FAMPO RESOLUTION 14-01 A RESOLUTION OF THE FREDERICKSBURG AREA METROPOLITAN PLANNING ORGANIZATION (FAMPO) POLICY COMMITTEE TO REQUEST THAT VDOT AND THE COMMONWEALTH TRANSPORTATION BOARD (CTB) IMMEDIATELY MOVE FORWARD TO CONSTRUCT A PROJECT TO REDUCE I-95 AND OTHER TRAFFIC CONGESTION IN THE FAMPO REGION AND TO IMPROVE REGIONAL SAFETY, ECONOMIC VITALITY AND QUALITY OF LIFE AND ALSO TO AMEND THE FY12-FY15 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) TO TRANSFER $250,000 OF PREVIOUS FUNDS FROM UPC # 13558 (RELOCATION OF INTERCHANGE ON I-95 AT RTE 630/EXIT 140, STAFFORD COUNTY ) TO UPC # 104928 (I-95 REST AREA ACCESS AND RTE. 3 CONNECTOR ROAD) WHEREAS, in 2010, after years of analysis, FAMPO submitted an Interchange Justification Report (IJR) to VDOT and the Federal Highway Administration (FHWA), and WHEREAS, this IJR showed that a series of improvements would alleviate congestion on I-95 and on Route 17 in Stafford County and Route 3 in the City of Fredericksburg and Spotsylvania County, as well as improving safety, economic vitality and quality of life in the FAMPO Region, and WHEREAS, the improvements recommended in the IJR included an upgrade to the I-95 interchange at Exit 133, expansion of I-95 capacity between Exits 133 and 130 (including new capacity across the Rappahannock River), a new I-95 interchange just north of the I-95 Welcome Center at Fredericksburg and a new parkway, extending from the new I-95 interchange and connecting with Route 3 at Gordon Road in Spotsylvania County, and WHEREAS, in 2010 VDOT and FHWA gave approval for the improvements recommended in the IJR to proceed to environmental review and design, and WHEREAS, in September 2013 the Commonwealth Transportation Secretary noted delays in solving I- 95 congestion in the FAMPO Region and the negative impacts this congestion was having on the Commonwealth and the American Eastern Seaboard, and directed VDOT to report back to the CTB with its recommendations for solving I-95-related congestion in the FAMPO Region at the December 2013 CTB meeting, and WHEREAS, having been asked by the Fredericksburg District CTB Member for a recommendation, FAMPO voted to endorse a combined project which included construction of all of the improvements contained in the 2010 IJR, as well as improvements to Exit 133 and construction of the “Berea Parkway,” extending from I-95 Exit 136 to Route 17 in Stafford County, and FREDERICKSBURG AREA METROPOLITAN PLANNING ORGANIZATION (FAMPO) Matt Kelly Fredericksburg City Chairman Spotsylvania County Stafford County Lloyd Robinson FAMPO Administrator

Upload: others

Post on 13-May-2022

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: FREDERICKSBURG AREA METROPOLITAN

FAMPO RESOLUTION 14-01

A RESOLUTION OF THE FREDERICKSBURG AREA METROPOLITAN

PLANNING ORGANIZATION (FAMPO) POLICY COMMITTEE TO REQUEST

THAT VDOT AND THE COMMONWEALTH TRANSPORTATION BOARD

(CTB) IMMEDIATELY MOVE FORWARD TO CONSTRUCT A PROJECT TO

REDUCE I-95 AND OTHER TRAFFIC CONGESTION IN THE FAMPO REGION

AND TO IMPROVE REGIONAL SAFETY, ECONOMIC VITALITY AND

QUALITY OF LIFE AND ALSO TO AMEND THE FY12-FY15

TRANSPORTATION IMPROVEMENT PROGRAM (TIP) TO TRANSFER

$250,000 OF PREVIOUS FUNDS FROM UPC # 13558 (RELOCATION OF

INTERCHANGE ON I-95 AT RTE 630/EXIT 140, STAFFORD COUNTY ) TO

UPC # 104928 (I-95 REST AREA ACCESS AND RTE. 3 CONNECTOR ROAD)

