2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 1 of 87
Project Proposition DescriptionCouncil District Amount
Traffic Signal Synchronization ProjectStreets and Transportation
Phase 1 - Upgrading the City's Traffic Signal System SW $20,000,000
Traffic Signal Installations Streets and Transportation
Installation of warranted traffic signals at 63 locations throughout the City
SW$18,350,000
Sidewalks 50/50 and ADA RampsStreets and Transportation
Funding for the City's 50/50 Cost Share Sidewalk Replacement Program and the installation of Barrier Free Ramps
SW
$6,240,000
Critical BridgesStreets and Transportation Funding for Critical Bridge Repair SW $6,300,000
Garland/Gaston/East Grand Intersection Safety Improvements
Streets and Transportation
Improvements to the intersection of Garland/Gaston and East Grande Avenue
2, 9, 14$1,100,000
Rail Road Crossing Quiet Zones Streets and Transportation
Install Quiet zone required infrastructure improvements at railroad crossings
6, 7, 9$543,000
Prairie Creek Bridge over UPRR TracksStreets and Transportation
Construct a new 4 lane divided roadway including a new bridge over UP rail with road tracks just south of Forney Rd with sidewalk and bicycle facilities
7
$9,200,000
LBJ/Skillman Intersection Improvements Streets and Transportation
Intersection Improvements at the LBJ/Skillman Interchange. Project includes lighting and streetscaping
10$6,500,000
US 75/Mockingbird/Lovers Lane Pedestrian Improvements Streets and
Transportation
Pedestrian and bicycle safety enhancements including traffic signals, sidewalks, crosswalks, and lighting
14
$1,100,000
Riverfront from UPPR tracks to Cadiz Streets and Transportation
Street reconstruction of Riverfront from UPRR tracks to Cadiz Street. Will also include bike facilities
1, 2 ,6 $4,600,000
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 2 of 87
Project Proposition DescriptionCouncil District Amount
Davis Street from Cockrell Hill to Clinton AveStreets and Transportation
Street reconstruction project. Will will also include bike lanes
1, 3$4,000,000
Cockrell Hill from La Reunion to Singleton Streets and Transportation
Construct a new 4 lane divided roadway including a new bridge over UPRR and new traffic signals at Singleton
6
$1,900,000
Wheatland Road from City Limits to University Hills Streets and Transportation
Construct a new 4 lane undivided roadway with bike lanes.
8$1,800,000
McKinney Ave/Cole Two Way Conversion Streets and Transportation
Convert existing roadway to two way facility
14$8,000,000
SoPAC/Katy Trail Drainage/Erosion Improvements Streets and Transportation
Install proper drainage improvements at these locations
9$700,000
Dolphin Road from Haskell to Spring Streets and Transportation
Reconstructing an existing 4 lane undivided roadway to a 4 lane divided roadway
7$2,000,000
Walnut Hill from Marsh to Midway Resurfacing ProjectStreets and Transportation
Resurfacing of the roadway between Marsh and Midway 13 $2,200,000
Forest Lane from Cromwell to Marsh Resurfacing Project
Streets and Transportation
Resurfacing of the roadway between Cromwell and Marsh Lane 6, 13 $1,100,000
Ewing Ave. From I35 E to Clarendon Streets and Transportation
Reconstruct the street and expand it to a 4 lane divided roadway with bike lanes and sidewalks 4 $6,000,000
Canada Drive from Westmoreland to Hampton Streets and Transportation
Complete Street reconstruction project to provide a four lane divided roadway with sidewalks and dedicated bicycle facilities. 6 $7,600,000
Commerce Street from Good Latimer to Exposition Streets and Transportation
Complete Street project to provide a two lane two way street with bike lanes and sidewalks 2 $9,700,000
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 3 of 87
Project Proposition DescriptionCouncil District Amount
Cheyenne from Lake June to Big Thickett – Phase I Streets and Transportation
Street improvement project that will add 4 lane divided roadway with sidewalks 5 $7,101,000
