july 21 cwg mtg corridor a presentation - alexandriava.gov · welcome t&es high capacity...
TRANSCRIPT
Date
WELCOME
T&ESHigh Capacity Transit Corridor Work Group
July 21, 2011 Meeting
Corridor A Preliminary Transitway Concepts
Meeting AgendaIntroduction and Background
Corridor A Discussion
Existing Conditions
Preliminary Comments
Screening and Evaluation Criteria
Preliminary Connection Concepts
CWG Input and Observations
Public Input and Observations
Next Steps
City Transitway InitiativesDevelopment of a plan fordedicated transit services inthree corridorsCorridor A: North-South CorridorCorridor B: Duke/EisenhowerCorridor C: Beauregard/Van Dorn
CC
BBAA
Land Use and Transportation ConnectivityBeauregard corridor planBraddock Metro &Braddock East plansColumbia Pike InitiativeCrystal City planEisenhower East planEisenhower West areadevelopmentLandmark/Van Dorncorridor planMark Center planMetrorail blue & yellowlinesNVCC Community Collegemaster planOld TownPentagonPentagon City developmentPotomac Yard plans(Arlington and Alexandria)Shirlington
Bailey’s Crossroads(5.5 million sf planned development)
Skyline
Beauregard(6.8million sf proposed development*)
ShirlingtonPotomac Yard North
(7.5 million sf planned development)
Crystal City
Eisenhower East(6 million sf planned development**)
Landmark/Van Dorn(12 million sf
planned development)
Pentagon City
Pentagon
Mark Center
NVCC
Columbia Pike(6 million sf planned development)
Old TownEisenhower West(to be determined)
Braddock Metro(2 million sf planned
development)Braddock East (1 million sf
planned development)
(19 million sfplanned development)
ArlingtonPotomac Yard
Potomac Yard South(4 million sf planned development)
Regional development values approximate*Value approximate based on current developer plans forBeauregard Area that have not been approved by City Council**Value does not include Carlyle
General Study Goals
CC
BB
AA
Define location andconfiguration of the transitwayin each corridor
Identify preferred transit modetechnology for each corridor
Develop plans for operationsfor each corridor
Identify potential stationlocations
Develop action plan -environmental documentation,funding levels/request, design,operations, governance, etc.
May June July August Sept. Oct. Nov. Dec. Jan. Feb. March
ExistingConditions
Prelim.TransitwayConcepts
EvaluatePreliminaryConcepts
PreferredAlternative
StationPrototypes
Implement.Plan Draft Plan
CWG:Evaluation
Criteria, Prelim.TransitwayConcepts
CWGComments onEvaluation of
Concepts
Working GroupComments on
PreferredAlternatives
Working GroupComments on
StationPrototypes andImplementation
Origins/Destinations
CWG :Transit 101,
ExistingConditions,
TransitConcepts
(Connections,Origins/Destinations
Areas to Avoid)
Project Schedule – Corridors A & B
EXISTING CONDITIONSCorridor A
Connects to Regional ActivityCentersMajor Destinations
Old TownPotomac YardPentagonCrystal CityKing Street Metrorail StationBraddock Road Metrorail Station
Corridor A: North-South
North-SouthCorridorTransitService
Existing corridor transit ridership
Average Weekday Metrorail Ridership: 58,400
Average Weekday VRE Ridership: 650 (approx.)
