ICT Processes

Standard Operating Procedures and

Good Practices

Prepared In January 2002

By OMSAR

Table of Contents 1.0 Preliminary and Administrative Activities ................................................1

Activity 1 : Define Business Objectives as Related to ICT .................................2 Activity 2 : Initiate and Plan the Good Practices Project ...................................3 Activity 3 : Collect Documents Relevant to the Project .....................................5 Activity 4 : Conduct Risk Management for the Good Practices Project.................6 Activity 5 : Establish Proper Communication Schemes .....................................8 Activity 6 : Setup a Performance Measurement Process ................................. 10 Activity 7 : How to Implement Standards .................................................... 12 Activity 8 : How to Manage ICT Projects ...................................................... 14 Activity 9 : Setup the Configuration Management Process .............................. 16

2.0 Managing ICT Human Resources ............................................................19 Activity 10 : Organize the Structure of the ICT Unit....................................... 20 Activity 11 : Identify the Required Competencies per Position......................... 22 Activity 12 : Identify Actual Competency Levels of all Staff ............................ 24 Activity 13 : Analyze Competencies to Identify Training Requirements ............. 26 Activity 14 : Identify Training Resources...................................................... 28 Activity 15 : Manage Training Material......................................................... 29 Activity 16 : Maintain Training Records........................................................ 30 Activity 17 : Define Recruitment Standards.................................................. 31

3.0 Relationships with Suppliers ..................................................................32 Activity 18 : Prepare a List of Supplier Products and Services ......................... 33 Activity 19 : How to Audit or Qualify Suppliers ............................................. 35 Activity 20 : Prepare an Agreements Register............................................... 38 Activity 21 : Evaluation of Suppliers, Products, Projects or Alternatives............ 40 Activity 22 : Recommended Issues to Consider in ICT Agreements .................. 42 3.1 Including Technical Specifications in Agreements ................................ 42 3.2 Schedule and Timing of Product Deliveries ......................................... 42 3.3 Costing and Other Financial Issues ................................................... 43 3.4 Software Upgrades and Updates....................................................... 44 3.5 The Supply of Source Code .............................................................. 44

3.5.1 Suggested Solutions ............................................................. 45 3.5.2 Data Structure vs Source Code............................................... 45

3.6 Maintenance and Warranty Services.................................................. 46 3.6.1 Warranties and Maintenance on Equipment .............................. 46 3.6.2 Warranties and Maintenance on Software................................. 46 3.6.3 Terms Applying to Both Hardware and Software........................ 47

3.7 Support Agreements....................................................................... 47 3.8 Ensuring Continuity of Services ........................................................ 48 3.9 Delivery and Acceptance Criteria ...................................................... 48 3.10 Authorization of Staff ...................................................................... 49 3.11 Copyrights and Intellectual Property ................................................. 49

4.0 Qualification Processes ..........................................................................51 Activity 23 : Specification Qualification (SQ) ................................................ 53 Activity 24 : Installation Qualification (IQ) ................................................... 56 Activity 25 : Operational Qualification (OQ).................................................. 58 Activity 26 : Performance Qualification (PQ)................................................. 60

5.0 Logical System Access and Security .......................................................64 Activity 27 : Identify Functions to be Secured .............................................. 65 Activity 28 : Assign Privileges and Access Rights........................................... 67 Activity 29 : Assign, Distribute and Control Passwords................................... 68

Activity 30 : ISO Standards for Security ...................................................... 70 6.0 Physical System Protection, Access and Security ...................................72

Activity 31 : Infrastructure – Server and Other Rooms .................................. 73 Activity 32 : Infrastructure – Cabling .......................................................... 75 Activity 33 : Infrastructure – Networks........................................................ 76 Activity 34 : Assign Physical Access Privileges .............................................. 78 Activity 35 : Assign, Distribute and Control Passwords................................... 80 Activity 36 : Insure the ICT Systems........................................................... 81

7.0 Information Integrity : Backup / Archiving and Data Protection............82 Activity 37 : Identify What is to be Backed Up and When ............................... 83 Activity 38 : Backing Up............................................................................ 85 Activity 39 : Identify What is to be “Restore Tested” and When....................... 87 Activity 40 : Restore Testing...................................................................... 89 Activity 41 : Good Back Up Practices........................................................... 91 Activity 42 : Protection Against Viruses ....................................................... 93

8.0 Information Integrity : Business Continuity Planning ............................94 8.1 Business Continuity Plans ................................................................ 94 8.2 Classifying Disasters ....................................................................... 94 Activity 43 : Disaster Recovery Procedures .................................................. 96 Activity 44 : Disaster Recovery – Good Practices .......................................... 99 Activity 45 : Business Continuity – Contingency Plans ................................. 100

9.0 Software Application Development ...................................................... 101 Activity 46 : Using a Software Development Process ................................... 102 Activity 47 : Software Development Tools.................................................. 104 Activity 48 : Programming Standards........................................................ 105 Activity 49 : Selecting Software Applications .............................................. 107

10.0 Operations Management ...................................................................... 109 Activity 50 : Logging Maintenance and Support .......................................... 110 Activity 51 : Control Dissemination of Hard Copies and Distribution ............... 113 Activity 52 : Good Practices for User Support ............................................. 115 Activity 53 : Managing the Supplies of the ICT Systems............................... 117 Activity 54 : Documenting Data Entry Procedures ....................................... 118 Activity 55 : Standard Data Entry Checks and Controls ................................ 120 Activity 56 : Using and Supporting Office Technology Products ..................... 121

11.0 Environment Management ................................................................... 123 Activity 57 : Define the Required Environmental Conditions.......................... 124 Activity 58 : Monitor Environmental Behavior ............................................. 126

The ICT Processes Page 1

1.0 Preliminary and Administrative Activities The Guide commences with a set of Activities that are general. They do not fall under any specific Information Process. Most are fundamental processes in that they apply to the whole Department.

The ICT Processes Page 2

Activity 1 : Define Business Objectives as Related to ICT Objectives : this Activity defines the steps needed to establish Policies and Goals for using its current and projected ICT Systems. This Activity also assesses the degree to which business/organizational plans and ICT plans are aligned. It determines the appropriateness of the mechanisms for establishing the priorities of ICT investments (New projects, changes to existing systems, etc). It establishes the governing rules and structure of the ICT unit as a whole. Of critical importance is an assessment of ICT spending. Questions such as the following should be asked and answered :

• What is each ICT System for? • What does the Department expect from each system? • How do the systems impact the general strategy of the Department? • Who are the beneficiaries of the Department’s ICT Systems? • What are the Technologies selected for current and projected systems • What is the justification for such selection? (Financial and otherwise) • How does each system contribute to the Products and Services the Department is

to provide to the Citizen? Or to other Departments? Or to the outside world? • What are the key performance indicators to be measured and tested to establish

the success of the system? • What are the challenges facing the ICT Systems? • What are the main risks facing the implementation of the Systems? • What is the structure of the ICT unit setup to handle all the ICT processes?

Scope of usage : to cover all ICT Systems under current use or that are projected for future use. Risks : should such goals and policies not be defined, the Department risks acquiring the wrong systems, using them in the wrong manner or even not estimating budgets properly. Documentation and Deliverables : prepare a document that responds to the above questions and any others that the Department finds crucial. Such a document would therefore establish the ICT strategy and plan for the Department.

The ICT Processes Page 3

Activity 2 : Initiate and Plan the Good Practices Project Objectives : the Good Practices Project is an ongoing process. The Department will benefit from an ongoing application of Good Practices. The Good Practices to be implemented in the Department should form part of a long term Project that is well planned, executed and monitored. The objectives of this Activity are to plan the Good Practices Project according to modern project management techniques. Scope of usage : restricted to the Good Practices Project. The Project will not be involved in any other ICT projects except in so far as it may propose and implement good practices for them. Risks : should the Department not plan the Good Practices project properly, it risks the following :

• Undefined or unclear scope of the Project (Too wide or too narrow) • Undefined or unclear deliverables • Undefined or unclear communications channels • Undefined or unclear authorizations • Improper scheduling of the the Project • Poor definition of a Project Team : responsibilities, authorities, etc. • Improper acquisition of resources required by the Project such as documentation,

project management, electronic documentation support, etc. Critical Risk : one of the major risks involved is that of the Department not having a Project Manager nor being able to assign a Project Team for the Project. This is a serious situation and can be known in advance. It is suggested that the Department contact OMSAR in such a case to study various other alternatives such as outsourcing, assistance by other Departments, etc. Standard Operating Procedure : 1) Define the Project Scope, Objectives and Goals. 2) Assign a capable Project Manager. Usually, this would be the Head of the ICT

Unit. However, in the case where the Unit has not been formed yet, the Management may find other parties for this role.

3) Identify all stakeholders of the project. Stakeholders are all parties within and

outside the Department that may have a positive or negative interest in the Project.

4) Ensure that the Project Objectives are understood by all stakeholders or persons

with active interest in the project. To do that, refer to the document developed in Use the document arrived at in Activity 1)

5) Analyze the Guide of Good Practices to identify the ICT Processes of interest to

the Department and to determine the Activities that the Department needs to implement.

The ICT Processes Page 4

6) Identify Alternatives and Options to such Activities. The Department may find that there are other Activities it needs to implement as Good Practices which are not mentioned in this Guide. This would be the right time to identify such Activities and add them to the overall list required by the Department.

7) Define and establish the three main elements of any project. These consist of the

core elements of the Project Plan : The functions and features of the Project (Deliverables) The phasing, scheduling and sequencing of Activities The estimates of the costs and resources needed to complete the Project 8) Highlight all exclusions : these are usually functions within the Project that some

stakeholder will “assume” are part of it but may not be. Identifying them at this stage would save a lot of time and avoid disputes.

9) Identify all Project constraints. The assumptions are the “Implied” needs of

various Stakeholders. Convert implied needs to stated needs or drop them from the Project.

10) State all assumptions. Assumptions often relate to various aspects of the Project

or the ICT Processes. Assumptions usually hide “implied” needs and cause gaps between what was promised and what was delivered. This would reduce the Quality of the Project.

11) Carry out Risk Analysis and Manage the Risks. (Refer to Activity 4) 12) Based on the above, define the Project Team, their responsibilities, authorities as

well as their lines of reporting. Typical roles in the team can be :

Management Staff from the ICT Unit Quality assurance or Internal auditors or inspectors The units in which the systems are used Refer to the note at the beginning of this Activity that points to the risk of not being able to identify or assign such a team.

Some of the above activities will be expanded as specific Activities in the following pages. Documentation and Deliverables : the above definitions result in a Project Plan. This has to be documented and circulated to all Stakeholders for final approval. Good Practices and Recommendations : it is always critical to implement modern Project Management practices. Ensure that the Project Manager has a good experience in the above activities. Acceptance Criteria : this Activity is considered accepted when a Project Plan is approved.

The ICT Processes Page 5

Activity 3 : Collect Documents Relevant to the Project Objectives : to collect all documents that will be of use during the various stages of the Good Practices project. Such documents should be verified to be correct and up to date. Scope of usage : documents related to the Department as a whole as well as to the ICT Systems in use by the Department. Risks : should such documents not be available nor be up to date, time would be lost during the completion of the various activities to collect and bring them up to date. Standard Operating Procedure : 1) Identify all existing documents that should be used such as : Department charter Ministerial decrees Various lists and registers Studies relevant to the ICT Systems Mission statements Vision statements Goals and Objectives Strategies for reaching such goals 2) Catalog such documents under a Register until they are subsumed under the

proper Activities. The Register would include the document names, type, status and location.

3) Ensure that all documents are up to date. Documentation and Deliverables : all the above documents along with the Register that identifies them.

The ICT Processes Page 6

Activity 4 : Conduct Risk Management for the Good Practices Project Objectives : in the early stages of the Good Practices project, the Department is bound to face many unknowns. This Activity presents a procedure for analyzing and mitigating the risks facing the Department. This would allow it to avoid problems during the later stages. A detailed discussion of Risk Management is presented in the Appendix of Supplementary Material of Supplementary Material. Risk Management should be carried out by the Project Manager. Scope of usage : the whole Project itself. Note that at this moment, the Department should not be concerned with Risk Management for its own ICT Systems. Risk analysis for the ICT Projects of the Department should be handled within those projects. Risks :

• Not being aware of how Risk Management takes place. • Spending too little or too much time analyzing Risks • Closing down the Project or specific Activities if major risks are found rather than

attempting to resolve them • Hiding risks from the eyes of the Management • Improper assessment of probabilities and impacts.

Standard Operating Procedure : Follow the details provided in the Appendix of Supplementary Material of Supplementary Material. Here follows a summarized procedure of Risk Analysis and Management : 1) Identify all events which may damage the Project 2) Assess the Risk or the likelihood or probability of each event taking place. This is

expressed as a percentage ranging from 0% (Not likely at all) to 100% (Certain to take place).

3) Assess the Impact on the project should each event take place. Impacts are

assessed as a percentage that ranges from 0% (No significant impact at all) to 100% (Catastrophic impact).

4) For information’s sake, an impact should also be assessed in terms of the

financial or time loss it might cause. For example, there are two events have 70% impact each. One results in a $200,000 loss while the other results in a 50 day delay. This is useful because it gives the Department a better way of assessing impact.

5) Find the Exposure : Multiply the Risk (From Step 2) by the Impact (From Step 3)

for each event. This is the exposure of the Department to this risk. This will be a number that is between 0% and 100%.

6) List all Risks sorted by decreasing Exposure

The ICT Processes Page 7

7) Compute the Total Exposure of the Project by adding all Exposures. 8) Address the topmost exposed events and find ways to manage the risk. This can

be managed by reducing the probability and/or by reducing the impact. Documentation and Deliverables : a risk analysis document for the project as per the structure proposed in the Appendix of Supplementary Material of Supplementary Material. Good Practices and Recommendations : 1) Ongoing Review of Good Practices Project : review Risk Analysis during all

stages of the Project. The purpose would be to learn from earlier analysis as well as to ensure that (a) none of the risks are still likely and (b) there are no new risks.

2) Risk Analysis for the Rest of the ICT Systems : should be carried out on the

ICT Systems should any of the following situations arise :

• New projects are launched • Before the commencement of every major phase • Troublesome spots are found in a Project • New management take over the Project • New software or systems are introduced • Changes in the organization take place • Changes in technology take place

Risk Analysis cannot be underestimated. It is usually the only way to avoid future problems. Acceptance Criteria : upon submission of the Risk Analysis document along with the proposed solutions to all risky events, this Activity would be considered complete.

The ICT Processes Page 8

Activity 5 : Establish Proper Communication Schemes Objectives : Since the Project relies heavily on following “Quality” practices, it follows that Communication between all concerned parties has to be properly defined for the overall project. The objective of this Activity is to define the Communications schemes of the Good Practices Project. Scope of usage : the scope of the Project. Risks : should the Department not have a proper Communications scheme for the Project, the following risks may arise :

• Improper implementation of the Project Plan • Lost information • Activities that are not properly carried out nor completed • Disputes between concerned parties • Improper monitoring of the Project and hence loss of control

Standard Operating Procedure : 1) Issue the Project Charter : this is a document that formally recognizes the

existence of the Project and is the trigger for its launch :

• The Charter is generally in the form of a memo or a letter by the Management • It clearly identifies the Project Champion or the main driving force behind the

Project and would probably be issued by that person. • It lists other elements such as : the Project’s title, date of authorization,

Project Manager’s name, contacts and duties, a brief scope statement for the Project, a summary of the planned approach for managing the project.

2) Prepare a list of all persons involved in the project : the Management Responsible

for the Project, the Project Team, the ICT personnel who will assist the Project Team, key Users, other parties outside the Department.

3) Define the roles and responsibilities of each person on the Project 4) Define the communication level to be established within the Project : What information to distribute? Who to send it to? When to issue letters, reports, minutes, analyses, etc.? Who is to issue such documents? Who gets copied? Where is the communication stored? What registers control the issue of such communications? 5) Identify the repository where such documents are to be kept and archived. Documentation and Deliverables : the documents listed in the above SOP.

The ICT Processes Page 9

Good Practices and Recommendations : it is best that electronic copies be kept of all such documents. Furthermore, key documents should be subsumed under the Configuration Management activity. Acceptance Criteria : the Activity is considered completed when all the documents mentioned in the above SOP are collected and approved by the Management, the Project Manager and all involved parties.

The ICT Processes Page 10

Activity 6 : Setup a Performance Measurement Process Objectives : Performance Measurement is one of the key managerial techniques in the modern world of organizations. What a Department can measure, it can manage. This Activity presents how a Department can prepare various metrics needed for performance measurement of ICT Systems. Scope of usage : all aspects of work involving ICT. However, there is no reason why the same methods cannot be used for other non-ICT processes in the Department. Risks : not introducing a performance measurement scheme may lead to the following risks :

• Measuring the wrong things • Using the measures for the wrong reasons or taking the wrong decisions • Taking measures irregularly resulting in fragmented series • Not having the proper information about various processes

Standard Operating Procedure : 1) Identify the Areas of Concern the Department needs to measure. Based on the

currently popular Balanced Scorecard, these are usually grouped in 4 major areas :

Financial areas Citizen based areas Internal Business Processes (Operations including ICT indices) Learning and Growth (Includes Human Resources)

2) Prepare the Metrics for each of these areas. Examples :

• Citizen satisfaction as measured by an index usually prepared through a survey and computed using the Weighted Index Scoring Procedure (Refer to the Appendix of Supplementary Material of Supplementary Material).

• Number of vouchers entered in one day, week or month • Number of documents returned per month because of error • Number of complaint cases raised against the department per year • Volume of transactions handled by the server per hour

3) Measurement Schemes : develop a document that defines how each of the

measurements can be taken and recorded. More importantly, define within the document the Indicators that help the Department recognize whether particular measurements are within or outside decision making areas.

For example, if the proportion of erroneous vouchers reaches more than 10% of

the total, the Department will need to look into what is causing such errors and remedy the cause. The figure of “10%” is thus an indicator. The decision making zone is any measurement above 10%.

The ICT Processes Page 11

4) Prepare databases, registers, tables or cards that can be used to register the measurements.

5) Analyze the measurements on a regular basis for decision making. 6) When problem areas are identified through such measurements, develop remedial

actions to resolve them. Documentation and Deliverables : 1) The Areas of Concern and the individual performance measurements showing the

indicators for each. 2) Measurements procedures which show how each measurement is to be taken. 3) Measurement results : statistics, tables or databases. 4) Recommendations and remedial actions that define the actions taken to remedy

problem or improvement areas. Good Practices and Recommendations : 1) It is very practical to use a spreadsheet to record all the measurements. It makes

it easier to analyze and chart them and analyze their trends. 2) It is highly recommended to use Statistical Process Control procedures (SPC) that

are in common use in Quality Control in the manufacturing sector. 2) Communicate the purpose behind the measurements. Very often, personnel are

suspicious of measurements as they might consider such activities as infringing on their behavior.

3) Remain consistent with measurements. Changing the nature of the measure over

the years stops the Department from analyzing trends and growths.

The ICT Processes Page 12

Activity 7 : How to Implement Standards Objectives : ICT goes regularly through phases of confusion followed by standardization. Many aspects of ICT processes need to conform or comply with some established standard. This Activity provides some Good Practices regarding the compliance with Standards. The benefits of complying with standards are the following : 1) To avoid breaches of any criminal or civil law, statutory, regulatory or contractual

obligations and of any security requirements 2) To ensure compliance of systems with organizational policies and standards 3) To ensure that various standards set by the Department’s Management,

international bodies, other Government agencies are implemented and that the ICT Processes within the Department are compliant with them.

Scope of usage : all Information Processes. Standards may be external standards issued by agencies outside the Department or Government such as the Control Agencies, International Standards bodies, etc. They may also be internal standards setup by the Department itself. For example, the Department may issue a standard for PC configurations covering the following : clerical PCs, PCs for engineers and PCs for management. Risks : not complying with standards may result in

• Legal infringements • Inefficient ICT processes • Drop in quality

Standard Operating Procedure : 1) Identify the standards in question. These may be standards such as the

following :

Cabling standards : cable speeds, bending radius, maximum lengths, etc ISO9000 standards Year 2000 standards (Though we are after 31-Dec-1999, problems still exist) Standards set by Software Development Processes such as documentation forms,

programming standards, coding techniques, database definitions, etc Auditing standards set by the various Control Agencies in the Government Arabic software standards Purchasing standards set by Tendering Committees or Donors Etc.

2) Train the ICT Unit staff so that they can identify the areas of applications and implement and monitor the standards.

3) Implement the standards as part of properly managed projects.

The ICT Processes Page 13

4) Monitor and audit compliance as an ongoing activity Documentation and Deliverables : 1) A list of all standards to be complied with 2) Documents that define the standards. 3) Implementation procedures 4) Tests that verify compliance 5) Results of the tests prepared on a regular basis Good Practices 1) The ICT Unit should be constantly on the lookout for standards that may be

emerging. Often, getting familiar with a standard during its inception will result in more efficient implementation.

