Page 1 of 4 Ibrahim Hassan Baklawa Electrical Power Engineer E-Mail: [email protected] LinkedIn: http://eg.linkedin.com/in/ibaklawa Skype Username: ibrahimbaklawa Suez Canal Authority Building no.2 El-Mashtal Land, Portfouad Port Said, Egypt 002 066 Mobile Phone: +2 10 04321806 Home Phone: +2 066 3400661 Personal information - Birth date: 28 Feb.1986. - Birth place: Port Said, Egypt. - Military service: Final exemption. - Nationality: Egyptian. - Marital Status: Married. - Driving license: Available. - Passport: Available. - Workplace: ready for relocating. Education information - Graduated from Faculty of Engineering, Suez Canal University, Portsaid. - Degree: Bachelor. - Major: Electrical Power. - Year of graduation: 2008. - Accumulative estimation: Good. - Project estimation: Excellent. - Project title: Spraying toxic liquid automatically using PLC. - The idea of this project is to develop an automatic spraying system of jeans trousers by using AC Motors, Push buttons, Limit switches and Programmable logic controller (PLC). Languages - Arabic: Native. - English: Fluent (speaking, writing, reading and listening). - I have worked as a preparer and broadcaster at "Youth on Air Radio" from 2006 to 2008. Skills and Certifications - Microsoft Office, Internet, Networks and Adobe Photoshop. - AutoCAD 2D from Axon Global Education Center. I have the ability to draw power and control circuits properly in short time - March 2009, 14 Hours. - Plant Risk Assessment from Egyptian Propylene & Poly Propylene Company. I have the ability to determine the likelihood that people may exposed to injury, illness or disease in the workplace arising from any hazard situation by using risk matrix - April 2012, 10 Hours. - Swimming Certificate with excellent grade from Suez Canal Club. I am doing my best to keep on this sport, Port Said - August 1997. - Training courses in safety and environmental health. Educational practice - Suez Canal Authority, Port Said (SCA) - Summer 2005, 21 Hours. - Port Said Port Authority (PSPA) - Summer 2006, 16 Hours.

Upload: ibrahim-baklawa

Post on 25-Jan-2017

22 views

Category:

Documents


1 download

TRANSCRIPT

Page 1 of 4

Ibrahim Hassan Baklawa Electrical Power Engineer

E-Mail: [email protected]

LinkedIn: http://eg.linkedin.com/in/ibaklawa

Skype Username: ibrahimbaklawa

Suez Canal Authority Building no.2 El-Mashtal Land, Portfouad

Port Said, Egypt 002 066

Mobile Phone: +2 10 04321806

Home Phone: +2 066 3400661

Personal information

- Birth date: 28 Feb.1986.

- Birth place: Port Said, Egypt.

- Military service: Final exemption.

- Nationality: Egyptian.

- Marital Status: Married.

- Driving license: Available.

- Passport: Available.

- Workplace: ready for relocating.

Education information

- Graduated from Faculty of Engineering, Suez Canal University, Portsaid.

- Degree: Bachelor.

- Major: Electrical Power.

- Year of graduation: 2008.

- Accumulative estimation: Good.

- Project estimation: Excellent.

- Project title: Spraying toxic liquid automatically using PLC.

- The idea of this project is to develop an automatic spraying system of jeans trousers by using AC

Motors, Push buttons, Limit switches and Programmable logic controller (PLC).

Languages

- Arabic: Native.

- English: Fluent (speaking, writing, reading and listening).

- I have worked as a preparer and broadcaster at "Youth on Air Radio" from 2006 to 2008.

Skills and Certifications

- Microsoft Office, Internet, Networks and Adobe Photoshop.

- AutoCAD 2D from Axon Global Education Center. I have the ability to draw power and control circuits

properly in short time - March 2009, 14 Hours.

- Plant Risk Assessment from Egyptian Propylene & Poly Propylene Company. I have the ability to

determine the likelihood that people may exposed to injury, illness or disease in the workplace arising

from any hazard situation by using risk matrix - April 2012, 10 Hours.

- Swimming Certificate with excellent grade from Suez Canal Club. I am doing my best to keep on this

sport, Port Said - August 1997.

- Training courses in safety and environmental health.

