uli schäfer 1 production modules status plans jem: status and plans

7
Uli Schäfer 1 • Production modules • Status • Plans JEM: Status and plans

Post on 21-Dec-2015

236 views

Category:

Documents


0 download

TRANSCRIPT

Uli Schäfer 1

• Production modules

• Status• Plans

JEM: Status and plans

Uli Schäfer 2

88 pair

V M E

each 165 pins FIO 60 bit @ 80Mb/s

TTCDec

System ACE

3 x 40 bit @ 40 Mb/s

DES

DES

DES

DES Input 2 B 1 A 0 V

60

60

40

Input 5 E 4 D 3 C

Input 8 H 7 G 6 F

Input --

10 X 9 W

DAQ/VME

To JMM

TX

Jet

R

S

T

U

Sum

DAQ

To SMM

ROI

Opto

clock mirror

TX Opto

CAN

CM

RM

4 IMs • Sum processor

XC2V2000• Jet processor

XC2V3000• 4 input modules (IM)

v1.1 (XC2V1500, SCAN921260)

• TTCdec module• Control Module (CM)

v1.3• CAN• VME control• Fan-out of

configuration lines• G-link readout module

(RM) v1.2

JEM1.3 (production)

Uli Schäfer 3

• Minor modifications of JEM wrt pre-production modules: silk screen, pads for CLKdes2 terminators, reduced bypass capacitance on 3.3V supply due to crate supply oscillations

• 4 pre-production + 41 production = 45 fully functional modules to be used on ATLAS

• 32 in JEP crates + 13 spares !

Yield so far:• 2 defective JEMs found : NO BGA issues, just one short on

connector and one chip mounted in wrong orientation• 8 input modules with BGA issues (replace?)• 7 input modules with minor issues (rework?)• small numbers of defective control and G-link modules

From pre-production to production

Uli Schäfer 4

• Many production issues with prototypes and pre-production

• All production steps have taken far longer than scheduled, minimum a factor of two

• Problems were reported only shortly before delivery dates, even if they were known for quite a while

• 3 iterations of input module PCB (impedance issues and others)

• 2 iterations of JEM PCB (impedance)• Wrong component (SMB voltage sensor) mounted on

control module• Inverted tantalum on control module rework• Insufficient cleaning and drying of input modules leading

to malfunction rework

Module production story

Uli Schäfer 5

• Record electronic serial number• JTAG B/Scan

• Input modules• Control modules• JEM main boards

• Flash and check CPLDs and CAN controller• Basic LVDS link tests : lock / no lock to 40MHz square

Acceptance tests (Bruno)

Uli Schäfer 6

Interface tests only, using counter patterns (linear ramp)• Error detection mainly in firmware• Basically using features built into production firmware for timing

calibration

Interfaces tested:• LVDS inputs - ramp pattern required for timing calibration (PPM!)• FIO - pattern detection required for timing calibration (not yet

included in jet production firmware)• DAQ and ROI links - software error detection• CMM - parity detection, pattern generation (so far) in dedicated

firmware

For details see Markus / Andrea

Full system tests with ROD readout at CERN only…

“System” tests, Mainz trigger lab

Uli Schäfer 7

• ship 8 crate-tested JEMs on March 19 to make a full crate of JEMs available for system tests at CERN

• continue production tests in Mainz (~ 2 weeks)• delay further module shipment until crate situation at

CERN becomes clear• full JEP system tests at CERN as soon as infrastructure

complete

Meanwhile: cabling, crate issues, firmware, software…

Plans