hme pdd mm 10 physical inv 041110 v01
TRANSCRIPT
-
7/31/2019 HME PDD MM 10 Physical Inv 041110 v01
1/13
IBM
Process Definition Document
Materials Management Physical Inventory Process
Client: Hill Metals Establishment.
Author: Sulman Ahmad Khan/ Aamir Masood Arbab
-
7/31/2019 HME PDD MM 10 Physical Inv 041110 v01
2/13
Page 2 of13
Table of Contents
1. INTRODUCTION TO PHYSICAL INVENTORY ................................................................... 5
2. PHYSICAL INVENTORY PROCESS ........................................................................................ 6
3. OUTPUTS (FORMS) ................................................................................................................. 9
4.
STANDARD REPORTS ........................................................................................................... 10
5. KEY PERFORMANCE INDICATORS ................................................................................... 11
6. INTEGRATION CONSIDERATIONS .................................................................................... 12
7. TESTING SCENARIOS ............................................................................................................ 13
-
7/31/2019 HME PDD MM 10 Physical Inv 041110 v01
3/13
Page 3 of13
Document History
AUTHORS & PARTICIPANTS
Role Name
HME Project Process Owner Mr. Abdul Aziz Sajid
HME Business Unit Process Owner Mr. Chaudhary Javaid Iqbal
HME Business Unit Process Owner Mr. Samiullah Khan
HME Business Unit Process Owner Mr. Mohammad Anees
HME Business Unit Process Owner Mr. Shahid Saeed
HME Business Unit Process Owner Mr. Mohammad Ashraf
HME Business Unit Process Owner Mr. Imran Khalid
HME Business Unit Process Owner Mr. Ahtesham Awan
IBM Consultant Sulman Ahmad Khan/ Aamir Masood Arbab
IBM Project Manager Adeel Hashmi
Workshop Participant
REVISION HISTORY
Date Document Version Document RevisionDescription
Author
04-11-2010 1.0 Customer review Sulman/ Aamir
-
7/31/2019 HME PDD MM 10 Physical Inv 041110 v01
4/13
Page 4 of13
REVIEWED AND APPROVED BY
Name Title Date Approved
Mr. Abdul Aziz Sajid HME Project ProcessOwner
Mr. Chaudhary Javaid Iqbal HME Business Unit ProcessOwner
Mr. Samiullah Khan HME Business Unit ProcessOwner
Mr. Mohammad Anees HME Business Unit ProcessOwner
Mr. Shahid Saeed HME Business Unit ProcessOwner
Mr. Mohammad Ashraf HME Business Unit ProcessOwner
Mr. Imran Khalid HME Business Unit ProcessOwner
Mr. Ahtesham Awan HME Business Unit ProcessOwner
Sulman Ahmad Khan/ AamirMasood Arbab
IBM Consultant
Adeel Hashmi IBM Project Manager
-
7/31/2019 HME PDD MM 10 Physical Inv 041110 v01
5/13
-
7/31/2019 HME PDD MM 10 Physical Inv 041110 v01
6/13
Page 6 of13
2. Physical Inventory Process
The physical inventory process comprises three phases:
Creation of physical inventory documents
Entry of count
Posting of inventory difference
In the first phase, you create the physical inventory (PI) documents. It is possible to generate
inventory documents in large quantities using batch input. After selecting the stocks to be counted
and creating the PI documents, you print out the documents in order to start the counting process.
You enter the count results in the system in the second phase. The system calculates the inventory
differences. If some of the results seem doubtful, you can arrange for a recount of the stock
management units affected. In this case, further PI documents are generated.
In the third phase, you post the inventory differences that have been identified. The quantities and
values of the stock are updated. The stock accounts are updated in FI.
-
7/31/2019 HME PDD MM 10 Physical Inv 041110 v01
7/13
Page 7 of13
2.1.1. Process Flow To-Be
Physical Inventory Process
Authorized PersonStore
Process End
Process Start
Manual sign-off by
HOD
2.1.2.5
2.1.2.6
Create Physical
Inventory (PI)
Document
Take print output
of PI for approval
Conduct physical
count of materials
listed in PI
document
Check
variances if too
large
YesEnter Count
Results
Post Inventory
DifferencesNo
Material &
Accounting
Document
generated by SAP
2.1.2.1
2.1.2.2
2.1.2.4
2.1.2.72.1.2.3
No Difference
-
7/31/2019 HME PDD MM 10 Physical Inv 041110 v01
8/13
Page 8 of13
2.1.2. Functional Description of Process Steps
If differences are Zero in Book inventory and physical inventory then zero indicator is check to closed
the physical inventory cycle
ActivityNo Business Activity SAP Process
SAPTransaction Input / Remarks
2.1.2.1Physical Inventorydocument
The Store Officercreates the PhysicalInventory Document inthe system
MI01Materials are blockedfor movements.
2.1.2.2 PrintoutThe Physical Inventorydoc printout is takenout for approval.
MI21
2.1.2.3 Approval Outside SAPThe HOD approval isobtained.
2.1.2.4Conduct Physical
Inventory
Outside SAP
The store keeper visitsthe store and conducts
the physical inventorycount.
2.1.2.5 Enter count resultsThe store officer entersthe count results in thesystem.
MI04Release material formovementautomatically.
2.1.2.6 Variance check
If the variance to toolarge, another physicalinventory document iscreated with referenceto first PI document.
MI01Complete data isadopted from the first PIdocument
2.1.2.7 Post Difference
The authorized personpost the inventorydifferences in thesystem
MI07/ MI20
Differences can beposted individually orfrom the differences list.
Material and accountingdocuments aregenerated by thesystem.
-
7/31/2019 HME PDD MM 10 Physical Inv 041110 v01
9/13
Page 9 of13
3. Outputs (forms)
Physical Inventory Document
-
7/31/2019 HME PDD MM 10 Physical Inv 041110 v01
10/13
Page 10 of13
4. Standard Reports
Stock Overview MMBE
Materials Document MB51
Reason for Movement MBGR
Physical Inventory Overview MIDO
Physical Inventory List MI24
Changes to Physical Inventory Document MI12
Count/ Difference MI08
Difference List MI20
-
7/31/2019 HME PDD MM 10 Physical Inv 041110 v01
11/13
Page 11 of13
5. Key Performance Indicators
Physical Inventory for material with higher value can be undertaken more frequently than
others, thereby providing a constant check to minimize the value/quantity differences.
SAP can be configured to automatically enable the concerned dept. to undertake the physical
inventory exercise (with list of materials already prepared) which requires physical inventory, via
batch processing.
Activating the Blocking function in SAP ensures that no goods movement of the material takes
place until physical inventory process is completed, thereby minimizing any chances of
discrepancy between the time physical inventory results recorded in SAP and any movements of
goods that took place while the inventory count was going on.
List of difference enables both quantity and value differences to be available for decision-making
purposes, that is, those requiring a re-count and those where reasonable difference is
acceptable.
-
7/31/2019 HME PDD MM 10 Physical Inv 041110 v01
12/13
Page 12 of13
6. Integration Considerations
The entire goods movements processes, that is, receipts, issuances, transfer postings provides
an instant source of information to form the basis of physical inventory in SAP and to cross-
check the information from SAP to that of physical inventory.
-
7/31/2019 HME PDD MM 10 Physical Inv 041110 v01
13/13
Page 13 of13
7. Testing Scenarios
Following are the scenarios which were listed by the user for the above mentioned processes:
Store check physical stock on quarterly basis and match the quantity of the book quantity and
physical quantity.