foundation fieldbus overview

31
Taking Advantage of Foundation Fieldbus Device Functionality Larry Wolfe Director, Technology Deployment REM Services, Inc. Charlotte, NC

Upload: hugo-mamani

Post on 21-Jul-2016

57 views

Category:

Documents


10 download

TRANSCRIPT

Page 1: Foundation Fieldbus Overview

Taking Advantage of

Foundation FieldbusDevice Functionality

Larry WolfeDirector, Technology Deployment

REM Services, Inc.Charlotte, NC

Page 2: Foundation Fieldbus Overview

November 17, 2009 Slide 22

Abstract

Taking Advantage of Foundation Fieldbus DeviceFunctionality

Foundation Fieldbus systems have been deployed in many facilitiessince their introduction in the late 1990’s. System and devicefunctionalities have improved in many ways since. This presentationwill provide an overview of Foundation Fieldbus functionality, contrastthe use of 4-20mA devices versus fieldbus devices in monitoring andcontrol strategies, and highlight what users across the organizationneed to know about the technology to gain the most benefit.

A control system and field devices utilizing current Foundation Fieldbusfunctionality will used throughout the presentation.

Page 3: Foundation Fieldbus Overview

November 17, 2009 Slide 33

Larry Wolfe - Biography

Larry Wolfe is Director, Technology Deployment for REM Services,Inc. in Charlotte, North Carolina. Larry earned a BS in AerospaceEngineering in 1968 and an MS in Mechanical Engineering in 1974from the University of Oklahoma. Between his times at University heserved four years in the Air Force. He came to North Carolina aftergraduate school to Fiber Industries, Inc. in Salisbury, NC. After 10 +years with that company, he took a job with the Robert E. MasonCompany in Charlotte in 1985 and has worked for the Robert E. Masonfamily of companies since.

Larry has worked with the integration of Process Control systems andfield devices for most of his career. He has worked with FieldbusFoundation host and device products from Emerson since theirintroduction. He has worked with customers to implement the benefitsthe systems provide and has helped to familiarize users with systemand device capabilities.

Page 4: Foundation Fieldbus Overview

November 17, 2009 Slide 44

Quick History of FF

• DCS Systems introduction in 1970’s• ISA – SP50 Committee efforts• Interoperability Systems Project• WorldFIP North America• Merging of ISP and WorldFIP NA to form

Page 5: Foundation Fieldbus Overview

November 17, 2009 Slide 55

What is Foundation Fieldbus?

• H1 is an all-digital, serial, two-way, deterministic,cyclic and acyclic communication systeminterconnecting “field” equipment such assensors, actuators and I/O

• The Physical Layer is OSI layer 1• The Data Link Layer (DLL) is OSI layer 2• The Fieldbus Message Specification (FMS) is

OSI layer 7• The Communication Stack is comprised of

layers 2 and 7 in the OSI model

Page 6: Foundation Fieldbus Overview

November 17, 2009 Slide 66

Physical Layer

• Foundation Fieldbus uses a two or threewire shielded cable (several classes fordifferent applications)

• Terminated at both ends• Maximum segment length 1900m• Segment Design Tools available• Connectivity and diagnostics products and

tools available from multiple vendors

Page 7: Foundation Fieldbus Overview

November 17, 2009 Slide 77

OSI vs Fieldbus Model

* The user application is not defined by the OSI Model

OSI Model*

Application Layer

Presentation Layer

Session Layer

Transport Layer

Network Layer

Data Link Layer

Physical Layer

Data Link Layer

Physical Layer

Application Layer

Fieldbus AccessSublayer

Physical Layer

Communication“Stack”

UserApplication

UserApplication

Fieldbus Model

6

7

5

4

3

2

1

Page 8: Foundation Fieldbus Overview

November 17, 2009 Slide 88

Device Descriptions

• The “drivers” for Foundation FieldbusDevices

• Typically two DD files and one capabilitiesfile

• Used by the host/control system tounderstand functions available in device

• DD’s are available on Foundation Fieldbuswebsite and vendor websites

Page 9: Foundation Fieldbus Overview

November 17, 2009 Slide 99

Foundation Fieldbus Blocks

• The Fieldbus Foundation has defined astandard User Application Layer based on“Blocks.”

• There are three standard block types inthe FF User Application Layer

• Resource Block• Transducer Block• Function Block

Page 10: Foundation Fieldbus Overview

November 17, 2009 Slide 1010

Resource Block

• The Resource Block describescharacteristics of the fieldbus device suchas the device name, manufacturer, andserial number

• There is only one Resource Block in adevice

Page 11: Foundation Fieldbus Overview

November 17, 2009 Slide 1111

Transducer Block

• The Transducer Blocks are used toconfigure devices

• Transducer Blocks decouple FunctionBlocks from the local input/outputfunctions required to read sensors andcommand output hardware

• They can contain information such ascalibration date and sensor type

Page 12: Foundation Fieldbus Overview

November 17, 2009 Slide 1212

Function Blocks

• Function Blocks (FB) provide the controlsystem behavior

• The input and output parameters ofFunction Blocks can be linked over thefieldbus

