Proposal 2 By Goh Jia Jun

Upload: gjj97

Post on 22-Jan-2017

182 views

Category:

Education


0 download

TRANSCRIPT

Page 1: Individual final 2

Proposal 2By

Goh Jia Jun 0323302

Page 2: Individual final 2

Contentpage

Introduction & objective 1

Suggestion and proposal 2

Rationale 3

Benefits 4

Impacts 5

Bubble diagram 6

Conceptual plan 7

Schematic plan 9

Elevation 10

Project concept 11

Project management 15

Page 3: Individual final 2

Introduction

The site is located at Persiaran Damai Utama 2, Taman Damai Utama, 47180 Puchong, Selangor and the area of the proposed site is decided to be 50m x 70m , which is 3500 m2. The proposed site is surrounded by residential area which is Taman Damai Utama and Kinrara residence and commercial area which is Melodi and Simfoni Kinrara. Beside the site is a pump station and a substation. Apart from that, that is an educational area beside the commercial area. There is a recreational area such as tennis court and football field in the park which is a bit far from the residential area.

Objectivei. Empty land is planned in a benefit use

ii. Provide a place for residents to do exerciseiii. Provide a place where resident can spend their time

together with their family during their free time

Page | 1

Page 4: Individual final 2

Suggestion and proposal

I decide our side to be a recreational area with an area of 50m x 70m (3500m2) inside a residential area.

Throughout the analysis of our site, I explored that this area is lacking of more recreational area for residents. There is an area of 9821m2 residential park with 1 football field and 3 tennis court but there isn’t provide any gymnasium and a swimming pool. If residents of this area want to go gymnasium or swimming pool they will take about 16 min for 8.3 km journey to the nearest gymnasium and 21 min for 13.2 km. This will waste a lot of time and money.

Apart from that, a restaurant so as people can have their meals after exercise. There is a garden adjoin the badminton stadium, gymnasium and restaurant.

In addition, there are 65 parking spaces provided for the visitors surrounding the building so as people no need to park their vehicles opposite the site and walk through 2 triple lane roads or even facing lacking parking space problem.

There is an advertising sign on the top of the building. The building is building in front a T-junction and this will be seen by the drivers that using these roads.

Page | 2

Page 5: Individual final 2

Rationale

After done our analysis of the area, I decide to build a recreation building for the site.

According to the analysis of the site, there is commercial area opposite the residential area and also 2 parks with a football field and 3 tennis court. The only thing that is lacking in the site is recreation area such as gymnasium and swimming pool. Resident need to waste lot of their time and money to gymnasium and swimming pool.

There isn’t any available parking space surrounding the site except opposite of it. But visitors need to walk through 2 triple lane roads from the commercial area and it is very dangerous way to pass the roads especially 2 triple lane roads.

i. Lack of recreational area: Residents need a nearly gymnasium and swimming pool to exercise and relax

ii. Lack of parking space: Residents can park their vehicles in the parking space provided which are located beside the building

iii. Great spot to develop a sport center: Residents can go to restaurant opposite the site to recover or the mini market to buy daily supplies

Page | 3

Page 6: Individual final 2

Benefits

1. Provide entertainment to the residents as there is no gymnasium and swimming pool around this residential area.

2. Provide a healthier lifestyle for residents3. There is an advertising sign on the top of the building to

introduce to the consumers about their products and gain their business.

4. Resident come to the site and spend will increase the economic growth of the site

Page | 4

Page 7: Individual final 2

Impacts

1. This site will become a busy corner. 2. During public holiday, there will be a lot of people

coming to gym and swimming and 65 parking spaces provided are totally not enough parking spaces at all for a large amount of people. People will need to park at commercial area which is located opposite of our site.

3. If the building is built and it will cause visual pollution , sound pollution and light pollution.

Page | 5

Page 8: Individual final 2

Bubble diagram of the proposed siteGround floor

1st floor

Page | 6

Page 9: Individual final 2

Conceptual plan of the proposed site

Swimming pool

Walkway

Toilet

Store

Page | 7

Parking lot

entrance

exit6m

3m

3m

Page 10: Individual final 2

Conceptual plan of the 1 st floor

Badminton stadium

Restaurant

Garden

Gymnasium

Toilet

Page | 8

Page 11: Individual final 2

Schematic plan of ground floor

Schematic plan of 1 st floor

Page | 9

Page 12: Individual final 2

East elevation

North elevation

Page | 10

Page 13: Individual final 2

Swimming pool

The swimming pool a semi-public pool which means any pool restricted for use by residents, members, or registered guests that is intended to be used for swimming or bathing.

The swimming pool is located on the ground floor of the building. The size of the swimming pool is 25m x20 m (500m2). This swimming pool can used to hold a competition as it’s a standard size for competition. While the size of the kiddie swimming pool is 9m x 11m and divided into 2 different depth with increasing depth form 0.5m to 1.5m.

There are pool chairs used to relax after swimming are prepared beside the pool. Besides that, 1 life guard chair will placed beside the pool.