2) Various standards such as the various ISO levels need to be purchased as they

are not available in the public domain. It is a good practice to budget for such acquisitions and to constantly revert to the related web sites for information about upgrades and their related costs.

The ICT Processes Page 14

Activity 8 : How to Manage ICT Projects Objectives : Project Management is an organizational discipline that is becoming more and more accepted as part of ICT life. A major area of inefficiency in ICT Units is the lack of proper Project Management. This Activity emphasizes the role to be played by Project Management in ICT Projects, specifically that of the Project Manager. Scope of usage : covers all types of ICT Projects whether handled by the Department or by its Suppliers. Risks :

• Projects without management will eventually fail. Failed projects will not meet their functional promises, their budgets nor their deadlines.

• Projects without managers will fail in the same manner. • Managers without the right experience, profile and authority will not be able to

manage projects properly. Good Practices and Recommendations : 1) Responsibilities of the Project Manager : it is necessary that the Supplier

appoint a fully responsible Project Manager no matter what size or scope the agreement has. It is also critical for the Department to appoint its own Project Manager.

These two persons will work as counterparts jointly assuring the success of the

project.

The following is a list of responsibilities or functions a Project Manager has, irrespective of whether the post is on the side of the Supplier or the Department :

• Reports to Senior Management • The Manager is the Primary Driver of the Overall Project completing such

activities as : planning, execution, monitoring and control • Coordinates between all parties • Manages product scope and specification • Manages resource allocation • Manages project scheduling • Tracks and monitors all Project activities • Communicates project status and progress • Facilitates team communications and interactions • Communicates with project stakeholders • Decides on key or critical trade off decisions • Analyzes and manages risks • Manages change control and configurations • Implements Quality Assurance to ensures that the project maintains it Quality

2) Modern Project Management techniques : project Management principles

apply to all types of projects. Essentially, general Project Management is not very different from ICT Project Management. The main differences lie in the

The ICT Processes Page 15

management of the scope of the products, ie, technical issues. ICT Projects require the following additional principles and methods :

• The use of business modeling for systems analysis and design • The use of standard Software Development Processes (Review Activity 46 :

Using a Software Development Process). • The implementation of team structures is very specific to ICT processes,

especially those that handle software development. • The content of the following general Project Management processes would be

different for ICT although the techniques are be the same : risk management, quality control, costing, configuration management.

It is recommended that the Department look into the possibility of training their own staff in ICT Project Management. One web site to visit is the Project Management Institute’s website : www. pmi.org. It is a focal point of modern and standardized project management practices.

3) Project Management Software : even if Project Management principles are not learnt with proficiency, it is still highly recommended that the team use a standard Project Management software such as Microsoft Project 2000™.

4) The Department should establish standards for Project Management to be applied

internally as well as requested from Suppliers. The latter can be part of the issued Requests for Proposals. (Review Activity 7 : How to Implement Standards).

5) The Department should establish Performance Measurements and Indicators for

its own Projects. (Review Activity 6 : Setup a Performance).

The ICT Processes Page 16

Activity 9 : Setup the Configuration Management Process Objectives : to setup a Configuration Management process, maintain it and benefit from the results of the information it produces. Configuration Management controls all components in an ICT System such as software, hardware, network components, documentation, training material, media, password lists, etc. It also implements a change control procedure to control and track all changes to the initial configuration. In the Appendix of Supplementary Material of Supplementary Material, the Guide defines the whole Configuration Management Process. Scope of usage : the scope of the Configuration Management process totally depends on what the Department wishes to include in the Configuration. At the most minimal level, this would cover the ICT System hardware, network components and software items. However, many other elements can be added. Risks : not launching a Configuration Management process will lead to the following damages :

• The Department will not know what is included in the ICT Systems which will causes losses, open the system to pilferage, etc.

• The Department will have a difficult time updating, upgrading or gathering information about the status of the system.

• Changes will take place in an ad hoc and uncontrolled manner leading to discrepancies, losses, mismatches and other problems. This is especially damaging in the case of software systems under development.

Standard Operating Procedure : This procedure closely follows the detailed processed defined in the Appendix of Supplementary Material of Supplementary Material. The steps discussed in the Appendix are summarized below. Standard Operating Procedure : Preliminary and One Time Tasks 1) Determine which Configuration Management software the Department wishes to

use to manage the Configuration. Once this is determined, it can be acquired or developed and made ready for use.

2) Develop a Product Numbering Scheme and Hierarchy 3) Develop other coding schemes that may be used such as tag numbers, etc. 4) Identify and Determine the Configuration elements, items, components, etc. 5) Setup all items on the Configuration Database as they are on a specific date. This

becomes the Baseline Configuration. All subsequent additions, deletions and modifications of items in the Configuration must adhere to the Change Control System defined next.

The ICT Processes Page 17

6) Develop a Change Control Mechanism. This will allow the Department to control all additions, deletions and modifications of any item on the Configuration.

Standard Operating Procedure : Ongoing Management of the Configuration 1) Use the Change Control System to ensure that any change to the Configuration is

subjected to the following process :

• Define the information needed to prepare a Change Request • Request the change • Analyze the Request : reason, impact, timing, costs, etc. • Approve or reject the Request (Or request additional information) • Implement the Change • Record the Change in the Configuration Database

2) Changes such as the following are also subject to the same mechanism : addition

of new items to the ICT Systems, deletion of items or their removal or uninstallation as well as any changes such transferred locations, upgrades, etc.

3) Monitor and Track the Configuration through the analysis of the information being

processed in the Configuration. (Review the Appendix of Supplementary Material of Supplementary Material for a more detailed list of such information).

Good Practices 1) What to include in a Configuration?

The Configuration can include but not be restricted to the following items (In alphabetic order) :

• Business Modeling Diagrams • Cabling • Compilers • Databases • Design specs • DLL’s and ActiveX Components • Documentation • Hardware components and units (PCs, modems, scanners, printers, etc.) • Integrated Development Environments • Network components and units • Object code components • Operating Systems • Power components and units • Prototypes • Queries • RDBMS (Servers, clients, etc) • Screen designs • Servers • Shell scripts • Site units • Environment units and test equipment

The ICT Processes Page 18

• Software Applications • Software Tools • Source Code • Style sheets (CSS) • Telecommunications components and units • Test Data • Test Plans • Upgrades and Patches • Web Pages • XML Schemas • Etc

2) Include Minor Databases and Registers : throughout most of the Activities of

this Guide, there is a constant recommendation to setup minor databases, lists or registers as a means of documenting procedures. If the Department sets up a Configuration Management process, it is advisable to setup these databases or lists on the Configuration database. The following are examples of such items :

• Agreements • Agreements with Suppliers • Backup media • Data sheets submitted by Suppliers for various equipment • Items under maintenance agreements • List of suppliers • List of supplies • Project plans • System manuals and documentation • Training institutions • Training material • Workshops and courses of such institutions

Documentation and Deliverables : Over and above the actual software application to be used for Configuration Management, the Appendix of Supplementary Material lists a variety of different analytic reports to be reaped from such an application.

The ICT Processes Page 19

2.0 Managing ICT Human Resources Human Resources are one of ICT’s major problems. The Technology is changing. Staff are not progressively trained. Job Classifications are faulty and neither reflect the Department’s needs nor the qualifications of the recruits. Responsibilities, generally horizontal in the ICT environment, are not clearly understood nor efficiently implemented. All of the above lead to inefficiencies and risks such as :

• Poor performance in all areas of ICT • Errors, rework, reruns, etc. • High turnover of staff • Demotivated staff • Regressing technical knowledge and competence • Problems within Project Management due to improper staff responsibility

allocations The following sets of Activities provide some Procedures and Good Practices related to ICT Human Resources. These Activities are supported by an extensive section in the Appendix of Supplementary Material regarding the Organization of a typical ICT Unit.

The ICT Processes Page 20

Activity 10 : Organize the Structure of the ICT Unit Objectives : to define the Organizational Structure of the ICT Unit according to modern principles. Different periods in ICT history have required different types of personnel with different relationships. Different organizations operating in different environments have also constantly had to change their structures. Hence, the Guide will not be able to propose a standard Organization Chart for ICT Units. The Guide will propose a generic Organizational structure that can be used as the basis for specific Units in each Department. Such a structure is presented in the Appendix of Supplementary Material of Supplementary Material to avoid disrupting the flow of Activities. Scope of usage : the ICT Unit in the Department. However, some Departments might have small isolated ICT units following major Directorates or Agencies that report to the Ministry. These have to be considered as part of the overall structure even though they may not report directly to the ICT Unit Director. Risks : an ICT Unit without a properly understood structure is subject to disruptive behavior :

• Overlap in responsibilities will cause tension and errors. • Specific responsibilities or functions might be left unaccounted for leading to

improper performance. • Personnel will team up in political or social groups causing damage to the overall

work. • The structure cannot easily be modified as technology changes. • Personnel will not be able to view their career path which is demotivating.

Standard Operating Procedure : The Guide will use the term “Position” instead of a “Job”. The term position defines a position that is created by the Department for a specific purpose. This position may or may not be filled. 1) Identify all positions in the ICT Unit and the positions they report to. 2) Use a minor database to setup at least the following data elements for each

position :

Description Date created Grade / Subgrade Date filled Staff ID Position it reports to Responsibilities (Text)

The responsibilities of each person would be as they are doing the work today. It would help to have the persons write down what they assume is their job. The difference between what Management considers their job and what they consider their job can often resolve a lot of issues.

The ICT Processes Page 21

3) Start by charting the ICT Unit on an “AS IS” basis. 4) Proceed by converting existing titles to industry standard nomenclature as

presented in the Appendix of Supplementary Material of Supplementary Material. This would help clarify the responsibilities of each person. This is a Position Classification exercise which is necessary for the other Activities discussed below.

5) Continue by reshuffling responsibilities to fit the new structure for the

Department. 6) If a position is occupied, ie, not vacant, link that position to a simple Employee

record containing at least the following data elements : Staff ID Name Title Date of birth Date of joining the department Educational level (Linked to multiple records) Work experience (Linked to multiple records) By now, the Department should have a fully detailed Organization Chart showing which staff is in which position. Documentation and Deliverables : The above Chart can be in a hard copy but it is recommended to have it in an automated form. Such a form can be as simple as a spreadsheet, a minor database application or a diagram. Acceptance Criteria : The Organization Chart needs to be approved by the Management of the Department before it becomes official.

The ICT Processes Page 22

Activity 11 : Identify the Required Competencies per Position Objectives : to identify which Competencies are required for each Position in the ICT Unit. Competency is a special ability a staff member acquires through training, education or experience. Within the ICT world, this could vary from technical to non-technical competencies. Competence is a major issue in ICT. The Technology changes so fast that staff who are considered experienced this year may be without much experience in a year’s time. Upon defining competencies, they can be used in the following areas :

• A position can be defined by its required Competencies • The staff’s actual Competencies can be identified to assess their fit • Training courses can be defined by the Competencies they enhance • Competencies can be tested for in staff performance evaluations

Scope of usage : the whole Department but specifically, the ICT Unit. Risks : not defining competencies will lead to the following risks :

• Improper evaluation of staff • Inefficient training • A poorly defined Organizational Structure

Good Practices and Recommendations : 1) Identify Expected or Required Staff Competencies for each Position by listing all

experience, knowledge, education or training that each position should have. 2) Review lists of training courses for ICT personnel. This would identify

Competencies that may be required. 3) Group competencies under some classification in order to analyze them jointly.

The following example takes a generalized approach by grouping typical Competencies under two groups :

Non-Technical PC literacy Managing Teams Project Management Configuration Management Human Resources Development Training Business correspondence Presentation skills Reception work English (Writing Level) Arabic (Writing Level) Etc

The ICT Processes Page 23

Technical Developing in Visual Basic Developing in Java XML NT Server Certification RDBMS Design Autocad Lotus Notes

Microsoft Certified Professional (MCP) Microsoft Certified Systems Administrator (MCSA) Microsoft Certified Systems Engineer (MCSE) Microsoft Certified Database Administrator (MCDBA) Microsoft Office User Specialist (MOUS)

Etc 4) Within each Competency, it may be useful to define several attainment level. For

example, Office 2000 capabilities can be defined at beginner, intermediate and advanced levels. The same may apply to Languages : Spoken, Read or Written levels.

5) Review all new technologies being introduced in the Department to establish

whether additional Competencies are to be considered or not. 6) Avoid defining Competencies in a broad manner. This would disable the

Department from evaluating whether a specific person has reached the required performance. It would also stand in the way of clearly identifying training requirements. Try to have a highly focused definition of each competency.

Documentation and Deliverables : A list showing all the Competencies required or expected of the Staff holding such each position in the ICT Unit.

The ICT Processes Page 24

Activity 12 : Identify Actual Competency Levels of all Staff Objectives : to analyze the education, experience, competence and project history of all staff. From this analysis, the Department would get a list of the Actual Competencies each person has. Later on, this can be used to compare the staff’s actual competencies with the expected competencies as defined in the previous Activity. (Review Activity 11 : Identify the Required Competencies per Position). In a later Activity, the Department can analyze the gap between required and actual competencies therefore identifying training needs. (Review Activity 13 : Analyze Competencies to Identify Training Requirements). This would provide the Department with a solid basis for reaching the following :

• Evaluating the Performance of Staff • Planning their Training

Scope of usage : the whole Department but specifically, the ICT Unit. Risks :

• Not knowing the education, experience, competence and project history of the ICT staff may lead to improper use of current personnel, poor career path planning and inefficient training.

• If qualified staff are kept in the wrong positions, this would lead to demotivation and reduced performance as well as increase the risk of turnover.

Standard Operating Procedure : 1) Prepare a list of all Positions in the ICT Unit. 2) For each staff member, analyze the following :

• Training attended within the Department • Training attended before joining the Department • Experience acquired within the Department • Experience acquired before joining the Department • Educational qualifications

3) Identify the Competencies each staff member has.

Documentation and Deliverables : A list of all staff currently in the employ of the Department showing the Competencies of each. Good Practices and Recommendations : 1) Personal interviews may highlight Competencies that were not identified from the

paperwork analysis. They may also help the Department drop some Competencies which were wrongly attributed to the staff member.

The ICT Processes Page 25

2) Testing : in some cases, it may be useful to test staff to verify that they actually do have a certain Competency and that it has not been forgotten due to lack of experience or time.

3) It is often useful to have staff review their own Competencies and those of other

colleagues. This would further help the Management with the identification process.

The ICT Processes Page 26

Activity 13 : Analyze Competencies to Identify Training Requirements Objectives : to identify the training requirements of staff so that the training can be budgeted for, approved, planned and completed. Having completed the two previous Activities of Identifying the required competencies per position and Identifying all staff competency levels, the next step would be to analyze the “Balance” or the “Gap” between what Competencies are required and what each staff actually has. Scope of usage : the whole Department but specifically, the ICT Unit. Risks :

• Lack of proper training leads to reduced performance of the ICT Unit. • If wrong training is offered, this may lead to the same damage • Wrong training will also lead to wasted costs • If staff are trained and not kept satisfied, they would leave the Department either

to another employ or would request to be transferred. Standard Operating Procedure : 1) Complete the Activities discussed in the previous two Activities. These should

produce a list of all required Competencies per position and a list of all Staff along with their actual Competencies.

2) Compare the two lists and identify the “Gap” or the Competencies needed by

each staff member to be fit for the position that he or she is occupying. 3) Gap Analysis may result in the following cases :

• The staff may be over-qualified for the position • The staff may be under-qualified for the position but untrainable • The staff fits the position he or she is in very well • The staff may be under-qualified for the position but trainable

The first two situations have to be dealt with by the Department’s management. The last situation is what is being sought in this Activity. It identifies the staff member who is short of his or her position’s qualifications and would also define the Competencies needed to make the person fit for that position.

4) The list of all staff and their required competencies can now be sorted by Competency. This allows the Department to plan the training for all staff.

Documentation and Deliverables : A list of all staff and their required Competencies. This can be resorted to show each Competency with a list of the Staff that require it. Good Practices and Recommendations : 1) Such an exercise should be repeated at least once a year.

The ICT Processes Page 27

2) Such an exercise should strongly be tied in with Performance Evaluation

practices. It is usual to have yearly evaluations. During each Performance Evaluation, the Department would test whether the particular Competencies had been acquired or not.

3) It is important that a person whose Competency is to be acquired through his or

her own effort and not through training, should be informed that such a Competency will be tested during the next Performance Evaluation. (Examples such as language proficiency, communications skills, etc, can be acquired at the personal level and not through training).

The ICT Processes Page 28

Activity 14 : Identify Training Resources Objectives : to setup and maintain a register of available training. There are many institutes offering training courses, workshops and programs in the field of ICT. With the advent of the Internet, many sites also offer free or chargeable online training. Risks : not having lists that are up to date will lead to loss of time when training is required. Secondly, not knowing what is available in terms of training may lead to misconceptions about what the staff may require in terms of their training. Standard Operating Procedure : 1) List all institutes that offer training with data about them : location, contacts,

type of workshops, etc. 2) List key training areas offered by each institute 3) Relate each training area to specific Competencies identified earlier. 4) Correspond with institutes to keep the Department up to date. 5) Maintain a table of website links that offer free or chargeable online training. Good Practices and Recommendations : 1) The Department should have cost estimates for most of the training being

investigated. 2) Technical exhibitions and forums can be of major benefit. These do not represent

formal training. However, attending such exhibitions is always educational and would provide the staff with exposure to new technologies and products as well as present them with the chance to collect data sheets, attend lectures and discussions.

3) Such information collected by various ICT Units in the government should be

consolidated. It can then be shared by setting it up on the web.

The ICT Processes Page 29

Activity 15 : Manage Training Material Objectives : this Activity presents some Good Practices that aim at maintaining a list of all training material : documents, CDs, tutorials, web sites, etc. Different persons will attend different workshops or courses and bring back training material with them. Invariably, such material gets spread around the Department and will not be shared resulting in lost resources. Scope of usage : all the Department including the ICT Unit. Good Practices and Recommendations : 1) Prepare a register of all such training material. 2) Such material can also be included in the Configuration Management database.

(Review Activity 9 : Setup the Configuration Management Process) 3) Share such registers or lists via the internal site of the Department or through

regular announcements or inter office memorandums.

The ICT Processes Page 30

Activity 16 : Maintain Training Records Objectives : to setup and maintain a Training Control Database. Training control systems have wide functions. However, it can be a simple matter to maintain a set of Training records for the ICT Unit staff. The main purpose would be to plan training, assign courses to staff and track the results of training per person and per institute or instructor. The application would cover the following functions by setting up the following records : Staff members Training institutes or training resources Available workshops/courses Required Competencies Actual Staff Competencies Planned training (Workshops, courses, etc)

Records of the actual results with evaluations of courses, instructors and attendants

Costing analysis Scope of usage : all the Department including the ICT Unit. Suggested Approach The Department can acquire such a system commercially. However, the design is not very complex and can be easily developed into a minor database.

The ICT Processes Page 31

Activity 17 : Define Recruitment Standards Objectives : to standardize recruitment practices and get the best out of recruitment of staff. This Activity suggests a way to automate the Recruitment process. It also recommends the maintenance of an applications register that allows the Department to review its applicants and follow up on their recruitment. Scope of usage : all personnel including ICT staff. Risks : if such practices are not implemented, the Department risks the following :

• Accepting staff with the wrong or fraudulent credentials • Insufficient knowledge about the recruit may result in accepting staff for the

wrong positions Good Practices and Recommendations : 1) Irrespective of the title being advertised, it is best to include in the clear job

definitions to avoid receiving more applications than needed. 2) On receiving applications, it is important to check work references. Some

applicants glorify the work they did at specific jobs. 3) Many applicants skip over jobs they had problems with. Gaps should be checked. 4) Educational qualifications should also be checked. 5) Multiple interviewing should take place either through panel interviewing or

through a series of interviews with different persons. 6) It is usually the case that ICT staff only get checked by ICT experts. This practice

is not efficient as an employee is not only recruited for his or her technical knowledge. Experts in related areas such as the unit that will benefit from ICT Services or the Financial Unit or Human Resources should also be part of the interviewing process.

7) On recruiting a person, it should be easy to find a short term project that the

person can complete as a test of his or her capabilities. Projects in the order of one or two weeks should normally be sufficient to verify the competencies of the new recruit.

8) It should be a simple matter to setup a basic database of all CVs received. Very

often, the Department may already have applications that they need on such a database thus avoiding time loss and additional advertising costs.

9) Review the Appendix of Supplementary Material for a presentation on the

setup of an applications register to help monitor, track and control the applications received by the Department.

