kym_mmsd present 13.09.13

Upload: vibhav

Post on 04-Jun-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/13/2019 Kym_mmsd Present 13.09.13

    1/27

    KAYAMKULAM

  • 8/13/2019 Kym_mmsd Present 13.09.13

    2/27

    MOU vs. ACTUAL

    Parameters UNITS 2013-14 Actual up

    to Aug 2013

    Achieved

    (2012-13)

    Generation MU 1200 325.95 1548.63

    PLF % 38.1 24.65 49.17

    DC % 91 89.97 90.97

    CC Heatrate Kcal/Kwh 1985 1943 1960

    APC % 2.8 3.08 2.6

    PO % 4.34 2.75 0.67

    FO % 0.5 0.0 0.952

  • 8/13/2019 Kym_mmsd Present 13.09.13

    3/27

    O&M REVIEW MEETING ON EVERY WEDNESDAY AS PER

    THE MEETING CALENDAR

    BUDGET FOLLOW-UP BASED ON ABB IN SAP

    REAP ANALYSIS AREA WISE

    PLANT MODIFICATION REGISTER STATUS ONLINE

    ONLINE MONITORING OF STATUTORY DOCUMENTS

    NMI ACTION PLAN BEFORE GETTING TAGGED AS NMI

    EQUIPMENT CONDITION MONITORING

    SEPARATE WEBSITE FOR MTP & SD ON INTRANET

    BEST PRACTICES OF MTP

  • 8/13/2019 Kym_mmsd Present 13.09.13

    4/27

    PM MODULE

  • 8/13/2019 Kym_mmsd Present 13.09.13

    5/27

    NO AREA / ISSUE STATUS

    1PTW ISSUANCE THROUGH SAP SYSTEM FOR ALL

    STATION EQUIPMENTSIN PRACTICE

    2 ISSUANCE OF ISOLATION & NORMALISATION SLIPS IN PRACTICE

    3 ISSUING KEY SAFE NUMBERS TO PERMITS IN PRACTICE

    4CLOSING OF PERMITS IN HARD COPY AS WELL AS IN

    SAPIN PRACTICE

    PTW / SAFETY SYSTEM

  • 8/13/2019 Kym_mmsd Present 13.09.13

    6/27

    PTW / SAFETY SYSTEM ISSUES

    Direct closing provision from PTW register to be given to

    maintenance.

    Permit validity appears as 01 year by default. Default option may

    be changed to 01 day

    Currently, there is no validity period mentioned for permits with

    Hot-work, Height workand work inConfined spaces.

    Validity of such long duration permits shall be mentioned. Being

    issued on daily basis these add to procedural delays. In addition,

    not able to generate a distinct permit number in SAP each time it is

    re-issued. Orphans are created by Cutting-off these permits from

    the main permit

  • 8/13/2019 Kym_mmsd Present 13.09.13

    7/27

    In Kayamkulam, confined space permit is being issued in-line with

    Kerala Factories and Boilers check list which is mandatory and

    auditable during their statutory inspections. Accordingly, Head of

    Chemistry is the designated authorized person to inspect the area

    before start of work and issue the signed checklist.

    Process is outside SAP and no records available in SAP for

    scrutiny. Alternatively, there is another checklist in SAP which is

    supposed to be signed by CFT personnel which if followed creates

    duplicity. In order to overcome this, incorporation of Kerala State's

    checklist in SAP with a provision to operate either of the checklists

    and giving authorization to Head of Chemistry ( E.No.004780)

    PTW / SAFETY SYSTEM ISSUES contd

  • 8/13/2019 Kym_mmsd Present 13.09.13

    8/27

    Points should be complied before start of Work

    in a Confined SpaceSl. No.

    POINT TO BE CHECKED STATUS

    1 Availability of Permit for Work Yes No

    2 Availability of competent person for supervising the work Available Not available

    3 Check for explosive atmosphere and the area should be free from explosive mixture Yes No

    4 Proper means of exit provided (existing Man doors / escape doors are in open

    condition) Provided Not provided

    5 Availability of fire water system & portable extinguisher Available Not available

    6 Proper ventilation with forced air circulation Provided Not provided

    7 Check for O2contentsufficient for working- by Safety & Chemistry:

    To be checked once in 05 days for work duration>05 days)

    [Acceptable Range : 20.0 % to 24.0%]

    Checked /

    % of O2= Not checked

    8 Standby personnel provided for vessel entry Available Not available

    9 Hot Work Permit is ensured (Standby personnel provided for fire watch from

    executing dept / contractor / CISF).