Pemberton Hill from Great Trinity Forest to Lake June
Streets and Transportation
This is a street improvement project that will improve the current roadway from a 2 lane undivided asphalt road to a four lane undivided concrete street with sidewalks and bike lanes 5, 7, 8 $13,980,000
Merit from Church Hill Way to LBJStreets and Transportation Street Reconstruction 11 $3,000,000
Edgefield and Windomere/12th to Wentworth (alley)Streets and Transportation Alley Petition Project 1 214,000
La Rue St. and Wyoming St. from Cockrell Hill Rd. to La Rue St. (alley)
Streets and Transportation Alley Petition Project 3 $122,000
Hord Ave. - Moler St. to Brandon St. (street)Streets and Transportation Street Petition Project 3 $850,000
Ginger Ave. - Dacki Ave. to Goldie Ave./Brandon St. (street)
Streets and Transportation Street Petition Project 3 $1,969,000
Harlandale Ave. - Ohio Ave. to Illinois Ave. (street)Streets and Transportation Street Petition Project 4 $539,000
Lonsdale Drive Ave. - Sarah Lee Ln. to Lake June Rd. (street)
Streets and Transportation Street Petition Project 5 $1,457,000
Trojan St. - Burma Rd. to Fellows Ln. (street)Streets and Transportation Street Petition Project 7 $1,090,000
Jeffries St. - Tanner St. to Warren Ave. (sidewalk)Streets and Transportation Sidewalk Petition Project 7 $37,000
Alley Between Cloister Drive and Escado Drive Ashbreek from existing pavement north of McCosh Drive to exsting pavement south of Peavy
Streets and Transportation Alley Petition Project 9 $86,000
Greentree Ln./Rockway Dr. - from Fisher Rd. to Westbrook and Fisher Rockway to Trammel (sidewalk)
Streets and Transportation Sidewalk Petition Project 9 $122,000
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 4 of 87
Project Proposition DescriptionCouncil District Amount
Glenleigh Dr. and Manning Ln. existing pavement to Manchester (alley)
Streets and Transportation Alley Petition Project 13 $62,000
Amhurst Ave. and Stanford Ave. from Linwood Ave. to Briarwood Ln. (alley)
Streets and Transportation Alley Petition Project 13 $212,000
Ridgecrest Rd. - Holly Hill Dr. to Sopac Trail east of Eastridge Dr. (street)
Streets and Transportation Street Petition Project 13 $5,512,000
Palo Pinto Ave. and Valesco Ave. from Concho St. to Skillman St. (alley)
Streets and Transportation Alley Petition Project 14 $174,000
Dirk St. - Alley south of Martel Ave. to Martel Ave. (street)
Streets and Transportation Street Petition Project 14 $146,000
Casa View Street ImprovementsStreets and Transportation
Complete Street Project. Reduces current roadway from 6 lanes to 4 lanes. The project will include the installation of wider sidewalks, pedestrian lighting and landscaping 9 $6,300,000
UT Southwestern Medical DistrictStreets and Transportation
Infrastructure Improvements in the UT Southwestern Medical District including sidewalks, street improvements and pedestrian lighting 2 $7,500,000
Tyler from Eldale to Wilbur (Easte Side OnlyStreets and Transportation Sidewalk Improvements 1 $ 362,000
W Jefferson Blvd (South Side)- N Westmoreland Rd to N. Plymouth Rd
Streets and Transportation Sidewalk Improvements 1 $ 362,807
Wright Street from S. Oak Cliff to EdgefieldStreets and Transportation Sidewalk Improvements 1 $ 447,125
Elmwood Area Street LightingStreets and Transportation Street Lighting 1 $ 500,000
Haines Ave from W. Colorado Blvd to W. Greenbriar LnStreets and Transportation
Street Reconstruction Local Streets1 $ 1,537,988
Kernack St from Phinney Ave to Burns Ave Streets and Transportation
Street Reconstruction Local Streets1 $ 759,785
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 5 of 87
Project Proposition DescriptionCouncil District Amount
N Lancaster Ave from E. Colorado Blvd to Addison St Streets and Transportation
Street Reconstruction Local Streets1 $ 414,430
Rugged Dr from Berkley Ave to Ferndale Ave Streets and Transportation
Street Reconstruction Local Streets1 $ 947,148