The ICT Processes Page 32

3.0 Relationships with Suppliers Due to the wide variety of products and services needed by ICT Processes, suppliers become a major part of the ICT Processes supplying the Department with such a variety of products and services as the following :

• Hardware • Networking components • Telecommunications Services • Web based services • Software of all types : operating, tailored, off the shelf applications, office

technology, networking, development tools, database engines, etc • Training • Support and maintenance • Recruitment • Secondment of staff • Etc

Some of the above products and services may be internally supplied, so that in a proper ICT environment, it may be necessary to apply the same Good Practices to Suppliers as to the internal sources. The relationship with Suppliers needs to be Quality Controlled. Proviso This ICT Process in this Section as well as those in the next Section on the various Qualifications are closely related to Procurement Policies that the Government and/or the Department may already have in place. It is important to recognize the Activities in these Sections as being recommendations and guidelines and that in no way will the recommended Procedures and Good Practices replace official procurement policies but should be supplementary to them.

The ICT Processes Page 33

Activity 18 : Prepare a List of Supplier Products and Services Objectives : to setup a list of Suppliers with their offered products and services. Suppliers are no more specialized as they were in the 80s and 90s. Suppliers that only sold one type of product can now sell hardware, software, web services and consulting. Setting up a list of Suppliers on a minor database will allow the Department to easily locate suppliers by product or by service. Furthermore, this list can be used to maintain a history of the relationship with the supplier evaluating their performance, prices and general quality. This Activity does not replace that of Supplier Qualification or Audit presented in the next Activity. It compliments it by providing the Department with a wider list of products and services to select Suppliers from. After such a selection, Supplier Qualification may take place. Scope of usage : the Department can expand this Activity to cover all products and services that it is interested in. However, the Activity will address ICT services and products. Risks : should the Department not have such a list :

• It would take a longer time to arrive at the right choice of products and services in the market.

• The lack of history tracking may cause the Department to purchase products and services from suppliers that it had had a problem with in the past

Standard Operating Procedure : 1) Identify the major areas of Products and Services that the Department is

interested in. 2) Prepare a multilevel classification of such Products and Services. This can be used

to speed up search and cataloging. 3) Setup a minor database that contains a record for each Supplier. The database

can have the following functions :

• A record for each supplier • A list of all products and services per supplier • A list of the history of the Department’s transactions with the supplier • The profile of the supplier : experience, typical projects, etc • The team in the supplier’s company that may be of use to the Department

Documentation and Deliverables : The database setup above that can produce lists of Suppliers or lists of products and services.

The ICT Processes Page 34

Good Practices and Recommendations : 1) As there would be many suppliers promoted on the web, it would be useful to

include such information on the Database. 2) It is important to coordinate with other Departments to avoid duplicated effort as

other Departments would have most likely gone through a similar exercise. Furthermore, the experiences with different Suppliers may then be shared. This

would ensure that Suppliers improve their products and services. 3) Consult various directories to update the database. Currently, there are several

companies promoting business directories, some general and some directly focused on ICT products and services.

The ICT Processes Page 35

Activity 19 : How to Audit or Qualify Suppliers Objectives : with such a wide variety of suppliers in the market, the Quality of the supply process becomes a critical issue to the Department. This Activity prepares the Department with some Good Practices that result in Qualifying Suppliers. This is not to be confused with some very strict and disciplined procedures for “Prequalifying” Suppliers which may be project specific. This Activity presents a single process that allows the Department to qualify whether it wishes to acquire products and services from this Supplier in the future or not. Scope of usage : mostly applied to Suppliers with whom the Department enters into a Commercial Agreement. However, it may often arise that the Department can be the beneficiary of products and services from International or Local Donors. It also often happens that the Department may acquire products and services from other Departments. All of these have to be taken into consideration when Qualifying Suppliers (Or sources). Risks : should the Department not have a Supplier Qualification procedure, the Department may end up dealing with Suppliers that are of lower quality than it expects. Standard Operating Procedure : 1) Supplier Lists : prepare lists of Suppliers classified by type of service or product.

It is a Good Practice to setup an efficient database that sets up other data about Suppliers such as size, history, location, key personnel, etc. This was discussed in the previous Activity 18 : Prepare a List of Supplier Products and Services.

2) Define the Type of Relationship Required : such relationships between the

Supplier and the Department may be ongoing or may be defined on a one time or a project specific basis.

The Department needs to establish the different types or level of relationships it requires from Suppliers. These are some of the usual levels of relationships :

• Long Lists of Suppliers that are suitable in general terms • Short Lists of Suppliers that are more focused on specific projects • Final Supplier Qualifications where selected Suppliers are subjected to very

strict procedures of Qualifications in a specific project. • Prequalified Suppliers that have been subjected to formal procedures of

Qualification and are found suitable in general terms.

3) Each of the above relationships should have its own Qualification Procedures. For example, here is a typical definition of a Short List relationship :

“For the Supply of Office Technology Products Training, the Department requires a minimum of 3 and a maximum of 6 Suppliers to form a Short List. These Suppliers should be evaluated with the following criteria so that any Supplier not scoring above 70% would be dropped from the evaluation and the Department will then select the Suppliers with the top 6 scores :

The ICT Processes Page 36

Relevant experience in general and for the specific project Team profile References Age of company Prior dealing with the Department Compliance levels (ISO, DIN, BSI, etc) Financial standing Etc.

4) Evaluation Criteria are the heart of Supplier Qualification. Without clear evaluation criteria, Supplier Qualification will not be Quality Controlled. The Department needs to define very clear and easy to test Evaluation criteria that allow the Department to accumulate scores for each of the factors it wishes to use while Qualifying a Supplier.

Example : Long List Relationship : since this is a general list for use while

prospecting for Suppliers, rigorous testing may not be possible. Therefore, the Department may find it simple and efficient to use 3 point scales for such evaluations as the following :

Relevant experience (Yes, Maybe, No) 15% Team Profile (Good, Medium, Bad) 15% References (Good, Medium, Bad) 15% Age of Company (Old, Medium, young) 10% Prior dealing with the Department (Good, Medium, Bad) 10% Compliance Level (ISO9000) (Yes, No) 30% Etc. (Weights will then total 100%)

Example : Short List Relationship : a Short List will usually result in a set of Suppliers invited to bid on a specific project. Therefore, short lists are more demanding. They would require to have more rigorous testing such as sample work, site visits, documented evidence, etc. Therefore, the Department would find it necessary to expand the evaluation scale and use percentages.

In all above tests, the Department should use the Weighed Indexing Scoring

Method to arrive at its results. This procedure allows the analyst to normalize and convert such criteria into one evaluation score. (Review the Appendix of Supplementary Material where a detailed presentation is given of the Weighted Index Scoring Procedure).

5) Qualifying Methods : depending on the nature of the project and the relationship that the Department is going into with the Supplier, it may use one or more of the following Qualifying Methods :

• Documented evidence • Certified evidence • Letters expressing interest in joining projects • Proposals • Company profiles / brochures • Company presentations

The ICT Processes Page 37

• Product data sheets • Product specifications • Site visits • Product demonstrations • Response to questionnaires and specific surveys • Interviews with key personnel • Reference checking • Qualifications checking • Educational checking • Compliance certification • Evaluation of specific processes (Software development, installation

procedures, training schemes, etc) 6) Documenting Qualifications : having established the Evaluation Criteria in very

clear terms, all Supplier evaluations must be documented and approved by the Evaluation Committee. Such documentation may be recalled in case of disputes or contestation. Furthermore, future Supplier Qualification exercises may benefit from the results of earlier findings.

Good Practices and Recommendations

1) Coordinate with other Departments who may have already carried out the exercise of preparing such lists. In the future, the whole Government should be able to share such information, especially if it is web based. This would also make it easier for the Suppliers to keep their data elements up to date.

2) Quality Assurance Methods at the Supplier’s : department should investigate any quality assurance programs used by the Supplier, their programming standards, Software Development Processes (SDP), implementation methodologies and their documentation reviews.

3) Compliance with International Standards : in some situations, the

Department would expect the Supplier to comply with specific International Standards such as the various ISO standards. The Department should identify such standards and request the Supplier to confirm compliance with them.

Documentation and Deliverables : 1) Supplier Lists 2) Evaluation Criteria 3) Qualification Results Generally, it would be Good Practice to setup a database for each Supplier and then setup a record for each time the Supplier was subjected to a specific Qualification Exercise.

The ICT Processes Page 38

Activity 20 : Prepare an Agreements Register Objectives : to prepare a list of all current agreements between the Department and any outsourced services. The purpose would be to consolidate the location of such agreements, monitor and track their performance as well as their other terms such as renewal, expiry and payment schedules. Such a register would also allow the Department to analyze possible cases of conflicts of interest. Scope of usage : generally, this Activity is concerned with current Agreements. However, there will be cases where agreements lapse for a short period or when agreements expire but the information they contain is of historical or auditing value to the Department. These two types should also be included in the list. The following types are some of the agreements this Activity covers :

• Purchase agreements • Maintenance and support • Training • Consulting services • Secondment

Risks : should a list of agreements not be available, the following might take place :

• Agreements might lapse giving the Supplier the chance to change his terms with the Department.

• Conflict of interest may arise. For example, a Consultant might be assisting the Department in one project only to find out that the same Consultant is bidding for a Software Development project with the Department.

• Payment schedules may be missed. Standard Operating Procedure : 1) Identify all agreements with the Department 2) Setup a minor database that houses such data elements as :

• Agreement data : supplier, date, reference, expiry, etc • Scope of agreement : deliverables, scope of work, schedules • Renewal terms • Physical location of agreement document (Or file number) • Brief description of agreement • Main items to be delivered • Financial terms

3) Update the database on a regular basis as and when agreement elements

change. 4) On a regular basis, analyze the database to list all agreements that are about to

expire during the next month or two.

The ICT Processes Page 39

Documentation and Deliverables : List of all agreements with minimal data elements. Good Practices and Recommendations : 1) Setup the agreements on the Configuration Management database 2) Link the agreements database with the Supplier database discussed in Activity 18

: Prepare a List of Supplier Products and Services.

The ICT Processes Page 40

Activity 21 : Evaluation of Suppliers, Products, Projects or Alternatives Objectives : this Activity presents a summarized procedure on how to compute Weighted Indices that combine various evaluation criteria into one number or index. When evaluation criteria of proposals are not clear, Suppliers will unbalance their offers to ensure that get selected. A more elaborate and detailed discussion of the Weighted Index Scoring Procedure is available in the Appendix of Supplementary Material. Scope of usage : whenever the Department wishes to evaluate Suppliers, Offers, Products, alternatives the Weighted Index Scoring procedure can be used. It can also be used for internal purposes such as Performance Evaluation of staff, projects, etc. Risks : without proper evaluation, the following risks may arise :

• Suppliers may contest the selection process • The selection process may result in unsuitable choices being made • Suppliers may bias their proposals on false assumptions being made by them as

to what is “important” to the Department Standard Operating Procedure : 1) Select the factors that best reflect the criteria that are important to the

Department and make them the Evaluation Criteria for the offer. 2) The following are examples of Evaluation Criteria that are mixed in that they

apply to different Information products and services : Reliability Technical fit with the Department’s requirements Profile of the team Profile of the company Relevant experience Knowledge of the business domain of the Department Timing Price Offered features Responsiveness to RFP (Have they understood what was requested) Project Planning Additional features 3) Assign weights to such criteria. Examples : Typical Government Tender on best price Price 100% Equipment RFP on price and features Fits with Requirements 30% Price 70%

The ICT Processes Page 41

Consultancy Services Price 30% Company Profile 15% Team’s Profile 20% Responsiveness to RFP 10% Relevant Experience 25%

Of course, any of the above criteria can be broken down further such as the Experience in the last example :

Relevant Experience 25% can be broken down into : Technical fit 10% Business domain fit 10% Project management 5% 4) Identify any pass/fail criteria. For example : “Companies that do not get 70% on their technical score will not be considered in

the overall selection”. 5) Publish the evaluation scheme in full detail in the Request for Proposal so that

Suppliers can prepare their proposals according to the defined weights. 6) On receiving the proposals, each offer needs to be evaluated and scores given to

each criterion. The best score would be computed using the Weighted Index Scoring Procedure defined in the Appendix of Supplementary Material.

Documentation or Deliverables : 1) The full evaluation scheme : the criteria, the range of scores, the weights and any

pass or fail conditions. 2) A list of all items to be evaluated with all their scores 3) The computation of the Weighted Index Score for each item Acceptance Criteria : when the best item is selected according to the Weighted Index Scoring procedure, the Activity is accepted.

The ICT Processes Page 42

Activity 22 : Recommended Issues to Consider in ICT Agreements Objectives : many attempts have been made to develop Standard Agreements betwee customers and suppliers. Due to the changing nature of technology, the different circumstances surrounding each agreement and the various policies and strategies followed in different Departments, it becomes very difficult to develop such Standards. This is a fairly long Activity. It discusses a variety of problematic issues that may arise while preparing Agreements and proposes solutions to such issues. Scope of usage : the typical Agreements that will be considered are the following :

• Purchase Agreements • Requests for Proposal • Support Agreements • Maintenance Agreements • Warranties

Risks : poorly developed agreements may never be a risk until disputes take place. In all cases, whether it wins or not, the Department would be the loser. It is the Department’s objective not to have to fall back on Agreements and litigate. Therefore, the major risks of these Activities are :

• Lack of agreements • Poorly written agreements • Agreements based on Supplier Proposals • Agreements that over-pressure the Supplier leading to eventual poverty in

delivery and performance • Agreements that do not address the issues discussed in the next few subsections

Specific Activities will have their own Risks and will be discussed in what follows. 3.1 Including Technical Specifications in Agreements In Section 4.0, the Guide presents a set of Qualifications, starting with the Specifications Qualification (Review Activity 23 : Specification Qualification (SQ) and Activity 1 : Define Business Objectives as Related to ICT). These two Activities provided SOPs that ensure that proper designs have been made and that Specifications to be used as the basis of delivery are in place. The Guide will not expand on this issue in this Section. 3.2 Schedule and Timing of Product Deliveries After the Technical Specifications, the second most important element in any project is the Schedule and Timing of activities. Many Agreements present a broad listing of target dates and delivery times. What is missing are some of the the following crucial dates :

• Detailed start and end dates of each activity in the project • Identification of key milestones • Identification of Delivery and Acceptance periods and expiries

The ICT Processes Page 43

• Identification of Warranty period starts and ends • Identification of points when payments are to be issued

Also missing are the following elements related to timing :

• Sequencing of Project activities • Contingency planning in case there are delays in the activities • Manning or the effort required to complete the activites needed to evaluate the

reality of scheduling • Assignment of Project personnel to individual activities

Here is a broad procedure for preparing the timing : 1) The Department usually starts by defining a broad and general timing. This would

be based on key milestones in the project. 2) The Supplier will then analyze the Products and Services being proposed. 3) Based on such analysis, the Supplier will then prepare a rigorous timing plan that

contains all activities, their duration and their sequencing. In the Request for Proposal issued by the Department, it is highly recommended to request the Supplier to submit a Project Plan, including all the above elements, in an industry standard Project Planning Software product such as Microsoft Project 2000™. 3.3 Costing and Other Financial Issues Usually, most agreements are overly concerned with financial issues. However, there are various weaknesses to be avoided. 1) Internally, the Department should rigorously estimate the overall cost of the

products and services being requested. Poor estimates result in the following risks :

• Proposals may result in wild variations leading to project cancelation. This

causes time loss and is unfair practice on the Suppliers. • Suppliers may have prior knowledge of these poor estimates and may gear

their proposals according to them. This would result in poor deliverables being proposed.

• Poor estimates may result in unrealistic scheduling of the Project. • Estimates that result in larger than budget figures may cause the project to

be unnecessarily cancelled. 2) Payments should be related to specific deliverables that have a very clear

Delivery and Acceptance Procedures. (Review the discussions in Section 4.0 : Qualification Processes)

3) Gear payments to the actual work or deliverables by the Supplier. Suppliers often

suffer because the schedule of payments does not reflect the work or deliverables

The ICT Processes Page 44

being submitted by them. This puts a strain on their cash flow which will only reflect itself on poorer performance and corner cutting.

4) Exchange Rates : clarify currencies in which payments are to be made and what

happens on the dates of payment should the rates differ. 5) Escalation Factors : costs must be projected over the coming years. If that is

not possible, an escalation factor must be specified that the supplier of such services must adhere to so that coming costs are not increased by more than the said factor.

6) Fixing Floats : The pricing of future products can be fixed by relating it to a

percent float above an international price list or any other basis that is mutually agreed upon.

3.4 Software Upgrades and Updates Software often goes through different releases and versions resulting in major upgrades or minor updates. 1) Agreements should clearly specify whether the Supplier is responsible for

supplying such upgrades and updates and at what cost. Otherwise, the Supplier would be under no obligation to provide the Department with such upgrades / updates.

2) It is critical in an agreement to specify the duration during which the Supplier is

obliged to provide such upgrades and updates. 3) Upgrades or updates may require conversion of databases or some rework on the

data. It should be clearly spelt out in the Agreement as to who is responsible for such conversions.

4) Upgrades or updates may also require the updating of source code in developed

applications. The Department should clearly cater for this situation : who is to redevelop the software, at which cost and how long that would take.

3.5 The Supply of Source Code Source code is always an issue in Software Contracts. There are two perspectives to this problem : The Supplier’s Argument : the supplier may have spent a lot of effort to setup standard interfaces, components, reusable routines, clever solutions of problems. Suppliers are usually reluctant to expose such practices. Secondly, with the Source Code in their hands, Suppliers ensure continued maintenance and support agreements. The Department’s Perspective : without Source Code, the Department is exposed to the risk of the Supplier going out of business or being acquired by other companies. In such cases, there is a risk of the software not being maintainable or supportable.

The ICT Processes Page 45

Secondly, Departments often feel that Suppliers hold them hostage because Suppliers have the Source Code. Both these views seem reasonable. However, there are clarifications and solutions to the stalemate that often arises regarding source code custody : 1) It is cheaper for Suppliers to maintain and support software than it is for a

Department to learn and train its development staff to support the software. In most cases, software companies do not have sufficient documentation within their source code making it even more difficult to support by parties that were not part of the development process from the start.

2) On acquiring the source code, most Suppliers would renounce their obligation to

support the application. The application responsibility becomes that of the Department.

3.5.1 Suggested Solutions It is recommended that the Department avoid problems related to support stoppage through the following suggestions : 1) The Source Code should be made accessible in the case of bankruptcy or

acquisition of the Supplier by other interests not obliged to continue with its support.

2) Agreements can state that the Source Code be placed in escrow with a Bank.

Under specific conditions, such as bankruptcy or stoppage of work, the Source Code can be made available to the Department.

3) It is usual to state in such agreements that the Source Code is only to be used for

internal support of the Department’s application and that it cannot be used by other parties nor divulged to them.

3.5.2 Data Structure vs Source Code There is often confusion in the mind of ICT Units between Source Code and access to data. In the case where the Department is only interested in accessing the data as it pleases, problems can be avoided by the Supplier providing the Department with a clear definition of the Database Structures. The ICT Unit can then use various Report Generators or even develop software to access its own data analysis and report production. However, such a procedure also has its risks :

• Without proper documentation and training, users may not have a clear idea of what the various data elements mean and how the data is structured within the database. This might result in data inconsistencies and erroneous reporting.

• Inexperienced users may strain the system by devising queries that place major loads on the system.

The ICT Processes Page 46

In all cases, data structure and its issues should be separated from the issue of Source Code. 3.6 Maintenance and Warranty Services In some cases, Maintenance is a continuation of the Warranty. In others, the services offered in each are different. 3.6.1 Warranties and Maintenance on Equipment 1) The Department must have the Supplier clearly spell out what parts of the

equipment can be replaced free of charge. Generally, parts that are fixed and subject to failure would be while consumables or items that are under heavy usage such as print heads are not cover by warranties.

2) Duty cycles should be observed and defined. Invariably, one does find a small line

of print that limits the usage of a specific product to so many hours of non-stop work. (For example, some printers are not to operate continuously for more than a specified number of hours).

3.6.2 Warranties and Maintenance on Software Generally, here are the services generally provided as part of the Warranties and Maintenance of Software items : 1) Correction of errors : the term “Error” should be clearly defined. Generally,

errors are undisputable discrepancies such as : Wrong totals or computations Misalignments

Actions that promise a result and do not perform it (Buttons, menus, etc) Crashes or application hangs Misleading error messages All spelling mistakes and typographic errors

Improper sequencing of work (Links that send you to the wrong place) 2) Supply of missing functions : should any function defined in the Technical

Specifications not be available in the delivered software, then this may be subject to Maintenance terms. The Supplier would have to supply it.

3) Performance issues : generally, performance is difficult to specify. However,

there are accepted rules of thumb as well as clear technical specifications. The issue of Performance is discussed in Activity 26 : Performance Qualification (PQ).

