as following:
Creating a reliable database for proper planning
Implementation of a proper route planning system also considering the backyard dwellings
Implementation of a performance monitoring system for internal and external services
Improvement of working conditions of municipal workers and ensuring efficient and optimal use of their time
Training of staff including Adult Basic Education and Training where necessary
Implementation of an asset management and equipment maintenance system
Timely repairs of collection vehicles
Most of the improvement measures are administrative measures since sufficient
equipment capacity is already available. The main aim will be the proper planning and
effective utilisation of resources.
2.2.5 Sweeping
Through the Extended Public Works Programme (EPWP) 150 street cleaners are
provided for cleaning the centre of Rustenburg town. The work is organised and
supervised by the RLM waste management unit. The workers are poorly equipped, mostly
just using bags and grabbers. The organogram (see section 2.2.1) indicates 37 additional
street cleaners, a foreman and a supervisor as staff of the unit for street sweeping.
Sweeping activities include emptying of street bins, cleaning of collections stands and
special cleaning campaigns.
In the areas where private contractors are implementing waste collection, the contracts
include sweeping services as well.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 20
2.2.6 Garden Waste Sites and Transfer Stations
Currently there are five communal sites for waste disposal. In order to close these sites
and transport the waste to the regional landfill, two years ago RLM applied for MIG
funding for the implementation of transfer stations. National treasury approved only three
transfer stations which will replace all these communal sites. A fourth transfer station in
Phatsima is listed in the Review Report of the IWMP from January 2014. The location of
these transfer stations and status of implementation are as follows:
Table 2 Planned transfer stations
Transfer Station
Replaced communal sites
Status
Phokeng Monakato and RBN No activity started
Lethabong Lethabong, Tsitsing, Bethanie
No activity started
Marikana Marikana Construction tendered
Phatsima Phatsima Geohydrolic and geotechnical studies completed, design and documentation in progress
The implementation of the Phokeng transfer station has not been started yet, because the
land issues have not been resolved and required funding is still not available. Similarly,
the land issues in Lethabong are also not solved. The construction of the Marikana
transfer station was tendered on 8th of June 2013; however, it is still to be awarded.
The closure of the communal dumping sites is supported by the North West University's
(NWU) Potchefstroom Campus in the framework of the university’s pro-bono office
established to provide local governments in the North West with free advice on
environmental management and environmental impact assessments. The allocated
budget for each of the transfer stations is 25 million ZAR (1.66 million EUR).The detail
design of the transfer stations is done by Aecom (BKS). The design of the transfer
stations foresees a security building at the entrance of the TS, a buy-back centre for
recyclables, an administration building, a drop-off centre for public deliveries, a
weighbridge, a material recovery facility, and a future compost area (see next figure).
All transfer stations will be equipped with a weighbridge in order to determine the
delivered waste quantities by municipal or private operators’ vehicles. It is envisaged to
apply a certain gate fee which will be determined by the local municipality. While the
waste delivered by the public will be placed in the skip containers, the municipal or other
service providers will deliver the waste to the MRF. There the recyclables will be sorted
AdvanImple
P:\1576 KfW R
out m
landf
Figur
The w
wast
next
multi
educ
The
and Z
nced Solid Wamentation Con
RLM Implementation\
manually an
fill.
re 6 Prop
weighbridge
te will be ch
to the facili
i-use centre
cation centre
RLM initially
Zinniaville a
aste Managemnsultant for M
\Bericht\03 - Needs A
nd baled for
posed gener
e will be uti
hipped and s
ty. In Phase
e including o
es, and a sm
y intended t
as mini tran
ment for RLMBT Facility
Analysis\0 - Drafts\ne
transport. T
ral layout of
lised only to
spread on t
e 2 of the p
on-site deve
mall-scale c
to rehabilita
sfer station
ew headline\RLM AIS
The residua
f the transfe
o weigh the
he site unti
roject, the t
elopment of
compost are
ate and dev
s for genera
SWM Needs Analysis
al waste wil
er stations (
e waste colle
l a compost
transfer stat
f growing ar
ea.
velop Garde
al and gard
s_v04_new.docx
l be taken to
BKS)
ection vehic
ting area wi
tion will be d
reas for frui
en Waste Si
en waste. H
Need
o the new W
cles. The ga
ill be establ
developed t
it and veget
ites in Krem
However, as
s Analysis
21
Waterval
arden
ished
to a
tables,
metart
s a
1
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 22
result of the public participation processes, the RLM Council has decided to rehabilitate
and close these sites2.
To replace the above mentioned garden waste sites, two waste drop-off centres (WDC)
will be established in Jabula and Strumosa.
In general, for the planned facilities, only the initial investment costs are calculated and
the operating costs or financial feasibility of the projects are not adequately assessed.
2.2.6.1 Mobile Equipment for Waste Transport
Currently RLM has three RoRo (roll-on/off) trucks which can transport 32 m3 RoRo
containers and four skip trucks for the transport of 6 and 9 m³ skip containers. According
to the reviewed IWMP, three skip trucks will be replaced by RoRo trucks. The
procurement of new trucks is in progress. The allocated budget is about 5.2 million ZAR.
Furthermore, 300,000 ZAR is planned for the procurement of RoRo containers. However,
both procurements cannot be finalised because of lack of funding.
2.2.7 Disposal
The location of the RLM landfills, used for disposal of municipal waste, is shown in Figure
3. Currently the collected waste from Rustenburg city is disposed at the Townlands
landfill. At this landfill all incoming traffic is registered and waste amounts are calculated
based on the transportation volume of trucks. The Townlands landfill is operated by a
private company (PWR), and the consulting company Zitholele is assigned for
management supervision as a technical advisor on operations. The Townlands landfill
does not comply with sanitary landfill standards and will be closed as soon as the new
Waterval landfill is available.
The waste collected in the rural areas of RLM mostly is not delivered to Townlands but
disposed on communal landfills/ dumpsites (see map of waste management
infrastructure). No data on waste amounts delivered to the communal landfills are
available.
2.2.7.1 New Waterval Landfill
At present, RLM is constructing a new landfill site (Waterval Landfill Site) in order to close
the current Townlands Landfill as well as further, non-permitted landfills. The Waterval
2 Public Participation Report for the Proposed Waste Licence for Closure Application for the Kremetart and Zinniaville Garden Waste Sites, Rustenburg, June 2011 and January 2012
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 23
General Waste Disposal Facility, for the Rustenburg Local Municipality, will be located
approximately 5 km southeast of Rustenburg. The new Waterval sanitary landfill has been
licensed in 2012 and construction is ongoing. Aside from the typical landfill and associated
infrastructure, the licence includes provision for specific additional activities:
a temporary storage facility for waste such as batteries, oil, paint, fluorescent tubes;
a recycling yard and building;
a composting facility;
a material recovery facility; and
a landfill gas processing facility.
The Waterval landfill is located approximately 5 km southeast of Rustenburg. The site is
approximately 115 hectares in total and the landfill cells will be developed in several
phases.
