Monthly Management Report january 2012.
Submitted By Facility Management Team
1
Monthly Report-(Jul 2011)
EXECUTIVE - SUMMARY
2
This report is a review on our performance during the last Month and is an attempt to analyse and evaluate our service delivery and make a progressive step forward with improvement plan.
The following points are put forward for review1. Scope and nature of services2. Proposed manpower distribution.3. Availability of manpower.4. Major incidents summary.5. Initiative taken. 6. Initiatives planned for next month.7. Power failure analysis8. Monthly HSD consumption.9. DG- Generated power KWH.10.EB power consumption.11.Average power consumption EB+DG.12.Suggestions and requirements.13.Transition pending works.14.Help desk, Comaplaint register.
1.Scope & Nature of Services
3
CeNSE-Facility
Management
Electrical
HVAC
Plumbing
Help desk
ETP & Ultra Pure water system
BMS
2.PROPOSED MANPOWER DISTRIBUTION
4
3.Availability of Manpower
5
DESIGNATION
Planed
July August September
October
November
December
January
Facility Manager
1 1 1 1 1 1 1 1
Technologist
3 3 3 3 3 3 3 3
Electrician
4 0 2 3 3 4 4 4
Chiller operators
1 0 1 1 1 1 1 1
BMS operator
3 0 1 1 1 1 1 1
Plumbers 1 0 0 0 0 1 1 1
Asst.Technician
2 0 2 2 2 2 1 2
Total 15 4 10 11 11 13 12 13
4.Major Incidents Summary
6
Date Location Details Failure analysis
31.1.2012 Clean room
At 17:50 Hrs Hrs, In Clean room Fire alarm panel activated.
due to high heat and smoke fire detector activated near furnace
Microsoft Office Word 97 - 2003 Document
5.Initiatives taken
7
5-1-12 -PVC, GI Pipes & Cables shifted from out side to utility building.
7-1-12- water shifted from rain water harvesting well to DI water supply tant.
8-1-12- Sputtering equipments shifted from old cleanroom to new building.
10-1-12- Fire extinguishers 20 nos placed at clean room.
12-1-12- HVAC make up tank proper packing done at fab building.
16-1-12- Wet bunch top cover fixed at 2nd floor Fab building.
In stalled water level controller for drinking water system, bore well water sum & Tank .
Provided electrical supply for RO systems. Installed UV lamps in each floor. Achieved purified DI water with bore well water.
6.Initiatives Planned for next month
8
Fire evacuation training for users and staff. Dedicated earth fitting for Film room equipments. Signage fitting for fire exit plan for clean room. Chiller planned preventive maintenance . Dg training program for FM team.
7.POWER FAILURE ANALYSISDATE FROM TO TOTAL
1-01-2012 18:05 18:55 50 Mins
2-01-2012 11:15, 15.20&15.40
11.25, 15:35 & 16.00
55 Mins
10-01-2012 15:30 15:45 15 Mins
11-01-2012 15:25 15:28 3 Mins
13-01-2012 13:40 13:50 10 Mins
15-01-2012 7:40 & 15:40 10:55 & 15:55 3 Hrs 30 Mins
13-01-2012 13:40 13:50 10 Mins
TOTAL HRS 5:53 Hrs
9
8.MONTHLY HSD CONSUMPTION
10
9.DG Generated Power KWH
11
10. EB Power Consumption
12
11.AVERAGE POWER CONSUMPTION EB+DG
13
0
50000
100000
150000
200000
250000
300000
350000
Jul-11 Aug-11 Sep-11 Oct-11 Nov-11 Dec-11 Jna-12
DG
EB
Total
12.Suggestions and Requirements
14
•Shelters to be provided for DGs & Fire pump house to avoid rain water and leaves come inside the DG cabin & Raw water tank in side.
•FPS & FAS system to be commissioned as early as possible to face any crisis in the building.
•PC with internet connection and telephone to be provided for maintenance team.
13.Transition – Pending works
15
•
Microsoft Office Excel 97-2003 Worksheet
14.Help desk, Complaints register
16
FACILITY HELP DESK COMPLAINT DETAILS
CeNSE
DATE TIME COMPLAINT GIVEN BY
COMPLAINT NO: NATURE OF COMPLAINT
CLOSED ATTENDED
BY
REMARKS
DATE TIME
11-01-2012 14:16 Adinarayana
murthyELE-11-1-12-
0001
1.Corridors lighting on First Floor & Second floor to be connected to UPS.2.Line diagrams for all the floors to be traced and the same has to be incorporated in the modified electrical drawings.3.Some lights in the Research Scholars rooms are not working. ( Switches problem).4.Power points in the race ways( FF 16) to be shifted.5.Cense Generator & UPS wiring diagram has to be integrated into the as built diagram.
16-01-2012 10:00
Prakash,Thiyaganand
2,5- Original drawing to
be provided from project people to do this.3-Need spare parts.
Original drawings not available to
trace the lines.
12-01-2012 10:14
Manikanth singh
ELE-12-1-12-0001
GF LAB- MCB to be replaced with higher rating.
12-01-2012 12:00
Srijith, Ajay
1P - power socket fixed.
Thanks
by, Facility Management Team17