S Patton Ave from E 10th St to E. Jefferson Blvd Streets and Transportation
Street Reconstruction Local Streets1 $ 382,678
S Van Buren Ave from W Pembroke Ave to Page Ave Streets and Transportation
Street Reconstruction Local Streets1 $ 591,967
W 12th St from Briscoe Blvd to Hampton Rd Streets and Transportation
Street Reconstruction Local Streets1 $ 601,990
E Davis St from Beckley Ave to Patton Ave Streets and Transportation
Street Reconstruction Thoroughfares 1 $ 1,162,793
Alco Ave from N. Plymouth Rd to N Hampton Rd Streets and Transportation
Street Resurfacing Local Streets1 $ 334,295
Bentley Ave from Chalmers St to S Hampton Rd Streets and Transportation
Street Resurfacing Local Streets1 $ 229,810
Berkley Ave from Rugged Dr to S Edgefield Ave Streets and Transportation
Street Resurfacing Local Streets1 $ 257,250
E 7th St from N Beckley Ave to N Crawford St Streets and Transportation
Street Resurfacing Local Streets1 $ 58,859
E Oakenwald St to Plowman Ave to N Zang Blvd Streets and Transportation
Street Resurfacing Local Streets1 $ 135,862
Eldorado Ave from Elsbeth Ave to N Beckley Ave Streets and Transportation
Street Resurfacing Local Streets1 $ 171,500
Emmett St from S Westmoreland Rd to S Ravinia Rd Streets and Transportation
Street Resurfacing Local Streets1 $ 288,529
Falls Dr from S Cockrell Hill Rd to Andrews St Streets and Transportation
Street Resurfacing Local Streets1 $ 169,259
Ferndale Ave from S Edgefield Ave to S Clinton Ave Streets and Transportation
Street Resurfacing Local Streets1 $ 149,205
Hartsdale Dr from Forth Worth Ave to W Colorado Blvd Streets and Transportation
Street Resurfacing Local Streets1 $ 217,874
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 6 of 87
Project Proposition DescriptionCouncil District Amount
Mt Washington St from Gilpin Ave to End of Pavement Streets and Transportation
Street Resurfacing Local Streets1 $ 217,493
N Edgefield Ave from Stewart Dr to W Colorado Blvd Streets and Transportation
Street Resurfacing Local Streets1 $ 288,463
N Van Buren Ave from W 10th St to W Davis St Streets and Transportation
Street Resurfacing Local Streets1 $ 319,191
N Windomere Ave from W 8th St to Taft St Streets and Transportation
Street Resurfacing Local Streets1 $ 302,464
Neches St from N Madison Ave to N Bishop Ave Streets and Transportation
Street Resurfacing Local Streets1 $ 360,848
S Barnett Ave from W Illinois Ave to Dutton Rd Streets and Transportation
Street Resurfacing Local Streets1 $ 321,855
S Llewellyn Ave from Pratt St to Wynnewood Plaza Streets and Transportation
Street Resurfacing Local Streets1 $ 228,095
Shelley Blvd from Keats Dr to Dyrden Dr Streets and Transportation
Street Resurfacing Local Streets1 $ 158,260
Shelley Blvd from Coombs Creek Dr to S Westmoreland Rd
Streets and Transportation
Street Resurfacing Local Streets1 $ 180,075
W Colorado Blvd from Leander Dr to N Hampton Rd Streets and Transportation
Street Resurfacing Local Streets1 $ 281,260
W Greenbriar Ln from Stemmons Ave to N Beckley Ave Streets and Transportation
Street Resurfacing Local Streets1 $ 296,974
E Colorado Blvd from Zang to N Marsalis Ave Streets and Transportation
Street Resurfacing Thoroughfares1 $ 585,244
Fort Worth Ave from Baham Dr to W Colorado Blvd Streets and Transportation
Street Resurfacing Thoroughfares1 $ 844,638
N Beckley Ave from E 6th St to E 5th St Streets and Transportation
Street Resurfacing Thoroughfares1 $ 75,518
N Beckley Ave from W Colorado Blvd to E Oakenwald St Streets and Transportation
Street Resurfacing Thoroughfares1 $ 230,736
N Beckley Ave from E Davis St to E Neely St Streets and Transportation
Street Resurfacing Thoroughfares1 $ 93,643
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 7 of 87
Project Proposition DescriptionCouncil District Amount
N Marsalis Ave from E 8th St to E 7th St Streets and Transportation
Street Resurfacing Thoroughfares1 $ 148,382
S Westmoreland Rd from Poinsettia Dr to Dutton Dr Streets and Transportation
Street Resurfacing Thoroughfares1 $ 145,678
