My Experiences..
John Wilson
April 2008
TopicsTopics
Remarks
Maintenance Management
Facilities Management
Asset Management
WPS
MAINTENANCE MAINTENANCE –– not just machinesnot just machines
• Woman raped – Government Living Quarters door locks not repaired
• Ceiling tile falls on Clerk - insurance refused to pay, court rules company liable as no proof of maintenance records
• Putrajaya – ceilings collapse
WPS
““SMITHSONIAN REPAIR COSTS COULD TOP US $ 1.5 BILLIONSMITHSONIAN REPAIR COSTS COULD TOP US $ 1.5 BILLION””(Washington Post (Washington Post -- 27 July 2001)27 July 2001)
• Team of experts estimate US $1.5 billion - for repairs
• NAPA concludes “that long standing management problems at this museum complex contributed to the mounting backlog”
• NAPA said “The lack of preventive maintenance allowed further deterioration, boosting the eventual cost of repairs.”
• The study criticised the Smithsonian for developing reactive instead of proactive plan for many repairs. It said the Smithsonian should increase its budget for preventive maintenance from US $1.9M to US $10 - 15M each year.
WPS
Maintenance Management LawsMaintenance Management Laws
• You cannot maintain a poorly designed and poorly constructed facility
• The maintenance budget will never be enough to do the work that is needed
• Computerised Maintenance Management Systems (CMMS) will neverresult in better maintenance
• A CMMS will rarely be used for anything other than job tracking
• You can defer maintenance for long periods with minimal result – but it will catch up (7 years is my estimate)
• You can never achieve a pure Planned/Preventive Maintenance (vs.Breakdown) program - maybe 60-40 is best practice
WPS
The Maintenance Guru The Maintenance Guru -- Mr. Oscar ZerkMr. Oscar Zerk
Mr. Zerk made his fortune by helping save money in maintenance.
Zerk's most important invention -- one that made him the most money -- was a tiny grease fitting, a lubrication system which became the basis for those used on nearly every car, truck, plane and other mechanized vehicle.
At the time of his death in 1968, it was estimated that 20 billion of the fittings had been manufactured.
WPS
The OilerThe Oiler
..lubricate and clean pumps, engines, blowers, compressors, motors, gears, ejectors and other equipment………..
Salary……$30.49 per hour
New York 2004……..
WPS
Maintenance ManagementMaintenance Management
• Maintenance should be 1.5-6% of the ERV – on average.
• Always try to separate out the real cost of maintenance from theoperations budget (security, cleaning, landscaping, waste, pest control are not maintenance!)
• Maintenance Managers must know the design intent, system capabilities, materials and usage
• Train and motivate staff
• Avoid short-term fixes – they bite
• Calculate the base PM workload; prioritise activities (“Do Nothing” is a strategy)
WPS
PAGES FROM WHITESTONEPAGES FROM WHITESTONE
Historical DataM&R budgets should be between 1-6% of ERV
WPS
Future Maintenance Management DriversFuture Maintenance Management Drivers
• Legislation (eg OHS, accountability)
• Life Cycle Costing
• Insurance industry Risk Assessments
• Productivity Increases/Waste Reduction
– Cost savings!
• Better Materials/Tools
• Demand for Quality
• Better Appreciation of Maintenance Needs (a long wait)
WPS
Facilities Management Facilities Management ……....
WPS
INTEGRATED FACILITIES MANAGEMENTINTEGRATED FACILITIES MANAGEMENT
•Caring for the facilities in the interests of the Owner and the Users
•Provision of Services
“Facilities management is the integration of processes within an organisation to maintain and develop the agreed services which support and improve the effectiveness of its primary activities”.
British and CEN Standards
WPS
FM ORIGINSFM ORIGINS• In US – Construction Contractors/Complex Systems
• UK – Large scale outsourcing (Military/Health/Transport)
• “Core Business” Focus in ’70’s - ’90’s
• Downturn in Construction Industry – gap filler
• Diversification of Specialists (Cleaners, BAS Controls)
• PFI/PPP BOOT Contracts – big growth opportunities
Higher Levels of Service/Expectations
Long-term Performance
Contractual Obligations - KPI’s
Equity
WPS
FACILITIES MANAGEMENT
Repairs and Maintenance Environment
PlanningContractors
Property
Decisions Energy Conservative
Budget
Facility Services
Space PlanningOperations
Suppliers
Tena
nts
UtilitiesBilling
Life Cycle Analysis
Aut
horit
ies
Communications
WPS
FM ELEMENTSFM ELEMENTS……..
