    Hamden East-West ransportation Study2

    Contents

    Introduction.............................................................................................3

    Existing Conditions................................................................................9

    Connolly/Elgin/Ardmore/Tornton..............................................10

    Haverord Street/Santa Fe Avenue........................... ..................... ...11

    Waite Street........................................................................................12

    Mather Street.....................................................................................13

    readwell Street.................................................................................14

    Putnam Avenue.................................................................................15

    Augur Street......................................................................................16

    Mill Rock Road/ Armory Street......................................................17

    Recommendations................................................................................18

    Connolly/Elgin/Ardmore/Tornton.............................................19

    Haverord Street/Santa Fe Avenue............................. .....................21

    Waite Street.......................................................................................22

    Mather Street....................................................................................24

    readwell Street.................................................................................26

    Putnam Avenue.................................................................................27

    Augur Street.....................................................................................29

    Mill Rock Road/ Armory Street......................................................31

    Cost Estimate and Implemenation Schedule............................... ..33

    oolbox...................................................................................................34

    Itemized Cost Estimate............................... ..................... .....................48

  • 8/2/2019 Ham Den East West Final 041012

    3/52

    Hamden East-West ransportation Study 3Introduction

  • 8/2/2019 Ham Den East West Final 041012

    4/52

    Hamden East-West ransportation Study4

    Introduction

    Hamdens transportation system consists o primarily north-southroutes or connections within the own as well as to adjacentcommunities such as Cheshire and New Haven. Due to Hamdensgeographical boundaries and orientation, east-west connectivity islimited to a ew major arterials and a number o local residential

    streets. Te roadway system is strongly inuenced by the WilburCross Parkway and the Route 5 and Route 10 regional transportationcorridors, which convey approximately 94,000 to 119,000 vehicles perday (2006 CDO average daily trac counts) through Hamden.

    rac is reportedly increasing on the east-west routes as drivers lookto avoid congestion on the north-south routes. Many o these roadsare minor arterials and collectors that serve neighborhoods, schools,and businesses; which residents believe are being negatively impactedby heavy trac volume, truck trac, and speeding vehicles. Te

    purpose o this study is to conrm issues along Hamdens east-weststreet network, and recommend strategies to mitigate the negativeconsequences o increased trac.

    Tis study will address transportation system opportunities orimproving saety, increasing accessibility, maximizing travel by allmodes, and enhancing the quality o lie within the community. Sincethe east-west routes are primarily local routes, with the exceptiono the Wilbur Cross Parkway, both conventional and innovativeapproaches will be considered.

    Te own has received numerous requests or trac calming in theSpring Glen and Whitneyville areas o Hamden. Te neighborhoodassociations that represent these areas have been active in collectingeedback rom residents and planning or trac calming andtransportation improvements. Tis study will build upon thoseeorts to develop and actionable transportation and trac calmingplan or the neighborhoods.

    Spring Glen and Whitneyville Civic Association Reports

    In 2010, the Spring Glen and Whitneyville Civic Associationssubmitted reports to the Mayors oce outlining trac calmingpreerences and recommendations.

    Te Spring Glen report was limited to a survey o residentpreerences. Te preerred trac calming treatments included:speedhumps, bike lanes, and on-street parking. Preerences wereidentied or each street in the neighborhood and include Ardmore,Elgin, and Haverord Streets.

    Te Whitneyville report, which was more comprehensive andincluded documentation o issues and proposed solutions, identiedseveral streets that are included in this study. Tese streets includeMather Street, readwell Street, Putnam Avenue and Augur Street.Recommendations varied and included: speed humps, trac circles,raised crosswalks, bike lanes, and sidewalks.

  • 8/2/2019 Ham Den East West Final 041012

    5/52

    Hamden East-West ransportation Study 5

    Steering Committee Workshop

    On September 27th, 2011 Hamden trac calming steering commit-tee members and neighborhood representatives rom Spring Glen andWhitneyville gathered or a workshop to identiy trac issues andrecommend trac calming and saety improvements or the neigh-borhoods.

    Te issues discussed were similar to those that had been previouslyidentied within neighborhood association reports and steering com-mittee meetings. Te streets that were presented or inclusion intothis transportation study include:

    ArdmoreStreet ArmoryStreet AugurStreet ElginStreet ConnollyParkway

    HaverfordStreet MatherStreet MillRockRd PutnamAvenue TreadwellStreet WaiteStreet

    Concerns in the Spring Glen neighborhood centered around tracspeed and volume and pedestrian conicts due to inadequate cross-ings and incomplete sidewalk networks. Discussion was ocused

    on the Connolly/Elgin/Ardmore corridor and Waite Street. raccircles, additional sidewalks, and speedhumps were discussed as po-tential solutions to various trac issues.

    Te issues identied by Whitneyville residents included pedestriancrossing issues, access to the Farmington Canal rail, stop sign run-ning, truck trac, on-street parking, sidewalk gaps, and speeding.Te solutions discussed varied rom improved crosswalks and moresidewalks to chicanes and intersection redesigns.

    Online Survey

    In October 2011 an online trac calming survey was posted and alink was distributed to the neighborhood associations and residents.Te response period was extended through December 2011 at therequest o residents. Over 190 responses were collected rom residentson 53 dierent streets. Te streets with the most respondents in-

    clude: Blake Road, Mather Street, Whitney Avenue, readwell Street,Ralston Avenue, Armory Street, Carleton Street, Haverord Street,King Street, Wilkins Street and Putnam Avenue. Survey respondentsranked trac study corridor streets in terms o their trac saetyconcerns in the ollowing order:

    1. Mather Street2. Putnam Avenue3. readwell Street4. Waite Street5. Augur Street6. Armory Street

    7. Connolly Parkway8. Ardmore Street9. Mill Rock Road10. Haverord Street11. Elgin Street

    90%

    31%

    50%

    12%

    0%

    10%

    20%

    30%

    40%

    50%

    60%

    70%

    80%

    90%

    100%

    Walking Jogging Bicycling None of the above, I

    primarily drive in the

    neighborhood

    What activities do you regularly engagein within Spring Glen or Whitneyville?

    When asked what activities that respondents regularly engaged inwithin the neighborhood, 90% o respondents reported that they walkin the neighborhood on a regular basis and 50% o respondents bi-cycle on a regular basis. Only 12% o those surveyed responded thatthey primarily drive in the neighborhood.

  • 8/2/2019 Ham Den East West Final 041012

    6/52

    Preferred

    Less

    Preferred

    Rating o Trafc Calming Measures

    Hamden East-West ransportation Study6

    Te most signicant issues identied by respondents included speeding,unsae intersections and reckless driving. Te percentage o respondentswho identied the ollowing items as trac saety concerns in theneighborhoods are as ollows:

    Speeding 80%Reckless driving 58%

    Unsae intersection 57%Cut-through trac 54%Diculty crossing roadways 47%rac volume 43%

    Maintenance 39%Lack o bicycle acilities 32%

    Lack o sidewalks 28%On-street parking 18%Bicyclist behavior 11%

    When asked i they could improve only one street in each neighborhood,65% o respondents identied Waite Street in Spring Glen while 37% orespondents identied Mather Street and 35% identied Putnam Avenueas the streets they would improve in Whitneyville.

    Respondents were likewise asked to identiy one intersection that they

    would improve in each neighborhood. Te Waite Street/WhitneyAvenue intersection in Spring Glen was overwhelmingly identiedby respondents with the Putnam/Whitney intersection ollowed bythe Belmont/Mather intersection o Whitneyville being identied aspriorities.

    O the trac calming and pedestrian saety measures presented to surveyrespondents; bike lanes, speed humps, warning signs and trac circleswere identied as the most amiliar and were correspondingly rated asthe most desirable measures.

    Presentation o Findings

    On November 30th, 2011 the intial ndings and recommendationsrom this study was presented to the public at the Miller Center inHamden. Approximately 60 people attended the meeting. In atten-dance were representatives rom the own o Hamden, SCRCOG,Spring Glen, Whitneyville, and the general public.

    Te presentation was open to comments and questions. Discussionand comments received included:

    Armory Street needs trac enforcement

    Trac on Mather Street is too fast, additional trac calming measures are desired.

    A connection to the Farmington Canal Trail from Mather Street is needed, BobBrinton (Public Works) informed that an easement had been negotiated with a

    property owner.

    Additional measures are desired at Prospect Street and Mill Rock Road

    A resident of Prospect Street (north-south corridor) expressed the desire for a study

    of and improvements to that roadway

    Attendees expressed interest in staying informed via email or the project website

    Curt Leng (Mayors oce) commented that some of the improvements, such assidewalks, have already been programmed

    ornton Street should have been added as a corridor. Visibility around the curveis limited. ornton has a trac light so it is the major cut-through rough sincecars can easily take a le onto Whitney Avenue.

    Residents were concerned that the study favored Whitneyville in terms of corridorsstudied and solutions proposed.

    A resident expressed concern about Ridge Road (north/south corridor) highspeeds coupled with bicyclists and pedestrians

    Several residents had not been aware of the on-line survey and were interested inparticipating

    See if the Town can host material on their website

    Bob Brinton (Engineering) informed that the property owner on the south side ofMather St. oered to donate an easement to the town as part of the developmentof the property.

    In response to eedback, this study was expanded to include TorntonStreet and Santa Fe Avenue, both in Spring Glen.

  • 8/2/2019 Ham Den East West Final 041012

    7/52

    Hamden East-West ransportation Study 7

    Study Area

    Tis study will recommend improvements or eight east/westcorridors in the Spring Glen and Whitneyville areas o Hamden.Tese corridors have been chosen due to initial trac assessment,neighborhood association reports, and the steering committeeworkshop. Tese corridors are identied in the graphic belowand include Connolly Parkway/Elgin/Ardmore/Tornton Street,Haverord Street/Santa Fe Avenue, Waite Street, Mather Street,readwell Street, Putnam Avenue, Augur Street, Mill Rock Road/Armory Street.

