MISSISSIPPI GULF COAST | 2040 METROPOLITAN TRANSPORTATION PLAN | SUMMARY REPORT PREPARED FOR GULF REGIONAL PLANNING COMMISSION AND MISSISSIPPI DEPARTMENT OF TRANSPORTATION

Upload: others

Post on 25-Aug-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

MISSISSIPPI GULF COAST | 2040 METROPOLITAN

TRANSPORTATION PLAN | SUMMARY REPORT

PREPARED FOR GULF REGIONAL PLANNING COMMISSION

AND MISSISSIPPI DEPARTMENT OF TRANSPORTATION

Page 2: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area

Mississippi Gulf Coast 2040 Metropolitan Transportation Plan

The latest iteration of the Mississippi Gulf Coast Area Transportation Study, initiated by Gulf Regional Planning Commission 40 years ago, extends the long-range transportation plan for the area encompassing Hancock, Harrison and Jackson counties to the year 2040.

The 2040 Metropolitan Transportation Plan resulted from a year-long planning process that included consultation with local elected officials and representatives of local, state and federal government agencies; outreach to transportation industry interests and stakeholder groups; and interaction with interested citizens and other potentially affected individuals through an extensive public involvement process.

It will serve as a blueprint for the development of transportation improvement projects and programs for the next five years. Regulations promulgated by the U.S. Department of Transportation require the long-range plan to look at least 20 years into the future; they also require that it be updated every five years.

The content of the plan was ultimately determined by the collective vision of elected officials, stakeholders and concerned citizens from three counties and a dozen municipalities acting in concert as the Mississippi Gulf Coast Metropolitan Planning Organization.

That vision calls for an integrated multimodal transportation system capable of connecting people of diverse circumstances and abilities to their desired destinations safely, conveniently and efficiently.

Moreover, it seeks to bring about a transportation system that will promote the sustainability of the Mississippi Gulf Coast region while enriching the overall quality of life for its residents and helping to ensure a memorably enjoyable experience for visitors to the area.

Page 3: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area

TABLE OF CONTENTS

SUBJECT PAGE

Introduction – The Mississippi Gulf Coast Area ……………………………………………………………………………… 1

Legislative Authority for Metropolitan Planning …………………………………………………………………………….. 2

The Metropolitan Planning Organization (MPO) …………………………………………………………….…………….. 3

The Metropolitan Transportation Plan (MTP) ………………………………………………………………………………… 4

Current Trends Affecting Transportation ……………………………………………………...………………….…………... 5

Metropolitan Transportation Plan Development ……………………………………………...…………………………… 6

Public Involvement in the Planning Process ……………………………………………………...…………………………… 7

Regional Goals and Objectives …………………..……………………………………………………...…………………………… 8

Land Use and Demographics ….…………………..……………………………………………………...………………………….. 9

Existing Transportation System – Roads and Bridges ………………………………………...……………………………. 10

Roadway Maintenance and Traffic Conditions ……….………………………………………...…………………………….. 11

Alternative Modes – Bicycle, Pedestrian, Transit .………………………………………...…………………………………. 12

Freight – Aviation – Safety ………………………………..………………………………………...………………………………….. 13

Future Travel Forecast …….………………………………..………………………………………...………………………………….. 14

Future Travel Needs - Roads and Bridges ……….....………………………………………...………………………………….. 15

Freight Transport – Bicycle and Pedestrian Needs ………………………………………...………………………………….. 16

Public Transportation Needs ………………………………………………………………………...………………………………….. 17

Transit Facilities and Operations …………………………………………………………………...………………………………….. 18

Financial Analysis ……………………..…………………………………………………………………...………………………………….. 19

Project Development and Evaluation …………………………………………………………...………………………………….... 20

Fiscally Constrained Long-Range Plan …………………………………………………………...………………………………….... 21

Projected Effectiveness of Planned Improvements .……………………………………...………………………………….... 22

Page 4: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area

LIST OF TABLES ~ LIST OF FIGURES

TABLES

Staged Improvement Program – Stage 1 Improvements (2016-2020)

Staged Improvement Program – Stage 2 Improvements (2021-2030)

Staged Improvement Program – Stage 3 Improvements (2031-2040)

Staged Improvement Program – Unfunded Improvements

FIGURES .

Stage 1 Improvements – Bay Saint Louis to Gulfport

Stage 1 Improvements – Gulfport to Ocean Springs

Stage 1 Improvements – Ocean Springs to Pascagoula

Stage 2 Improvements – Bay Saint Louis to Gulfport

Stage 2 Improvements – Gulfport to Ocean Springs

Stage 2 Improvements – Ocean Springs to Pascagoula

Stage 3 Improvements – Bay Saint Louis to Gulfport

Stage 3 Improvements – Gulfport to Biloxi

Stage 3 Improvements – Biloxi to Ocean Springs

Stage 3 Improvements – Ocean Springs to Pascagoula

Unfunded Improvements – Hancock County

Unfunded Improvements – Harrison County West

Unfunded Improvements – Harrison County East

Unfunded Improvements – Jackson County West

Unfunded Improvements – Jackson County East

Page 5: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area 1

INTRODUCTION – THE MISSISSIPPI GULF COAST AREA

This summary report encapsulates the 2040 Metropolitan Transportation Plan for the Mississippi Gulf Coast Area spanning three counties that contain 12 municipalities: Waveland, Diamondhead and Bay Saint Louis in Hancock County; Pass Christian, Long Beach, Gulfport, Biloxi and D’Iberville in Harrison County; and Ocean Springs, Gautier, Pascagoula and Moss Point in Jackson County. There are two distinct urbanized areas designated by the U. S. Census Bureau within the metropolitan planning area (MPA): the Gulfport Urbanized Area (UZA) which stretches from Bay Saint Louis to Ocean Springs and includes portions of all three coastal counties; and the Pascagoula UZA located in the eastern half of Jackson County. The Gulfport UZA encompasses the cities of Bay Saint Louis and Waveland in Hancock County; all five municipalities in Harrison County; and Ocean Springs in Jackson County; as well as adjacent unincorporated portions of all three counties. The Pascagoula UZA encompasses the cities of Pascagoula and Moss Point, most of Gautier and adjacent unincorporated portions of Jackson County. The newer northern portion of the last-named city was designated a separate entity, the Gautier Urban Cluster (UC), by the Census Bureau. The newly incorporated City of Diamondhead in Hancock County was designated an urban cluster separate from the Gulfport UZA.

Mississippi Gulf Coast Counties and Designated Urban Areas

Page 6: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2 2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area

LEGISLATIVE AUTHORITY FOR METROPOLITAN PLANNING

Beginning with the Federal-Aid Highway Act adopted by the U. S Congress in 1962, Federal legislation establishing or renewing highway and transit funding programs has required metropolitan transportation planning. The existence of a current long-range transportation plan is a condition for the receipt of surface transportation funds appropriated for urban areas with a population of at least 50,000. Development of the long-range plan must be carried out through a continuing, cooperative, and comprehensive planning process based on the most current information available; reflecting regional needs and priorities consistent with those of the state; and taking into account all modal alternatives. Transportation planning must be cognizant of similar initiatives in other fields—especially those relating to land use and economic development—in order to achieve a level of complementarity conducing to the success of all planning efforts. Interstate 10 twin bridges spanning the Pascagoula River Adoption of the metropolitan transportation plan (MTP) is the first step towards implementation of any regionally significant transportation project, whether with Federal assistance or funding from other sources. Following formal adoption of the plan, a project can be programmed for design, right-of-way acquisition or construction in the Transportation Improvement Program (TIP). The metropolitan planning organization (MPO) responsible for development of the MTP must proceed in accordance with requirements set forth in Federal law and regulatory guidance. U. S. Department of Transportation (USDOT) guidelines require that the MTP have a planning horizon of at least 20 years; that it foster mobility and access for both people and goods; facilitate the efficient performance of the transportation system and support its preservation; and seek to better the quality of life enjoyed by people living and working in the area. It must also provide for consideration of the following planning objectives:

Support the economic vitality of the metropolitan area, especially by enabling global competitiveness, productivity, and efficiency; ¶ Increase the safety and security of the transportation system for motorized and nonmotorized users; ¶ Increase the accessibility and mobility options available to people and for freight; ¶ Protect and enhance the environment, promote energy conservation, and improve quality of life; ¶ Enhance the integration and connectivity of the transportation system, across and between modes, for people and freight; ¶ Promote efficient system management and operation; and ¶ Emphasize the preservation of the existing transportation system.

Page 7: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area 3

THE METROPOLITAN PLANNING ORGANIZATION (MPO)

The MPO is a legislatively mandated policy-making body made up of representatives from local government and transportation agencies with collective responsibility for the coordination of transportation planning and programming in the metropolitan planning area (MPA). The Federal-Aid Highway Act (Public Law 87-866), adopted by Congress in 1962, made metropolitan transportation planning a condition for receipt of Federal funds for transportation projects in urban areas with a population of 50,000 or more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO on December 20, 1973. GRPC performs the principal planning and programming functions of the MPO under the direction of a Transportation Policy Committee (TPC) advised by a Technical Coordinating Committee (TCC). The TPC holds the ultimate responsibility for making decisions regarding the regional transportation system in accordance with Federal legislation. The TCC provides technical input to the decision-making process.

THE TRANSPORTATION POLICY COMMITTEE

The TPC has ultimate responsibility for making decisions regarding the planning and funding of improvements to the regional transportation system. TPC members for the Mississippi Gulf Coast MPO include the president of the board of supervisors for each of the three counties in the metropolitan planning area (MPA); the mayor or city manager for each of the 12 municipalities; the chairman of the GRPC Board of Commissioners; the chairman of Coast Transit Authority; the executive director of the Mississippi Department of Transportation; the executive director of the Gulfport International Airport Authority; and the port directors for each of the three maritime port operators in the MPA: Hancock County Development Commission (Port Bienville), Mississippi State Port Authority (Mississippi State Port at Gulfport) and Jackson County Development Commission (Port of Pascagoula). Non-voting members of

the TPC include the president of the Mississippi Trucking Association; a designated representative of the Heritage Trails Partnership; the Federal Transit Authority Region IV administrator; the Federal Highway Administration Mississippi Division administrator; and the Mississippi Gulf Coast Business Council president. The TPC is responsible for the periodic adoption of a Unified Planning Work Program (UPWP) and

Transportation Improvement Program (TIP), and for the establishment of policies and procedures in compliance with federal regulations. The TPC is guided by recommendations developed and put forth by the TCC. The TCC consists of individuals whose skills, training and professional status qualify them to take an active role in helping to shape and to oversee the transportation planning program for the region.

Page 8: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

4 2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area

THE METROPOLITAN TRANSPORTATION PLAN (MTP)

Beginning with the Federal-Aid Highway Act adopted by the U. S Congress in 1962, Federal legislation establishing or renewing highway and transit funding programs has required metropolitan transportation planning. The existence of a current long-range transportation plan, produced and adopted as a result of the ongoing metropolitan planning process, is a condition for the receipt of surface transportation funds appropriated for urban areas with a population of at least 50,000.

THE METROPOLITAN TRANSPORTATION PLANNING PROCESS

The metropolitan transportation planning process, as outlined in the Federal Highway Administration (FHWA) publication, Transportation Planning Process: Key Issues (FHWA, no date: page 3), requires completion of the following tasks: Monitoring existing conditions ¶ Forecasting future population and employment growth, including assessing projected land uses in the region and identifying major growth corridors ¶ Identifying current and projected future transportation problems and needs and analyzing, through detailed planning studies, various transportation improvement strategies to address those needs ¶ Developing long-range plans and short-range programs of alternative capital improvement and operational strategies for moving people and goods ¶ Estimating the impact of recommended future improvements to the transportation system on environmental features, including air quality ¶ Developing a financial plan for securing sufficient revenues to cover the costs of implementing strategies.

METROPOLITAN TRANSPORTATION PLANNING REQUIREMENTS

Requirements set forth in Federal law (23 USC §134) and regulations adopted pursuant thereto (23 CFR §450.322) stipulate that the MTP must have a planning horizon of at least 20 years; foster mobility and access for both people and goods; facilitate the efficient performance of the transportation system and support its preservation; and seek to better the quality of life enjoyed by people living and working in the area. In addition the MTP must provide for consideration and implementation of projects, strategies and services that will address the following planning factors originally enumerated in the Transportation Equity Act for the 21st Century (Public Law 105-178):

Support the economic vitality of the metropolitan area, especially by enabling global competitiveness, productivity, and efficiency ¶ Increase the safety and security of the transportation system for motorized and nonmotorized users ¶ Increase the accessibility and mobility options available to people and for freight ¶ Protect and enhance the environment, promote energy conservation, and improve quality of life ¶ Enhance the integration and connectivity of the transportation system, across and between modes, for people and freight ¶ Promote efficient system management and operation ¶ Emphasize the preservation of the existing transportation system.

Page 9: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area 5

CURRENT TRENDS AFFECTING TRANSPORTATION

Social and demographic trends affecting travel demand on a national level are having a predictable impact on transportation in the Mississippi Gulf Coast metropolitan planning area (MPA). The U. S. Census Bureau projects that population growth will slow over the next 30 years due to lower fertility rates among U. S. women and decreasing rates of immigration. While in-migration is seen as slowing, most of the growth in population predicted over the next 25 years is expected to come from immigrants and their children. At the same time, longer lifespans are raising the average age of the population and increasing the number of elderly persons less likely to travel, especially as drivers of personal vehicles. The American workforce is changing in ways that mirror broader demographic changes. The overall labor force participation rate, already falling, will continue to go down as the percentage of people too old to work grows. The growing impact of robotics and other technological influences will also serve to depress the size of the active workforce. Since commuter work-trips are the principal cause of peak-period congestion, these structural trends affecting travel demand will have a major impact on transportation systems.

IMPACT OF TECHNOLOGICAL INNOVATION

The impact of technological innovation on transportation is understandably difficult to predict, but increased telecommuting made possible by the internet is likely, as is the use of intelligent transportation systems (ITS) applications that enhance the effective capacity of existing facilities and networks. Bikesharing and carsharing initiatives that apply rapidly evolving new technologies are already affecting travel demand, especially in urban areas where they make car-ownership less essential. The phenomenal growth in electronic commerce has had a significant impact on travel demand, as internet sales reduce the number of trips made for shopping, entertainment and other purposes. This trend has been tracking steadily upward since the Census Bureau began monitoring e-commerce activity at the beginning of 2006, and so far it shows no signs of leveling off.

DECLINING TRAVEL DEMAND AND TRANSPORTATION REVENUES

According to the Federal Highway Administration (FHWA), total vehicle-miles traveled (VMT) in the United State topped three trillion in 2007 and went up again in 2008 as had been the case in every year since 1981. However, in 2009 VMT fell back below the three-trillion-mile mark and has remained below that level since, an unprecedented flattening of the historical curve. While the end of the long-term trend has had its positive effects—reduced traffic congestion, pollutant emissions and vehicular collisions—it also has its more problematical side. Both state and Federal transportation revenues are largely dependent on the consumption of motor fuels. Reduced travel, coupled with improved fuel economy, has resulted in less revenue that can be used for building and maintaining highways and other transportation facilities, or for equipping and operating public transit systems. Federal fuel tax revenues declined by 18 percent from 1999 to 2013; fuel tax revenues in Mississippi peaked at $469 million in 2004. The result is a looming crisis in funding for transportation programs in the years ahead.

Page 10: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

6 2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area

METROPOLITAN TRANSPORTATION PLAN DEVELOPMENT

The metropolitan transportation planning process consists of the following principal components:

Monitoring existing conditions – This applies to the transportation system as a whole and includes consideration of all available modes. ¶ Forecasting future population and employment growth – The resulting forecast seeks to provide a realistic projection of how population and employment will be distributed across the metropolitan area in the future based on an assessment of projected land use in the region and the identification of major growth corridors and nodes. ¶ Identifying current and projected problems and needs – In addition to the identification of existing and anticipated transportation system deficiencies, this component involves analyzing, through detailed planning studies, strategies for addressing those needs. ¶ Developing long-range alternatives and short-range programs – In addition to providing for the long-term future transportation requirements of the region, the plan seeks to identify the near-term measures necessary to address immediate needs for capital improvements and operational strategies. ¶ Assessing the potential environmental effects of proposed improvements – This component is particularly concerned with the likely air quality and environmental justice implications of recommended projects. ¶ Developing a financial plan for funding needed transportation improvements – In order to produce a fiscally responsible plan it is necessary to undertake a realistic analysis of present and projected future resources, identifying shortfalls and suggesting means for securing sufficient revenues to cover costs which exceed the anticipated availability of funds. PUBLIC INVOLVEMENT PROCESS

As part of its ongoing transportation planning process, Gulf Regional Planning Commission (GRPC) coordinated a public engagement program in accordance with the U. S. Department of Transportation (USDOT) metropolitan planning regulations. Both the general public and potentially interested stakeholders were informed of the long-range plan update process and afforded numerous opportunities to participate. Public participation activities were coordinated with the Mississippi Department of Transportation (MDOT) statewide plan update. Outreach messages and timelines were aligned to provide a consistent look for public display and coordinated opportunities for community input. GRPC also participated with MDOT in a statewide online outreach initiative. The MindMixer website afforded people who were unable or unwilling to attend scheduled public meetings an opportunity to review materials and provide feedback. In addition to posting information for public viewing, the site allowed participants to enter questions, make comments and share their project suggestions with planning staff. Planners also solicited feedback by means of a statewide telephone survey. The information collected contributed to the initial drafting of long-range goals and objectives which were then made available for public comment. The top priority identified by respondents in both urban and rural areas, as well as statewide, was the need to maintain the existing transportation system. Improving safety and reducing traffic congestion also ranked high in the Mississippi Gulf Coast area and in other metropolitan areas across the state.

