Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #4 December 12, 2017 Prepared by: Kim Fabend, C&S Companies File: N93.012.001 Attendees: See Sign‐In List The fourth meeting of the Project Advisory Group (PAG) for the ABE Master Plan was held at the Lehigh Northampton Airport Authority (LNAA) offices to review development alternatives. A copy of the presentation and sign‐in sheet is attached for reference. Following is a summary of items discussed during the meeting. Alternatives Development & Evaluation An update of the project process was presented as well as the status of on‐going elements. Marc Champigny provided an overview of the runway and taxiway alternatives, cargo development alternatives, and the alternatives associated with general aviation and service/support facility needs. Scott Tumulo presented on terminal area alternatives and Kim Fabend presented on access, circulation, and parking alternatives. The following items were mentioned during the presentation or through further discussion. Regarding Terminal Alternative 3A – the separate FIS (federal inspection service) building would result in a poor terminal passenger experience since most international travelers would be getting a connection to another destination. Differing opinions on this because the service is not defined and could be point to point which would limit connections. The plans for Airport Road are continuously changing with the anticipated development in the area and subsequent additional traffic. For example, the one southbound lane being built on Airport Road may not be adequate for the additional development proposed north of the Airport. It was noted that there was a past parking study developed that evaluated adding parking vertically on the existing public parking area and potential access from the terminal roadway at different points which may be helpful if additional parking is needed in the future. There was a lot of discussion regarding truck traffic on Race St and Airport Rd due to development in the area as well as the potential for some, or all cargo moving to the northwest quadrant of the airfield. The preliminary preferred alternative drawing indicated maintaining the protection of the land associated with a 3 rd runway. It was noted that the previous Airport Layout Plan (ALP) showed a relocation of Willowbrook Rd. A recent subdivision development has language associated with it that would make the relocation of Willowbrook Rd come into Weaversville Rd infeasible or impossible. The current assumption is that Willowbrook Rd would be tunneled or somehow accommodated under the new runway, not relocated, but this will be reconsidered and confirmed before finalizing the proposed development plan. The information and discussion items above will be used for input and follow up as appropriate in the development of the master plan. Meeting was adjourned. End Meeting

Upload: others

Post on 21-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

 

 

 

Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #4 December 12, 2017  Prepared by:    Kim Fabend, C&S Companies 

File:       N93.012.001 

Attendees:  See Sign‐In List  

The fourth meeting of the Project Advisory Group (PAG) for the ABE Master Plan was held at the Lehigh Northampton  Airport  Authority  (LNAA)  offices  to  review  development  alternatives.    A  copy  of  the presentation and sign‐in sheet is attached for reference.  Following is a summary of items discussed during the meeting.   

Alternatives Development & Evaluation 

An  update  of  the  project  process  was  presented  as  well  as  the  status  of  on‐going  elements.  Marc 

Champigny  provided  an  overview  of  the  runway  and  taxiway  alternatives,  cargo  development 

alternatives, and the alternatives associated with general aviation and service/support facility needs. Scott 

Tumulo presented on terminal area alternatives and Kim Fabend presented on access, circulation, and 

parking  alternatives.  The  following  items were mentioned during  the presentation or  through  further 

discussion. 

Regarding Terminal Alternative 3A – the separate FIS (federal inspection service) building would 

result in a poor terminal passenger experience since most international travelers would be 

getting a connection to another destination. Differing opinions on this because the service is not 

defined and could be point to point which would limit connections. 

The plans for Airport Road are continuously changing with the anticipated development in the 

area and subsequent additional traffic.  For example, the one southbound lane being built on 

Airport Road may not be adequate for the additional development proposed north of the 

Airport.   

It was noted that there was a past parking study developed that evaluated adding parking 

vertically on the existing public parking area and potential access from the terminal roadway at 

different points which may be helpful if additional parking is needed in the future. 

There was a lot of discussion regarding truck traffic on Race St and Airport Rd due to 

development in the area as well as the potential for some, or all cargo moving to the northwest 

quadrant of the airfield.   

