Monthly Management Report October 2012.
Submitted By Facility Management Team
1
Monthly Report-(Jul 2011)
EXECUTIVE - SUMMARY
2
This report is a review on our performance during the last Month and is an attempt to analyse and evaluate our service delivery and make a progressive step forward with improvement plan.
The following points are put forward for review1. Scope and nature of services2. Proposed manpower distribution.3. Availability of manpower.4. Major incidents summary.5. Initiative taken. 6. Initiatives planned for next month.7. Power failure analysis8. Monthly HSD consumption.9. DG- Generated power KWH.10.EB power consumption.11.Average power consumption EB+DG.12.Liquid nitrogen consumption.13.Suggestions and requirements.14.Transition pending works.15.Help desk, Complaint register
1.Scope & Nature of Services
3
CeNSE-Facility
Management
Electrical
HVAC Plumbing Help desk
ETP BMS
RO PlantUltra pure
water system
2.PROPOSED MANPOWER DISTRIBUTION
4
3.Availability of Manpower
5
DESIGNATION
Planed
Jul-11
Aug-11
Sep-11
Oct-11
Nov-11
Dec-11
Jan-12
Feb-12
Mar-12
Apr-12
May-12
Jun-12
Jul-12
Aug-12
Sep-12
Oct-12
Facility Manag
er
1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
Technologist
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
Electrician
4 0 2 3 3 4 4 4 4 4 4 4 4 4 4 4 4
Chiller operato
rs
1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
BMS operato
r
3 0 1 1 1 1 1 1 1 1 1 1 1 1 3 2 2
Plumbers
1 0 0 0 0 1 1 1 1 1 1 1 1 1 1 1 1
Asst.Technicia
n
2 0 2 2 2 2 1 2 2 2 2 2 2 2 2 2 2
Total 15
4 10 11 11 13 12 13 13 13 13 13 13 13 15 14 14
4.Major Incidents Summary
6
Date Location Failure details Action taken & Status
05-10-12
Utility Di water drained out Wet bunch tap was in open position
11-10-12 Cleanroom PCW filter damaged at wet etch area.
Replaced the filter.
Microsoft Office Word 97 - 2003 Document
5.Initiatives taken
7
1. FPS- pressure gauge fixed near BMS.2. Cleanroom wet etch area – new pipe
line provided at corridor.3. Scrap material shifted from open
area.4. PCW pump o-rings fixed.5. LT panel room cleaned.(Which is
maintaining by CCMD)6. ETP painting work done.7. General exhaust, chiller, AHU, DG,
UPS, FPS PPM done.
6.Initiatives Planned for next month
8
DG “B” check. New bore well water tap connection for chiller cleaning. Electrical system taking over- CeNSE. Partition of utility 2nd floor area. A/C works at UPS area 2nd floor utility. AHU all- filters changing.
7.POWER FAILURE ANALYSIS
9
SL
Date From To Total
1 1-10-12 11:30, 15:45
11:50,16:00 35 Mins
2 7-10-12 11:05,18:15
11:30,18:30 40 Mins
3 10-10-12
9:10, 9:20 10 Mins
4 12-10-12
9:45 9:55 10 Mins
5 13-10-12
10:50 12:10 (20 times power fluctuation)
1:20 Hrs
6 14-10-12
15:00 15:15 15 Mins
7 22-10-12
13:35,16:35
14:05,16:45 40 Mins
8 30-10-12
12:45 13:00 15 Mins
TOTAL HRS 6: 05 Hrs
8.MONTHLY HSD CONSUMPTION
10
9.DG Generated Power KWH
11
10. EB Power Consumption
12
11.AVERAGE POWER CONSUMPTION EB+DG
13
12.LIQUID NITROGEN CONSUMPTION
14
13.Suggestions and Requirements
15
•Shelters to be provided for DGs, Utility terrace & Fire pump house to avoid rain water and leaves come inside the DG cabin, utility building & Raw water tank in side.• Shelter with closed fencing can make on the Fire tank & this area use as storage place.•Uniform & Safety shoes to be provided for all maintenance staffs.•Walky-talky to provided for maintenance staff.•Dg-1&2 (CeNSE Building) B-Check pending.•A/C for UPS to be provided.•Chemical & Gas cabinet exhaust to be provided.
14.Transition – Pending works
16
•
Microsoft Office Excel Worksheet
15.Help desk, Complaints register
17
Microsoft Office Excel Worksheet
Thanks