Page 11: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area 7

PUBLIC INVOLVEMENT IN THE PLANNING PROCESS

Public meetings provided attendees with a comprehensive overview of the planning process as well as opportunities to be actively involved in the plan development process. Informational materials were produced, presented and displayed by both MPO and MDOT planning staff at each public meeting. Separate meetings were held at locations in each of the three study area counties in February 2015 shortly after the planning process got underway and in mid-November 2015 during the 45-day public review period for the draft plan.

Bay Saint Louis Community Hall Public Meeting

Feedback collection activities were provided for visitors during the public meetings in an attempt to facilitate their involvement in evaluating current conditions and identifying needs. Large maps were laid out for individuals to mark, indicating where they would like to see improvements made. There were also two surveys: The first asked attendees to rate the performance of the existing transportation system by mode; the second asked participants how they would spend limited financial resources available for transportation improvements. The modal response with respect to the expenditure of funds (21 percent) supported the use of scarce resources to maintain existing streets and highways. The second highest level of support (15 percent) favored using available funds to improve the connectivity of designated bicycle paths. The third most popular use (12 percent) called for improving existing transit service and public transportation options or developing new ones where needed. With regard to the condition and performance of existing modal facilities and services, the biggest response came from those dissatisfied with the status of bicycle paths and lanes. Sidewalks and crosswalks were also rated “poor” by a significant number of respondents. Responses relating to the condition and performance of roads and bridges, and the roadway network as a whole, were largely favorable.

Page 12: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

8 2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area

REGIONAL GOALS AND OBJECTIVES

The passage of the Moving Ahead for Progress in the 21st Century Act (MAP-21) in 2012 brought new focus to bear on the use of performance measures by state departments of transportation (DOTs) and metropolitan planning organizations (MPOs). Performance measures provide a basis for evaluating progress over time toward the realization of goals and objectives. They are also useful for comparing alternative improvement strategies under consideration in the present. The U.S. Department of Transportation (USDOT) adopted national performance measures relating to the following areas of concern: Safety; Infrastructure Condition; Congestion Reduction; System Reliability; Freight Movement and Economic Vitality; Environmental Sustainability; and Reduced Project Delivery Delays.

THE METROPOLITAN PLANNING VISION

Building on input elicited through public outreach activities and consultation with stakeholders, the MPO Transportation Policy Committee (TPC) adopted the following goals and objectives to guide the long-range planning process for the Mississippi Gulf Coast:

Goal 1.0: Strategically enhance corridors

Objectives: Maximize transportation system efficiency by promoting alternatives to adding general-purpose traffic lanes. ¶ Reduce roadway congestion. ¶ Improve the mobility of freight trucks. Enhance mobility by improving the connectivity of the existing transportation network. ¶ Improve the form and function of transportation corridors in order to contribute to the sense of place. ¶ Improve economic vitality of the region with transportation decisions.

Goal 2.0: Improve and expand transportation choices

Objectives: Make public transportation a choice mode of transportation on the Mississippi Gulf Coast. ¶ Improve marketing and promotion of transportation options to increase awareness on the Mississippi Gulf Coast. ¶ Promote rail transportation opportunities.

Goal 3.0: Increase safe transportation

Objectives: Make all Mississippi Gulf Coast urban area roadways suitable for bicycles, pedestrians and transit. ¶ Improve safety at intersections. ¶ Promote safety through public education, enforcement and engineering.

Goal 4.0: Manage the relationship between transportation, community and environment

Objectives: Promote land use patterns and development policies that support transportation mobility. ¶ Consider climate variability when making transportation project decisions. ¶ Coordinate transportation decisions to preserve existing communities. ¶ Evaluate potentially disparate impacts of transportation projects on environmental justice target areas. ¶ Provide public involvement processes to engage the general public, minority and low-income populations in transportation decision-making. ¶ Promote the development of a transportation system and programs that maintain or improve air quality and reduce greenhouse gases, ozone, particulate matter and other pollutants.

Page 13: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area 9

LAND USE AND DEMOGRAPHICS

The Mississippi Gulf Coast is located on the northern shore of the Gulf of Mexico approximately 88.40 to 89.70 degrees west of the prime meridian and roughly 30.17 to 30.74 degrees north of the equator. The metropolitan planning area (MPA) defined for long-range planning purposes is the Gulfport-Biloxi-Pascagoula Metropolitan Statistical Area (MSA). The Gulfport-Biloxi-Pascagoula MSA includes the three southernmost counties in Mississippi: Hancock, Harrison and Jackson.

LAND USE

Land-use and transportation are inextricably linked. Land uses generate vehicle-trips; land-use locations determine trip-lengths; and land-use character influences mode selection. The predominantly rural character of the study area as a whole is reflected in the fact that 45 percent of all acreage in the three counties is vacant and 25 percent is parkland or open space. Single-family residential developments occupy 20 percent of all land. That means less than 10 percent of the 1,466,661 acres in the three-county area are being used for all other categories: Agriculture, multi-family residential, schools and other institutions, offices, retail and service outlets, industrial activities, utilities, transportation facilities, parking lots and garages.

POPULATION AND HOUSING

The MSA had a population of 370,702 in 2010, according to the decennial census. The U. S. Census Bureau estimate for 2014 showed an increase of more than four percent to 386,144. Over the 70 years from 1940 to 2010 the population of the Mississippi Gulf Coast grew at an annual rate in excess of two percent. If that rate (2.17 percent) were to be sustained for another decade there would be very nearly half a million people living in the area by 2026. While population in the area more than quadrupled from 1940 to 2010, housing increased sevenfold. This reflects the fact that a significant amount of the housing in Hancock County and the western part of Harrison County is occupied on a part-time basis by people from south Louisiana who have weekend or summer homes on the Mississippi Gulf Coast.

EMPLOYMENT The number of people employed by establishments in the Mississippi Gulf Coast study area has increased by a little more than 30 percent in a little less than 25 years, according to the Mississippi Department of Employment Security. However, all of that growth occurred during the decade of the 1990s when casino gambling was legalized and new gaming establishments were opened in Hancock and Harrison counties. Establishment-based employment peaked at more than 164,000 in 2000 but has since fallen off to approximately 154,000. The drop-off in the number of people employed in the area actually occurred in the five-year period immediately prior to Hurricane Katrina. Surprisingly, estimated employment in 2010 was exactly the same as it had been in 2005 before the storm and was only slightly lower in 2014. This probably says as much about continuing weakness in the national economy as it does about local economic conditions.

Page 14: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

10 2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area

EXISTING TRANSPORTATION SYSTEM–ROADS AND BRIDGES

Planning for the future transportation system begins with an evaluation of existing facilities and services, including roadways and bridges, bicycle and pedestrian facilities, public transit, freight transportation, aviation safety and security. The region’s roadways and bridges are used by almost everyone: Travel by motor vehicle is the primary means of transportation. The importance of a region’s roadways and bridges can hardly be overestimated.

Interstate highways in the area include Interstate 10 (I-10) and Interstate 110 (I-110). The total centerline length of the interstate system within the study area is 81.62 miles; mainline lane capacity includes 377.73 lane-miles. While carrying the heaviest volume of traffic, the interstate system represents only a little more than three percent of total major roadway mileage in the metropolitan area. Major roadways include all interstate routes, principal arterials, minor arterials and collectors.

Principal arterials carry the highest volumes, and typically the longest trips, after the interstates. They extend approximately 211 miles in total length, accounting for slightly less than eight percent of all major roadway mileage in the area. This class includes important travel routes like US Highway 90 (US 90) and US Highway 49 (US 49).

Minor arterials collectively account for about 246 route-miles or just over nine percent of total mileage in the major roadway network. The numerous routes classified as minor arterials include portions of US 90, Mississippi 43 (MS 43) and MS 53 in Hancock County; MS 15, MS 53, State Route 605 (SR 605) and a sizable number of city and county streets in Harrison County; and MS 57, a portion of SR 613 and numerous city and county streets in Jackson County.

Collectors carry the lowest volumes of traffic among the functionally classified major streets. Their primary purpose is to provide a connection between local streets and the arterial network, facilitating access to one or the other, depending on the direction of travel. There are more than 700 miles of collector roads in each of the three Mississippi Gulf Coast area counties. Collectively they account for 2,127 route-miles or very nearly 80 percent of the overall total. In all, there are 2,666.5 miles of major roads in the study area. A majority of roadway mileage in the study area (about 55 percent) is actually to be found in local streets that provide direct access to homes, places of work or recreation, grocery stores, small shops and many other places of origin or destination. There are more than 3,300 miles of local streets in the study area. Adding those to the major roadway total of 2,666 yields an overall total for all streets and highways of 5,968.8 miles. Thus the interstate system represents a mere 1.4 percent of the systemwide total, the principal arterial share is only 3.5 percent, the minor arterial share 4.1 and the collector share 35.6 percent.

Page 15: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area 11

ROADWAY MAINTENANCE AND TRAFFIC CONDITIONS

As all local streets, the vast majority of collectors, and a significant number of arterial routes fall under the jurisdiction of local government, city and county authorities have maintenance responsibility for well over 90 percent of all street and highway mileage in the region. Nevertheless, the State of Mississippi bears responsibility for maintaining most of the more heavily traveled routes, such as I-10, I-110, US 90, US 49 and all of the roadways on the state highway system. In a 2013 report on Mississippi’s Transportation Infrastructure, the Mississippi Department of Transportation (MDOT) assessed the anticipated maintenance needs for roads and bridges over the next 20 years on a county-by-county basis. The report identified more than $53 million in maintenance needs in Hancock County and over $107 million in rehabilitation costs for Harrison County roads and bridges. The total cost for maintenance in Jackson County fell between the figures for the other two counties: $88,340,062.

DAILY TRAFFIC AND ROADWAY CONGESTION

The total number of trips made daily within the metropolitan planning area (MPA) exceeds 1.5 million; about 60 percent have one end at the trip-maker’s place of residence. An estimated 8.3 percent of all trips are made by truck or other commercial vehicle; about nine percent of the total have an origin and/or destination outside the metropolitan area. While the interstate system accounts for only 3.1 percent of all centerline route-mileage on the major street and highway network, it carries nearly 37 percent of all traffic on the network, registering more than 4.5 million vehicle-miles daily of the estimated 12.3 million traveled in the study area. Principal arterials account for another 4.1 million or more than 33 percent. The remaining 30 percent is split between minor arterials (13 percent) and collectors (17 percent).

Vehicle delay is the difference between the actual time required to make a trip and the time that would be required if one were able to travel at free-flow speed. Output from the regional travel demand forecasting model indicated more than 55,000 hours of delay result each day from the suppressed operating speeds associated with traffic congestion. That represents 18 percent of all time spent travelling. One common measure of congestion is the ratio of traffic volume to roadway capacity. A ratio in excess of 1.00 indicates a roadway is carrying a higher volume of traffic than it is designed to support. The actual capacity of a given roadway depends on a number of factors, including the number of travel lanes, type of access, operating speed, lane width and so forth. The regional travel demand model generates a statistic representing the maximum volume/capacity (VOC) for each link in the network. Maximum VOC is the higher ratio when directional values are compared for a two-way street or highway. The base-year model calibrated to current conditions in 2013 yielded VOC as high as 1.20 on US 49 between the Crossroads Mall and Prime Outlets respectively north and south of I-10 in Gulfport. However, the highest ratios were registered for Promenade Parkway (1.26) and Indian River Road (1.25), two short routes which provide access to the Promenade Mall and Lakeview Village shopping district, respectively located immediately northwest and northeast of the I-10/I-110 interchange in D’Iberville.

Page 16: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

12 2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area

ALTERNATIVE MODES – BICYCLE, PEDESTRIAN, TRANSIT

The availability of quality bicycle and pedestrian facilities is an important indicator of how well an area provides for the mobility of residents and visitors. Within the Mississippi Gulf Coast Metropolitan Planning Area (MPA) there are approximately 48 miles of designated shared-use roadways (i.e., signed bike routes), four times the number of signed miles (12) in 2010. There are 20 miles of shared-use (multiuse) pathways, more than doubling the number (8.5) available in 2010. There are 36 miles of bike lanes, up slightly from the 2010 total (33). Local communities around the region are embracing opportunities to expand their bicycle networks. Coast Transit Authority (CTA) has also done its part to make cycling a realistic travel option through the transit operator’s highly successful Bike ‘n Bus Program. The installation of front-mounted bicycle racks on CTA vehicles enables an individual to make a trip by combining alternative modes. Sidewalks are currently not prevalent outside the downtown districts and older residential neighborhoods in the incorporated municipalities, although they are increasingly included in newer developments. Nevertheless, efforts to upgrade bicycle and pedestrian facilities in the area are steadily gaining momentum. The MPO Complete Streets Policy will encourage local jurisdictions to include sidewalks in their plans for new streets or roadway improvements. Today central business districts reconstructed after Hurricane Katrina in Bay Saint Louis, Pass Christian, Gulfport, Biloxi, Ocean Springs, Gautier and Moss Point feature wide sidewalks and pedestrian amenities such as benches, crosswalks and signals enabling those on foot to cross streets safely. The beachfront boardwalk in Harrison County was also rebuilt following the storm.

PUBLIC TRANSIT

CTA currently operates buses on nine regularly scheduled routes and provides demand-response paratransit service for qualified individuals who live in the area. The agency also sponsors a highly successful commuter vanpool service for Mississippi Gulf Coast workers who live outside the metropolitan area. The CTA offices, bus storage and maintenance facilities are centrally located on DeBuys Road in Gulfport immediately west of the Biloxi city limit. Transit centers in Gulfport and Biloxi provide parking and passenger accommodations and serve as the principal transfer points for routes radiating outward from those centrally located facilities. A third transit center built in D’Iberville opened for business early in 2015, and Edgewater Mall in Biloxi continues to operate as a major transfer point. CTA scheduled operations extend into all three Mississippi Gulf Coast counties and five different cities: Gulfport, Biloxi and D’Iberville in Harrison County; Ocean Springs in Jackson County; and Bay Saint Louis in Hancock County. CTA experienced phenomenal growth in the years following Hurricane Katrina with total ridership exceeding one million in 2011 and each of the succeeding three years. However, ridership began to decline in FY 2014 and then fell off drastically in FY 2015 as the price of gasoline collapsed. Over the past two years the loss in total ridership exceeded 260,000 passengers, falling to fewer than 875,000 riders.

Page 17: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area 13

FREIGHT ~ AVIATION ~ SAFETY

The safe, reliable and efficient movement of freight, both within and through the metropolitan area, is essential for the maintenance and growth of the regional economy. Highways, railroads, airports and maritime ports are all vital components of the Mississippi Gulf Coast freight transportation system. There are two major freight corridors in the Mississippi Gulf Coast Metropolitan Planning Area (MPA) for shipping goods by truck, Interstate 10 and US 49. There are four railroads for moving goods by rail; three airports that accommodate both airborne shipping and passenger air travel; three maritime ports providing access to the Gulf of Mexico; and a waterway for movement between the gulf and inland industrial facilities. There four railroads include the CSX Transportation (CSXT) line, Kansas City Southern Railway (KCS), Mississippi Export Railroad (MSE) and Port Bienville Railroad (PBVR). CSXT and KCS are Class I railroads; MSE and PBVR are Class III shortline railroads. The CSXT line runs east and west along the Mississippi coast, connecting New Orleans and Mobile. KCS operates on a north-south rail line that has its southern terminus in the Mississippi State Port at Gulfport. MSE is a 42-mile railway between the Port of Pascagoula and Evanston in George County where it connects to the Canadian National Railways line between Hattiesburg and Mobile. Port Bienville Railroad is a 7.5-mile shortline providing service between the port and the CSXT mainline rail junction in the vicinity of Ansley.

AVIATION

There are three publicly owned commercial and general aviation airports in the Mississippi Gulf Coast MPA, one in each of the three counties. The principal location for commercial airline service is Gulfport-Biloxi International Airport in Harrison County. Stennis International Airport in Hancock County provides general aviation facilities and services in proximity to the National Aeronautics and Space Administration’s Stennis Space Center. Trent Lott International Airport provides the same services in Jackson County for the benefit of the general public and corporations engaged in heavy industry in and around Pascagoula. SAFETY

Safety Analysis Management System (SAMS) data, provided by the Mississippi Department of Transportation (MDOT), were used to georeference crash reports for the period from 2011 through 2013. The crash records included the time and location of the accident, its severity, and local conditions at the time of the collision. A total of 27,592 crashes occurred within the study area: 154 resulted in fatalities, and 8,475 involved injuries. There were in excess of 9,000 crashes in each of the three years, and in each year more than half of all crashes occurred in Harrison County. Approximately 75 percent of all crashes occurred between 8 a.m. and 8 p.m. Rear-end collisions were far and away the most frequently recorded type of crash (37.2 percent). Pedestrians were involved in 246 traffic accidents, 22 of which resulted in fatalities. Bicyclists were involved in 98 crashes, including two fatal accidents.

