final mag.pdf
TRANSCRIPT
-
8/12/2019 final mag.pdf
1/9
THE NATIONAL GALLERY OF MODERN ARTNEW DELHI
-
8/12/2019 final mag.pdf
2/9
GENERAL ANALYSISLOCATION:
Ja ipur House, Ind ia ga te, New Delhi .
l at i t ude and longi t u te 52'30" N 13'23" E.
SURROUNDING LAND USE:
DESIGN APPROACH:To cr eate a bu ilt env ironment whic h creates the r igh t back grou nd to v iew the works
on display
Not t o bec om e ' lo ud ' an d overwhe lm the visi to r ,i .e .w i t hou t beco min g an ob jec t
of art itself,yet retaini ng digni ty a nd impressiveness
First a im was to design the new extension in a manner that w oul d c onv ey i tsinc lus ive prog ramm e as a contemp orary publ i c b u il d i n g
The secon d was to design a bui ld i ng that wou ld har mon ize with the sit e a n d its orig ina l
inhab i t an t ,the Jaipur HouseThe extension to Jaipur House has inst ead been d ev el op ed wit h a new v ocabu la ry
,based on re interpretat ion an d inno vat ion ,as well as a respect for our archi tectu ral
heritage an d contextual s ignif i c a n c e
PROJECT DETAILS
be ga n in july 2001. co mp le te d
in no vem ber 2009.
BUILDING APPROACH
:
The museu m adjoins to t he jaipur ho use near
India gate.
Nearest metro s tat ion is cent era lseceretrait an d
also Khan market
ART MUSEUMDEEPTI CHAUHAN
UV 2200041
YEAR : IV YEAR SEM : VIII
SESSION : JAN 2014 - JUNE 2014
BATCH : 01 ( 2010 2015)NATIONAL GALLERY OF MODERN ART-JAIPUR HOUSE, INDIA GATE
-
8/12/2019 final mag.pdf
3/9
ART MUSEUMDEEPTI CHAUHAN
UV 2200041
YEAR : IV YEAR SEM : VIII
SESSION : JAN 2014 - JUNE 2014
BATCH : 01 ( 2010 2015)NATIONAL GALLERY OF MODERN ART-JAIPUR HOUSE, INDIA GATE
O R I E N T A T I O N
The or i entat ion is go ver ned by the posi t ion ing o f t he o r ig i n a lJa ipur
House on t he site an d sh ape of th e plo t .
The th ree blo c ks a r e p l a c e d o r t h o g o n a lly to th e s ite edges t o der iv e
maxi mum possib le use of sp ace on t he s i te.
To k eep as substant ia la dis tanc e as possib le bet we en the
extension a n d t he or ig inal bu ild ing .
To ali gn th e New Wing with t he sit ing oft he o lder bu il d i n g ,a f reestand in g c o l o n n a d e h a s b e e n b u ilt as a screen paral le l
to th e rear f ac ad e of J a ipur House.
A g ar d en c ou r t is f o rmed be t ween
the o ld an d t h e new bu i ld ing,it restores an d re inforces th e
original ax is,c lear ly
establish ing in the process the greater archi tectur a l h ierarchy
of the o lder Ja ipur House.
CLIMATE ANALYSIS
-
8/12/2019 final mag.pdf
4/9
ART MUSEUMDEEPTI CHAUHAN
UV 2200041
YEAR : IV YEAR SEM : VIII
SESSION : JAN 2014 - JUNE 2014
BATCH : 01 ( 2010 2015)NATIONAL GALLERY OF MODERN ART-JAIPUR HOUSE, INDIA GATE
SPACE ANALYSIS
The f irst s pac e entered is t h e r e c e p t i o n a n d f a ci l i t a ti o n lo b b y t h a t is
f o rmed b y t h e corner o f t he " angle d " s qu are w hic h sits wi th in t he t r ip le
heig ht atr iu m of the f irst g al le ry b lo ck
The adjo i n in g gallery blo c k h as t wo o f its upp er f loors l in ked to thisf irst
block t h rough a b r idg e fo rmed b y ramps .
The extern a lly accessed Exhib i t ion Hal l spac e islo c a t e d a t t h e l o w e r level of this second blo c k .
Th e g al l er y f lo or s b e t w e e n t h e t wo blo c ks h a v e " s t a g g e r e d" f loor
l e v els. This creates wit h i n e a c h o f t h e blocks , a va r ie t y o fvo lumes to
suit d ifferent disp layre quirements.