    Tese roadways connect both the Spring Glen and Whitneyvilleneighborhoods to one another and to north/south routes suchas Dixwell Avenue, Whitney Avenue, Newhall Street, and RidgeRoad. Tese roadways also serve as critical bicycle and pedestrianconnections to resources such as the Farmington River Canal rail,Lake Whitney, Bassett Park, DiNicola Park, the water treatment

    plant gardens, playgrounds and athletic elds.

    Rout

    e15

    New

    ha

    llS

    t MillRockRd

    ArmorySt

    PutnamAve

    AugurSt

    TorntonSt

    SanteFeAve

    Wh

    itney

    Ave

    Dixwe

    llAve

    Rid

    ge

    Rd

    TreadwellSt

    MatherSt

    WaiteSt

    HaverfordSt

    ArdmoreSt

    ElginSt

    Fa

    rmin

    gtonRiv

    erCanalT

    rail

    BassettPark

    DogPark

    DiNicolaPark

    Playground

    WaterTreat-ment

    AthleticField

  • 8/2/2019 Ham Den East West Final 041012

    8/52

    Hamden East-West ransportation Study8

    Te ollowing table provides a summary o the study corridorsattributes and documented issues. Te corridors are comprised olocal, collector and arterial roadways with trac volumes that rangerom 1,500 vehicles per day on Ardmore Street to 11,900 vehicles perday on Putnam Avenue. Roadway width varies slightly across the

    corridors with Augur Street being the narrowest roadway at 22-24wide and Mill Rock Road being the widest roadway at 30-34 wide.

    Speed limits are 25mph on all corridors with the exception o PutnamAvenue which is posted at 30mph. While there are sidewalks onevery corridor in the study area, there are signicant sidewalk gapson several roadways including Waite Street, Mather Street, readwellStreet, Putnam Avenue, Augur Street, Mill Rock Road and Armory

    Street. Speeding has been identied as a concern on all corridors.

    Corridor StreetType

    Volume(ADT)

    Width SpeedLimit

    Attributes Issues

    Connolly Pkwy/Elgin St/ArdmoreSt/Tornton St

    Local 6800/3100/1500/na

    30 25 Continuous sidewalks, no pavement markings orintersections within corridor, residential land use

    Speeding, trac rolls through stop signs

    Haverord Street/Santa Fe Avenue

    Local not available/950

    30 25 Continuous sidewalks, 2 all-way stops withincorridor, residential land use

    Limited sight lines due to curve, speeding, steepgrades approaching Ridge Road

    Waite Street Arterial 3000 24-28 25 Limited sidewalks. Pedestrian and bicyclistdemand or access to Lake Whitney and BassettPark. One trac light and one all-way stopcontrolled intersection within corridor

    Sidewalk gaps, complex intersections, speeding

    Mather Street Arterial 4200 26-30 25 Limited sidewalks, uninterrupted trac owbetween Dixwell and Whitney Avenue.

    Complex intersections at Whitney Ave andWaite Street, signicant sidewalk gap at LakeWhitney, misdirected cut-thru trac, pedestrianconicts

    readwell Street Collector 3900 24-30 25 Sidewalk gap at northern end, high pedestrianactivity at southern end, one trac signal and twoall-way stops within corridor at southern end

    Signicant sidewalk gap between Dixwell Aveand Leeder Hill Dr. Complex intersection atWhitney Ave and Mather Street, speeding.

    Putnam Avenue Arterial 11,900 30-32 30 Continuous sidewalks throughout much o corridor, on-street parking on south side, 3 traclight controlled intersections within corridor, busline

    Sidewalk gaps, pedestrian crossing concerns,heavy trac, speeding

    Augur Street Local not available 22-24 25 One-way westbound, parking on south side o road, continuous sidewalks, dense residentialdevelopment, two a ll-way stops within corridor

    Stop sign running, sidewalk gaps, speeding

    Mill Rock Road/Armory Street

    Local 3400/2900 30-34/28-30

    25 Park activity and parking on south side at westernend o Mill Rock Road, sidewalk gaps, two all-waystop intersections within corridor

    Speeding and ailure to stop at Mill Rock Rd/Prospect St/Armory Street intersection. Highpedestrian activity and parking demand nearpark

    Corridor Attributes and Issues

  • 8/2/2019 Ham Den East West Final 041012

    9/52

    Existing

    ConditionsHamden East-West ransportation Study 9

  • 8/2/2019 Ham Den East West Final 041012

    10/52

    Hamden East-West ransportation Study10

    Fast moving trac rom Elgin toArdmore. Right turning tractends to roll through stop signs.

    rac rolls through

    our-way stop

    Connolly Parkway/Elgin Street/Ardmore Street/Tornton Street: Existing Conditions

    Tis corridor is used as a cut-through or trac between Dixwell andWhitney Avenues. Te posted speed limit through this corridor is25 mph, but observed trac speeds appear to be higher. Roadwaywidth varies between 28 to 30 and is relatively uniorm. ConnollyParkway is the only road with a yellow centerline, pavement markings

    are otherwise sparse. While sidewalks are present on both sides othe street throughout this corridor, the only marked crosswalks arelocated at Whitney Avenue intersections. Additionally, there are nostop-bar pavement markings at stop sign locations.

    rac volumes are moderate to low with a majority o trac (6800AD) being carried by Connolly Parkway with Elgin and ArdmoreStreets carrying an average o 3100 and 1500 vehicles per dayrespectively. Te progression o these volumes rom east to westreveals o unneling o trac towards and away rom both Elgin

    Street and Connolly Parkway.Notable eatures along this corridor include the Farmington Canalrail which has a trail head o Connolly Parkway just west o theRoute 15 overpass.

    rac rolls throughall-way stop sign

    North/south tracdoes not stop, limited

    visibility due to treesEastbound trac usesTornton Street tomake lef turn at lightonto Whitney Ave

    ConnollyParkway

    Farmin

    gto

    nCan

    alT

    rail

    ElginStreet

    ArdmoreStreet

    W h i t

    n e y A

    v e

    N

  • 8/2/2019 Ham Den East West Final 041012

    11/52

    Hamden East-West ransportation Study 11

    Haverord Street/Santa Fe Avenue: Existing Conditions

    Haverord Street and Santa Fe Avenue are local roadways that carry tracbetween Whitney Avenue and Ridge Road. Tese roadways are 28-29 eetwide and unstriped. Santa Fe Avenue carries approximately 950 vehicles perday. Field observations or Haverord Street noted a low volume o trac onthat roadway as well. Both corridors have a posted speed limit o 25 mph.

    Both roadways have steep grades approaching Ridge Road that result in astacceleration in the westbound direction descending rom Ridge Road.

    Stop controlled intersections within the corridors include the Broadeld Roadintersection o Santa Fe Avenue and the intersection o Lansdowne Avenue andHaverord Street. Stop bars were absent rom both o these intersections.

    Limited sight-linesalong curve

    Long interrupted segmentallows or speeding

    Steep grade contributes todownhill speeding

    Long interrupted segmentallows or speeding

    HaverfordStreet

    Santa FeAve

    R i d

    g e R o a d

    Whitn

    ey

    Ave

    Haverford Street at Lansdowne Avenue: View west

  • 8/2/2019 Ham Den East West Final 041012

    12/52

    Hamden East-West ransportation Study12

    Waite Street: Existing Conditions

    Waite Street is an arterial roadway that spans Lake Whitney andconnects Mather Street to Whitney Avenue and Ridge Road. WaiteStreet has an average daily trac volume o 3000 vehicles and ranges inwidth rom 24 to 28 eet. Sidewalks are present on Waite Street althoughnot continuous. Signicant sidewalk gaps exist rom Mather Street

    across Lake Whitney and between Ford Street and Barrett Street. Tespeed limit on Waite Street is 25mph although reported speeds aremuch higher.

    Pavement markings on Waite Street include a yellow centerline andmarked crosswalks and stop bars at Whitney Avenue and Ridge Road.

    A primary concern o residents is the segment o Waite Street thatcrosses Lake Whitney. Tis segment lacks sidewalks despite demand orwalking and jogging along this scenic area. Te intersection o Waiteand Mather Street is also a concern and is described as conusing and

    potentially dangerous. Tis intersection is also home to swans whichattract on-lookers despite the lack o sidewalks near the intersection.

    Waite Street combined with Mather Street has the potential to orma strong pedestrian and bicycle connection between Dixwell Avenue,Whitney Avenue and Ridge Road.

    Narrow roadway, no shouldersor sidewalk despite pedestrianand bicyclist demand

    Intersection is conusing.Pedestrians visit local swans, yethave no sidewalks or crosswalks

    Gap in sidewalk network.Demand or access to park

    WaiteStreet

    Whit

    neyA

    ve

    Rid

    geRd

    MatherSt

    Bassett Park

    WaiteStreet

    N

    Waite Street at Lake Whitney

  • 8/2/2019 Ham Den East West Final 041012

    13/52

    Hamden East-West ransportation Study 13

    Mather Street: Existing Conditions

    Mather Street is an arterial roadway that connects Dixwell Avenue to WhitneyAvenue. Mather Street has an average daily trac volume o 4200 vehicles and rangesin width rom 26 to 30 eet. Sidewalks are present on Mather Street although notcontinuous. Te speed limit on Mather Street is 25 mph, although the neighborhoodassociation reports that speeding is a signicant issue on this street. Pavement

    markings on Mather Street include a yellow centerline and marked crosswalks andstop bars at Mather Streets intersection with Dixwell and Whitney Avenues.

    Mather Street is comprised o two distinct segments. Te northern segment isabutted by commercial development at Dixwell Avenue and naturalized areasadjacent to Lake Whitney. Less than hal o this segment has sidewalks and there areew driveways or intersections. Te southern segment o Mather Street is primarilyresidential in nature, is punctuated by several cross streets and driveways and hascontinuous sidewalks on the western side.

    Te southeast end o Mather Street particularly between Cliord Street and Whitney

    Avenue has a relatively high number o pedestrians and a demand or on-streetparking. Te intersection o Mather and Belmont Street is a gathering spot orchildren who wait or the bus at this location. Southbound trac ofen turns ontoGessner Place or east on Belmont in search o Whitney Avenue only to nd that theseroads do not continue through.