    Available Not available

    10 Oxygen and Acetylene cylinders kept out side the vessel / tank Yes No

    11 24 V supply for hand lamps Provided Not provided

    12 Ensure the availability of a lifeline tied to the hip of working personnel keeping the

    other end outside the confined area. Also, ensure the availability of standby

    personnel just outside the confined space holding the lifeline.

    Checked &

    Ensured

    Not ensured

    13 Personal Protective Equipment required are available Yes No

    14 Safety Helmets / Shoes / Gloves / Goggles / welding suit / Face shield / Fresh AirMask / Apron / life line / Safety Belt Available Not available

  • 8/13/2019 Kym_mmsd Present 13.09.13

    9/27

  • 8/13/2019 Kym_mmsd Present 13.09.13

    10/27

    OUTAGE DETAILS

    UNIT TYPE OF OUTAGE PLANNED ACTUAL

    GT-1 CI-9 16-Apr-2013

    to 23-Apr-2013

    (08 days)

    30-June-2013 to

    05-July-2013

    (*06 days)

    HRSG-1 HRSG#1 License

    renewal

    Filter Clean/Change/

    Compressor Water

    Wash

    19-July-2013

    to 22-July-2013

    Completed with GT-1 CI

    STG Governing system

    OH

    19-July-2013

    to 30-July-2013

    (12 days)

    17-Aug-2013 to

    26-Aug-2013

    (*10 Days)

    *2 days gain was there in CI and STG governing system as no cooling time required

    due to non running

    ACTUAL OUTAGE FOR 2013-14 (TILL NOW)

  • 8/13/2019 Kym_mmsd Present 13.09.13

    11/27

    GT1 START DATE DAYS REMARKS

    CI-10 / Gas Skid commissioning 01-Sept-2014 14

    CI is for 8 days only. Skid

    commissioning for 14 days in

    parallel.

    Filter Clean/Change/ Compressor Water

    Wash10-Apr-2014

    2

    Filter Clean/Change/ Compressor Water

    Wash 07-Jan-2015 2Total 18

    GT2 START DATE DAYS REMARKS

    CI-10 / HRSG Inspection for license renewal 01-Apr-2014 8

    Gas skid commissioning / Filter

    Clean/Change/ Compressor Water Wash16-Sept-2014 14

    Skid commissioning for 14 days.

    Though license renewal is due on

    03-11-2014, this will be advanced

    to club with CI to utilize the

    opportunity

    Filter Clean/Change/ Compressor Water

    Wash08-Dec-2014 2

    Total 24

    PLANNED OUTAGE FOR 2014-15

    OUTAGE DETAILS

  • 8/13/2019 Kym_mmsd Present 13.09.13

    12/27

    O/H MODULE

    NO AREA / ISSUE STATUS

    1 IMPLEMENTATION OF OVERHAUL MODULE IMPLEMENTED IN FEB 2011

    2 OVERHAUL ACTIVITIES UPTO MICRO LEVEL IN PRACTICE

    3UPLOADING OF ENGG DECL IN SAP THROUGH THE

    DMS SYSTEMIN PRACTICE

    4O/H DAILY EXCEPTION REPORT THROUGH SAP O/H

    MODULE

    IN PRACTICE SINCE GT-2 CI

    (Nov 2012)

    5DISCONTINUATION OF O/H DAILY EXCEPTION REPORT

    THROUGH FAX

    IN PRACTICE SINCE GT-2 CI

    (Nov 2012)

  • 8/13/2019 Kym_mmsd Present 13.09.13

    13/27

    OVERHAULING PREPAREDNESS INDEX

    NO AREA / ISSUE STATUS

    1IMPLEMENTING ERP BASED OPI MONITORING

    SYSTEM

    IMPLEMENTED (SINCE

    OVERHAUL 2010-11)

    2 OPI REVIEW MEETINGS AS PER GUIDELINES IN PRACTICE

    3 OPI SCORES FOR OVERHAULS 15-16 AVAILABLE IN SAP

  • 8/13/2019 Kym_mmsd Present 13.09.13

    14/27

    OPI 2015-16

  • 8/13/2019 Kym_mmsd Present 13.09.13

    15/27

    OPI ISSUESGT-1 MI (2015-16) :

    PR details for Critical materials are not appearing(100084938,100087956) at identification, indents & enquiry links.

    Order link is leading to wrong PO.

