ibrahim baklawa - electrical power engineer
TRANSCRIPT
Page 1 of 4
Ibrahim Hassan Baklawa Electrical Power Engineer
E-Mail: [email protected]
LinkedIn: http://eg.linkedin.com/in/ibaklawa
Skype Username: ibrahimbaklawa
Suez Canal Authority Building no.2 El-Mashtal Land, Portfouad
Port Said, Egypt 002 066
Mobile Phone: +2 10 04321806
Home Phone: +2 066 3400661
Personal information
- Birth date: 28 Feb.1986.
- Birth place: Port Said, Egypt.
- Military service: Final exemption.
- Nationality: Egyptian.
- Marital Status: Married.
- Driving license: Available.
- Passport: Available.
- Workplace: ready for relocating.
Education information
- Graduated from Faculty of Engineering, Suez Canal University, Portsaid.
- Degree: Bachelor.
- Major: Electrical Power.
- Year of graduation: 2008.
- Accumulative estimation: Good.
- Project estimation: Excellent.
- Project title: Spraying toxic liquid automatically using PLC.
- The idea of this project is to develop an automatic spraying system of jeans trousers by using AC
Motors, Push buttons, Limit switches and Programmable logic controller (PLC).
Languages
- Arabic: Native.
- English: Fluent (speaking, writing, reading and listening).
- I have worked as a preparer and broadcaster at "Youth on Air Radio" from 2006 to 2008.
Skills and Certifications
- Microsoft Office, Internet, Networks and Adobe Photoshop.
- AutoCAD 2D from Axon Global Education Center. I have the ability to draw power and control circuits
properly in short time - March 2009, 14 Hours.
- Plant Risk Assessment from Egyptian Propylene & Poly Propylene Company. I have the ability to
determine the likelihood that people may exposed to injury, illness or disease in the workplace arising
from any hazard situation by using risk matrix - April 2012, 10 Hours.
- Swimming Certificate with excellent grade from Suez Canal Club. I am doing my best to keep on this
sport, Port Said - August 1997.
- Training courses in safety and environmental health.
Educational practice
- Suez Canal Authority, Port Said (SCA) - Summer 2005, 21 Hours.
- Port Said Port Authority (PSPA) - Summer 2006, 16 Hours.
Page 2 of 4
On site experience:
- Low voltage (400V & 500V) motors (up to 450KW).
- Medium voltage (6.6KV & 11KV) motors (up to 6500KW).
- Replace DE & NDE bearings of MV motors (up to 950KW) and LV motors (up to 75KW).
- Medium and low voltage cables glanding and terminations.
- Low and medium voltage switchgears.
- Power distribution transformers.
- 400V Emergency Diesel generator.
- Heat tracing (Steam\Electrical).
- Circuit breakers.
- Earthing system.
- Lighting and receptacles power system.
- Protection relay (SEPAM & SIMOCODE & TESYS-T).
- Intercourse with well-known companies such as TK Xervon, Siemens, Uhde, ABB and Schneider.
- Work as per safety rules, issued work orders and Cold\Hot permits in safe\hazardous areas.
- Perform Isolation\Deisolation for electrical equipment as per operation and maintenance requests by
issuing isolation certificates signed by involved departments.
- Help keep workers from mistakenly turning on electrical equipment by using Lockout and Tagout.
Familiar with:
- Multimeter. - Megger (insulation resistance).
- Earthing tester. - Micro ohmmeter (contact resistance).
- Secondary injection. - Circuit breaker analyzer.
- Infrared temperature gun. - Lux meter.
- CMMS (Maximo maintenance software).
Experience
From 1 May 2014 until Present
• Company Name: BME Global Maintenance and Construction.
• Position: Senior Electrical Engineer (Construction and Maintenance)
• Site: TCI Sanmar Petrochemicals S.A.E (Ethylene Plant).
• Website: http://www.sanmargroup.com/tci.php
• Field: Petrochemicals.
• Product: Ethylene and PVC.
• Attend construction, pre-commissioning, commissioning and startup of “Ethylene Plant”, “Water
Treatment Unit” and “Utility\Offsite” with aid of Jacobs Consultant India.
• Involve in construction and commissioning of new substation equipment and protection schemes
installed on the Electric System.
• Follow up electrical substation contains 10MVA 22/6.6KV Voltamp transformer, 2000KVA 11/0.4KV
ABB transformer, 250KVA 380V Cummins diesel generator and Schneider distribution switchgears.
• Follow up critical loads such as:
- Crude Ethylene Compressor Motor. 6.6KV 1300KW. Bharat Motor.
- Refrigeration Compressor Motor. 6.6KV 950KW. Siemens Motor.
- Cooling Water Circulation Pump Motor. 6.6KV 330KW. Crompton Greaves Motor.
• Lead, motivate and support electrical maintenance team consist of 2 junior engineers and 4 electricians
and 2 helpers.
• Create daily, weekly and monthly checklists for electrical equipment including field and substation and
follow up current, temperature and vibration readings.
• Receive breakdown calls during all the day and assign a maintenance group according to work
requirement and priorities.
Page 3 of 4
• Follow up annual maintenance plan via CMMS and hand it out to be implemented by junior engineers
for the following equipment:
- 6.6KV and 400V electrical motors. - Distribution transformer and NGR. - Isolation transformer.