Figure 7 Layout plan of Waterval landfill
AdvanImple
P:\1576 KfW R
Start
landf
Figur
The o
Gold
far ha
calcu
The W
also
are c
close
landf
closu
2.2.8
The o
deliv
for o
the tr
below
of a w
nced Solid Wamentation Con
RLM Implementation\
t of operatio
fill construct
re 8 Con
operational
der Associat
as not been
ulation of co
Waterval la
for the othe
currently be
ed, the trans
fill. A detaile
ure of existi
8 Waste
only availab
veries by the
peration of
rucks is use
w, gives an
waste treatm
aste Managemnsultant for M
\Bericht\03 - Needs A
on was expe
tion is now
struction of
manual for
tes. Operati
n tendered.
ost covering
andfill shall s
er communa
ing prepare
sfer stations
ed impleme
ng dumpsit
Amounts a
ble data on
e private co
the Townla
ed for calcu
indication o
ment facility
ment for RLMBT Facility
Analysis\0 - Drafts\ne
ected for Ja
scheduled
f Waterval la
r the new la
ion services
Also, no ca
g tariffs have
serve not on
al landfills/ d
ed by AECO
s will be use
entation plan
es and star
and Waste
waste amo
mpany Plat
ands landfill.
lation of wa
of waste am
y.
ew headline\RLM AIS
anuary 2014
for August
andfill durin
andfill will be
s shall be co
alculation of
e been prep
nly as a rep
dumpsites i
OM (BKS) c
ed for long
n, which coo
rt of long dis
Character
ounts in RLM
tinum Wast
. Since no w
aste amoun
mounts, but
SWM Needs Analysis
4 but due to
2014.
ng August 20
e prepared
ontracted to
f unit costs
pared.
placement fo
n the munic
onsultants.
distance tra
ordinates th
stance trans
ristics
M derive fro
e Resource
weighbridge
ts. Therefor
is not reliab
s_v04_new.docx
o recent dela
013
by the cons
o a private c
for landfill o
or the Town
cipality. Lan
Once the c
ansport to th
he individua
sport, is not
om the regis
es (Pty) Ltd
e is availabl
re, the landf
ble and ade
Need
ays finalizat
sulting comp
company, b
operations a
nlands land
ndfill closure
communal s
he Waterva
al working s
t available.
stration of w
(PWR), con
le, the volum
fill data pre
equate for p
s Analysis
24
tion of
pany
but so
and no
fill, but
e plans
sites are
al
teps for
waste
ntracted
me of
sented
planning
4
AdvanImple
P:\1576 KfW R
Table
Ye
201 201 201 201
Rega
is a h
imple
deliv
Furth
comm
Wate
nced Solid Wamentation Con
RLM Implementation\
e 3 Was
ear WasteGeneWas
0 56,1 59,2 49,3 51,
arding a for
high level of
ementation
veries from i
hermore, no
munal landf
erval landfill
aste Managemnsultant for M
\Bericht\03 - Needs A
ste amounts
e Types regeral ste
IndusWas
,659 24,,826 60,,910 59,,798 77,
ecast of the
f uncertaint
of tipping fe
industry.
o data is ava
fills. With th
l, thus addin
ment for RLMBT Facility
Analysis\0 - Drafts\ne
s registered
gistered attrial
ste GardRefu
314 13,913 16,216 16,600 11,
e future was
ty. Currently
ees in the fu
ailable rega
e closure o
ng to the ov
ew headline\RLM AIS
at Townland
t Townlandden use
Foostuf
,891 2,,605 11,,713 12,,169 8,
ste amounts
y, RLM doe
uture will m
arding the w
of these land
verall volum
SWM Needs Analysis
ds landfill fr
ds landfill [td-ffs
BuildRubb
948 43,918 24,188 26,814 31,
s for waste
s not charg
ost likely ha
waste amou
dfills, the wa
me.
s_v04_new.docx
rom 2010 to
tons per yeing ble
Gran
138 5,686 4,680 5,720 7,
deliveries fr
e any gate
ave an impa
nts currentl
aste will be
Need
o 2013
ear] Tot
nite
545 146893 178300 170150 188
from industr
fee at the la
act on the
ly delivered
transported
s Analysis
25
tal
,495,842,007,251
ry there
andfill;
to the
d to the
5
AdvanImple
P:\1576 KfW R
A wa
fenci
figure
Figur
The c
cons
very
Table
Frac
Orga
Pap
Plas
Glas
Meta
Othe
Tota1Revie2Advan3Advan
nced Solid Wamentation Con
RLM Implementation\
aste compos
ing project”
e below.
re 9 Was
Was
comparison
siderable dif
high and th
e 4 Com
ction
anics
er; Cardboa
stics
ss
als (Cans e
ers
al
ew of the Integra
nced Integrated
nced Solid Was
aste Managemnsultant for M
\Bericht\03 - Needs A
sition analy
led be Boff
ste composi
ste Managem
n of the resu
fferences. E
he organic f
mparison of
Ru
ard
etc.)
ated Waste Man
Solid Waste M
ste Managemen
ment for RLMBT Facility
Analysis\0 - Drafts\ne
sis recently
fin and Fund
tion of RLM
ment Plan; C
ults with sor
Especially, t
raction is ve
results of so
ustenburg Municipal
15%
19%
24%
5%
9%
28%
100%
nagement Plan;
anagement Sys
t for the City of
ew headline\RLM AIS
y has been c
di. The outc
M general wa
Consolidate
rting analys
the plastic f
ery low.
orting analy
WaLocal
lity1
Consolidated R
stem for Manga
Cape Town; Fin
SWM Needs Analysis
conducted
come of this
aste accordi
d Report (Ja
sis from othe
raction and
ysis
aste Compo
Bloemfon38%
21%
14%
9%
5%
13%
100%
Report (January
ung Local Muni
nal Feasibility R
s_v04_new.docx
in the scope
s analysis is
ing to Revie
anuary 2014
er South Af
the metal f
osition
ntein2
%
y 2014)
cipality; Feasibi
Report (Septemb
Need
e of the “rin
s presented
ew of the Int
4)
frican cities
fraction in R
Cape Tow26%
18%
15%
5%
2%
33%
100%
ility Study (Febr
ber 2012)
s Analysis
26
g-
d in the
tegrated
shows
RLM are
wn3
%
ruary 2011)
6
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 27
Furthermore, the analysis so far has only been conducted for general (domestic) waste.
No data are available for industrial waste, which makes up for the highest share of the
deliveries to the landfill.
Additional sorting analysis and investigations will be conducted by the AISWM
Consultants to verify and amend the available data. As a result of these investigations
relevant design parameters for the treatment plant shall be defined such as:
Input amount for the treatment plant
Average waste composition, particle size, moisture content
Recycling potential
Estimation of output amounts and calculation of calorific value.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 28
Part 3 The Project
As a result of the assessment of different waste treatment options it has been agreed
upon that the future AISWMS will comprise a
• Material Recovery Facility (MRF) for reclamation of recyclables and a
• MBT with biological drying to produce refuse derived fuel (RDF)
The two components will be built within the boundaries of the new Waterval landfill.
For the MRF grant funding from the mining industry has been envisaged, provided that the
plant can be operated financially sustainable. A feasibility study has been recently
prepared providing evidence of the economic feasibility of the plant. Implementation of the
MRF is expected for 2015. Although the MRF is part of the overall treatment process the
intended MPPP project is focussing at the MBT for production of refuse derived fuel.