4) Upgrades and updates are often included as part of Warranty and Maintenance

services. (Review Section 3.4 for some restrictions on such upgrades and updates).

The ICT Processes Page 47

3.6.3 Terms Applying to Both Hardware and Software 1) Specify clearly when the Supplier can be called. Usually, a business shift is

specified so that calls outside it are either not answered or are chargeable at different rates.

2) Specify clearly how long a Supplier can take before responding to the first call. 3) Having taken the first call, specify clearly how long a Supplier can take before

resolving the problem. 4) Specify clearly what contingency plan the Supplier has if the problem cannot be

solved. An example for hardware maintenance would help :

• Maintenance Hours : 8:00 till 14:00 • Calls made after 14:00 will be charged at an agreed upon rate. • Calls should be responded to by a visit within 8 working hours from the time the

call was placed. • Any problem should be resolved within 16 working hours (2 days) of the

response. • Should the problem not be resolved within 16 hours from the response, then the

Supplier has to replace the component with a working one or change the unit at no additional charge.

3.7 Support Agreements Many agreements confuse support with maintenance and often combine the two. This eventually leads to disputes. Maintenance aims at retaining the system in the working state which it was supposed to have been delivered in. It is the responsibility of the Supplier. Support is any additional effort the Supplier has to put to support the Department. Support includes such effort as :

• Additional training • Resolving problems which are outside the control of the Supplier such as

breakdowns due to damages, power failures, force Majeure, etc. • Assisting users in activities which are outside maintenance • Developing minor reports, modifications and enhancements • Secondment of personnel during critical periods such as end of month, end of

year, closings, etc • Undertaking activities that are outside any agreed upon work such as upgrades,

migration, re-installing software, trouble shooting, etc. Since Support is labor intensive, the following guidelines are suggested :

The ICT Processes Page 48

1) An estimate can be made of the time that needed from the Supplier in terms of support hours per year.

2) Because such effort is to be booked in advanced, the Supplier will generally offer

them at a lower rate. The total is then booked at an agreed upon rate. 3) Should these hours not be used, the Supplier will still get compensated because

of the commitment he made. 4) Should the Department use more than the agreed upon hours, a rate for

additional hours will be agreed upon and used as part of the agreement. Generally, it should be lower than the yearly rate.

5) Whenever support is needed, the Department will request it and document such

requests. 6) When possible, the Supplier will provide estimates of specific support work to be

carried out. The Department will need to approve such estimates before they can be executed.

7) On a monthly basis, the Supplier will submit a statement of all hours used so far.

Only those officially requested and approved are included in the statement. 3.8 Ensuring Continuity of Services Schemes should be established to ensure that the Suppliers guarantee continuity of services in terms of supplying maintenance, support, spares, new products. Here are some recommendations : 1) Duration of service : the agreement should include a commitment by the Supplier

to maintain his products up to a specified number of years. Penalties should be included in case the Supplier defaults on this condition.

2) Spare Parts : with changing technology, products are often withdrawn from the

market after a few years and spare parts get into short supply. The Department should estimate the life cycle of the products it is acquiring and ensure that spare parts are made available by the Supplier during that period. Failure to do so should result in compensation by the Supplier or change of equipment.

3) Software upgrades : as per the earlier paragraph on Software Upgrades and

Updates, the Agreement should also specify as to how long the Supplier is under an obligation to provide such Upgrades.

3.9 Delivery and Acceptance Criteria This is one of the most serious areas of disputes between Suppliers and their customers. The main reason is the lack of an agreement on how such Deliveries are to be made and what constitutes Acceptance Criteria.

The ICT Processes Page 49

Review Activity 24 : Installation Qualification (IQ) and Activity 25 : Operational Qualification (OQ) for a detailed procedure for Delivery and Acceptance. 3.10 Authorization of Staff Suppliers often deliver goods without there being a recognized party that has the final authorization in certifying that the goods have been properly received. This will lead to disputes because invariably, payment terms are tied to certified deliveries which in this case would be postponed. It is important to ascertain that persons expected to carry out key work in a project or an agreement are authorized to do so. This is applicable on both the staff within the Department and those carrying out the various activities in the agreement. 1) For each deliverable, state clearly which party is responsible for :

• Delivering it • Installing it • Ensuring that it is operational • Certifying that it has been properly received as per agreement

2) In critical situations, it is important to have a written authorization for such

persons. 3) In the case where such persons are to be changed, documented notices should be

issued by the Project Manager. (Review Activity 2 : Initiate and Plan the Good Practices Project where the Guide discusses the importance of Project Management and the role of the Project Manager). 3.11 Copyrights and Intellectual Property Various problems arise when Suppliers supply systems with software that is not legally licenses for that system. This often happens with built in databases or software that is inadvertently left on the installed systems. Risks :

• Such installed software may be incompletely installed or may require modification to the installed components. Therefore, at some time, the Department will need the original media which are not available.

• It may not be possible to upgrade such software free of charge or at nominal costs because it is not legally registered.

• No support on such software

The ICT Processes Page 50

Good Practices and Recommendations : 1) Illegally installed software is theft. To ensure that the Department stays on the

right side of the law, make sure that a license document for each item of software acquired is submitted with the software.

2) Always register the acquired software. This will make available to the Department

upgrades, patches, new announcements and support. 3) Note that “Shareware” is not equivalent to legally licensed software. The usage of

such software beyond specified time limits becomes illegal. 4) Investigate carefully the End User License Agreement (EULA) for the software.

Some software may only be licensed on specific number of machines or may be restricted from usage in specific environment.

5) Some software requires upgrades in registration to maintain it in a valid form.

Using the software beyond the expiry of the current registration is not illegal but will not avail the Department with the benefits of upgrades, support and announcements.

The ICT Processes Page 51

4.0 Qualification Processes A Qualification is a condition or standard that must be complied with. Qualifications are critical because they are the basis of Agreements between the Department and its Suppliers, even if these are internal Suppliers. Qualification processes are usually required during any of the following processes :

• Development, installation and use of software applications • Design of hardware configurations : networks, minicomputer systems, etc. • Implementation of telecommunications networks • Development of web based applications • Preparation of computer sites along with all environmental equipment and

testers. • Consultancy services : design, supervision, project management, etc • Training

Whichever of the above processes is being implemented, externally or internally, the Department needs to go through 4 types of Qualifications as in the following diagram.

SQ achieved duringDesign of Product

Qualifications performed byBusiness Analysts / Designers

IQ Performed byQuality Assurance Staff

PQ Performed byQuality Assurance Staff

IQ Performed byQuality Assurance Staff

SpecificationQualification

SDP orTechnicalProcesses

InstallationQualification

PerformanceQualification

OperationalQualification

Analysis andDesign

Developmentor

Construction

Installation

Use

3

2

1

4

1) Analysis and Design : during that phase of the overall delivery process,

Specifications produced by the Designers must be qualified. The Specifications Qualification has the objective of ensuring that the Technical Design will result in a product or a service that complies with the Requirements of the Users.

The ICT Processes Page 52

2) Development or Construction : in software projects, the term “Development”

is used. Increasingly, the term “Construction” is being used to cover the phase in all projects where the deliverables are being “built”. The Development phase will requires ongoing qualifications. However, these are usually technical and follow the technical processes being used. Such technical processes will not be discussed in the Guide. For example, the Department may select to use Microsoft’s Solution Framework Software Development Process. Within that process, there are various checkpoints and milestones that qualify whether the designs are being properly developed.

3) Installation : starts with delivery, goes through the installation of the products

and ends with the operation of the systems. Installation covers two major Qualifications :

Installation Qualification aims at ensuring that the products have been

properly installed and are ready for operation. Operational Qualification aims at ensuring that the products, once installed,

operate properly and are ready for use by the User (And for the next qualification).

4) Use : once the systems or the products are ready for use, ie, they have passed

the Operational Qualification, Performance Qualification is carried out to ensure that the products are performing within their expected performance ranges. This normally includes response time, speed, capacity, throughput, etc.

The above four Qualifications are presented in the next few Activities.

The ICT Processes Page 53

Activity 23 : Specification Qualification (SQ) Objectives : the purpose of Specification Qualification is to show that the controls required to specify the design have been addressed and agreed upon by an authorized party. The objective of this Activity is to provide an SOP for the Qualification of a wide variety of Specifications (SQ). Definition : the SQ is a technical, quality and commercial review of any product or service that the Department is interested in acquiring externally or developing internally. Once developed, the SQ becomes the basis of Delivery and Acceptance of the product or service and hence the heart of any Commercial or Internal Agreement. Example : a UPS has Specifications such as power capacity, battery capacity in ampere-hours, number of output connectors, whether there is an RS-232 connection and related software to use on the connected PC or not, whether there is an alarm when power is down or unstable, etc. These are technical Specifications and can be verified by a Specifications Qualification. Other issues to be raised in the Specification relate to how the UPS operates :

• What happens when the power goes down? • What happens when the power resumes? • How do we charge the unit on first use or after stoppages? • How do we turn off the alarms? • How do we run the software on the PC so that it can shut down the operating

system with impending power drops? Risks : the importance of the proper Specification of systems cannot be underestimated. The lack of proper specifications is one of the major causes of failed ICT projects. Projects would develop disputes, inappropriate deliveries and deliverables that do not meet user needs. Such risks result from any of the following :

• Not having Technical Specifications • Improper specifications or those that have not been properly qualified or

validated • Specifications prepared by persons without the proper and related experience • Specifications based on proposals or verbal definitions

Scope of usage : all system processes listed at the beginning of this Section :

• Development, installation and use of software applications • Design of hardware configurations : networks, minicomputer systems, etc. • Implementation of telecommunications networks • Development of web based applications • Preparation of computer sites along with all environmental equipment and

testers. • Consultancy services : design, supervision, project management, etc • Training

This Activity covers a variety of situations :

The ICT Processes Page 54

• when the Department is issuing an RFP that contains a design • When the design team of the Department is preparing designs for its internal use

while developing or building systems • When the supplier is proposing a system and must include a design with the

proposal • When one of the products or services a supplier is delivering includes a systems

design. Standard Operating Procedure : The following procedure applies to all the above cases : 1) Identify the party that will approve the design specifications. The party should

be given the authority to approve such a design. This may be a single user or a Technical Evaluation Committee.

2) Establish Standards : define ahead of time what standards are required to

ensure that a specific function or feature is properly specified. Example : while developing software specifications, the Department may have a

set of standards for systems design.This is particularly critical for software applications.

Example : while defining a network, the Department may have a standard for

drawing the network topography may be used.

This is a critical step as it is such standards that will be used when evaluating the design in this SOP.

3) Collect Required Documents : identify and collect the documentation that the

Design would be based on. Such documents as the following may be needed :

• User requirements specification • Functional specification (if available at this time) • Supplier qualification or Audit Report • Any related agreements • Any purchasing standards • Technical drawings • Data sheets for equipment • Catalogs • Etc

In the case of including the design in an RFP, such documents must be included in the RFP as an appendix.

4) Involve Users : ensure that the staff who will be the direct beneficiaries and users of the deliverables are part of the planning process that defines what is to be designed. The users must then analyze all documentation and approve it.

5) Review Specifications : the team setup to evaluate the specifications will now

review the specifications and establish whether or not they consist of a complete

The ICT Processes Page 55

system design that can be used for later construction, development, delivery, installation and use.

6) Approve the Specifications : once the Specifications are seen as fit, they can

be approved and hence, released as the Technical Terms of Reference. Documentation or Deliverables : 1) The design documents 2) All supporting documents 3) Standards for accepting Specifications 4) Specification Qualification Review report Good Practices and Recommendations : 1) In the case of complex designs, it may be useful to submit the design to experts

outside the Department. An independent objective review may pinpoint design weaknesses that are hard to see by the team developing them. Such parties can be other ICT Units in the Government or independent third parties such as Consultants.

2) The presentation of the design in the RFP will be read by private sector parties. A

good practice is to ensure that the design, is very clearly presented. Some designs that are included in RFPs are only clear to the parties that developed them.

3) What to do with Demonstrations? many disputes arise from Departments

acquiring software only presented before agreement through live demonstrations. Such demonstrations are risky because :

• Demonstrations are almost never complete • Demonstrations may hide a lot of problems with the system • Systems being demonstrated may not be the same as those being

delivered and it is difficult to compare the two.

To avoid this problem, consider demonstrations only as a means of clarifying various functionalities. They would be used as a review of the “qualitative aspects” of the systems. They should not replace Technical Specifications.

Acceptance Criteria : Once the party authorized to approve the design has issued its approval, the Qualification of Specification is considered as accepted.

The ICT Processes Page 56

Activity 24 : Installation Qualification (IQ) Objectives : before an ICT System is brought into use, it should be properly installed and confirmed as being capable of operation. The objective of this Activity is to provide an SOP for the Qualification of installation of a wide variety of systems. This is essentially a delivery process and should not be confused with operational qualification to be discussed in the next Activity. Definition : Installation qualification (IQ) is the documented verification that all key aspects of the installation adhere to approved intentions. These intentions could have been expressed through :

• Design specifications • System specifications • Manufacturers' recommendations • Developers’ recommendations • Data sheets

Scope of usage : hardware, software or systems related to networks and telecommunications. Risks : the lack of proper installation qualification will result in the following risks :

• Disputes regarding what was and was not delivered • Items or services are missed while delivery is taking place causing delays and

losses during later parts of the operation or the project • Improper installation may result • Discrepancies between what was ordered and what was delivered

Standard Operating Procedure : 1) Identify the party that will approve the installation. The party should be given

the authority to approve the IQ. This may be a single user or a Technical Evaluation Committee.

2) Standard Installation Procedures : these are SOP’s that define Standard

Installation procedure for each type of system or deliverable being installed. Installation procedures should be defined ahead of time by various parties depending on the nature of the system being delivered.

The SOP will ensure that all components of the ICT System are installed as per

the specifications of the supplier or developer. The SOP should contain the following :

• The step by step installation procedure • The tests needed to verify that the installation has been carried out

successfully. • The installation acceptance criteria without which the Department will not

be able to establish whether a system has been properly installed or not.

The ICT Processes Page 57

• Site or environmental conditions necessary for the proper installation of the system.

• The party authorized to carry out the installation. Should such a procedure not be available, then the ICT Department should

prepare one to ensure that the system is being installed according to a standard process. The procedure may also include guidelines and related options.

3) Install the system as per the standard instructions and confirm each step. 4) Record all the test results. 5) Pass or fail the installed products. Documentation and Deliverables : 1) Standards Installation Procedures for the type of system in question 2) The test results produced by the Installation Procedure 3) A document confirming the proper installation of the system in question.3) 4) A list of all documentation submitted with the system 5) A list of all components in the system to be used for Configuration Management Good Practices and Recommendations : 1) In all agreements, insist that Suppliers provide Installation procedures. Without

these, proper IQ cannot take place. 2) Document all installation problems for later use in Risk Analysis. 3) Update the Configuration Management database to reflect the installation. 4) Environment : make sure that physical location or site meets the installation

conditions specified in the system documentation for such factors as air conditioning, low moisture, power, and room conditions.

5) Ensure that all related software is the proper version for the installation. 6) System Documentation : a list of all system documentation promised to be

delivered with the system should be compiled and tested against delivery of such documents. The documents will be subjected to Configuration Control and must be registered in the Configuration.

Acceptance Criteria : the system is fully installed when the installation process is fulfilled as per the supplied Installation Procedure. It would then be ready for Operational Qualification.

The ICT Processes Page 58

Activity 25 : Operational Qualification (OQ) Objectives : Operational qualification (OQ) is the documented verification that each unit or subsystem operates as intended throughout its anticipated operating range. A system that has been properly installed is not often tested for proper use and operation. Before bringing such systems into full operation, they should be properly tested and confirmed as operating properly. The objective of this Activity is to provide an SOP for the Qualification of Operation of a wide variety of systems. OQ tests the built-in capabilities of the new system. In OQ there is a focus on specific functions and how these functions can be tested. OQ consists of such assurances and questions as the following : • Do key functions of the system operate correctly as specified in the design? • Does the system have the ability to operate all the software that either came with

it or was installed on it as part of the installation procedure? • Can we demonstrate that the functions are working properly without errors and

missing functionalities? • Can the system connect to all its units, be networked or be directly connected

and use the connectivity for the various functions involved? There are two clarifications to be made : 1) Difference between installation and operation : there is often a confusion

between installation and operation. Many ICT systems can be installed and confirmed to be ready to operate without being fully operational.

Example : a software developer may install a full software application and confirm

that it can be launched, some menu items can be accessed and it can be shut down without error. However, this does not mean that it is fully operational.

2) Difference between Operation and Performance : OQ implies that all

functions and features promised with the system must be operational. Performance implies that other factors such as loads, volumes and other capacity and power related issues are not problematic. This is dealt with in the Activity 26 : Performance Qualification (PQ).

Scope of usage : hardware, software or systems related to networks and telecommunications. Risks : improper or lack of operation qualification may lead to the following :

• The Department may not be able to know whether the system can operate properly or not.

• The system may be operated by the wrong persons • Major deficiencies may exist in the system to be identified during later stages of

its operation (End of month, year, etc). Standard Operating Procedure :

The ICT Processes Page 59

1) Identify the party that will approve the Operational Qualification. The party should be given the authority to approve the OQ. This may be a single user or a Technical Evaluation Committee.

2) Installation : ensure that the system has been installed properly through a

review of the Installation Qualifications results. 3) Operating Instructions : Ensure that the system has the proper operating

instructions. These could be SOP’s that define operation or use procedures for each aspect of the system being tested. Operating Instructions should be defined ahead of time by various parties depending on the nature of the system being tested.

4) Test Procedures : ensure that the system has proper test procedures. It is

these tests that will decide whether the system is “Qualified” as operational or not.

5) Operate each function of the system to ensure that they are in working order.

This can be carried out by the supplier of the system or by persons identified in Step 1 above.

6) Record all the test results. 7) Pass or fail the products or services. Documentation and Deliverables : 1) Standards Operating Procedures for the type of system in question 2) A document confirming the proper operation of the system in question. 3) A list of all test results 4) A list of possible causes and remedies in case the errors are diagnosed while

operating. Good Practices and Recommendations : 1) Include users in the test process 2) Cover all “testing zones”. For example, there are many systems that get passed

for regular operation leaving out of zone tests such as closing of periods or the use of large values during data entry or the testing of record sharing and locking in multi-user environments. Usually, the reason is due to lack of data, knowledge or time.

Acceptance Criteria : the system is fully operational when the test process is completed and no errors or missing functions are noted. Note that operation may be completed and yet the system may not be performing properly. For this, the Department may need to consult the Performance Qualification Activity.

The ICT Processes Page 60

Activity 26 : Performance Qualification (PQ) Objectives : Performance is a measure of various parameters in a system such as speed, response, capacity, power, etc. Performance Qualification (PQ) ensures that the total system performs as intended in the specified operating range. The aim of this Activity is to develop a Standard Operating Procedure that allows the Department to verify that its systems are performing the way they should. Scope of usage : the system includes all hardware and software components, associated equipment, people and procedures that make up the system. Which systems should be tested?

• New systems that are being delivered and used for the first time • Existing systems to be qualified on a regular basis • Systems that have undergone modifications • Systems that have had additional usage • Systems that have seen sudden deterioration of performance should be tested

and qualified • Systems expanded to operate at a higher capacity

• Lack of knowledge as to what constitutes a performance measurement. • Lack of knowledge of the indicators that define whether the measurements are

within or outside the proper ranges. • Wrong measures are used. • Measurements taken in wrong environments or using wrong data.

Risks : should Performance Qualification not take place, the Department may face the following risks :

• Systems will slow down or break down during critical periods causing time losses and interruption of operations

• It will be difficult to hold suppliers responsible for performance problems if these are not tested properly.

• By the time that problems arise, Supplier agreements may be closed making it difficult to hold them responsible for performance problems.

Standard Operating Procedure : The following procedure is used to qualify if a system is running within its proper “ “Zone” of performance : 1) Defining the operating environment : a description of the use of the system

in the context of the work environment should be developed. For example, it should be specified that this system is to be used by the employees in the Department during their office hours from 8:00 till 14:00.

2) Setting operational limits : the SOP shall include testing the system against

(but not exceeding) its operational capacity.

The ICT Processes Page 61

The performance levels should be set by the user but should not exceed the rated capacity provided by the supplier. A set of measurement indicators should be developed and approved before running the Performance Qualification (PQ) Scripts. Here are some examples of indicators :

• When 20 users are using the system, the response time for accessing a

Citizen’s record should not be longer than 2 second. • Opening a web page and viewing all images on the Intranet should take no

more than 1 second. • Preparing a full statement of all certificates should not take longer than 15

minutes.

These indicators define the expected results of the test or the qualification.

3) Test Data : disputes will arise when different parties do not agree as to what data is to be used. Agreements do not often specify that and Suppliers are tempted to use test data rather than actual data. Users will often refuse to use actual data stating that the data is not representative.