    Sidewalk is discontinuous

    Complexintersection

    Complex intersection

    Large number o school childrenat Belmont and Mather, bus stop.Drivers ail to stop at stop signs.

    rac attempts to cut-through

    to Whitney AvenueWhitney Hall SchoolMath

    erStreet

    MatherStreet

    DixwellA

    venue

    Whitn

    eyAven

    ue

    N

    Farm

    ingtonCanalTrail

    Mather Street at Belmont Street: View east

  • 8/2/2019 Ham Den East West Final 041012

    14/52

    Hamden East-West ransportation Study14

    readwell Street: Existing Conditions

    readwell Street is a collector roadway that, like Mather Street, connects Dixwell Avenue to WhitneyAvenue. readwell Street has an average daily trac volume o 3900 vehicles and ranges in width rom26 to 30 eet. Sidewalks are present on both sides o the street south o Leeder Hill Drive. Te speedlimit on readwell Street is posted 25 mph east o Cliord Street, although the neighborhood associationreports that speeding is a signicant issue on this street. Pavement markings on readwell Street include

    a yellow centerline and marked crosswalks and stop bars at readwell Streets intersection with DixwellAvenue, Cliord Street, and Whitney Avenue. Connecticut ransit Route O to New Haven travels onthis corridor between Whitney Avenue and readwell Street.

    Like Mather Street, the southeast end o readwell Street between Cliord Street and Whitney Avenuehas a relatively high number o pedestrians. Like both Waite and Mather Street, the sidewalk network isincomplete through the Lake Whitney area.

    O signicant concern to residents is the intersection o readwell Street, Mather Street and WhitneyAvenue. Tis intersection is dicult or pedestrians to cross and complex or drivers to negotiate. Anadditional concern noted by several residents was the volume o truck trac on readwell Street. Much

    o this trac is contributed to construction activities on Leeder Hill Drive and Newhall Street and is notexpected to be a long term issue.

    No crosswalk to DiNicola Parkdespite pedestrian demand

    Sidewalk gap

    DiNicolaPark

    Tread

    wellS

    treet

    Farm

    in

    gtonCanalTrail

    LeederHillDrive

    TreadwellStreet

    Treadw

    ellStree

    t

    WhitneyAvenue

    DixwellAvenue

    N

  • 8/2/2019 Ham Den East West Final 041012

    15/52

    Hamden East-West ransportation Study 15

    Putnam Avenue: Existing Conditions

    Putnam Avenue is an arterial roadway that connects Dixwell Avenue toWhitney Avenue. Putnam Avenue has an average daily trac volumeo 11,900 vehicles and ranges in width rom 30 to 32 eet. Sidewalks arecontinuous on both sides o Putnam Avenue with the exception o a gapon the north side between Leeder Hill Drive and Winnet Street. Te speed

    limit on Putnam Avenue is 30 mph, although the neighborhood associationreports that speeding is a signicant issue on this street. Pavementmarkings on Putnam Avenue include a yellow centerline and markedcrosswalks at Dixwell Avenue Leeder Hill Drive, Cliord Street, GlendaleStreet, Whitney Avenue. Sharrow markings, as recommended in this plan,have were installed on the roadway in October o 2011.

    Putnam Avenue is an active street with a relatively high volume o trac,on-street parking, bus stops, and a high level o pedestrian activity. Cransit Route O to New Haven travels through this corridor. Additionally,the eastern segment o the street is signed as a school zone and there are

    retail establishments at the intersection o Putnam and Whitney Avenue.

    Sidewalk terminates midblock

    Deli parking obstructssidewalk and intersection

    Pedestrian crossing saety concerns betweensidewalk to Leeder Hill Drive and sidewalkon south side o Putnam Ave

    rac on Putnam queues too closeto intersection and blocks turningtruck and bus trac rom Whitney

    PutnamAve

    LeederHillDr

    Dix

    wellA

    ve

    NewhallSt

    WinnettS

    t

    ParamountSt

    FrancisAve

    TurnorAve

    Lila

    cAve

    Carle

    tonSt

    Cliffo

    rdSt

    Belmo

    ntSt

    Glend

    ale

    St

    Whitn

    ey

    Ave

    N

    Putnam Avenue: View west

    Farmin

    gto

    nC

    analT

    rail

  • 8/2/2019 Ham Den East West Final 041012

    16/52

    Hamden East-West ransportation Study16

    Augur Street: View west

    Augur Street: Existing Conditions

    Augur Street is a narrow (22-24 wide) local roadway that connectsNewhall Street to Whitney Avenue. Augur Street is one-waywestbound rom Frederick Street to Newhall Street. On-street parkingis permitted and heavily used on the south side o the street. Tereare no pavement markings with the exception o marked crosswalks

    at Newhall Street and Whitney Avenue. Sidewalks are ound on bothsides o the roadway throughout the corridor with the exception o agap on the south side between Farnsworth and Giles Street.

    Te primary concern o residents is speeding and stop sign running.Long, straight interrupted segments o roadway and one-way tracow contribute to speeding. Posted speed limit is 25 mph but reportedspeeds are higher. Augur Street acts as a bypass o Putnam Avenueor drivers traveling northbound on Whitney Avenue connecting toNewhall or Dixwell Avenues. Te lack o signalization on Augur Streetmay act as an attractive alternative to Putnam Avenue.

    Stop sign running

    Sidewalk gap

    AugurStre

    et

    NewhallStre

    et

    Whi

    tneyAve

    nue

    N

  • 8/2/2019 Ham Den East West Final 041012

    17/52

    Hamden East-West ransportation Study 17

    Mill Rock Road & Armory Street: Existing Conditions

    Mill Rock Road and Armory Street are local residential streets thatcarry trac rom Newhall Street to Whitney Avenue. Te roadwaywidth varies rom 28 eet to 34 eet wide. rac volume on MillRock Road is 3,400 vehicles per day and 2,900 vehicles per dayon Armory Street. Tese two distinct segments o roadway areconnected by a short segment o Prospect Street. Te posted speedlimit is 25 mph, but residents are concerned about speeding.

    Pavement markings on these streets are limited to yellow centerlineand marked crosswalks at Newhall Street and Whitney Avenue.On-street parking is ound on the south side o Mill Rock Roadparticularly at the playground and athletic elds on the corner oNewhall Street.

    Local residents expressed concern about speeding on ArmoryStreet, children crossing to the playground on Mill Rock Road, andaccidents at the intersection o Mill Rock Road and Prospect Street.

    Stop sign running,accidents

    No curb ramp or

    crosswalk signage

    Speeding onArmory Street

    No playgroundwarning signage

    MillRockRd

    ArmoryStreet

    Whitn

    ey

    Stre

    et

    NewhallStreet

    Prospect St

    N

    Prospect Street at Mill Rock Road: View north

    No crosswalk toplayground, sidewalkterminates abruptly

  • 8/2/2019 Ham Den East West Final 041012

    18/52

    Hamden East-West ransportation Study18

    Recommendations

  • 8/2/2019 Ham Den East West Final 041012

    19/52

    Hamden East-West ransportation Study 19

    3. Marked crosswalks and stopbars at Elgin/Greenway andGreenway/Ardmore intersections

    2. rac circleand stop bars

    6. rac circle andstop bars

    1. Bicycle lanes

    4. Chicane

    7. Chicane

    Connolly Parkway/Elgin Street/Ardmore Street/Tornton Street: Recommendations

    5. Curb extensions

    and stop bars

    ConnollyParkway

    ElginStreet

    ArdmoreStreet

    ThorntonStreet

    W h i t

    n e y A

    v e

    N

    Te improvements or this corridor ocus on calming trac as itenters Spring Glen rom Connolly Parkway and managing tracspeed along this corridor. Recommendations include the use o tra-c circles, stop bar markings, crosswalk markings, chicanes and curbextensions. Te goal o these measures is to improve driver conor-

    mity to trac laws and reduce trac speeds without shifing trac toparallel corridors.

    Bicycle lanes are also recommended or Connolly Parkway as ameans o improving access to the Farmington Canal rail which hasa trailhead on Connolly Parkway.

    Prior to the installation o chicanes on Ardmore Street, speed datashould be collected to conrm that speeding is an issue. I the 85thpercentile speed (speed at which 85% o trac is traveling at orbelow) is in excess o 5 mph above the posted speed limit, temporarydevices should be installed and monitored. I the temporary devices

    are proven eective in reducing trac speed and are agreeable toresidents, permanent devices should be considered or installation.

    Farmin

    gto

    nCan

    alT

    rail

  • 8/2/2019 Ham Den East West Final 041012

    20/52

    Hamden East-West ransportation Study20

    ArdmoreStreetArdmoreStreet

    ArdmoreStreet

    ElginStreet

    Bedfo

    rdA

    ve

    Bedfo

    rdAve

    GreenwaySt

    4. Install chicanes on ArdmoreStreet hal-way between GreenwayStreet and Bedord Ave so as toslow trac.

    7. Install chicanes on Tornton Streetat the intersection o Greenway andWakeeld Street so as to slow tracthrough the intersection

    3. Paint stop bars, yellow centerlines, andcrosswalks at intersection o Elgin Streetand Greenway Street and Greenway andArdmore Street. Tis measure will makestop signs more visible and encourage ullstops beore the intersection and thereby

    slowing vehicle speeds on Greenwaybetween Elgin Street and Ardmore Street.

    5. Install curb extensions and new curbramps at Bedord Avenue intersection to slow

    turning trac and shif and slow thru-trac.

    5.1 Paint stop bars at each leg o intersection,install 50 l o yellow centerline on each lego Ardmore Street

    Thornt

    onStree

    t

    Connolly

    Pkwy

    ElginStreet

    2. Install mini-trac circle at intersectiono Connolly Parkway, Tornton and ElginStreet. rac circle will prevent stop signrunning and will accommodate bus andemergency vehicle trac.

    2.1 Paint marked stop bars at eachapproach.

    Gre

    enwaySt

    Thornto

    nSt

    WakefeldSt

  • 8/2/2019 Ham Den East West Final 041012

    21/52

    Hamden East-West ransportation Study 21

    SantaFeAve

    SantaFeAve

    HaverfordSt

    Bro

    adf

    eld

    RdHaverord Street and Santa Fe Avenue: Recommendations

    Te goal o these improvements is to slow vehicles as they enter and exit the curved portion oHaverord Street and the intersection o Santa Fe Avenue and Broadeld Road.