•Repairs & Maintenance
•Cleaning
•Security
•Space Planning
•Waste Management
•Pest Control
•Landscaping
•User Guidance
•Utilities Management
•BAS/IT Operation
•Sub-Contract Mgt
•Tech. Library Mgt
•Traffic/Parking
•Temporary Staff/Reception
•Mail/Courier Services
•Furniture
•Communications
•etc
WPS
Management
Energy
PM Maintenance
Cleaning
Rates & Taxes
Other operating Cost
Insurance
Maintenance 1.0 %Cleaning 1.5 %Energy 1.1 %Insurance 0.5 %Rates and Taxes 4.0 %Management 0.6 %Other Operating Costs 0.5 %
9.2 %
***
FACILITY OWNERSHIP COSTSFACILITY OWNERSHIP COSTSRepresent ~ 40% of recurring costs*
* Directly related to D & C quality
WPS
FM BUDGETING FM BUDGETING -- OVERVIEWOVERVIEW
Life Cycle Cost
0
50,000,000
100,000,000
150,000,000
200,000,000
250,000,000
300,000,000
1 6 11 16 21 26 31 36
YEAR
CO
ST
Acquisition
Operations & Maintenance Salvage/Handover
WPS
FM IN ACTIONFM IN ACTION……
• Professional/Technical competence – Asset Knowledge
• Guidance for Users
• Regular inspections & reporting
• Budgets – (Preserving the “sinking fund” - renewal funding)
• Evaluating new technologies
• Audits – design vs usage/effectiveness/compliance
• Documented Procedures and records (you can’t manage what you can’t measure)
• FM IT Systems? (e.g. CMMS CAFM ERP)
WPS
FM IN DESIGNFM IN DESIGN……• Design out maintenance
• Design for maintenance
• Design for reliability
• Design for energy efficiency
• Design for accessibility
• Design for changing technology
• Design for Code/compliance change
• Design for skills availability
• Realistic KPIs
• Space for the Facilities Management Team
BEST PRACTICE IN FM?BEST PRACTICE IN FM?
• UNICCO of the USAHand-held technology
Performance contracts
Integrated IT systems
95% Repeat business
Constant growth
Savings to customers
WPS
Asset Management Asset Management ……....
WPS
Asset Management
Facilities Management
Property Management
Maintenance Management
ASSET MANAGEMENTASSET MANAGEMENT
OBJECTIVE OF ASSET MANAGEMENTOBJECTIVE OF ASSET MANAGEMENT
To provide the desired level of service (functionality and presentation)
in
the most cost effective manner
for
present and future customers
WPS
WHAT DO WE MEAN BY WHAT DO WE MEAN BY ““LEVELS OF SERVICELEVELS OF SERVICE””??
VISION
SERVICE
Infrastructure
What are the outcomes to be achieved?
What services (including their performance levels) are required to meet the vision?
What infrastructure is required to support the service?
WPS
““LEVELS OF SERVICELEVELS OF SERVICE”” EXAMPLEEXAMPLEFunction:
•Sanitary disposal
•strategically located
•Accessible/safety
•Catchment size/useage
•Open plan discouraging unsociable behaviour
•Sufficient facilities to provide for a majority of the community needs (drug users?)
Presentation:•Level of cleanliness & maintenance
•Timing of inspections
•Responsiveness to customer complaints etc
•Quality & type perishables
WPS
AM PrinciplesAM Principles
Policy Strategy Plans Operations
Wisdom Knowledge Information Data
Planning Steps
Knowledge StepsWPS
WPS
AM DEFINITIONS
Maintenance/Operations: Regular ongoing day-to-day work necessary to keep asset operating eg road patching
Renewal/Refurbishment: Restores, rehabilitates, replaces existing asset to its original capacity eg gravel resheets
Upgrade/Improvements: Enhances existing asset to provide higher LoS eg widen seal
New: Creation of an new asset to meet additional service level requirements eg new building
What is Life Cycle AM Planning?What is Life Cycle AM Planning?MANAGEMENT
REVIEWS
ASSET AUDIT ASSET PLANNING STRATEGIES
ASSET DISPOSAL / RATIONALISATION
ASSET CREATION/ ACQUISITION
ASSET REPLACEMENT ASSET ACCOUNTING & ECONOMICS
ASSET REHABILITATION /
RENEWALASSET OPERATIONS
ASSET CONDITION & PERFORMANCE
MONITORINGASSET MAINTENANCE
STARTING POINT
Stewardshipand
ContinuousImprovement
Requires organisation to understand &
document condition and useful life of
assets over time
What are the whole of life costs
of assets?
WPS
WPS
Asset Condition Degradation Curve with Time0
1
2
3
4
5
6
7
8
9
100.0 10.0 20.0 30.0 40.0 50.0 60.0
Asset Life in Years
Poo
r
-
A
sset
Con
ditio
n
-
G
ood
AA
AM AM –– KNOW YOUR ASSETSKNOW YOUR ASSETS
• Renewal Intervention – Condition Based
•Financial Depreciation vs Technical Depreciation
AM IN PRACTICEAM IN PRACTICE
• Actively adopted in NZ and Australia - referred to as “sustainability modelling” in US.