• The execution of each Function Blockused is precisely scheduled

Page 13: Foundation Fieldbus Overview

November 17, 2009 Slide 1313

Partial Function Block List

RARatio

PIDProportional/Integral/Derivative

PDProportional/Derivative

MLManual Loader

DODiscrete Output

DIDiscrete Input

CSControl Selector

BGBias/Gain

AOAnalog Output

AIAnalog Input

SymbolFunction Block Name

AALAnalog Alarm

TMRTimer

ARArithmetic

ISInput Selector

SPGSetpoint Ramp Generator

ITIntegrator (Totalizer)

DTDeadtime

LLLead Lag

SCSignal Characterizer

OSOutput Splitter

DCDevice Control

SymbolFunction Block Name

Page 14: Foundation Fieldbus Overview

November 17, 2009 Slide 1414

Still More Function Blocks

MDOMultiple Discrete Output

MDIMultiple Discrete Input

MAOMultiple Analog Output

MAIMultiple Analog Input

SymbolFunction Block Name

Page 15: Foundation Fieldbus Overview

November 17, 2009 Slide 1515

Commissioning Devices

• Assign the device a name• Assign the device a permanent address

– (DeltaV calls this the Commissioned address)

• Download the information to the deviceand the host

Page 16: Foundation Fieldbus Overview

November 17, 2009 Slide 1616

Downloading Devices

• Loads information into host accessibleparameters of the device – typically innon-volatile memory

• Assigns permanent Fieldbus addressesand names to devices and device blocks

• May require download of “shadow” blocksif host uses this functionality

Page 17: Foundation Fieldbus Overview

November 17, 2009 Slide 1717

Segment Communications

• VCR• DD / DDL• Basic Device• Link Master• Compel Communications• Publish PV OUT• Subscribe• Token• Probe Node Message

Page 18: Foundation Fieldbus Overview

November 17, 2009 Slide 1818

DeltaV Macrocycle

Page 19: Foundation Fieldbus Overview

November 17, 2009 Slide 1919

Segment Design Software

• Pepperl+Fuchs Segment Design– http://www.segmentchecker.com/

• MTL Fieldbus segment calculator v1.5.4– http://www.mtl-inst.com/products/C397

Page 20: Foundation Fieldbus Overview

November 17, 2009 Slide 2020

Handheld Tools

• Segment Diagnostic Tools– MTL Fieldbus Monitor, FBT-6– MTL FBT-3 Fieldbus monitor– MTL FBT-4 Fieldbus Power & Signal Probe– MTL Fieldbus Wiring Validator, FBT-5

• http://www.mtl-inst.com/product/test_equipment/

• Device Configuration/Diagnostic Tools– Emerson 375 / 475 Field Communicators

HART and Foundation Fieldbus• http://www2.emersonprocess.com/en-us/brands/fieldcommunicator/Pages/fieldcommunicators.aspx

Page 21: Foundation Fieldbus Overview

November 17, 2009 Slide 2121

Foundation Fieldbus DeviceConfiguration / Diagnostic Software

• Emerson AMS Intelligent Device Manager– http://www2.emersonprocess.com/en-

US/brands/amssuite/amsdevicemanager/Pages/AMSDeviceManager.aspx

• National Instruments– http://sine.ni.com/nips/cds/view/p/lang/en/nid/10240

Page 22: Foundation Fieldbus Overview

November 17, 2009 Slide 2222

References

• Fieldbus Foundation– http://www.fieldbus.org/

• Emerson Process Managementhttp://www2.emersonprocess.com/en-US/plantweb/whatisplantweb/connecting/Pages/FOUNDATION_Fieldbus.aspx

Page 23: Foundation Fieldbus Overview

November 17, 2009 Slide 2323

References

• Pepperl+Fuchs– http://www.am.pepperl-fuchs.com/products/productfamily.jsp?division=PA&productfamily_id=1244

• MTL– http://www.mtl-inst.com/products/C77/

Page 24: Foundation Fieldbus Overview

November 17, 2009 Slide 2424

Resources for learninghttp://www2.emersonprocess.com/en-US/plantweb/whatisplantweb/connecting/Pages/FOUNDATION_Fieldbus.aspx

Page 25: Foundation Fieldbus Overview

November 17, 2009 Slide 2525

Resources for learning cont.

• http://www2.emersonprocess.com/en-US/plantweb/whatisplantweb/connecting/Pages/FOUNDATION_Fieldbus.aspx

Page 26: Foundation Fieldbus Overview

November 17, 2009 Slide 2626

Resources for learning cont.

• http://plantweb.emersonprocess.com/university/default.asp

Page 27: Foundation Fieldbus Overview

November 17, 2009 Slide 2727

Resources for learning cont.

• http://plantweb.emersonprocess.com/university/engSch_Fieldbus_XML.asp

Page 28: Foundation Fieldbus Overview

November 17, 2009 Slide 2828

Resources for learning cont.

Page 29: Foundation Fieldbus Overview

November 17, 2009 Slide 2929

Questions?

Questions? / Comments!

Page 30: Foundation Fieldbus Overview

November 17, 2009 Slide 3030

Foundation Fieldbus Demo

• Foundation Fieldbus Demonstration– Host DeltaV V10.3 Scalable Process System– AMS Intelligent Device Manager– Devices

• Rosemount– 3051S DPT 848T TT 644 TT– 3144 TT 752 Indicator

• Fisher Controls International– DVC6000F

• FieldQ– QC34 FF Controller

Page 31: Foundation Fieldbus Overview

November 17, 2009 Slide 3131

Thank You Very Much!!