Average Weekday Bus RidershipRoutes AT2 (King St, Fairfax St, others): 2,035Routes AT3 (Washington St, Royal/Fairfax, Pendleton St, others): 976Route AT4 (N. Fairfax St, others): 912Route AT5 (King St, Fairfax St, Madison/Montgomery, others): 2,063Route AT7 (King, Payne/Royal, Eisenhower Ave): 1,015Route AT8 (Duke St, Royal St): 2,628Route AT 10 (Commonwealth Ave, Mt Vernon Ave, others): 731Metrobus Route 9A-E (Washington St, Jefferson David Hwy): 1,788Metrobus Route 11Y (Washington St, George Washington Pkwy): 378Metrobus Routes 29K,N (Duke St, others): 2,272Metrobus REX (Eisenhower Ave, Telegraph Rd): 3,685
DASH ridership 2011, WMATA ridership 2009, VRE ridership 2010
AT2,3,4,5
9A,E
AT1011Y
11Y
9A,E
AT8
AT2,5,7
0 0.50.25Miles
29K, N
REX
Legend
City of Alexandria Line
MetrorailYellow Line
Blue Line
Bus
DASH Bus
Metrobus
Metrobus REX
DASH Service
Average Weekday Bus Ridership
Route AT2: 2,035Route AT3: 976Route AT4: 912Route AT5: 2,063
Route AT7: 1,015Route AT8: 2,628Route AT10: 731DASH ridership 2011
Legend
City of Alexandria LineMetrorail
Yellow Line
Blue LineDASH Route
AT1
AT2
AT3
AT4
AT5
AT6
AT7
AT8
AT10
King StreetTrolley
Average daily ridership greater than 2,000Runs 7 days/week between 11:30 a.m. and 10:00 p.m.20 minute headwaysFree to usersA survey of riders found
98% view the trolley as making Alexandria a more desirable place to visit76% of nonresidents said it increased the number of restaurants and businesses used24% said they would not have made the trip to Old Town but for the trolleyOf the 76% who would have come anyway, 33% would have used a personal car or taxi
Recommendations for enhancing King Street Trolley service in the 2009 King Street Retail Study:Expand the trolley hours to 9:00 am to 11:00 p.m. or later on Friday and Saturday nightsIncrease the frequency of trolley trips to a headway of 10 to 15 minutes
Legend
King Street Trolley! Trolley Stop
City of Alexandria LineMetrorail
Yellow Line
Blue Line
Zoning
Legend
ZoningCommercial
Industrial
Mixed-use
Office
Park
Single-family Residential
Multi-family Residential
Retail
Utilities and Transportation
City of Alexandria LineMetrorail
Yellow Line
Blue Line
2010 Land UseArea that does not have ahigh-capacity transit stationwithin ½ mile:
6,100 households(60% of “Old Town” total)
10,800 people(55% of “Old Town” total)
21,000 total employees(48% of “Old Town” total)
5,400 retail employees(60% of “Old Town” total)
12,300 office employees(44% of “Old Town” total)
Source: Metropolitan Washington Council of Governments Round 8 Forecasts
Legend
Quarter-mile station area
Half-mile station area
Mode Choice
Legend
Residents who Drove Alone to WorkUp to 35 Percent
35 to 45 Percent
45 to 55 Percent
55 to 65 Percent
Greater than 65 Percent
Source: United States Census America Community Survey Results from 2005 to 2009
Quarter-mile station area
Half-mile station area
PRELIMINARY COMMENTSCorridor A
Preliminary CommentsConcerns:
Existing traffic volumes
Streetscapes
Maintain on-street parking
Old Town already has high transit usage
What will transit in Corridor A accomplish?
There has never been a scheduled transit route along US Route 1
in Old Town
A significant amount of traffic through Old Town comes to and from
Maryland
Preliminary CommentsIdeas:
A no build alternative (maintain the existing bus routes)
Circulator
Serve the Waterfront
Remove vehicular capacity to add transit
Put Transitway on streets where transit already exists
Electric-powered bus alternative
Park-and-ride at southern terminus in Fairfax County
Destinations in the corridor:
Canal Center
King Street
Potomac Yard
Slater’s Lane District
Southern Old Town
Waterfront
Preliminary Comments
Legend
Quarter-mile station area
Half-mile station area
EVALUATION CRITERIACorridor A
General Evaluation CriteriaGrouping Criteria Sub-Group Evaluation Criteria
For Use inPreliminary
Screening ofConcepts
For Use inComparativeEvaluation of
Concepts Measurement Method
Effectiveness -Addresses stated transportation
issues in the corridor
Coverage
Service to Population,Employment, and Other
DestinationsTabulate population, employment, key destinations, and similar, served by option
Transit Connectivity Access to other transit services (existing and planned)
Operations
Running-way Configuration(s) Quantify amount of runningway that is dedicated and amount that is mixed flow
Corridor Length Measured length of the corridor (mi or feet)
Capacity Potential corridor capacity (hourly) based on mode technology, headways, and other conditions
Interoperability Identification of whether the chosen runningway configuration and transit mode technology arecompatible with regionally planned systems
Avoidance of Congestion Number and locations of LOS E/F intersections avoided
