kym_mmsd present 13.09.13
TRANSCRIPT
-
8/13/2019 Kym_mmsd Present 13.09.13
1/27
KAYAMKULAM
-
8/13/2019 Kym_mmsd Present 13.09.13
2/27
MOU vs. ACTUAL
Parameters UNITS 2013-14 Actual up
to Aug 2013
Achieved
(2012-13)
Generation MU 1200 325.95 1548.63
PLF % 38.1 24.65 49.17
DC % 91 89.97 90.97
CC Heatrate Kcal/Kwh 1985 1943 1960
APC % 2.8 3.08 2.6
PO % 4.34 2.75 0.67
FO % 0.5 0.0 0.952
-
8/13/2019 Kym_mmsd Present 13.09.13
3/27
O&M REVIEW MEETING ON EVERY WEDNESDAY AS PER
THE MEETING CALENDAR
BUDGET FOLLOW-UP BASED ON ABB IN SAP
REAP ANALYSIS AREA WISE
PLANT MODIFICATION REGISTER STATUS ONLINE
ONLINE MONITORING OF STATUTORY DOCUMENTS
NMI ACTION PLAN BEFORE GETTING TAGGED AS NMI
EQUIPMENT CONDITION MONITORING
SEPARATE WEBSITE FOR MTP & SD ON INTRANET
BEST PRACTICES OF MTP
-
8/13/2019 Kym_mmsd Present 13.09.13
4/27
PM MODULE
-
8/13/2019 Kym_mmsd Present 13.09.13
5/27
NO AREA / ISSUE STATUS
1PTW ISSUANCE THROUGH SAP SYSTEM FOR ALL
STATION EQUIPMENTSIN PRACTICE
2 ISSUANCE OF ISOLATION & NORMALISATION SLIPS IN PRACTICE
3 ISSUING KEY SAFE NUMBERS TO PERMITS IN PRACTICE
4CLOSING OF PERMITS IN HARD COPY AS WELL AS IN
SAPIN PRACTICE
PTW / SAFETY SYSTEM
-
8/13/2019 Kym_mmsd Present 13.09.13
6/27
PTW / SAFETY SYSTEM ISSUES
Direct closing provision from PTW register to be given to
maintenance.
Permit validity appears as 01 year by default. Default option may
be changed to 01 day
Currently, there is no validity period mentioned for permits with
Hot-work, Height workand work inConfined spaces.
Validity of such long duration permits shall be mentioned. Being
issued on daily basis these add to procedural delays. In addition,
not able to generate a distinct permit number in SAP each time it is
re-issued. Orphans are created by Cutting-off these permits from
the main permit
-
8/13/2019 Kym_mmsd Present 13.09.13
7/27
In Kayamkulam, confined space permit is being issued in-line with
Kerala Factories and Boilers check list which is mandatory and
auditable during their statutory inspections. Accordingly, Head of
Chemistry is the designated authorized person to inspect the area
before start of work and issue the signed checklist.
Process is outside SAP and no records available in SAP for
scrutiny. Alternatively, there is another checklist in SAP which is
supposed to be signed by CFT personnel which if followed creates
duplicity. In order to overcome this, incorporation of Kerala State's
checklist in SAP with a provision to operate either of the checklists
and giving authorization to Head of Chemistry ( E.No.004780)
PTW / SAFETY SYSTEM ISSUES contd
-
8/13/2019 Kym_mmsd Present 13.09.13
8/27
Points should be complied before start of Work
in a Confined SpaceSl. No.
POINT TO BE CHECKED STATUS
1 Availability of Permit for Work Yes No
2 Availability of competent person for supervising the work Available Not available
3 Check for explosive atmosphere and the area should be free from explosive mixture Yes No
4 Proper means of exit provided (existing Man doors / escape doors are in open
condition) Provided Not provided
5 Availability of fire water system & portable extinguisher Available Not available
6 Proper ventilation with forced air circulation Provided Not provided
7 Check for O2contentsufficient for working- by Safety & Chemistry:
To be checked once in 05 days for work duration>05 days)
[Acceptable Range : 20.0 % to 24.0%]
Checked /
% of O2= Not checked
8 Standby personnel provided for vessel entry Available Not available
9 Hot Work Permit is ensured (Standby personnel provided for fire watch from
executing dept / contractor / CISF).