Page | 11

Page 14: Individual final 2

Gymnasium

The size of the gymnasium is 22m x 18m and it is built on

the 1st floor. There are prepared with lot of gymnasium apparatus such as barbells, bench press, dumb bells and etc. 2 wall mirrors with a size of 18m x 2.5m placed opposite each other. The gymnasium is designed to be an air-conditioner gymnasium. Apart from that, a beverage machine is prepared at the gymnasium.

Page | 12

Page 15: Individual final 2

Badminton Stadium

The badminton stadium is located at the 1st floor. The standard size of a badminton court is 13.4m x 6.1m so there will be 5 badminton courts in the stadium. The roof of the badminton stadium and gymnasium will have a different height although they are on the same floor because the height of badminton stadium is 9.1m while gymnasium is 3.0m.

5 small benches against the wall are prepared for player to put their personal belongings. Hanging lights will be 4.9m away from floor.

Page | 13

Page 16: Individual final 2

Restaurant

The restaurant is located at the 1st floor and the size of the restaurant is 8m x 22.4m. The restaurant is located beside the badminton stadium and garden.

The restaurant is a place where the resident able to have their meal to recover or rest after their exercises.

Page | 14

Page 17: Individual final 2

Project management taskType of profession involve in this project

1. Architect2. Contractor3. Quantity surveyor4. Landscape architect5. Civil and structural engineer6. Mechanical and electrical engineer7. Supplier

Page | 15

Page 18: Individual final 2

ArchitectArchitect need to meet the client to discuss the concept

and design of the building and consult with other professionals. He or she will leading a group of professionals such as engineers, suppliers and etc. Architect needs to consider the building and safety regulations, local planning regulations and restrictions. Architect also advises the client on the project. Architect produce detailed drawing and use computer-aided design (CAD) to test feasibility of the building. He or she will present feasibility reports and design proposals to clients Architect need to keep within the budget that given by the client and the deadline.

Architect will draw up tender document for contractors. They will visit the site and meeting to ensure the project is running on time and also the budget throughout the project and they need to solve any problems that occur during construction.

ContractorContractor are responsible for overseeing construction on

the building. Contractor will work with architect to ensure the project is implemented as planned and solve any issues during constructions with architect. Contractor also gathers and evaluate bids of the site and also from the sub-contractors. Contractors must complete the project in daily to ensure that the construction is complete in time and correct manner. They coordinate specialty contractors and also provide skilled labour. In addition, contractor also responsible for obtaining material.

Page | 16

Page 19: Individual final 2

Quantity surveyorQuantity surveyor manage and control contract and cost

within construction project. They need to undertake the cost analysis for repair and maintenance project work. Quantity surveyor will use plans that drawn by architects to work out the cost of constructing buildings and do a brief outline specifications. They also prepare tender and contract documents. As the development proceeds through many stages of design phrase, the cost is always compared to the original construction budget that was established at the feasibility stage. Quantity surveyor prepare insurance replacement to estimate for building.

Apart from that, they need to identify, analysis and develop responses to commercial risk. Lastly, they have to value the completed work and arrange the payments.

Landscape ArchitectLandscape architect need to research including urban

regeneration schemes, pedestrian schemes, road or retail schemes, and maintaining the character of sites of natural beauty before construction. He or she also need to meet the clients and establish general landscape requirement with them. Beside that, landscape architect need to match the client's wishes with your knowledge of what will work best. Landscape architect need to conduct preliminary studies of the site such as contours, soil, ecology, buildings of the site.

They also carry out environment impact assessment. They accurately preparing and presenting detailed plans and working drawings, including applications, construction details and specifications for the project using computer-aided design (CAD) packages or similar design software . They also will contact and coordinate manufacturers and suppliers.

Page | 17

Page 20: Individual final 2

Civil & structural engineerCivil & structural engineer deal with the analysis and

design of structures that support loads. They undertake technical and feasibility studies. They are responsible to design and plan the hydraulic system and structure. They also advise architect and client by using the most efficient method to provide in the building. Apart from that, they prepare design calculations and material specifications. They use software to calculate the load and grade requirements, water flow rates, and also the material stress factors. Before construction, they need to visit the site to investigate and determine the suitability of the earth. Structural engineer often take responsible in the organisation and delivery of materials and equipment.

Electrical & mechanical engineerElectrical & mechanical engineer carry out cost-effective

equipment modifications to ensure the safety of the building. They develop, test and evaluate the design before the building is used. They also discuss with the supplier, architect, contractor and solve complex problems. They will use CAD to turn research idea into technical plan before construction . After construction, they need to take the responsible on maintenance about 2-3 years.

SupplierSupplier is responsible to supply material to the site. They

also need to ensure the quality and quantity of the material so as the project goes smoothly. Supplier need to transport the material to the site in time to make sure the project is done in time. They sometimes also recognized as subcontractor because of their large contributions to the project.

Page | 18