    Speed humps are recommended on both sides o the curve on Haverord Street as they are themost eective device or acutely lowering speeds. A third location on the east end o HaverordStreet may be considered or placement o a speedhump i the two proposed locations prove

    ineective at lowering speeds throughout the corridor. Discretion should be used in thenumber o these devices applied to one roadway as the placement o too many devices maycause trac to shif to another residential street. Te topography o Haverord Street also limitsthe use and location o speed humps as they require relatively at grades in the area o theirplacement. Te proposed locations are suitable in terms o grade and sight distance.

    A trac circle is recommended at the intersection o Santa Fe Avenue and Broadeld Roadas a means o slowing vehicle speeds through that segment o the roadway and increasingcompliance to the stop controlled intersection.

    1. Speed hump and warning signage

    1. Speed hump and warning signage

    2. rac circle& stop bars

    2. rac circle& stop bars

    N

    R i d

    g e R o a d

    Whitn

    ey

    Ave

  • 8/2/2019 Ham Den East West Final 041012

    22/52

    Hamden East-West ransportation Study22

    Te Waite Street improvements seek to provide saer pedestrianaccess across Lake Whitney, improve the saety o the Waite Street/Mather Street intersection, improve pedestrian connections toBassett Park, and provide accommodations or bicyclists.

    In achieving these aims, the intersection o Waite and Mather

    Street should be converted to a intersection so as to simpliy theintersection, reduce vehicle turning speeds through the intersectionand provide additional space or sidewalks. Additionally, a tracstudy should be conducted to determine i an all-way stop iswarranted or this location. o accommodate pedestrian demandon Waite Street, a sidewalk should be constructed on the north sideo the roadway connecting the existing sidewalk to the east o LakeWhitney to the sidewalk on the north side o the bridge and to theMather Street intersection.

    Tese recommendations to the west end o Waite Street were madein a 2000 report by the PA Group. wo options or the sidewalkwere presented and should be considered going orward. Te rstoption was a raised sidewalk and curb and the second option was

    an at-grade sidewalk separated by a post and cable guardrail. Eitheroption would address pedestrian needs. Te recommendationsherein dier in that the PA report had recommended the sidewalkbe constructed on the south side o the roadway. It is recommendedthat the sidewalk be located on the north side so as to connect withthe existing sidewalk on the bridge and at the east o the lake.

    In addition to improvements at the west end o Waite Street, thesidewalk gap on the north side o Waite Street between Ford Streetand Bassett Park should be completed to as to provide pedestrianaccess to Bassett Park.

    Bicyclist demand or acilities could be satised via the provisiono shared lane designation. Tis designation is provided by theinstallation o sharrow pavement markings and Share the Roadsignage.

    Waite Street: Recommendations

    2. Install sidewalk onnorth side o roadway1. Convert to intersection,

    conduct trac study todetermine i all-way stop iswarranted

    4. Designate as shared roadway,install sharrow markings andShare the Road signage

    3. Complete sidewalk gap

    WaiteStreet

    Whitn

    eyAve

    Rid

    geRd

    MatherSt

    Bassett Park

    WaiteStreet

    N

  • 8/2/2019 Ham Den East West Final 041012

    23/52

    Hamden East-West ransportation Study 23

    2. Sidewalk improvements to Waite Street.Drawings rom PA Group.

    4. Shared lane designation on Waite Street Sharrow

    1. Convert Waite/Mather Street intersection to intersection.Install island or trac separation and sign placement. Convert toall-way stop i warranted.

    2. Install sidewalk on the north side o Waite Street. Installcurb-ramp and crosswalk connecting to proposed sidewalk onsouth side o Mather Street.

    MatherStre

    et

    Waite

    Stree

    t

  • 8/2/2019 Ham Den East West Final 041012

    24/52

    Hamden East-West ransportation Study24

    Mather Street: Recommendations

    Te recommended improvements to Mather Street are ocused uponimproving pedestrian and bicycle movement through the corridor.Tere are two distinct areas o Mather Street that would benet romsidewalk improvements. Te largest segment extends rom the endo the existing sidewalk on the west end o Mather Street to Waite toMartin errace; and the second location is a small segment west oGessner Place. Te construction o these sidewalks would provide acontinuous pedestrian corridor through the length o Mather Street.

    In addition to the need or sidewalks along the corridor, there is ademand or opportunities to cross Mather Street, as there are nomarked crosswalks on Mather Street between Dixwell Avenue and

    Whitney Avenue. Marked crosswalks across Mather Street should beinstalled at two locations; at Servoss Street and Belmont Street.

    Intersection improvements are recommended or the Waite Streetintersection (see Waite Street plan) and Belmont Street intersectionwhere the realignment o a curb on the south side o Mather Street

    would calm trac through the intersection. Several crosswalksshould be marked at the Mather Street intersection to improvepedestrian circulation.

    Bicycles can be accommodated on the roadway through designationo a shared road which includes sharrow pavement markings andshare the road signage.

    1. Complete sidewalk gap 4. Complete sidewalk gap

    3. Crosswalk & reuge island

    See Waite Street plan 5. Intersection improvements2. Speed eedback sign2. Speed eedback sign

    Whitney Hall SchoolMatherS

    treet

    MatherStreet

    DixwellA

    venue

    Whitn

    eyAven

    ue

    N

    7. Convert to shared roadway:Sharrows and share the road signage

    6.Construct trailhead to FarmingtonCanal rail

    Farm

    ingtonCanalTrail

  • 8/2/2019 Ham Den East West Final 041012

    25/52

    Hamden East-West ransportation Study 25

    5. Mather-Belmont Improvements

    5.6 Extend curb

    5.5 Relocate stopsign & bar

    5.7 Paint crosswalks

    5.3 Extend curb andinstall curb ramp

    5.4 Install raisedcrosswalks

    5.2 No Outlet sign

    5.1 ranslucentstop sign

    3. Install crosswalk,crosswalk signage,reuge island, andcurb ramps

    4. Completesidewalk gap

    7. Shared lane markings

    MatherS

    treet

    ServossStreet

    Math

    erStreet

    Mather Street

    Can

    alTrail

    GessnerP

    l

    MatherS

    treet

    Belm

    ontStreet

    Belmo

    ntStree

    t

    KingStreet

    6. Construct trailheadaccess to FarmingtonCanal rail at 380Mather Street

  • 8/2/2019 Ham Den East West Final 041012

    26/52

    Hamden East-West ransportation Study26

    readwell Street: Recommendations

    Improvements to readwell Street are ocused on improving bicycleand pedestrian movement and crossings through the corridor. Terecommended pedestrian improvements to readwell Street include asidewalk rom Marine Street to Leeder Hill Drive, a crosswalk at LeederHill Drive (upon construction o the sidewalk) and a new crosswalk andpedestrian reuge island at Lake Street.

    readwell Street should also be designated as a shared roadway withsharrow markings and share the road signage. Tese improvements wouldminimize conict between pedestrians, bicyclists, and motor vehicle trac.Designation as a shared roadway will also improve bicycle connectivity tothe Farmington Canal rail.

    While there are no stand-alone trac calming measures recommended orthe roadway, share the road signage and pavement markings increase theawareness o drivers and encourage more responsible driving.

    1. Complete sidewalk gap 1.1 Install crosswalk 2. Install crosswalk & reuge island

    2. Install crosswalk,crosswalk signage,and reuge island

    Tread

    wellS

    treet

    LeederHillDrive

    TreadwellStreet

    TreadwellS

    treet

    Lake

    Stree

    t

    Treadw

    ellStree

    t

    WhitneyAvenue

    DixwellA

    venue

    N

    Farm

    in

    gtonCanalTrail

    3. Convert to shared roadway:Sharrows and share the road signage

    DiNicolaPark

  • 8/2/2019 Ham Den East West Final 041012

    27/52

    Hamden East-West ransportation Study 27

    PutnamAve

    LeederHillDr

    Dix

    well

    Ave

    New

    hallSt

    WinnettSt

    ParamountSt

    FrancisAve

    TurnorAve

    Lila

    cAve

    Carle

    tonSt

    Clifford

    St

    Belm

    ontSt

    Glen

    dale

    St

    Whitn

    ey

    Ave

    N

    Farmin

    gto

    nC

    analT

    rail

    Putnam Avenue: Recommendations

    Te recommended improvements or Putnam Avenue are ocusedupon improving pedestrian crossings, accommodating bicycles, andmanaging parking. Recommended bicycle improvements include theinstallation o bicycle lanes rom Dixwell Avenue to Newhall Drive,where the roadway width and lack o on-street parking allows orsuch designation. Shared lane markings (sharrows) and share theroad signage is recommended between Newhall Street and WhitneyAvenue. A painted bike box is recommended at the intersectiono Putnam Avenue and Whitney Avenue to accommodate bicycliststhat are waiting to turn lef. Te marking o this space is primarilyaimed at discouraging drivers rom creeping past the marked stop barand queuing near the crosswalk where they obstruct turning bus andtruck trac.

    Recommended pedestrian improvements include improved curbramps, bulbouts, and the extension o a sidewalk. Te sidewalk

    extension is planned or the north side o the roadway between

    Winnett and Paramount Street where the existing sidewalkterminates abruptly. Tis sidewalk should be extended to Leeder HillDrive. A crosswalk and pedestrian reuge island should be installedbetween Winnett Street and Paramount Street to accommodate mid-block crossing demand. Additionally, new curb ramps are needed atthe Cliord Street intersection where curb ramps on the north sideare not ADA compliant and there are no curb ramps on the southside.

    Intersection improvements are needed at the intersection o GlendaleStreet, Putnam Avenue, and Carleton Street where patrons o adeli park illegally on the sidewalk and in the intersection. Teseimprovements include reconstruction o the curb on the north sideo Putnam Avenue at Glendale Street to prevent parking on thesidewalk, angled striping o the shoulder on the south side o thestreet within the intersection and additional no parking signage.

