ipm status and plans

17
and plans ertical detector has extremely low coupling to beam and to signal-ga t also has improved resolution due to reduced channel spacing. pp) ode circuit board and MCP in an rf enclosure. Electron signal pass rough a mesh which attentuates rf by 100dB. annel spacing reduced from 0.6mm to 0.4mm. pton sheets used for HV insulation have been removed. tage circuitry has been rebuilt. ao, Craig Dawson) P bias divider in separate chassis with bypass caps added hlke switch isolated in rf enclosure and hardware vacuum interlocks to HV have been added. ao, Steve Tepikian)

Upload: hewitt

Post on 03-Feb-2016

43 views

Category:

Documents


0 download

DESCRIPTION

IPM status and plans Yellow vertical detector has extremely low coupling to beam and to signal-gating grid. It also has improved resolution due to reduced channel spacing. (Dave Kipp) A.Anode circuit board and MCP in an rf enclosure. Electron signal passes - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: IPM status and plans

IPM status and plans

1. Yellow vertical detector has extremely low coupling to beam and to signal-gatinggrid. It also has improved resolution due to reduced channel spacing.(Dave Kipp)

A. Anode circuit board and MCP in an rf enclosure. Electron signal passes through a mesh which attentuates rf by 100dB.

B. Channel spacing reduced from 0.6mm to 0.4mm.C. Kapton sheets used for HV insulation have been removed.

2. High voltage circuitry has been rebuilt.(Steve Jao, Craig Dawson)

A. MCP bias divider in separate chassis with bypass caps addedB. Behlke switch isolated in rf enclosure

3. Software and hardware vacuum interlocks to HV have been added.(Steve Jao, Steve Tepikian)

Page 2: IPM status and plans
Page 3: IPM status and plans

Collector board and MCP, together with all the feedthroughs, are isolated in an rf enclosure.Electrons enter colllector through mesh rated to attentuate rf by 100dB.

Page 4: IPM status and plans

Sweep electrode held on ceramic standoffs. Signal connections are bare wires with fish-spine beads.

Page 5: IPM status and plans

New design greatly reduces coupling between signal-gating grid and anode.

Noise burst when gatefires.

Bunch in bucket #1Bucket #1. There is no

noise from gate firing.

Yellow horizontal Yellow vertical

Six bunch fill on Friday afternoon.

Page 6: IPM status and plans

Old HV distribution box.

Divider chain for MCP biasing. This circuitrywas picking up noise from the Behlke switch. Itis now in a separate enclosure.

Pulse monitoring circuit and Behlke switch.The monitoring circuit was picking up transientsfrom the switch. The switch is now in an rf enclosure.

Page 7: IPM status and plans

MCP biasing circuitry is in a separate enclosure.

Page 8: IPM status and plans

Yellow horizontal Yellow vertical

Top trace is the signal gate opening for one turn. The time constant for the gate voltage ramping back up is much

shorter in the vertical detector from improvements made in the electronics. The signal is gated off in about 20s

in vertical compared with >80s in horizontal.

Page 9: IPM status and plans

Hardware HV interlock

Power supplies were interlocked to vacuum gauge to latch off at 1e-6torr. Yellow vertical with new MCP is stillgassy and keeps tripping off on ramp with 10s measurement intervals.

Page 10: IPM status and plans

Friday Steve added a software interlock. This turns off sweep voltage at 1e-7torr and turns it back onat 1e-8torr. The hardware interlock is still in place for equipment protection. This is ramp from thismorning showing that 8 measurements were lost instead of the last half of the ramp.

Page 11: IPM status and plans

Consider scatter in measured emittance. I analyze a three hour period during Fill 9358, 15:30 Dec. 7 to 8:30 Dec. 8.

Page 12: IPM status and plans

A line is fitted to the emittance values and a table is generated of differences between measured values and thevalue of the fit. These numbers added to the average emittance for this three hour period are plotted. Therms of the differences is 0.393 or 2.7%.

Page 13: IPM status and plans

The same analysis on horizontal gives 3.9%

Page 14: IPM status and plans

8

7

6

5

4

3

2

1

0

Measurement uncertainty (percent)

50004000300020001000

Number of collected electrons

A sample of 1,000 electrons has a limit of ±2% scatter and a sample of 10,000 points has a limit close to ±1%.

Statistical noise floor.

The scatter in consecutive measurements is limited by statistics. I did a Monte Carlo calculation

where N numbers were pulled randomly from a gaussian parent distribution. For each sample

a gaussian was fit to the data. After many measurements the average and standard deviation of

the sigmas was calculated. Plotted here are the values of SD/AVG vs. N.

Page 15: IPM status and plans

Estimated signal in yellow detectors.

In yellow vertical the base pressure is 6 x10-10 torr. This is assumed to be H2 and He.

During measurement the pressure rises to 1.3 x 10-9 torr. I assume this is water.

Single bunch intensities were ~0.8 x 109 during these fills.

Using these numbers and the measured cross sections from CERN report 'Principlesof Operation of Multiwire Proportional and Drift Chambers' by F. Sauli (77-09), I estimate that each gold bunch in the IPM chamber produces about 1,000 electrons.We average 100 bunches so each measurement is from 105 electrons.

Average pressure in horizontal is about 10% of vertical.

From graph in last slide the difference in measurement-measurement scatter should bemuch less than 1% between the two detectors based on signal sizes. Difference is 1.2%with Yellow vertical being quieter.

The same analysis of fill #9364 gives 1rms scatter of Vertical=2.5%, Horizontal=2.9%.

Page 16: IPM status and plans

Fill 9364

Page 17: IPM status and plans

SummaryThe yellow vertical IPM and its biasing electronics have been rebuilt. The coupling between the signal-gating grid and the anode has been greatly reduced and the signal gating off time is much shorter. Hugeamounts of kapton sheeting was removed. HV conditioning time eliminated from hours at vacuum.

The measurement-measurement scatter in yellow vertical is smaller then yellow horizontal. Some of this difference is from the higher chamber pressure in vertical from the new MCP outgassing, however thedifference appears to be larger than would be expected from the improved statistics. More analysis needsto be done here.

Two levels of pressure interlocks have been added. A pressure of 10 -6 torr latches off the HV power supplies.Also Steve Tepikian, on Friday, added a software interlock. When the chamber pressure reached 10 -7 torrthe sweep voltage is set to zero. It is reset to 6,000V when the pressure recovers to 10 -8 torr. This seemsto have kept Yellow vertical on in the second half of the ramp over the weekend.

We are planning to rebuild all of the IPMs to this basic design during the next shutdown.

Significant contributions to the IPM system have been made by:

Craig Dawson Craig RheinJesse Fite Tom RussoSteve Jao Todd SatogataDave Kipp Steve TepikianRob Michnoff Chuck Trabocchi