Transit Travel Time Transit travel time
Intersection Priority Percent of intersections where TSP is needed and can be implemented successfully - notation ofwhere it cannot be implemented successfully
Ridership Forecast number of riders
AlignmentGeometrics Geometric quality of alignment
Runningway Status Percent of corridor to be located on new or realigned roadway
Phasing Phasing Identification of ability to phase operations and implementation
Impacts -Extent to which economics,environment, community,
transportation are affected
Economic Development Incentive Perceived value of transit mode technologies with regard to development potential
NaturalEnvironmental
Natural Environment Summary of key environmental conditions affected (wetlands, floodplains, T&E, streams, and similar)
Parks and Open Space Summary of parks and/or open spaces affected
Neighborhood andCommunity
PropertyNumber, use type, and quantity of properties impacted with anticipated level of impact (ROW only,partial take, total take)
Streetscapes Impact to existing streetscapes
Community Resources Identify number and location of historical, cultural, community, archaeological resources affected
Demographics Identification of impacts to special populations
Noise and Vibration Summarize relative noise and vibration impacts of different mode types and corridor configurations
Transportation
Traffic Flow Impact Effect of transit implementation on vehicular capacity of corridor
Traffic Signals Number of existing signalized intersections affected by transit, identification of need for new signalphases, and number/location of new traffic signals needed to accommodate transit
Multimodal Accommodation Impacts to, and ability to accommodate bicycles and pedestrians
Parking Impacts to parking
Cost Effectiveness -Extent to which the costs are
commensurate with their benefitsCost
Capital cost Order of magnitude capital cost for corridor (stations, runningway, etc.)
Operating cost Order of magnitude operating cost
Cost Per Rider Order of magnitude operating cost per rider
Financial Feasibility -Cost of system/concept is in
alignment with available fundingFunding
Funding Availability to specific funding sources
Private Capital Incentive Judgment as to whether the concept has the potential to attract private capital investment andinnovative procurement
Evaluation Criteria
Preliminary Screening Criteria Description
Service to Regional Destinations Key destinations served
Service to Population, Employment,and Retail in the Corridor Population, employment, retail, and key destinations served
Transit Travel Time Relative speed of transit along the Van Dorn/Beauregard corridor
Alignment Quality Geometric quality of alignment
Property Impact Number, use type, and quantity of properties impacted withanticipated level of impact (ROW only, partial take, total take)
Streetscape Impact Impact to existing streetscapes
Community Resource Impact Identify number and location of historical, cultural, community,archaeological resources affected
Noise and Vibration Impact Summarize relative noise and vibration impacts of different modetypes and corridor configurations
Traffic Flow Impact Effect of transit implementation on general vehicle flow (non-transit) in corridor
Parking Impact Impacts to parking
Capital Cost Comparative capital cost for initial system construction
Corridor A Preliminary Screening Criteria
CONNECTION CONCEPTSCorridor A
Legend
Quarter-mile station area
Half-mile station area
Corridor A
Legend
Quarter-mile station area
Half-mile station area
Existing Direct Access to High-Capacity Transit
NORTH-SOUTH CONNECTIONTRANSITWAY CONCEPTS
Legend
Quarter-mile station area
Half-mile station area
Existing and PlannedHigh-CapacityNorth-South Connections
Legend
Quarter-mile station area
Half-mile station area
Bifurcated Concept
Legend
Quarter-mile station area
Half-mile station area
Connect alongMetrorail Concept
Legend
Quarter-mile station area
Half-mile station area
Connect through OldTown Concept
Legend
Quarter-mile station area
Half-mile station area
Extend CC/PYTransitway SouthConcept
Legend
Quarter-mile station area
Half-mile station area
Extend CC/PYTransitway to KingStreet Concept
CIRCULATOR CONCEPT
Legend
Quarter-mile station area
Half-mile station area
Circulator Concept:To be studied as partof the DASHComprehensiveOperational Analysis
SUMMARY OF CONCEPTS
Existing & Planned Bifurcated Connect along Metrorail
Connect through Old Town Extend CC/PY South Extend CC/PY to King St
Legend
Quarter-mile station area
Half-mile station area
Summary of Concepts
INPUT ANDOBSERVATIONS
Corridor A
THANK YOU!
Project information is available atwww.alexandriava.gov/HighCapacityTransit