Meeting Summary ABE Master Plan Project Advisory Group (PAG) Meeting #4 December 12, 2017 Prepared by: Kim Fabend, C&S Companies
File: N93.012.001
Attendees: See Sign‐In List
The fourth meeting of the Project Advisory Group (PAG) for the ABE Master Plan was held at the Lehigh Northampton Airport Authority (LNAA) offices to review development alternatives. A copy of the presentation and sign‐in sheet is attached for reference. Following is a summary of items discussed during the meeting.
Alternatives Development & Evaluation
An update of the project process was presented as well as the status of on‐going elements. Marc
Champigny provided an overview of the runway and taxiway alternatives, cargo development
alternatives, and the alternatives associated with general aviation and service/support facility needs. Scott
Tumulo presented on terminal area alternatives and Kim Fabend presented on access, circulation, and
parking alternatives. The following items were mentioned during the presentation or through further
discussion.
Regarding Terminal Alternative 3A – the separate FIS (federal inspection service) building would
result in a poor terminal passenger experience since most international travelers would be
getting a connection to another destination. Differing opinions on this because the service is not
defined and could be point to point which would limit connections.
The plans for Airport Road are continuously changing with the anticipated development in the
area and subsequent additional traffic. For example, the one southbound lane being built on
Airport Road may not be adequate for the additional development proposed north of the
Airport.
It was noted that there was a past parking study developed that evaluated adding parking
vertically on the existing public parking area and potential access from the terminal roadway at
different points which may be helpful if additional parking is needed in the future.
There was a lot of discussion regarding truck traffic on Race St and Airport Rd due to
development in the area as well as the potential for some, or all cargo moving to the northwest
quadrant of the airfield.
The preliminary preferred alternative drawing indicated maintaining the protection of the land
associated with a 3rd runway. It was noted that the previous Airport Layout Plan (ALP) showed a
relocation of Willowbrook Rd. A recent subdivision development has language associated with it
that would make the relocation of Willowbrook Rd come into Weaversville Rd infeasible or
impossible. The current assumption is that Willowbrook Rd would be tunneled or somehow
accommodated under the new runway, not relocated, but this will be reconsidered and
confirmed before finalizing the proposed development plan.
The information and discussion items above will be used for input and follow up as appropriate in the
development of the master plan. Meeting was adjourned.
End Meeting
2/12/2018
1
PROJECT ADVISORY GROUP (PAG) MEETING #4
DRAFT ALTERNATIVES AND CONCEPTAIRPORT MASTER PLAN UPDATE
LEHIGH VALLEY INTERNATIONAL AIRPORT
December 12, 2017
2The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
• Where we are in the process
• Alternatives Development
• Phasing and Reporting
• Next Steps
Agenda
2/12/2018
2
3The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Master Plan Process Flowchart: 19 Elements
2/1/17 8/15/17 12/12/17
Jan/Feb 18
10/26/16 Mar 18
4/20/17
Jan/Feb 18
6/2/17
4The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
• Runways
• Taxiways
• Terminal Area
• Ground Access and Circulation
• Cargo
• General Aviation and Support Facilities
Alternative Development
2/12/2018
3
5The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
• Economic/Strategic– LNAA Strategic Goals
– Construction Cost
• Operational/Maintenance– Facility Requirements and Design Standards
– Development and Maintenance
– Implementation Feasibility
• Natural Resources/Sustainability– Environmental Impacts or Challenges
– Sustainability, Long-Term Planning
• Social/Community/Passenger Experience– Off-airport considerations
– Passenger/User experience
Alternative Evaluation Factors
6The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
• Pavement Management Plan – 5-year maintenance plan
• Increase/efficient use of capacity with taxiway improvements
• Address airfield design geometry, MOS’s, if able
• Obstruction identification and removal
• Control RPZs/RW 6 blast pad
• RW 13-31 considerations (EMAS lifecycle, extension)
• Phased extension of RW 6-24 up to 10,000 ft
• Maintain plan for 3rd runway in next planning period, 20+ years
Airfield Facility Requirements
2/12/2018
4
7The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
8The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Runway 6-24 Preferred Concept
• Extend to 10,000 feet in one phase
• Consideration of costs to only move ILS, approach lights one time