3.1 Technical Concept of the Plant for Biological Drying
Unlike other aerobic treatment options, the biological drying of waste is not aiming for a
maximum degradation of the organic matter but for a short term drying process of around
seven days in order to enhance significantly the sorting capabilities for an efficient sepa-
ration of RDF and recyclables (e.g. metals). The fraction to be landfilled is reduced to an
amount of 15 – 20 % and consists mainly of non-organic (inert) parts such as sand,
stones and glass. Once the waste is dried, combustibles like plastics, paper, textiles,
wood and fine organic matter can easily be separated by means of air separation due to
their low density. This density separation works very effectively and as a result, the
amount and the quality of such RDF is highly superior to an RDF arising from wet separa-
tion. Recyclables like ferrous and non-ferrous metals can be separated with high purities
in order to sell them directly to the recycling market. Due to the short drying period, the
organic matter of the waste remains predominantly in the RDF.
Mass balance
The biological drying process leads to a mass reduction of expected 30 %. The separation
of ferrous and non-ferrous metals is expected to be at around 2 % of the treated waste.
The amount of separated RDF is expected to be around 40 % of the waste amount. The
remaining fraction of mainly inert particles, which has to be landfilled, is reduced to an ex-
pected amount of 15 %.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 29
The following flowchart illustrates the mass balance of the described aerobic drying op-
tion.
Figure 10 Mass balance of aerobic drying MBT process (including MRF)
Main Benefits
The main benefits of the treatment are
Compliance with South African waste reduction targets and environmental regulations, as well as the target of the RLM Waste Management Policy (IWMP)
Environmental benefits (climate, groundwater, odour)
Creation of employment
Minimizing required landfill volume and environmental risks of disposal
No long term costs for mitigation of environmental impact of landfills
Production of secondary fuel from waste and separation of recyclables
AdvanImple
P:\1576 KfW R
The c
very
rema
expa
respe
Mark
RDF
in sp
purpo
Alter
subs
recov
indus
minin
Figur
Beca
recov
- C
-
nced Solid Wamentation Con
RLM Implementation\
construction
small and m
ain in aerob
anded due t
ectively.
keting of R
, the high c
pecifically co
oses or in t
rnatively, RD
stitute for so
very. Along
strial use of
ng related im
re 11: Opti
ause RLM is
very seems
Coal fire
Cement
aste Managemnsultant for M
\Bericht\03 - Needs A
n of gas dra
methane de
ic condition
o the MBT
RDF
calorific valu
onstructed p
urn would b
DF can be c
olid fossil fue
with a sign
f RDF offers
mpacts.
ons for the
s more or le
s to be the m
d power
kilns
Bio
ment for RLMBT Facility
Analysis\0 - Drafts\ne
ainages is d
ecompositio
n. In total, th
process and
ue fraction o
plants in ord
be transform
co-fired in d
els like coa
nificant redu
s significant
use of RDF
ess surroun
most likely o
stations
omass re
ew headline\RLM AIS
dispensable
on will happe
he lifespan o
d the landfi
of mixed wa
der to obtai
med into ele
designated i
l or coke an
uction of the
t benefits in
F
ded by a nu
one for the
RDF
s
elated ca
SWM Needs Analysis
e because m
en in the m
of the landf
ll costs will
aste streams
n thermal e
ectricity for t
industrial pl
nd in order t
e amount of
n terms of gr
umber of ce
proposed M
F
arbon cre
for in
s_v04_new.docx
methane gen
ost upper la
ill will be sig
be dramatic
s (mainly M
nergy like s
the energy m
ants (e.g. c
to create a
waste to be
reenhouse
ement kilns,
MBT concep
edits
Powe
ndustrial
Need
neration wil
ayers, which
gnificantly
cally reduce
MSW) can be
steam for in
market.
cement kilns
useful ener
e landfilled,
gases and
, this option
pt.
er plants
energy
s Analysis
30
ll be
h
ed,
e used
dustrial
s) as a
rgy
, the
coal
of RDF
supply
0
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 31
In the vicinity of Rustenburg there are several cement kilns operated by four different
companies:
• AfriSam (Pty) Ltd;
• Lafarge;
• Pretoria Portland Cement (PPC);
• Sephaku Cement (starting operations in 2014).
Already during the preparation of the feasibility study in 2009 these companies have been
approached regarding their interest and potential to utilize the RDF produced in the MBT.
These companies, again, have been contacted in 2012 and 2014. Overall, the cement
companies are showing a high interest in the project. Also there is more than sufficient
capacity for utilization of the RDF amounts produced in the MBT.
3.2 The Site
At present, RLM is constructing a new sanitary landfill (Waterval Landfill Site) in order to
close the current Townlands landfill as well as further, non-permitted landfills. The
components of the Waterval General Waste Disposal Facility are a landfill, a materials
recovery facility, a public drop-off area, and a composting area. The licence for the facility
has been provided in 2012.
Within the boundaries of the Waterval landfill site, an area for construction of the MBT has
been assigned and kept free from other uses.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 32
Part 4 Budget Analysis
4.1 Operational Expenditures
For the initial financial analysis the Consultant has reviewed the budgets and expenditure
of the waste management unit for the financial years 2009/10 to 2013/14.
Table 5 Operational expenditures of the RLM waste management unit
Total operational expenditures in 2012/13 amount to 102 million ZAR. Wages, salaries
and other staff related costs in 2012/13 make up for 35% of the overall costs. Service
contracts (without landfill operation) amount to 17% of total costs.
4.2 Revenues
Tariffs paid by households and businesses are the main source for financing of waste
management services.
Table 6 Revenues for RLM waste management services
In 2011/2012 and 2012/13 revenues actually exceeded the operational expenditures for
these financial years. The main reason for the increase in revenue was the increase of
waste tariffs, which have been almost doubled within a period of five years.
Description
[1,000 ZAR] [%] [1,000 ZAR] [%] [1,000 ZAR] [%] [1,000 ZAR] [%] [1,000 ZAR] [%] Wages, salaries and other employment costs 18,843 20% 23,871 21% 28,452 34% 35,877 35% 36,803 28%
Contracted services 13,247 14% 13,615 12% 12,614 15% 17,718 17% 15,961 12%
Transport 5,984 6% 5,010 4% 10,511 12% 9,491 9% 7,122 5%
Landfill management 3,967 4% 3,825 3% 5,243 6% 4,715 5% 6,180 5%
Irrecoverable debts 39,578 41% 37,850 34% 1,463 2% 4,325 4% 7,231 6%
Depreciation 3,387 4% 4,984 4% 2,586 3% 2,586 3% 26,009 20%
Supply of wheel bins - 0% - 0% 1,989 2% 3,000 3% 5,000 4%
Hiring of equipment - 0% 10,016 9% 2,188 3% 2,809 3% 2,900 2%
Free basis refuse 1,776 2% 2,071 2% 3,273 4% 3,050 3% 2,392 2%
Other expenditures 2,592 3% 4,742 4% 7,242 9% 7,730 8% 8,877 7%
Administration costs 6,695 7% 6,281 6% 9,193 11% 11,152 11% 11,193 9%
Total 96,068 100% 112,265 100% 84,752 100% 102,452 100% 129,667 100%
Operational expenditures 2009/10
Actuals
Operational expenditures 2011/12
Actuals
Operational expenditures 2012/13
Actuals
Operational expenditures 2013/14
Budget
Operational expenditures 2010/11
Actuals
Description Revenues 2013/14 Budget
[1,000 ZAR] [%] [1,000 ZAR] [%] [1,000 ZAR] [%] [1,000 ZAR] [%] [1,000 ZAR] [%]
User Charges -49,200 63% -66,420 68% -74,274 67% -82,256 68% -77,338 58%
Equitable share -28,064 36% -30,384 31% -36,275 33% -38,360 32% -45,668 35%
Others -563 1% -296 0% -289 0% -311 0% -9,350 7%
Total Revenues -77,827 -97,100 -110,838 -120,927 -132,357 Total Expenditures 96,068 112,265 84,752 102,452 129,667
Balance 18,241 15,165 ‐26,086 ‐18,475 ‐2,689
Revenues 2009/10Actual
Revenues 2010/11Actual
Revenues 2011/12Actual
Revenues 2012/13 Actual
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 33
Table 7 Excerpt of the RLM refuse removal tariffs 2013/2014
Tariff description [ZAR/month]
Standard Container, 1 emptying per week 96Standard Container, 2 emptying per week (business/commerce) 237Bulk container 1.5 m³, 1 emptying per week 1,279Bulk container additional 1.5 m³, 1 emptying per week 1,114
Bulk container 6 m³, 1 emptying per week 5,101
Since most households currently still don’t have special waste containers (major part of
the waste is still collected in bags), the costs mainly refer to fees per property/ household.