    1. Bicycle lanesDixwell to Newhall

    2. Crosswalkimprovements

    3. Extend sidewalkto Leeder Hill Dr

    4. Crosswalk & curbramp improvements

    5. Intersectionimprovements

    6. Bike box

    7. Convert to shared roadway rom Newhall to Whitney:

    Sharrows and share the road signage

  • 8/2/2019 Ham Den East West Final 041012

    28/52

    Hamden East-West ransportation Study28

    7. Shared lane designation on Putnam Avenue

    4. Upgrade curb ramps onnorth side o intersection, install

    curb ramps on south side at bothcrosswalks

    2. Bulbout curb and install newcurb ramps and crosswalk

    3. New curb ramp and sidewalk

    6. Paint bike box marking toaccommodate lef turning

    bikes and discourage queuingtoo close to intersection.Paint Wait Here marking inadvance o the stop bar.

    Cliffo

    rdSt

    LeederHillDr

    NewhallSt

    Glend

    aleSt

    Carle

    to

    nSt

    PutnamAv

    e

    PutnamAv

    e

    PutnamAve

    5. Replace curb and install

    new 6 high curb to preventparking on sidewalk. Install noparking signage

    5.1 Bump-out curb to shortencrossing distance and improve

    visibility beyond parked cars

    5.2 Install angled pavementmarkings at intersections to

    designate no parking areas

    Wait

    Here

  • 8/2/2019 Ham Den East West Final 041012

    29/52

    Hamden East-West ransportation Study 29

    Augur Street: Recommendations

    A chicane strategy is the primary recommended improvementor Augur Street. Tis strategy would be eective in interruptingthe long interrupted segments o roadway that are conducive tospeeding. Tis strategy can be implemented by shifing parking tothe north side o Augur Street at three locations: between PacicStreet and Barraclough Avenue, between Paramount Avenue andFrancis Avenue, and between Morris Street and Carleton Avenue.Tis parking reassignment should be accompanied by the installationo pavement markings to designate parking lanes as well as parkingsignage.

    Improvements should also be made to the two all-way stopintersections on Augur Street at Barraclough Avenue and CarletonAvenue. Te recommended improvements include painting markedstop bars at each leg o the intersection and installing verticalreective strips on the sign posts. Tese measures would improve the

    visibility o the stop signs and combined with slower speeds createdby the chicanes would improve conormity to the stop signs.

    Additionally, a sidewalk gap on the south side o Augur Streetbetween Farnsworth and Giles Street should be completed so thatpedestrians dont walk in the roadway through this area.

    4. Stop bars & signageimprovements

    3. Stop bars & signageimprovements

    2. Complete sidewalk

    1. Chicane trac by alternating

    parking to north side o street

    AugurStre

    et

    NewhallStre

    et

    Whi

    tneyAve

    nue

    N

  • 8/2/2019 Ham Den East West Final 041012

    30/52

    Hamden East-West ransportation Study30

    1. Stripe 8 wide parking bays onalternating north and south sideso road

    4. Paint stop bars and addvertical reective strips tostop sign posts

    1.1 Install new parking and noparking signage

    2. Install sidewalk on southside o Augur Street west sideo Farnsworth Street to east oRole Road

    AugurStre

    etRolfe

    Road

    FarnsworthS

    t

    Barracloug

    h

    A

    ve

    WinnettSt

    AugurStre

    etCarletonStre

    et

  • 8/2/2019 Ham Den East West Final 041012

    31/52

    Hamden East-West ransportation Study 31

    Mill Rock Road & Armory Street: Recommendations

    Recommended improvements to Mill Rock Road and Armory Streetare ocused on slowing trac at the corridor and improving saety attwo locations: at the playground and at the intersection o Mill RockRoad and Prospect Street.

    Saety improvements at the playground include the installation o

    playground warning signage on the east and west approach to theplayground and the installation o a raised crosswalk and bulboutconnecting the end o the sidewalk on the north side o Mill RockRoad to the playground.

    Te recommended intersection improvements at Mill Rock Roadinclude: lighting improvements, signage and pavement markingimprovements, and the installation o an island that would slowturning speeds and allow or the placement o an additional stop sign

    on the lef side o the travel lane on Prospect Street approaching MillRock Road.

    An additional location that requires improvement is the markedcrosswalk rom Mill Rock Road to the south side o Armory Street.Crosswalk warning signage is recommended or both the east and

    west approaches on Armory Street and a curb ramp is recommendedor the south side o the Armory Street.

    Speedhumps are recommended at two locations on Amory Streetas a means o calming trac along that road. Speed data should becollected prior to the installation o temporary devices. Collectiono speed data is critical in conrming that speeds are high enough towarrant the placement o speed humps.

    3. Intersection

    improvements

    5. Curb ramp &

    crosswalk signage

    4. Speed hump4. Speed hump

    2. Crosswalk improvements

    Playground

    Playground

    1. Playgroundwarning signage

    1. Playgroundwarning signage

    MillRockRd

    ArmoryStreet

    Whitn

    ey

    Stre

    et

    NewhallStreet

    Prospect St

    N

    6. Convert to shared roadway:

    Sharrows and share the road signage

  • 8/2/2019 Ham Den East West Final 041012

    32/52

    Hamden East-West ransportation Study32

    3.2 Paint crosswalk and stop bar

    3.1 Install W1-6R warning sign

    2.2 Install raised crosswalk andcrosswalk warning signage

    2.3 Curb extension and curb ramp

    2.1 Install curb ramp, connect toexisting sidewalk

    2. Crosswalk at playground

    3.3 Island with additionalSOP sign

    3.4 Add vertical reectivestrips to stop sign and stop

    ahead posts

    3.5 rim vegetation as needed

    3. Intersection improvements to Prospect Street

    at Mill Rock Road

    MillRockRd

    MillRockRd

    P r o s p e c

    t S

    t

  • 8/2/2019 Ham Den East West Final 041012

    33/52

    Hamden East-West ransportation Study 33

    Cost Estimate and Implementation Schedule

    Te total cost o improvements within the study area is approximately$1 million. Tis cost estimate reects typical construction andinstallation costs o the recommended measures in this plan. Tisestimate represents 2012 construction costs and is intended orplanning purposes only. An itemized cost estimate is available on

    page 49 o this report.Cost per Corridor

    Connolly Pkwy/Elgin/Ardmore/Tornton St: $102,900Haverord Street/Santa Fe Avenue: $25,000Waite Street: $314,200Mather Street: $282,000readwell Street: $175,700Putnam Avenue: $77,600Augur Street: $62,200

    Mill Rock Road/Armory Street: $37,600otal Cost: $1,077,200

    Cost per Improvement ype

    Bicycle acilities: $57,100Crosswalk and curb ramp improvements: $115,600rail access $50,000Sidewalk improvements: $606,800Sign and pavement marking upgrades: $27,700rac calming devices: $120,000Intersection reconstruction: $100,000

    otal Cost: $1,077,200

    Improvements should be phased in a ve-year period to allow or thebudgeting o capital improvement unds. Low cost improvementsitems should be considered or short term improvements, with morecapital intensive improvements scheduled or the long term. Aproposed ve year phasing plan is included here.

    All chicane and speed hump recommendations are subject to tracspeed data collection prior to implementation. Collected data mustconrm that speeding is an issue as reported (85th percentile speedsmust exceed the posted speed limit by 5 mph). Upon documentationo speeding, temporary chicane and speed hump devices should be

    deployed. I these devices prove eective at lowering speeds, and areagreeable to residents, permanent devices should be considered orimplementation.

    Year 1 $86,800

    BicyclefacilitiesimprovementsSignandpavementmarkingupgradesCrosswalkmarkings(atlocationsnotrequiring

    inrastructure upgrades)Tracspeeddatacollection

    Installandtesttemporarytraccalmingdevices

    Year 2 $237,500

    InstallpermanenttraccalmingdevicesInstallpedestrianrefugeislands,curbextensionsCrosswalkandcurbrampimprovementsPutnamAvenuesidewalkextension

    Year 3 $250,000

    ReconstructionofWaite/MatherSt.intersectionConstructionofWaiteStreetsidewalkatLakeWhitney

    Year 4 $265,000

    CostructionofMatherStreetsidewalksConstructionofMatherStreettrailaccesstoCanalTrailConstructionofWaiteStreetsidewalkapproachingBassettPark

    Year 5 $237,900

    ConstructionofTreadwellStreetsidewalk

    ConstructionofAugurStreetsidewalk

  • 8/2/2019 Ham Den East West Final 041012

    34/52

    oolboxHamden East-West ransportation Study34

  • 8/2/2019 Ham Den East West Final 041012

    35/52

    Hamden East-West ransportation Study 35

    Marked Crosswalks

    Marked crosswalks are a critical component o the pedestrian network. Teyguide the pedestrian to the saest crossing o the roadway and alert drivers tothe expected presence o pedestrians. Te piano key style crosswalk, whichconsists o multiple white bars aligned perpendicular to the walking path,is currently in use in Norwalk and should be used or crosswalk locations

    identied in this plan.

    Crosswalk markings provide guidance for pedestrians crossing theroadway by defining and delineating the most appropriate crossingpath. Crosswalk markings also alert road users to a pedestrian cross-ing point not controlled by traffic signals or stop signs. At non-in-tersection locations, these markings legally establish the crosswalk.

    Institute for Transportation Engineers - Traffic Safety Toolbox

    In general, crosswalk markings at unsignalized intersections appearto have several positive effects and no observed negative effects. Spe-cifically, drivers appear to be aware that pedestrians are in a marked

    crosswalk and drive slightly slower. Crosswalks also have the positivebenefit of channeling pedestrians to the intersection. Also, there ap-pears to be no evidence to support the contention that pedestrians feelprotected in marked crosswalks and act more carelessly. In conclusion,it appears that marking pedestrian crosswalks at relatively narrow,low-speed, unsignalized intersections is a desirable practice.-FederalHighway Administration -RD-00-103

    Crosswalks can be raised or can be designed in conjunction withspeed tables, medians, crossing islands, curb extensions, and othersupplemental measures. With these measures, unsignalized crossings

    may be feasible at additional location types. Institute for Transporta-tion Engineers - Traffic Safety Toolbox

    Benets

    Encouragespedestrianstocrossthestreetatregularlocations.Improvesvisibilityofpedestrians,alertsdriverstothepresenceofpedes -trian trac.

