Transcript
  • ContentsIntroductionTheCompanyFeaturesTypicalSet-upBenefitsClientsContact

    www.safehousehabitats.com

    1of12

  • IntroductionThecompanySafeHouseHabitats(Scotland)LtdaretheownersoftheSafeHouseHabitatsystem.

    Theservicesprovidedbythecompanyareasfollows:

    Offshoresurveytoestablishcommercialand technicalproposal.

    Participatinginprojectplanningandriskevaluation processestosatisfyhazardousoperationsanalysis.

    SupplyoftheSafeHousehabitatoneitherlongor short-termrentalbasis.

    Installationofthehabitatbyinhousetechnicians.

    Trainingofcontractorspersonneltorecognised competencylevel.

    www.safehousehabitats.com

    2of12

    ATEX 95

    Directive 94/9/EC II 2 G

  • www.safehousehabitats.com

    ThesystemisATEXCertifiedforuseinZone1&2Areas.

    TheSafehousesystemoffers2criticalproperties;Containmentthepanelarrangementensuresthatgrindingsparksand/orweldingslaghavenopossibilitytoescapefromtheenclosure.

    Pressurisationtheinflationmethodcreatesaninternaloverpressurewhichactsasabarriertopreventtheingressofhydrocarbons.

    TosummarizeHydrocarbons + Hot Work = Habitats

    TheSafehousehabitatsystemistypicallyusedforthefollowingconstructionapplications;

    Installation&tie-inofnewpipework forBrownfielddevelopmentsand Campaigns.

    Installationofnewstructuralsupports andskidsforplatform/plantupgrades.

    Repairofcriticalplant&equipment, cablesplicingandhousing non-EXequipment.

    RepairofProcessVesselswhere internalentryisrequired.

    3of12

    The Safehouse pressurised habitat system has been used successfully by the Upstream and Downstream Oil & Gas Industry for many years, the safe deployment has allowed naked flame and other hot work to be carried out without the need for a Production Shutdown.

    The Company

    ATEX 95

    Directive 94/9/EC II 2 G

  • www.safehousehabitats.com

    4of12

    Theinflatedhabitatcanformmostshapes,thisisparticularlyimportantwheretheworkareaiswithinaconfinedspaceorwheretherearerestrictionspreventingtheinstallationofastandardcubeorboxshape.

    Thestandardpanelsizesare: 1mx2m

    2mx2m

    Theminimumhabitatsizeis2mx1mx2m,thereisnomaximumsize,habitatsaslargeas12mx14mx6mforuseastemporaryfabricationshopshavebeenconstructed

    Becauseallofthepanelsareinterchangeableamultipurposekitmadeupfromdifferentpanelarrangementscanberecycledthroughaprogrammeofhotworktasks.

    Thereisnowaste;thepanelsaretearresistantanddurable.

    Gas Detection & Automatic Shutdown Capabilitiesthereare2separatesolutionsselectionofthemostsuitableoptionwillbedeterminedbyriskanalysisandtheplant/platformoperatingconditions

    SupplyAirGasDetectionUnit(GDU),this deviceisconnectedupstreamofthe supplyfan,itspurposeistosensethe supplyairensuringthathydrocarbonsare notpulledinandpushedthroughtothe habitatinternal,theinternalgasdetection issetat10%LEL(methane).

    AutomaticGasDetectionandShutdown Unit(ASU),thissophisticateddeviceis engineeredsothatallofthewelding plantandelectricallydriventoolsusedin thehotworktaskareconnectedtoa centralcontroller,ifanyoftheunitsremote gasdetectorssensehydrocarbonsthe powerisautomaticallycutshuttingdown thehotworkwithouthumanintervention.

    The principal components are Modular Panels fabricated from high specification flame retardant and fire proof fabric, the panels are zipped together to create the required size and shape of the habitat, the internal seams are lined with Velcro strips to minimise pressure loss.

    Features

    ATEX 95

    Directive 94/9/EC II 2 G

  • www.safehousehabitats.com

    The panel design allows for construction materials and equipment for example pipe spools or steelwork to be brought in and out of the habitat without need to completely dismantle it; one side can be simply unzipped or the roof panel can be rolled back to allow the crane to drop pipe spools in situ.

    Features

    5of12

    Itshouldbenotedthatwheretheworkareaislocatedinanexposedlocation,belowdeckforexample,thehabitatcanbedismantledveryquicklyandflatpackedreadyforre-constructionwhenweatherconditionsabate.

    Thestandardkitincludesalightweightaluminiumdoorwhichisselfclosingtominimisepressureloss,apressuremonitorismountedontheoutsideofthedoor,awindowusedasanobservationportforthefirewatcher.

    Therearetransitpanelsinthedoorframethroughwhichallweldingandothercablesarepassedthrough,thiseliminatestriphazardsonthehabitatfloor.