• Current users priority to remove obstructions first
• Estimated timing in the 10 to 15 year planning period
• Estimated construction cost $21 million excluding land acquisition cost
2/12/2018
5
9The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
10The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
2/12/2018
6
11The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
• Consideration of EMAS lifecycle as decision point for extension
• Estimated timing in the 10 to 15 year planning period
• Estimated construction cost:
– ALT 2 – $46.2 million
– ALT 3 – $53.7 million
• Alternatives exclude land acquisition cost
• Wind coverage dictates status quo is suitable for fleet mix operations
• Extend to 7,600 feet utilizing EMAS, to 10,000 feet not practicable
• Maintains long-term plan connection to 3rd runway (20+ years)
Runway 13-31 Preferred Concept
12The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
2/12/2018
7
13The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
14The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Taxiway Preferred Concepts
• All taxiway improvements shown will help airfield efficiency
• Phasing priorities proposed to support other alternative development
• Runway 6-24 Taxiway Improvements:
– Priority – Parallel, supports cargo, est. $18.7 million, year 5 to 10
– Could be phased, north done first to support cargo, full parallel is operationally efficient and safer
• Runway 13-31 Taxiway Improvements:
– Priority – Entrance to terminal, swap with service road, est. $1.1 million, year 5 to 10
– Low priority – Parallel, when development on west, est. $19.9 million, year 10 to 15
– Likely phased, portion to east is financially impracticable and in the 20+ year horizon
2/12/2018
8
15The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
• Require 8 gates: 7 for large regional jets, 1 narrow-body
– No additional required, but recommend adding 1 for flexibility
• Passenger security area is undersized
– Up to 4 lanes and 3,500 SF needed (double existing)
• Aged equipment and upgrades
• Some concession space needed – post-security
• Minimal increase outbound baggage area
• Federal Inspection Service (FIS) Facility (exploratory)
Terminal Area
16The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Alternatives – Terminal Area
2/12/2018
9
17The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Alternatives – Terminal Area
18The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Alternatives – Terminal Area
2/12/2018
10
19The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Alternatives – Terminal Area
20The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Alternatives – Terminal Area
2/12/2018
11
21The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Alternatives – Terminal Area
22The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Alternatives – Terminal Area
2/12/2018
12
23The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Terminal Cost Estimates/Ranking
Alternatives
Item 1A 1B 1C 2 3A 3B
Construction Cost $8,500,000 $34,050,000 $7,472,500
Contingency 20% $1,700,000 $6,810,000 $1,494,500
Construction Cost Total $9.1M $13.5M $10.2M $41M $9M $8.7M
FIS Facility $9M $11.2M $15.7M
Taken from Arora Report
1A 1B 1C 2 3A 3B
TERMINAL CRITERIA
Economic/Strategic Factors 7 6 6 7 5 7
Operational/Maintenance Factors 8 8 9 8 9 9
Natural Resources/Sustainability 3 3 6 2 5 2
Social/Community Impacts/Passenger Experience 4 4 4 6 2 4
TOTAL SCORE 22 21 25 23 21 22
RANKING 3 4 1 2 4 3
ALTERNATIVES
24The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Terminal Preferred Concepts
• Vertical circulation improvements:
– Escalator/elevator improvements or replacement, est. TBD million, year 0 to 5
• Security checkpoint improvements:
– Build new security checkpoint and circulation to meet 20-year demand, est. TBD million, year 5-10
• Long-term concourse expansion placeholder
– Mirror the concourse layout to maximize gates, beyond the 20-year planning horizon
• FIS facility feasibility:
– FIS facility development, est. TBD million, not tied to a year, dependent on demand or airport policy
2/12/2018
13
25The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
• Airport Road intersection congestion
• Arrivals curbside congestion
• Parking– Reallocate existing public parking area
– More short-term & ADA spaces
– Employee/rental car parking will be sufficient
• Improve confusing intersection/entrance alignment
• Incorporate land use analysis recommendations
• Pavement Management Plan – 5-year maintenance plan
Access, Circulation, & Parking
26The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
• Common Elements to All Alternatives
– Changes to public parking ingress/egress
– Reallocation of public parking spaces – increase short-term spaces
– Proposed development areas
• Travel Plaza, Retail Plaza, Hotel
• Demolition of parking booths on internal roadway
– New access & traffic signal