Page 18: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

14 2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area

FUTURE TRAVEL FORECAST

The updated Mississippi Gulf Coast Area Regional Travel Demand Forecasting Model developed for the 2040 Metropolitan Transportation Plan (MTP) is driven by a land-use and demographic database assembled by Gulf Regional Planning Commission (GRPC). Input data include base-year population, housing, employment, hotel and motel occupants, school attendance, and casino gaming area and positions. These data were used to calibrate the model to actual traffic conditions in 2013 by first estimating the number of trips produced and attracted within each of the 798 traffic analysis zones in the study area. GRPC also developed a long-range data forecast used to generate trips for the short-term (2020), intermediate (2030) and long-range (2040) planning years. Projected future travel was then assigned to the existing network, expanded to include committed improvements already programmed for implementation, in order to identify potential deficiencies likely to occur absent additional improvements.

LAND-USE AND DEMOGRAPHIC FORECAST

The land-use and demographic data forecast projected total population in the Mississippi Gulf Coast Metropolitan Planning Area (MPA) would increase by a little less than 22 percent between 2013 and 2040, growing by 80,000 to more than 450,000. The largest absolute increase (50,000) was forecast to occur in Harrison County, the largest relative increase (33 percent) in Hancock County. Establishment-based employment was projected to increase by nearly 27 percent from a little more than 196,000 to more than 249,000 employees. As with population, projected employment growth was concentrated largely in Harrison County (more than two-thirds of the 52,000 new employees) with Hancock County again showing the largest relative gain (44 percent).

FUTURE SYSTEM PERFORMANCE

The travel demand model was calibrated to actual traffic in the base year using a street and highway network that included all major roads as well as some local streets required for continuity. The Existing-Plus-Committed (E+C) network, incorporating changes made since the base year and improvements already programmed, was subsequently developed to represent the baseline case for testing alternatives. Model output data for the E+C network assignment generated with 2040 input data were compared with the 2013 base-year model results to derive an overall picture of how system performance would likely be affected if no additional improvements were made. The comparison indicated that a projected population increase exceeding 21 percent would result in 25 percent more trips, adding about eight-tenths of a mile and two minutes to the average trip. This would lead to increases in vehicle miles traveled (36 percent), vehicle hours traveled (45 percent) and vehicle hours of delay (90 percent). The delay share of total travel time would expand from less than 15 percent to almost 20. The added traffic congestion associated with increased delay would reduce the average operating speed by more than 1.5 miles per hour. This potential decline in system performance is what the long-range transportation plan seeks to avert by recommending measures needed to prevent or mitigate deteriorating conditions.

Page 19: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area 15

FUTURE TRAVEL NEEDS - ROADS AND BRIDGES

The transportation system of the future will need to provide for increased travel demand and an increasing diversity of needs arising from evolving patterns of land use and development, economic activity and social interaction. It is expected that in 25 years, with nearly 80,000 additional residents making almost 400,000 trips daily, the number of vehicle miles traveled (VMT) on the Existing-plus-Committed (E+C) network would exceed VMT on the 2013 base-year network by approximately 4.45 million or 36 percent. The resulting increase in vehicle hours traveled (VHT) would be approximately 132,000 or 43 percent. That additional time spent traveling would include about 52,000 more vehicle hours of delay (VHD), a 93 percent increase over 2013. In the absence of any additional improvements to the transportation system, beyond those already funded, the added travel demand resulting from fairly moderate population growth would result in significantly greater traffic congestion and reduced operating speeds. The portion of overall travel time attributable to delay caused by congested conditions would increase from 18 percent in 2013 to almost 25 percent in 2040, and the average operating speed would decrease by about two miles per hour across the system.

CAPACITY AND CONDITION OF ROADS AND BRIDGES The base-year network assignment showed a fairly limited number of generally short street or highway segments with volume/capacity (VOC) greater than 1.00, but the number is expected to triple (to 21) by 2040 if improvements other than those already committed are not made. Some of these anticipated roadway capacity deficiencies may need to be addressed by widening existing roadways; others may not be soluble except by providing new route alternatives. Nevertheless, it is important to note that in some cases it may be more appropriate to apply Intelligent Transportation Systems (ITS) solutions such as interconnected traffic signals or reversible travel lanes; or the situation may call for employing Transportation Demand Management (TDM) strategies and/or improved bicycle, pedestrian and transit facilities and services to encourage the use of alternative means of transportation. In a 2013 report entitled Mississippi’s Transportation Infrastructure, the Mississippi Department of Transportation (MDOT) presented a county-by-county assessment of projected needs related to state-maintained roads and bridges. Based on a two-year program of inspections that rated bridge and pavement condition in accordance with state and federal standards, the report identified long-range rehabilitation-related costs in the three Mississippi Gulf Coast counties totaling $76.79 million for pavement on highways, $92.36 million for bridges on the statewide system maintained by MDOT, and $79.88 million for county bridges under the jurisdiction of the Office of State-Aid Road Construction (OSARC). Total needs for the individual counties amounted to $53.38 million in Hancock County, $107.32 million in Harrison County, and $88.33 million in Jackson County. The grand total for the area as a whole was $249.04 million.

Page 20: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

16 2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area

FREIGHT TRANSPORT - BICYCLE AND PEDESTRIAN NEEDS

The principal Mississippi Gulf Coast highway freight corridor is Interstate 10 (I-10) from the Louisiana line on the west to the Alabama border on the east. The principal north-south routes intersecting I-10 are US 49 in Gulfport and MS 63 in Pascagoula. The three coastal counties intersected by the I-10 corridor account for 13 percent of both population and employment in Mississippi. Ingalls Shipbuilding, the state’s largest employer with over 13,000 employees, is located in the I-10 freight corridor. Within the metropolitan area the corridor serves three major maritime ports located on the Gulf of Mexico, including deep-water ports in Gulfport and Pascagoula. Truck freight is the dominant mode of goods transport in the area, and it is expected to grow from 61 percent of total freight in 2011 to 65 percent in 2040. The Hancock County Port and Harbor Commission is pursuing plans to install approximately 24 miles of new track to connect the existing Port Bienville Railroad (PBVR) to the Norfolk Southern (NS) mainline at Nichols. This long-contemplated addition to the shortline railroad will make it possible to ship incoming freight north on the NS line, as well as east and west on the CSX Transportation (CSXT) railroad, which has long been the only option. Another notable freight railroad initiative moved a step closer to implementation when Kansas City Southern (KCS) entered into an agreement with the Mississippi State Port Authority (MSPA) in 2015 to upgrade the line leading north from the Mississippi State Port at Gulfport to Hattiesburg. Pending improvements will render the KCS rail line capable of carrying standard 286,000-pound cars and double-stack trains, an enhancement of the regional freight transportation network that has long been considered an essential element of plans for improving access to the state’s principal seaport.

BICYCLE AND PEDESTRIAN NEEDS While significant progress has been made in the development of bicycle and pedestrian facilities in the metropolitan area, the demand for non-motorized travel continues to grow, spurring efforts to provide sidewalks, bike paths, safe routes for cycling and multiuse pathways for both pedestrians and those riding bicycles. In addition to the local improvements designed to meet mobility needs within residential, commercial and recreational areas, there is a larger need for development of a regional network, serving longer trips between different sections of a city or even between cities. GRPC planners have sketched a network of separated paths, radiating from a spine defined by the Highway 90 corridor. Developed over time, the separated-path network will improve bicycle mobility and increase connectivity throughout the Mississippi Gulf Coast area. North-south routes would radiate inland from the coast along major roadways such as Beatline Road and County Farm Road, Highway 49, Popp’s Ferry Road, Highway 609 and the Gautier-Vancleave Road. Some segments of these routes would not be suitable for the installation of separated paths but could be adapted to accommodate bicycle travel safely.

Page 21: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area 17

PUBLIC TRANSPORTATION NEEDS

The overarching issue with respect to public transportation on the Mississippi Gulf Coast is the lack of a stable source of local funding adequate to match Federal funds available for transit operating and capital expenditures. Local funding is appropriated annually by participating cities and counties from their general funds, forcing Coast Transit Authority (CTA) to compete year after year with other community services seeking public support. As a result, CTA has had to rely more heavily than most transit agencies on its ability to generate revenues from fares and other sources. During the period from 2010 through 2013, the share of CTA fixed-route transit operating expenses covered by fare revenues increased steadily, topping out at a little less than 19 percent. However, while data for 2014 are not yet available from the National Transit Database (NTD) it is apparent that since 2013 ridership and fare revenues have been adversely affected by the collapse of oil prices and resulting low cost of gasoline to the consumer. CTA data indicate ridership on regularly scheduled routes was down by more than 85,000 passengers from 2013 to 2014 and fell another 140,000 in the 2015 operating year. The aggregate local contribution to transit operations has declined in absolute terms in recent years, forcing cutbacks that have adversely affected ridership. Moreover, as noted in the 2010 Transit Development Plan (TDP), the local percentage share of operating funds has been decreasing since 2001. Thus, the impressive expansion of ridership in the years following Hurricane Katrina was achieved in spite of contracting local support for the system.

MAINTAINING THE EXISTING SYSTEM The immediate challenge confronting CTA is to maintain the existing system, consolidating the gains made following Katrina, in order to provide a stable platform for future growth and expansion. Two modifications proposed for implementation during the initial five-year planning period from 2016 to 2020 could significantly improve fixed-route transit operations. The first would eliminate so-called “hail stops” made when someone wishing to board flags down a bus at a non-designated location. The second would eliminate non-essential route deviations made to provide front-door pickups where curbside stops would suffice and save valuable time. Another needed important involves reducing the time between scheduled trips in order to increase the frequency of service. Headways presently range from 45 to 90 minutes. CTA proposes to reduce 45-minute headways to 30 minutes wherever possible and to cut 90-minute trip intervals to 60 minutes. These measures might require additional equipment and operating funds, but they are essential if the transit system is to build a solid base of support among riders who consider bus service to be a convenient and reliable alternative to private-vehicle travel. Additional measures, such as reducing travel distance by shortening or redirecting routes, can also contribute to lessening the time between scheduled trips. Proper maintenance of rolling stock and replacement of aging vehicles are also necessary measures if the transit system is to be kept in a state of good repair and service is to remain safe and reliable.

Page 22: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

18 2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area

TRANSIT FACILITIES AND OPERATIONS

Coast Transit Authority (CTA) currently has on order seven new low-floor hybrid-electric buses with reclining seats, overhead luggage racks, wireless internet and electrical outlets. These vehicles will have a major impact on the public perception of transit as an alternative to driving. The implementation of new technology will also serve to pique interest in enhanced transit service: The RouteShout mobile app launched in 2015 allows riders to find out where a bus is located and when it will arrive at a specified stop.

Parallel paratransit service will necessarily grow as the fixed-route system expands, and the ADA Paratransit Plus operation will eventually provide transportation for qualified individuals throughout all three Mississippi Gulf Coast counties. CTA also remains committed to its highly successful commuter ridesharing program, operated under contract by vRide, and will continue its outreach to large employers and efforts to provide parking and associated facilities needed to new patrons. In addition, the Bike-n-Bus program has been extremely successful in attracting riders from among the cycling population.

UPGRADING FACILITIES

CTA is in the process of finalizing plans for expansion of the Gulfport Transit Center into the adjacent structure which served as the Gulfport Main Library for many years prior to Hurricane Katrina. The structure, gutted by the storm and abandoned by the Harrison County Library System, will be rehabilitated and reconfigured to serve as a multimodal transportation center. An elevated pedestrian bridge and tramway, spanning Highway 90, will facilitate direct access to Jones Park and the Mississippi Sound waterfront. CTA also plans to locate transit super-stops and park-and-ride facilities at new hubs located at key transfer-points for travel in the region: the Interstate 10 (I-10) interchange with US 49; the I-10 interchange with I-110; and in the proposed Coliseum Hotel and Convention District at the intersection of US Highway 90 (US 90) and extended Popp’s Ferry Road. In order to optimize planned express bus service in the Highway 90 corridor, CTA will pursue the installation of transit signal priority equipment on traffic lights and buses to facilitate the movement of transit vehicles approaching congested intersections.

EXPANSION OF THE EXISTING SYSTEM

In addition to improving existing service, CTA intends to expand the fixed-route transit network to areas where latent demand is presently unmet. A key objective relates to the need for more service connecting east-west routes in the older urban areas located along the Mississippi Sound to the areas that have been annexed or incorporated in the years since the City of D’Iberville achieved municipal status in 1988. Gulfport, Biloxi and Gautier have all annexed large areas lying north of their old city limits, and more recently, residents of the Diamondhead community in Hancock County voted to incorporate. There are now a dozen incorporated municipalities in the region and only half of them enjoy transit service.

Page 23: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area 19

FINANCIAL ANALYSIS

In forecasting how much funding can reasonably be expected from Federal, state and local sources, the financial analysis proceeded under the assumption that expenditures over the next 15 years will be consistent with spending during the past 15 years. The Mississippi Department of Transportation (MDOT) facilitated this approach by providing a database listing all transportation expenditures in Hancock, Harrison and Jackson counties during the 15-year period from 1999 through 2013. Total spending for transportation improvements during that period amounted to more than $1.493 billion in actual dollars. Adjusting for inflation yielded a total of over $1.748 billion in 2013 dollars. Of that total more than 83 percent went to construction projects, and 62 percent of all construction funds were expended on new bridges, almost all of it on replacement of the two U.S. Highway 90 bridges destroyed by Hurricane Katrina. Roadway construction costs accounted for roughly 28 percent of the construction total, leaving 10 percent for new interchanges, roadway widening and overlay projects, bicycle and pedestrian facilities and intersection improvements. Road and bridge maintenance accounted for nearly 12 percent of all money spent on transportation. The balance of five percent or so was expended for facilities and equipment – street lighting and safety improvements, traffic signals, and roadside or right-of-way enhancements such as rest stops, visitor centers and landscaping – as well as non-roadway-related projects.

PROJECTED FUTURE FUNDING

In order to establish a basis for projecting the amounts that would be available for use in each of the three plan stages (2016-2020, 2021-2030, 2031-2040) the categorized costs were annualized. This yielded an average annual overall expenditure of $116.58 million for the period from 1999 through 2013 after adjusting for inflation. Of that total more than $97 million related to construction projects, including $60 million for bridges and $28 million for roads. The huge expenditures required to replace the Highway 90 bridges represented a one-time emergency infusion of funds that cannot be expected to recur on a regular basis. Therefore those costs were eliminated from further consideration in the analysis. In forecasting short-term funding for local projects, the historical data were set aside in favor of amounts included in the current fiscally constrained Statewide Transportation Improvement Program (STIP). Federal regulations contain an explicit requirement that project costs be expressed not in real dollars but in “year of expenditure dollars.” Therefore, the average annual expenditure amounts previously developed for the base year (2013) were first updated to 2015 dollars, assuming an annual inflation rate of one percent. The same rate was then applied to all succeeding years from 2016 through 2040 in order to calculate the projected availability of funds for all categories and sub-categories of transportation improvements, yielding the following projected total amounts:

• 2016-2020 $ 256,811,419 • 2021-2035 $ 553,590,961 • 2031-2040 $ 611,508,825

Page 24: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

20 2040 Metropolitan Transportation Plan |Mississippi Gulf Coast Area

PROJECT DEVELOPMENT AND EVALUATION

Proposed improvements were evaluated based on goals and objectives adopted by the Metropolitan Planning Organization (MPO) Transportation Policy Committee (TPC). To the extent possible, the anticipated benefits of a project were quantified and monetized. Travel time-savings likely to result from an improvement that would reduce traffic congestion or provide a faster alternative route were particularly amenable to this approach. The regional travel demand forecasting model was used to generate traffic assignments with and without a proposed improvement, and the difference in vehicle hours traveled (VHT) was used to quantify potential time-savings. The analysis separated time-savings attributable to trucks from those accruing from improved passenger-vehicle travel and assigned appropriate monetary values to each. The value of time that would be saved by making the improvement was then compared to the cost that would be incurred in its implementation in order to derive a benefit/cost ratio with which to measure its effectiveness relative to other actions under consideration. Safety benefits related to reduced accidents, injuries and deaths were subjected to similar analysis. CONGESTION MANAGEMENT AND QUALITY OF LIFE

In connection with development of the 2040 Metropolitan Transportation Plan (MTP), the Gulf Regional Planning Commission (GRPC) Congestion Management Program (CMP) and travel demand forecasting model were updated. These important tools help planners identify areas of current and potential future congestion and to quantify the associated travel delay. Results generated by these tools were used in evaluating and prioritizing proposed transportation projects based on anticipated benefits. While increasing traffic is often advantageous for retail business establishments, residential neighborhoods can be adversely affected by higher volumes and vehicle speeds. They may bring noise, safety and air quality impacts or undermine community cohesion. Measures may be required to mitigate such effects, or it may be necessary to alter or forego a project likely to have excessive adverse impacts such as these. The analysis also sought to account for the benefits accruing from the diversion or slowing of traffic passing through residential areas. Other potential benefits taken into consideration in evaluating proposed projects included those resulting from enhanced system connectivity; those attributable to the safer and more expeditious movement of freight within the urban area; those related to the facilitation of better transit operations; and those contributing to the economic well-being of the area. Connectivity benefits play an important part in maintaining and expanding the functionality of the transportation system. Freight-related benefits enhance the overall performance of the transportation system by supporting the efficient interaction of different modes and reducing conflicts between passenger-vehicle and truck traffic. Projects that improve the efficiency of transit benefit the entire area by helping to reduce the overall volume of traffic on arterial routes, and those that enhance the area’s ability to attract new business strengthen the economic sustainability of the region for years to come.