The gal lery f lo o rs b e t we en t h e t w o b lo c ks m a y b e visit ed i n a
con t inuous sequenc ef ro m t o p t o b o t t o m . Ho we v e r , given t he ex ten t
o f t h e a rea t o b e visit e d w i t h in t h e g alleries, a v is i tor would require
mor e than a d ay t o see a l l the f lo ors i n d e t a i l.
The g aller y fl oors are there fo re des igned to b e seen separa te ly over seve ra l visits. For such a requ i rement t he c i r cu la t io n t o e a c h o f t h e
floo rs have be en design ed t o b e accessed separa tely as w el l .
ORGANISATION OF SPACES WITHIN THE GALLERIES:
-
8/12/2019 final mag.pdf
5/9
ART MUSEUMDEEPTI CHAUHAN
UV 2200041
YEAR : IV YEAR SEM : VIII
SESSION : JAN 2014 - JUNE 2014
BATCH : 01 ( 2010 2015)NATIONAL GALLERY OF MODERN ART-JAIPUR HOUSE, INDIA GATE
FORM ANALYSIS
-
8/12/2019 final mag.pdf
6/9
ART MUSEUMDEEPTI CHAUHAN
UV 2200041
YEAR : IV YEAR SEM : VIII
SESSION : JAN 2014 - JUNE 2014
BATCH : 01 ( 2010 2015)NATIONAL GALLERY OF MODERN ART-JAIPUR HOUSE, INDIA GATE
FORM ANALYSIS
-
8/12/2019 final mag.pdf
7/9
ART MUSEUMDEEPTI CHAUHAN
UV 2200041
YEAR : IV YEAR SEM : VIII
SESSION : JAN 2014 - JUNE 2014
BATCH : 01 ( 2010 2015)NATIONAL GALLERY OF MODERN ART-JAIPUR HOUSE, INDIA GATE
USER ANALYSIS ENTRY TO THE SITEVehicular entry to th esite is f rom the ga te ad jacen t t o the High
Cour t onSher Shah Suri Mar g, w hil e th eexi t g at e is
o nthe Hexagon road .Visitors who a p p r o a c ht he si te on f o o t m ayenter from
any o f thesegates. Service entry to t he com pl ex is from Justice Sunanda
Bhandare Marg at t he rear o f the co mp lex , on the s ide of theAir Fo rce O ff ic ers Mess .
Cargo vehicles enter throu gh the serv ice ga te to access
: f reight e levators t hat are lo cat ed in the rear corner o f eac ho f
th e three bloc ks of the New Wing.
Visi tors wh o enter the co mpl ex through the Hexago n Gat e have
the opt io n to app ro ach the NGMA Inst itu t ion an d Admin ist rat ive
Block f irst, bef or e conti nui ng t o the Centr al Court
The app ro ac h f rom t he entry ga te a t the High Cour t en d leadsthe v is itor through lan ds cap ed gardens to th e Centra l Cour t .
From here the visitor chooses t o visi t the per man ent art
col lect ion ei ther within the New Wing or the ol der Jaipur House.
ILLUMINATION
-
8/12/2019 final mag.pdf
8/9
ART MUSEUMDEEPTI CHAUHAN
UV 2200041
YEAR : IV YEAR SEM : VIII
SESSION : JAN 2014 - JUNE 2014
BATCH : 01 ( 2010 2015)NATIONAL GALLERY OF MODERN ART-JAIPUR HOUSE, INDIA GATE
ILLUMINATION
Diffused dayl ig ht i l luminatest he g allery floors fro m t he sides. The galleries ar e alsol itf r om abo ve b y means o f specially des ignedskylightstha t a l l owon ly indirect, di f fusedd ayl ight ing to i l luminate the deeper centra l spaces of thegal lery floors.
Natural i l lumination within th e gal lery spacesis sup plem ented b y" in te l l igent"
art i f icial i l lu minatio n systems.
Dayl ightsensors auto mati cal ly regula tethe overa l l ambi ent l ight ing wi thingal lery
spaces toa preset i l lumination level th atremainscons tan t ir respective ofvar iat ions in
sunl ight caused by diurnal orseasonalcycles.
Thepr imary i l luminationwi th in thegalleriesis therefore pr ov id edby des igned day
l ight ing, sup plement ed wi th synchron ised, co lour b a lan ced ,h ig h ef f ic iency f luorescent
l ight fittings.
A gr ido f ce i l ingm o u n t e dl ight ingtracks pr ov id e further f lexibi l ity t o highl ight speci f ic
ar t ob jects usingspecial ly d e ve l o p e d l o wglare track mounted luminaries.