    Application

    Crosswalklocationsshouldbelocatedapproximately300feetapart.In -creased distances decrease pedestrian conormity, decreased distances maydecrease driver conormity.Crosswalksshouldbeaminimum6eet wide to 10 eet wide or width o

    sidewalk i greater. Curb ramps, if present, should bealigned with crosswalk.Crosswalks aremosteective whencrossing roadway at a right angle. Crosswalks should be accompaniedby signage or signalization where con-ditions warrant.

  • 8/2/2019 Ham Den East West Final 041012

    36/52

    Hamden East-West ransportation Study36

    Crosswalk Signage

    Crosswalk signage should be used at all crosswalks where trac is not con-trolled by a trac light or stop sign. Tis signage may also be used to supple-ment crosswalks at locations where sight-lines are an issue or where driversail to yield to pedestrians despite stop signs or trac lights. Te most com-mon application o this sign would be a mid-block crosswalk. When locatedwithin a school zone, the school crossing sign should be used in lieu o the

    pedestrian crossing sign. Te Manual or Uniorm rac Control Devices(MUCD) provides the ollowing guidance:

    Non-Vehicular Warning (W11-2) signs may be used to alert road usersin advance of locations where unexpected entries into the roadwaymight occur or where shared use of the roadway by pedestrians mightoccur. These conflicts might be relatively confined, or might occur ran-domly over a segment of roadway.

    If used in advance of a pedestrian crossing, the W11-2 signs shouldbe supplemented with plaques with the legend AHEAD or XX FEET toinform road users that they are approaching a point where crossingactivity might occur.

    The W11-2 and W11-9 signs and their related supplemental plaquesmay have a fluorescent yellow-green background with a black legendand border.

    When a fluorescent yellow-green background is used, a systematicapproach featuring one background color within a zone or area shouldbe used. The mixing of standard yellow and fluorescent yellow-greenbackgrounds within a selected site area should be avoided. Crossing

    signs should be used only at locations where the crossing activity is

    unexpected or at locations not readily apparent. - Pedestrian relevantexcerpts from MUTCD Section 2C.5

    Benets

    IncreasesdriverawarenessAssistspedestriansinlocatingcrosswalks

    Application

    Signagetypicallyusedatmid-blockcrossinglocations

    SignagemustnotinterferewithsidewalkfunctionSchoolcrossingsignshouldbeusedwhencrosswalkislocatedwithinaschool zone or has a high number o students in route to school

    Pedestrian CrossingSign

    W11-2 sign withW16-7P arrow

    School CrossingSign

    S1-1 sign withW16-7P arrow

  • 8/2/2019 Ham Den East West Final 041012

    37/52

    Hamden East-West ransportation Study 37

    Curb Ramps

    Curb ramps are required by the American Disabilities Act at intersectionsand marked crosswalks. Any roadway that undergoes reconstruction is re-quired, by ederal law, to include these acilities. Curb ramps are integral tothe pedestrian network and are a critical link between crosswalks and side-walks.

    According to the Connecticut Highway Design Manual, when determiningthe need or a curb ramp, the designer should consider the ollowing:

    1. If at least one curb will be disturbed by construction at an existing inter-section, then curb ramps shall be constructed at all crosswalks which extendfrom a paved sidewalk in that intersection.2. For all projects, curb ramps will be constructed at all crosswalks whichprovide pedestrian access in that intersection and will be provided on allcorners. At T-intersections, the designer must ensure that curb ramps arelocated on the side opposite the minor intersecting road.3. Opposing ramps must always be provided on adjacent legs of an inter-section even if outside project limits.

    4. Curb ramps shall be positioned so as not to cause a safety hazard forblind pedestrians.5. Curb ramps shall be located or protected to prevent their obstruction byparked vehicles.6. Curb ramps at marked crossings shall be wholly contained within themarkings, excluding any flared sides.7. A diagonal curb ramp shall be wholly contained within the paintedmarkings, including any flared sides. There shall be at least 610 mm offull-height curb within the crosswalk. In addition, there shall be at least1220 mm between the gutter line and the corner of the two intersectingcrosswalks.

    8. The function of the curb ramp must not be compromised by other high-way features (e.g., guide rail, catch basins, utility poles, signs).9. Curb ramps are required at all curbed intersections with sidewalks oralong all accessible routes.10. The location of the curb ramp must be consistent with the operationof pedestrian-actuated traffic signals, if present. In addition, a pedestrianpush-button must be located so it can be reached by wheelchair-boundindividuals.11. The designer will provide the Division of Traffic Engineering with a setof plans at the preliminary design stage and before the preliminary designreview. The Division of Traffic Engineering, in its review, will determine the

    need and location of mid-block curb ramps.

    Benets

    Improvesaccessibilityforpeoplewithmobilityaids.Improvesthemobilityofpeoplewithcarriages,strollers,carts,andchil-dren on bicycles.Encouragespedestrianstocrossroadwayataxedpoint.

    ApplicationRampperpendiculartocurbline1:12maximumrunningslope1:48(2%)maximumcrossslope36inchminimumwidthLevellandingattopLanding36inchlongiftoeroomavailableLanding48inchlongifconstrainedRampwithincrosswalkatfootNoexposuretomovingtraclaneFlush(nolip)connectionatstreet

  • 8/2/2019 Ham Den East West Final 041012

    38/52

    Hamden East-West ransportation Study38

    Sidewalks and Pathways

    Sidewalks and ootpaths are the core o the pedestrian network and also themost capital intensive inrastructure component o the network. Sidewalksare typically concrete construction and a minimum o ve eet wide (thiswidth allows two adults to walk comortably side by side). Footpaths (beingsomewhat unique to Norwalk) are typically asphalt construction and rangerom three to our eet wide. Footpaths are less expensive and intrusive than

    concrete sidewalks, but are a less permanent acility.

    Sidewalks used for pedestrian access to schools, parks, shoppingareas, and transit stops and placed along all streets in commercialareas should be provided along both sides of the street. In residentialareas, sidewalks are desirable on both sides of the street but needto be provided on at least one side of all local streets. American

    Association of State and Highway Transportation Officials (AASHTO)

    Sidewalks and walkways separate pedestrians from the roadwayand provide places for children to walk, run, skate, ride their bikes,and play. Sidewalks have been found to be associated with signifi-cant reductions in pedestrian collisions with motor vehicles. Suchfacilities improve mobility for pedestrians and should be provided forall types of pedestrian travel: to or from home, work, parks, schools,

    shopping areas, transit stops, etc. Walkways should be part of everynew and renovated facility and every effort should be made to retrofit

    streets that currently do not have sidewalks or walkways. -Institutefor Transportation Engineers - Traffic Safety Toolbox

    Benets

    Minimizespedestrianexposuretovehiclesbyprovidingwalkingspaceoo roadway.Encourageswalkingtrips

    Application

    Minimumsidewalkwidthof5feetisnecessaryfortwoadultstocomfort-ably walk side-by-side.Sidewalkmosteectivewhenseparatedfromcurbbyabuerspace.Buerprovidesspaceforstreettrees,utilities,&snowstorage.

    Buermosteectiveat6feetwide,thusallowingtheplacementofanac-cessible curb ramp between curb line and sidewalk.Maximum2%cross-slope Sidewalkzoneshouldbekeptclearofobstructions,providingaminimumclear width o 32 inches at spot locations and 36 inches or the length o thewalk.

    Aprotectedzoneof27inchesto80inchesinheightmustbekeptclearofvegetation, signage, and other structures.

  • 8/2/2019 Ham Den East West Final 041012

    39/52

    Hamden East-West ransportation Study 39

    Pedestrian Reuge Islands

    Reuge islands are a highly eective tool or assisting pedestrians in crossingwide roadways, heavily tracked roads, or at midblock locations. Tese is-lands can be as narrow as our eet and give the pedestrian a sae place to stopi they are unable to cross the road in one attempt. In addition to assistingpedestrians in crossing, these devices provide a location or the placement

    o pedestrian crossing signs and can slow the speed o trac at crosswalks.

    Cross islands, also known as center islands, refuge islands, or medianslow points, are raised islands placed in the center of the street at in-tersection or midblock locations that help to protect pedestrians frommotor vehicles. Crossing islands allow pedestrians to be concernedwith only one direction of the street and wait for an adequate gap intraffic before crossing the second half of the street. Where midblockor intersection crosswalks are to be installed at uncontrolled loca-tions (i.e., where no traffic signals or stop signs exist), crossing islands

    should be strongly considered as a supplement to the crosswalk. If

    there is sufficient width, crossing islands and curb extensions can beused together to create a highly improved pedestrian crossing.-Institute of Transportation Engineers - Traffic Safety Toolbox

    Benets

    ReducesvehiclespeedsDecreasespedestriancrossingdistanceIncreasesvisibilityofcrossing

    Application

    Foruseatintersectionsormid-blockUseonlyonstreetswithspeedlimitbelow45mphunlesssignalizationisprovidedMid-blockislandcrossingshouldbelocatedatleast300feetfromnearestcrossingsAppropriatesignagerequiredAdequatelightingrequiredMinimumwidthof4feet

    Pedestrian refuge island and mid-block crosswalk

  • 8/2/2019 Ham Den East West Final 041012

    40/52

    Hamden East-West ransportation Study40

    Curb Extension

    Curb extensions are used to shorten the crossing distance or pedestrians.Tese devices have the added benet o improving the visibility or and opedestrians when crossing and can slow trac. Tese devices take manyorms and are ofen reerred to as bulbouts.

    Curb extensions, also known as bulbouts or neckdowns, involve extending

    the sidewalk or curb line into the street, reducing the effective width. Curbextensions significantly improve pedestrian crossings by reducing pedestriancrossing distance, improving the ability of pedestrians and motorist to seeeach other, and reducing the time that pedestrians are in the street. Curbextensions that are placed at an intersection essentially prevent motoristsfrom parking in a crosswalk or blocking a curb ramp. Motor vehiclesparked at corners present a serious threat to pedestrian safety becausethey block sight lines, hide pedestrians, and other vehicles, and maketurning particularly difficult for emergency vehicles and trucks. Motorists areencouraged to travel more slowly at intersections or midblock locations withcurb extensions, because the restricted street width sends them a visual cue.