However, one of the problems with the billing is that several families may live at one
property.
4.3 Capital Expenditures
In the table below capital expenditure for the last 5 years are presented.
Table 8 Capital expenditures for the last 5 years
A major part of the investment is funded through MIG funding. For example in 2012/13,
96 % of the capital expenditure was financed through Municipal Infrastructure Grants.
4.4 Assessment of the Financial Status
In the table below a balance of annual costs and revenue is shown for the last five years.
Capital expenditures
2009/10
Capital expenditures
2010/11
Capital expenditures
2011/12
Capital expenditures
2012/13
Capital expenditures
2013/14
Actuals Actuals Actuals Actuals Budget
[1,000 ZAR] [1,000 ZAR] [1,000 ZAR] [1,000 ZAR] [1,000 ZAR]Waste Depot 23,130 6,187 98 87 700
Landfills 1,319 765 3,879 74,851 45,458 Garden waste sites and transfer stations - 3,607 436 2,047 20,396
Others (furniture etc.) 218 1,150 50 299 105
Containers 391 - 514 1,093 300
Vehicles 1,067 10,187 - - -
Total 26,123 21,896 4,976 78,378 66,960
thereof MIG 24,448 10,559 4,327 75,045 52,458
percentage of MIG-Funding 94% 48% 87% 96% 78%
Description
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 34
Table 9 Balance of annual costs and revenues for the last five years
Actually, in 2011/12 and 2012/13 the revenue exceeded the expenditure, thus at first
glance suggesting financially comfortable situation of the RLM waste management
services. However, on closer inspection, the financial situation reveals:
Major share of the capital investment (financed from MIG or other grants) is not included;
The increase in revenue is mainly due to increase in tariffs. Thus, in spite of considerable efforts to improve the fee collection rate, the situation of poor billing and fee collection efficiency still remains;
The unit costs for different types of services are not known. Even for new projects, the focus is on investment costs (i.e. acquisition of MIG funds), without thoroughly calculating the full costs of the measure and the financial implications on the waste management system. For example, for the new Waterval landfill (which currently is built mostly from MIG funds), no calculation of unit costs has been conducted, in spite of the fact that the operation costs of the new landfill will be significantly higher compared to the Townlands landfill;
Currently, waste management services in RLM are still rudimentary. In order to comply with national requirements, services need to be further developed, which will result in a considerable cost increase. Even, if future investments are mainly financed from grant sources, increase of operating costs has to be expected, for example for the following measures:
• Operation of the new sanitary landfill (compared to operation of the Townlands landfill)
• Closure of communal landfills, and transfer and long distance transport of the waste to Waterval landfill
• Implementation of separate collection for recyclables and hazardous waste
• Material recovery facilities, drop off centres, and garden waste sites
Revenues and expenditures
2009/10 Actuals
Revenues and expenditures
2010/11 Actuals
Revenues and expenditures
2011/12 Actuals
Revenues and expenditures
2012/13 Actuals
Revenues and expenditures
2013/14 Budget
[1,000 ZAR] [1,000 ZAR] [1,000 ZAR] [1,000 ZAR] [1,000 ZAR]
Operational expenditures 96,068 112,265 84,752 102,452 129,667Captial expenditure without MIG 1,675 11,337 649 3,333 14,501
Revenues -77,827 -97,100 -110,838 -120,927 -132,357
Balance 19,916 26,502 -25,437 -15,142 11,812
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 35
• Composting of garden waste
• Advanced waste treatment
Approaches to deal with the additional costs, besides increasing the household tariffs,
include:
a) Extending the revenue basis for services
b) Improved efficiency of service delivery
a) Extending the Revenue Basis for Services
Currently, besides the refuse removal fees for households and businesses a considerable
part of the RLM waste management services is provided for free. For example no gate fee
is charged at Townlands landfill for industrial waste. Thus, currently, private households
are subsidizing the waste disposal of the industry. Other free services include waste drop
off at the transfer stations and garden waste sites.
In the current situation, where the waste management system mainly consists of collection
and disposal, a complex tariff system, based on full cost accounting might be dispensable.
However, with adding additional (costly) components to the system, the revenue basis has
to be broadened as well, in order not to overburden the private households. Required
measures include:
Calculation of unit costs for individual (existing and planned) services
Development of tariffs for different types of services, based on actual costs (with consideration of social, environmental and economic aspects)
Since the current accounting and waste information system does not support the
identification and evaluation of unit costs, there is the need to develop a new structure for
accounting (full cost accounting), tariff setting and billing.
Furthermore, the overall billing and collection rate of fees needs to be improved.
Considerable efforts have been and are being made with regard to registration of
customers (i.e. new project conducted by Boffin & Fundi). Nevertheless, the Consultant
has not received a comprehensive list of the targets and achievements of this initiative.
The information of the available revenues indicates that, so far, this initiative was not very
successful.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 36
b) Improved Efficiency of Service Delivery
Improvement of efficiency is a main target of this project. Even though the present
accounting and Waste Information System does not provide sufficient tools for
performance monitoring, there still would be a possibility to implement fairly simple
measures, such as monitoring the performance of each collection crew (i.e. number of
deliveries to the landfill per months). However, within the Waste Management Unit, the
organogram of the waste management unit does not show any position, explicitly being
assigned for efficiency monitoring. As a consequence, so far efficiency assessment within
the RLM waste management services is not visible.
The weaknesses already described in the previous sections are also reflected in the
overall costs of service delivery. The available data do not allow a clear differentiation
between collection costs and costs of other waste management services. Therefore, it is
difficult, to specify and compare the unit costs for individual services. Nevertheless,
according to the simplified estimation unit costs for collection are in a range of more than
2,000 ZAR per ton. There is indication that the collection costs are approx. three to four
times higher compared to the unit costs of a private service provider. Still, on the RLM
side capital costs are not included, which would even increase the cost difference.
4.5 Costs of the MBT
In the Feasibility Study prepared in 2009 the initial investment costs have been calculated
with 258 million ZAR.