Page 25: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan | Mississippi Gulf Coast Area 21

FISCALLY CONSTRAINED LONG-RANGE PLAN

The Staged Improvement Program presents a fiscally constrained plan for meeting the projected future needs of people traveling in the Mississippi Gulf Coast Metropolitan Planning Area (MPA) by auto, truck, bicycle, or on foot; for work, shopping, personal business, recreation or any other purpose. Future funding amounts were projected for four categories: Alternative transportation improvements such as sidewalks, bicycle paths and facilities supporting access to transit; Road improvements such as adding lanes, reconstructing existing routes, building new roads or modifying intersection geometry; Safety improvements such as roadway lighting, signage, signalization or railroad crossing protection devices; and Interstate and interchange improvements such as adding lanes, modifying existing interchanges or constructing new ramps to enhance access to the interstate system. The analysis yielded a projected total amount available for transportation improvements over the next 25 years of $999 million or just under $40 million per year. In accordance with FHWA regulatory guidance, funds projected to be available are expressed in future dollars based on the assumption that the real value of the currency will decline over time. The Bureau of Labor Statistics Consumer Price Index (CPI) Inflation Calculator indicates that the purchasing power of the dollar has decreased by less than one percent per annum in each of the last two years, and the overall decline over the past seven years has been less than 10 percent. In the absence of any reason to expect a significant deviation from the current trend, the assumption was made that inflation would continue at or near its present rate for the foreseeable future. The projected total funding amount of $999 million over 25 years is based on an assumed annual inflation rate of one percent. The total amount projected to be available includes $29 million for alternative transportation improvements, $75 million for safety enhancements, $780 million for road improvements and $115 million for interstate highway improvements. The amount programmed for local improvement projects is $196 million. Funding for projects to be sponsored by the state (or others) amounts to $803 million or 80 percent of the total.

CONTENT OF THE PROGRAM

Approximately half of the projects listed in the Stage 1 (2016-2020) short-term program component are included in the Statewide Transportation Improvement Program: Fiscal Years 2015-2019. The Stage 2 (2021-2030) component addresses the projected mid-term transportation needs of the region; the Stage 3 (2031-2040) component focuses on long-range requirements of the Mississippi Gulf Coast multimodal transportation system. The program includes interstate highway improvements, roadway construction, safety measures, intersection projects, bicycle and pedestrian facilities, and transit enhancements. The program also identifies projects which would benefit the region but do not fit into the fiscally constrained long-range budget at this time. In the absence of additional resources, these unfunded projects will not be implemented due to the lack of adequate state or local funds to match federal grants.

Page 26: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

22 2040 Metropolitan Transportation Plan | Mississippi Gulf Coast Area

PROJECTED EFFECTIVENESS OF PLANNED IMPROVEMENTS

In order to assess the probable effectiveness of roadway capacity projects included in the Staged Improvement Program, travel demand model assignments were generated for each of the program components (2020, 2030 and 2040) and compared to the base-year (2013) assignment for the existing network and the long-range (2040) assignment for the Existing-plus-Committed (E+C) network. The results suggested that aggregate vehicle hours of delay (VHD) would increase by a little more than two-thirds, due to the greater volume of traffic, even if all projects in the Staged Improvement Program were implemented. However, in the absence of additional improvements beyond those included in the E+C network, the increase in VHD would likely exceed 82 percent. Under current conditions, more than 15 percent of the time spent traveling is attributable to delay. In the absence of additional improvements, VHD would expand to account for almost 20 percent of total travel time. The implementation of all roadway capacity enhancements in the Staged Improvement Program would hold the projected VHD share of total travel time to approximately 18.4 percent. Average operating speed for all vehicles on the current roadway network is roughly 35.9 miles per hour (mph). Increasing congestion over the next 25 years is projected to reduce average operating speed to 34.1 mph without additional improvements beyond those already programmed. Implementation of the Staged Improvement Program would result in a lesser decrease to 34.8 mph. The probable effectiveness of the program was also analyzed in terms of its impact on projected volume-over-capacity (V/C) ratios expected to exceed 1.00 at some point between the base year (2013) and the long-range planning horizon (2040). Seven roadways are already carrying volumes that exceed theoretical capacity. In the absence of additional improvements, that number would likely increase to 11 by 2040. However, model output indicated the number could be reduced to three by making all of the improvements included in the Staged Improvement Program.

STAGED IMPROVEMENT PROGRAM

The Staged Improvement Program is summarized in tabular form on the following four pages. This summary presentation is followed by four sets of figures, one for each stage, locating each proposed project in relation to the regional network of streets and highways. There are 15 figures in all, five of which serve to illustrate the numerous unfunded projects included in the plan for informational purposes. It should be noted, however, that any project included in the long-range plan can be advanced for implementation via the Transportation Improvement Program, assuming there are sufficient funds available at that time for its implementation.

HARRISON

Mississippi Sound

Biloxi Bay

Page 27: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan - Mississippi Gulf Coast Area

LOCATION ROUTE FROM TO CATEGORY IMPROVEMENT Local Projects State Projects49,180,820$ 132,420,906$

Bay Saint Louis Old Spanish Trail Main Street Waveland city limit Alternative Transportation Pedestrian pathway lighting 800,800$ -$ Biloxi Popp's Ferry Road Cedar Lake Road D'Iberville city limit Road Improvements Widen to 4-lane divided 4,006,003$ -$ Biloxi Popp's Ferry Road Pass Road Beach Boulevard Road Improvements New 4-lane divided construction 2,704,000$ -$ D'Iberville D'Iberville Blvd/Big Ridge Rd I-10 I-110 Road Improvements Widen to 4-lane divided 3,672,472$ -$ Gulfport Dedeaux Road Three Rivers Road Highway 605 Road Improvements Widen to 4-lane divided 3,750,000$ -$ Gulfport Courthouse Road Pass Road US 90 Road Improvements Add median, sidewalks, lighting 3,354,415$ -$ Harrison County Lorraine Road Biloxi River Bridge -- Road Improvements Bridge replacement 1,513,996$ -$ Pascagoula Hospital Road Old Mobile Highway US 90 Road Improvements Reconstruction 2,866,522$ -$ Moss Point Main Street Ely Street Jefferson Street Alternative Transportation Construct sidewalks 555,000$ -$ Gautier MS 57 Brown Road [Intersection] Road Improvements New signal 125,000$ -$ Gautier Martin Bluff Road Gautier-Vancleave Rd I-10 Frontage Road Road Improvements Reconstruction 3,328,004$ -$ Jackson County LeMoyne Boulevard Brittany Avenue [Intersection] Road Improvements Signal, signage, striping 385,000$ -$ Jackson County Highway 609 Old Fort Bayou Road [Intersection] Road Improvements Realign, reconstruct intersection 1,867,050$ -$ Regional Grouped Projects -- -- Alternative Transportation -- 2,225,750$ -$ Regional Grouped Projects -- -- Safety Improvements -- 2,375,000$ -$ Regional Grouped Projects -- -- Safety Improvements -- -$ 9,734,129$ Jackson County I-10 Connector Daisy Vestry Road Seaman Road Road Improvements New construction -$ 12,305,000$ Jackson County Interstate 10 Highway 609 Gautier-Vancleave Rd Interstate/Interchange Widen to 6 lanes -$ 35,100,000$ Gulfport Three Rivers Road Crossroads Parkway Seaway Road Road Improvements Widen to 4-lane divided 424,530$ -$ Gulfport Landon Road Hwy 49 34th Street Road Improvements Widen to 4-lane divided 2,492,000$ -$ Gulfport Airport Road Existing 4-lane Washington Avenue Road Improvements Widen to 4-lane 687,500$ -$ Harrison I-10 Lorrraine Road -- Interstate/Interchange Interchange improvements -$ 11,845,500$ Gulfport Hwy 605 Magnolia Street Pass Road Road Improvements Reconstruction -$ 1,224,300$

Jackson Beachview Drive Old Spanish Trail Point Aux Chenes Rd Road Improvements Reconstruction 8,362,463$ -$

Gulfport US 49 Dedeaux Road [Intersection] Safety Improvements Intersection improvements -$ 636,000$ Gulfport US 49 Creosote Road [Intersection] Safety Improvements Intersection improvements -$ 636,000$ Pass Christian North Street High School Pass Estates Alternative Transportation Sidewalks 566,000$ -$ Long Beach Pineville Road Railroad Street Beatline Road Alternative Transportation Construct Separated Path PH 1 1,020,000$ -$ D'Iberville Popp's Ferry Road Gay Road D'Iberville Boulevard Alternative Transportation Construct Separated Path PH 1 1,313,250$ -$ Ocean Springs Border to Border - US 90 -- -- Alternative Transportation Construct Separated Path PH 1-3 -$ 10,123,500$ Gautier Border to Border - US 90 -- -- Alternative Transportation Construct Separated Path PH 1-3 -$ 7,790,250$ Bay St Louis Border to Border - US 90 -- -- Alternative Transportation Construct Separated Path PH 1-3 -$ 5,087,250$

Subtotal for Stage 1 Projects Overall Total 142,876,684$ Local/State Projects Total 48,394,755$ 94,481,929$ Balance Available for Stage 2 Projects Overall Balance 38,725,043$ Local/State Projects Balance 786,066$ 37,938,977$

Note: Local Projects Amount Available includes $14,901,320 in Surface Transportation Program (STP) carryover funds; $2,500,000 in STP funds programmed for unspecified MPO uses; and $555,000 in STP Non-Urban funds made available by the Mississippi Department of Transportation for local use.Source: Gulf Regional Planning Commission; Mississippi Department of Transportation: Statewide Transportation Improvement Program: FY 2015-2019 for local project funding availability.

STAGE 1 (2016 - 2020) ESTIMATED AMOUNT AVAILABLE

PROJECTED COST

STAGED IMPROVEMENT PROGRAM - STAGE 1 IMPROVEMENTS (2016-2020)

Page 28: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

2040 Metropolitan Transportation Plan - Mississippi Gulf Coast Area

LOCATION ROUTE FROM TO CATEGORY IMPROVEMENT Local Projects State ProjectsSTAGE 1 (2016 - 2021) PROJECTED CARRYOVER AMOUNT 786,066$ 37,938,977$

69,770,168$ 318,910,764$ 70,556,234$ 356,849,741$

Gulfport Highway 601 Interstate 10 Mississippi State Port Road Improvements Construct new expressway -$ 59,902,400$ Hancock County MS 43 Kiln Bypass -- Road Improvements New construction -$ 60,523,200$ Jackson County MS 57 Interstate 10 Vancleave Road Improvements Realign and add 2 lanes -$ 87,200,000$ Ocean Springs-Gautier US 90 Hwy 609 Dolphin Drive Road Improvements Add 2 lanes -$ 37,571,700$ Gulfport Landon Road US 49 34th Avenue Road Improvements Widen to 4-lane divided road 2,783,030$ -$ Biloxi Pine Street Back Bay Boulevard US 90 Road Improvements Construct 4-lane divided road -$ 14,769,000$ Long Beach Beatline Road Extension Railroad Street US 90 Road Improvements New 4-lane construction 3,766,875$ -$ Gulfport Dedeaux Road Stewart Road Hwy 605 Road Improvements Road Improvements 10,563,855$ -$ Ocean Springs Ocean Springs Road Reilly Road US 90 Road Improvements Widen to 3-lane road 9,973,500$ -$ Biloxi Popp's Ferry Road Back Bay Pass Road Road Improvements Widen to 4-lane divided road 3,820,770$ -$ Biloxi Popp's Ferry Road Riverview Drive Back Bay of Biloxi Road Improvements Reconstruct as 4-lane road 4,761,945$ -$ Gulfport Three Rivers Road Angela Drive Crossroads Parkway Road Improvements Reconstruct as 4-lane road 1,551,840$ -$ Biloxi Division Street Caillavet Street Forrest Ave-Keesler AFB Road Improvements Widen to 4-lane divided road 3,160,390$ -$ Gulfport Washington Avenue Airport Road 54th Street Road Improvements Widen to 3-lane road 1,950,780$ -$ Gulfport Hwy 605 Dedeaux Road I-10 Road Improvements Widen to 4-lane divided road -$ 1,252,390$ Diamondhead Gex Drive Aloha Drive Diamondhead Drive S Road Improvements Widen to 4-lane divided road 2,393,580$ -$ Harrison I-10 County Farm Road [Interchange] Interstate/Interchange Interchange Improvements -$ 11,175,000$ Harrison I-10 Hwy 609 [Intechange] Interstate/Interchange Interchange Improvements -$ 11,175,000$ Biloxi US 90 I-110 Keller Avenue Road Improvements Reconstruction -$ 4,197,600$ Biloxi US 90 Azalea Drive I-110 Road Improvements Reconstruction -$ 2,516,250$ Gulfport Pass Road Cowan Road Washington Avenue Road Improvements Reconstruction 6,996,000$ -$ Pascagoula US 90 Hospital Road Veterans Boulevard Road Improvements Reconstruction -$ 4,496,250$ Hancock Kiln-Delisle Road Hwy 603 [Intersection] Safety Improvements Intersection Improvements 738,000$ -$ Gulfport US 90 US 49 [Intersection] Road Improvements Intersection Improvements -$ 2,050,000$ Jackson US 90 Gautier-Vancleave Rd [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Gulfport US 49 Landon Road [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Gulfport US 49 O'Neal Road [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Gulfport US 49 MS 53 [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Ocean Springs US 90 Hwy 609 [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Jackson MS 63 Hwy 614 [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Gulfport Pass Road Cowan Road [Intersection] Safety Improvements Intersection Improvements 738,000$ -$ Gulfport US 49 Community Road [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Biloxi US 90 White Avenue [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Jackson County Hwy 609 Lemoyne Boulevard [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Moss Point MS 63 Grierson Street [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Bay St Louis US 90 MS 43 [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Jackson Hwy 613 MS 63 [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Jackson MS 63 Saracennia Road [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Ocean Springs US 90 MS 57 [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Gulfport US 90 30th Avenue [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Bay St Louis US 90 Blue Meadow Road [Intersection] Safety Improvements Intersection Improvements -$ 738,000$ Biloxi Cedar Lake Road Popps Ferry Road [Intersection] Safety Improvements Intersection Improvements 738,000$ -$ Biloxi Cedar Lake Road I-10 Popps Ferry Road Road Improvements Reconstruction 1,442,925$ -$ Regional Grouped Projects -- -- Alternative Transportation -- 2,458,610$ -$ Regional Grouped Projects -- -- Safety Improvements -- 2,623,475$ 10,752,534$

Overall Total 379,850,899$ Local/State Projects Total 201,574,042$ 1,033,088,806$ Overall Balance 47,555,075$ Local/State Projects Balance 131,017,809$ 676,239,065$

Source: Gulf Regional Planning Commission.

STAGED IMPROVEMENT PROGRAM - STAGE 2 IMPROVEMENTS (2021-2030)

Subtotal for Stage 2 ProjectsBalance Available for Stage 3 Projects

PROJECTED COST

STAGE 2 (2021 - 2030) ESTIMATED BASE AMOUNT AVAILABLESTAGE 2 (2021 - 2030) ESTIMATED TOTAL AMOUNT AVAILABLE

Page 29: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

LOCATION ROUTE FROM TO CATEGORY IMPROVEMENT Local Projects State ProjectsSTAGE 2 (2021 - 2030) PROJECTED CARRYOVER AMOUNT 10,094,659$ 37,460,417$ STAGE 3 (2031 - 2040) ESTIMATED BASE AMOUNT AVAILABLE 77,069,720$ 352,275,836$ STAGE 3 (2031 - 2040) ESTIMATED TOTAL AMOUNT AVAILABLE 81,432,575$ 389,736,253$ Gulfport US 49 School Road O'Neal Road Road Improvements Widen to 6-lane divided road -$ 24,811,500$ Harrison County I-10 Diamondhead Wolf River Interstate/Interchange Add lane each way -$ 62,765,050$ Gulfport Canal Road I-10 28th Street Road Improvements Widen to 4-lane road 14,230,125$ -$ Harrison County County Farm Road I-10 Red Creek Road Road Improvements Widen to 4-lane divided road 5,637,705$ -$ Jackson County Ocean Springs Road Reilly Road Hwy 57 Road Improvements Widen to 3-lane road 10,705,500$ -$ Jackson County Old Fort Bayou Road Washington Avenue Yellow Jacket Road Road Improvements Widen to 3-lane road 8,418,000$ -$ Biloxi Popp's Ferry Road North Shore Back Bay South Shore Back Bay Road Improvements Construct new 4-lane bridge -$ 90,600,000$ Jackson County Seaman Road I-10 Connector Road Jordan Road Road Improvements Widen to 4-lane divided road 7,992,848$ -$ Gulfport MS 53 US 49 County Farm Road Road Improvements Widen to 4-lane road -$ 17,438,940$ Hancock I-10 Diamondhead Drive [Interchange] Interstate/Interchange Interchange Improvements -$ 16,762,500$ Biloxi Pass Road DeBuys Road Stennis Drive Road Improvements Reconstruction 5,378,175$ -$ Moss Point Main Street Dantzler Street [Intersection] Road Improvements Intersection Improvements 815,210$ -$ Gulfport US 49 Airport Road [Intersection] Safety Improvements Intersection improvements -$ 815,210$ Regional Grouped Projects -- -- Alternative Transportation -- 2,715,835$ -$

Regional Grouped Projects -- -- Safety Improvements -- 2,897,950$ -$

Regional Grouped Projects -- -- Safety Improvements -- -$ 11,877,490$

Sub-Total for Stage 3 Projects Overall Total 283,862,038$ Local/State Projects Total 58,791,348$ 225,070,690$ Balance Available for Unfunded Projects Overall Balance 187,306,790$ Local/State Projects Balance 22,641,228$ 164,665,563$

Source: Gulf Regional Planning Commission.

