future growth fgp · 1 modular substation was fabricated by skema llp in kazakhstan. performance...
TRANSCRIPT
KAZAKHSTAN
Caspian Sea
Uzbekistan
Kyrgyzstan
DISCOVERED IN 1979, TENGIZ IS ONE OF THE WORLD’S DEEPEST DEVELOPED SUPER GIANT OILFIELDS. THE FUTURE
GROWTH PROJECT (FGP), INTEGRATED WITH THE WELLHEAD PRESSURE MANAGEMENT PROJECT (WPMP), ARE EXE-
CUTED SIMULTANEOUSLY TO EXPAND TENGIZ PRODUCTION AND MAINTAIN FULL PRODUCTION RATES OF THE EXIST-
ING TENGIZ FACILITIES. THE FGP PLANTS WILL NOT PRODUCE SULFUR. THE NATURAL GAS CONTAINING HYDROGEN
SULPHIDE WILL BE RE-INJECTED INTO THE RESERVOIR TO MAINTAIN RESERVOIR PRESSURE. THE EXPANSION IS DE-
SIGNED AND CONSTRUCTED TO OPERATE WITH THE LATEST TECHNOLOGY TO REDUCE AIR EMISSIONS.
FUTURE GROWTH PROJECT (FGP) / KAZAKHSTAN ONSHORE
“This was a technically challenging order. As a result Skema worked very collaboratively with our engineering and management team to
come to successful solutions.”
Project Manager
EPC CONTRACTOR: KPJV / A JV BETWEEN: FLUOR / WORLEY PARSONS / JSC KING AND LLP KGNTEND USER: TENGIZCHEVROIL / A CONSORTIUM OF: CHEVRON / EXXONMOBIL / KAZMUNAYGAS / LUKARKO
ENGINEERING
The substations supplied for the FGP/
WPMP project are one level steel
structures installed above a concrete
foundation. The main structure con-
sists of transverse frames connected
by floor beams, wall corrugated plates
and floor plates. The main structure is
completed with longitudinal beams
connecting the bottom of the main
columns. The structures and machin-
ery are designed to withstand the
seismic design loads and to meet the
general seismic requirements, in ac-
cordance with the SiD (Safety in De-
sign) requirements. All analyses were
carried out using Semi-probabilistic
method at Limit states (LSD), while all
structures were analyzed using FEM
method bend on the package 3D
model, considering the operation con-
figuration and the lifting phase.
For seismic analysis static analysis
was carried out. The lifting was from
top of the substation.
A 3D separate model was generated
for each module in a right handed or-
thogonal Cartesian coordinate sys-
tem. The structural models of the
modules were representative of the
actual structural components and in-
cluded all primary framing members,
namely columns, f loor beams and
floor plates.
FABRICATION IN ITALY
The modular substations fabricated in
Italy were tested at Skema’s yard fa-
cilities, then disassembled in modules
and transported by road to Tengiz, to
be reassembled locally.
The supply included 10 Container-
ized complete transformer 10/0.4 kV
substations for the Contractors’ Com-
pound / Early Works, equipped with:
> 10 kV Gas Insulated Switchgear
(6 sections)
> 10 kV Ring Main units (24 sections)
> Intelligent PMCCs
(66 sections, 154 drawers)
> Distribution Boards (68 sections)
> 220 VDC system
> 220 VDC Ni-Cd battery rack
> 10/0.4 kV cast resin Transformers
> Lighting and electrical system
> HVAC system
> Fire and gas system
2 Containerized 35/10 kV packaged
substations were fabricated for New
Camp 9/A, and were equipped with:
> 35 kV Gas Insulated Switchgear
(21 sections)
> 10 kV Gas Insulated Switchgear
(26 sections)
> 10 kV Disconnector Switches
(4 sections)
> Distribution Boards (25 sections)
> 220 VDC system
> 220 VDC Ni-Cd battery rack
> 10/0.4 kV – 750 kVA cast resin
Transformers
> On Load Tap Changer (OLTC) panel
> Patch panel
> Badge reader access door
> Lighting and electrical system
> HVAC system
> Fire and gas system
The equipment was pre-assembled
and base plated mounted to the maxi-
mum extent including piping, supports,
instruments, wiring, junction boxes.
“I would like to thank you and your team for producing a quality product which will serve TCO for many years. I appreciate your effort, patience and understanding in working with us to achieve this significant milestone of
signing off the substations for T9A and Orken Village to the required standard
and to the agreed schedule.”
Lead Project Engineer
FABRICATION IN KAZAKHSTAN
Skema LLP was awarded the local fab-
rication of 1 Containerized 10 kV pack-
aged substation for the Construction
Compound. The substation included:
> 10 kV Gas Insulated Switchgear
(15 sections)
> Distribution Boards (11 sections)
> 220 VDC system
> 220 VDC Ni-Cd battery rack
> Cast resin Transformers 35/0.4 kV
> Lighting and electrical system
> HVAC system
> Fire and gas system
The equipment was pre-assembled
and base plated mounted to the maxi-
mum extent including piping, supports,
instruments, wiring, junction boxes.
The modular substation fabricated
in Atyrau was tested at the fabrica-
tion yard facilities, then disassembled
in modules and transported by road
to Tengiz, to be reassembled locally.
For the modular substations fabricated
for the FGP/WPMP, Skema supplied the
following services: preservation, pro-
tection and storage at the fabrication
yard; disassembly in modules; pack-
aging, preservation and protection for
sea and land transport; winterization
for shipment and storage; load out.
Skema was in charge of the sizing, detailed design, engi-
neering, project management, scheduling, procurement,
fabrication, painting, inspection, non-destructive exam-
ination, shop testing, expediting, QA/HSE management,
documentation and preservation of 13 Modular Substa-
tions. The fabrication, multidisciplinary installation ac-
tivities (architectural, mechanical, E&I, HVAC, etc.), test-
ing and pre-commissioning of 12 modular substations
were carried out at Skema’s yard in Ravenna, Italy, while
1 modular substation was fabricated by Skema LLP in
Kazakhstan. Performance was according to IEC/GOST
standards and PUE ROK.
SOLUTIONS DELIVERED
13 MODULAR SUBSTATIONS
MV 10/35 KV SWITCHGEAR (68 COLUMNS)
MV 10 KV RING MAIN UNITS (24 COLUMNS)
INTELLIGENT POWER MOTOR CONTROL CENTERS (66 COLUMNS, 154 DRAWERS)
DISTRIBUTION BOARDS (104 COLUMNS)
EPC CONTRACTOR: KPJV / A JV BETWEEN: FLUOR / WORLEY PARSONS / JSC KING AND LLP KGNTEND USER: TENGIZCHEVROIL / A CONSORTIUM OF: CHEVRON / EXXONMOBIL / KAZMUNAYGAS / LUKARKO