Godrej & Boyce Mfg. Co. Ltd.
Project : R-APDRP - Gurdaspur circle , Package-2
Name of Division : Batala
Name of 11KV Feeder: Industrial Feeder24 33C L
Item Description → Propoosed Item
Nos. Nos.2877 2730
Pro
posed
Pro
posed
Sl.No. DTR Location
1 BALLE BALLE 63 1 00 1 2
0 0 0 0
2 RAJINDER WALA 100 2 00 1 3
0 0 0 0
3 GOLDEN WALA 63 3 02 0 3
0 0 16 0
4 GURNAM SINGH 6.3 7 01 0 0
0 0 8 0
5 B.N. FLOOR MILL 100 12 24 2 8
0 0 48 2
6 S.K.I 200 13 54 0 10
1 1 72 5
7 LIFAFA FACTORY 100 14 11 3 1
2 0 16 1
8 ALLOWAL VILLAGE 100 15 86 0 0
2 0 112 8
9 DISPOSAL WALA 63 16 06 0 15
1 0 48 0
10 COMPLAINT CENTRE 200 18 200 12 7
9 3 160 20
11 RAKHIA DAIRY 200 19 1411 0 6
30 0 200 14
12 KACHA KOT 200 20 106 3 6
6 0 128 10
13 RAMAN DAIRY 200 21 2112 0 4
5 0 264 21
WO SL No →Material Category (HT/LT/C) →
Aluminium
Thimbles off size
Civil work for
foundation of 20in 1 pillar box
Unit →Total WO Qty →Feeder DPR Proposed Qty →
Survey Data / Quantity →↓Piller Box
20 in 1Piller Box 4
in 1
Meter Box for 1 Ph.
Meter (1 in 1)
Meter Box for 3 Ph.
Meter (1 in 1)
Single phase
electronic meter
Three phase
electronic meter
DTR Capacity (in kVA)
DTR No.
Godrej & Boyce Mfg. Co. Ltd.
Project : R-APDRP - Gurdaspur circle , Package-2
Name of Division : Batala
* 51 68 69 70 71 72 82 83 84 85 89 90 95 97 98 99 100 106C L L L L L L L L L L L C C C C C L
Set Kg. Mtr. Mtr. Mtr. Mtr. Mtr. Mtr. Mtr. Mtr. Mtr. Nos. Nos. Kg. Kg. Kg. Kg. Kg. Nos.60517 1365 313145 507190 2176 1904 2357 4957 273137 737 3575 272 2968.2 7158 1167 136184.6 4183.2
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
0 14.5 0 48 0 97 0 0 1 2 0 0 3 0
0 22.8 0 65 0 163 0 0 1 3 0 0 4 0
0 58.9 0 244 45 180 0 0 120 0 3 2 20 5 3
0 23.4 0 87 87 0 0 0 60 0 0 1 10 1 1.5
2 226.1 45 1186 199 471 0 0 240 120 2 8 4 120 100 12
5 492.8 0 3282 443 663 0 0 240 240 60 0 10 4 240 229 21
1 85.5 68 425 207 35 0 0 60 60 3 1 1 50 48 4.5
8 511 116 3184 970 0 0 0 360 360 120 0 0 6 380 350 33
0 202.5 0 537 236 892 0 0 360 0 15 6 60 21 9
20 1719.5 286 12094 2476 419 0 0 720 900 300 12 7 0 800 879 60
14 1382.1 383 10130 1487 321 0 0 660 420 420 0 6 11 670 619 58.5
10 817.5 172 6071 613 359 0 0 360 360 240 3 6 6 460 445 39
21 1754.3 406 12648 2281 228 0 0 720 660 600 0 4 12 960 919 81
** Earthing Sets
complete (Chemical
Type/Water level type)
GSL 4mm2 (8 SWG)
LT PVC Cable 2 Core 10
mm2
LT PVC Cable 2 Core 4 mm2
LT PVC Cable 2 Core 6 mm2
LT PVC Cable 4 Core 10
mm2
LT PVC Cable 4 Core 6 mm2
LT XLPE Cable 4
core 150 mm2
LT XLPE Cable 4 Core 16
mm2
LT XLPE Cable 4 core 50
mm2
LT XLPE Cable 4
core 95mm2
Meter Box for 1 Ph. Meter
Meter Box for 3 Ph. Meter
MS Angle iron
50x50x6 mm
MS channel
iron 75X40
mm
MS Flat 25X3m
m
MS flat 50X6mm
MS Nut Bolts (off size)
PCC Pole 9 Meter
Godrej & Boyce Mfg. Co. Ltd.