The preliminary preferred alternative drawing indicated maintaining the protection of the land 

associated with a 3rd runway.  It was noted that the previous Airport Layout Plan (ALP) showed a 

relocation of Willowbrook Rd. A recent subdivision development has language associated with it 

that would make the relocation of Willowbrook Rd come into Weaversville Rd infeasible or 

impossible.  The current assumption is that Willowbrook Rd would be tunneled or somehow 

accommodated under the new runway, not relocated, but this will be reconsidered and 

confirmed before finalizing the proposed development plan. 

The information and discussion items above will be used for input and follow up as appropriate in the 

development of the master plan. Meeting was adjourned.  

End Meeting 

Page 2: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This
Page 3: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

1

PROJECT ADVISORY GROUP (PAG) MEETING #4

DRAFT ALTERNATIVES AND CONCEPTAIRPORT MASTER PLAN UPDATE

LEHIGH VALLEY INTERNATIONAL AIRPORT

December 12, 2017

2The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

• Where we are in the process

• Alternatives Development

• Phasing and Reporting

• Next Steps

Agenda

Page 4: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

2

3The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Master Plan Process Flowchart: 19 Elements

2/1/17 8/15/17 12/12/17

Jan/Feb 18

10/26/16 Mar 18

4/20/17

Jan/Feb 18

6/2/17

4The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

• Runways

• Taxiways

• Terminal Area

• Ground Access and Circulation

• Cargo

• General Aviation and Support Facilities

Alternative Development

Page 5: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

3

5The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

• Economic/Strategic– LNAA Strategic Goals

– Construction Cost

• Operational/Maintenance– Facility Requirements and Design Standards

– Development and Maintenance

– Implementation Feasibility

• Natural Resources/Sustainability– Environmental Impacts or Challenges

– Sustainability, Long-Term Planning

• Social/Community/Passenger Experience– Off-airport considerations

– Passenger/User experience

Alternative Evaluation Factors

6The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

• Pavement Management Plan – 5-year maintenance plan

• Increase/efficient use of capacity with taxiway improvements

• Address airfield design geometry, MOS’s, if able

• Obstruction identification and removal

• Control RPZs/RW 6 blast pad

• RW 13-31 considerations (EMAS lifecycle, extension)

• Phased extension of RW 6-24 up to 10,000 ft

• Maintain plan for 3rd runway in next planning period, 20+ years

Airfield Facility Requirements

Page 6: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

4

7The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

8The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Runway 6-24 Preferred Concept

• Extend to 10,000 feet in one phase

• Consideration of costs to only move ILS, approach lights one time

• Current users priority to remove obstructions first

• Estimated timing in the 10 to 15 year planning period

• Estimated construction cost $21 million excluding land acquisition cost

Page 7: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

5

9The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

10The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Page 8: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

6

11The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

• Consideration of EMAS lifecycle as decision point for extension

• Estimated timing in the 10 to 15 year planning period

• Estimated construction cost:

– ALT 2 – $46.2 million

– ALT 3 – $53.7 million

• Alternatives exclude land acquisition cost

• Wind coverage dictates status quo is suitable for fleet mix operations

• Extend to 7,600 feet utilizing EMAS, to 10,000 feet not practicable

• Maintains long-term plan connection to 3rd runway (20+ years)

Runway 13-31 Preferred Concept

12The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Page 9: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

7

13The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

14The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Taxiway Preferred Concepts

• All taxiway improvements shown will help airfield efficiency

• Phasing priorities proposed to support other alternative development

• Runway 6-24 Taxiway Improvements:

– Priority – Parallel, supports cargo, est. $18.7 million, year 5 to 10

– Could be phased, north done first to support cargo, full parallel is operationally efficient and safer

• Runway 13-31 Taxiway Improvements:

– Priority – Entrance to terminal, swap with service road, est. $1.1 million, year 5 to 10