Table 10 Estimated dynamic unit costs [ZAR/ ton] for different scenarios of the future
RLM SWM system (project period of 20 years, with contingencies and costs of
implementation consultant)
Baseline MBT A1 MBT A2 SWM system without MBT
SWM system with MBT initial investment as loan
SWM system with MBT initial investment as grant
operation total operation total operation total Administration 172 181 172 181 172 181Collection, sweeping, transport 343 600 343 600 343 600MRF 99 136 99 136 99 136MBT 0 0 180 382 180 220
Landfill 28 98 11 16 11 16
Total 1 643 1,014 806 1,314 806 1,152Revenues MRF -71 -71 -71 -71 -71 -71Revenues CDM 0 0 0 -68 0 -68
Transport Costs RDF 0 0 0 71 0 71
Total 2 572 943 735 1,246 735 1,084
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 37
Based on these calculations the MBT will increase the waste management costs
compared to the baseline (without waste treatment) in a range between 13% and 24%
depending on financing conditions for initial investment (grant financing or loan). The
overall financial impact of the MBT will be highly dependent on the successful marketing
of the products (especially the RDF).
Cost calculations will be updated and revised during the preparation of the feasibility
study.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 38
Part 5 Capacity and Commitment
5.1 Project Officer and Project Team
The Municipality’s Project Team and the Transaction Advisory Team structures are set out
in the diagram below. The diagram includes the lines of decision-making within the project
team. The roles and responsibilities of the Municipality’s Project Officer and the TA Team
are summarised below.
Figure 12 Project officer and project team
5.1.1 Roles and Responsibilities
5.1.1.1 Project Officer
The Project Officer from the Municipality is responsible for:
• Reporting to and taking direction from the RLM council;
• Developing project plans and assigning tasks to other RLM project personnel, including monitoring project staff and the progress of the project, as well as managing risks and escalated issues from project work-stream teams;
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 39
• Controlling Departmental budgets, scheduling resources, and recommending suitable work approaches, all with a view to assuming overall responsibility for the successful conclusion of the project;
• Measuring project success against budget, original scope, and business objectives, including assuming responsibility for planning resource requirements and coordinating the daily tasks of all Department project team members in conjunction with contract resources;
• Ensuring that all resources and their respective skills are optimally utilised, and providing quality assurance of work undertaken by Department staff assigned to the project; and
• Providing the principal point of contact between the RLM council and the Transaction Advisory team, including obtaining and delivering regular reports on the project progress and outstanding issues.
5.1.1.2 Project Leader
The Project Leader is responsible for:
Reporting to and taking direction from the Municipality Project Officer;
Developing project plans and assigning tasks to other TA project team personnel, including monitoring project resources and the progress of the project, as well as managing risks and escalated issues from project work-stream teams;
Controlling the project budget, scheduling resources, and recommending suitable work approaches, all with a view to assuming overall responsibility for the successful conclusion of the project on the part of the TA team;
Measuring project success against budget, original scope, and business objectives, including assuming responsibility for planning resource requirements and coordinating the daily tasks of all TA team members in conjunction with contract resources;
Ensuring that all resources and their respective skills are optimally utilised, and providing quality assurance of work undertaken by TA team resources assigned to the project; and
Providing the principal point of contact between the Municipality Project Officer and the TA project team, including preparing and delivering regular reports on the project progress and outstanding issues.
The Project Leader is supported by the Expert for MPPP Guidance, especially concerning
all formal questions of MPPP procedures and steps.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 40
5.1.1.3 Project Work-stream Leaders
The Work-stream Leaders are responsible for:
Managing tasks for a specific process, functional or application area defined as part of the work breakdown structure of the project;
Supporting the daily tasks for the assigned team;
Initiating and managing the issue research and resolution process;
Monitoring and reporting the progress of the assigned team, completing tasks and deliverables assigned by the Project Leader, and keeping the Project Leader informed of progress and issues in a timely manner.
5.1.1.4 TA Project Team
Members of the TA Project Team are comprised of Consultants and Analysts with diverse
skill-sets, to fulfil the requirements of the project. The role of each member of the Project
Team is to:
Undertake the fulfilment of the assigned work breakdown structure of the project as defined;
Communicate suitably with all persons involved and concerned with suitable fulfilment of the work tasks and activities defined for the project;
Produce all project documentation in accordance with the standards deployed for the project;
Co-ordinate and generate the design, development, and deployment of all common-usage materials that may be required for the fulfilment of the specific work tasks and activities of the project (process narratives, explanatory recordings and responses, analyses workings and formulations, change management notes and related references), in accordance with project standards as implemented.
The transaction advisory team and their roles are summarised in the following table.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 41
Table 11 Roles of the transaction advisory team
Name Description Company
Team Leader
Gernod Dilewski Project Leader INFRASTRUKTUR & UMWELT Professor Böhm und Partner
MPPP Guidance
Sheila Galloway Guidance of MPPP Feasibility Study and processes
Utho Capital
Financial Advisor
Roland Hunter Work-stream Leader Mott MacDonald PDNA
Reginald Muzariri Support to preparation of MPPP Feasibility Study
Utho Capital
Technical Advisors
Dr Wolfgang Müller Waste Treatment INFRASTRUKTUR & UMWELT Professor Böhm und Partner
Andreas Puchelt Biological Drying/ RDF INFRASTRUKTUR & UMWELT Professor Böhm und Partner
Orhan Boran Tendering INFRASTRUKTUR & UMWELT Professor Böhm und Partner
Vijay Domun Procurement Mott MacDonald PDNA
Hugh Robert Tyrrell Stakeholder communication
Mott MacDonald PDNA
Dhanashree Naidoo Environmental and EIA Mott MacDonald PDNA
Marius ELS Quality and compliance control
Mott MacDonald PDNA
Legal Advisor
Duard Barnard Work-stream Leader Mott MacDonald PDNA
Institutional Advisor
Anita Botha Work-stream Leader Mott MacDonald PDNA
5.2 Capacity in Project Team
The Project Team, comprising both the Project Officer and the Transaction Advisory
Team, has the capacity to undertake the Feasibility Study. The TA team is available to
assist the Municipality where an external mechanism is preferred for the procurement of
the service.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 42
Further, the Municipality has the capacity to guide the feasibility study and procurement
based on its previous experience.
5.3 Skills Transfer Plan
The RLM have since appointed a service provider, Boffin & Fundi (B&F), to assist in the
establishment of a waste entity. The brief of Boffin and Fundi is to establish a waste
management entity that will “have to deal with INTEGRATED waste management within
RLM proximities so as to ensure creative but sustainable and waste management
solutions for the municipality.”3
The establishment of an entity goes beyond ring-fencing the unit, and ring-fencing forms
one part or component of entity establishment. The new entity will have to make provision
for providing the necessary support required for successful implementation of the
AISWMS.
In the scope of the consultancy services comprehensive capacity building measures will
be provides to the Solid Waste Management the SWM Unit in RLM. The capacity building
measures in general focus on the improvement of the efficiency of SWM service delivery.
The capacity building measures are divided into seven key activities as shown in the
following table.