Project : R-APDRP - Gurdaspur circle , Package-2
Name of Division : Batala
111 112 123 124 139 * * *L L L H L C C C
Nos. Nos. Set Nos. Set Nos. Nos. Nos.2730 241 9847 1471.03 788
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
Pro
posed
0 0 0 0 01 2
0 0 0 00
1 3
0 2 0 00
7 2
0 1 0 00
3 0
2 4 0 012
30 8
5 4 1 130
71 9
1 1 2 06
11 1
8 6 2 048
77 0
0 6 1 0 015 17
20 0 9 3 120272 14
14 11 30 0 84196 20
10 6 6 060
124 37
21 12 5 0126
287 7
Pillar Box for
20 Energy meter
Pillar Box for
4 Energy meter
Single phase
electronic
Stay set complete
(egg insulator 9000kg + stay wire
7/3.15mm)
Three phase
electronic meter
Wooden Seprator
Shifting of 1 Ph. Meter
Shifting of 3 Ph. Meter
14 F.C.I 200 22 73 2 4
11 0 80 7
15 JAWAHAR NAGAR-1 200 23 118 3 4
17 0 152 11
16 JAWAHAR NAGAR-2 200 24 148 0 4
14 1 176 14
17 OBC BANK-1 200 25 129 0 3
16 0 168 12
18 OBC BANK-2 200 26 89 0 6
19 0 136 8
Total 133 90 27 86 133 5 1784 133
7 687.7 0 5081 957 239 0 0 180 300 120 2 4 3 310 310 25.5
11 955.7 335 5483 2370 229 0 0 480 420 240 3 4 8 520 488 45
14 1157.6 106 8180 1712 258 0 0 480 600 240 0 4 8 640 614 54
12 1056 320 7499 1327 154 0 0 540 540 180 0 3 9 570 528 49.5
8 737.6 90 4854 1083 329 0 0 540 300 180 0 6 9 410 359 37.5
133 11905.5 2327 81098 16493 5037 0 0 6120 5280 2700 27 86 90 6220 0 5922 534 0
7 3 11 042
100 16
11 8 17 0 66140 3
14 8 14 1 84174 17
12 9 16 0 72164 20
8 9 19 048
103 6
133 90 133 0 5 798 1776 182
"BOQ Summary of Consumer Indexing 11 KV Aliwal Feeder"
Sl No WO Sl No Item Description Unit
1 24 Aluminium Thimbles off size Nos. 28772 33 Civil work for foundation of 20in 1 pillar box Nos. 27303 51 GSL 4mm2 (8 SWG) Kg. 605174 68 LT PVC Cable 2 Core 10 mm2 Mtr. 13655 69 LT PVC Cable 2 Core 4 mm2 Mtr. 3131456 70 LT PVC Cable 2 Core 6 mm2 Mtr. 5071907 71 LT PVC Cable 4 Core 10 mm2 Mtr. 21768 72 LT PVC Cable 4 Core 6 mm2 Mtr. 19049 74 LT XLPE Cable 1 Core 150mm2 Mtr. 8160
10 75 LT XLPE Cable 1 core 16mm2 Mtr. 104011 76 LT XLPE Cable 1 core 25mm2 Mtr. 33081.612 77 LT XLPE Cable 1 core 300mm2 Mtr. 192013 78 LT XLPE Cable 1 core 35mm2 Mtr. 88014 79 LT XLPE Cable 1 Core 50mm2 Mtr. 220015 80 LT XLPE Cable 1 core 70mm2 Mtr. 016 81 LT XLPE Cable 1 Core 95mm2 Mtr. 2148017 82 LT XLPE Cable 4 core 150mm2 Mtr. 235718 83 LT XLPE Cable 4 Core 16 mm2 Mtr. 495719 84 LT XLPE Cable 4 core 50 mm2 Mtr. 27313720 85 LT XLPE Cable 4 core 95mm2 Mtr. 73721 89 Meter Box for 1 Ph. Meter Nos. 357522 90 Meter Box for 3 Ph. Meter Nos. 27223 95 MS Angle iron 50x50x6 mm Kg. 2968.224 96 MS Channel iron 100X50 mm Kg. 8730.59725 97 MS channel iron 75X40 mm Kg. 715826 98 MS Flat 25X3mm Kg. 116727 99 MS flat 50X6mm Kg. 136184.628 100 MS Nut Bolts (off size) Kg. 4183.229 106 PCC Pole 9 Mtr. Nos. 5644.4530 111 Pillar Box for 20 Energy meter Nos. 273031 112 Pillar Box for 4 Energy meter Nos. 24132 123 Single phase electronic Set 9847
33 124 Stay set complete (egg insulator 9000kg + stay wire 7/3.15mm) Nos. 1471.03
34 128 Strain insulator Nos. 035 139 Three phase electronic meter Set 788
N.B.:-
1. Star (*) mark items are extra items which are not covered under Work Order.2. Above mentioned qty. are as per joint survey carried out by Godrej & Boyce Mfg. Co. Ltd. with PSPCL representative.3. Above mentioned qty. as per best knowledge of both parties with certain assumptions.4. Above mentioned qty. may vary as per site conditions, actual work to be carried at site and Right of way issues etc.5. Saging and Westage is considered as 1% per conductor.6. Jumpering is considered as 2 mtr. Per conductor per HT Cut Point.7. Cable is considered as 10 mtr extra for future mentainance purpose.8. Jumpering for DTR is considered as 27 mtr per DTR.9. Jumpering for AB Switch is considered as 21 mtr per DTR.10. Jumpering is considered as 1 mtr. Per conductor per LT Cut Point.11. Dismental material quanties will be considered at the time of dismentaling after execution
