OBJECT Silicone composite insulator TYPE YPIL-MSA-066-BS REPORT OF PERFORMANCE TIC 1464-11 This Report of Performance applies only to the object tested. The responsibility for conformity of any object having the same designations with that tested rests with the Manufacturer. This report consists of 12 pages in total. © Copyright: Only integral reproduction of this report is permitted without written permission from KEMA. Electronic copies in e.g. PDF-format or scanned version of this report may be available and have the status “for information only”. The sealed and bound version of the report is the only valid version. KEMA Nederland B.V. S.A.M. Verhoeven Director Testing, Inspections & Certification The Netherlands Arnhem, 30 September 2011 MANUFACTURER YAMUNA Power & Infrastructure Ltd., Jagadhri, Haryana, India CLIENT YAMUNA Power & Infrastructure Ltd., Jagadhri, Haryana, India TESTED BY KEMA HIGH-VOLTAGE LABORATORY Arnhem, the Netherlands DATE OF TESTS 14 January to 22 August 2011 TEST PROGRAMME Tracking and erosion test; Test at multiple stresses in accordance with IEC 62217 (2005) clause 9.3.3 and annex B. SUMMARY AND CONCLUSION The composite polymer suspension insulator samples passed the 5000 h test at multiple stresses. Version: 1

Upload: tarun-aggarwal

Post on 29-Sep-2015

31 views

Category:

Documents


1 download

DESCRIPTION

test

TRANSCRIPT

  • OBJECT Silicone composite insulator TYPE YPIL-MSA-066-BS

    REPORT OF PERFORMANCE TIC 1464-11

    This Report of Performance applies only to the object tested. The responsibility for conformity of any object having the same designations with that tested rests with the Manufacturer. This report consists of 12 pages in total. Copyright: Only integral reproduction of this report is permitted without written

    permission from KEMA. Electronic copies in e.g. PDF-format or scanned version of this report may be available and have the status for information only. The sealed and bound version of the report is the only valid version.

    KEMA Nederland B.V.

    S.A.M. Verhoeven Director Testing, Inspections & Certification The Netherlands

    Arnhem, 30 September 2011

    MANUFACTURER YAMUNA Power & Infrastructure Ltd., Jagadhri, Haryana, India

    CLIENT YAMUNA Power & Infrastructure Ltd., Jagadhri, Haryana, India

    TESTED BY KEMA HIGH-VOLTAGE LABORATORY Arnhem, the Netherlands

    DATE OF TESTS 14 January to 22 August 2011

    TEST PROGRAMME Tracking and erosion test; Test at multiple stresses in accordance with IEC 62217 (2005) clause 9.3.3 and annex B.

    SUMMARY AND CONCLUSION

    The composite polymer suspension insulator samples passed the 5000 h test at multiple stresses.

    Ver

    sion

    : 1

  • -2- TIC 1464-11

    TABLE OF CONTENTS

    TABLE OF CONTENTS .......................................................................................................................... 2

    1 Identification of the test object......................................................................................................3 1.1 Description of the test object........................................................................................................3 1.2 List of drawings ............................................................................................................................3

    2 General information......................................................................................................................4 2.1 The tests were witnessed by........................................................................................................4 2.2 The tests were carried out by.......................................................................................................4 2.3 Purpose of the test .......................................................................................................................4 2.4 Measurement uncertainty.............................................................................................................4 2.5 Applicable standards....................................................................................................................4

    3 Tracking and erosion test; Test at multiple stresses....................................................................5 3.1 Test parameters ...........................................................................................................................5 3.1.1 The accelerated weather ageing cycle ........................................................................................5 3.1.2 Spectrum of the solar radiation simulation...................................................................................6 3.1.3 Leakage current measurement ....................................................................................................7 3.2 Evaluation of the test....................................................................................................................8

    APPENDIX A MEASUREMENT UNCERTAINTIES........................................................................... 9

    APPENDIX B MANUFACTURERS DRAWING............................................................................... 10

    APPENDIX C PHOTOGRAPHS OF THE TEST OBJECT AFTER TEST........................................ 12

    Ver

    sion

    : 1

  • -3- TIC 1464-11

    1 IDENTIFICATION OF THE TEST OBJECT 1.1 Description of the test object

    Manufacturer YAMUNA Power & Infrastructure Ltd., Jagadhri, Haryana, India

    Type YPIL-MSA-066-BS Creepage distance 525 mm Length 348 15 mm Arcing distance 230 mm Shed / housing material silicone rubber Number of sheds 4 (two of 150 mm and two of 96 mm) Diameter of rod/core 27 mm Rod / Core fibreglass 1.2 List of drawings The manufacturer has guaranteed that the object submitted for tests has been manufactured in accordance with the following drawing. KEMA has verified that this drawing adequately represents the objects tested. The following drawing is included in this report: - Drawing no. YPIL-MSA-066-BS