    Turning speeds at intersections are reduced with curb extensions (curb radiishould be as tight as practicable). Curb extensions are appropriate onlywhere there is an on-street parking lane (curb extensions must not extendinto travel lanes, bicycle lanes, or shoulders). -Institute for Transportation

    Engineers - Traffic Safety Toolbox

    Benets

    EncouragespedestrianconformitytomarkedcrosswalksShortenscrossingdistanceforpedestriansProvidesadditionalspaceforcurbrampsImprovespedestrianvisibilitybyextendingpastparkedvehicles

    ImprovesdriversvisibilityofpedestriansSlowsturningvehiclesPreventsparkingatcorner

    Application

    Forusewherewidecurblanes,shoulders,oron-streetparkingresultinwide pavement widths.Curbextensionshouldnotextendbeyond6feetofexistingcurblineandshould not obstruct bike or travel lane.Adequatevehicleturningradiimustbemaintainedwhenusedatintersec-tions.

    Mid-block curb extension and crosswalk

  • 8/2/2019 Ham Den East West Final 041012

    41/52

    Hamden East-West ransportation Study 41

    Mini-rafc Circles

    Mini circles are raised circular islands that are constructed in the center o residentialstreet intersections to reduce vehicle speeds. Tey are sometimes used instead o stopsigns. Tey orce motorists to maneuver around them and have been ound to reducemotor vehicle crashes. Drivers making lef turns are directed to go on the ar side othe circle (not the near side) beore making the turn. Signs may be installed within thecircle to direct motorists to proceed to the right o the circle beore passing through or

    making a lef turn. -Institute for Transportation Engineers - Trac Safety Toolbox

    Benets

    Preventsred-lightorstopsignrunningSlowsvehiclespeedsthroughintersection

    Application

    ForuseonlocalstreetsandlowvolumecollectorstreetsReplacesfour-waystoporlowvolumesignalizedintersectionLandscapingcannotinterferewithdrivervisibility,canbemaintainedbyresidents

    Traffic Circle

  • 8/2/2019 Ham Den East West Final 041012

    42/52

    Hamden East-West ransportation Study42

    Speed Humps

    Speed humps are paved (generally asphalt), approximately three to ourinches high at their center, and extend the ull width o the street. Tere areseveral designs or speed humps. Te traditional 12-f. hump has a designspeed o 15 to 20 mph. Te 14-f. hump has a design speed o a ew mphhigher. A 22f. table has a design speed o 25 to 30 mph. Te longer humpsare gentler or larger vehicles. -Institute for Transportation Engineers - Trac

    Safety Toolbox

    A speed table is an elongated speed hump or a at topped speed hump. Atthe top o the at version, a pedestrian crossing (sometimes with a markedcrosswalk) is ofen provided or people to walk across the road. -Institute forTransportation Engineers - Trac Safety Toolbox

    Benets

    SlowsvehiclespeedsTableprovidescrossingareaforpedestriansTablediscouragesparkingincrosswalk

    Application

    Nomorethantwotravellanesor40-footpavementwidthHorizontalcurveof300-footradiusormoreVerticalcurvewithadequatestoppingsightdistanceGradeof8percentorlessPostedspeedlimitof30mphorlessNomorethan5percentlong-wheelbasevehiclesNotaprimaryemergencyresponserouteorbusrouteSpacing:150-600apart

    Use22humpsonhighvolumestreets

    12 Speedhump, West Hartford, CT

    12 Speedhump profile

    22 Speedhump profile

  • 8/2/2019 Ham Den East West Final 041012

    43/52

    Hamden East-West ransportation Study 43

    Chokers & Chicanes

    Chokers and Chicanes use small islands placed near the curb to slow trac.Chokers use two islands, placed opposite one another in order to create a nar-row opening that constricts trac. When placed twelve eet apart, these islandsonly allow one vehicle through at a time, thereby stopping trac in the oppositedirection. Chicanes, however, typically allow trac to continue moving in bothdirections. Tis is accomplished via staggered islands that create lateral shifs in

    the roadway, thus slowing drivers

    Chokers are more eective on streets where opposing trac is more requent.isincludesstreetsthatexperiencesignicantpeaktractimes.Vehiclespeedsat other times will be minimally impacted as vehicles are allowed to travel straightthrough the choker without being orced to yield to oncoming trac.

    Chicanes create a horizontal diversion of traffic and can be gentler or more re-strictive, depending on the design. Shifting of a travel lane will affect speeds aslong as the taper is not so gradual that motorists can maintain speeds, the aimof traditional highway design. Shifts in travelways can be created by movingparking from one side to the other (if there is space for only one side of park-

    ing) or by building landscaped islands (islands can also effectively supplementthe parking shift).

    Diversion of the path of travel plus restriction of lanes is usually accomplishedthrough a series of bulbouts or curb extensions that narrow the street to twonarrow lanes or one lane at selected points, forcing motorists to slow down tomaneuver between them. Such treatments are intended for use only on resi-dential streets with low traffic volumes.

    If there is no restrictions (i.e., the number of lanes is maintained), chicanes canbe created on streets with higher volumes, such as collectors or minor arterials.-Institute for Transportation Engineers - Traffic Safety Toolbox

    Benets

    ReducesvehiclespeedCanbeusedinconjunctionwithon-streetparkingChokersmaybeusedwithamid-blockcrosswalk

    Application

    ResidentialstreetsandlowvolumecollectorandarterialroadwaysAminimumstraightpathway12widemustbepreservedforemergencyvehiclesIslandscanbeplaced12fromcurblinesoasnottoobstructdrainage

    Chicane

  • 8/2/2019 Ham Den East West Final 041012

    44/52

    Hamden East-West ransportation Study44

    Sharrows

    Shared lane pavement markings (or sharrows) are bicycle symbols careullyplaced to guide bicyclists to the best place to ride on the road, avoid car doors,and remind drivers to share the road with cyclists. Unlike bicycle lanes,sharrows do not designate a particular part o the street or the exclusive useo bicyclists. Tey are simply a marking to guide bicyclists to the best placeto ride and help motorists expect to see and share the lane with bicyclists.

    Tese acilities are used where roadways are to narrow or dedicated bicyclelanes and when trac speeds and volumes allow bicyclists to saely mix withtrac.

    Benets

    Assistbicyclistswithlateralpositioninginasharedlanewithon-streetparallel parking in order to reduce the chance o a bicyclists impacting theopen door o a parked vehicleAssistbicyclistswithlateralpositioninginlanesthataretoonarrowforamotor vehicle and a bicycle to travel side by side within the same trac lane

    Alertroadusersofthelaterallocationbicyclistsarelikelytooccupywithin the traveled wayEncouragesafepassingofbicyclistsbymotoristsReducetheincidenceofwrong-waybicycling

    Application

    esharrowshouldnotbeplacedonroadwaysthathaveaspeedlimitabove 35 mph.Sharrowsshallnotbeusedonshouldersorindesignatedbicyclelanes.Ifusedinasharedlanewithon-streetparallelparking,sharrowsshouldbeplaced so that the centers o the markings are at least 11 eet rom the ace o

    the curb, or rom the edge o the pavement where there is no curb.Ifusedonastreetwithouton-streetparkingthathasanoutsidetravellanethat is less than 14 eet wide, the centers o the sharrows should be at least 4eet rom the ace o the curb, or rom the edge o the pavement where thereis no curb.esharrowshouldbeplacedimmediatelyaeranintersectionandspacedat intervals not greater than 250 eet thereafer.SharetheRoadsignageshouldbeplacedatthebeginningofasharedroadway and proceeding major intersections within that roadway.

    Sharrow pavement marking

    Shared lane roadway

    Share the road signage

  • 8/2/2019 Ham Den East West Final 041012

    45/52

    Hamden East-West ransportation Study 45

    Bicycle Lanes

    Dedicated bicycle lanes are the preerred acility or most bicyclists. Teselanes are ofen ound at the edge o the roadway and would otherwise appearto be a roadway shoulder. Tey are marked by a white edgeline separat-ing the bicycle lane rom the trac lane and by bicycle pavement markingswithin the lane. Signage is typically used at the beginning o the corridor andintermittently to inorm drivers and bicyclists o the presence o the bicycle

    lane.

    Bicycle Lane Safety Benefits - City of Cambridge, MA

    Bike lanes help define road space, decrease the stress level of bicyclistsriding in traffic, encourage bicyclists to ride in the correct directionof travel, and signal motorists that cyclists have a right to the road.Bike lanes help to better organize the flow of traffic and reduce thechance that motorists will stray into cyclists path of travel. Bicyclistshave stated their preference for marked on-street bicycle lanes innumerous surveys. In addition, several real-time studies (where cyclists

    of varying abilities and backgrounds ride and assess actual routes andstreet conditions) have found that cyclists are more comfortable andassess a street as having a better level of service for them where thereare marked bike lanes present.

    The Purpose of Bicycle Lanes - Connecticut Statewide Bicycle andPedestrian Plan

    Create on-street separated travel facilities for bicyclists. Provide space for vehicles to safely overtake bicyclists. Reduce or prevent problems associated with bicyclists overtakingvehicles in congested or narrow streets.

    To encourage lower motor vehicle speed by narrowing availablelanes.

    Application

    Foruseoncollectorandarterialroadways,orlocalstreetsinurbanareaswhere bicyclists cannot saely ride with trac.Bikelanesshouldbeonewayfacilitiescarryingbicyclistsinthesamedi-rection as adjacent trac and located on the right side o the travel lane.Bikelanesgenerallyshouldbeinstalledinbothdirectionsoftheroadway.Bike lanes installed on only one side o the roadway may encourage riding

    in the wrong direction.