Total WO Qty
(Batala Town)
12. Materials required for Consumer Indexing are excluded in the current BOQ and will be submitted later.13. Rate are as per work order awarded.14. Proposal for approval of rate & amount of Extra items identified in survey will be submitted cumulatively.15. 01 (One) nos. of 200 KVA DT mounted mobile trolley proposed for each sub-division.
"BOQ Summary of Consumer Indexing 11 KV Aliwal Feeder"
G. Total
1784 1784133 133
11905.5 11905.52327 232781098 8109816493 164935037 5037
0 000000000
0 06120 61205280 52802700 270027 2786 8690 90
06220 6220
0 05922 5922534 5340 0
133 13390 90133 133
0 0
05 5
1. Star (*) mark items are extra items which are not covered under Work Order.2. Above mentioned qty. are as per joint survey carried out by Godrej & Boyce Mfg. Co. Ltd. with PSPCL representative.3. Above mentioned qty. as per best knowledge of both parties with certain assumptions.4. Above mentioned qty. may vary as per site conditions, actual work to be carried at site and Right of way issues etc.5. Saging and Westage is considered as 1% per conductor.6. Jumpering is considered as 2 mtr. Per conductor per HT Cut Point.7. Cable is considered as 10 mtr extra for future mentainance purpose.8. Jumpering for DTR is considered as 27 mtr per DTR.9. Jumpering for AB Switch is considered as 21 mtr per DTR.10. Jumpering is considered as 1 mtr. Per conductor per LT Cut Point.11. Dismental material quanties will be considered at the time of dismentaling after execution
Feeder DPR Qty (HT+LT)
Survey Qty (CI)
Saging &
Westage
12. Materials required for Consumer Indexing are excluded in the current BOQ and will be submitted later.13. Rate are as per work order awarded.14. Proposal for approval of rate & amount of Extra items identified in survey will be submitted cumulatively.15. 01 (One) nos. of 200 KVA DT mounted mobile trolley proposed for each sub-division.
"BOQ Summary of Consumer Indexing 11 KV Aliwal Feeder" Extra Items
Sl No WO Sl No Item Description Unit
1 * Wooden Seprator Nos. -2 * Earthing Sets complete (Chemical Type/Water level type) Set -3 * Shifting of 1 Ph. Meter Nos. -4 * Shifting of 3 Ph. Meter Nos. -
N.B.:-
1. Star (*) mark items are extra items which are not covered under Work Order.2. Above mentioned qty. are as per joint survey carried out by Godrej & Boyce Mfg. Co. Ltd. with PSPCL representative.3. Above mentioned qty. as per best knowledge of both parties with certain assumptions.4. Above mentioned qty. may vary as per site conditions, actual work to be carried at site and Right of way issues etc.5. Saging and Westage is considered as 1% per conductor.6. Jumpering is considered as 2 mtr. Per conductor per HT Cut Point.7. Cable is considered as 10 mtr extra for future mentainance purpose.8. Jumpering for DTR is considered as 27 mtr per DTR.9. Jumpering for AB Switch is considered as 21 mtr per DTR.10. Jumpering is considered as 1 mtr. Per conductor per LT Cut Point.11. Dismental material quanties will be considered at the time of dismentaling after execution12. Materials required for Consumer Indexing are excluded in the current BOQ and will be submitted later.13. Rate are as per work order awarded.14. Proposal for approval of rate & amount of Extra items identified in survey will be submitted cumulatively.15. 01 (One) nos. of 200 KVA DT mounted mobile trolley proposed for each sub-division.