Educational practice

- Suez Canal Authority, Port Said (SCA) - Summer 2005, 21 Hours.

- Port Said Port Authority (PSPA) - Summer 2006, 16 Hours.

Page 2 of 4

On site experience:

- Low voltage (400V & 500V) motors (up to 450KW).

- Medium voltage (6.6KV & 11KV) motors (up to 6500KW).

- Replace DE & NDE bearings of MV motors (up to 950KW) and LV motors (up to 75KW).

- Medium and low voltage cables glanding and terminations.

- Low and medium voltage switchgears.

- Power distribution transformers.

- 400V Emergency Diesel generator.

- Heat tracing (Steam\Electrical).

- Circuit breakers.

- Earthing system.

- Lighting and receptacles power system.

- Protection relay (SEPAM & SIMOCODE & TESYS-T).

- Intercourse with well-known companies such as TK Xervon, Siemens, Uhde, ABB and Schneider.

- Work as per safety rules, issued work orders and Cold\Hot permits in safe\hazardous areas.

- Perform Isolation\Deisolation for electrical equipment as per operation and maintenance requests by

issuing isolation certificates signed by involved departments.

- Help keep workers from mistakenly turning on electrical equipment by using Lockout and Tagout.

Familiar with:

- Multimeter. - Megger (insulation resistance).

- Earthing tester. - Micro ohmmeter (contact resistance).

- Secondary injection. - Circuit breaker analyzer.

- Infrared temperature gun. - Lux meter.

- CMMS (Maximo maintenance software).

Experience

From 1 May 2014 until Present

• Company Name: BME Global Maintenance and Construction.

• Position: Senior Electrical Engineer (Construction and Maintenance)

• Site: TCI Sanmar Petrochemicals S.A.E (Ethylene Plant).

• Website: http://www.sanmargroup.com/tci.php

• Field: Petrochemicals.

• Product: Ethylene and PVC.

• Attend construction, pre-commissioning, commissioning and startup of “Ethylene Plant”, “Water

Treatment Unit” and “Utility\Offsite” with aid of Jacobs Consultant India.

• Involve in construction and commissioning of new substation equipment and protection schemes

installed on the Electric System.

• Follow up electrical substation contains 10MVA 22/6.6KV Voltamp transformer, 2000KVA 11/0.4KV

ABB transformer, 250KVA 380V Cummins diesel generator and Schneider distribution switchgears.

• Follow up critical loads such as:

- Crude Ethylene Compressor Motor. 6.6KV 1300KW. Bharat Motor.

- Refrigeration Compressor Motor. 6.6KV 950KW. Siemens Motor.

- Cooling Water Circulation Pump Motor. 6.6KV 330KW. Crompton Greaves Motor.

• Lead, motivate and support electrical maintenance team consist of 2 junior engineers and 4 electricians

and 2 helpers.

• Create daily, weekly and monthly checklists for electrical equipment including field and substation and

follow up current, temperature and vibration readings.

• Receive breakdown calls during all the day and assign a maintenance group according to work

requirement and priorities.

Page 3 of 4

• Follow up annual maintenance plan via CMMS and hand it out to be implemented by junior engineers

for the following equipment:

- 6.6KV and 400V electrical motors. - Distribution transformer and NGR. - Isolation transformer.

- Low and medium voltage switchgears. - DC UPS System. - Electrical heaters.

- Lighting and receptacles power system. - Diesel generator. - Overhead cranes.

• Prepare monthly and yearly technical reports and raise it to manager.

• Determine the requirements for materials, spare parts and services base on maintenance and upgrading

work for exist units and substations.

• Provide technical guidance for CMMS in order to track maintenance activities.

From 1 June 2011 to 22 April 2014.

• Company Name: Alexandria Petroleum Maintenance S.A.E (Petromaint).

• Website: http://petromaint.net/

• Position: Electrical Maintenance Engineer.

• Site: Egyptian Propylene & Polypropylene Co. (EPPC) with total assets cost of 1.2 Billion USD.

• Field: Oil and Gas.

• Product: Propylene and Polypropylene.

• Follow up the following:

- Main GIS station contains two 45MVA 220/11KV distribution transformers.