– No proposed changes to curbside areas at this time
Access, Circulation & Parking
2/12/2018
14
27The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Alternative 1 – Ground Access and Circulation
• Terminal traffic separated from development traffic
• Two-way internal roadway for development area & multi-modal center
• Does not improve internal intersection
• No internal delay/queuing issues anticipated
28The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Alternative 2 – Ground Access and Circulation
• TBD
• All traffic moved to new access
• Two-way internal roadway for development area & multi-modal center
• Reduces confusion/conflicts at internal intersection but increases conflicts along internal roadway
• No internal delay/queuing issues anticipated
2/12/2018
15
29The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Alternative 3 – Ground Access and Circulation
• TBD
• All traffic moved to new access
• One-way circulator roadway around development area & multi-modal center
• Reduces confusion/conflicts at internal intersection & circulator roadway
• Longer route for some internal traffic
• No internal delay/queuing issues anticipated
30The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Access, Circulation & Parking
• Estimated Construction Costs:– Circulation Alt 1 - $1.34 million
– Circulation Alt 2 - $1.54 million
– Circulation Alt 3 - $1.98 million
• Preferred Concept - Alternative 2
1 2 3
ROADWAYS/GROUND ACCESS FACILITIES CRITERIA
Economic/Strategic Factors 6 5 4
Operational/Maintenance Factors 4 5 5
Natural Resources/Sustainability 4 4 3
Social/Community Impacts/Passenger Experience 4 5 6
TOTAL SCORE 18 19 18
RANKING 2 1 2
ALTERNATIVES
2/12/2018
16
31The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
• Building area deficient by approximately 20,000 – 70,700 SF
• Apron area deficient by approximately 102,900 – 352,000 SF
Cargo Facilities
Cargo Building Area (95,570 SF)
Year
Existing LVIA
Ratio
Industry
Standard Ratio
Average of
Existing LVIA
Ratio & Industry
Standard Ratio
2022 123,372 85,675 104,524
2027 134,794 93,607 114,200
2032 146,699 101,874 124,286
2037 158,877 110,331 134,604
2040 166,289 115,479 140,884
Cargo Apron Area (474,530 SF)
Year
Existing LVIA
Ratio
Industry
Standard
Ratio
Average of
Existing LVIA
Ratio & Industry
Standard Ratio
2022 613,160 428,375 520,768
2027 669,924 468,035 568,980
2032 729,092 509,370 619,231
2037 789,616 551,655 670,636
2040 826,458 577,395 701,927
32The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
2/12/2018
17
33The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
34The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
2/12/2018
18
35The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
36The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Evaluation of Cargo Alternatives
• Total Program 9 Spaces
• Estimated Construction Costs:– Cargo Alt 1 - $52.0 million
– Cargo Alt 2 - $79.7 million
– Cargo Alt 3 - $64.9 million
– Cargo Alt 4 - $61.8 million
• Cargo Alt 1 is only 3 additional spaces
• Hybrid Preferred Concept:– Limit new apron in existing cargo area,
new aprons and buildings built on north side
– Buildings, truck docks, GSE, employee parking to support operation
– Split operation, or reuse of existing cargo for GA hangars, deicing pad, RON parking
1 2 3 4
CARGO FACILITIES CRITERIA
Economic/Strategic Factors 1 4 6 6
Operational/Maintenance Factors 5 9 8 9
Natural Resources/Sustainability 2 8 8 8
Social/Community Impacts/Passenger Experience 4 4 4 4
TOTAL SCORE 12 25 26 27
RANKING 4 3 2 1
ALTERNATIVES
2/12/2018
19
37The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
• T-hangars and aprons will be sufficient
• Additional conventional hangar space needed
• Tenant survey noted need for FBO improvements
General Aviation Facilities
YearTotal Conventional
Hangar Requirements (SF)
Existing Non-exclusive Conventional Hangar
Space (SF)Surplus/(Deficit) (SF)
2016 252,300 258,680 6,380
2017 258,800 258,680 (120)
2022 283,600 258,680 (25,000)
2027 317,900 258,680 (60,000)
2032 355,700 258,680 (97,000)
2037 395,300 258,680 (137,000)
2040 421,300 258,680 (163,000)
38The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
Alternatives – General Aviation and Support
2/12/2018
20
39The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
• Drainage Evaluation
• Obstruction Analysis
• PMP and Maintenance
• Financial Modeling
• All Projects on Approved ALP Subject to Environmental Review
On-Going Elements Still in Play
40The following document is for internal use only by Lehigh-Northampton Airport Authority staff. This document/presentation contains information that is subject to change and is not available for distribution.
• Finalize Working Paper Development
• Finalize Preferred Development Concept
• Finalize Phasing, Incorporate Maintenance
• Complete Financial Modeling
• Winter Meetings
– PAG #5 – Final
– PIW – Final