Total WO Qty (Batala
Town)
Feeder DPR Qty (HT+LT)
"BOQ Summary of Consumer Indexing 11 KV Aliwal Feeder" Extra Items
G. Total
798 798133 1331776 1776182 182
1. Star (*) mark items are extra items which are not covered under Work Order.2. Above mentioned qty. are as per joint survey carried out by Godrej & Boyce Mfg. Co. Ltd. with PSPCL representative.3. Above mentioned qty. as per best knowledge of both parties with certain assumptions.4. Above mentioned qty. may vary as per site conditions, actual work to be carried at site and Right of way issues etc.5. Saging and Westage is considered as 1% per conductor.6. Jumpering is considered as 2 mtr. Per conductor per HT Cut Point.7. Cable is considered as 10 mtr extra for future mentainance purpose.8. Jumpering for DTR is considered as 27 mtr per DTR.9. Jumpering for AB Switch is considered as 21 mtr per DTR.10. Jumpering is considered as 1 mtr. Per conductor per LT Cut Point.11. Dismental material quanties will be considered at the time of dismentaling after execution12. Materials required for Consumer Indexing are excluded in the current BOQ and will be submitted later.13. Rate are as per work order awarded.14. Proposal for approval of rate & amount of Extra items identified in survey will be submitted cumulatively.15. 01 (One) nos. of 200 KVA DT mounted mobile trolley proposed for each sub-division.
Survey Qty (CI)
Saging & Westage
"Cost Estimation of Batala Under RAPDRP PART - B (Distribution)"
Work Order No: 36 / RAPDRP / HQ - 43 / CE / RE & APDRP / 2013 - 14 Dated.- 10.05.2013
Operation Division: City Batala & Sub-Urban, Batala / Circle: Gurdaspur / APDRP Cell: APDRP Construction Division, Amritsar
Client: Punjab State Power Corporation Limited, Punjab
Contractor: Godrej & Boyce Mfg. Co. Ltd., Vikhroli, Mumbai
Name of 11kV Feeder:- Aliwal
Part-I (Erection) Quantity Cost Per Unit as per Work Order (Rs.)
Sl No WO SL No Item Description Unit
1 2 3 4 5 6 7 8 91 24 Aluminium Thimbles off size Nos. 2,877.00 1,784.00 48.00 20.00
2 33 Civil work for foundation of 20in 1 pillar box Nos. 2,730.00 133.00 - 9,607.00
3 51 GSL 4mm2 (8 SWG) Kg. 60,517.00 11,905.50 86.00 9.00
4 68 LT PVC Cable 2 Core 10 mm2 Mtr. 1,365.00 2,327.00 33.00 13.00
5 69 LT PVC Cable 2 Core 4 mm2 Mtr. 313,145.00 81,098.00 21.00 8.00
6 70 LT PVC Cable 2 Core 6 mm2 Mtr. 507,190.00 16,493.00 31.00 8.00
7 71 LT PVC Cable 4 Core 10 mm2 Mtr. 2,176.00 5,037.00 51.00 20.00
8 72 LT PVC Cable 4 Core 6 mm2 Mtr. 1,904.00 - 45.00 20.00
9 74 LT XLPE Cable 1 Core 150mm2 Mtr. 8,160.00 - 119.00 33.00
10 75 LT XLPE Cable 1 core 16mm2 Mtr. 1,040.00 - 25.00 13.00
11 76 LT XLPE Cable 1 core 25mm2 Mtr. 33,081.60 - 31.00 13.00
12 77 LT XLPE Cable 1 core 300mm2 Mtr. 1,920.00 - 227.00 33.00
13 78 LT XLPE Cable 1 core 35mm2 Mtr. 880.00 - 38.00 20.00
14 79 LT XLPE Cable 1 Core 50mm2 Mtr. 2,200.00 - 49.00 20.00
15 80 LT XLPE Cable 1 core 70mm2 Mtr. - - 63.00 33.00
16 81 LT XLPE Cable 1 Core 95mm2 Mtr. 21,480.00 - 80.00 33.00
17 82 LT XLPE Cable 4 core 150mm2 Mtr. 2,357.00 - 465.00 33.00
18 83 LT XLPE Cable 4 Core 16 mm2 Mtr. 4,957.00 6,120.00 68.00 20.00
19 84 LT XLPE Cable 4 core 50 mm2 Mtr. 273,137.00 5,280.00 159.00 27.00
20 85 LT XLPE Cable 4 core 95mm2 Mtr. 737.00 2,700.00 299.00 33.00
Total WO Qty
Feeder DPR Qty (HT+LT)
Survey Qty (CI)
Material Supply Rate
L1 Labour Rate per
Unit Including Taxes.
