Page 1: Meeting 3   planning

Personal Project - Planning

Page 2: Meeting 3   planning

Completed as specification(shown in report)

Completed as action plan(shown in process journal and report appendix)

(recorded in process journal and shown in report)

Page 3: Meeting 3   planning

Specifications - Example

Page 4: Meeting 3   planning

Specification stages1. Identify the details of a rigorous example of

your final outcome using the rigorous goal outcomes worksheet.

Page 5: Meeting 3   planning

Specification stages2. For each specification develop a scale from a limited to adequate to substantial to rigorous, using the specification worksheet

Page 6: Meeting 3   planning

Level Descriptor Task specific clarification1-2 Develop a limited criteria for the

product or outcome Some aspects stated Stated in list format

3-4 Develop adequate criteria for the product or outcome

Most aspects described Described list format

5-6 Develop substantial and appropriate criteria for the product or outcome

All aspects described Specification table attempted Suitable range shown for some aspects

7-8 Develop rigorous criteria for the product or outcome

All aspects described and are suitably challenging specification identified

Specification table completed Suitable range for all aspects

Specification rubric

Deadline to be uploaded: October 24th

Page 7: Meeting 3   planning

Personal Project Action Plan

1. Now you will need to create a plan for how you will achieve your goal. Create a detailed “to do” list. The plan must include at least TEN tasks and the following information:

a. Tasks to be completedb. End dates for each task to be completedc. Resources needed to accomplish a task (name people, resources, etc.)

Page 8: Meeting 3   planning

Level Descriptor Task specific clarification1-2 Present a limited or partial plan for

the project Stages of action are suggested

3-4 Present an adequate plan for the project

Most stages of action are recorded with a timeline

5-6 Present a substantial plan for the project

All required stages of action are recorded with a timeline

Some related details including who, what, where and how are incorporated, as required

7-8 Present a detailed and accurate plan for the project

All stages of action (including reflection and refinement) are recorded with a timeline

Including detailed who, what, where and how, as required

Action plan rubric

Deadline to be uploaded: October 31st

Note – there is a blank word document calendar with AISB dates accessible on the PP website

Page 9: Meeting 3   planning

Meeting #3 Outcomes

• Project specifications • Action plan

And in addition:Continued researchContinued use of process journal

Deadline: November 4th