The paintings are di spl ayed o n a system of mo va bl e mo du lar wal ls. The wal l posit ions,
therefore, are f lex ib le and c an b e al tered at any po in t a n d posi t i oned acc or d i ng t o the
specia ll ydesigned f loor ingpat terns whi ch are in " sync" wi th thel ight i n garrangements.
In thisw ay th e layout of t he Permanent Gal lery f loors are no t frozen but h av e th e
ca p a c i t y t o b e ch a n g e d a n d a d d e d t o,a t anystagein the fut ure. Therefore, eve n th e
Permanent Gal lery f loors h av e an inbui l t po tent i a l to b ed yn am i ca l l y ch a n g e d in
response to displayspeci f ic demands o f thecurator f rom t ime tot ime.
MATERIAL ANALYSIS & LIGHTING
PVCstrip800mmw i d eis p l ac ed in
f rontofall exhibitsw h i c hserves as
tact i le or ienta t ion c lueto personsw i th
vision impairment.
The Layered facades generate the
impression o fgenerousverandahsa n d
entran ce por t ions typ i ca l o f t heo lder
inst i tut ion bui ld ings that stands eithersideso f
r a j pa th . TheLayer ing eff ect has bee n
ex tended t oth e detai ls of s tone
c l a d d i n g .
Themasonry wallsh a v e b e e n
h igh l igh ted b ymeans of a luminium
flashings an d corners.
The patt erno f r ed
sandstoneisused to c r e a t emodernis t
arch i tec ture .
The aca des are designed aslayers or planes
that ov er lap to der ive a cer ta in
s oph ist icat ion.
EXHIBITAREA:
WALL LAYERING
STRUCTURAL PARKING SERVICE& LANDSCAPING
-
8/12/2019 final mag.pdf
9/9
ART MUSEUMDEEPTI CHAUHAN
UV 2200041
YEAR : IV YEAR SEM : VIII
SESSION : JAN 2014 - JUNE 2014
BATCH : 01 ( 2010 2015)NATIONAL GALLERY OF MODERN ART-JAIPUR HOUSE, INDIA GATE
STRUCTURAL,PARKING,SERVICE& LANDSCAPING
STRUCTURE:The st ruc tu r a l s ys tem is a 7.68m X 7 .68m g r i d w h i ch isa n e co n o m i ca l sp a nina f la ts lab system.Columns a r e a t t h e c o r n er o f t h e squares ,f r o m w h i c h ar es p a n n e d t h e m a i n 4 p er i ph er al b e am s a n d t h e s ec o n da ryd i a g o n a l beams. The res t o f the space is d i v i d e d in t r iangular co f fe rs wh i ch h e l p t o r e d u c e th ed e p t h of th e overa l l s t ructure.The o the r a d v a n t a g e o f t h e t r ian g ul ar co f f e r sys tem is t h eflexibi l i ty of the exh ib i t i on spa c e; for t h e b o t t o m fa c e o f t h e
co f f e r ribsw o u l dh a ve d o u b l e s l id in gtracksfor l ightsan d d isp laypanels or wal ls.
LANDSCAPING:The t rees p res en t o n sit e h a v e b ee n i n co r p o r a t ed i n tot h el a n d s c a p e d e s i g n o f t h e co mp l e x in a w a y t h a t sc reen st h enew er bu i ld ings, present ing the facades as f rag ment sagainst th eful ler a p p e a r a n ce o f t h e o l d e r b u i l d i n g .New treesh a v eb e e np l a n te d i n a manner to genera t e a va r ietyo f o p e ncour tya rds .
Large u n h i n d e r e d g r e e n sp a c es an d s imp le l i nes de f in ing theh a r d p a v ed a rea f rom the g r een,p r o v i d e a su i tab leb a c k g r o u n dforscu lp tura l displays .
Plants an d f lower bed sa r ekep t to the min imum.
PARKING:
Acces sible pa rk i ng w i th ove r allm in imum d imens ion 3600mm x
5000mm ,i n c l u d i n ga islesp a ce o f 1200mma r eg i ven . _ . ,
u n d e r g r o u n d p a r k i n g =15 cars
su r face park in g= 264c ars.
SERVICES:
Service l iftsan d also passeng erl i fts are pro vi ded.
Ramp sare alsopr ov id ed for every raise in th eb u ild i n g .
Toiletsar ep r o v i d e da t e a c h floorsa n da lso p ro v i ded for disa b l e d.