PROJECTED COST

STAGED IMPROVEMENT PROGRAM - STAGE 3 IMPROVEMENTS (2031-2040)

Page 30: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

LOCATION ROUTE FROM TO CATEGORY IMPROVEMENT Local Projects State ProjectsSTAGE 3 (2021 - 2030) PROJECTED CARRYOVER AMOUNT 22,641,228$ 164,665,563$ Gulfport East-West Corridor US 49 Hwy 605 Road Improvements Construct 4-lane roadway -$ 56,067,500$ Gulfport East-West Corridor Hwy 605 Popps Ferry Road Road Improvements Construct 4-lane roadway -$ 41,298,500$ Biloxi East-West Corridor Popps' Ferry Road I-110 Road Improvements Construct 4-lane roadway -$ 70,016,000$ Gulfport/Long Beach East-West Corridor Jeff Davis Avenue US 49 Road Improvements Construct 4-lane roadway -$ 53,059,000$ Long Beach East-West Corridor Beatline Road Jeff Davis Avenue Road Improvements Construct 4-lane roadway -$ 30,768,750$ Pass Christian East-West Corridor Henderson Point Beatline Road Road Improvements Construct 4-lane roadway -$ 86,699,500$ Biloxi Woolmarket Connector I-10 Popp's Ferry@Riverview Road Improvements Construct 4-lane roadway -$ 102,475,000$ Hancock I-10 Hwy 603 [Interchange] Interstate/Interchange Interchange Improvements -$ 16,762,500$ Gautier I-10 Hwy 57 [Interchange] Interstate/Interchange Interchange Improvements -$ 16,762,500$ Ocean Springs I-10 Menge Avenue -- Interstate/Interchange Interchange improvements -$ 11,845,500$ Hancock County I-10 Louisiana state line MS 43 Interstate/Interchange Add lane each way -$ 132,341,812$ Biloxi Border to Border - US 90 -- -- Alternative Transportation Construct Separated Path PH 1-3 -$ 7,535,250$ Gulfport Border to Border - US 90 -- -- Alternative Transportation Construct Separated Path PH 1-3 -$ 5,450,625$ Long Beach Border to Border - US 90 -- -- Alternative Transportation Construct Separated Path PH 1-3 -$ 4,806,750$ Pascagoula Border to Border - US 90 -- -- Alternative Transportation Construct Separated Path PH 1-3 -$ 10,123,500$ Pass Christian Border to Border - US 90 -- -- Alternative Transportation Construct Separated Path PH 1-3 -$ 6,706,500$ Waveland Border to Border - US 90 -- -- Alternative Transportation Construct Separated Path PH 1-3 -$ 2,907,000$ Moss Point Martin Luther King Blvd Magnolia Street Kreole Avenue Alternative Transportation Construct Separated Path PH 1-3 3,812,250$ -$ Jackson County Hwy 609 Fort Bayou Bridge I-10 Alternative Transportation Construct Separated Path PH 1-3 -$ 3,391,500$ Gulfport US 49 Hwy 53 US 90 Alternative Transportation Construct Separated Path PH 1-6 -$ 11,985,000$ Biloxi Popp's Ferry Road Cedar Lake Road Pass Road Alternative Transportation Construct Separated Path PH 1-3 5,865,000$ -$ Long Beach Pineville Road Railroad Street Beatline Road Alternative Transportation Construct Separated Path PH 2-3 2,040,000$ -$ Long Beach County Farm Rd-Beatline Rd I-10 Railroad Street Alternative Transportation Construct Separated Path PH 2-3 4,420,000$ -$ Waveland Central Avenue Waveland Avenue City Limits Alternative Transportation Construct Separated Path PH 1-2 2,805,000$ -$ Bay St Louis Central Avenue City Limits Washington St Alternative Transportation Construct Separated Path 1,530,000$ -$ Total for Unfunded Projects Overall Total 691,474,937$ Local/State Projects Total 20,472,250$ 671,002,687$ Balance of Funds Available (Lacking) Overall Balance 504,168,146$ Local/State Projects Balance (2,168,978)$ 506,337,124$ Source: Gulf Regional Planning Commission.

PROJECTED COST

STAGED IMPROVEMENT PROGRAM - UNFUNDED IMPROVEMENTS

Page 31: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

HARRISON

DEDEA U X R D

Mississippi Sound

St Louis Bay

HW

Y 6

01

I-1 0

I -10

HIG

HW

AY

60

5

SEA WA Y ROA D

LO

WE

R B

AY

RO

AD

JO

HN

LEE

RO

AD

S B EA CH BO ULEVA RD

BELLS FERR Y R D

K ILN-D ELI SLE RO AD

O'NEAL ROA D

M S 53

CA

NA

L R

OA

D

VID

AL

IA

RO

AD

J. P . LADNER R D

CO

UN

TY

FA

RM

RO

AD

I-10

FIR ETOW

ER R OAD

OLD

HI

GH

WA

Y 4

9

D IAMO N DH EAD D RK ILN D ELISLE ROA D

KAPA

LAM

A D

R IVEE

DW

IN L

AD

NE

R R

OA

D

RA ILRO AD ST

28TH ST

ES

PY

AV

E

N SW AN ROA D

CABLE

BRID

GE R

OAD

ST

AN

DA

RD

DE

DE

AU

X R

OA

D

CH

AM

BE

RL

AI

N A

VE

NU

E

KLO

ND

YK

E R

OA

D

LANDON R OAD

RED

CR

EEK R

OA

D

ROBI NSON R OAD

FIR ETOWER R OAD

JOH

N C

LAR

K R

OA

D

ME

NG

E A

VE

NU

E

DUCK WOR TH R OA D

CO

UN

TY

FA

RM

RD

ST

AN

DA

RD

CE

ME

TE

RY

RO

AD

KEN

DA

LL AVEN

UE

WA

VE LA ND

A V E

TH

RE

E R

IVE

RS

RO

AD

AIR

PO

RT

RD

WI T

TM

AN

RD

BLUE

ME

ADO

W R

OA

D

CENTRA L A

VE

OR ANG E G R OVE RD

US 90

FAY E R OAD

KI

LN

WA

VE

LA

ND

CU

TO

FF

RO

AD

WOLF R

IV ER RD

BE

AT

LI

NE

RD

EX

T

LO

RR

AIN

E R

D

MS

43

CL E

RM

ON

T RO

AD

RO

AD

35

7

FRED D IE FRA NK R OAD

HA

MP

TO

N R

D

P INEV ILLE RD

JOH N RO SS ROA D

DAU G HE RTY R OAD

CC ROA D

N B

EA

CH

BO

ULE

VA

RD

BR

OA

D A

VE

N IC HO

LS ON

A VENU

E

34T H ST

COMMU NIT Y R OAD

DA

VIS

AV

EN

UE

FL

EIT

AS

AV

EN

UE

CO

WA

N R

OA

D

CLOV ERLEA F

US

49

C REOSOTE R OA D

C T SW ITZER D R

E RA ILRO AD ST

MAR TI N LU THER KI NG JR DR

MA

RK

ET

ST

RE

ET

COMMISSION R OA D

DU

NB

AR

AV

EN

UE

J OHNS ON ROA D

WA SHI NG TON STR EET

BE

AT

LIN

E R

OA

D

12

TH

AV

E

HA

MP

TO

N R

OA

D

US 90BA YV IEW ST

LEW

IS A

VE

NU

E

ST LOU IS STR EET

GEX

DR

MAIN S TR EET

S SWA N R OA D

ES

PY

AV

EN

UE

E O LD PA SS RO AD

48TH ST

CH

AP

MA

N R

OA

D

COLE M

AN A V

E NUE

SWITZER R OA D

E R AILR OA D STREET

E SECO N D STREET

W EST DU BUI SSON RD

PIN EVI LLE RO AD 42

ND

AV

E

W AVELA ND

22 ND ST

GO

LF C

LU

B D

RIV

E

SH

OR

EC

RE

ST

RD

NOR TH CA R OLI NA AV ENUE

EV ER ETT STREET

E NO RTH STREET

MA GNOLI A STRE ET

CO

UR

TH

OU

SE

RDM

I LLS

AV

EN

UE

DEDEA UX R OAD

25

TH

AV

E

34

TH

AV

E

R IPPY R D

HE

WE

S A

VE

NU

E

PA SS RD

1 7TH S T

PA SS R OA D

MI L

L RO

AD

N O RTH STREET

8T

H A

VE

DR

IN

KW

AT

ER

RO

AD

19TH ST

A NGELA DR

A LL EN R

D

5T

H A

VE

E SEC OND ST

38

TH

AV

E

HO

LL

YW

OO

D B

LV

D

U N ION STR EET

WA

SH

FA

YA

RD

RO

AD

U S 90

13TH S T

RE

D C

RE

EK

RD

AN

NIS

TO

N A

VE

CO

UR

TH

OU

SE

RO

AD

BE

AT

LIN

E R

D

WA

SH

ING

TO

N A

VE

NU

E

OLD

NI

CHO

LSO

N R

OA

D

S 6

7

MISSISSIPPI GULF COAST METROPOLITAN TRANSPORTATION PLAN

0 2.5 5 7.5

MilesSTAGE 1 IMPROVEMENTS - BAY SAINT LOUIS TO GULFPORT

Bicycle/Pedestrian ImprovementsSafety-Related ImprovementsInterstate Highway ImprovementsRoadway Improvements

Page 32: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

ARRISON

DEDEA U X R D

Mississippi Sound

Biloxi Bay

Mississippi Sound

MS 67

MS 57

I-1 0

HI G

HW

AY

60

5

WH

ITE

PLA

INS

RD

J OE BA TT R D

TH

RE

E R

IVE

RS

RO

AD

WO

OL

MA

RK

ET

CO

NN

EC

TO

RSE AWA Y ROA D

JOH

N L

EE

RO

AD

CA

RR

BR

I DG

E R

D

O 'NE AL ROAD

MS

15

JIM

RA

MS

AY

RO

AD

BL

AC

KW

ELL FA

RM

RD

G ROV ELAND R OAD

CC ROAD

I -10 CONNECTOR R D

HW

Y 6

01

E WOR THA M RO AD

SE

AM

AN

RD

OLD SPA NISH TRA IL

I -10

OL

D F

OR

T B

AY

OU

RO

AD

OL

D H

IG

HW

AY

49

GA U

TI ER

VAN

CLEA

VE R

OA D

HU MP HR EY R D

IR ISH HI LL DR

28TH ST

I- 1

10

MS

57

N SWA N R OA D

L AMEY BRID GE RO AD

MONEY FAR M ROA D

US

90

HU

DS

ON

KR

OH

N R

D

CH

AM

BE

RL

AI

N A

VE

NU

E

JOR

DA

N R

D

TRA D ITI ON PA RK WAY

COOK R OA D

A NDON ROA D

OL D

HIG

HW

AY

67

OCEA

N SP RI

NGS

R D

I -10

OL

D B

IL

OX

I R

OA

D

DU CK WORTH ROA D

BR ODI E R OAD

HWY 6 05

KEN

DAL

L AVE

NU

E

TU

CK

ER

RO

AD

AIR

PO

RT R

D

BR ASHI ER ROA DB

AC

K B

AY

BL

VD

LEM OYNE B

O UL EVAR D

ORA NGE G ROV E R D

BE

AC

H V

IEW

DR

PO

PP

' S F

ER

RY

RO

AD

LO

RR

AI

NE

RD

BI G R IDG E R OAD

PO

PP

' S F

ER

RY

RD

BE

LL

E F

ON

TA

INE

RO

AD

FO

RR

ES

T A

VE

NU

E

JO HN RO SS ROAD

BE

AU

VO

IR R

OA

D

POI NT AUX CHE NE S R

OAD

LA

ME

Y S

TR

EE

T

DA

ISY

VE

ST

RY

RD

BR

OA

D A

VE

34TH ST

BO

BB

Y E

LEU

TE R

IU

S B

OU

LE

VA

RD

COM MU NITY R OA D

CO

WA

N R

OA

D

WA

SHIN

GTO

N A

VE

US

49

CR EOSOTE ROA D

C T SW ITZER D RIV E

OHN CLAR K ROA D

E RAI LRO AD ST

M AR TIN LUTHER K ING J R DR

CE

DA

R L

AK

E R

OA

D

B ROD IE RD

J AM

LA

NE

12

TH

AV

E

U S 90

OA

K S

TR

EE

T

D I VI SION STR EET

HA

NS

HA

W R

OA

D

OLD FO R T BA YO U RD

S S WAN ROA D

4 8TH S T

RE

ILL

Y R

OA

D

DA

ISY

VES

TR

Y R

OA

D

SWITZER R OA D

CA

MP

WI

LK

ES

RO

AD

HA

LS

TE

AD

RO

AD

S 53

VE

TE

RA

NS

BO

UL

EV

AR

D

ES TERS B OU LEV AR DJIM

MO

NE

Y R

OA

D

42

ND

AV

E

F RONT BEACH DR

G OVER NMENT ST REETSHE ARWATE R DR

22ND S T

FONTA INEBLEA U ROA D

LA

ME

Y B

RID

GE

RD

SH

OR

EC

RE

ST

RD

25

TH

AV

E

NORTH CA ROLINA A VENU E

O CEAN SPRI NGS RO AD

MAG NOLIA ST REET

PA SS RD

PA LM ER CR EEK R OA D

CO

UR

TH

OU

SE

RD

LLS

AV

EN

UE

W OA KLA WN R D

DEDEAU X R OA D

B AYV IEW DR

34

TH

AV

E

R IPPY R D

HE

WE

S A

VE

NU

E

CLO VER LEA F

WOOL MARK ET RD

P AS S R OAD

MIL

L RO

AD

WH

ITE

AV

E

8T

H A

VE

B AY SHORE D R

MY

RT

LE

ST

RE

ET

POR TER AV ENUE

CE

DA

R LA

KE

RDT

RA

ILW

OO

D D

RIV

E

33

RD

AV

E

ANG ELA DR

5T

H A

VE

J ACK SON S T

38

TH

AV

E

LO

RR

AI

NE

RO

AD

RO

DE

NB

ER

G A

VE

NU

E

23

RD

AV

E

19TH ST

E BEACH DRI VE

WA

SH

FA

YA

RD

RO

AD

20

TH

AV

E

TE

AG

AR

DE

N R

OA

D

AN

NI

ST

ON

AV

E

CO

UR

TH

OU

SE

RO

AD

GO

RE

NF

LO

RO

AD

BR

ITT

AN

Y A

VE

NU

E

30

TH

AV

E

WA

SH

IN

GT

ON

AV

EN

UE

N R OAD

PO TICAW

MISSISSIPPI GULF COAST METROPOLITAN TRANSPORTATION PLAN

0 2.5 5 7.5

MilesSTAGE 1 IMPROVEMENTS - GULFPORT TO OCEAN SPRINGS

Bicycle/Pedestrian ImprovementsSafety-Related ImprovementsInterstate Highway ImprovementsRoadway Improvements