    Service PRs are linked correctly from Identification,

    Indents , Enquiry & Offer links, but Order is linked to wrong PO.

    HGPI (2015-16)

    PRs for Critical materials at received link is showing double entry

    Service PRs not linked at Offer

    Screen shots attached for OPI data matrix entry and ZOPISCORE

    for GT-2 HGPI 2015-16 .

  • 8/13/2019 Kym_mmsd Present 13.09.13

    16/27

    OPI ISSUES Contd

    For Gas Stations, Rolling Plan must be shortened to 05 Year in

    view of high uncertainty and same to be implemented in SAP

    For GT-1 CI carried out in May 2013, flash report was not

    getting generated in OH module

    PR release problem for Capital Spares for next overhaul due

    to NMI tags.

    Provision for adding checklist in OPI in order to ensure the

    Material/service indents in time.

    SRM / e procurement casesstatus non-availability in SAP

  • 8/13/2019 Kym_mmsd Present 13.09.13

    17/27

    ACTIVITY BASED BUDGETING

    C S G

  • 8/13/2019 Kym_mmsd Present 13.09.13

    18/27

    ACTIVITY BASED BUDGETNO AREA / ISSUE STATUS

    1

    REVIEW AND UPDATE ALL THE TASK LISTS BY REPLACING OLD

    MATERIAL & SERVICE CODES WITH NEW ONES IMPLEMENTED FOR ABB 2013-14

    2 ABB FOR O&M AREAS WERE COMPLETED.IMPLEMENTED

    (ABB 2011-12 ONWARDS)

    3CAPITAL SPARES CONSUMPTION/ PROCUREMENT PROJECTION

    THROUGH ABB DONE FOR 2012-13 , 2013-14 & 2014-15

    IMPLEMENTED (2012-13

    ONWARDS)

    4COST BOOKING FOR SPARES THROUGH MAINTENANCE

    ORDERS.IN PRACTICE

    5COST BOOKING FOR CONTRACTS THROUGH MAINTENANCE

    ORDERS.IN PRACTICE

  • 8/13/2019 Kym_mmsd Present 13.09.13

    19/27

    ISSUES - ABB

    For effective contracts/spares procurement and follow up, ABB

    should be included for MBOA also.

    Automatic PR generation yet to start.

    Actual cost booking against the budgeted cost for reliability,

    Building, Township and other assets is not being done due to cost

    element issues, though budget was projected in 2013-14 ABB.

    BD planned cost should be accounted on pro-rota basis spread

    over 12 months period. At present all cost appears on 1st April.This will help in streamlining the ratios.

    Service & Materials booking through maintenance orders for

    non-O&M sections (for example: O&M stores etc)

  • 8/13/2019 Kym_mmsd Present 13.09.13

    20/27

  • 8/13/2019 Kym_mmsd Present 13.09.13

    21/27

    NMI

    Full NMI tagging is not happening (ZMMCONS)

    Provision for online tagging in SAP for NMI(ex:

    Emergency spares)

  • 8/13/2019 Kym_mmsd Present 13.09.13

    22/27

    MATERIAL CODIFICATION

  • 8/13/2019 Kym_mmsd Present 13.09.13

    23/27

    CODIFICATIONN

    O AREA / ISSUE STATUS

    1 SERVICE CODIFICATION IN PRACTICE

    2 MATERIAL CODIFICATION IN PRACTICE

    Service codes for motor rewinding not issued. PR raised

    without service code. Why service code at all ??

    For act asgn K post Po, not able to create SES with

    service code(msg no.9000267977)

    Provision may be given to view other proj PO below E-5

  • 8/13/2019 Kym_mmsd Present 13.09.13

    24/27

  • 8/13/2019 Kym_mmsd Present 13.09.13

    25/27

  • 8/13/2019 Kym_mmsd Present 13.09.13

    26/27

    ERP ISSUES

    NO AREA / ISSUE STATUS

    1 ERP Directory (category wise) TO BE PROVIDED

    2

    ACTUAL CASH FLOW FOR CAPITAL SPARES

    AT A GLANCE AS PER the FORMAT OFBUDGET GROUP

    TO BE PROVIDED

    3 RISK PLOT PROCEDURESTO BE PROVIDED

    4T-CODE ZSM067 FOR SRM BID VIEWING

    FOR BETTER MONITORING

    AUTHORIZATION TO

    BE PROVIDED

    FOR MTP

  • 8/13/2019 Kym_mmsd Present 13.09.13

    27/27

    THANK YOU