    Thereisanairlockmodulesuppliedinthestandardkit,thisisanecessaryprovisiontopreventtheingressofgasorotherhazardoussubstancesiftheentrycontrolproceduresfail.

    Thereisanescapepanelincludedinthestandardkitwhichallowsaneasyescapeandstretchertobebroughtintothehabitatshoulditbenecessarytoevacuateacasualty.

    ATEX 95

    Directive 94/9/EC II 2 G

  • www.safehousehabitats.com

    Secondlythereisthequadrantpenetrationpanelthisisusedwheretheapplicationcallsforahabitatwherepipeworkorequipmentmustbeinstalledondifferentelevationsandorientations,thisisachievedbyremovablequadrantsandinlaypanels,thesepanelsaresimilarlyinterchangeable.

    Theutilisationofthiscombinationofpanelsallowsthehabitattobeusedformostapplicationsirrespectiveofthesurroundingarea,theproblemscreatedbytheneedtoinstallahabitatinthemostcongestedorrestrictedlocationscanbesolvedwithoutrecoursetofabricatingspecialone-offpanelsorparts.

    TheuseoftheSafehousehabitateliminatesthewasteanddisposalofscrapmaterials,typicallysheetmetal,woodandsheetingwhicharebyproductsoftraditionalhabitats.

    ThematerialsusedintheconstructionofSafehousehabitatareveryrobustallowingthemtobecontinuallyre-used.

    Thehabitatisinflatedbymeansofcompressedairsuppliedfromacompressororfromtheplatformsplantairutilitiessystem;therequirementislessthan1bar.Thesupplyairdeliveredtothehabitatenvironmentisofbreathingquality,thereisalsoanexhaustfacilitytoremoveweldingorotherharmfulfumes.TotalAirchangeistypically7-8secondsina2m3habitat.

    The package of modular panels is completed by 2 different types of penetration panels, firstly there is the standard penetration panel which is designed to accept single spools or pieces or equipment up to a diameter of 42 inches, these panels are particularly suited for applications like riser connections or large bore hydrocarbon lines, all of the panels are interchangeable allowing them to be used on the floor or the roof or through the side walls.

    Features

    6of12

    ATEX 95

    Directive 94/9/EC II 2 G

  • 1. Allofthepanelscanbefixedinany orientation.Thegeneralruleistostart withtheroofpanel,fixittothescaffold frameorsupportsusingthecambuckle strapsthroughthedringeyelets aroundtheperimeteredgeofthepanel. Donotightenthestraps,letthepanel hangloosely.

    2. Takeanyofthesidepanels,(ifusingan escapepanelcheckthepanelisthe rightwayup,i.e.thezippertothetop). Connectthesidepaneltotheroofpanel byfasteningtheothersideplacestraps thoughttheuppercornerdringsand tightensufficientlytotakethestrain fromtheroofpanelzips.Thesame procedureappliestotheoppositeside.

    3. Theendpanelisnext.Fixtotheroof aspoint2thenjointhesidesby connectingthecorrespondingzipsthere isnoneedtoutilisethesidedrings atthistimefittheoppositepanelby thesamemethod.

    4. Thepenultimatepanelisthedoorpanel, threadthestrapsthroughtheringson thetopofthealuminiumdoorframe thenhangupthedoorfromthescaffold orsupportframe,thiswillhavethe effectoftakingtheweightofthestraps makingthezipseasiertofasten.

    5. Fitthefloorpanellastbyconnectingall thezips.

    6. Ifusingpanelswithdampersfitteditis goodpracticetoplantheassembly sothattheairentersatfloorleveland theextractexpelsthefumesatrooflevel, creatingagoodairflowthroughthehabitat.

    Features

    www.safehousehabitats.com

    Basic Method Statement

    7of12

    ATEX 95

    Directive 94/9/EC II 2 G

  • www.safehousehabitats.com

    Standard Safehouse Modular Panels Habitat Equipment

    2mx2mpanels VenturiAirMover

    2mx1mpanels SupplyandExtractducting 300mmdiameter

    2mx2mpenetrationpanelsstandard LocalExtractDucting 100mmdiameter

    2mx2mquadrantpanels Manometer,mountedon doorpanelAluminiumdoor, fixedtofrontpanel Pneumaticor*electrically drivenfans

    *Dualvoltage,110or 240volts

    7. Onceconstructioniscompletetighten theroofstrapstorequiredheight, connecttheflexibleductingtotheair fanthenconnectoppositeendtosupply damper,opendamperlouvresthen connectflexibleductingtotheextract damper.Keepthedamperclosed, connecttheoppositeendtotheair mover(venturi),ifusinganairfan, connectthefiltrationunittothefan thenconnectinthecompressedair supply.Openthevalveslightly;this willgentlyinflatethehabitattothe requiredshape.