Page 33: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

JACKSON

Biloxi Bay

Mi

Pascagoula Bay

MS 57

I -10

JOE BA TT R D

I-1 0

MS

61

3

I-10

O LD RIVER RO AD

SA

RA

CE

NN

IA R

OA

D

OL

D B

ILO

XI

RO

A

JIM

RA

MS

AY

RO

AD

B IG POINT ROAD

D ANTZLER AV ENUE

G R OV ELAND ROA D

I-10 C ONNECT OR RD

POTI CAW BA YOU R OAD

SE

AM

AN

RD

OLD SPA NISH TR A IL

OL

D F

OR

T B

AY

OU

RO

AD

CC

RO

AD

GA U

TI ER

VAN

CLEA

V E R

OAD

HU MP HREY R D

MS

57

C ODA R OAD

MONEY FA RM R OA D

US

90

JOR

DA

N R

D

FE

RR

Y P

OI

NT

RO

AD

COOK R OAD

MS

63

OCE

AN S

P RING

S RD

ELD R FERR Y RO AD

LA

DN

IE

R R

OA

D

PO

LL

OC

K F

ER

RY

RO

AD

MA

RT

IN B

LU

FF R

OA

D

BA

CK

BA

Y B

LV

D

MS 6 11

LEM OYN E B

OUL EVARD

DA

I SY

VE

ST

RY

RO

AD

BEAC H BLVD

JAMESTO W N RO AD

G R IER SON S TREET

BE

AC

H V

IE

W D

R

LI

TT

ON

RO

AD

I-10 Frontag e R oad

BI G R IDG E R OAD

BE

LL

E F

ON

TA

INE

RO

AD

ELD

E R F

ERR

Y R

OA

D

POIN

T AUX CHE NE S R

OAD

MS

61

3

GAUTIE R-VAN CL EAVE ROAD

DO

LP

HIN

RO

AD

FR EDER ICK S TREET

WILD

WO

O D R

D

JOH

NS

BA

YO

U R

OA

D

DA

ISY

VE

ST

RY

RD

OLD

MO

BIL E

AVENUE

HW

Y 6

13

JEFFER SON A VENU E

WA

SHIN

GTO

N A

VE

LO

UI

SE

ST

RE

ET

W ILSON SP RI NG S RD

G REEN WI CH AV ENU E

G RAVELIN E RO AD

MA

RK

ET

ST

RE

ET

CA TA LP A AV E

CODA RD

US 90

OA

K S

TR

EE

T

SION STR EET

MA

RT

IN

ST

RE

ET

HA

NS

HA

W R

OA

D

O LD FO R T B AYO U R D

PI

NE

ST

RE

ET

SH ERLA WN STR EET

BE

LA

IR S

T

RE

ILL

Y R

OA

D

MS

63

HW

Y 6

11

G RIFFIN

STREET

HA

LS

TE

AD

RO

AD

F RONT BEACH D R

GOVE RNMENT S TREETSHE ARWATE R DR

MC

INNIS

A VEN

UE

PA

SC

AG

OU

LA

ST

RE

ET

FONTA INEBLEA U ROA D

OLD STA GE ROA D

BE

AS

LE

Y R

D

J A CK SON A VENU E

O CEAN SPRI NG S RO AD

CA

NT

Y S

TR

EE

T

TU

CK

ER

RO

AD

TU CK ER AV ENU E

USS VIC

KSBURG W

AY

DO

LP

HI

N D

RI

VE

TA YLOR A VENU E

ISLA ND R OA DB

EA

SL

EY

RO

AD

2N

D S

T

CH IC

OT ST

REET

D UTCH BAYO U RO AD EXT

NF

LO

RO

AD

GA

UT

IER

- VA

NC

LE

AV

E R

DK BAY BO ULEVA RD

MY

RT

LE

ST

RE

ET

P OR TER A VENUE W ESTGA TE PKW Y

FR

ED

ER

I C S

T

OA

K S

TR

EE

T

MA

IN S

T

LE

E S

TR

EE

T

E BEACH D RIVE

RACK RO AD

LA

ME

US

E S

TR

EE

T

MISSISSIPPI GULF COAST METROPOLITAN TRANSPORTATION PLAN

0 2.5 5 7.5

MilesSTAGE 1 IMPROVEMENTS - OCEAN SPRINGS TO PASCAGOULA

Bicycle/Pedestrian ImprovementsSafety-Related ImprovementsInterstate Highway ImprovementsRoadway Improvements