Table 12 Measures for improvement of the efficiency of municipal SWM services
Activity Sub-activity
1) Improved Financial Management Development of Internal Income and Cost Centres and Modification of Accounting
Solid Waste Management Tariffs and Improvement of Cost Recovery Systems
Review and Update of Solid Waste Management By-laws
2) Improved Organisational Management Structures
Institutional Assessment
Business and Organisational Planning
Organisational Development of the PEA
3) Optimisation of Operational and Administrative Processes
Planning of Waste Management Services
Analysis of Waste Collection and Sweeping
Fleet Maintenance
3 Rustenburg Local Municipality. RLM/DI/0128/2012/13: Review of Integrated Waste Management Plan and Establishment of a Waste Entity. Scope of Work
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 43
Activity Sub-activity
Separate Collection of Household Hazardous Waste
4) Waste Information Management System
Immediate Measures
Data Collection and Monitoring
5) Awareness Raising Measures and Public Campaigns
Concept for Awareness Raising for Citizens and Political Stakeholders
Preparation of Products (Brochures, Leaflets, PR Events)
Waste Entity Specific Web Site
6) Cooperation with Informal Sector Data Base of Waste Pickers on Townlands Landfill
Facilitation of Discussion Process with Waste Reclaimers
Support Program for Waste Reclaimers
Concept Preparation for Selected Pilot Measures
7) Training, Capacity Building and Excursions
Training Needs Assessment, Preparation and Implementation of Training Programs
International Study Tour
Study Tour in South Africa
Trainings for SWM Unit Staff
Additional training packages will be developed with regard to the implementation and
operation of the waste treatment plant.
5.4 Key Stakeholders
The Key Stakeholders will include
Table 13 Proposed Key Stakeholders
Stakeholder Roles RLM
Local Municipality: RLM – Council, Mayoral Committee and relevant Portfolio Committee
Receive, comment on and approval of Feasibility study and contractual arrangements
Local Municipality: RLM – Solid Waste Management Unit
Mandated to implement the project
Local Municipality: RLM – PMU Project management unit that manages several projects that might have a bearing on this project including the Boffin & Fundi contracts
Local Municipality: RLM – Municipal Manager Project Champion and Accounting Officer
Local Municipality: RLM – Chief Operations Officer
Overall management of the services level framework for outsourced services
Local Municipality: RLM – Corporate Support Services
Human Resources, ICT and Legal Services
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 44
Stakeholder Roles Local Municipality: RLM – Budget and Treasury
Budget and financial management, Billing services
Local Municipality: RLM – Infrastructure Directorate
Directorate within which RLM Solid Waste Management Unit falls and responsible for infrastructure capital projects
Local Municipality: RLM – Rustenburg Rapid Transport
Project synergies
Local Municipality: RLM – Directorate Planning and Human Settlement
Development Planning and Environment Management
Other Local Municipalities
Local Municipality: Madibeng Local municipality within the BPDM – east of RLM
Local Municipality: Moses Kotane Local municipality within the BPDM – north, north-west of RLM
Local Municipality: Moretele Local municipality within the BPDM – east of Madibeng Local Municipality
Local Municipality: Kgetlengrivier Local municipality within the BPDM – west of RLM
District Municipality District Municipality: Bojanala Platinum District Municipality (BPDM)
District Municipality within which RLM sits and which has its seat in the RLM
North West Provincial Government (NWPG)
NWPG Department of Health/Waste involvement and inputs
Tribal Communities Royal Bafokeng Nation (RBN)
Treasuries National Treasury Guidance/Advice/Support/TVR iro PPP North West Provincial Treasury Guidance/Advice/Support/TVR iro PPP
Banks IDC Funding
DBSA Funding physical, social and economic infrastructure
KfW Entwicklungsbank Feasibility Study/Technical Advisory/Technical Assistance Funder on Project
Local Communities RLM Ward Councillors and ward committees For local community consultation Local Non-governmental Organisations (NGOs)
Relevant local Community Based Organisations (CBOs)
For local community consultation
Other interested and affected parties For local community consultation Reclaimer Communities Reclaimer community input and involvement
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 45
Stakeholder Roles National Departments
Department of Environmental Affairs (DEA) Project Champions/KfW Contact
Department of Co-operative Governance and Traditional Affairs (COGTA)
Consultation iro views and recommendations iro PPP
South African Local Government Association (SALGA)
Represent , promote and protect the interests of local government
Cement Producers
Afrisam (Pty) Ltd Potential Offtaker: Utilize the RDF produced in MBT
Lafarge Potential Offtaker: Utilize the RDF produced in MBT
Pretoria Portland Cement (PPC) Potential Offtaker: Utilize the RDF produced in MBT
Sephaku Cement Potential Offtaker: Utilize the RDF produced in MBT
Business/Industry Associations Association of Cementitious Material Producers (ACMP)
Industry Association for information dissemination and stakeholder support
Rustenburg Association of Business Business Association for information dissemination and stakeholder support
Labour Organisations South African Municipal Workers Union (SAMWU)
Engagement on labour issues
National, Education, Health and Allied Workers Union (NEHAWU)
Engagement on labour issues
North West Employers Organisation Engagement on labour issues Independent Municipal and Allied Workers Trade Union (IMATU)
Engagement on labour issues
Mining Houses AngloPlat Land lessor
Serviced Providers to the RLM/Private Operators Landfill Operators/Managers MRF Operators/Managers Compost Producers
5.5 Stakeholder Engagement Plan
This project is one that has many key stakeholders. It is therefore critical that a
“consultation plan”, which details how consultations with key stakeholders will occur
during the project and how their views will be incorporated into the project, is developed.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 46
This also includes the results of any consultation that the Municipality has already
undertaken.
A Stakeholder Communication Plan needs to be prepared containing the following
elements:
Description of the Project
The process of inclusion of the stakeholders
The expectations of the stakeholders
Receive feedback from key stakeholders
Details of the stakeholder engagement plan will be developed in the next step of the
feasibility study.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 47
Part 6 Project Outputs
6.1 Activity to be Undertaken
The activity to be undertaken is the treatment of municipal solid waste before disposal by
means of mechanical and biological processes.
The main benefits of the treatment are
Compliance with South African waste reduction targets and environmental
regulations, as well as the target of the RLM Waste Management Policy (IWMP)
Reduction of greenhouse gases, thus protection of climate
Decrease of leachate generation, thus protection of groundwater sources
Reduction of bad odours and poor visibility of landfills
Creation of employment
Minimizing required landfill volume
No long term costs for mitigation of environmental impacts of landfills
Production of secondary fuel from waste and separation of recyclables
Solution for sewage sludge treatment
6.2 Outputs Required to Deliver the Activity
The main outputs of the project will be:
Reduction of the quantity and volume of waste to be disposed in the landfill
Production of refuse derived fuel (RDF) to be used as a secondary fuel in cement plants or similar facilities
Separation of recyclables like ferrous and non-ferrous metals.
The implementation process of the envisaged activity is supported by an international
consultancy funded by German KfW Entwicklungsbank. In addition to this support,
following outputs from this consultancy are expected for the RLM Waste Unit:
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 48
Improved financial management system
Optimised organisational and administrative processes
Improved organisational management structures
Successfully operated waste information system
A number of public awareness measures and public campaigns
Integration of informal sector into to the formal waste management.
6.3 Minimum Standards for the Outputs
Reduction of the quantity and volume of waste to be disposed in the landfill: The
quantity of waste to be disposed shall be reduced by 67% to 72% after the mechanical
biological treatment processes. Another 13% will be sorted out by the upstream material
recovery facility (MRF) so that the total reduction will be about 80% to 85%. In addition to
the reduced quantity, the output to be landfilled shall have an inert character so that
minimal efforts will be required for emission control at the landfill. The density of the
materials to be landfilled shall be at least 0.85 t/m³ so that for the emplacement and
compacting of waste fewer efforts will be required. Hence, the required volume for waste
disposal will be decreased by approx. 90 %. More savings in airspace will come on top,
because the mainly inert material does not require daily earth cover since its material
properties are quite similar to gravel.