Therefore, the SOP should define what the Qualification Data is : actual data for a

full month? A full year? Random data generated specifically for the Qualification?

Abnormal data or data which is outside the operating ranges should also be tested to ensure that it is handled correctly in the system.

Whatever data is to be used, the justification for using it should be documented. 4) Requirements for setting up the data : should it be required to setup special

data for the tests, then the procedure and requirements for such setup should be documented in the SOP.

5) Test Procedures or scripts : the SOP must contain one or more Qualification

Scripts that describe the procedures needed to verify the performance of the system against the User Requirements or the Indicators established earlier.

They should simulate the operation of the system in a live situation, using all

system components and operating procedures.

Here is an example of a typical database application test procedure or script. The purpose is to test the response of the system using a Search program when 20 users are busy posting transaction vouchers :

1. Initialize the database to purge all transaction records 2. Generate test data as per part 3 of the SOP. (This is not included in this

example but can briefly be introduced as : create 200 citizen records, create 50,000 transaction records, etc).

The ICT Processes Page 62

3. Have 20 users log onto the system. They should be ready to use the Transactions entry program when instructed to do so. For the moment, there should be no entry.

4. Make ready a test station and log onto the system. Launch a the program that searches for citizens using the location parameter. The program will display all citizens that meet the entered location.

5. Do not search yet. 6. Prepare the users to start entry of vouchers without interruption. A supervisor

will time the start of entry so that users start one after the other with a 5 minutes interval.

7. As each user starts, the tester at the test station will search for the citizens and note down the time it took the system to respond.

8. Once the last of the 20 users is left working for 10 minutes, the test is over. 9. Plot the response time as the users come on to the system and analyze the

results.

Since test procedures are often carried out by persons not located in the same room, it is necessary to have a good way of communicating the procedure and ensuring that all users know how to execute it.

6) Test Results : enter the test results in form reserved for such results in the SOP. The executor should record, sign and date the results. Screen prints or electronic logs should be retained to verify the results.

7) Unexpected Results : systems may crash or show unexpected behavior. This

should be documented for later analysis. 8) Should the SOP result in disqualifying the system, two steps are required :

• Diagnose the problem causing the lack of performance • Initiate remedial action

The system should then be resubmitted for Performance Qualification. 9) Qualification Report : if the PQ generates extensive documentation, then a

summary report should be written. It should include such information as :

• Whether or not the qualification scripts were followed • Whether or not the expected results were attained • Description of any deviation from expected results • Any follow-up activities to correct any deviations

Documentation and Deliverables : 1) The definition of the environment 2) The operating limits of the system 3) The Performance test scripts 4) The Qualification Report to include all test results, unexpected behavior and any

remedial action that is required for correct performance.

The ICT Processes Page 63

Good Practices and Recommendations : 1) When systems are being designed or acquired from Suppliers, it would be the

right time to establish broad lines for Performance Qualification. At a later date, more specific SOPs can refine the qualification criteria.

2) Where appropriate, automated testing tools may be used to record results. These

are available commercially. 3) Data may need to be charted or analyzed for averages, standard deviations,

trends, etc. 4) In some situations where performance suddenly deteriorates, there may not be

qualifications scripts. In this case, historical information may be used. However, the actions taken, the data used and the results obtained when the historical data was generated must be clear.

5) While carrying out Performance Qualification tests, the Change Control history for

that system must be analyzed to ensure that no changes have been introduced which would affect test results. (Example : some systems have their memory reduced to be installed on other systems. This would affect test results).

6) The PQ should always be performed at the user site and will include testing

specific to the user environment and defined ways of working. Acceptance Criteria : Upon the successful completion of a Performance Qualification SOP for each system, application, etc, that item is considered as passed. When remedial action is to be taken, then the subsequent PQ will be subjected to the same conditions.

The ICT Processes Page 64

5.0 Logical System Access and Security ICT Systems need to be secured so that specific functions can only be accessed by specific staff. This is called the Logical System Access facility and is different from the Physical access to the ICT Systems site. The latter is defined in Section 6.0 : Physical System Protection, Access and Security. Why should ICT Systems be Secured? 1) ICT Systems process information of a confidential nature. (Example : the health

sector may have storage of disease history for citizens which are confidential). 2) Some processes are the responsibilities of specific persons and must therefore not

be processed by others. For example, posting vouchers should be identified by the person who posted them. This creates the necessary transparency.

3) Some procedures can only be executed by persons with the proper background

and training. 4) Some information procedures may put the Department under a liability and hence

should be secured. Objectives The objectives of the ICT Process of Logical System Access are : 1) To prevent unauthorized access, damage and interference to business premises

and information 2) To prevent loss, damage or compromise of information assets 3) To prevent interruption of business activities 4) To ensure that only specific personnel carry out specific functions 5) To prevent compromise or theft of information and information processing

facilities. 6) To detect unauthorized activities. 7) To protect the confidentiality, authenticity and integrity of information The last Activity in this Section discusses the current Security Standard within the ISO certification.

The ICT Processes Page 65

Activity 27 : Identify Functions to be Secured Objectives : in order to control logical access to the ICT systems, the Department has to prepare a complete list of all functions that are to be secured. For each item in the functions list there would be a definition of the kind of accesses that may be allowed. Scope of usage : typical functions are :

• Access to the network • Access to a specific PC desktop • Access to a particular database application • Access to specific web sites

Standard Operating Procedure : 1) The Department’s management must decide who can prepare such a list. 2) List all types of ICT systems to be secured (See above list under scope as a

guideline) 3) Define the functions to be secured in each system. 4) Define the nature of access. These are called Privileges. These can be of various

types or levels :

• Record level : access to read, to write, to update, to delete records on the database

• Data element level : this is more specific than record level security. If a use can view a record, he or she will need to have special privilege to view specific data elements within the record. For example : a user may view the full purchase order but will need privileged access to view the purchase price, or to view the salaries on employee records, etc.

• Function level : this is where the user can access major functions but will need privileged access to activate minor functions within them. For example, a user can create a purchase order but will need privileged access to update the exchange rate, or change payment date, etc.

5) If the privilege is subject to an expiry period, then this has to be defined. This is

useful when employees are given time restricted privileges such as when the supervisor is on leave and hands over his or her duties to someone else.

Documentation and Deliverables : the list of Accesses or Privileges. Good Practices and Recommendations : 1) Privileges in customized software : when software is being designed, it is a

good time to establish some of the above accesses and privileges. Many system designers leave the security at the level of the database and hence, expose the system to more than necessary.

The ICT Processes Page 66

2) Vendor security : database engines are often secured by a single password. Knowing that password will allow intruders to access the database from outside the application. Special care must be had to ensure that such a password is protected either by making it dynamic or by changing it frequently.

3) Encryption : as hackers become more capable of penetrating systems, the

tendency is to encrypt the data using modern encryption methods. In the past, this was not possible because encrypting the data had a detrimental effect on system performance. Today’s systems are more powerful and can handle the load of encryption.

There is not one way of encrypting data. The Guide can only recommend that the Department look into the facility of encrypting data that is to be secured.

4) Remote Access to Site : some Departments provide remote sites access to their system. These sites are to be secured so that no illegal access takes place. It is important to ensure that all access from such sites is password controlled. As discussed in the previous paragraph, Encryption may be used to further secure the access. Should the access be through wide area networks, the communications protocols should be secured. It is important to be able to log the remote access and analyze it. Patterns in the usage of remote access may show illegal attempts at access.

Acceptance Criteria : The list is considered accepted when the Management approve its content.

The ICT Processes Page 67

Activity 28 : Assign Privileges and Access Rights Objectives : having identified the functions to be secured on the ICT systems, the next Activity is that of determining the staff who can access the various functions and assign them these privileges. Scope of usage : all staff who can access the system must be included. All the privileges defined in the previous Activity must be included. Standard Operating Procedure : 1) The Department’s management must decide who can assign such privileges to

the various members of staff. 2) Ensure that the previous Activity of identifying all Privileges and Access Rights

has been completed. 4) Prepare a list of all staff who might be able to access the system. 5) Group the staff by groups to ease the task of assigning privileges. For example,

all secretaries will have the same set of privileges. A new secretary will automatically inherit the same privileges as the rest of the group.

4) The above two lists will form a matrix or a spreadsheet. At the top of each

column, enter the type of access. In each row, enter the name of the staff. For example, under the column Exchange Rates and across from the Chief

Accountant row, you can enter ALL to signify that this person can create, read or retrieve, update or delete a currency record. On the other hand, a specific person, such as the Store Keeper, will have only R under his name because he can only Retrieve the exchange rate but not delete it, update it or create a new currency code.

Documentation and Deliverables : the list of all staff and their related Privileges and Access Rights. Good Practices and Recommendations : 1) Review the list periodically as Staff may change posts and may retain privileges

they are not supposed to have. Secondly, they may then be restricted from privileges they are supposed to use because of the change.

2) Review the list of Privileges regularly as new software is introduced or existing

software is modified or enhanced. Such software may have holes from which unauthorized persons may access functions they are not authorized to access.

Acceptance Criteria : The list is considered accepted when the Management approve its content.

The ICT Processes Page 68

Activity 29 : Assign, Distribute and Control Passwords Objectives : once the list of all functions is prepared and all staff are given the proper privileges of accessing the ICT systems, it is time to setup the procedure for assigning passwords to staff. This Activity presents an SOP that ensures that the process itself is safe. Scope of usage : all staff on the list prepared in the Activity 28 : Assign Privileges and Access Rights. Risks : without such an SOP, Leakage of Superuser passwords or password lists will cause the Department to be exposed to insecure systems. Standard Operating Procedure : 1) Assign at least two Superusers in charge of all password assignments. They

should be either part of the senior management or entrusted to this task by the Senior Management. This task must be authorized in writing.

2) A Superuser ID and password will be assigned to each Superuser by the

Management or sometimes, by the Supplier. (See Good Practices below). 3) Each Superuser can then create Logon IDs and Passwords for the staff, assigning

them the Privileges and Access Rights defined in the earlier Activity. 4) Users will be informed of their IDs and Passwords through some scheme such as

email or sealed envelopes. Documentation and Deliverables : The list of IDs and Passwords. This is a very secure document and must be stored where it cannot be located except by the Management who issued it and the Superuser. Good Practices and Recommendations : 1) In some cases, the system may be able to display the list of all users and their

passwords. Such a privilege should only be given to the Superuser and the Senior Management.

2) It is good practice to keep the password list outside the Department. This is a

procedure that allows the Department access to the list in case it is lost or access to the system breaks down. Such lists can be left in escrow with a Bank or parties that the Department can trust.

3) Users should be instructed to regularly change their passwords. This avoids theft

of passwords. Checks on this can be made at random. 5) Instruct Users on how to prepare their own passwords. Most users tend to use

such easy passwords as their phone numbers, dates of birth, names of children or loved ones. These are targets for hacking. On the other hand, if passwords are

The ICT Processes Page 69

very complex, no one can remember them and users may write them down where they are easily accessed. This is to be avoided. The Guide proposes that users resort to complex words that have an easy to remember “sound” but have no meaning. Passwords such as kledobim and friklasiv can be remember but cannot be guessed.

6) In the case of tailored software, it is best to implement some security procedures

that avoid illegal access such as the following :

• Suspend the screen if a user enters a faulty password more than 3 times in a row within a specific time, say 15 minutes.

• Prepare weekly or fortnightly system warnings for users to change their passwords

• Stamp all records with the ID of the user who created the record and the ID of the user who last modified it. This is a good audit trail.

7) One of the two owners of Superuser rights should regularly check his or her

access to ensure that he or she has not been deliberately or inadvertently shut out.

8) Many systems are assigned passwords that can be cracked by the Suppliers or

are even set by Suppliers. These have to be checked to ensure that only persons within the Department have such passwords.

9) It is a good practice to analyze transgressions so that the Department can tell

that specific areas are target to attack. Acceptance Criteria : The list is considered accepted when the Management approves its content, storage and means of frequent update.

The ICT Processes Page 70

Activity 30 : ISO Standards for Security Objectives : ISO has established a standard for security (ISO17799) which is slowly getting implemented in a variety of ICT systems. This Activity introduces this standard and prepares for its implementation. What is ISO17799? ISO17799 is a comprehensive set of controls comprising best practices in information security. It is an internationally recognized generic information security standard. What is the use of ISO17799? The standard is intended to serve as a single reference point for identifying a range of controls needed for most situations where ICT systems are used in industry and commerce facilitation of trading in a trusted environment Background The standard was first published as a Department of Trade and Industry Code of Practice in the UK. In February 1995, it was repackaged and published by British Standards as Version 1 of BS7799. At that time, it was not accepted widely because it was not flexible enough. Furthermore, its acceptance was delayed because there were other issues such as Y2K, etc. A major revision took place with the issue of Version 2 in May 1999 and within the same year, formal certification and accreditation schemes were launched. Supporting tools start to appear and it was soon published as an ISO standard. What is happening now? There is major activity taking place in terms of using the standard :

• Many organizations in the West are quoting intent to use the standard • Some are well on route to certification • Some organizations already certified through BS7799 are converting to ISO17799

General Description The Standard, even as far back as the BS7799, was made up of 10 sections :

• Security Policy • Security Organization • Assets Classification and control • Personnel security • Physical and environmental security • Computer and network security • System access control • Systems development and maintenance • Business continuity planning • Compliance

The ICT Processes Page 71

The above sections cover 10 Key Controls

• Information security policy document • Allocation of information security responsibilities • Information Security Education & Training • Reporting of Security Incidents • Virus Controls • Business Continuity Planning Process • Control of proprietary software copying • Safeguarding of organizational records • Data Protection • Compliance with security policy

Good Practices Embarking on a full certification is a complex task. However, if the Department is strongly interested in Information Security, it should seriously consider the structure of the Standard and start implementing the controls even without the aim of certification.

The ICT Processes Page 72

6.0 Physical System Protection, Access and Security The following set of Activities are concerned with the following aspects of the Information Resources :

• Physical Protection • Physical Access • Security • Practical usage

The next few Activities shall adopt a different format due to the nature of the items being reviewed. Each one will have a set of countermeasures (Which automatically point to the risk to be avoided) and a set of recommended good practices. Note : the Guide does not provide technical guidance. For example, the Guide will not present the reader with the best ways to test cables or install servers. These are part of the technical specifications and would be covered as per the guidelines of Activity 23 : Specification Qualification (SQ). Standard Operating Procedure : here is the procedure recommended for all items : 1) An inventory list is to be prepared of the existing Information Resources. If

implemented, it is best to use the Configuration Management database. 2) Using the items on the list, two major paragraphs are presented. One presents a

list of possible threats or risks. The other presents a list of recommended countermeasures.

3) The Department can then form a baseline by surveying all the items and checking

whether the countermeasures exist or not. 4) Thereafter, the Department can select to remedy any shortcomings according to

its needs, budgets and practical considerations. 5) After the survey, the baseline is then updated. Indeed, the Department can

consider surveying the above material on an ongoing basis to ensure that the ICT Resources are secure and protected.

Documentation and Deliverables : 1) A list of all items to be reviewed or surveyed. Normally, this would be based on

the items presented in this Section. However, the Department needs to setup its own list.

2) A list of the physical protection, access and security levels (Or the countermeasures that are expected for each item).

3) The survey results including suggestions for remedial actions. 4) Any remedial actions taken.

The ICT Processes Page 73

Activity 31 : Infrastructure – Server and Other Rooms Objectives : should the ICT Unit be hosted in a dedicated building, the Building would have its own Physical Protection and Access schemes. However, these are so similar to measures and practices taken for other computer rooms that the Guide has grouped them together. The objective of this Activity is to list the various items that fall under Server Rooms and other Computer locations and identify the threats and related countermeasures need to avoid them. Refer to the introduction of this Section for an SOP that covers this Activity as well as for other Infrastructural items. Scope of usage : there are various rooms that should have special considerations such as :

• Server Rooms • Mainframe or mini-computer centers • Media Archives Storage centers • Technical Infrastructure Rooms • Computer Centers • Protective cabinets (Which may house servers)

These rooms usually accommodate documentation, data media, additional equipment, etc. Risks : there are various risks involved in the handling of rooms or physical sites. These are avoided by the following countermeasures : Recommended Countermeasures

Adapted segmentation of power circuits Hand-held fire extinguishers Use of safety doors Closed windows and doors Intruder and fire/smoke detection devices Avoidance of water pipes Overvoltage protection Emergency circuit-breakers Proper earthing schemes Air conditioning with positive outward airflow Local uninterruptible power supply (UPS) Remote indication of malfunctions Redundancies in the technical infrastructure (Additional hubs, etc) Development and use of Standard Technical and Organizational requirements for

server rooms Door key management Supervising or escorting outside staff and/or visitors Entry regulations and controls Inspection rounds Ban on smoking Monitoring of access to the room Shielding or change of location to avoid interference : electromagnetic radiation,

cellular networks or generators.

The ICT Processes Page 74

Lightning protection devices Availability of plans detailing the location of supply lines Alert plan and fire drills

Good Practices 1) Any devices or equipment which require access by a large user group, e.g. a fax

machine or photocopier, must be located outside such rooms. 2) Combustible materials such as printer paper should not be stored in such rooms. 3) Avoid the use in computer centers of mobile phones or other units that have

transmission/reception facilities such as walkie-talkies and pagers. These can cause considerable interference with the operation of the systems.

4) The rooms should not be occupied by regular staff. They should be used only

randomly and for short-term assignments.

The ICT Processes Page 75

Activity 32 : Infrastructure – Cabling Objectives : cabling of ICT Systems covers all cables and passive components of networks. Their scope is from any existing delivery point of an extraneous network (telephone, ISDN) to the terminal points of network subscribers. The objective of this Activity is to list the various items that fall under cabling and identify the threats and related countermeasures need to avoid them. Refer to the introduction of this Section for an SOP that covers this Activity as well as for other Infrastructural items. Scope of usage : network components such as the following are considered as equipment and are not dealt with in this Activity : Repeaters, routers, gateways, couplers, bridges, etc. Risks : there are various risks involved in cabling. These are avoided by the following countermeasures : Recommended Countermeasures

Fire sealing of trays Selection of cable types suited in terms of their physical/mechanical properties Sufficient dimensioning of lines Physical protection of lines and distributors Prevention of transient currents on shielding Neutral documentation in distributors Monitoring of existing lines Removal, or short-circuiting and grounding, of unneeded lines Selection of an appropriate network topography Selection of types suitable for required bandwidth Documentation on cabling and related markings Minimizing routing of cables to avoid damage Provision of redundant lines Avoid proximity to power or other interference sources

Good Practices 1) Make available all cabling plans and drawings in an easily recognized location. It

is often the case that other infrastructural technicians may need to work on the structures and would hence be helped by tracing the cables.

The ICT Processes Page 76

Activity 33 : Infrastructure – Networks Objectives : networking of ICT Systems covers all components of networks. The objective of this Activity is to list the various items that fall under networking and identify the threats and related countermeasures need to avoid them. Refer to the introduction of this Section for an SOP that covers this Activity as well as for other Infrastructural items. Scope of usage : the following is applicable to different types of networks :

• Server-Based networks • Networked Unix Systems • Peer-to-Peer networks • Windows NT networks • Novell Netware based networks • Heterogeneous networks

This Activity does not take network operating systems or the operating systems of client PCs into account. Risks : there are various risks involved in the handling of networks. These are avoided by the following countermeasures : Recommended Countermeasures

Ban on using non-approved software Survey of the software held Escrow of passwords Documentation on the system configuration Designation of an administrator and his deputy Documentation on authorized users and their privileges Establishment of a restricted user environment Documentation on changes made to existing ICT systems Obtaining information on security weaknesses of the system Division of administrator roles in PC networks Training before actual use of a program Training of maintenance and administration staff Password protection for ICT systems Use of memory resident virus detection programs that check for viruses coming

through the network Periodic runs of a virus detection programs to scan full systems Restrictions on access to accounts and/or terminals Blocking and erasure of unneeded accounts and terminals Network management Regular data backup Sporadic checks of the restorability of backups Possible removal of hard disks or floppies from client stations

Good Practices

The ICT Processes Page 77

1) Use a suitable Network Management System. This is used to control all the hardware and software components located in the local network. Such systems should support the system administrators as much as possible in their daily work.