WHEREAS, in 2010, after years of analysis, FAMPO submitted an Interchange Justification Report

(IJR) to VDOT and the Federal Highway Administration (FHWA), and

WHEREAS, this IJR showed that a series of improvements would alleviate congestion on I-95 and on

Route 17 in Stafford County and Route 3 in the City of Fredericksburg and Spotsylvania County, as well

as improving safety, economic vitality and quality of life in the FAMPO Region, and

WHEREAS, the improvements recommended in the IJR included an upgrade to the I-95 interchange at

Exit 133, expansion of I-95 capacity between Exits 133 and 130 (including new capacity across the

Rappahannock River), a new I-95 interchange just north of the I-95 Welcome Center at Fredericksburg

and a new parkway, extending from the new I-95 interchange and connecting with Route 3 at Gordon

Road in Spotsylvania County, and

WHEREAS, in 2010 VDOT and FHWA gave approval for the improvements recommended in the IJR to

proceed to environmental review and design, and

WHEREAS, in September 2013 the Commonwealth Transportation Secretary noted delays in solving I-

95 congestion in the FAMPO Region and the negative impacts this congestion was having on the

Commonwealth and the American Eastern Seaboard, and directed VDOT to report back to the CTB with

its recommendations for solving I-95-related congestion in the FAMPO Region at the December 2013

CTB meeting, and

WHEREAS, having been asked by the Fredericksburg District CTB Member for a recommendation,

FAMPO voted to endorse a combined project which included construction of all of the improvements

contained in the 2010 IJR, as well as improvements to Exit 133 and construction of the “Berea Parkway,”

extending from I-95 Exit 136 to Route 17 in Stafford County, and

FREDERICKSBURG AREA METROPOLITAN

PLANNING ORGANIZATION (FAMPO) Matt Kelly

Fredericksburg City Chairman

Spotsylvania County

Stafford County Lloyd Robinson

FAMPO Administrator

Page 2: FREDERICKSBURG AREA METROPOLITAN

2

WHEREAS, on December 4, 2013 the Commonwealth Transportation Board met and reviewed a report

by VDOT on alternatives for reducing traffic congestion on I-95 and elsewhere in the FAMPO Region,

and

WHEREAS, VDOT’s recommendation to the CTB was identical to the FAMPO recommendation, and

WHEREAS, after reviewing the VDOT presentation, the CTB acted to immediately move forward to

transfer $250,000 in FY13 funds within the current Six Year Improvement Program from UPC 13558 to

UPC 104928 to expedite development of VDOT’s recommended project, and

WHEREAS, as shown in the attached maps and described above, the overall project the CTB selected to

expedite consists of three smaller projects, namely: 1) the Berea Parkway in Stafford County; 2) the

Rappahannock River Crossing in Stafford County and the City of Fredericksburg, and 3) the

Rappahannock Parkway in the City of Fredericksburg and Spotsylvania County, and

WHEREAS, each of the three smaller projects listed above are included in the FAMPO 2040

Constrained Transportation Plan, and

NOW, THEREFORE BE IT RESOLVED BY THE FREDERICKSBURG METROPOLITAN

PLANNING ORGANIZATION (FAMPO) POLICY COMMITTEE THAT IT HEREBY AMENDS

THE FY12-FY15 TRANSPORTATION IMPROVEMENT PROGRAM (TIP) TO TRANSFER

$250,000 OF PREVIOUS FUNDS FROM UPC # 13558 (RELOCATION OF INTERCHANGE ON

I-95 AT RTE 630/EXIT 140, STAFFORD COUNTY ) TO UPC # 104928 (I-95 REST AREA

ACCESS AND RTE. 3 CONNECTOR ROAD), AND HEREBY URGES THE CTB AND VDOT

TO EXPEDITE DEVELOPMENT AND IMPLEMENTATION OF A PROJECT CONSISTING

OF THE BEREA PARKWAY, THE RAPPAHANNOCK RIVER CROSSING AND THE

RAPPAHANNOCK PARKWAY, IN ORDER TO REDUCE REGIONAL TRAFFIC

CONGESTION AND TO IMPROVE SAFETY, ECONOMIC VITALITY AND THE QUALITY

OF LIFE.