Refuse derived fuel (RDF): The RDF shall be used as a substitute for fossil fuels in
designated plants, such as cement kilns, coal fired power plants or special incineration
plants in order to produce energy. Therefore, the minimum standards of the prospective
facility shall be applied. In general RDF to be produced shall have following specifications.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 49
Table 14 Composition of RDF
Parameter Unit Min Max N % 0.52 0.52 S % 0.1 0.2 Cl % 0.28 0.7 CV kj/ kg 13,000 22,000 Humidity % 2.9 34 Sb ppm dry 9 14.7 As ppm dry 0.9 8.8 Cd ppm dry 0.18 2.6 Cr ppm dry 11.3 140 Co ppm dry 0.6 4 Mn ppm dry 28 210 Hg ppm dry 0.1 0.4 Ni ppm dry 0.85 21 Pb ppm dry 25 157 Cu ppm dry 45 266 Sn ppm dry 4 500 Tl ppm dry 0.02 0.5 V ppm dry 0.3 7 Zn ppm dry 225 340
Depending on the final utilisation process for RDF, some of the fore mentioned
parameters are of more importance than others in terms of process stability and air
emissions. With regard to a possible utilisation of RDF in a cement kiln the more important
parameters are the heavy metal contents of chrome and mercury, the chlorine-content
and the calorific value of RDF. However, especially the cement industry is rather flexible
towards diversifying RDF qualities as to a number of process related reasons (high
temperatures, long retention time, de-dusting system, by-pass systems, e.g. for chlorine,
composition of raw meal).
Separation of recyclables: After the drying process, the ferrous and non-ferrous metals
shall be separated with high purities so that they can be sold directly to the recycling
market. About 2% of the input of the biological treatment process shall be sorted as
recyclable materials.
Of course, the composition of the input (mixed municipal waste) and the sorting of
recyclables and hazardous wastes at the upstream MRF will affect the achievement of the
minimum standards. During the course of the TA project, a waste analysis will be carried
out in order to confirm the composition of the waste from RLM.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 50
6.4 Assessment of the Output Specifications
In 2011 a Study on the Feasibility of Regional Waste Facilities in BPDM was conducted, in
order to determine whether existing and planned waste management facilities can be
used as regional facilities for the whole BPDM, in order to share existing resources
between municipalities and to determine, if a collective approach for waste minimisation
techniques will be beneficial to achieve the targets set out within the South African
National Waste Management Strategy (NWMS). As a result of the study, a regional landfill
site shall be implemented, within close proximity of the major waste generator in BPDM,
i.e. RLM.4 For this reason, it is expected that the Waterval Landfill Site, which is currently
under construction, will serve as a regional landfill site for BPDM in the near future.
In this respect, the reduction of the quantity and volume of the waste to be disposed will
allow disposing of the waste from the entire district with a constant or even longer lifetime
of the landfill.
Since any activity beyond the simple disposal of waste creates additional costs, revenues
through this activity have to be generated. Ideally these revenues should be generated on
a continuous basis and the influence of the supply and demand of the market should be at
minimum. A long-term RDF delivery contract with the energy consuming industry would
allow constant revenues for the MBT operator on the one side and supply of secondary
fuels to the industry at a stable price on the other side. The latter leads to sustainable
energy and process costs compared to the uncertainty of future price development of
fossil fuels. Because RLM is more or less surrounded by a number of cement kilns, this
option of RDF recovery seems to be the most likely one for the proposed MBT concept.
The statutory requirements for alternative waste treatment options as well as an increased
interest of the South African cement industry to expand their cement production capacities
in conjunction with the aim to lower their energy related production costs will increase the
importance of environmentally friendly substitutes for fossil fuels. The same development
has been observed in Europe and in other industrialised countries mainly within the last
10 years.
4 Bojanala Platinum District Municipality: Feasibility of the Regional Waste Facilities in the Bojanala Platinum District Municipality; 2011.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 51
The various advantages for the use of RDF (co-incineration) can be summarised as fol-
lows:
• The cement manufacturing process has remarkable energy requirements, on the order of 3,000 – 5,000 kJ/ kg of produced clinker5.
• High process temperature in conjunction with a counter-current movement of fuel and fumes lead to a high degree of thermal destruction of organic pollutants without causing adverse environmental impacts.
• Contribution towards a lowering of emissions such as greenhouse gases by replac-ing the use of fossil fuels with materials that would otherwise have to be incinerated or landfilled with corresponding emissions and final residues.
• Full energetic and material recovery of RDF as to the fact that the provided energy is used directly in the kiln for clinker production and non-combustibles are substi-tuting raw material in the cement. Disposal of ash and slag can be avoided.
• Benefits related to a reduction of greenhouse gas emissions in the amount of at least 1.6 kg of CO2 per kg of RDF compared to coal.
• Benefits related to the reduction of NOx-emissions at around 0.36 kg/ Mg RDF.
In line with the requirements of the National Waste Management Strategy and the IWMP,
the separation of ferrous and non-ferrous metals will contribute to achieve the recycling
targets of the RLM.
6.5 Key Indicators for Performance Monitoring
The performance of the proposed activity will be monitored and measured by means of
following indicators:
Quantity and composition of the input to the MBT
Quantity and composition of the produced RDF
Calorific value of the RDF and quantity of substituted fossil fuel
Quantity and composition of the residuals to be disposed at the landfill
Quantity and type of the separated recyclables
Environmental parameters of the MBT, like condensate and air emissions
Environmental parameters of the landfill, like leachate, landfill gas, and odour.
5 EU, 2001. IPPC reference document on best available techniques in the cement and lime manufacturing industries
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 52
6.6 Service Interface Expectations
The following figure presents the interfaces with municipality’s other services as well as
services of other private operators.
Figure 13 Service interfaces
The waste collected by the internal and external service providers will be first weighed at
the weighbridge at the entrance of the Waterval Waste Disposal Facility. A small amount
of waste will be delivered directly by the waste generators at the public drop off area.
From there, the waste will be forwarded to the MRF and after sorting of recyclables to the
MBT. The separately collected green waste will be delivered directly to the MBT. While
the products of the MBT, RDF and recyclables will be marketed to the end users, the
residuals will be disposed at the landfill.
RLM plans to contract private operators for the operation of the above mentioned facilities.
However, it is currently not yet clear; if there will be only separate operators for each
facility or only one operator for all facilities. Most probably, the weighbridge will be
operated by the landfill operator. In any case, the RLM Waste Unit will have the function of
contracting and monitoring.
Furthermore, the necessary water and electricity will be delivered by the municipal
suppliers. The Environment Management Department will be responsible assessment and
monitoring of the operation in respect of compliance with environmental standards.
External waste collection services
Internal waste collection services
Weighbridge MRF MBT
Landfill
RDF consumer
Recycling market
Private Operators Private Operator Private Operator Private Operator Private Operator
RLM Waste Unit Contracting / Monitoring
RLMElectricity Supply
Water SupplyEnvironment Management
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 53
6.7 BEE and Socioeconomic Targets for the Project
The BBBEE scorecard and targets recommended hereunder were determined after
having reviewed the Integrated BBBEE generic scorecard, the needs of the RLM for
empowerment, the new BBBEE codes, the BEE scorecards for the previous PPP
arrangement, performance achieved thereon and inputs received from the Department.