– Low priority – Parallel, when development on west, est. $19.9 million, year 10 to 15

– Likely phased, portion to east is financially impracticable and in the 20+ year horizon

Page 10: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

8

15The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

• Require 8 gates: 7 for large regional jets, 1 narrow-body

– No additional required, but recommend adding 1 for flexibility

• Passenger security area is undersized

– Up to 4 lanes and 3,500 SF needed (double existing)

• Aged equipment and upgrades

• Some concession space needed – post-security

• Minimal increase outbound baggage area

• Federal Inspection Service (FIS) Facility (exploratory)

Terminal Area

16The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Alternatives – Terminal Area

Page 11: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

9

17The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Alternatives – Terminal Area

18The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Alternatives – Terminal Area

Page 12: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

10

19The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Alternatives – Terminal Area

20The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Alternatives – Terminal Area

Page 13: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

11

21The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Alternatives – Terminal Area

22The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Alternatives – Terminal Area

Page 14: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

12

23The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Terminal Cost Estimates/Ranking

Alternatives

Item 1A 1B 1C 2 3A 3B

Construction Cost $8,500,000 $34,050,000 $7,472,500

Contingency 20% $1,700,000 $6,810,000 $1,494,500

Construction Cost Total $9.1M $13.5M $10.2M $41M $9M $8.7M

FIS Facility $9M $11.2M $15.7M

Taken from Arora Report

1A 1B 1C 2 3A 3B

TERMINAL CRITERIA

Economic/Strategic Factors 7 6 6 7 5 7

Operational/Maintenance Factors 8 8 9 8 9 9

Natural Resources/Sustainability 3 3 6 2 5 2

Social/Community Impacts/Passenger Experience 4 4 4 6 2 4

TOTAL SCORE 22 21 25 23 21 22

RANKING 3 4 1 2 4 3

ALTERNATIVES

24The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Terminal Preferred Concepts

• Vertical circulation improvements:

– Escalator/elevator improvements or replacement, est. TBD million, year 0 to 5

• Security checkpoint improvements:

– Build new security checkpoint and circulation to meet 20-year demand, est. TBD million, year 5-10

• Long-term concourse expansion placeholder

– Mirror the concourse layout to maximize gates, beyond the 20-year planning horizon

• FIS facility feasibility:

– FIS facility development, est. TBD million, not tied to a year, dependent on demand or airport policy

Page 15: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

13

25The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

• Airport Road intersection congestion

• Arrivals curbside congestion

• Parking– Reallocate existing public parking area

– More short-term & ADA spaces

– Employee/rental car parking will be sufficient

• Improve confusing intersection/entrance alignment

• Incorporate land use analysis recommendations

• Pavement Management Plan – 5-year maintenance plan

Access, Circulation, & Parking

26The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

• Common Elements to All Alternatives

– Changes to public parking ingress/egress

– Reallocation of public parking spaces – increase short-term spaces

– Proposed development areas

• Travel Plaza, Retail Plaza, Hotel

• Demolition of parking booths on internal roadway

– New access & traffic signal

– No proposed changes to curbside areas at this time

Access, Circulation & Parking

Page 16: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

14

27The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Alternative 1 – Ground Access and Circulation

• Terminal traffic separated from development traffic

• Two-way internal roadway for development area & multi-modal center

• Does not improve internal intersection

• No internal delay/queuing issues anticipated

28The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Alternative 2 – Ground Access and Circulation

• TBD

• All traffic moved to new access

• Two-way internal roadway for development area & multi-modal center

• Reduces confusion/conflicts at internal intersection but increases conflicts along internal roadway

• No internal delay/queuing issues anticipated

Page 17: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

15

29The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Alternative 3 – Ground Access and Circulation

• TBD

• All traffic moved to new access

• One-way circulator roadway around development area & multi-modal center

• Reduces confusion/conflicts at internal intersection & circulator roadway

• Longer route for some internal traffic

• No internal delay/queuing issues anticipated

30The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Access, Circulation & Parking