• Brings finance, technical and other stakeholders together
• Focus on “Levels of Service” and LCC rather than short-term operational budgeting
• Look-ahead 10-20 years typical
• Structured documentation (LoS, Asset Plans, links to Corporate Plans)
• Identifies “renewal” gap funding
• Uses Scorecards to chart progress
• International Infrastructure Management Manual
WPS
AM AM –– Australia Australia -- the LGAQ Projectthe LGAQ Project
• Program now in Vic/Tasmania/West Australia/Sth Australia
• 8 Consultants teaching Councils in Queensland about AM fundamentals
• Councils adopting AM and “renew before new” philosophies
• Encouraging single “corporate” asset register
• Working to identify the “Renewal Gap” for each Council
• Whole of organisation approach
• Developing standard terminology, challenging Accounting Stds
• Govt Depts of Finance & Audits actively support the LGAQ Program
• In Victoria - $4m/year/Council under-funding
WPS
BUDGET PARADIGM SHIFTBUDGET PARADIGM SHIFT
- Street Lighting- Valve maintenance
Non-discretionary Funding Discretionary Funding- Cleaning drains
-Reseals / Resheets -Pavement widening -Kerb and footpath replacement
-Sprinkler replacement -New community centre
- Additional WW pumping capacity- New Kerb/footpath
- Pothole patching - Parks maintenance - Buildings maintenance
- Mowing
Existing Recurrent Expenditure Existing Capital ExpenditureOperational and Maintenance Costs Renewal/Upgrade & New Programs
Operating Maintenance(Routine & Specific)
Refurbishment / Renewal
Upgrade ,New/ Expansion
- Street lighting - Pothole patching -Reseals -Pavement widening - Grass Mowing - Playground Equip -Gravel Resheets -New kerb / footpath - Cleaning drains - Wate Main Valve -Oval refurbishment - New Com building- Streetsweeping - Build (window rep) -Roof replacement - Facilities cleaning - Bridge pile mtce -Pump replacement
Non-discretionary Funding
Non-discretionary Funding
Non-discretionary Funding
Discretionary Funding
Non-discretionary Funding
Non-discretionary Funding
Recurrent Expenditure Capital Expenditure Additional Whole of Life Costs
Operational Costs Maintenance Costs Asset Management Upgrade & New Projects
-Additional or reduction
-Additional or reduction
- Waste Water additional pumps
Net Maintenance ImpactUpgrade and New/Expansion
Net Operational Impact
WPS
• A Council builds a new $8 million swimming pool but cannot afford ongoing $350,000 mtce & operation
• A Council has 200 buildings but cannot afford to maintain essential bridges
• Council accepts “gift” of heritage building from State Gov but cannot afford to maintain & renew
• A person is injured in a substandard building that council did not know that they owned
• A council stops a street lighting program after community consultation shows ratepayers would prefer lighting in pedestrian areas
CASE STUDIESCASE STUDIES……
WPS
34Visit : www.ctman.com.au
Management Group Pty Ltd
Facilities Lifecycle
Design & Develop
Occupy, Use & Maintain
Review Use Review Users
Refurbish, Renew, Reuse
Establish Need
Demolish Divest
35Visit : www.ctman.com.au
Management Group Pty Ltd
Changing Paradigms – Capital Works
CommentsRenewal Upgrade New
1 20Gravel Road Resheeting - As per 5 yr program Fred 400,000$ 400,000$ -$
2 32Albert Car Park Construction Jack 375,000$ 375,000$ 2,000$
3 114Extension/refurbishment Jack Pavilion Bill 1,100,000$ 200,000$ 150,000$ 750,000$ 9,000$ ~ 1% extension cost
4 56Roof replacement Mavis Library Jill 25,000$ 25,000$ 500-$
5 24Oban Road widening & resurfacing Fred 160,000$ 70,000$ 90,000$ 1,000-$
6 59Pavement Reseals as per 5 yr program Fred 750,000$ 750,000$ -$ Ave condition same
Totals 2,810,000$ 1,445,000$ 240,000$ 1,125,000$ 9,500$
Net Additional
Mtce Cost/yr
Asset Works CategoryLine No.
Bus Case No. Project Description
Project Advocate
Total Project Cost
*Important to take into consideration Contributed Assets and long term management strategy
36Visit : www.ctman.com.au
Management Group Pty Ltd
AM Plans “End Product”
37Visit : www.ctman.com.au
Management Group Pty Ltd
Why Monitor Asset Condition/Performance?Triggers day-to-day maintenance & renewalsLong term $ & Operational planning - renewalUnderstand asset deterioration trendsIdentifying the optimal asset lifecycleMeasuring asset performance to target LoS
Also demonstrates sustainable stewardship
38Visit : www.ctman.com.au
Management Group Pty Ltd
WHY PLAN LONG TERM?
Intergenerational Equity
Maintain Services & assets that deliver them
Smooth Funding Requirements
No Surprises - Community & Council
WPS
ON THE INTERNETON THE INTERNET
Facilities Management in the UKThe current market for facilities services in the UK is around £16 billion (€26 billion / US$ 24 billion) and expected to reach £25 billion (?45 billion / US$ 37 billion) by 2006, increasing at an average rate of around 10% per annum. Source: BISRA
BIFM Award for Best Practice in a PFI/PPP Project 2006
As many worthy PFI/PPP projects have now been established and operating for some time, we are seeking to recognise facilities management involvement demonstrated through
excellence and best practice.
Contractual & Legal Issues in PPP/PFI Projects
WPS
QUESTIONS?