    Ver

    sion

    : 1

  • -4- TIC 1464-11

    2 GENERAL INFORMATION 2.1 The tests were witnessed by The tests were not witnessed. 2.2 The tests were carried out by Name Company

    Mr P.J. Hlkenberg KEMA Nederland B.V. Mr T.R. Hiddink Arnhem, the Netherlands 2.3 Purpose of the test Purpose of the test was to verify whether the material complies with the specified requirements. 2.4 Measurement uncertainty A table with measurement uncertainties is enclosed in appendix A. Unless otherwise indicated in the report, the measurement uncertainties of the results presented are as indicated in this table. 2.5 Applicable standards When reference is made to a standard and the date of issue is not stated, this applies to the latest issue, including amendments, which have been officially published prior to the date of the tests.

    Ver

    sion

    : 1

  • -5- TIC 1464-11

    3 TRACKING AND EROSION TEST; TEST AT MULTIPLE STRESSES Standard and date Standard IEC 62217 clause 9.3.3 and Annex B Test dates 14 January to 22 August 2011 3.1 Test parameters Characteristic test data Test duration 5000 hours (= 208 days and 8 hours) Test voltage 15,2 kV Test frequency 50 Hz Heating 50 C Humidification 95 % Salt fog salinity 7 kg/m3 Artificial rain 100 m Number of samples 2

    Solar radiation see clause 3.1.2 3.1.1 The accelerated weather ageing cycle

    0 2 4 6 8 10 12 14 16 18 20 22

    humidification 95%

    heating 50oC

    artificial rain (100 m)

    salt fog: 7 kg/m3

    solar radiation simulation

    test voltage

    In operation

    Out of operation

    Ver

    sion

    : 1

  • -6- TIC 1464-11

    3.1.2 Spectrum of the solar radiation simulation For the solar radiation simulation, a lamp is combined with a boro-silicate filter. The solar spectrum of this combination is given below and fits well within the solar spectrum at noon in the summertime, at a latitude of 42 .

    Solar spectrum at noon in summer at a latitude of 42 . Spectrum of the lamp with a boro-silicate filter measured in the test chamber.

    Ver

    sion

    : 1

  • -7- TIC 1464-11

    3.1.3 Leakage current measurement Voltage is applied to the high voltage side of the insulator. The leakage current measurement is connected to the other ground side of the insulator.

    The electrical measurement scheme is as follows:

    Test voltage

    Ver

    sion

    : 1

  • -8- TIC 1464-11

    3.2 Evaluation of the test pass/fail criteria observation sample 1 observation sample 2

    number of over-current trip-outs 0 0 tracking no no erosion depth more than 3 mm no, (< 1 mm) no, (< 1 mm) erosion reached the core no no sheds are punctured no no housing is punctured no no interface is punctured no no

    Requirements The test is regarded as passed if, on both test specimens:

    - no tracking occurs - for composite insulators: erosion depth is less than 3 mm and does not reach the core, if applicable - no shed, housing or interface is punctured.

    Result The test was passed.

    Ver

    sion

    : 1

  • -9- TIC 1464-11

    APPENDIX A MEASUREMENT UNCERTAINTIES The measurement uncertainties in the results presented are as specified below unless otherwise indicated. measurement measurement uncertainty dielectric tests and impulse current tests:

    peak value 3% time parameters 10%

    capacitance measurement 0,3% tan measurement 0,5% 5 x 10-5 partial discharge measurement: < 10 pC 2 pC

    10 to 100 pC 5 pC > 100 pC 20%

    measurement of impedance AC-resistance measurement

    1%

    measurement of losses 1% measurement of insulation resistance 10% measurement of DC resistance: 1 to 5 1%

    5 to 10 0,5% 10 to 200 0,2% radio interference test 2 dB calibration of current transformers 2,2 x 10-4 Ii/Iu and 290 rad calibration of voltage transformers 1,6 x 10-4 Ui/Uu and 510 rad measurement of conductivity 5%

    measurement of temperature: -50 to -40 C 3 K

    -40 to125 C 2 K 125 to 150 C 3 K

    Ver

    sion

    : 1

  • -10- TIC 1464-11

    APPENDIX B MANUFACTURERS DRAWING 2 pages (including this page)

    drawing no. description/title date rev.

    YPIL-MSA-066-BS Drawing for multi stress ageing test of 5000Hrs. as per IEC 61109 (silicone composite insulator)

    18-03-2010 -

    Ver

    sion

    : 1

  • -11- TIC 1464-11

    Ver

    sion

    : 1

  • -12- TIC 1464-11

    APPENDIX C PHOTOGRAPHS OF THE TEST OBJECT AFTER TEST

    Photo 1: the two samples after 5000 hours of test

    Ver

    sion

    : 1