- Three substations, every substation contains two 6300KVA 11/6.6KV Schneider transformers, two

2000KVA 11/0.4kv Areva transformers, 1250KVA 380V Heinkel diesel generator and Schneider

distribution switchgears.

• Power distribution control system PDCS with ability to monitor switchgears and control bus coupling,

incomers and transformers.

• Implement preventive (PM), corrective maintenance (CM) and shutdown plan (SDP) for:

- 11KV motors (up to 6500KW – Extruder Motor). - 6.6KV motors (up to 750KW).

- Low and medium voltage switchgears. - DC UPS System. - Low voltage motors.

- Lighting and receptacles power system. - Diesel generator. - Overhead cranes.

- Distribution transformer and NGR. - Isolation transformer. - Electrical heaters.

• Hand over continued jobs to next shift clearly and smoothly.

• Implement ISO 9001 by applying quality management system requirements for all areas of the business

including facilities, people, training, services and equipment.

• Use Maximo software to track maintenance and spare parts.

From 18 Dec. 2010 to 25 May 2011.

• Company Name: Sumitomo Electric Wiring Systems Egypt (SEWS-Eg).

• Website: http://www.sews-eg.com/

• Position: Electrical Maintenance Engineer.

• Field: Automotive.

• Product: Electric harnesses built in cars and motor bikes.

• Schedule and undertake periodic maintenance on all electrical equipment and components such as power

transformers, distribution panels and lighting system.

• Perform maintenance and tests for KOMAX machines, harnesses test boards and lay up boards as per

schemes, which are received, from Honda and Toyota.

• Ensure that equipment is operating as close to design parameters as possible to ensure that there is no

wasted production from less-than-optimal equipment capacity.

• Provide prompt response to inquiries whenever there is a breakdown, and resolve the issue as quickly as

possible.

• Recommend replacement for old or faulty electrical components or fittings to the management in order

to keep productivity level as per request.

Page 4 of 4

From 16 Nov. 2009 to 15 Nov. 2010.

• Company Name: TCI Sanmar Petrochemicals S.A.E at an investment cost of 1.3 Billion USD.

• Website: http://www.sanmargroup.com/tci.php

• Position: Electrical Construction Engineer.

• Field: Petrochemicals.

• Product: Chlorochemicals, VCM and PVC.

• Attend construction, pre-commissioning, commissioning and startup of plants and substations with aid

of Technip Consultant India.

• Follow up the following:

- Main station contains two 125MVA 220/22KV distribution transformers.

- Three substations, every substation contains two 8000KVA 22/6.6KV transformers, two 2000KVA

22/0.5kv transformers, two 2000KVA 22/0.4kv transformers and distribution switchgears.

• Supervise contractors stuff and issue the safety documents, process permit requests, prepare snag lists

and inspect new plant prior to taking over.

• Assist in arrangement and implementation of testing, commissioning, switching operations and trial run

for electrical equipment, as following:

- 6.6KV and 400V electrical motors. - Distribution transformer and NGR. - Isolation transformer.

- Low and medium voltage switchgears. - DC UPS System. - Electrical heaters.

- Lighting and receptacles power system. - Diesel generator. - Overhead cranes.

• Inspect, lay and perform termination for medium voltage power cables (size up to 400mm²) and low

voltage power cables (size up to 240mm²).

• Earthing grid and protection for power stations and field.

• Maintain and serve electrical equipment in hazardous area.

• Design and implement lighting and power system for outdoor, buildings and closed rooms.

• Follow up technical and financial affairs.

• Estimate the initial cost of projects depending on supplying and erection.

• Make requisitions of any required items, necessary tools, equipment and supplies.

From 01 Nov. 2008 to 30 Oct. 2009.

• Company Name: Royal Chemicals (Alaam El-Deen Group).

• Website: http://www.royalchemicals-eg.com/

• Position: Electrical Maintenance Engineer.

• Field: Chemicals.

• Product: Sulphonation and Sulphation, Soap Noodles, Fatty Acids and Glycerin.

• Promoted from trainee engineer to shift leader after 3 months.

• Follow up electrical substation (11KV\400V) and field.

• Periodic maintenance for MCC and PDB panels.

• Initiate periodic and random inspections in various stages of work, follow up the jobs during shift and

resolve any unforeseen problems.

• Prepare daily and weekly reports with readings of loads.