Adopted by the FAMPO Policy Committee at its meeting on January 27, 2014.

FAMPO Resolution 14-01

____________________________________________________

Chairman

Fredericksburg Area Metropolitan Planning Organization

Date:___________________

(540) 373-2890

406 Princess Anne St. FAX: (540) 899-4808

Fredericksburg, Virginia 22401 www.fampo.gwregion.org

Page 3: FREDERICKSBURG AREA METROPOLITAN

(3) Rappah an n o c k Par kw a y

Æþ1

Exit 130

!"#$95

Æþ17

ÉÊ3

Exit 133

Exit 136

ÉÊ3

Æþ17

Æþ1

!"#$95

ÉÊ2

ÉÊ3

ÉÊ218

620

627

610

652

656

670

616

621

610

612

639

613

Copyright:© 2009 ESRI

I Recommended CTB Projects to Reduce I-95 and Other Tra�c Congestion in the FAMPO Region

0 1 20 . 5M i l e s

S p o t s y l va n i a C o u n t yS p o t s y l va n i a C o u n t y

C i t yC i t yC i t yo fo f

Fr e d e r i c k s b u r gFr e d e r i c k s b u r gFr e d e r i c k s b u r gFr e d e r i c k s b u r g

ivvee rr

Fr e d e r i c k s b u r g a n d S p o t s y l va n i aFr e d e r i c k s b u r g a n d S p o t s y l va n i aFr e d e r i c k s b u r g a n d S p o t s y l va n i aN a t i o n a l M i l i t a r y Pa r kN a t i o n a l M i l i t a r y Pa r k

B a t t l e o f C h a n ce l l o r s v i l l e

Fr e d e r i c k s b u r g a n d S p o t s y l va n i aN a t i o n a l M i l i t a r y Pa r k

P ra t t P ra t t Pa r kPa r k

Berea Parkway(1)(2)(3)

Rappahannock River Crossing Improvements

Rappahannock Parkway

Highlighted Projects

þþþÆþÆÆþÆÆþÆÆþÆ17ÆþÆÆþÆ17ÆþÆÆþÆ17ÆþÆ

656656

S t a � o r d C o u n t yS t a � o r d C o u n t yS t a � o r d C o u n t y

RRaapppppp aa hhh aa nn nnn oockkk

RRiivv

(1) Berea Parkway

ar kkww aa yy

( 2 ) Ra p p a h a n n o c kR i ve r C r o s s i n gI m p r ove m e n t s

670670

( 2 ) Ra p p a h a n n o c k

Page 4: FREDERICKSBURG AREA METROPOLITAN

Fredericksburg MPO

MPO TIP Report Interstate

UPC 104928 SCOPE New Construction Roadway

SYSTEM Interstate JURISDICTION District-Wide OVERSIGHT FO

PROJECT I-95 Rest Area Access and Rte 3 Connector Road ADMIN BY VDOT

DESCRIPTION From: I-95 (Virginia Welcome Center) To: Intersection of Rte 3 and Rte 627

ROUTE/STREET Interstate 95 TOTAL COST $150,000,000

FUND SOURCE Prev Alloc. FY12 FY13 FY14 FY15

Residue Parcel – Interstate $0 $0 $250,000 $0 $0

TOTAL $0 $0 $250,000 $0 $0

MPO NOTE $250,000 was transferred in the SYIP from UPC 13558 (Interchange Relocation at Exit 140/Rte 630 in Stafford County) per CTB action; $2,000,000 in NHPP: Interstate funds programmed in SYIP for FY2016