![Page 1: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic](https://reader036.vdocuments.mx/reader036/viewer/2022070415/5697c02b1a28abf838cd87d0/html5/thumbnails/1.jpg)
Update on the Escambia/Santa Rosa Regional Advanced Traffic Management
System (ATMS) Feasibility andImplementation Plan
Ben Faust, P.E.
Advanced Traffic Management System
![Page 2: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic](https://reader036.vdocuments.mx/reader036/viewer/2022070415/5697c02b1a28abf838cd87d0/html5/thumbnails/2.jpg)
Advanced Traffic Management System
Todays Presentation Agenda• Update on Traffic Signal System Operations
& Engineering Support Contract• Update on ATMS Phase I• Overview of ATMS Feasibility Study
• Project Schedule & Progress• ATMS Phase II – Future Funding
![Page 3: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic](https://reader036.vdocuments.mx/reader036/viewer/2022070415/5697c02b1a28abf838cd87d0/html5/thumbnails/3.jpg)
Update on Traffic Signal System Operations & Engineering Support Contract
DRMP - to work on Best Practices for Regional Traffic Operations Optimization:
– Regional Traffic Engineering Champion– Optimize Regional Signal Operations– Continue the Signal Retiming efforts– Manage and operate ATMS projects
Advanced Traffic Management System
![Page 4: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic](https://reader036.vdocuments.mx/reader036/viewer/2022070415/5697c02b1a28abf838cd87d0/html5/thumbnails/4.jpg)
FDOT Financial Project ID 428058-52-01Design-Build project 18 Intersections, fiber optic connection to signal controller and CCTV cameras
• Brent Lane & Bayou Boulevard from Highway 29 to 12th Avenue
• SR95 (N Palafox Street) from Brent Lane to Fairfield Drive
• Fairfield Drive from Texar Drive to North 9th Avenue
Staff training completed • in final test phase
The ATMS Phase 1 Project
![Page 5: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic](https://reader036.vdocuments.mx/reader036/viewer/2022070415/5697c02b1a28abf838cd87d0/html5/thumbnails/5.jpg)
• Monitors system-wide traffic conditions and devices
• Enables proactive management• Empowers users with data,
accessible via web enabled devices• Ensures system integrity through
data validation• Centralizes documentation and
inventory control
The ATMS Phase 1 Project
![Page 6: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic](https://reader036.vdocuments.mx/reader036/viewer/2022070415/5697c02b1a28abf838cd87d0/html5/thumbnails/6.jpg)
Escambia/Santa Rosa Regional Advanced Traffic Management System Feasibility
Study and Implementation Plan
ATMS Study
![Page 7: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic](https://reader036.vdocuments.mx/reader036/viewer/2022070415/5697c02b1a28abf838cd87d0/html5/thumbnails/7.jpg)
• City of Pensacola contracted with Atkins
• The results of this study will be used to develop a project or series of projects that will evolve the existing signal systems into a regional ATMS, and will identify immediate, intermediate, and future needs.
ATMS Study
![Page 8: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic](https://reader036.vdocuments.mx/reader036/viewer/2022070415/5697c02b1a28abf838cd87d0/html5/thumbnails/8.jpg)
• Notice to Proceed to Atkins: May 13, 2015• 3 Stakeholder meetings in June & July
• Develop ATMS Phase II RFP by December• Final Masterplan and Implementation Plan
completed by June 2016
ATMS Study Schedule
![Page 9: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic](https://reader036.vdocuments.mx/reader036/viewer/2022070415/5697c02b1a28abf838cd87d0/html5/thumbnails/9.jpg)
Existing Conditions
ATMS Framework
ATMS Study Schedule
![Page 10: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic](https://reader036.vdocuments.mx/reader036/viewer/2022070415/5697c02b1a28abf838cd87d0/html5/thumbnails/10.jpg)
ATMS Implementation Plan
Technology Review
Develop ATMS Requirements
TMC - Operations
Implementation Plan &RFP Development
![Page 11: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic](https://reader036.vdocuments.mx/reader036/viewer/2022070415/5697c02b1a28abf838cd87d0/html5/thumbnails/11.jpg)
• Meeting with FDOT October 22nd
– Provide Details on Masterplan to date– Discuss viable funding alternatives
• Develop Request for Proposal– Design Build for ATMS Phase II– Other deployment options
ATMS Study
![Page 12: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic](https://reader036.vdocuments.mx/reader036/viewer/2022070415/5697c02b1a28abf838cd87d0/html5/thumbnails/12.jpg)
DRAFT
ATMS Study
DRAFT
![Page 13: Update on the Escambia/Santa Rosa Regional Advanced Traffic Management System (ATMS) Feasibility and Implementation Plan Ben Faust, P.E. Advanced Traffic](https://reader036.vdocuments.mx/reader036/viewer/2022070415/5697c02b1a28abf838cd87d0/html5/thumbnails/13.jpg)
Questions?
Ben Faust, P.E.
Advanced Traffic Management System