[email protected] M.RAVI KUMAR +601136440258

17, Taman Bunga Ros Sitiawan-32000PerakMalaysia

CAREER OBJECTIVE:

Seeking an innovative and challenging career in Design and Development to utilize my skills and abilities in the piping Industry with an opportunity for ample growth and professional development, where I can put my best efforts.

PROFESIONAL EXPERIENCE:

Working as SP3D Piping designer in Sapura kencana Petroleum -Malaysia, from 26-Feb-2014 To till date

Working on generating P&ID’s, building 3D CAD models of oil refineries and extracting piping Isometrics by using SP3D and SP P&ID software

Team Member with good communication and inter personal skills along with Analytical and Troubleshooting ability with a passion to learn and upgrade skills .

Can take responsibilities with minimal supervision

EDUCATION SUMMARY:

Graduate in mechanical engineering from institution of mechanical engineers India (Mumbai) inDecember 2003

Page 1 of 7

WORKING EXPERIENCE:

Worked as process designer in PL ENGINEERING , Gurgaon from Oct-2013 to

January 2014 (on contract basis for 3 months)

Worked as Process designer in Kellogg Brown and Root engineering(KBR) Gurgaon,Haryana India, from 10-Sep-2012 to 07-Sep-2013(on deputation, through oil tech engineering India Pvt Ltd)

Worked as Sr Engineer Level-2 in ROLTA INDIA Limited, Mumbai from Mar 2008

To July 16, 2012

Total comes to 6+ years of experience

SOFTWARE SKILLS:

CAD Software’s : Smart Plant 3D, Smart Plant Review, SP P&ID Ver.2009

Auto Cad 2010, Micro Station J.

Operating Systems : Ms-Dos, windows 95/98, XP, 2000, NT

Other Packages : Ms Word, Excel, Ms Office

Page 2 of 7

PROJECT DETAILS:

PROJECT #1

Title : MAA REFINERY MODERNISATION PROJECT (KNPC- KUWAIT)

Client’s Name : KUWAIT NATIONAL PETROLEUM COMPANY

Duration : Mar-2008 to Jun-2010

Project Description : 3D as built Modeling using 3D Laser Scanning data

Role : 3D Modeler

Inputs for the project : General arrangement drawings (GAD), piping and instrumentation diagrams (P&ID) and isometric drawings and finally 3D laser scanning data

Responsibilities:

Preparation of equipment list, line list.

Pipe routing and modeling with reference to point cloud data (laser scan data) using LFM Software.

3D modeling of equipment’s, pipes and pipe supports

Reviewing plant model on Smart Plant Review for clash checking.

Hard and soft QC checkups for equipment’s and piping.

Isometric Drawing Generation.

Extraction of GAD using Orthogen& Drawing manager.

Tools Used: Smart Plant-3D, Smart Plant Review, LFM Server

Page 3 of 7

PROJECT #2

Title : PILOT PROJECT ENGINEERING FOR 600MW POWER PLANT

Client’s Name : BHARAT HEAVY ELECTRICALS LIMITED PEM, NOIDA (BHEL)

Duration : July-2010 to jun-2011.

Project Description : 3D Modeling.

Inputs: 1.P&ID's with line numbers 2. Piping material specifications 3. Vendor drawings and datasheets for equipment 4. General arrangement drawings showing equipment layout, piping routing and supports 5. Piping support details (Project Standards provided) 6. Commodity Codes for MTO generation. 7. Isometrics. 8. Any other detail drawings necessary for 3D modeling

Responsibilities:

Pipe routing and modeling by referring the GAD'S, P&Id's and isometric drawings

3D modeling of equipment’s and structures as per Inputs.

GAD and Isometric extraction

Generating clash check reports.

Hard and soft QC checkups for equipment’s and piping.

Co-ordination with piping and equipment team. Checking and preparation of line list, equipment’s list and valve list.

Tools Used: SP3D, AUTOCAD, SP P&ID

Page 4 of 7

PROJECT #3

Title : SHARQ EXPANSION PROJECT

Client’s Name : EASTERN PETROCHEMICAL COMPANY (SHARQ)

Duration : July 2011 to Jan 2012

Project Description : Data correction (SPP&ID data base) and Data conversion of Existing plants P&IDs and Migration to Smart plant P&ID

Role : Drafter

Responsibilities:

Correction of all piping, instruments, instrument loops, equipment, piping component item tag numbers to comply with SHARQ tag numbering specification. Labels that displayed all item tags shall be corrected accordingly to reflect the tag numbers as per SHARQ tag numbering specification. Data conversion of existing Micro station, AutoCAD and scanned CIT/TIFF files into intelligent data centric drawings using SP P&ID Ver.2009.

Tools Used: AUTOCAD, SP P&ID Ver.2009

PROJECT #4

Title : ONGC B&S Asset

Client’s Name : OIL AND NATURAL GAS CORPORATION OF INDIA

Duration : Jan-2012 to Jun 2012

Project Description : Data correction (SPP&ID data base) and Data conversion of Existing plants P&IDs and Migration to Smart plant P&ID

Role : Drafter

Responsibilities:

On site activities:

Re-create/UP-grade as-built existing drawings based on site verification/visual inspection ofEquipment’s, piping Instrumentation system with respect to existing P&ID. Electrical related information/Single Line Diagram/as per the name plate of electrical equipment.

Page 5 of 7

Off-site activities:

Re-creation/UP-gradation of existing P&IDs on the basis of site verified and ONGC approved hardcopy of drawings

Digitization of P&I diagram to intelligent format on the basis of available P&ID (AutoCAD/hard copy)

Tools Used: MICROSTATION, SP P&ID Ver.2009

PROJECT #5

Title : DATA EDITING AND CONVERSION PROJECTS

Client’s Name : KELLOG BROWN AND ROOT ENGINEERING (KBR)

Duration : 10-Sep-2012 to 07-Sep-2013

Project Description : Data correction (SPP&ID data base) and Data conversion of Existing plants P&IDs and Migration to Smart plant P&ID

Role : PROCESS DESIGNER

Responsibilities:

Development of Piping and Instrumentation Diagrams (P&ID) as per hard copy mark ups given by Process Engineer. Drafting all existing Micro station, Auto CAD and scanned file P&I Diagrams into intelligent data drawings using SPPID. Updated attributes of Pipeline and Piping component as per input. All dump component & labels, converted into intelligent data. Resolving all inconsistencies. Placing segment breaks wherever necessary. Placing missing features as per input drawing.

Tools Used: MICROSTATION, AUTOCAD, SP P&ID Ver.2009

Page 6 of 7

PROJECT #6

Title : WHEAT STONE LNG PLANT MODULE

Client’s Name : BECHTEL

Duration : 01-Mar-2014 to till date

Project Description : 3D Modelling of piping and equipment’s as per the isometric Drawings provided by the Bechtel and 3D Model review in SPR

Role : SP3D PIPING DESIGNER

PERSONAL PROFILE:

Father name : M.KondalaRao

Permanent address : 5-1-3, Gudelaramula Streeet, chittinagar,Vijayawada-9,Andhra Pradesh

Date of birth : 20-7-1976.

Languages known : English, Hindi &Telugu.

DECLARATION:

I hereby declare that all the above information furnished by me is true to the best of my knowledge and belief.

Place: SITIAWAN,MALAYSIADate : 6-05-2015 RAVI MALLAMPATI