Network management includes all the precautions and activities for securing the effective use of a network such as :

• Checking that the network components are functioning correctly • Monitoring the network performance • Centrally configuring of the network components

2) Use a suitable System Management application which is concerned with the

management of distributed ICT Systems. This includes :

• The central administration of the users • The distribution of software • The management of the applications • Configuration management • Performance management • Error management • Security management

The ICT Processes Page 78

Activity 34 : Assign Physical Access Privileges Objectives : to determine the staff who can access the various areas in the Computer Center and assign them these privileges. Scope of usage : all staff who can access the system must be included. Risks : not assigning Physical Access Privileges properly will cause the Department to be exposed to insecure operations. Types of Physical Access Control Schemes A Department may introduce different types of physical access control schemes such as the following : 1) Monitor entry manually through registration at the desk and the issuance of

visitor badges 2) Use automated badge card readers and provide staff with cards that can access

specific areas in the center. 3) Use password protected door locks Standard Operating Procedure : 1) The Department’s management must decide who can assign such privileges to

the various members of staff. 2) Identify all systems that need to be physically secured and their locations. 3) Prepare a list of all staff who can access the system. 4) The above two lists will form a matrix or a worksheet. In each row of this

worksheet, enter the staff names. At the top of each column, enter the system/locations of access. In each cell where a row and a column meet, you can then indicate the type of access for that staff.

Types of access can be : visitor, worker, temporary, etc. 5) Depending on the type of Access System used, the Department can then issue

passwords, cards, etc. Documentation and Deliverables : the list of all staff and their related Physical Access Privileges. Good Practices and Recommendations : 1) Staff may change posts and may retain Physical Access privileges they are not

supposed to have. Secondly, they may then be restricted from areas they are supposed to use. Review the list periodically.

The ICT Processes Page 79

2) In the case of access control through registry at the reception, it is important that persons entering are properly checked through the use of their IDs, staff cards, etc. When necessary, it can be dictated that such persons never enter the site on their own but that they are escorted by an authorized staff member.

Acceptance Criteria : the list is considered accepted when the Management approve its content.

The ICT Processes Page 80

Activity 35 : Assign, Distribute and Control Passwords Objectives : in some cases, Physical Access to ICT locations may require passwords. Such schemes as password protected door locks and cards require issuing policies. This Activity aims at setting up the procedure for assigning passwords and/or distributing access cards to staff. Scope of usage : all staff on the list prepared in the Activity 34 : Assign Physical Access Privileges. Risks : this is a very risky activity. Leakage of passwords or password lists will cause the Department to be exposed to insecure systems. Standard Operating Procedure : 1) The Department’s management must assign at least two Access Administrators in

charge of all password assignments and card distribution. They should be either part of senior management or entrusted to this task by the Senior Management. This task must be authorized in writing.

2) The Access Administrator will then handle the creation of Passwords for all staff

and the production of the access cards. 3) Users will be informed of their Passwords through some scheme such as email or

sealed envelopes. Cards are also distributed through a secure scheme to ensure that the right person has received the right card.

Documentation and Deliverables : The list of and Passwords and/or the list of assigned Access Cards. This is a very secure document and must be stored where it cannot be located except by the Management who issued it and the Access Administrator. Good Practices and Recommendations : 1) It is good practice to keep the password list outside the Department. This is a

procedure that allows the Department access to the list in case it is lost or access to the location where the list is kept is not possible. Such lists can be left in escrow with a Bank or parties that the Department can trust.

2) The Access Administrator needs to regularly change passwords. This avoids theft

of passwords. Checks on this can be made at random. Acceptance Criteria : the list is considered accepted when the Management approves its content, storage and means of frequent update.

The ICT Processes Page 81

Activity 36 : Insure the ICT Systems Objectives : to present a set of Good Practices that aim at insuring the various ICT resources in the Department. The financial value of a Department’s systems along with related equipment may reach a high enough value to warrant such an insurance. Scope of usage : insurance can cover a variety of losses. These are defined in the Good Practices section below. Good Practices and Recommendations : 1) Equipment : all equipment such as computers, communications components,

printers, scanners, etc, can be insured proportional to their financial value. These can easily be insured against theft, sabotage, damages due to various reasons or acts of civil strife.

2) Loss of documentation : training, operating and other documentation form a

major part of the ICT resources. Such documentation can be lost due to theft, negligence, water, etc. These can easily be insured.

3) Loss of Work : loss of time spent on work caused by Force Majeure or other

damaging situations can be insured. Such work can be insured : recovery costs, rework, reentry of data, reinstallation of software and systems, cost of the emergency procedures, etc.

4) Loss of Source Code : this often happens in different ways. Source code may

become inaccessible for various reasons. Source code may be corrupted. Wrong backup may take place. Backup media may be destroyed due to various reasons. The Department can also insure itself against such losses.

5) Loss of Software Products : some of the more expensive products can be

insured. Loss may take place due to theft, corruption of media, loss or theft. In many cases, losses can be averted by proper backup, increased Risk Analysis and better physical security management as shown in the previous Activities in this Section. In the case of setting up a Disaster Recovery System, various works can be insured. Review paragraph (3) in the Activity 44 : Disaster Recovery – Good Practices.

The ICT Processes Page 82

7.0 Information Integrity : Backup / Archiving and Data

Protection One of the most frequent causes of damage or the highest risks in ICT Systems is loss of data or its corruption. The reasons are many : equipment breakdown, operator error, software bugs, etc. The only effective measure that can be taken to ensure that Information Integrity is maintained in an acceptable state is to have a rigorous Backup and Archiving policy. Some Definitions Backup is the storage of data, source code, software products, scripts, etc., on a separate medium that can be used to restore the data to its initial form if need be. This could be a regular or an ad hoc activity. Archiving : this term is essentially the same as Backup. However, some centers use it to signify removal of the data or cyclical backup that is not very frequent. In all cases, the procedures are the same as for Backup, so this Guide will not differentiate between the Backup and Archiving. Purging : removing data from the initial medium to make space or reduce database size. Example : transactions are kept within the operational database for the current and the most recent 3 years. On completion of each year, the ICT Unit would need to purge the oldest year from the database. Checkpoints : these are points in time where the Department has to take a full backup so that disaster recovery schemes can be used to restart the system from such Checkpoints. (Review Activity 43 : Disaster Recovery Procedures) The following Activities present various procedures and good practices related to the above.

The ICT Processes Page 83

Activity 37 : Identify What is to be Backed Up and When Objectives : the purpose of this Activity is to document the data and software that needs to be backed up and/or purged. A Back Definition List will define the scope of the data and will include a variety of information about each specific backup. Scope of usage : the following is a recommended list of data and software but is not restricted to these items. These are targets for back up :

Operational data (Used by the various software applications) Development data Source Code Scripts Web pages Graphics used in screens Documentation and help files Test scripts Test plans Operating data Shell scripts Operating Instructions Software products Libraries Compiled systems (To avoid recompilation on restore) Off the Shelf Commercial Software Updates / Upgrades / Patches Operating Systems / Tools / Utilities User Data Data that is processed on client stations and centrally stored on servers Reports ASCII based output COLD technology output : Computer Output on Laser Disks Acrobat Reader output (PDF files)

Risks : not preparing a proper list of items to be backed up will cause the Department to be exposed to loss of data. Standard Operating Procedure : 1) Classify the types of data to be backed up as suitable for the Department. Refer

to the Scope of Backup above for a proposed classification. 2) List all data in appropriate groups. For example, it is inappropriate to backup

master files on their own. These should be backed up with all related transaction and parameter files.

3) Prepare the Backup Definition List which contains the following data

elements :

• The frequency of backup : daily, weekly, monthly, end of cycle, etc.

The ICT Processes Page 84

• When to backup? : in case backups are required on an ad hoc basis. • The type of backup : is this an incremental backup or does it fully replace the

data? Is it a purge or a copy? Etc. • The type of backup media and where it will be located. • Who is to carry out the backup?

Good Practices : 1) User Input : it is good practice to include users when defining the Backup

Definition List. Users usually have a good sense of how to avoid data loss and would indicate at which critical points backup is to be made.

2) The Backup Definition List may be setup on the Configuration Management

database if that is suitable. Changes to the list can then be controlled. 3) When to backup? Most centers tend to backup at specific frequencies such as

end of day, end of week. However, there are other times when backup becomes necessary :

At the end of specific business cycles Before migration to new systems (Equipment or software) Before upgrading/updating software or introducing patches Before relocating systems Before introducing new staff/users to the system

In fact, any time the Department feels that there will be a risk of data corruption, backup should take place.

4) Regularly review the Backup Definition List as it often arises that new systems or situations arise such as those in the previous paragraph that will require the Department to update the list.

Acceptance Criteria : the Backup Definition List is considered accepted when the Management approves its content, storage and means of frequent update.

The ICT Processes Page 85

Activity 38 : Backing Up Objectives : to prepare a Backup procedure observing all backup requirements stated in the Backup Definition List and to ensure that there is a record of all backups taken for all types of information. This is the most crucial Activity to be carried out by the Department and it aims at maintaining Information in total integrity. It may be time consuming and it may be costly, but it is an insurance against data loss or corruption. Risks : not backing up the data on a regular basis will cause the Department to be exposed to loss of data and software items. Standard Operating Procedure : 1) Consult the Backup Definition List on a regular basis to ensure that no backup is

missed. 2) Backup Media : ensure that there is available media for the backup well in

advance of the backup itself. Many centers lose valuable data because media is not available and operators end up backing up over backed up media with useful data.

3) Complete the backup and fill in a register that has the following recommended

columns : Date of backup Time of backup Type of backup (Incremental, full, purge, etc) Source data : describe it and its status ID of the backup as per the Backup Definition List (Refer to Activity 37 : Identify What is to be Backed Up and When) Operator Media type Media label Where the media is to be stored Has restored testing been tried? Result of restore testing Remarks Documentation and Deliverables : The backup register which can be a printed form or a database. Good Practices and Recommendations : 1) Centralization of the Backup Register : in the case where Departments have

several sites, servers, applications, etc, it would be necessary to have a centralized register. Copies of printed forms can be sent to such a location. If the register is setup on a minor database, then it can either be located centrally and made accessible to all operators, or different databases can be consolidated on a regular basis.

The ICT Processes Page 86

2) Configuration Management : it may be suitable to setup the Backup Register

as part of the Configuration Management database. 3) Securing Backup : some centers follow the recommended practice of carrying

out the backup by well trained personnel. In order to do that, some security measures may be implemented so that only such persons can carry out the backup.

4) Review the Activity 41 : Good Back Up Practices Acceptance Criteria : 1) On a regular basis, the Backup Register should be checked against the actual

media. Verification can be made that the backup entries correspond totally to the stored media.

2) On a regular basis, the Backup Register should be checked against the Backup

Definition List prepared in the earlier Activity 37 : Identify What is to be Backed Up and When. Verification can be made that all items in the Backup Definition List are being properly backed up. (To facilitate matters, the Backup Definition List ID is included in the Backup Register).

2) More importantly, and this will be discussed in the next Activity, restore checking

should be made on random or specific backups. This should be part of the Acceptance Criteria of the Backup Register preparation.

The ICT Processes Page 87

Activity 39 : Identify What is to be “Restore Tested” and When Objectives : many centers face major upsets upon realizing that their backed up media is badly backed up or is corrupted. The main reason for such a state is the lack of testing of the backed up media. Sometimes, it is a matter of deterioration of the backed up media or its environmental corruption. This Activity presents a procedure that defines what media is to be “Restore Tested”, how frequently and what the tests are. Scope of usage : all data that is backed up may be subjected to Restore Testing. Risks : not testing backed up data will cause the Department to be exposed to loss of data and software items. Standard Operating Procedure 1) Identify the type of data to be Restore Tested and enter the relevant information

on the Backup Definition List prepared in Activity 37 : Identify What is to be Backed Up and When. The ID of that item would then be known. A new List can then be prepared which can be called the Restore Definition List.

2) For each item in the Restore Definition List :

• Define the frequency of restore testing : daily, weekly, monthly, end of financial period, etc.

• Define the mode of testing : is this a simple hardware test? Is it a logical data checking test? Etc.

3) For each item in the Restore Definition List, prepare a Test Plan that covers all

aspects of the Restore and its testing. A typical test plan is presented below :

• Prepare sufficient space on the local disk • Ensure that the versions of the operating system that is running, the version

of the application software and the database structure are all compatible. • Physically restore the data into the hard disk • Logically restore the data into the database server (Import, etc.). • Run the program that presents a list of system parameters : number of items,

number of citizens, number of transactions, etc. • Compare the above list with the same list produced on the day when backup

was made. • Pass or fail the test

Documentation and Deliverables : the Restore Definition List. Good Practices : 1) User Input : it is good practice to include the users when defining the Restore

Definition List. Users usually have a good sense of what is risky in their work. They would help the ICT Unit identify which data is to be tested, when and what constitutes a good Test Plan.

The ICT Processes Page 88

2) The Restore Definition List may be setup on the Configuration Management database if that is suitable. Changes to the list can then be controlled.

Acceptance Criteria : the Restore Definition List is considered accepted when the Management approves its content, storage and means of frequent update.

The ICT Processes Page 89

Activity 40 : Restore Testing Objectives : this Activity presents a procedure that allows the Department to reduce the risk of bad backup media through regular Restore Testing. Scope of usage : in most cases, it is too costly and time consuming to test all backed up media. However, frequent and random tests can reduce the risk of damaging situations. Risks : not carrying out restore testing will cause the Department to be exposed to loss of data. Standard Operating Procedure : 1) Consult the Restore Definition List to identify the items that require Restore

Testing. 2) Prepare the receiving system for the Restore and restore the data 3) Apply the Restore Test Plan as indicated in the Restore Definition List. 4) Prepare a Register that shows the Restore Test details and results : Identify the ID of the backed up media to get all the data elements for it Date of Restore test Time of Restore test Type of backup (Incremental, full, purge, etc) Operator Test script or plan Result of restore testing Pass or Fail If fail, remedial actions Remarks 5) Pass or fail the test as per the Test Plan. 6) If the Restore Test fails, the Department would have unusable data. It becomes

the responsibility of operators to do one of two things : Data recovery is possible : the operators will recover the data through some

means like reindexing, etc. Alternatively, they can get the data from duplicate media stored outside the Department.

Data recovery is not possible : if neither of the above schemes is possible, the

operators would need to give warning to the ICT Unit Management and the user, that such data is not available. In case of needing such data, it may have to be re-entered and processed.

7) In all cases, enter the data related to the Restore Test in a Restore Test Register.

The ICT Processes Page 90

Documentation and Deliverables : the Restore Test Register. Good Practices and Recommendations : 1) It is important to relate Restore Testing with the Business Continuity Process

discussed in the next Section. 2) Configuration Management : it may be suitable to setup the Restore Register

as part of the Configuration Management database. 3) Securing Restore Testing : some centers follow the recommended practice of

carrying out the Restore Testing by well trained personnel. In order to do that, some security measures may be implemented so that only such persons can carry out such Tests.

4) Auditing Restore Testing : similarly, some centers may wish to have auditors

or user representatives on the spot when such tests are carried out. Acceptance Criteria : On a regular basis, the Restore Register should be checked against the Restore Definition List prepared in the earlier Activity 39 : Identify What is to be “Restore Tested” and When. Verification can be made that all items in the Restore Definition List have been properly tested.

The ICT Processes Page 91

Activity 41 : Good Back Up Practices Objectives : the main aim of this Activity is to present a set of Good Practices that apply to the variety of back up procedures presented so far. Scope of usage : covers all types of data backup. Good Practices and Recommendations : 1) Media Availability : ensure that there is available media for the backup well in

advance of the backup itself. Many centers lose valuable data because media is not available and operators end up backing up over valid and much needed backed up media.

2) Labeling Procedures : one of the major problems facing ICT Units is that when

a backup medium is required for restore, the operators are never sure which data it contains. Labeling is important but not sufficient. A rigorous scheme for labeling must be followed and should be linked to the Backup Definition List identification. This should also include Directory or File Listing so that file dates are clearly shown.

3) What to do with Local Data? With the increasing spread of PCs on user desks,

larger and larger portions of a Department’s information will be processed on these local PCs. This presents a risk to the Department because users are not very disciplined about their own backups. There are two solutions to this problem :

Server based data : force users to work on a folder hierarchy that is setup on

the Server and is secure, so that no other person than the specific user can access such a hierarchy. This is a safe process. However, it does present an additional load on the network since processing requires data traffic with the server.

Locally based data that is regularly backed up : users can be shown how to

concentrate all their data in one main folder hierarchy on their own PC. On a regular basis, scripts can be prepared to push that data from the local folders to secure folders on the Server. This is more efficient in terms of network traffic but is slightly more risky as the data is as fresh as the most recent backup.

4) Rotational Backup : ensure that there is a daily backup for all operational data

that is stored on separate media so that there is a tape for Monday, one for Tuesday, etc. These can be rotated during the next week.

Once a week, prepare an end of week tape separately for each week in the

month. These can be rotated during the next month. Once a month, prepare an end of month tape separately for each month in the

year. These can be kept as archives. The above scheme therefore requires :

The ICT Processes Page 92

7 daily tapes that can be reused 4 weekly tapes that can be reused 12 monthly tapes for each year Of course, some Departments may consider the above too risky and would need

to establish daily or weekly backups that are rotated less frequently. Some may even require hourly backup.

5) Offsite Locations : ensure that duplicate backups made for key periods such as

end of week or end of month or end of key closing periods are stored outside the site to avoid theft, damage or loss. Usually, it is best to store such off site backup media with a Bank or a branch of the Department.

6) Media Duplication : often magnetic media spoils with time. It is therefore highly

recommended to include in the above list backups whereby existing backups are duplicated on other media. Both are then kept in case of need.

7) Media Technology : change in technology is becoming frequent. This can

present a problem. For example : some centers are finding that they have a mass of 5 inch floppies as a back up only to find that on a specific day, they do not have a 5 inch floppy drive or that it has not been tested and is not operational. The same would apply to 3 inch floppies, DAT tapes and CD-ROMs one day.

It is highly recommended that when the ICT Unit feels that a specific backup

media is being slowly phased out of the market (As what happened with the LSI-120 disks), that all backed up data gets migrated onto more popular media.

8) Automating Backup : there are products in the market that automate the tasks

of Backup with such features as : scheduling, tracking, incremental backup, etc. It is recommended that such software be used.

9) Mirroring : disk systems can be duplicated to allow the system to use mirroring

of data. Furthermore, the RAID technology allows such mirroring with the facility of hot swapping in case of breakdowns, etc. This is also recommended.

The ICT Processes Page 93

Activity 42 : Protection Against Viruses Objectives : viruses are increasing in their damaging capability as well as the way they carry out such damages. The aim of this Activity is to provide Good Practices that reduce the problems associated with Virus infection to a minimum. Risks : virus can corrupt data, stop access to systems, wipe out files and cause system slow down. In web sites, they may create a denial of access to the site or even redirect traffic. Good Practices and Recommendations : 1) Backup : one of the best insurance schemes against infection is proper data

backup. This includes all operating or application software. Review the earlier activities in this Section for a discussion of backup procedures.

2) Use up to date anti-virus products with the latest patches and upgrades.

These have to be licensed to run on the various machines in the center. 3) Use up to date virus definitions : ensure that a responsible person regular

checks and updates the data definitions of the viruses. Many centers wrongly assume that if they have the latest version of the software, they are protected. It is estimated that 200 new viruses are identified per month. Developers of anti-virus products frequently release new virus definitions to meet this surge.

4) System scans : on a regular basis, scan the whole system including zipped files.

This can be carried out at night when there is no work load on the system. 5) Importing data into the site : in the sites where there is a lot of traffic of data

to and from the outside world, it may be required to implement strict techniques about using data on floppies or CDs or zip drive disks coming from the outside. Some centers disable all such units. Others remove them completely. In the case where a center cannot remove a CD drive because of its internal use, it becomes critical to discipline users to scan CDs for viruses before using them.

6) Virus hoaxes : even though there are many virus hoaxes, it is better to be safe

than sorry. Stories should be believed until proven innocent. There are several sites on the web published by the major anti-virus developers that list the hoax viruses. Virus warnings sent by mail should be checked against these sites. Here are some examples :

http://www.europe.f-secure.com/news/hoax.htm http://vil.nai.com/VIL/hoaxes.asp http://vil.mcafee.com/hoax.asp? These and other sites will also list real viruses and explain what their effect is and they can be treated.

The ICT Processes Page 94

8.0 Information Integrity : Business Continuity Planning Force Majeure situations may occur and disrupt business at the Department over periods of different lengths. Such situations as the following can cause disasters :

• Civil strife • Lack of access due to security reasons • Flooding or water seepage • Total electrical failure • Construction damages • Extreme weather conditions • Chemical or toxic gases • Etc

Whatever the case the Department’s ICT Processes should guarantee that there is a continuity of the Department’s business by setting up countermeasures to such failures and disasters. 8.1 Business Continuity Plans Such plans should be available to describe how the Department can continue to operate in the event of its ICT Systems not being available. The Plans should include : Contingency procedures as well as Disaster Recovery procedures. 1) Disaster Recovery Procedures describe how the Department can obtain

alternate ICT resources in the event of the primary systems being unavailable. These procedures would be followed if the system is to be down for longer than manual procedures could feasibly be used. Disaster Recovery Procedures are described in the Activity 43 : Disaster Recovery Procedures and Activity 44 : Disaster Recovery – Good Practices.