- Low and medium voltage switchgears. - DC UPS System. - Electrical heaters.
- Lighting and receptacles power system. - Diesel generator. - Overhead cranes.
• Prepare monthly and yearly technical reports and raise it to manager.
• Determine the requirements for materials, spare parts and services base on maintenance and upgrading
work for exist units and substations.
• Provide technical guidance for CMMS in order to track maintenance activities.
From 1 June 2011 to 22 April 2014.
• Company Name: Alexandria Petroleum Maintenance S.A.E (Petromaint).
• Website: http://petromaint.net/
• Position: Electrical Maintenance Engineer.
• Site: Egyptian Propylene & Polypropylene Co. (EPPC) with total assets cost of 1.2 Billion USD.
• Field: Oil and Gas.
• Product: Propylene and Polypropylene.
• Follow up the following:
- Main GIS station contains two 45MVA 220/11KV distribution transformers.
- Three substations, every substation contains two 6300KVA 11/6.6KV Schneider transformers, two
2000KVA 11/0.4kv Areva transformers, 1250KVA 380V Heinkel diesel generator and Schneider
distribution switchgears.
• Power distribution control system PDCS with ability to monitor switchgears and control bus coupling,
incomers and transformers.
• Implement preventive (PM), corrective maintenance (CM) and shutdown plan (SDP) for:
- 11KV motors (up to 6500KW – Extruder Motor). - 6.6KV motors (up to 750KW).
- Low and medium voltage switchgears. - DC UPS System. - Low voltage motors.
- Lighting and receptacles power system. - Diesel generator. - Overhead cranes.
- Distribution transformer and NGR. - Isolation transformer. - Electrical heaters.
• Hand over continued jobs to next shift clearly and smoothly.
• Implement ISO 9001 by applying quality management system requirements for all areas of the business
including facilities, people, training, services and equipment.
• Use Maximo software to track maintenance and spare parts.
From 18 Dec. 2010 to 25 May 2011.
• Company Name: Sumitomo Electric Wiring Systems Egypt (SEWS-Eg).
• Website: http://www.sews-eg.com/
• Position: Electrical Maintenance Engineer.
• Field: Automotive.
• Product: Electric harnesses built in cars and motor bikes.
• Schedule and undertake periodic maintenance on all electrical equipment and components such as power
transformers, distribution panels and lighting system.
• Perform maintenance and tests for KOMAX machines, harnesses test boards and lay up boards as per
schemes, which are received, from Honda and Toyota.
• Ensure that equipment is operating as close to design parameters as possible to ensure that there is no
wasted production from less-than-optimal equipment capacity.
• Provide prompt response to inquiries whenever there is a breakdown, and resolve the issue as quickly as
possible.
• Recommend replacement for old or faulty electrical components or fittings to the management in order
to keep productivity level as per request.
Page 4 of 4
From 16 Nov. 2009 to 15 Nov. 2010.
• Company Name: TCI Sanmar Petrochemicals S.A.E at an investment cost of 1.3 Billion USD.
• Website: http://www.sanmargroup.com/tci.php
• Position: Electrical Construction Engineer.
• Field: Petrochemicals.
• Product: Chlorochemicals, VCM and PVC.
• Attend construction, pre-commissioning, commissioning and startup of plants and substations with aid
of Technip Consultant India.
• Follow up the following:
- Main station contains two 125MVA 220/22KV distribution transformers.
- Three substations, every substation contains two 8000KVA 22/6.6KV transformers, two 2000KVA
22/0.5kv transformers, two 2000KVA 22/0.4kv transformers and distribution switchgears.
• Supervise contractors stuff and issue the safety documents, process permit requests, prepare snag lists
and inspect new plant prior to taking over.
• Assist in arrangement and implementation of testing, commissioning, switching operations and trial run
for electrical equipment, as following:
- 6.6KV and 400V electrical motors. - Distribution transformer and NGR. - Isolation transformer.
- Low and medium voltage switchgears. - DC UPS System. - Electrical heaters.
- Lighting and receptacles power system. - Diesel generator. - Overhead cranes.
• Inspect, lay and perform termination for medium voltage power cables (size up to 400mm²) and low
voltage power cables (size up to 240mm²).
• Earthing grid and protection for power stations and field.
• Maintain and serve electrical equipment in hazardous area.
• Design and implement lighting and power system for outdoor, buildings and closed rooms.
• Follow up technical and financial affairs.
• Estimate the initial cost of projects depending on supplying and erection.
• Make requisitions of any required items, necessary tools, equipment and supplies.
From 01 Nov. 2008 to 30 Oct. 2009.
• Company Name: Royal Chemicals (Alaam El-Deen Group).
• Website: http://www.royalchemicals-eg.com/
• Position: Electrical Maintenance Engineer.
• Field: Chemicals.
• Product: Sulphonation and Sulphation, Soap Noodles, Fatty Acids and Glycerin.
• Promoted from trainee engineer to shift leader after 3 months.
• Follow up electrical substation (11KV\400V) and field.
• Periodic maintenance for MCC and PDB panels.
• Initiate periodic and random inspections in various stages of work, follow up the jobs during shift and
resolve any unforeseen problems.
• Prepare daily and weekly reports with readings of loads.
Original papers and certifications will be available upon your request.