logistics hall vitra neuenburg (germany) · logistics hall vitra neuenburg (germany) pfeiferconsult...

1
LOGISTICS HALL Vitra Neuenburg (Germany) PfeiferConsult German Engineering Consultancy PfeiferINTERPLAN is a registered trade mark NEW BUILDING Pictures / Illustrations: PfeiferConsult Client: Certified Inspection Engineer: Our services: Brief description: Architects: Structural engineers: Completion: Vitra Verwaltungs-GmbH, Weil am Rhein Prof. Dipl.-Ing. Matthias Pfeifer Structural engineering inspection in accordance with regulations and standards Static calculations Structural fire protection Earthquake engineering Sound insulation Execution planning Random monitoring of the structure during the building phase Construction of a new logistics building partially cellared with a 2-storey area for stores and administration integrated into the building - logistics hall, 135 m x 90 m x 10 m - flat roof structure with 20 m wide span of welded steel girders (special sections) as main load-bearers and steel purlins cladded in trapezoidal covering as a secondary structure - load transfer through clamped reinforced concrete columns, at the top furnished with steel components for fixing the steel girders - a canopy around the whole building constructed in timber as a space frame, overhang 4 m - reinforced concrete slabs over the partial cellar area withstanding a working load of up to 50 kN/m² Antonio Citterio and Partners, Milano (Italy) Steel structure Walter & Reinhardt Ing.-Ges. mbH, Herbolzheim Solid structure Kienzler und Kunzelmann, Freiburg 2008 www.pfeifer-interplan.com

Upload: others

Post on 06-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: LOGISTICS HALL Vitra Neuenburg (Germany) · LOGISTICS HALL Vitra Neuenburg (Germany) PfeiferConsult German Engineering Consultancy Pfeifer INTERPLAN is a registered trade mark NEW

LOGISTICS HALL Vitra Neuenburg (Germany)

PfeiferConsult German Engineering Consultancy�PfeiferINTERPLAN is a registered trade mark

NEW BUILDING

Pictures / Illustrations: PfeiferConsult

Client:

CertifiedInspection Engineer:

Our services:

Brief description:

Architects:

Structural engineers:

Completion:

Vitra Verwaltungs-GmbH, Weil am Rhein

Prof. Dipl.-Ing. Matthias Pfeifer

Structural engineering inspection in accordancewith regulations and standards Static calculations Structural fire protection Earthquake engineering Sound insulation Execution planning Random monitoring of the structure during the building phase

Construction of a new logistics building partially cellaredwith a 2-storey area for stores and administrationintegrated into the building- logistics hall, 135 m x 90 m x 10 m - flat roof structure with 20 m wide span of welded steel girders (special sections) as main load-bearers and steel purlins cladded in trapezoidal covering as a secondary structure- load transfer through clamped reinforced concrete columns, at the top furnished with steel components for fixing the steel girders - a canopy around the whole building constructed in timber as a space frame, overhang 4 m - reinforced concrete slabs over the partial cellar area withstanding a working load of up to 50 kN/m²

Antonio Citterio and Partners, Milano (Italy)

Steel structureWalter & Reinhardt Ing.-Ges. mbH, Herbolzheim Solid structureKienzler und Kunzelmann, Freiburg

2008

w w w. p f e i f e r - i n t e r p l a n . c o m