2) Contingency Procedures describe how the functions provided by the system

can be performed manually in the event of the system being unavailable. Contingency Procedures are described in the Activity 45 : Business Continuity – Contingency Plans.

8.2 Classifying Disasters The recommended solutions cover different types of disasters. Departments may modify these terms to suit their own "urgencies". The following Activities provide Procedures and Good Practices for the following types of interruptions : 1) Stoppages within the center that result in an interruption of a few days. Such a

stoppage is short enough not to require relocation of the total system. 2) Stoppages that result in indefinite interruptions or interruptions that have an

unknown resumption time. These can be further sub-classified as follows :

The ICT Processes Page 95

Small sites Non-critical sites Medium sites with large operating volumes Sites that are semi-critical Mission Critical Sites no matter how large The Guide will provide three main Activities to ensure Business Continuity by grouping the above 5 types of sites into 3 groups. Notice that the first type of stoppage is considered non-critical and will be considered as part of the first group : Small and Non-Critical Sites or Short Stoppages

• Non-critical sites that operate batch based applications • Non-critical sites that solely use office technology products. • Sites that do not operate in real-time • Sites that do not have external users such as private sector companies, citizens

or banks. • Semi-critical or medium sites as in the next Activity but only in the case where

the stoppage is known to take less than is justifiable for a full disaster recovery. Medium and Semi-Critical Sites

• Semi-critical sites that operate with central applications • Sites that may operate in real-time • Sites that do not operate in real time but have short cycles such as daily closing. • Sites that have external users such as private sector companies, citizens or

banks. Mission Critical Sites

• Sites whose interruption is considered to be a disaster • Sites whose users are in the public domain : citizens, private companies,

overseas users, banks, etc. • Sites that have real time operations that depend on minute by minute up to date

information • Sites that depend on the Internet for their processing.

In determining the appropriate solution, the Department must analyze their requirements in the case of a disaster. The analysis must consider up front costs, maintenance costs, Department inconvenience, and recovery time. The solutions provided below range from a cost effective to a mission critical solution.

The ICT Processes Page 96

Activity 43 : Disaster Recovery Procedures Objectives : there is a variety of situations that can be considered disastrous depending on the criticality and the size of the site in question as well as on the nature and duration of the distaster. When a disaster takes place, the Department has to move to an Alternate System. This is called the Recovery System. All software and data will be recovered on such a system. However, there are different ways of acquiring such a system depending on the classification of the disaster defined at the beginning of this Section. This Activity presents a general procedure for dealing with the recovery from disasters. The following are broad steps to be followed depending on the size of site and criticality of that site : Recovery Systems for Small and Non-Critical Sites 1) Acquire another similar system. This may take time. 2) Recover all software and data 3) Resume operations Recovery Systems for Medium and Semi-Critical Sites 1) Prepare an agreement with another center a distant from the current site so that

the equipment in that center can be used in emergency situations. 2) Recover all software and data 3) Resume operations Recovery Systems for Mission Critical Sites 1) On a regular basis, take a Checkpoint backup and restore it on the Recovery

System in anticipation of a disaster. Being mission critical, Checkpoint backup may be very frequent, say twice a day. (Review the start of Section 7.0 : Information Integrity : Backup / Archiving and Data Protection).

2) Acquire a mirror system through purchase or agreement with a third party for use

in such situations. The system need not have the same capacity as the current system. Minimally, it should be able to run the mission critical applications.

3) Install the software and ensure that the operating environments are compatible. 4) In an emergency situation, the Department can resume its work from the latest

Checkpoint. Note : in the following discussion, the Guide will not differentiate between the above choices but will present a generic Disaster Recovery Procedure or Plan for all types. Standard Operating Procedure The Minimal Requirements for Recovery are :

The ICT Processes Page 97

1) Prepare the following documentation before the Disaster : Emergency Procedures : describes the immediate action to be taken following

a major incident which jeopardizes business operations. Such actions are usually not ICT related and would cover such activities as : moving files or special equipment, ensuring personnel get to the new location, moving support to the new location, informing external users such as citizens or companies of the change, etc.

Responsibles : specify the individuals responsible for executing each component of the plan.

Configuration : prepare a document that describes the configuration of the

recovery system to avoid reconfiguring such elements as user names, passwords, directory structure, service packs, etc.

The Recovery Procedure : a document that describes the Recovery Procedure in a step by step fashion.

The Recovery Test Plan : a document that shows the procedure needed to certify that the Recovery has been properly executed. For example, the Test Plan can include :

File counts File sizes Tests on various reports (Transaction listings, etc) Database record counts Date checking Etc

Related Documents : other documents prepared by related activities such as Security lists, Backup Registers, etc.

Keep the above documents ready outside the Department so that they can be

immediately accessed in the case of Disaster. 2) Prepare whatever is necessary to ensure access to a Recovery System as

selected for the particular site from the choices presented at the beginning of this Activity.

Note that even if agreements exist for such systems, the organization in question

might also be under the same disaster, so it is preferable to have recourse to more than one such site.

3) Backup Media : prepare an offsite location for the backup media. It is

recommended that the media be stored at a significant distance from both the Production and the Recovery environment in order to avoid total loss in the event of a widespread disaster. It is vital that the backed up media can be accessed in a hurry, so again, it is best to have recourse to multiple backups in different sites.

The ICT Processes Page 98

4) Disaster Specific Backup : on a regular basis, take a back up of the full system. The point at which the backup is taken is called the Checkpoint. Backups at Checkpoints should be “operation ready”. This means that all the Operating System and the related software tools should be backed up in a recoverable form to avoid re-installation in the new recovery site. (Note that this is not the same as the regular data backup taken by most Departments).

The frequency of such backup should be commensurate with the time of stoppage

that the Department can afford. For example, if the Department is worried about interruptions that may last more than 1 week, then the backup should be taken at least once a week, preferably on daily basis.

Recovery Procedure 1) Setup the new Production environment according to the documented Recovery

Procedure. 2) Restore the backed media from the latest Checkpoint. 3) Conduct a test of the recovery procedure as per the Test Plan prepared earlier. 4) Inform all users as to when they can start in the sequence of their work. This

totally depends on the most recent restoration of the data. 5) Open access to users.

The ICT Processes Page 99

Activity 44 : Disaster Recovery – Good Practices Objectives : the previous Activity presented a procedure for handling the recovery from disaster by preparing alternative systems. This Activity supplements the previous Activity by presenting good practices to be followed when handling such situations. The following Good Practices are suggested as a support to the Disaster Recovery Procedures of the previous Activity 1) Outsourcing : the major servers needed as Recovery Systems may not always

be available within the Department. Indeed, in some cases, it has been known to resort to such systems outside the country. Therefore, any outsourcing to be made to have access to such systems must be submitted to rigorous qualification. Furthermore, it is critical to regularly test the alternate site to ensure that the Recovery System is ready for operation.

2) Testing : as in the case of Backup, Disaster Recovery is a kind of a “Restore”

operation. Therefore, it is crucial to test the Recovery on a regular basis by simulating a disaster.

3) Insurance : not all problems generated by the Disaster can be resolved by a

Disaster Recovery Procedure. A lot of cost and effort is required to setup of a Recovery System :

The increase in backup frequency Repeat work that is lost during Emergency and Recovery Replacement of equipment Additional running costs such as transportation, relocation, data entry, etc. Outsourcing of servers, sites, etc.

It is recommended that such activities be insured so that the Department can recover parts of its losses.

4) Training drills : an emergency is sue to have people lose their heads. It is

therefore crucial in semi-critical and critical situations to have training drills on Emergency and Recovery Procedures.

5) Risk Analysis : much of the cost and time loss of the Disaster Recovery can be

avoided by a rigorous Risk Analysis of such situations. Ensure that Disasters are included in the Risk Events to be analyzed in the Department.

The ICT Processes Page 100

Activity 45 : Business Continuity – Contingency Plans Objectives : as an insurance against the possibility that a system may not be available for any reason, it is essential to have recourse to Manual Operating Procedures. Technology being addictive, most organizations forget how to process their work in a manual fashion and end up losing time and money in case Disasters take place. The aim of this Activity is to prepare a procedure that defines how Manual Operating Procedures can take place in case the ICT Systems are not available. Standard Operating Procedure : 1) Prepare a Procedure for each of the information processes within the system. For

example, Entry of project data is one such procedure. 2) The Procedure will generally consist of the following structure :

• Define the reports that define the status of the data at specific checkpoints.

• Identify the transactions through their manual vouchers • Define the procedure used to update the data manually and check it • Define the procedure to be used upon re-starting the system

3) On turning into the Manual procedure, follow the steps of each of the above

procedures. Example : the following is a typical procedure for the Maintenance of the Vehicle Fleet in the Ministry of Public Works : Prerequisites : a daily list showing all vehicles with transactions on each starting from the beginning of the month. There will be a list identifying the following vouchers : change of location, change of department, entry of petrol usage, entry of distance counter, change of vehicle particulars (Color, chassis, etc), entry of maintenance summary, etc. 1) Prepare the Vehicles list from separate media 2) As each voucher is received, then manually update the statement by adding one

line by hand showing the specifics of the particular transaction. 3) In case cumulative totals are required such as in the case of Maintenance Costs,

these can be computed on the hard copy report. 4) On a weekly basis, prepare a summary list of all totals (In the above case, only

the accumulated costs). Upon resuming the system, the operators can re-enter the data directly from the manually prepared transaction histories. Documentation and Deliverables : all manual procedures.

The ICT Processes Page 101

9.0 Software Application Development Throughout the past 30 years, the ICT industry has been plagued with problems that were and still are mostly caused by poor software. The basic reason is simple. The Software Technology is still young and has not had the chance to develop a standard methodology for architecture and contracting, as was successfully done in the Construction Industry. Some of the major Problems with Software Processes : 1) There is no clear separation between Architects or Designers of systems and the

Contractors, or the Software Developers of systems. It is known that some companies do both resulting in inefficient projects and software.

2) There is no standard and efficient Business Modeling language that allows

Software Developers to “draw” their systems in the manner that Architects draw their buildings and bridges. This leads to communications problems and hence disputes.

3) Project Management principles are still not being applied Software Development Processes (SDPs) have started arising and as is normal in such situations, there are many competing processes. This Section covers a variety of issues relating to Software Development. It points to a document that describes SDPs in full that can be downloaded from OMSAR’s web site.

The ICT Processes Page 102

Activity 46 : Using a Software Development Process Objectives : Most ICT Units suffer from not having a defined and documented Software Development Process (SPD). Suppliers delivery customized software applications to the Department may suffer from a similar shortcoming. Selecting and adapting an SDP is not a simple matter. The Guide will not present such a procedure. However, this Activity will define software development processes, emphasize their importance and provide guidelines on how to select them. Scope of usage : this covers any software development effort whether for : 1) Internal Usage : when a Department wishes to develop its own software

applications, it requires to select and use an SDP OR for 2) Usage by Suppliers : when a Department wishes to investigate the SDP that a

supplier who develops software applications uses. This is presented in the Activity 19 : How to Audit or Qualify Suppliers.

Background : a Software Development Process (SDP) as defined as :

A method whose objective is to plan, execute, monitor and control the development of software products from the stage when such products are conceived as basic concepts up to the point where the developed products are delivered and certified as operational.

It is critical to note that SDPs are called “Processes”. This is to emphasize that they are not simple step by step “Procedures”. Indeed, many have failed in the past because they were forced into tight waterfall “Procedures”. Risks : not using a Software Development Process may result in the following risks :

• Non standardized approach to programming and development • Lack of reuse of components • Poor and nonstandard documentation • Inefficient project planning • Inefficient life cycle phases : poor requirements analysis, business analysis,

design, testing and other activities. Why the Guide cannot recommend a single SDP? The reasons for not providing a recommendation are the following :

• There is no standard internationally accepted SPD that can be recommended • Describing typical SPDs requires extensive discussion • Different applications may require different SPDs • Different development platforms may require different SPDs

The ICT Processes Page 103

• SDPs require discipline and are hence more than just a Standard Operating Procedure. They may require training, supervision and monitoring to get properly implemented as well as adaptation.

• As the technology changes, SDPs change. A case in hand is the emergence of the Internet which caused a revision to many standard development processes.

With the above restrictions, the Guide will neither be able to recommend a specific Standard Operating Procedure for an SDP nor provide a set of Good Practices for one. Good Practices and Recommendations : 1) It is important to recognize that SDPs are either commercially available products

or are products that may be learnt from various academic resources such as books and web sites. The Department needs to research both areas for a proper SDP.

2) SDPs must have characteristics :

• A methodology that follows a Project Plan and not just tips and techniques for development.

• It must rely on Modern Project Management practices • Be based on a modern modeling scheme so that the documentation across

its phases is visual, simple and accepted internationally • The SDP must not have a strict waterfall approach. The waterfall method

of analysis, design, development, testing and implementation must be avoided. The alternative is a two dimensional approach where the phases correspond to those of a modern project as discussed in the Project Management Institute’s site at www.pmi.org. Within each phase, there will be a variety of processes such as analysis, design, building, testing, etc.

• Documentation must be a high priority for the process. • Reuse of components • Must be flexible and it must be subject to reconfiguration so that it can be

used in different environments. • Platform and development language independent • Application independent • Rely on horizontal Teamwork as opposed to Hierarchical structures • Iterative and incremental Development • Efficient and Quality controlled Requirements Management • The use of Component Architecture • Traceability of models • Relies on Risk Management

3) Selecting the SDP must submit to the same procedures presented in Activity 49 :

Selecting Software Applications. 4) Once an SDP is introduced, special effort must be put on maintaining its practices

as planned. Various organizations fall into the trap of applying an SDP only to start drifting from its standardized procedures.

The ICT Processes Page 104

Activity 47 : Software Development Tools Objectives : various development tools and platforms (Database systems) can be used to assist the software development process. This Activity highlights the importance of using such tools. It also presents some of them and emphasizes the need to justify them operationally and financially. Scope of usage : software tools are needed to support the Software Development Process selected by the Department. Risks : not using the proper software development tools would result in the following risks :

• Delays and increased development costs • Reduction of the quality of the development process and the software itself • Using the wrong tools would also result in inefficiencies and higher costs • Using tools that are not standardized across the Department will result in

inefficiencies and higher costs • There is a risk of not using tools if those selected are too advanced and require

extensive training Good Practices and Recommendations : 1) Here is a list of such tools (Presented under generic titles) CASE Tools Integrated Development Environments Commercially available libraries of components, routines, etc Business Modeling tools Source code repositories Debuggers Automated testing systems Commercially available Software Development Processes Help file generators Code generators Report generators Data warehousing and OLAP tools 2) The Department should select the products that it requires and present a

justification for their acquisition. The justification should be documented. 3) Proper training should be had of all such tools otherwise they will not be

efficiently used. 4) Tools that enforce a standard must be widely utilized as the tools would have a

negative impact if part of the Department does and the other part does not use them.

5) It is often possible to acquire trial or evaluation products that can be used and

tested before purchasing them.

The ICT Processes Page 105

Activity 48 : Programming Standards Objectives : with the large number of development platforms, and due to the hurried nature of development itself, the development profession has not been able to standardize its work. There are many reasons for this shortcoming that the Guide shall not go into. However, the Guide will recommend a set of Good Practices that serve to establish programming standards. Scope of usage : the scope of this Activity is not limited to one development platform but is presented as a generic set of practices to be setup for each. Risks : having poor or no standards will result in the following :

• Code that cannot be understood or even read by others • Code that is difficult to debug and test • Code that is difficult to reuse • Duplication of effort, variables, file names, etc. • Code that may result in technical hitches, system crashes, hangs, etc. • Code that may produce errors and bugs

Good Practices and Recommendations : 1) Study the development platform under use and establish Programming Standards

that apply to it. 2) Publish the standards and ensure compliance with them. This can be carried out

by frequent checking, dry testing and code review. 3) The following are the areas that need to be addressed when setting up a

Programming Standards document. Review web sites and academic material for work already done in these areas, especially if a specific development platform is in use :

• Access to Hardware • Argument Passing • Comments • Data Declarations • Defining Constants • Documentation • Error Handling • Function Declarations and Returns • Function Layout • Including Files • Modular Coding • Module Layout • Naming Files • Naming Variables • Source Code Formatting • Standard techniques and algorithms • Style consistency • Version Control

The ICT Processes Page 106

• Using objects 4) The Department should use source code repositories. These have the following

useful features :

• Librarian control on individual modules to avoid them being modified by different coders at the same time.

• Allows development by teams • Facilitates version tracking • Tracks modular and reusable code by sharing files between projects • Provides security on source code access

Such products as Microsoft Visual SourceSafe™ are typical of source code repositories and can even be used for a variety of other work such as storage of project documents, specifications, office technology documents, spreadsheets, etc.

The ICT Processes Page 107

Activity 49 : Selecting Software Applications Objectives : when selecting software applications, a methodology should be followed different from the selection of other information resources such as equipment and networking items. There should be a logical and manageable progression through the selection process in order to stress on making the selection process Quantitative rather than Qualitative. This Activity presents a Standard Operating Procedure for the selection process. Scope of usage : covers the selection of all types of software applications and tools. Standard Procedure : 1) Document Requirements : this is part of the design process. Qualifying the

design so that the Department has the proper Specifications was discussed in Activity 23 : Specification Qualification (SQ) and as such, should be followed during this first step. Without a proper specification of the requirements needed from the specific software, the selection process will be faulty.

2) Research Possible Vendors : this is a multi-step task. It depends strongly on

the procurement procedures of the Department and of the project in question. Briefly, the Department can use the recommendations of Activity 19 : How to Audit or Qualify Suppliers to start with a Long List and progressively reduce it to a Short List of Suppliers that can supply the required software product.

3) Create and Issue RFP : where the RFP must include all relevant sections

discussed earlier in Activity 22 : Recommended Issues to Consider in ICT Agreements. Especially important is the presentation in the RFP of the basis of the evaluation scheme to be used to select the supplier and the product.

4) Create and Issue Demo Scripts : on receiving the proposals, and part of the

evaluation of the products, the Department must issue scripts to be used in the demonstration of the products. These are test and evaluation scripts that will verify that each of the functions stated in the design or specifications is part of the product and is working as expected.

Demo scripts should include such items as scenarios to demonstrate, sample

date, evaluation criteria and expected results. 5) Visit other user sites : one of the most efficient means of analyzing software

products is to view them under actual usage. This exercise also confirms that the supplier has already installed the product elsewhere and that as such, he has the proper experience in supporting the product.

6) Analyze Proposals : the Department needs to subject the proposals to a

disciplined evaluation scheme as described in Activity 21 : Evaluation of Suppliers, Products, Projects or Alternatives. This will assist the Department in the task of converting qualitative scores into a single quantitative score based on which the selection can be made.

The ICT Processes Page 108

6) Select Vendor/Software : upon arriving at the best score, the Supplier will be selected and will hence go into a negotiations phase where the final drafting of the agreement takes place.

7) Project Plan : in parallel with finalizing the draft agreement, the Supplier and

the Department must prepare a final Project Plan for the acquisition, installation, operation and performance testing of the software product. The plan must be subject to the criteria established in the various Qualification Processes : Installation, Operation and Performance Qualifications discussed in Section 4.0.

Documentation or Deliverables : 1) Software specifications 2) Evaluation criteria and weights 3) The request for proposal (RFP) 4) Demo or test scripts 5) The test results 6) The evaluation results 7) The implementation project plan Acceptance Criteria : upon the submission of all the above documents, the Activity can be considered complete.

The ICT Processes Page 109

10.0 Operations Management The Appendix of Supplementary Material of this Guide discusses the structure of typical ICT Units. One of the major functions in such an organizational structure is that of Operations. The function of the Operations Unit within the ICT Unit was stated as :

“A unit that has the responsibility of seeing all work and operations processed by the ICT Unit completed according to the highest possible quality level. Operations include regular data processing as well as some user based work”.

There are various Procedures and Good Practices that should be followed by the Operations Unit to meet the above objectives. The functions of this Unit were clearly stated in the Appendix of Supplementary Material. Therefore, in this Section, the Guide shall not repeat the functions of data entry, data flow, etc. The Activities that follow cover some procedures related to the Operations Function. The following Section covers procedures related to the Data Entry functions.

The ICT Processes Page 110

Activity 50 : Logging Maintenance and Support Objectives : one of the main causes of disputes between the following parties is that lack of coordination on Support and Maintenance : users, third parties supporting or maintaining systems, Suppliers and the ICT Unit. This Activity presents a procedure that defines the means of logging all support calls for the purpose of tracking, analysis and control. Scope of usage : the procedure covers :

• Maintenance of hardware, software and networks • Support of hardware, software and networks • Application support for users

Risks : not having a register will lead to lost calls, improper traceability and reduced analysis of problem causing areas. Prerequisites for the Standard Operating Procedure : 1) Valid users : establish a list of all persons who can call regarding Maintenance

and Support services. Persons outside this list should either be considered for inclusion or given special lower priority treatment.