    8. Coveralltheinternalseamswith theVelcrostripstocompletethe sealingprocess.

    9. Themanometerpressuregaugeis mountedontheoutsideofthe aluminiumdoorbymeansofabolt fixing.Thegaugeisusedasvisualmeans ofmonitoringpressuredifferential.

    10.Finally,themulti-penetrationpanelis a2x2paneldividedintofourquarters heldintoplacewithzips,each quartercanberemovedindividually andplacedoverapenetrationor multiplepenetrationsthenzippedback

    intoplacecreatingacomplete2x2 panel.Thisisthensealedfromthe insidewiththequarteroverlaypanel, sealingthepenetrationbyusinga flexiblelightweightsockwithVelcro seals,stillallowingtheapplicationof theVelcrostripsaroundtheouter edgeofthepanels.

    FeaturesBasic Method Statement

    8of12

    ATEX 95

    Directive 94/9/EC II 2 G

  • www.safehousehabitats.com

    Explanatory Notes:

    Detachableairlockomittedforclarity.

    Thereare2methodsforinflation;themethodillustratedusingastandalonecompressorandtheairreceiverorbyplantair,thismethodrequiresaminimum0.8barofpressure.

    Notethesupplyairwillbetakenfromadesignatedsafearea;theairdeliveredintothehabitatinternalwillbeofbreathingquality.

    Thelengthsofflexiductingareconnectedinto300mmvolumecontroldampersfittedtothesidewalls,forsupplyandextract.

    ExcludesguidancenotesforGDUandASU,seeseparatenotes.

    Typical Set up

    9of12

    ATEX 95

    Directive 94/9/EC II 2 G

    Gas Detection Unit

    Air Fan

    Flexi Ducting

    DoorManometer

    Escape Panel

    Venturi

    Extract Ducting

  • www.safehousehabitats.com

    Iftheprojectscopeincludesarequirementforanumberofhabitatstocoverdifferentworkfaces,thehabitatscanbedismantledandre-erectedastheworkprogresses.

    Thisfeaturedeliverssignificantbenefitstotheprojectschedulewhileminimisingthemanpowerallocationandtheoffshoreaccommodationrequirement.

    Typically2or3habitatsaresuppliedtoberecycledaround9or10differentapplications,thishighlightstheversatilityofthehabitat.

    Thepackageisverylight,theweightofa2m3packageisonly92kgs.Allofthecomponentpartscanbeeasilyliftedandcarriedbyonemanreducingtheriskofmanualhandlinginjuries,thereisalsothepossibilityoftransportingthehabitatbyhelicoptershouldtherequirementmeritthistypeofarrangementintheeventofafailureofcriticalequipmentoranyemergencysituation.

    Thelightnesshasafurtherbenefitwhentheapplicationdeterminesthatascaffoldplatformisrequiredtosupportthehabitat,thehabitatslightnesspermitsthescaffoldarrangementtobeonlylightdutyorgeneralpurposeinsteadofcomplexspeciallydesignedstructure.

    Tosummarise,theSafehousehabitathasproventomanyoperatorsandcontractorsafterrigorousexaminationandevaluationexercisesthatitisasignificantinnovationcomparedtothetraditionaltypehabitatswhentheappliedcriteriaiseithersafetyperformanceorcosteffectiveness.

    The principal benefit that Safehouse will deliver to any project is the speed of installation, whether it is a small standard cube shape or larger 4m habitat the standard time for installation is 4 hours.

    Benefits

    10of12

    ATEX 95

    Directive 94/9/EC II 2 G

  • www.safehousehabitats.com

    11of12

    TheSafehouseSystemisinuseworldwide,amongthecompaniesandprojectswhichhavebenefitedfromitsdeploymentare;

    BP Worldwide:includingonshorerefineriesandoffshoreplatformsinAngola,Australia,Sharjah,Trinidad&Tobago,Azerbaijan,IndonesiaUKCSandEurope

    Exxon Mobil:Qatar,UKCS,CanadaandMalaysia

    Conoco Phillips:SouthEastAsia,AustraliaandUKCS

    Chevron:WestAfricaandUKCS

    Total:UKCS

    Talisman:UKCS

    Shell: SouthEastAsia,UKCS,Netherlands,NigeriaandRussia

    BG Group:Tunisia,KazakhstanIndia,Trinidad&TobagoandUKCS

    Statoil:Norway

    Petro Canada:Newfoundland

    Repsol:Trinidad&Tobago

    BHP Billiton:Trinidad&Tobago

    Maersk Oil & Gas:UKCS

    ENI: Kazakhstan

    Clients

    Habitat Users and Accreditation

    ATEX 95

    Directive 94/9/EC II 2 G

    Home:

    Contact:

    Enlarge/Reduce page:

    admin@safehouseltd: com:

    www: safehousehabitats: com:


Top Related