    Insomeinstances,onone-wayroads,thebikelanemaybeinstalledonthelef side o the travel lane i this provides better saety to the bicyclist.4feetwideminimum5feetwideifvehiclespeedsexceed50mphorthelaneisadjacenttoaguardrail or tall barrierWhenplacedadjacenttoon-streetparking,thelehandlanestripe(the

    stripe that separates the bicycle lane rom the travel lane) should be no lessthan 12 eet rom the curb. I parking volumes are substantial or turnoveris high, such as downtown locations or streets with metered parking, thiswidth should be increased to 14 eet so as to avoid collisions in the doorzone o parked cars.Bikesymbolpavementmarkingshouldbespacedevery500feetandcanbe used more requently in dense urban setting.Bicyclelanesignageshouldbeusedatthebeginningatthelaneandspaced every mile or at signicant intersections.

    Pavement MarkingBike Lane Sign

    Bike Lane

  • 8/2/2019 Ham Den East West Final 041012

    46/52

    Hamden East-West ransportation Study46

    Bike Box

    Bike boxes are used in conjunction with bicycle lanes at intersections thatare controlled by trac signals. Te bike box provides bicycles with space towait at the intersection to make a lef turn or saely wait to continue straightahead o right turning trac. Tese boxes are reserved or use at intersec-tions with high trac or high bicyclist volume.

    BenetsAllowsbicycliststosafelynegotiatealeturnatintersections.Providesstoragespaceforcycliststravelingstraightpastarightturnlane.

    Application

    Locatebetweencrosswalkandstopbar.Bikeboxshouldhaveaminimumdepthof8feet.Bikeboxesshouldonlybeusedwhentraditionalintersectiontreatmentsdonot adequately address bicycle saety or mobility.Bikeboxeshavebeenusedatintersectionswithhighleturnandrightturncrash rates.Bikeboxesmaybeusedinconjunctionwithbicyclesignalstogivebicyclistspreerence on a given roadway.Coloredbikeboxeshavebeenused for extravisibility. Greenmarkingsmay be used, however maintenance needs must be considered. Blue bike boxpavement markings are not recommended or use, as this color is reservedor public saety use.

    Bike Box

  • 8/2/2019 Ham Den East West Final 041012

    47/52

    Hamden East-West ransportation Study 47

    Stop line

    Yield line

    Stop and Yield Lines

    Stop and yield pavement markings let drivers know where they are expectedto stop or an intersection or crosswalk. While these markings are not man-datory on local residential roads, they should be applied where vehicles ailto stop at the proper location or ail to yield to pedestrians.

    Benets:

    Improvevisibilityofintersections.Guidesdriverstotheproperplacetostoporyield

    Stop Line Application

    Stoplinesshouldbeusedtoindicatethepointbehindwhichvehiclesarerequired to stop in compliance with a trac control signal.Stoplinesmaybeusedtoindicatethepointbehindwhichvehiclesare

    required to stop in compliance with a SOP (R1-1) sign, a Stop Here ForPedestrians (R1-5b or R1-5c) sign, or some other trac control devicethat requires vehicles to stop, except YIELD signs that are not associatedwith passive grade crossings.

    Ifused,stopandyieldlinesshouldbeplacedaminimumof4feetinad-vance o the nearest crosswalk line at controlled intersections, except oryield lines at midblock crosswalks. In the absence o a marked crosswalk,the stop line or yield line should be placed at the desired stopping or yield-ing point, but should not be placed more than 30 eet or less than 4 eetrom the nearest edge o the intersecting traveled way.Stoplinesatmidblocksignalizedlocationsshouldbeplacedatleast40feet

    in advance o the nearest signal indication.Stoplinesshallconsistofsolidwhitelinesextendingacrossapproachlanes

    to indicate the point at which the stop is intended or required to be made.

    Stoplinesshouldbe12to24incheswide.Ifyieldorstoplinesareusedatacrosswalkthatcrossesanuncontrolledmulti-lane approach, the yield lines or stop lines should be placed 20 to50 eet in advance o the nearest crosswalk line, and parking should beprohibited in the area between the yield or stop line and the crosswalk.Stoplinesshallnotbeusedatlocationswheredriversarerequiredtoyield

    in compliance with a YIELD (R1-2) sign or a Yield Here o Pedestrians(R1-5 or R1-5a) sign or at locations on uncontrolled approaches wheredrivers are required by State law to yield to pedestrians.

    Yield Line Application

    Yieldlinesmaybeusedtoindicatethepointbehindwhichvehiclesarerequired to yield in compliance with a YIELD (R1-2) sign or a Yield Hereo Pedestrians (R1-5 or R1-5a) sign.Yieldlinesshallnotbeusedatlocationswheredriversarerequiredto

    stop in compliance with a SOP (R1-1) sign, a Stop Here For Pedestrians(R1-5b or R1-5c) sign, a trac control signal, or some other trac control

    device.Yieldlinesshallconsistofarowofsolidwhiteisoscelestrianglespointingtoward approaching vehicles extending across approach lanes to indicatethe point at which the yield is intended or required to be made.eindividualtrianglescomprisingtheyieldlineshouldhaveabaseof

    12 to 24 inches wide and a height equal to 1.5 times the base. Te spacebetween the triangles should be 3 to 12 inches.Ifyield(stop)linesareusedatacrosswalkthatcrossesanuncontrolled

    multi-lane approach, Yield Here o (Stop Here For) Pedestrians (R1-5series) signs shall be used.

    Whendriversyieldorstoptooclosetocrosswalksthatcrossuncontrolledmulti-lane approaches, they place pedestrians at risk by blocking otherdrivers views o pedestrians and by blocking pedestrians views o vehiclesapproaching in the other lanes.

  • 8/2/2019 Ham Den East West Final 041012

    48/52

    Cost Estimate

    Hamden East-West ransportation Study48

  • 8/2/2019 Ham Den East West Final 041012

    49/52

    Hamden East-West ransportation Study 49

    Itemized Cost Estimate

    ID Location Improvement Improvement Items Cost

    1 Connolly Parkway Bicycle lanes

    2700 lf striping, 6 bike lane pavement markings, 2 bike

    lane signs $ 4,500

    2 Connolly Parkway/Elgin Street intersection $ 15,000

    2.1 Connolly Parkway/Elgin Street intersection Stop bars 4 stop bar pavement markings $ 800

    3 Elgin St/Greenway Street/Ardmore Street Pavement markings

    2 crosswalks, 2 stop bars, 100 lf yel low centerline

    markings $ 1,600

    4 Ardmore Street Chicanes 2 landscaped chicanes and regulatory signage $ 20,000

    5 Ardmore Street at Bedford Avenue Curb extensions

    2 curb extensions, 2 ADA compliant curb ramps and

    extension of sidewalks $ 25,000

    5.1 Ardmore Street at Bedford Avenue Stop bars 3 stop bars, 100 lf yellow centerline markings $ 1,000

    6 $ 15,000

    7 Chicanes 2 landscaped chicanes and regulatory signage $ 20,000

    $ 102,900

    Haverford Street/Santa Fe Avenue

    ID Location Improvement Improvement Items Cost

    1 Haverford Street Speed humps 2 speed humps and regulatory signage $ 10,000

    2 $ 15,000

    $ 25,000

    Waite Street

    ID Location Improvement Improvement Items Cost

    1 Waite Street/Mather Street intersection Convert to "T" intersection

    Reconstruction of intersection, new signage and

    pavement markings, 200 lf of sidewalk, guardrail and

    fencing within intersection area $ 100,000

    2 Waite Street at Lake Whitney Sidewalk

    1500 lf 4' wide asphalt sidewalk or stone dust pathway,

    1400 lf 3 cable guardrail and fence $ 150,000

    3 Waite Street east of Whitney Avenue Sidewalk 550 lf 4-5' wide concrete sidewalk $ 55,000

    4 Waite Street Shared lane markings 40 sharrow pavement markings, 4 "Share the Road" signs $ 9,200

    $ 314,200

  • 8/2/2019 Ham Den East West Final 041012

    50/52

    Hamden East-West ransportation Study50

    Mather Street

    ID Location Improvement Improvement Items Cost

    1 Mather Street, south side Sidewalk

    2300 lf 4' wide asphalt sidewalk or stone dust pathway,

    fence and guardrail improvements $ 160,000

    2 Mather Street Speed feedback sign 2 signs $ 10,000

    3 Mather Street at Servoss Street Crosswalk improvements 1 pedestrian refuge island, 1 marked crosswalk, 4pedestrian crosswalk signs 10,000$

    4 Mather Street west of Gessner Place Sidewalk 150 lf 4-5' wide concrete sidewalk 15,000$

    5.1 Mather Street at King Street Stop sign upgrades 1 translucent stop sign 200$

    5.2 Mather Street at Belmont Street "No outlet" signage 1 freestanding sign, 1 street sign mounted placard 400$

    5.3 NE corner of Mather Street at Belmont St Curb ramp 1 ADA accessible curb ramp and curb extension 5,000$

    5.4 Mather Street at Belmont Street Raised crosswalks 2 raised crosswalks 10,000$

    5.5 Mather Street at Belmont Street Stop bar Relocate 1 stop bar 400$

    5.6 SE corner of Mather Street at Belmont Street Curb extension 1 landscaped curb extension 10,000$

    5.7 Belmont and King Street Crosswalks Install 2 marked crosswalks 1,000$6 Mather Street at Farmington Canal Trail Trail access Approximately 200 lf 8' wide asphalt pavement 50,000$

    7 Mather Street Shared lane markings 44 sharrow pavement markings, 4 "Share the Road" signs 10,000$

    282,000$

    Treadwell Street

    ID Location Improvement Improvement Items Cost

    1 Treadwell Street west of Leeder Hill Drive Sidewalk 1550 lf 4-5' wide concrete sidewalk 155,000$

    1.1 Treadwell Street at Leeder Hill Drive Crosswalk 1 marked crosswalk 500$

    2 Treadwell Street at Lake Street Crosswalk improvements

    1 marked crosswalk, pedestrian refuge island, 4

    crosswalk warning signs 10,000$

    3 Treadwell Street Shared lane markings 42 sharrow pavement markings, 6 "Share the Road" signs 10,200$

    175,700$

  • 8/2/2019 Ham Den East West Final 041012

    51/52

    Hamden East-West ransportation Study 51

    Putnam Avenue

    ID Location Improvement Improvement Items Cost

    1

    Putnam