Page 34: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

HARRISON

Mississippi Sound

St Louis Bay

HW

Y 6

01

I-10

I-10

MS

43 B

YPA

SS

S TAN DAR D DED EA UX ROAD

HIG

HW

AY

60 5

C C ROAD

S EA WAY ROAD

LOW

ER

BA

Y R

OA

D

FIR ETO WER RO AD

M S 5 3

BEL LS FERRY RD

SA

UC

IER

-LIZ

ANA

RD

KIL N-DELISLE RO AD

O 'NEAL R OAD

CA

NA

L R

OA

D

VID

AL

IA R

OA

D

J. P . LAD NER RD

D UMMYL INE ROA D

CO

UN

TY F

AR

M R

OA

D

F IRETO W

ER R OA D

CU EVAS DEL IS LE ROAD

OL

D H

I GH

WA

Y 49

DIAM OND HEAD DRK IL N DEL ISLE ROAD

K APAL

AMA

D RI V

E

ED

WIN

LA

DN

ER

RO

AD

RAIL ROAD ST

LA

KE

SHO

RE

RO

AD

28TH ST

ES

PY

AV

E

N SWAN R OAD

CAB LE

BRI

DGE

R OAD

CH

AM

BE

RL

AIN

AV

EN

UE

KL

ON

DY

KE

RO

AD

LAN DO N RO AD

RED

CR

EEK

ROAD

ROB IN SO N ROAD

JOH

N C

LAR

K R

OA

D

MS

43

ME

NG

E A

VE N

UE

FR ED DIE FR ANK ROA D

D UCKW OR TH RO AD

CO

UN

TY F

AR

M R

D

H WY 605

ST

AN

DA

RD

CE

ME

T ER

Y R

OA

D

KEND

AL L AVEN

UE

D ED EAUX RD

WAV ELAND

AV E

TH

RE

E R

IVE

RS

RO

AD

AIR

POR

T R

D

MS

60

3

WI T

T MA

N R

D

BL UE

MEAD

OW

RO

AD

CENT RA

L AV E

O RAN GE GRO VE R D

US 9 0

FAYE RO AD

KILN

WA

VE

LAN

D C

UTO

FF R

OA

D

WO

LF RI VER RD

BE

AT

LINE

RD

EX

T

LO

RR

AIN

E R

D

CLER

MO

NT

RO

AD

RO

AD

35

7

HA

MP

TO

N R

D

PIN EVILL E RD

JOHN ROSS RO AD

D AUG HERTY RO AD

N B

EA

CH

BO

ULE

VA

RD

BR

OA

D A

VE

NICH

OLSON A V

ENU E

34TH ST

CO MMUNITY R OAD

DAV

I S A

VEN

UE

FLE

I TAS

AVE

NU

E

CO

WA

N R

OA

D

CL E

VELA

ND

AVE

NU

ECL OVERL EAF

US

49

MS

67

CREO SO TE RO AD

E RAILRO AD ST

MAR TIN L UTHER KIN G JR DR

I-10

R IPPY

RD

MA

RKE

T S

TR

EET

COMMISSIO N ROA D

DU

NB

AR

AV

EN

UE

JO HN SON RO AD

WASHINGTON STREET

BE

AT

LIN

E R

OA

D

12

TH A

VE

HA

MP T

ON

RO

AD

US 90

BAYVIEW ST

LEW

IS AVE

NU

E

ST LOUIS STREET

GEX

DR

M AIN STREET

S SWAN RO AD

ES

PY

AV

ENU

E

48TH ST

CH

APM

AN

RO

AD

C OLEMAN

AVEN UE

E RAILRO AD STREET

E SECO ND STREET

WEST DUBUISSO

N RD

P IN EVIL LE R OAD

FELICITY STREET

42

ND

AV

E

WAVEL AN D

22ND ST

GOL F

CL U

B DR

IVE

NO RTH CARO LIN A AVENUE

EVERETT STREET

E NORTH STREET

MAG NO LIA ST

L O NG FEL LO W DRIVE

CO

UR

TH

OU

SE

RD

MILL S

AV

ENU

E

W OLD P ASS ROAD

D EDEAUX RO AD

O LD SPAN ISH TRAIL

25

TH

AV

E

34

TH A

VE

HE

WE

S A

VE

NU

E

17TH ST

PASS RO AD

MILL R

OA

D

NO RTH STREET

8T

H A

VE

19TH ST

HE

ND

ERS

ON

AV

EN

UE

CRO SSROAD S PKWY

33R

D A

VE

ANG ELA DR

5T

H A

VE

E SECON D ST

38

TH A

VE

CH BOULE VARD

HOLL YW OOD BLVD

P ASS RD

UNION STREET

US 90

RED

CR

E EK

RD

AN

NIS

TO

N A

VE

CO

UR

THO

US

E R

OA

D

A LL EN RD

BE

AT

LIN

E R

D

W R

D

WA

SH

ING

TO

N A

VE

NU

E

30

TH

AV

E

OL D

NIC

HO

LSO

N R

OA

D

15TH ST

JO

MISSISSIPPI GULF COAST METROPOLITAN TRANSPORTATION PLAN

0 2.5 5 7.5

MilesSTAGE 2 IMPROVEMENTS - BAY SAINT LOUIS TO GULFPORT

Safety-Related ImprovementsInterstate Highway ImprovementsRoadway Improvements

Page 35: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

ISON

Mississippi Sound

Biloxi Bay

Mississippi Sound

MS

67

MS 57

I-10

HIG

HW

AY

60 5

WH IT

E PL

AI N

S R

D

JOE BATT R D

TH

REE

RIV

ER

S R

OA

D

WO

OL M

AR

KE

T C

ON

NEC

TORSEAWAY RO AD

JOH

N LE

E RO

AD

CA R

R B

RID

GE

RD

B LA CK WE LL FA RM RD

OL

D B

ILO

XI

RO

AD

O 'N EA L ROA D

MS

15

JIM R

AM

SA

Y RO

AD

G ROV EL AND ROAD

CC ROAD

I- 10 CO NNEC TO R RD

HW

Y 6

01

E WORTHAM ROAD

SE

AM

AN

RD

O L D SPANISH TRAIL

I-10

OL

D F

OR

T B

AY

OU

RO

AD

OLD

HIG

HW

AY 4

9

GAUTIER

VAN C

LEAVE

ROAD

H UMPHREY R D

IRISH HIL L DR

I -11

0

MS

57

N SW AN ROA D

L AM EY BRIDGE ROAD

MO NEY F ARM ROA D

US

90

HUD

SO

N K

RO

HN

RD

CH

AM

BE

RL

AIN

AV

EN

UE

JOR

DA

N R

D

TRAD ITIO N PARKWAY

CO OK RO AD

OL D

HIG

HW

A Y 67

O CEA N

SPR

ING

S RD

MS

67

I -10

D UCK WO RTH ROA D

BR OD IE RO AD

HW Y 605

KEND

AL L AVEN

UE

TUCK

ER

RO

AD

D EDEAU X R D

AIR

POR

T R

D

BRASHIER RO AD

BA

CK

BA

Y B

LV

D

LE MOY NE BOUL EV

ARD

DA

I SY

VES

TR

Y R

OA

D

G E G RO VE RD

BE

AC

H V

IEW

DR

P OP

P' S F

ER

RY

RO

AD

LO

RR

AIN

E R

D

BIG RIDG E R OAD

PO

P P' S

FER

RY

RD

BE

LLE

FO

NT

AIN

E R

OA

D

FO

RR

ES

T A

VE

NU

E

JOHN ROSS ROAD

BE

AU

VO

IR R

OA

D

PO TICAW BAY OU

POIN

T AUX C

HE NES R

OAD

LAM

EY

STR

EET

DA

ISY

VE

S TR

Y RD

34TH ST

BO

BB

Y EL E

UT E

RIU

S BO

ULE

VAR

D

COMMUN ITY RO AD

LA NDO N RO AD

CO

WA

N R

OA

D

PO

PP

S FE

RR

Y R

D

CL O VERLEAF

WASH

INGT

ON AV

E

US

49

C REOSO TE RO AD

C T SWITZER D RIVE

H N CLAR K RO AD

E RAILRO AD ST

MARTIN LU TH ER K ING JR DR

R IPP Y

RDC

ED

AR

LA

KE

RO

AD

BR OD IE RD

W ALKER RO AD

J AM

LAN

E

12

TH A

VE

US 90

OA

K S

TR

EE

T

DIVISIO N STREET

LEM OYNE BL VD

HA

NS

HA

W R

OA

D

OL D FO RT BAYOU RD

HO WAR D AVENUE

S SWAN R OAD

48TH ST

RE

ILLY R

OA

D

SWITZER RO AD

CA

MP

WIL

KES

RO

AD

28TH ST

BR

OA

D A

VEN

UE

HA

LS

TE

AD

RO

AD

VE

TE

RA

NS

BO

UL

EV

AR

D

ESTERS BOU LEVAR DJIM

MO

NEY

RO

AD FRONT B EACH DR

GO VERNMENT STREETSHE ARWA TE R DR

22N D ST

FO NTAINEBLEAU RO AD

LA

ME

Y B

RID

GE

RD

SH

OR

EC

RE

ST

RD

25

TH

AV

E

N ORTH CA ROL INA AVENU E

OCEAN SP RINGS ROAD

MAGN OL IA STREET

PASS R D

PALM ER CREEK ROAD

CO

UR

TH

OU

SE

RD

I BE

RV

ILLE

DR

IVE

OLD

HIG

HW

A Y 1

5

W OAKL AW N R D

DEDEAU X R OAD

BAYVIEW DR

34

TH A

VE

HE

WE

S A

VE

NU

E

WOOLMARKE T RD

17TH ST

PASS RO AD

MIL L

RO

AD

WH

I TE

AV

E

8T

H A

VE

BAY SH ORE DRM

YR

TLE

ST

RE

ET

PORTER AVENUE

CE

DA

R L

AK

E R

D

TRA

ILWO

OD

DR

IVE

33R

D A

VE

ANG ELA D R

5T

H A

VE

38

TH A

VE

BR

ITTA

NY

AV

ENU

EDAV ID SO N ROA D

LO

RR

AIN

E R

OA

D

O L D BAY RO AD

RO

DE

NB

ER

G A

VE

NU

E

23

RD

AV

E19TH ST

E BEACH DR IVE

WA

SH

FA

YA

RD

RO

AD

20

TH A

VE

TE

AG

AR

DE

N R

OA

D

AN

NIS

TO

N A

VE

CO

UR

THO

US

E R

OA

D

GO

RE

NFL

O R

OA

D

30

TH

AV

E

WA

SH

ING

TO

N A

VE

NU

E

42

ND

AV

E

MA LLET T ROAD

TU

R

MISSISSIPPI GULF COAST METROPOLITAN TRANSPORTATION PLAN

0 2.5 5 7.5

MilesSTAGE 2 IMPROVEMENTS - GULFPORT TO OCEAN SPRINGS

Safety-Related ImprovementsInterstate Highway ImprovementsRoadway Improvements

Page 36: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

JACKSON

Biloxi Bay

Missis

Pascagoula Bay

Point A

MS 57

I-10

JO E BATT RD

I-10

MS

613

I-10

OL D RIVER ROAD

SA

RA

CE

NN

IA R

OA

D

JIM R

AM

SA

Y RO

AD

BIG POINT ROA D

DA NTZLER AVENUE

G RO VELAN D ROA D

POTICAW BAYO U RO ADS

EAM

AN

RD

O L D SPANISH TRAIL

OL

D F

OR

T B

AY

OU

RO

AD

GAU TI ER

VANC

LEAVE

ROAD

H UMPHREY RD

MS

57

C OD A R OAD

MO NEY FARM RO AD

US

90

JOR

DA

N R

D

FER

RY

PO

INT

RO

AD

CO OK RO AD

MS

63

O CEA N

SPR

ING

S RD

ELDR FERRY ROAD

LAD

NI E

R R

OA

D

OLD

BI L

OX

I R

OA

D

PO

L LO

CK

FE

RR

Y R

OA

D

TUC

KER

RO

AD

MA

RT

IN B

LU

FF R

OA

D

BA

CK

BA

Y B

LV

D

MS 611

OY NE BO UL

EVARD

BEACH BL VD

JAMESTOWN ROAD

G RIERSO N STREET

BE

AC

H V

IEW

DR

LIT

TO

N R

OA

D

BIG RID G E RO AD

BE

LLE

FO

NT

AIN

E R

OA

D

E LDE

R F E

RRY

RO

AD

POIN

T AUX C

HENES

ROAD

MS

61

3

GA UTI ER -V ANC LEA VE R OAD

DO

LPH

IN R

OA

D

FRED ERICK STREET

WILDW

O OD RD

JO

HN

S B

AY

OU

RO

AD

OLD

MOB IL

E AVEN

UE

HW

Y 6

13

JEF FERSO N AVENU E

WASH

INGT

ON AV

E

LOU

ISE

ST

RE

ET

WIL SON SPRING S RD

GREENWICH AVENUE

GRAVELINE ROAD

W ALKER RO AD

MA

RK

ET

ST

RE

ET

CATALPA AVE

CODA RD

US 90

OA

K S

TR

EE

T

MA

RT

IN S

TR

EE

T

L EM OYNE BL VD

HA

NS

HA

W R

OA

D

OL D FO RT BAYO U RD

PINE

ST

RE

ET

RD AVENUE

SHERL AWN STREET

JACKSO N AVENU E

BE

LA

IR S

T

RE

ILLY R

OA

D

DA

I SY

VES

TR

Y R

OA

D

MS 6

3

HW

Y 6

11

GR IFFIN STR EET

HA

LS

TE

AD

RO

AD

FRONT B EACH DR

GO VERNMENT STREETSHE ARWATE R DR

MC INN IS A VENUE

PAS

CA

GO

UL

A S

TR

EET

F ONTAINEBL EAU RO AD

LE

E S

TR

EE

T

O LD S TAG E R OAD

BE

AS

LE

Y R

D

O CEAN SPRINGS RO AD

CA

NT

Y S

TR

EE T ED

EN

ST

RE

ET

MAR TIN L UTHER KING BOU LEVARD

TUCKER AVENU E

USS V IC

KSBURG W

AY

DO LPH IN D RIVE

TAYL O R AVENUE

CH

I CO

T S

TR

EE

T

2N

D S

T

DUT CH BAY OU RO AD EXT

ELDER STREET

MY

RT

LE S

TR

EE

T

PORTER AVENUE WESTGATE PKW Y

FR

ED

ER

I C S

T

DA VIDSO N RO AD

OA

K S

TR

EE

T

MA

IN S

T

EL Y STREET

E BEACH DR IVE

CHIC

O T RO

AD

R

Y RD

D

MISSISSIPPI GULF COAST METROPOLITAN TRANSPORTATION PLAN

0 2.5 5 7.5

MilesSTAGE 2 IMPROVEMENTS - OCEAN SPRINGS TO PASCAGOULA

Safety-Related ImprovementsInterstate Highway ImprovementsRoadway Improvements

Page 37: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

HARRIS

St L i B

I-10

I-10

BE LLS FE

RRY RD

M S 53

CA

NA

L RO

AD

VI D

ALI A

RO

AD

J. P . L ADN ER R D

CO

UN

TY

FAR

M R

OA

D

FI RETOW

ER RO AD

C UEVAS DEL ISLE ROA D

D IAMON DHEAD DRKILN DEL ISLE ROAD

K APA

LAM

A D

RIVE

EDW

IN L

AD

NE

R R

OA

D

ES

PY A

VE

ME

NG

E A

VEN

UE

CABL

E BR

IDGE R

OA D

ST

AN

DA

RD

DED

EAU

X R

OAD

KLO

ND

YKE R

OA

D

FI RET OWER R OAD

RED

CR

EEK

RO A

D

RO BIN SON RO AD

JOH

N C

LAR

K R

OA

D

F RED DIE F RAN K R OAD

L AND ON RO AD

CA

NA

L R

OA

D

CO

UN

TY

FA

RM

RD

ST

AN

DA

RD

CE

ME

TE

RY

RO

AD

WIT

TM

AN

RD

I-10

FAYE ROA D

WO

LF RI VER RD

P IN EVILL E RD

DAU GH ER TY RO AD

GO

LF C

LUB

DR

IVE

BE

AT

LIN

E R

D

BR

OA

D A

VE

OL

D H

IGH

WA

Y 4

9

ORAN GE GR OVE RD

VIDALIA ROAD

C LEV

ELA N

D A

V EN

K ILN D

ELIS

LE R

OAD

28TH ST

CO MMIS SION RO AD

BE

AT

LINE

RO

AD

K ILN -DELIS LE R OAD

LEW

IS A V

EN

U

GE

X D

R

W EST DUBUISSO N RD

HW

Y 6

01

P INEVILLE ROAD

E OLD

PASS

ROAD

MIL LS

A VE

NU E

ALLE N RD

RED

CR

EEK

RD

6 2 ND AVE

HA

MP

TO

N

MISSISSIPPI GULF COAST METROPOLITAN TRANSPORTATION PLAN

0 1.5 3 4.5

MilesSTAGE 3 IMPROVEMENTS - BAY SAINT LOUIS TO GULFPORT

Safety-Related ImprovementsInterstate Highway ImprovementsRoadway Improvements

Page 38: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

HARRISON

AIRPO RT RD

MS 6 7

HW

Y 6

01

HIG

HW

AY

60 5

WO

OL

MA

RK

ET C

ON

NE

CT

OR

S EA WAY ROAD

JO

HN

LEE

RO

AD

I- 10

O 'NEAL R OAD

CA

NA

L RO

AD

MS 5 3

CO

UN

TY

FA

RM

RO

AD

I-10

OL

D H

I GH

WA

Y 49

IRISH HIL L D R

28TH ST

MS

15

N SW AN RO AD

LAM EY BRIDGE ROAD

HU

DS

ON

KRO

HN

RD

CH

AM

BE

RLA

IN A

VEN

UE

KLO

ND

YKE R

OA

D

L AND O N ROAD

OLD

HIGH

WA

Y 67

J OH

N C

LAR

K R

OA

D

THRE

E R

I VER

S RO

AD

DU CKWO RTH RO AD

CA

NA

L R

OA

D

BRO DIE ROA D

KEND

AL L AVENU

E

DEDEAU X R D

BRASH IER R OAD

RO BINSO N RO AD

OR ANG E G ROVE RD

PO

PP

'S F E

RR

Y R

OA

D

LO

RR

AIN

E R

D

PO

PP'S

FE

RR

Y R

D

FOR

RE

ST

AV

EN

UE

PIN EV ILL E RD

JOHN ROSS ROAD

BE

AU

VO

IR R

OA

D

US

49

LA

ME

Y S

TR

EE

T

US 90

I-10

LAME Y

B R IDGE

RD

BR

OA

D A

VE

34TH ST

IRISH H IL L D R

BO

BB

Y E

LEUT

ER IU

S B

OU

CO MMU NITY RO AD

54TH

ST

CO

WA

N R

OA

D

PO

PP

S F

ER

RY

RD

CLEV

E LAN

D A

VEN

CL OV ER LEAF

CREOSO TE R OAD

C T SWITZER DRIVE

E RAILRO AD ST

MARTIN LU TH ER K IN G JR DR

CE

DA

R L

AK

E R

OA

D

CO MMISSIO N RO AD

OLD

HIG

HW

AY

49

BIG

LAK

E R

OA

D

J AM

LA

NE

12

TH

AV

E

OL D

HW

Y 4

9

U S 90

E RAIL ROAD STREET

LEW

IS AV

EN

U

PASS RD

L ORRAINE RO AD

S SWA N ROAD

48TH ST

SW

ITZ

ER

RO

AD

CA

MP

WIL

KE

S R

OA

D

BR

OA

D A

VE N

JIM

MO

NE

Y R

OA

D

42

ND

AV

E

KL

EIN

RO

AD

22N D ST

E OLD

P ASS ROAD

HEW

E S AVENUE

SH

OR

EC

RE

ST

RD

25

TH

AV

E

NO RTH CARO LIN A AV EN UE

MAGN OL IA S TR EET

RAIL ROAD STREET

17TH ST

MILL

S AVE

NU

E

IBE

RV

ILLE

DR

IVE

OLD

HIG

HW

AY 15

US

49

W O AKLAW N RD

DED EAUX RO AD

CO

UR

THO

US

E R

D

CROSSROAD S P KW Y

34

TH

AV

E

RIPPY RD

GU

LF A

VE

NU

E

CE

DA

R LA

KE

RD

WOOLM ARKET RD

JUD GE SEKU L AVE

BR

OD

IE R

D

PASS RO AD

MIL

L RO

AD

EI S

E NH

OW

E R D

RI V

E

WH

ITE

AV

E

8TH

AV

E

DA

UG

HE

RT

Y RO

AD

TR

AILW

OO

D D

RIV

E

33

RD

AV

E

ANG ELA D R

ALL EN RD

5T

H A

VE

OL D BAY ROAD

38

TH A

VE

19TH ST

RO

DE

NB

ERG

AV

EN

UE

WA

SH

ING

TO

N A

VE

NU

E

23R

D A

VE

WA

SH

FA

YA

RD

RO

AD

20

TH A

VE

13TH ST

TE

AG

AR

DE

N R

OA

D

AN

NIS

TO

N A

VE D

EBU

YS

RO

AD

22

ND

AV

E6 2ND AVE

21

ST

AV

E

I

MISSISSIPPI GULF COAST METROPOLITAN TRANSPORTATION PLAN

0 1.5 3 4.5

MilesSTAGE 3 IMPROVEMENTS - GULFPORT TO BILOXI

Safety-Related ImprovementsInterstate Highway ImprovementsRoadway Improvements

Page 39: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

Biloxi Bay

I-10

I-10

WO

OL

MA

RK

ET C

ON

NE

CT

OR

G RO VELAN D RO AD

MS

67

I-10 C ON NECTOR RD

SE

AM

AN

RD

HA

MIL

L F

AR

M R

OA

D

HU MPH REY RD

IRISH H ILL D R

I-11

0

DA

ISY

VE

ST

RY

RD

MS

57

MON EY FAR M RO AD

US

90

HU

DS

ON

KR O

HN R D

JOR

DA

N R

D

LAME Y BR

IDG

E RO

AD

CO OK RO AD

OLD

HIG

HW

AY 6

7

OCE

A N S PR

ING S

RD

MS

15

OL

D B

ILO

XI

RO

AD

OCEAN SPRING S R

OAD

BRO D IE RO AD

TU

CK

ER R

OA

D

BRA SHIER ROA D

BA

CK

BA

Y BL

VD

L EMO YN

E BOULEVARD

OL

D FO

RT

BA

YOU

RO

AD

BE

AC

H V

IEW

DR

PO

PP

' S F E

RR

Y R

OA

D

B IG RIDG E RO AD

PO

PP'S

FE

RR

Y R

D

BE

LLE

FO

NT

AIN

E R

OA

D

FOR

RE

ST

AV

EN

UE

BE

AU

VO

IR R

OA

D

POIN

T A UX

CHENES

ROAD

DA

ISY

V ES

TRY

R OA D

JIM RAM

SAY ROAD

US 90

LA

ME

Y S

TR

EE

T

U S 90

IRISH H ILL D RIVE

BOBB

Y E

LEUT

ER IU

S B

OU

LEV

AR

D

PO

PP

S FE

RR

Y R

D

WAS

H INGTO

N AVE

O L D SPA NISH TRAIL

CE

DA

R L

AK

E R

OA

D

BROD IE R D

MA LL ETT ROA D

W ALK ER RO AD

MC

CA

NN

RD

JAM

LA

NE

OA

K S

TR

EE

T

D IVISION S TREET

D'IBE R

VI LL E BL VD

LEM OYNE BL VD

HA

NS

HA

W R

OA

DGU

LF I

SL

AN

DS

NA

T S

EA

SH

OR

E P

AR

KW

AY

PASS RD

OL D FO RT BAYOU RD

HO WAR D AVENUE

CA

ILLA

VE

T S

TR

EE

T

RE

ILLY

RO

AD

CA

MP

WIL

KE

S R

OA

D

HA

LS

TEA

D R

OA

D

ESTERS BO ULEVA RD

JIM

MO

NE

Y R

OA

D FRONT B EACH DR

G OVERNMENT STREET

S HEA RW A TER DR

BR

ITTA

NY

AV

EN

UE

F ON TAIN EBL EAU R OAD

LAM

EY

BR

IDG

E R

D

BEC

HT

EL B

OU

LEV

AR

D

E BEACH DRIVE

IBE

RV

ILLE

DR

IVE

OL D

HIG

HW

AY 15

O AKL AWN RD

HO

LC

OM

B B

OU

LE

VA

RD

CAL HO UN STREET

DE

ENA

DR

JOHN

SON S TILL

ROAD

CE

DA

R LA

KE

RD

WOOLM ARKET RD

JUD GE SEKUL AVENU E

GO

RE

NFL

O R

OAD

HA

NL

EY

RO

AD

WH

ITE

AV

E

BACK BAY BO ULE VARD

BAY SH ORE DR

MY

RT

LE S

TR

EE

T

PO RTER AVEN UE

TR

AILW

OO

D D

RIV

E

A Y RO AD

LOR

RA

INE R

OA

D

RO

DE

NB

ERG

AV

EN

UE

LA

ME

US

E S

TREE

T

SANGAN

I BLV

D

MISSISSIPPI GULF COAST METROPOLITAN TRANSPORTATION PLAN

0 1.5 3 4.5

MilesSTAGE 3 IMPROVEMENTS - BILOXI TO OCEAN SPRINGS

Safety-Related ImprovementsInterstate Highway ImprovementsRoadway Improvements

Page 40: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

Mississippi Sound

Pascagoula Bay

I-10

I-10

DAN TZLER AVEN UE

O LD SPAN IS H TR AIL

I-10 F rontage Road

I-10

HA

MIL

L F

AR

M R

OA

D

SA

R AC

E NN

IA R

OA

D

MS

57

FE R

RY

PO

I NT

RO

AD

OC EA

N SPR

I NG S

RD

GAUTI ER VA NCLE AV E ROA D

ELD R F ERRY ROAD

L AD

NIE

R R

OA

D

MS 611

BEACH BLVD

OLD

FOR

T BAY

O U R

OAD

JAMESTOWN ROAD

BE

AC

H V

IEW

DR

S UTT ON ROAD

LIT

TON

RO

AD

BE

LLE

FO

NT

AIN

E R

OA

D

ELD

E R FE R

RY R O

AD

P OINT AU

X CHENE S R

OAD

MS

61

3

MS

63

GAUTI ER -VA NCLE AV E ROA D

DO

LPH

IN R

OA

D

US 90

FRED ERICK STREET

GRO VEL AND RO AD

OLD M

OBILE

AVE

NUE

MA RTIN B LUFF RO AD

COD A RO AD

HW

Y 61

3

SARACENNIA RD

JEF FERSO N AVENU E

LO

UIS

E ST

RE

ET

GREENW ICH AVENU E

GRIERS

ON STREE

T

GRAVELINE ROAD

MA

RK

ET

ST

RE

ET

K REBS A VENUE

CATALPA AVE

US 90 MA

RT

IN S

TR

EET

HA

NS

HA

W R

OA

D

PINE

ST

RE

ET

SHO RT

CUT ROAD

SHERL AWN STREET

JA CKSO N AVENUE

F RAN

K G

R IF F

IN R

OA

D

BEL

AIR

ST

OL D SPAN ISH TRAIL

RE

ILLY

RO

AD

HW

Y 6

11

GR

I FFI N

ST

RE

ET

IN GAL LS AVEN UE

MA

GN

OL I

A S

TR

EE

T

BO

WE

N S

TR

EE

T

MCI NN I S AV ENUE

L IVE O AK AVENUE

PA

SC

AG

OU

LA

ST

RE

ET

FO NTAINEBLEAU ROAD

BE

AS

LEY

RD

EL DER STREET

MA

GN

OL

IA S

T

OL D

MO

BILE

HIG

H WAY

CA

NT

Y S

TR

EE

T

CODA R D

D UTCH BA YO U RO AD

ED

EN S

TREE

T

MAR TIN L UTHER KIN G BOU LEVARD

TUCKER AVENU E

DE

EN

A D

R

L AKE AVENUE

USS V IC

KSBURG W

AY

DOL PH IN DRIVE

TAYL O R AVENUE

CH

I CO

T S

T RE

ET

KR

EO

LE

AV

EN

UE

2N

D S

T

DUTCH BAYO U RO AD EXT

GA

UTI E

R-V

AN

CLE

AV

E RD

W ESTGATE P KWY

HO

SPIT

AL

ST

RE

ET

F RED

ER

I C S

T

MC

PH

EL

AH

RO

AD

RABBY RD

VE

TE

RA

NS

ST

RE

ET

ISLAN D RO AD

OA

K S

TREE

T

MA

IN S

T

W ASHING TON AVEN UE

RI V

ER

RO

AD

PARSL EY AVE

CHI CO

T RO

AD

DE

SO

TO

ST

RE

ET

MISSISSIPPI GULF COAST METROPOLITAN TRANSPORTATION PLAN

0 1.5 3 4.5

MilesSTAGE 3 IMPROVEMENTS - OCEAN SPRINGS TO PASCAGOULA

Safety-Related ImprovementsInterstate Highway ImprovementsRoadway Improvements

Page 41: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

I-10

Mississippi Sound

St Louis Bay

I-10

I-10

TEXAS F LAT RO AD

MA

INL

INE

RO

AD

HW

Y 6

07

LOW

ER

BA

Y R

OA

D

S BEACH BO ULEVARD

MS

604

D IAM OND HEAD D R

TEXAS F LAT RD

MS 607L A

KE

SH

OR

E R

OA

D

OL D LO WER BAY ROAD

CLER

MO

NT R

OA

D

US 90

MS 43

WAVELA ND

AVE

BLUE M

EADO

W RO

AD

CENTR

A L AVE

KIL

N W

AV

ELA

ND

CU

TO

FF R

OA

D

GO

LF C

LUB

DRI

VE

K APA LA

MA DR IV

E

NI CH

OLSON A

V ENUE

CENTR

A L AV EN

UE

US 90

MS 4 3

LOW

ER BA

Y R O

DU

NB

AR

AV

EN

UE

GE

X D

R

OL D SPAN ISH TRAIL

CH

AP

MA

N R

OA

D

COLEM

A N AV ENU E

LO NG FEL LO W D RIVE

ST

JOS

EP

H S

T

FE L ICITY STREET

M AIN STREET

WAVELAND

N BEACH BOULE VA

RD

MC

LAU

RI N

ST

RE

ET

WASHING TON STREET

OLD

NIC

HO

LS

ON

RO

AD

ST

FRA

NC

IS S

T

GR

EE

N M

EAD

OW

RO

AD

DR

INK

WA

TE

R R

OA

D

HO LLY WOO D BL VD

MS

43

BY

ILLE

RD

MISSISSIPPI GULF COAST METROPOLITAN TRANSPORTATION PLAN

0 1.5 3 4.5

MilesUNFUNDED IMPROVEMENTS - HANCOCK COUNTY

Bicycle/Pedestrian ImprovementsInterstate Highway ImprovementsRoadway Improvements