Available Not available
10 Oxygen and Acetylene cylinders kept out side the vessel / tank Yes No
11 24 V supply for hand lamps Provided Not provided
12 Ensure the availability of a lifeline tied to the hip of working personnel keeping the
other end outside the confined area. Also, ensure the availability of standby
personnel just outside the confined space holding the lifeline.
Checked &
Ensured
Not ensured
13 Personal Protective Equipment required are available Yes No
14 Safety Helmets / Shoes / Gloves / Goggles / welding suit / Face shield / Fresh AirMask / Apron / life line / Safety Belt Available Not available
-
8/13/2019 Kym_mmsd Present 13.09.13
9/27
-
8/13/2019 Kym_mmsd Present 13.09.13
10/27
OUTAGE DETAILS
UNIT TYPE OF OUTAGE PLANNED ACTUAL
GT-1 CI-9 16-Apr-2013
to 23-Apr-2013
(08 days)
30-June-2013 to
05-July-2013
(*06 days)
HRSG-1 HRSG#1 License
renewal
Filter Clean/Change/
Compressor Water
Wash
19-July-2013
to 22-July-2013
Completed with GT-1 CI
STG Governing system
OH
19-July-2013
to 30-July-2013
(12 days)
17-Aug-2013 to
26-Aug-2013
(*10 Days)
*2 days gain was there in CI and STG governing system as no cooling time required
due to non running
ACTUAL OUTAGE FOR 2013-14 (TILL NOW)
-
8/13/2019 Kym_mmsd Present 13.09.13
11/27
GT1 START DATE DAYS REMARKS
CI-10 / Gas Skid commissioning 01-Sept-2014 14
CI is for 8 days only. Skid
commissioning for 14 days in
parallel.
Filter Clean/Change/ Compressor Water
Wash10-Apr-2014
2
Filter Clean/Change/ Compressor Water
Wash 07-Jan-2015 2Total 18
GT2 START DATE DAYS REMARKS
CI-10 / HRSG Inspection for license renewal 01-Apr-2014 8
Gas skid commissioning / Filter
Clean/Change/ Compressor Water Wash16-Sept-2014 14
Skid commissioning for 14 days.
Though license renewal is due on
03-11-2014, this will be advanced
to club with CI to utilize the
opportunity
Filter Clean/Change/ Compressor Water
Wash08-Dec-2014 2
Total 24
PLANNED OUTAGE FOR 2014-15
OUTAGE DETAILS
-
8/13/2019 Kym_mmsd Present 13.09.13
12/27
O/H MODULE
NO AREA / ISSUE STATUS
1 IMPLEMENTATION OF OVERHAUL MODULE IMPLEMENTED IN FEB 2011
2 OVERHAUL ACTIVITIES UPTO MICRO LEVEL IN PRACTICE
3UPLOADING OF ENGG DECL IN SAP THROUGH THE
DMS SYSTEMIN PRACTICE
4O/H DAILY EXCEPTION REPORT THROUGH SAP O/H
MODULE
IN PRACTICE SINCE GT-2 CI
(Nov 2012)
5DISCONTINUATION OF O/H DAILY EXCEPTION REPORT
THROUGH FAX
IN PRACTICE SINCE GT-2 CI
(Nov 2012)
-
8/13/2019 Kym_mmsd Present 13.09.13
13/27
OVERHAULING PREPAREDNESS INDEX
NO AREA / ISSUE STATUS
1IMPLEMENTING ERP BASED OPI MONITORING
SYSTEM
IMPLEMENTED (SINCE
OVERHAUL 2010-11)
2 OPI REVIEW MEETINGS AS PER GUIDELINES IN PRACTICE
3 OPI SCORES FOR OVERHAULS 15-16 AVAILABLE IN SAP
-
8/13/2019 Kym_mmsd Present 13.09.13
14/27
OPI 2015-16
-
8/13/2019 Kym_mmsd Present 13.09.13
15/27
OPI ISSUESGT-1 MI (2015-16) :
PR details for Critical materials are not appearing(100084938,100087956) at identification, indents & enquiry links.
Order link is leading to wrong PO.