21 89 Meter Box for 1 Ph. Meter Nos. 3,575.00 27.00 753.00 26.00
22 90 Meter Box for 3 Ph. Meter Nos. 272.00 86.00 1,090.00 39.00
23 95 MS Angle iron 50x50x6 mm Kg. 2,968.20 90.00 66.00 13.00
24 96 MS Channel iron 100X50 mm Kg. 8,730.60 - 66.00 13.00
25 97 MS channel iron 75X40 mm Kg. 7,158.00 6,220.00 66.00 13.00
26 98 MS Flat 25X3mm Kg. 1,167.00 - 66.00 13.00
27 99 MS flat 50X6mm Kg. 136,184.60 5,922.00 66.00 13.00
28 100 MS Nut Bolts (off size) Kg. 4,183.20 534.00 70.00 13.00
29 106 PCC Pole 9 Mtr. Nos. 5,644.45 - 2,655.00 993.00
30 111 Pillar Box for 20 Energy meter Nos. 2,730.00 133.00 12,358.00 192.00
31 112 Pillar Box for 4 Energy meter Nos. 241.00 90.00 1,649.00 192.00
32 123 Single phase electronic Set 9,847.00 133.00 819.00 64.00
33 124Nos.
1,471.03 - 945.00 128.00
34 128 Strain insulator Nos. - - 80.00 33.00
35 139 Three phase electronic meter Set 788.00 5.00 2,312.00 64.00
Total Cost of the Feeder excluding Extra Items (Rs.)
Stay set complete (egg insulator 9000kg + stay wire 7/3.15mm)
Cost Per Unit as per Work Order (Rs.) Total Cost of the Feeder (Rs.)
Total WO Cost As Per DPR As Per Survey As Per DPR As Per Survey As Per DPR As Per Survey
10= (8+9) 11= (5*10) 12= (6*8) 13= (7*8) 14= (6*9) 15= (7*9) 16= (12+14) 17= (13+15) 68.00 195,636.00 - 85,632.00 - 35,680.00 - 121,312.00 9,607.00 26,227,110.00 - - - 1,277,731.00 - 1,277,731.00 95.00 5,749,115.00 - 1,023,873.00 - 107,149.50 - 1,131,022.50 46.00 62,790.00 - 76,791.00 - 30,251.00 - 107,042.00 29.00 9,081,205.00 - 1,703,058.00 - 648,784.00 - 2,351,842.00 39.00 19,780,410.00 - 511,283.00 - 131,944.00 - 643,227.00 71.00 154,496.00 - 256,887.00 - 100,740.00 - 357,627.00 65.00 123,760.00 - - - - - - 152.00 1,240,320.00 - - - - - - 38.00 39,520.00 - - - - - - 44.00 1,455,590.40 - - - - - - 260.00 499,200.00 - - - - - - 58.00 51,040.00 - - - - - - 69.00 151,800.00 - - - - - - 96.00 - - - - - - - 113.00 2,427,240.00 - - - - - - 498.00 1,173,786.00 - - - - - - 88.00 436,216.00 - 416,160.00 - 122,400.00 - 538,560.00 186.00 50,803,482.00 - 839,520.00 - 142,560.00 - 982,080.00 332.00 244,684.00 - 807,300.00 - 89,100.00 - 896,400.00
Material Supply Cost of the Feeder (Rs.)
Material Erection Cost of the Feeder (Rs.)
Per Unit Cost of WO
779.00 2,784,925.00 - 20,331.00 - 702.00 - 21,033.00 1,129.00 307,088.00 - 93,740.00 - 3,354.00 - 97,094.00 79.00 234,487.80 - 5,940.00 - 1,170.00 - 7,110.00 79.00 689,717.16 - - - - - - 79.00 565,482.00 - 410,520.00 - 80,860.00 - 491,380.00 79.00 92,193.00 - - - - - - 79.00 10,758,583.40 - 390,852.00 - 76,986.00 - 467,838.00 83.00 347,205.60 - 37,380.00 - 6,942.00 - 44,322.00 3,648.00 20,590,953.60 - - - - - - 12,550.00 34,261,500.00 - 1,643,614.00 - 25,536.00 - 1,669,150.00 1,841.00 443,681.00 - 148,410.00 - 17,280.00 - 165,690.00 883.00 8,694,901.00 - 108,927.00 - 8,512.00 - 117,439.00
1,073.00 1,578,415.19 - - - - - -
113.00 - - - - - - - 2,376.00 1,872,288.00 - 11,560.00 - 320.00 - 11,880.00
203,118,821.15 - 8,591,778.00 - 2,908,001.50 - 11,499,779.50