Page 42: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

AIRPO RT RD

Mississippi Sound

ay

HW

Y 6

01

I-10

SEAWA Y RO AD

BE LLS FE

RRY RD

VI D

AL

I A R

OA

D

I-10

CO

UN

TY

FA

RM

RO

AD

F I RETO W

ER RO AD

I-10

CU EVAS D ELISL E R OAD

KIL N DEL ISL E R OAD

CA

NA

L RO

AD

RAILROAD ST

28TH ST

ES

PY A

VE

ME

NG

E A

VEN

UE

CH

AM

BER

LAIN

AV

EN

UE

KL

ON

DY

KE

RO

AD

LAN DO N RO AD

RED

CRE

EK

RO A

D

F REDD IE F RAN K RO AD

CO

UN

TY

FA

RM

RD

KEND

ALL AVEN

UE

DED EAUX RD

RE

E RIV

ER

S R

OA

D

WI T

TM

AN

RD

R OBIN SON RO AD

HIG

HW

AY

605

O RANG E G RO VE RD

U S 90

BE

AT

LI N

E R

D E

XT

LO

RR

AIN

E R

D

HA

MP T

ON

RD

P IN EVILL E RD

JOHN RO SS ROAD

DAU GHER TY ROA D

BE

AT

LINE

RD

BR

OAD

AVE

34TH S T

CO MMUNITY R OAD

54TH

ST

DAV

I S A

VEN

UE

FLE

I TA

S A

VE

NU

E

CO

WA

N R

OA

D

CLE

VELA

ND

AVE

NU

E

CLO VERL EAF

OL

D H

IGH

WA

Y 4

9

CREO SOTE ROA D

E RAILRO AD ST

MARTIN L UTHER KING JR D R

MA

RK

ET S

TR

EET

CO MMIS SION RO AD

JOH NSO N RO AD

BE

AT

LINE

RO

AD

12

TH

AV

E

U S 90

H AM

PT ON

RO

A D

E RAIL ROAD STREET

BAYVIEW ST

LEW

IS A

VEN

UE

ST L OUIS ST REET

ES

PY

AV

EN

UE

E OL D P ASS ROAD

US 90

48TH ST

HE

ND

ER

SO

N A

VE

NU

E

E SECON D STREET

US

49

BR

OA

D A

V EN

UE

E SEC

OND ST

P IN EVIL LE ROAD

42

ND

AV

E

LAN

G A

VE

NU

E

KL

EIN

RO

AD

22ND ST

E NORTH STREET

H EWES AV EN

UE

25

TH

AV

E

N ORTH CAR OL INA AVENUE

EVERETT STREET

MAG NO LIA STR

RAILRO AD STREET

17TH ST

MIL LS

AV

E NU

E

W OLD P ASS ROAD

D EDEAU X RO AD

CO

UR

TH

OU

SE

RD

CRO SSRO ADS P KWY

CE

DA

R A

VE N

UE

34

TH

AV

E

RIPPY RD

GU

LF A

VE

NU

EPASS RO AD

MILL

RO

AD

8TH

AV

E

WR

IGH

T A

VE

E RAIL ROAD ST

33

RD

AV

E

AN GEL A D R

AL LEN RD

5T

H A

VE

38

TH

AV

E

19TH ST

WA

SH

ING

TO

N A

VE

NU

E

23R

D A

VE

P ASS RD

HI ER

N A

VE

NU

E

20

TH A

VE

13TH ST

RED

CR

EEK

RD

TE

AG

AR

DE

N R

OA

D

CO

UR

TH

OU

SE

RO

AD

WOLF R IV ER R D

22

ND

AV

E

MISSISSIPPI GULF COAST METROPOLITAN TRANSPORTATION PLAN

0 1.5 3 4.5

MilesUNFUNDED IMPROVEMENTS - HARRISON COUNTY (WEST)

Bicycle/Pedestrian ImprovementsInterstate Highway ImprovementsRoadway Improvements

Page 43: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

HARRISON

AIRPO RT RD

Bil

HW

Y 6

0 1

I-10

WO

OL

MA

RK

ET

CO

NN

EC

TOR

SEAW AY RO AD

JOH

N L

EE

RO

AD

I -1 0

O' NEAL RO AD

MS

67

I-10 CO NN EC TO R RD

HIG

HW

AY

60

5

I -10

OL

D H

IGH

WA

Y 49

IR ISH HIL L DR

28TH ST

I- 11

0

DA

ISY

VE

STR

Y R

D

N SW AN ROA D

HU

DS

ON

KRO

HN

RD

CH

AM

BER

LAIN

AV

EN

UE

LAME

Y BR

IDG

E ROA

D

C OO K ROAD

L AND ON RO AD

OL D

HIG

HW

A Y 6

7

MS

15

THRE

E RI

V ERS

RO A

D

OL

D B

ILO

XI

RO

AD

D UCK WO RTH ROA D

BRO DIE R OAD

KEND

ALL AVEN

UE

D EDEAU X RD

BRASH IER RO AD

BA

CK

BA

Y B

LVD

O BINSO N ROA D

LEMOY NE

BOULEVAR

D

ORAN GE GRO VE RD

PO

PP

'S F

ER

RY

RO

AD

LO

RR

AIN

E R

D

BIG RID GE ROA D

POPP

' S F

ERR

Y R

D

FOR

RE

ST

AV

EN

UE

JOHN ROSS RO AD

BE

AU

VO

IR R

OA

D

DA

ISY

VE S

T RY

RO

AD

US

49

LAM

EY

STR

EET

US 90

BRO

AD A

V E

34TH ST

IRISH HIL L DRIVE

BO

BB

Y E LEU

TER

IUS

BO

ULE

VA

R D

C OMMUN ITY RO AD

54TH

ST

JO HN CL ARK RO AD

CO

WA

N R

OA

D

PO

PP

S F

ER

RY

RD

MS 53

CL OVERL EAF

CR EOSO TE RO AD

C T SWITZ

ER DRIVE

E RAIL ROAD ST

MAR TIN L UTHER KIN G JR DR

CE

DA

R L

AK

E R

OA

D

OLD

HIG

HW

AY

49

BRO D IE RD

MAL LETT RO AD

BIG

L AK

E R

OA

D

MC

CA

NN

RD

JAM

LA

NE

12

TH

AV

E

OLD

HW

Y 4

9

US 90

E RAILR

O AD STREET

OA

K S

TR

EE

T

DIVISIO N STREET

D'I B

E RVIL LE B

LVD

LEW

IS A

VE N

UE

PASS RD

LO RRAINE RO AD

H OW ARD AVEN UE

S SWAN RO AD

CA

IL LA

VE

T S

TRE E

T

48TH ST

SW

ITZ

ER

RO

AD

CA

MP

WIL

KE

S R

OA

D

BR

OAD

AV E

NU

E

ESTERS BO UL EVARD

JIM

MO

NE

Y R

OA

D

42

ND

AV

E

BR

ITT

AN

Y AV

EN

UE

KL

EIN

RO

AD

22ND S T

TU

CK E

R R

OAD

LA

ME

Y B

RID

GE

RD

HEWES

AVENU E

SH

OR

ECR

ES

T RD

25

TH

AV

E

N OR TH C AROL INA AVEN UE

MAG NO L IA STREET

RAIL ROAD STREET

17TH ST

MILLS

AV

ENU

E

IBE

RV

ILLE

DR

IVE

OL

D H

IGH

WA

Y 1 5

US

49

W OAK LAW N RD

DED EA UX ROAD

CO

UR

TH

OU

SE R

D

CROSSROADS PKWY

34

TH A

VE

RIPPY RD

GU

LF A

VE

NU

E

JOHNSO

N STILL

ROAD

CE

DA

R L

AK

E R

D

WOOLMARKE T RD

JUDG E SEKUL AVEN UE

GO

RE

NFL

O R

OA

D

PASS RO AD

MILL

RO

AD

EI S

EN

HO

WE

R D

RIV

E

WH

ITE

AV

E

8TH

AV

E

BACK BAY BOUL EVARD

BAY SHO RE D R

MY

RT

LE S

TR

EET

TRA

ILWO

OD

DR

IVE

33

RD

AV

E

ANG ELA DR

5T

H A

VE

O L D BAY RO AD

38

TH

AV

E

19TH ST

RO

DE

NB

ER

G A

VE

NU

E

WA

SH

ING

TO

N A

VE

NU

E

23

RD

AV

E

WA

SH

FA

YA

RD

RO

AD

20

TH A

VE

13TH ST

TE

AG

AR

DE

N R

OA

D

AN

NIS

TO

N A

VE D

EB

UYS

RO

AD

LA

ME

US

E S

TR

EE

T

22

ND

AV

E

S ANGANI B

L VD

JIM RAMSAY

MISSISSIPPI GULF COAST METROPOLITAN TRANSPORTATION PLAN

0 1.5 3 4.5

MilesUNFUNDED IMPROVEMENTS - HARRISON COUNTY (EAST)

Bicycle/Pedestrian ImprovementsInterstate Highway ImprovementsRoadway Improvements

Page 44: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

Biloxi Bay

Mississippi Sound

Pascagoula Bay

I-10

I-10

I-10

GRO VEL AND RO AD

I-10 CO NN ECTO R RD

SE

AMA

N R

D

O LD SPAN ISH TRAIL

I-10 F rontage Road

HA

MIL

L F

AR

M R

OA

D

GAU

TI ER V

A NCLEAV

E RO A

D

DA

ISY

VE

STR

Y R

D

MS

57

MO NEY F ARM ROA D

US 9

0

FE

RR

Y P

OIN

T R

OA

D

COO K ROA D

OCEAN

SPR

I NG

S R D

LA

DN

IER

RO

AD

JOR

DAN

RD

TU

CK

ER R

OA

D

BA

CK

BA

Y B

LVD

LEMOY NE B

OUL EVARD

OLD

FO

RT

BA

YO

U R

OA

D

BE

AC

H V

IEW

DR

BIG RID GE RO AD

BE

LLE

FO

NT

AIN

E R

OA

D

POIN

T A UX CH

E NES

ROAD

DA

ISY

VES

TRY

RO

A D

GAUT IER -VA NCLE AV E ROA D

DO

LP

HIN

RO

AD

U S 90

MARTIN BLU FF R OAD

WAS

HIN GTO

N AVE

GRAVELINE RO AD

W ALKER RO AD

MC

CA

NN

RD

OA

K S

TR

EE

T

IS IO N STREET

LEM OYNE BLVD

HA

NS

HA

W R

OA

DGU

LF I

SLA

ND

S N

AT

SE

AS

HO

RE

PA

RK

WA

Y

OL D FO RT BAYOU RD

HO WARD AVEN UE

OL D SPAN ISH TRAIL

RE

ILLY

RO

AD

HA

LSTE

AD

RO

AD

F RONT B EACH DR

GO VERNMENT STREET

S HE ARWAT ER DR

BR

ITT

AN

Y AV

EN

UE

F ONTAINEBL EAU RO AD

BE

AS

LE

Y R

D

BE

CH

TE

L BO

ULE

VA

RD

E BE ACH DRIVE

HO

LC

OM

B B

OU

LEV

AR

D

CAL HOU N STREET

DO LP HIN D RIVE

HA

NL

EY R

OA

D

DE

EN

A D

R

GAU

TI ER

- VAN

CLE

AV

E RD

K BAY BOUL EVARD

MY

RT

LE S

T RE

ET

POR TER AVENUEW ESTGATE P KWY

OA

K S

TR

EE

T

OR

ENFL

O R

OA D

MA

IN S

TR

EE

T

OC

EA

N S

P RI N

GS

RO

AD

ROA D

TT ROAD

MS

5

JO

HN

S

MISSISSIPPI GULF COAST METROPOLITAN TRANSPORTATION PLAN

0 1.5 3 4.5

MilesUNFUNDED IMPROVEMENTS - JACKSON COUNTY (WEST)

Bicycle/Pedestrian ImprovementsInterstate Highway ImprovementsRoadway Improvements

Page 45: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

Mississippi Sound

Pascagoula Bay

Point Aux Chenes Bay

I-10

I-10

D ANTZLER AVENUE

I-10 F rontage Road

S AR

A CEN

NIA

RO

AD COD A ROAD

FE

RR

Y P

OIN

T R

OA

D

GAUTI ER V ANC LEA VE ROA D

EL DR FERRY RO AD

LA

DN

IER

RO

AD

MS 611

BEACH BLVD

JAM ESTOW N RO AD

G RIERSO N STR EET

SUT TON ROAD

LIT

TO

N R

OA

D

E LD

ER F

ERR

Y RO

AD

MS

61

3

MS

63

GA UT IE R-V ANC LEA VE ROA D

DO

LP

HIN

RO

AD

F REDERICK STREET

OLD M

OB IL

E AV EN

UE

MARTIN BLU FF ROAD

HW

Y 61 3

SARACENNIA RD

IND EPEND ENCE R

JEF FER SON AVEN UE

LOU

ISE

ST

RE

ET

FRA

NK

LIN

CR

EEK

RD

G REEN WICH AVEN UE

G RAVELINE RO AD

MA

RK

ET

STR

EET

KREBS AVENU E

CATAL PA AVE

CODA RD

US 90 MA

RT

IN S

TREE

T

PIN

E ST

RE

ET

S HORTCUT

ROAD

SH ERL AWN STREET

JACKSO N AVENU E

FRAN

K G

RIFF

IN R

OA

D

BE

LA

IR S

T

O LD SPANISH TRAIL

HW

Y 6

11

GR

I F FIN

ST

REE

T

ING ALL S A VENUE

MA

GN

OL

IA S

TR

EE

T

BO

WE

N S

TR

EE

T

MC INN IS AV ENUE

L IVE O AK AVENU E

PAS

CA

GO

UL

A S

TREE

T

OL D STAGE ROAD

BE

AS

LE

Y R

D

ELD ER S TREET

MA

GN

OL

I A S

T

OL D

MO

BILE

HI G

HW

AY

CA

NT

Y S

TR

EE

T

DU TC H BAYOU RO AD

ED

EN

ST

RE

ET

US 90

MARTIN LU TH ER K IN G BO UL EV ARD

TUC KER AV EN UE

LAK E AVEN UE

USS VIC

KSBU

RG WA Y

DO LP HIN D RIVE

TAYLO R AVENU E

CH

ICO

T S

TR

EET

KR

EO

LE

AV

EN

UE

2N

D S

T

DUT CH BAY OU ROAD EXT

GAU

TI ER

- VAN

CLE

AV

E RD

WESTGATE P KWY

HO

SP

ITA

L ST

RE

ET

FR

ED

ER

IC S

T

MC

PH

ELA

H R

OA

D

RABB Y RD

VE

TE

RA

NS

ST

RE

ET

ISL AND RO AD

OA

K S

TR

EE

T

MA

IN S

T

WASH IN GTO N AVENUE

M ARTIN L UTHER KING DRIVE

RIV

ER

RO

AD

PAR SLEY AVE

CH ICO

T ROAD

DE

SO

TO

ST

RE

ET

PO

LLO

CK

FE

R

MISSISSIPPI GULF COAST METROPOLITAN TRANSPORTATION PLAN

0 1.5 3 4.5

MilesUNFUNDED IMPROVEMENTS - JACKSON COUNTY (EAST)

Bicycle/Pedestrian ImprovementsInterstate Highway ImprovementsRoadway Improvements

Page 46: MISSISSIPPI GULF COAST 2040 METROPOLITAN · more. Gulf Regional Planning Commission (GRPC) was designated by the governor of Mississippi to serve as the Mississippi Gulf Coast MPO

Mississippi Gulf Coast Area Transportation Study: 2040 Metropolitan Transportation Plan

The 2040 Metropolitan Transportation Plan for the Mississippi Gulf Coast Area was formally adopted by the Transportation Policy Committee on December 7, 2015.

The summary document presented herein represents a condensation of information contained in the 2040 Metropolitan Transportation Plan.

The unabridged version of the adopted plan is available online at www.grpc.com.

Acknowledgements Grateful acknowledgment is made to the following individuals on the staff of Gulf Regional

Planning Commission who assisted in preparation of the 2040 Metropolitan Transportation Plan:

Elaine Wilkinson, Executive Director Kenneth Yarrow, Senior Transportation Planner

David Taylor, Planning Director Ken Holland, Senior Planner - GIS

Jeff Loftus, Senior Planner – Bicycle and Pedestrian Jason Zimmer, Transportation/Transit Planner

Stephanie Plancich, Public Involvement/Title VI Coordinator David Sauls, Senior CAD Operator

Sincere thanks are also due the following individuals whose support and participation

made possible the development of a long-range transportation plan for the Mississippi Gulf Coast:

Members of the Mississippi Gulf Coast Metropolitan Planning Organization Transportation Policy Committee and Technical Coordinating Committee

Kevin Coggin, Executive Director, Coast Transit Authority Christ Foret, Assistant Executive Director, Coast Transit Authority

Jeff Ely, Sammy Holcomb, Trung Trinh and Lindsey Netherland Mississippi Department of Transportation Planning Division

Randy Jansen, Transportation Specialist/Planner U.S. Department of Transportation – Federal Highway Administration

Prepared by Neel-Schaffer, Inc. in association Cambridge Systematics, SOL Engineering Services, LLC and Marr/Arnold Planning

Preparation of the 2040 Metropolitan Transportation Plan for the Mississippi Gulf Coast was a cooperative effort of the U. S. Department of Transportation - Federal Highway Administration and Federal Transit Administration, the Mississippi Department of Transportation and Gulf Regional Planning Commission in partial fulfillment of requirements promulgated pursuant to 23 USC 134 and 135 (MAP-21 Sections 1201 and 1202) and the Gulf Regional Planning Commission Unified Planning Work Program. The contents of the document do not necessarily reflect the official views or polices of the U. S. Department of Transportation.