2) Valid items to maintain or support : establish a list of all items that can be

supported. Items outside the list should either be considered for inclusion or given special lower priority treatment. (This could be linked to the Configuration Management database).

3) Maintenance and support request form : prepare a printed form or an

automated form. The latter can be a centralized application, an email form or an intranet web page. These can be used by users to log in their medium to long term problems.

Maintenance and Support Logging Procedure 1) Each call should be registered or logged on the selected media : printed form,

email, intranet web page, application, etc. 2) The Maintenance and Support Request form should contain the following data : Time/Date Name of User / Department Type of call (To be entered by the user and later modified if need be) Description of problem Priority (To be set by the user) Expected date for completion (To be set by the user) 3) The Calls should be processed by support staff who can tell which one is to be

support by which unit. They will then be routed accordingly. During routing, the support person can enter the receiving party’s name on the form.

The ICT Processes Page 111

It will be the responsibility of the Support or Maintenance person to process the

Change Request if there is reason to change the Configuration. 4) External Maintenance or Support : in case these are to be supplied by

Suppliers outside the Department, it will be the responsibility of the Support person to liaise between the User and the Suppliers. Suppliers will receive copies of the Request and will act accordingly.

5) The support person will then review the situation, visiting the user if need be. On

completion, the following is entered on the call form : Time/Date started processing the call Time/Date completed processing the call

Real problem : as the user may have phrased the problem wrongly, the support person will enter the actual cause or issue of support.

Action taken : describes what was done to solve the problem or give support 6) In case the call is being handled by a Supplier, then the Supplier must complete

the call and fill in some of the information above. Documentation and Deliverables : 1) A list of the valid Users 2) A list of the valid Items to Maintain or Support 3) The Call Form Good Practices and Recommendations : 1) Since users generally consider all their problems as high priority, it may be a

good practice to prepare a Help Desk that filters these calls, directing the user to note down his or her problem on paper or electronically if that problem is judged to be of medium or low priority.

2) Whenever there are changes to the Configuration, these should be posted onto

the Configuration Management database by the person completing the Maintenance or Support Request.

3) On a regular basis, the Requests should be analyzed to arrive at such analyzes as

the following : Most frequent calls by : Type of call (Repair, preventive maintenance, queries, bugs, etc) Department or Unit or Division Equipment Software Networking components Site items How does training vary with the frequency of calls? What is the average time between the following :

The ICT Processes Page 112

Time request placed till it was handled Time request started getting handled till it was cleared In how many cases did the request cause system stoppage? Etc

The ICT Processes Page 113

Activity 51 : Control Dissemination of Hard Copies and Distribution Objectives : one of the major responsibilities of the Operations Department is the dissemination of the information being processed by the various systems. More and more, such information is being converted from paper form to screen displays. However, there is a need to plan and control such dissemination. The objective of this Activity is to prepare a Procedure that allows the Department to plan the distribution and dissemination of reports applying security whenever this is crucial. Scope of usage : all displays and reports are included in this Procedure. Moreover, with the popularity of exporting data from various databases for use on local employee stations, such data is also included. Risks : not being able to control the dissemination of hard copies may lead to the following risks :

• Lack of security • Overproduction of reports • Storage of paper reports instead of on electronic media leading to loss of space

Standard Operating Procedure : 1) Prepare a list of all reports, major screen outputs and exported data 2) Define the frequency of the reports when they are cyclical. The rest can be

produced on request. 3) Prepare a list of all users and which reports they should receive 4) Configure the system so that user can print on specific printers. 5) Establish security levels required for : The production of the reports The viewing of the screens The exporting of the data 6) The Reports Distribution List : by now, the Operations Unit would have a list

of all reports to be produced for which user and at what frequency. As this list, produce the reports where it is the responsibility of the Operations

Unit to do so, otherwise, that is left for the user. Documentation and Deliverables :

• The Reports Distribution List

The ICT Processes Page 114

Good Practices and Recommendations : 1) Electronic Storage : in the past, it was always the case that reports should be

produced for auditing and checking purposes. With more reliable software, it is recommended that users should be store reports in electronic format on their individual PCs. This would save in printed paper and time of production.

Here, it may be beneficial for the Department to resort to the use of COLD technology (Computer Output on Laser Disk). This technology converts any report being sent to a printer into an Acrobat Reader PDF or ASCII text mode in an electronic format providing a variety of search services, annotations, etc.

2) Report Generators : more and more, Suppliers are supplying “report

generating” software along with database structures. This generally makes it easy for users to prepare reports directly from the database. Although of great benefit, training is required for this practice. Without proper training the following two risks may be faced : by using wrong fields or wrong conditions on some of the fields, users may produce reports that are not valid. Secondly, users may create queries that are massive which would create heavy loads on the system.

3) Export Data : when systems are being designed, it is recommended to select

some of the reports and allow them to be exported in spreadsheet format. General software applications are not capable of charting, sensitivity and statistical analysis. By allowing the data to be exported in such format, users can manipulate the data using standard spreadsheet products.

4) Security : sometimes reports have part of their data that needs to be secured.

For example, an inventory list in the Municipality’s Vehicles Maintenance Department should be viewed by anyone. However, not anyone should be able to review the cost prices. Therefore, the design should cater for such security checks at the data element level.

Acceptance Criteria : The Reports Distribution List should be approved by the Management of the Department before any reports are released.

The ICT Processes Page 115

Activity 52 : Good Practices for User Support Objectives : with the spread of Office Technology, User Support is currently a wider function than simply that of supporting an application. The Support Unit is described in the Appendix of Supplementary Material. The objective of this Activity is to present a set of Good Practices for the Planning, Execution and Control of User Support. Scope of usage : all types of Users :

• Management • Technical and Operational Staff • Users accessing the system from outside the Department (Citizens, companies,

etc) The support is for all types of applications and requirements :

• Hardware : its fault reporting, usage, preventive maintenance and installation • Office Technology Applications : usage, installation, upgrades, updates,

configuration and error reporting. • Telecommunications : connections, installation, configuration fault reporting. • Running specific applications of the Department.

Risks : not having proper user support may lead to the following problems :

• Inexperienced users handling their own problems • Inexperienced users assisting others because of slightly higher experience • Lack of procedure for analysis of support calls • Lack of user training will lead to increased calls for support • Improper Installation, Operation and Performance Qualification will lead to

increased calls for support. Good Practices and Recommendations : 1) Ensure that the Procedure defined in Activity 52 : Good Practices for User Support

is setup for logging Support Calls. This is useful to track calls and follow them up. When analyzed, the types of support calls direct the Department towards the solution of the problems causing these calls.

2) Ensure that Users are properly trained in all products that they use. It has been

regularly shown that properly trained users translates into a major drop in the volume and criticality of support calls.

3) Encourage Users to resort to Help Files and user Documentation. This would also

translate into a drop in the volume of support calls. 4) Automate parts of the support. This applies to the following :

• Network Management Software that analyzes all components on connected PCs on a daily basis. This supports Configuration Management and enhances the knowledge of the Department about what each PC contains.

The ICT Processes Page 116

• Provide users with Intranet or application based logging of support calls on issues that are not urgent.

• Ensure that all software installations are carried out by system support personnel.

The ICT Processes Page 117

Activity 53 : Managing the Supplies of the ICT Systems Objectives : to present a set of Good Practices that allow the Department to better manage the supplies needed for the various ICT Systems. Essentially, these aim at ensuring that supplies have the right quality, capacity, standard and availability. Scope of usage : supplies can broadly be grouped as follows :

• Paper products : blank paper, preprinted computer forms, preprinted vouchers, computer labels, boxes

• Magnetic media : tapes, diskettes, zip drive media • Backup media : CD-R, CD-RW and DVDs • Ink : cartridges, toners, etc. • Stationery • Backup spare parts such as printer heads, floppy drives, power supplies for PCs,

modems, hubs, hard disk units for PCs, etc Standard Operating Procedure : 1) Itemize the required supplies. Establish their technical specifications according to

the systems in use. 2) Define the expected usage for the next period (Usually, one year). 3) Survey the market and qualify the Suppliers and their supplies. 4) Follow the Department’s procurement policies to acquire such material. 5) Prepare an inventory management scheme with an issuing policy so that there is

a complete control on the movement of such items. 6) On a regular basis, analyze the above inventory to ensure that there is enough

material to avoid shortages. Good Practices and Recommendations : 1) Some supplies have special storage requirements which should be observed. For

example, some computer continuous forms should be stored in computer rooms to avoid humidity which may cause paper jams. Magnetic media should be stored in areas that are protected against interference.

2) Pay special attention to Backup Media Control. Shortage of such media can be

most damaging. 3) Link of supplies to Configuration Management.

The ICT Processes Page 118

Activity 54 : Documenting Data Entry Procedures Objectives : generally, most work done on improving the standards of data entry covers the entry of data for operational, financial or administrative applications. These are either developed for the Department or acquired as Commercial products. This Activity presents some Good Practices for ensuring that all data entry procedures are properly documented. Scope of usage : generally, this would apply to data entry for operational, administrative and financial application software. However, in some cases, there are data entry procedures that are covered by Office Technology products. These latter are discussed under the Activity 56 : Using and Supporting Office Technology Products later on in this Section. Risks : not having proper data entry procedures would lead to the following :

• Improper entry of data causing errors, rework and possibly damages with citizens and other users of the data.

• Erroneous or slow entry of data leading to loss of time and re-entry • More rigorous training of new staff

Standard Operating Procedure : 1) For each data entry form in each software application, a detailed Data Entry

Procedure is to be prepared. Generally, the software would have such procedures if it is well documented. In such a case, the Department should check if such procedures are sufficient, otherwise, they would be used as the basis for a redeveloped Data Entry Procedure.

The Data Entry procedure would be used in the following cases : Training Day to day entry tasks Validation and consistency checking Auditing purposes Refreshing the user A Sample Data Entry Procedure is presented in the Appendix of

Supplementary Material. 2) On preparing a Data Entry Procedure, it should be tested to ensure that all data

elements are clearly explained and that the procedure is easy to understand and use.

3) Whenever the Department is developing its own systems or requesting such

systems to be developed by third parties, it is essential to follow some Data Entry standards or Good Practices. These are presented in the Appendix of Supplementary Material.

The ICT Processes Page 119

4) Error analysis should be carried out. When errors are reported, they should be registered and totaled. If specific forms are found to generate more errors than others, then there is the possibility that the form is not being properly understood or that it may have programming problems.

5) Use Audit Trails when possible. Audit Trails are rigorous ways of verifying

proper data entry. Throughout the years, the term got distorted to mean the following : a list of transactions as entered. This is not correct. Audit trails technically mean the following. A batch of vouchers is entered. One of its fields is accumulated manually, say the amount on the voucher. The batch is controlled as one single group of vouchers by the system. The batch or Audit Trail is entered into the system. The batch is not updated or posted to the database unless the computed total equals the entered total. Along with this checking, the system must be able to produce a validation list of all vouchers before committing the entry.

6) Data Integrity : various systems are designed without proper data integrity. For

example, there are many Inventory Management systems that allow the quantity to go negative. There are cases where the accounting vouchers posted from an operational module do not correspond to the totals recognized by the accounting system. For example, purchases in the Inventory Management system do not correspond to the total inventory in the Accounting System. Such areas should be investigated and checked on a regular basis to ensure that there is Data Integrity.

Documentation and Deliverables : all Data Entry procedures Acceptance Criteria : data entry procedures are critical and must be validated by the developers of the software and the users in the related Departments. Upon full validation that such procedures are corrected, it is recommended that they be tested. They can then be accepted.

The ICT Processes Page 120

Activity 55 : Standard Data Entry Checks and Controls Objectives : when developing or acquiring software applications, it is important to ensure that the data being entered is properly checked. This Activity presents guidelines for data entry checks and controls. Good Practices and Recommendations : The following types of checks and controls are important to have in the data entry screens in all software applications :

• Validate all field that have ranges such as dates or amounts • Try to increase the number of lookup tables so that users do not enter country

codes or currencies whichever way they wish. • Allow the user, under privilege control, to add a parameter that is not in a lookup

table on the spot without having to go to another screen. • Allow the user to search for major tables such as citizens, projects, contractors,

etc. This should be available during deletions, modifications, printing and other system functions.

• Design screen layouts to be similar to actual vouchers. This eases data entry and requires less training for the user

• Use clear color coding as per Windows standards : Black labels, White for enterable fields and Grayed fields for non-enterable or for system responses

• Differentiate between Info, Error and Warning messages through the proper use of buttons : Info (OK), Error (OK), Warning (Yes, No), Choices (Yes, No, Cancel).

• Use clear and unambiguous messages • Avoid cluttering the screen with a large number of fields. It becomes difficult to

visually scan the screen and validate the data. In the case of large number of fields, it is best to use TABs or even multiple screens. For example, the CV database presented in the Appendix of Supplementary Material can be presented over two pages with buttons that will show other screens for the entry of work, education and training experience.

• Do not allow the system to accept to create or modify a record unless all data is validated. Many systems suffer from temporary entries that are never completd.

The above guidelines should be standardized across various applications to ensure that users get familiar with the look and feel of applications and hence require less training.

The ICT Processes Page 121

Activity 56 : Using and Supporting Office Technology Products Objectives : many governmental processes are based on Office Technology Products (OTP) that are end user programmable. For example, a certain Ministry may use a word processor to prepare various authorizations or certificates. Another may use a spreadsheet to prepare budgeting exercises. Should the use of such products not be organized properly, damages may result and worse still, the products will be underutilized. This Activity covers a variety of recommendations, many of them related to standardization of work by the users. Scope of usage : covers all PC based applications that are used on a stand alone basis by the users. This covers such products as word processors, spreadsheets, personal information managers, email, faxing products, illustrators, minor databases, web page editors and a variety of other office technology products. Risks : not following good practices in this area :

• Creates a confused environment that is not standardized • Increases dependence on user support • Reduces the efficiency of training • Exposes the Department to data and document losses • May cause deterioration of network response if not organized properly

Good Practices and Recommendations : 1) User Training : one of the most prevalent problems is that of lack of familiarity

with Office Technology Products (OTP) in use. Most products are simple to “start using”. However, as soon as users hit difficulties, they are on their own without assistance. This is due to lack of proper training and poor practices. The first step to ensure proper use of Office Technology Products is to provide regular training of users.

2) Encouraging use of office technology products : most users will be happy

using 10% of a word processor and a spreadsheet. It does not require much more effort to improve the competence in such products. However, it is more important to encourage users to use other products which are not so obvious such as slideshows (Powerpoint), illustrators (Visio), minor databases (Access), etc.

3) Standardized Directory Structures : most users have a tendency to create

documents all over the disk on their PCs. This usually results in document losses, duplication and difficulties while backing up. It is recommended that the Department establish a standardized directory or folder structure that can be used by all users. This has the added benefit of allowing easier support and backup.

4) Standardized File Naming : for files that are used internally and between

different users, it is best that a standardized naming procedure is followed. This may be linked to a reference generator that is setup on a published register. For example, on issuing a specific type of certificate, the user can open a centrally accessible spreadsheet, get the next reference, register the certificate on the

The ICT Processes Page 122

spreadsheet and use the reference as part of the file name. Other types of file naming practices can be introduced such as clear titles, etc.

5) Backup procedures : although discussed in Activity 38 : Backing Up, this

activity is slightly more complex with user data as such data is not centralized nor standardized. There are different ways to handle backup and all are discussed in the above Activity. The important issue is to ensure that users are aware of the need to backup their documents using whatever method is selected as per Activity 38.

6) Using standard forms : many organizations fall in the trap of using different

forms for their standard correspond and issues. Forms can be standardized and setup as templates on the user systems or on the central server. Linked with the reference generating practice discussed above, this would give the Department a more efficient control of correspondence. Such forms as the following can be standardized :

• Outgoing general correspondence • Faxes • Certificates the Department may issue • Authorizations the Department may issue • Various procurement forms such as orders, delivery reports, change

orders, etc. • Various human resource forms such as leave requests, absence

justification, change of status, etc. • Invoices, receipts and other financial documents

7) Version Issues : office technology product suppliers often update and upgrade

their products resulting in documents not being compatible between one version and the next. Often, this causes inconvenience and time loss for users exchanging such documents. It is therefore important to ensure that all users have the same versions of office technology products or at least have the proper converters for such products.

8) Information Sharing : invariably in an office environment, the same

information gets logged onto different PCs resulting in duplicated effort and incompatible data. It is important to survey the Department to identify such information and ensure that it is either centralized or that it resides with the person who is totally responsible for its maintenance. In all cases, it should be sharable. Such information as the following should be shared : telephone lists, email addresses, schedule of events, project lists, supplier names and records, file structure, reference register, document registers, types of templates, placed orders, etc.

The ICT Processes Page 123

11.0 Environment Management Most large computer centers require specific environmental conditions so that the equipment is maintained in proper running order. This is an Information Process that covers the definition of environmental conditions, the drivers used to maintain such conditions within the correct operating zones and the testers needed to warn against such conditions going out of their operating zones.

The ICT Processes Page 124

Activity 57 : Define the Required Environmental Conditions Objectives : this Activity presents a Procedure that defines the technical specifications required of the environment of the site where various ICT systems reside. Scope of usage : the environment covers large computer sites, server rooms, communications rooms, cabinets, media storage, etc. Equipment is required to monitor the environment for such purposes as :

• To measure various parameters (Temperature, humidity, dust, etc) • To warn when such situations arise as excessive smoke, fire, temperature,

humidity, etc. • To act under certain situations. For example, in case the UPS is not producing the

required voltage to run the system, it may send a signal to the servers to shut down normally, turning on emergency lamps, etc.

Risks : not knowing what the proper environmental conditions are may lead to

• Building improper sites : either too lax which may cause system problems or too strict which may require excessive costs.

• Not recognizing that the systems are operating outside their proper operating zones and hence expose the Department to environment problems

Standard Operating Procedure : The following Procedure should be prepared with the help of Suppliers, Site Engineers and in some cases, the architects of the site. It consists of the development of 5 types of documents : 1) Environmental Factors or Drivers : prepare a list of all environmental factors

to be controlled. Examples such as the following are common :

Temperature levels Dust levels Humidity levels Quality, stability and continuity of power Radiation interference (Radars, cellular networks and phones, motors, etc) Smoke levels Fire Other gases A/C quality Etc

2) Range of Operation : define the ranges allowed for each of the above for the specific site. These are technical specifications and should be validated with the Suppliers or the Manufacturers of the Equipment.

These are also critical items since in some cases, insurance, warranties and

maintenance agreements may be voided if the environment is not within its required limits.

The ICT Processes Page 125

3) Monitoring Equipment : identify the type of monitoring equipment needed to

test the above environmental drivers. Acquire such equipment through the proper procurement procedures.

4) Monitoring Equipment Test Procedures : develop Test Procedures that can be

applied to the monitoring equipment itself to ensure that it is running properly. 5) Environmental Drivers Test Procedures : develop Test Procedures that can be

applied to the Environmental Drivers to ensure that “in situ” the monitoring equipment is operating properly providing the right measurements, warnings or actions.

Documentation and Deliverables : the above 5 lists. Good Practices and Recommendations : 1) Include all monitors in the Configuration Management database for better

tracking.

The ICT Processes Page 126

Activity 58 : Monitor Environmental Behavior Objectives : to monitor the various environmental factors affecting the environment in which the ICT Systems operate and to ensure that the environment is maintained running within its allowable zones. Risks : having no monitors or faulty monitors can lead to :

• Stoppage of work due to the environment creeping out of its valid operating zones

• Damage to equipment in the short and long term • Corruption of data on current and backed up media • Voidance of warranties and maintenance terms by Suppliers who will claim that

their equipment may have been operating outside their acceptable operating zone.

Standard Operating Procedure : 1) Ensure that the 5 lists required in Activity 57 : Define the Required Environmental

Conditions have been properly prepared. 2) Ensure that the required monitors as defined in the above lists are acquired on

time and installed according to the proper IQ and OQ procedures presented earlier.

3) Apply Monitoring Equipment Test Procedures prepared in the previous

Activity at the time of installation and on a regular basis to ensure that they provide the proper reading, give the right alarms or carry out the proper action.

4) Apply the Environmental Drivers Test Procedures prepared in the previous

Activity to ensure that unusual environmental behavior is being intercepted and that the proper actions are taken by the equipment.

5) Document all test results. 6) Diagnosis and Remedial Action : in case monitors give results that show that

the various environment parameters are veering out of the acceptable operating range, the related parties responsible for such systems should be contacted for diagnosis and remedial action.

Acceptance Criteria : For each monitor, both the above tests should be passed.