• Estimated Construction Costs:– Circulation Alt 1 - $1.34 million

– Circulation Alt 2 - $1.54 million

– Circulation Alt 3 - $1.98 million

• Preferred Concept - Alternative 2

1 2 3

ROADWAYS/GROUND ACCESS FACILITIES CRITERIA

Economic/Strategic Factors 6 5 4

Operational/Maintenance Factors 4 5 5

Natural Resources/Sustainability 4 4 3

Social/Community Impacts/Passenger Experience 4 5 6

TOTAL SCORE 18 19 18

RANKING 2 1 2

ALTERNATIVES

Page 18: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

16

31The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

• Building area deficient by approximately 20,000 – 70,700 SF

• Apron area deficient by approximately 102,900 – 352,000 SF

Cargo Facilities

Cargo Building Area (95,570 SF)

Year

Existing LVIA

Ratio

Industry

Standard Ratio

Average of

Existing LVIA

Ratio & Industry

Standard Ratio

2022 123,372 85,675 104,524

2027 134,794 93,607 114,200

2032 146,699 101,874 124,286

2037 158,877 110,331 134,604

2040 166,289 115,479 140,884

Cargo Apron Area (474,530 SF)

Year

Existing LVIA

Ratio

Industry

Standard

Ratio

Average of

Existing LVIA

Ratio & Industry

Standard Ratio

2022 613,160 428,375 520,768

2027 669,924 468,035 568,980

2032 729,092 509,370 619,231

2037 789,616 551,655 670,636

2040 826,458 577,395 701,927

32The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Page 19: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

17

33The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

34The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Page 20: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

18

35The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

36The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Evaluation of Cargo Alternatives

• Total Program 9 Spaces

• Estimated Construction Costs:– Cargo Alt 1 - $52.0 million

– Cargo Alt 2 - $79.7 million

– Cargo Alt 3 - $64.9 million

– Cargo Alt 4 - $61.8 million

• Cargo Alt 1 is only 3 additional spaces

• Hybrid Preferred Concept:– Limit new apron in existing cargo area,

new aprons and buildings built on north side

– Buildings, truck docks, GSE, employee parking to support operation

– Split operation, or reuse of existing cargo for GA hangars, deicing pad, RON parking

1 2 3 4

CARGO FACILITIES CRITERIA

Economic/Strategic Factors 1 4 6 6

Operational/Maintenance Factors 5 9 8 9

Natural Resources/Sustainability 2 8 8 8

Social/Community Impacts/Passenger Experience 4 4 4 4

TOTAL SCORE 12 25 26 27

RANKING 4 3 2 1

ALTERNATIVES

Page 21: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

19

37The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

• T-hangars and aprons will be sufficient

• Additional conventional hangar space needed

• Tenant survey noted need for FBO improvements

General Aviation Facilities

YearTotal Conventional

Hangar Requirements (SF)

Existing Non-exclusive Conventional Hangar

Space (SF)Surplus/(Deficit) (SF)

2016 252,300 258,680 6,380

2017 258,800 258,680 (120)

2022 283,600 258,680 (25,000)

2027 317,900 258,680 (60,000)

2032 355,700 258,680 (97,000)

2037 395,300 258,680 (137,000)

2040 421,300 258,680 (163,000)

38The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

Alternatives – General Aviation and Support

Page 22: Final PAG Meeting #4 Notes - Dec 12 2017€¦ · 12/12/2017  · 2/12/2018 2 3 The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This

2/12/2018

20

39The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

• Drainage Evaluation

• Obstruction Analysis

• PMP and Maintenance

• Financial Modeling

• All Projects on Approved ALP Subject to Environmental Review

On-Going Elements Still in Play

40The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.

• Finalize Working Paper Development

• Finalize Preferred Development Concept

• Finalize Phasing, Incorporate Maintenance

• Complete Financial Modeling

• Winter Meetings

– PAG #5 – Final

– PIW – Final

Schedule and Next Steps