Table 15 BBBEE Scorecard
PPP BEE element Indicative PPP project Target
Recommended bid evaluation
weighting A: Private Party equity 15% A1: Black equity 30% A2: Active black equity 55% of A1 A3: Cost of black equity Value-for-money A4: Timing of black equity returns Early and ongoing returns B: Private Party management & employment
10%
B1: Black management control Commensurate with A1 & A2 B2: Black women management control
5% of B1. Increase to 10% over 20 years
B3: Employment equity Compliant with the law B4: Skills development 2% of payroll spent on the
development of Black employees
C: Sub-contracting 50% C1: Project CAPEX to black enterprises
40%
C2: Project OPEX to black enterprises
50%. Increase to 80% over 10 years
C3a: Black management control 25% C4: Black women management control
10% of C3. Increase to 10% over 20 years
C5: Employment equity Strong plan, legally compliant C6: Skills development 2% of payroll spent on the
development of Target Groups (of which at least 1% of the payroll must be spent on Black employees)
C7: Procurement Capex to black SMEs –Design & Construction
25%
C8: Procurement Opex to black SMEs – Facilities Management
30%
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 54
PPP BEE element Indicative PPP project Target
Recommended bid evaluation
weighting D: Local socio-economic impact 100% use of unskilled labour
from RLM 50% of semi-skilled labour from within the Province 20% of materials and supplies of total construction from within the Province.
25%
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 55
Part 7 Project Scope
7.1 Project Scope
The scope of this project is to implement a new waste treatment facility/ waste to energy
facility on Rustenburg’s new Waterval Landfill. This way the South African National Waste
Policies with regard to utilisation of waste as a resource (recyclables, energy recovery) by
applying innovative waste treatment technologies shall be achieved, while at the same
time the quality and efficiency of waste management services in RLM are increased. As a
most favourable solution a MBT with biological drying to produce refuse derived fuel
(RDF) has been identified, subsequent to a Material Recovery Facility for reclamation of
recyclables.
The implementation of the MBT shall be undertaken jointly between RLM and private
industry thus optimising the strength and opportunities of both sectors. The operation of
the MBT and the marketing of its products shall be given to the private industry.
Therefore, this project focusses on the justification and implementation of the foreseen
municipal PPP, strictly in accordance with the South African legislative frame work and
regulative policies.
Thus, this project entails the following:
a thorough feasibility study that will provide options to RLM with respect to the implementation of the new waste treatment/ waste to energy facility from an external service provider via a PPP; and
in the event that the RLM wishes to proceed with the preferred option, to assist in the procurement of the private sector partner.
7.2 How the Project Objectives will Address the Institution’s Strategic Objectives
Following table gives the ways of achievement of the RLMs strategic objectives by the
project objectives.
Advanced Solid Waste Management for RLM Implementation Consultant for MBT Facility Needs Analysis
P:\1576 KfW RLM Implementation\Bericht\03 - Needs Analysis\0 - Drafts\new headline\RLM AISWM Needs Analysis_v04_new.docx 56
Table 16 Achievement of RLMs strategic objectives
Priority How They Will Be Achieved
Efficient provision of quality basic services and infrastructure within a well-planned spatial structure:
A logical and well planned spatial structure supported and sustained by high quality infrastructure
Citizens enjoy high quality of life.
Through the implementation of the new waste treatment/ waste to energy facility on the new Waterval Landfill Site and the related utilisation of materials and energy from waste RLM’s waste management will turn form ordinary disposal into resource management. Furthermore, from a spatially point of view the core infrastructure for waste treatment and disposal will be joint in one area in RLM. With the waste treatment facility, it can be ensured, that the waste generated in RLM has the least practicable impact on the environment, and low environmental pollution contributes to a high quality of life.
Drive diversified economic growth and job creation:
A diversified and resilient economy
Implementation of the new waste treatment facility/ waste to energy facility will address economic growth. Jobs will be created in the environmental technology industry, which is one of the industries of the future.
Ensure municipal financial viability and management:
A city well governed by municipal administration providing decisive leadership.
Due to shortage of staff and skill the municipal PPP will attract private party to assist in the administration of the facility and the running processes.
Maintain clean, green, safe and healthy municipal environment for all:
Sustainable use and effective management of natural resources.
With the waste treatment facility, it can be ensured, that the waste generated in RLM has the least practicable impact on the environment. At the same time, the amount of waste to be disposed will be minimised significantly, while the consumption of virgin natural resources for energy production will be delayed and the maximum practicable benefits from products/ resources will be extracted.
Transform and maintain a vibrant and sustainable rural development:
Citizens enjoy high quality of Life.
The building of the new waste treatment facility will support and maintain a vibrant sustainable rural development to ensure that citizens enjoy high quality life.
Uphold good governance and public participation principles:
A city well governed by municipal administration providing decisive leadership.
The project will assist the Municipality to uphold good governance and public participation principles.
Drive optimal municipal institutional development, transformation and capacity building
appropriately skilled labour force.
Implementation of the new waste treatment facility Project will assist in attracting appropriate skilled labour force for the municipality, to foster capacity building within the municipality as well as to develop and optimise existing municipal institutions.
AdvanImple
P:\1576 KfW R
7.3 L
The
treat
Site,
Wate
cons
(6,00
7.4 P
In ge
arran
opera
struc
Figur
In ad
proje
who
treat
nced Solid Wamentation Con
RLM Implementation\
List of Sign
main gover
ment/ waste
which is lo
erval landfill
sumption for
00 m² and a
Project Str
eneral, a typ
ngements b
ators, finan
cture of this
re 14 Proj
ddition to the
ect are the c
are assigne
ment facility
aste Managemnsultant for M
\Bericht\03 - Needs A
nificant Go
rnment asse
e to energy
cated appro
l site is app
r the MBT (
additional 3,
ructure
pical PPP p
between a n
ciers, supp
kind of proj
ect structur
e parties sh
consulting c
ed as extern
y/ waste to
ment for RLMBT Facility
Analysis\0 - Drafts\ne
overnment
et necessar
facility will
oximately 5
roximately
aerobic dry
000 m² for
roject struct
number of pa
liers, contra
ject.
re
hown in the
companies I
nal experts
energy faci
ew headline\RLM AIS
Assets for
ry for the pro
be located.
km southe
115 ha in e
ying) will nee
extension).
ture is quite
arties includ
actors. The
figure abov
INFRASTR
to support
lity in Ruste
SWM Needs Analysis
r the Projec
oject is the
. This will be
ast of Ruste
extent, it is e
ed an area
e complex a
ding equity/
following fig
ve a further
UKTUR & U
the implem
enburg.
s_v04_new.docx
ct
land, on wh
e on the ne
enburg Tow
estimated th
of about 9,0
and involves
/ project spo
gure shows
participatin
UMWELT, P
entation of
Need
hich the new
ew Waterval
wn. While th
hat the spec
000 m² (0.9
s contractua
onsors, proj
s the project
ng group in t
PDNA and U
the waste
s Analysis
57
w waste
l Landfill
he whole
cific land
9 ha)
al
ject
t
the
UTHO,
7