Europe RF Update

Reisholz, Mainz, Niederbipp

Bob Drew

1 May, 2003

Success Stories

Reisholz Mainz

Niederbipp

Reisholz Mill

Reisholz Mill

Wet Strength Efficiency with RF Grade Towels

• Reduced from 6 lpm to 3 lpm on RF Towels (80 kg/MT to 40 kg/MT)

• Solution – Switch from 1000 m³/h long whitewater loop to short white water loop to retain Kymene in short loop with fibre. On normal production, the Silag used all white water of the paper machine (400 m³/h) building and all from RF plant (600 m³/h)

• To shorten loop on RF towels, we used our Krofta for clarification and not the outside Silag flotation. So now white water goes from the PM building direct to the Krofta. Clarified water is recycled to the paper machine.

The old “Single“ Water Loop

RF Plant 600 m³/h from DNT‘s

TM Building 400m³/h from Tray Chest

Silag 1000m³/h

The new “Double“ Water Loop

RF Plant 600 m³/h

Silag 600 m³/h

TM Building 400m³/h

Krofta Flotation

Pulper with new Rotor Type Mainz and Niederbipp

Characteristics:

Spoiler system brings improved mixing

over total volume, especially the upper part.

Target: Intense pulping with Reduced Pulping Time

Results:

Dilution time reduced from 15 min to 10 min.

Dilution time/t and pulper energy consumption/t reduced by about 10 %.

Increased fiber yield

Less reject and disposal costs

Increased pulper system capacity

Results will be quantified over

a longer time period.

Niederbipp Results New Pulper-Rotor

Cost : $37 k

Savings : $80 K/Year

+ 0.8 Ton / Day Increased Throughput (6

% Improvement)

+ Can Pulp Longer Fibre Length

SUCCESSFUL STORIES FROM NIEDERBIPP

1. Voith Ecomizer Forward Cleaners

2. Reject Drum Sorter

3. New Pulper Rotor Design

3 Main Projects

Cost : 245‘000 USD

Savings : 323‘380 USD/Year

INSTALLATION OF THE “ECO-MIZER“-CLEANER FROM VOITH

2 % HIGHER EFFICIENCY

OF THE RF-PLANT.

1. Rebuilt Foward Cleaners

Cost: $97 K

Savings: $180 K/Year

+ 1.7 MT/Day Reduced Fibre Loss

+ Reduced Ash

1. Cleaner Stage 1 Remains Stages 2,

3, and 4 Rebuilt to Ecomizer

2. New Dilution Water Pump for Stages

2 and 3

3. Reduction Number of Pipes

Stage 2 from 28 to 20

Stufe 3 from 8 to 4

Stufe 4 from 4 to 1

4. Less Instrumentation at Stage 4:

(Removed some valves, no

compressed air necessary)

Stages 1 to 3, Stufe 1 im Vordergrund

(APA Bedienungsboden)

1. Rebuilt Forward Cleaners 4th Stage

4th Stage

HIGH PRESSURE NEEDLE SHOWER IN REJECT SCREENING DRUM

FIBRE FREE REJECT

AFTER DRUM

2. Reject Drum Sorter HP Shower

Kosten : $93 K

Einsparung : $103 k/Year

1. Took off oscillator and Drum not

Changed

2. Needle Jet Nozzles Installed

3. New 40 Bar Pump

4. Same Experience in Other Mills in

Switzerland

5. Reduced Cleaning Frequency

Sortiertrommel nach erfolgreichem

Umbau in Utzenstorf

2. Reinigung Sortiertrommel auf 40 bar erhöhen

Nadelstrahldüsen

40bar

Düsenstücke neu und

näher an der Trommel

+ 1.2 Tons/ Day Fiber Recovery

+ Less Plugs and Cleaning Time for Operator due to More efficient

Drum Cleaning

+ Less Ash

- Install additional HP Pump to Reach 40 Bar

2. Reject Drum Cleaning Shower at 40 bar

68

FCE Europe RF Optimisation

• Demand for Higher Brightness – PL Customers

Demanding Virgin Fibre

• Price Differential RF and Virgin fibre low – In

Short Term

• Cost Challenges in Germany

• Fiber Quality Opportunities

What is RF Strategy for FC Europe?

68

Approach to RF Optimisation

Action Plan &

Analysis

RF Process

Database

Implement

Plan

Cost

Comparison

•Within FCE

•Global

•Identify Opportunities

•Financial Analysis – Equipment Plan

•Best Practice Opportunities

•Fibre, Utilities, and Chemical Opportunities

•Capital Plan 2004

•BP Action Plan

•Long Term Fibre Strategy

•Key Comparisons – Equipment and Fibre Quality

•Identify Gaps & Opportunities

50

55

60

65

70

75

80

85

90

95

100

$200.00 $250.00 $300.00 $350.00 $400.00 $450.00 $500.00

Variable Cost $ US/MT

ISO

Bri

gh

tness (

%)

RF Variable Cost Comparison

50

55

60

65

70

75

80

85

90

95

100

$200.00 $250.00 $300.00 $350.00 $400.00 $450.00 $500.00

Variable Cost $ US/MT

ISO

Bri

gh

tness (

%)

RF Variable Cost Comparison

R2 = 0.302

50

55

60

65

70

75

80

85

90

95

100

$200.00 $250.00 $300.00 $350.00 $400.00 $450.00 $500.00

Variable Cost $ US/MT

ISO

Bri

gh

tness (

%)

World

Reisholz

Niederbipp

Mainz

RF Variable Cost Comparison Niederbipp:

•Fiber Cost

•Sludge Incineration

•High Fixed Costs

Mainz & Reisholz:

•Fiber Cost

•Treatment Cost - SILAG

SCREENING:

•Stickies

•Contaminants

Flotation:

•Reduce Fibre

Cost

•Vs Virgin PL

Peroxide Bleaching:

•Fibre Cost at Required ISO

68

Mainz Projects

68

Next Steps

•More in depth cost analysis

•Quarterly Report

•Update BP Action Plan

•Project Plan 2004-2005 – Financial

Analysis

68

Questions?