Service PRs are linked correctly from Identification,
Indents , Enquiry & Offer links, but Order is linked to wrong PO.
HGPI (2015-16)
PRs for Critical materials at received link is showing double entry
Service PRs not linked at Offer
Screen shots attached for OPI data matrix entry and ZOPISCORE
for GT-2 HGPI 2015-16 .
-
8/13/2019 Kym_mmsd Present 13.09.13
16/27
OPI ISSUES Contd
For Gas Stations, Rolling Plan must be shortened to 05 Year in
view of high uncertainty and same to be implemented in SAP
For GT-1 CI carried out in May 2013, flash report was not
getting generated in OH module
PR release problem for Capital Spares for next overhaul due
to NMI tags.
Provision for adding checklist in OPI in order to ensure the
Material/service indents in time.
SRM / e procurement casesstatus non-availability in SAP
-
8/13/2019 Kym_mmsd Present 13.09.13
17/27
ACTIVITY BASED BUDGETING
C S G
-
8/13/2019 Kym_mmsd Present 13.09.13
18/27
ACTIVITY BASED BUDGETNO AREA / ISSUE STATUS
1
REVIEW AND UPDATE ALL THE TASK LISTS BY REPLACING OLD
MATERIAL & SERVICE CODES WITH NEW ONES IMPLEMENTED FOR ABB 2013-14
2 ABB FOR O&M AREAS WERE COMPLETED.IMPLEMENTED
(ABB 2011-12 ONWARDS)
3CAPITAL SPARES CONSUMPTION/ PROCUREMENT PROJECTION
THROUGH ABB DONE FOR 2012-13 , 2013-14 & 2014-15
IMPLEMENTED (2012-13
ONWARDS)
4COST BOOKING FOR SPARES THROUGH MAINTENANCE
ORDERS.IN PRACTICE
5COST BOOKING FOR CONTRACTS THROUGH MAINTENANCE
ORDERS.IN PRACTICE
-
8/13/2019 Kym_mmsd Present 13.09.13
19/27
ISSUES - ABB
For effective contracts/spares procurement and follow up, ABB
should be included for MBOA also.
Automatic PR generation yet to start.
Actual cost booking against the budgeted cost for reliability,
Building, Township and other assets is not being done due to cost
element issues, though budget was projected in 2013-14 ABB.
BD planned cost should be accounted on pro-rota basis spread
over 12 months period. At present all cost appears on 1st April.This will help in streamlining the ratios.
Service & Materials booking through maintenance orders for
non-O&M sections (for example: O&M stores etc)
-
8/13/2019 Kym_mmsd Present 13.09.13
20/27
-
8/13/2019 Kym_mmsd Present 13.09.13
21/27
NMI
Full NMI tagging is not happening (ZMMCONS)
Provision for online tagging in SAP for NMI(ex:
Emergency spares)
-
8/13/2019 Kym_mmsd Present 13.09.13
22/27
MATERIAL CODIFICATION
-
8/13/2019 Kym_mmsd Present 13.09.13
23/27
CODIFICATIONN
O AREA / ISSUE STATUS
1 SERVICE CODIFICATION IN PRACTICE
2 MATERIAL CODIFICATION IN PRACTICE
Service codes for motor rewinding not issued. PR raised
without service code. Why service code at all ??
For act asgn K post Po, not able to create SES with
service code(msg no.9000267977)
Provision may be given to view other proj PO below E-5
-
8/13/2019 Kym_mmsd Present 13.09.13
24/27
-
8/13/2019 Kym_mmsd Present 13.09.13
25/27
-
8/13/2019 Kym_mmsd Present 13.09.13
26/27
ERP ISSUES
NO AREA / ISSUE STATUS
1 ERP Directory (category wise) TO BE PROVIDED
2
ACTUAL CASH FLOW FOR CAPITAL SPARES
AT A GLANCE AS PER the FORMAT OFBUDGET GROUP
TO BE PROVIDED
3 RISK PLOT PROCEDURESTO BE PROVIDED
4T-CODE ZSM067 FOR SRM BID VIEWING
FOR BETTER MONITORING
AUTHORIZATION TO
BE PROVIDED
FOR MTP
-
8/13/2019 Kym_mmsd Present 13.09.13
27/27
THANK YOU