W Clarendon from S Waverly Dr to S Edgefield Ave Streets and Transportation
Street Resurfacing Thoroughfares1 $ 403,512
Bishop from 10th St to Jeffersonl Blvd Streets and Transportation Streetscape/Urban Design 1 $ 1,590,767
Jefferson Blvd from Adams Ave to Polk St Streets and Transportation Streetscape/Urban Design 1 $ 1,000,000
Jefferson/Twelth Connector Lane Diet/Removal Streets and Transportation Street Improvement 1 $ 2,000,000
North Boulevard Terrace Extension/Bridget to Plymouth
Streets and Transportation Street Improvement 1 2,143,750
Council District 1 Pedestrian/Safety/Crosswalk ProgramStreets and Transportation
Traffic Intersection Capacity and Safety Improvements 1 260,000
4812-4840 Worth St & 4807-4841 Tremont St Streets and Transportation
Alley Petition2
205,427$
1503-1551 Riar Cliff Rd & 5503-5537 Mesa Cir Streets and Transportation
Alley Reconstruction2
209,573$
2503-2623 W Lovers Ln & 2502-2614 W Amherst Ave Streets and Transportation
Alley Reconstruction2
195,878$
3703-3771 Cortez Dr & 3702-3770 Durango Dr Streets and Transportation
Alley Reconstruction2
301,620$
3805-3945 Hawick Ln & 3804-3858 Eaton Dr Streets and Transportation
Alley Reconstruction2
330,922$
4503-4535 Live Oak St & 4514-4522 Bryan St Streets and Transportation
Alley Reconstruction2
193,648$
4902-5032 Thursh St & 4903-5033 Wenonah Dr Streets and Transportation
Alley Reconstruction2
262,126$
503-511 N Prairie Ave & 4721-4721 Tremont St Streets and Transportation
Alley Reconstruction2
59,560$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 8 of 87
Project Proposition DescriptionCouncil District Amount
5100-5152 Lahoma ST & 5101-5147 N HALL ST Streets and Transportation
Alley Reconstruction2
216,580$
5300-5358 Willis Ave & 5303-5355 Richard Ave Streets and Transportation
Alley Reconstruction2
243,653$
Bristol Ave from March Ave to Hopkins Ave Streets and Transportation
Sidewalk Improvements2
79,872$
Oak Lawn/Cedar Springs Area Improvements (Sidewalks/Lighting/Pedestrian Ssfety Improvements)
Streets and Transportation
Sidewalk Improvements2
500,000$
W University Blvd from Roper St to Kenwell St Streets and Transportation
Sidewalk Improvements2
94,833$
Bombay Ave from Huron Dr to Thurston Dr Streets and Transportation
Street Reconstruction Local Streets2
1,286,618$
Bradford Dr from Maple Springs Blvd to Hedgerow Dr Streets and Transportation
Street Reconstruction Local Streets2
1,944,975$
Fillmore Dr from Empire Central to Register Ave Streets and Transportation
Street Reconstruction Local Streets2
1,342,845$
Hay St from Ring St to End of Pavement Streets and Transportation
Street Reconstruction Local Streets2
153,468$
Lenel Pl (Partnership W/ Dist 6)from Clover Ln to Wemd Streets and Transportation
Street Reconstruction Local Streets2
786,854$
Murray St from Main St to Canton St Streets and Transportation
Street Reconstruction Local Streets2
570,544$
N Walton St from Elm St to End of Pavement Streets and Transportation
Street Reconstruction Local Streets2
496,125$
Race St from End of Pavement to N Washington Ave Streets and Transportation
Street Reconstruction Local Streets2
575,009$
Waneta Dr from Robin Rd to Inwood Rd Streets and Transportation
Street Reconstruction Local Streets2
366,471$
Alma from Cockrell Ave to End of Pavement Streets and Transportation
Street Resurfacing Local Streets2
169,785$
Ash Ln from Caldwell Ave to S Fitzhugh Ave Streets and Transportation
Street Resurfacing Local Streets2
116,346$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 9 of 87
Project Proposition DescriptionCouncil District Amount
Bennett Ave from Monarch St to Fuqua St Streets and Transportation
Street Resurfacing Local Streets2
128,042$
Benson St from S Washington Ave to S Hill Ave Streets and Transportation
Street Resurfacing Local Streets2
133,050$
Brown St from Shelby Ave to Reagan St Streets and Transportation
Street Resurfacing Local Streets2
61,809$
Burlew St from Bryan St to San Jacinto St Streets and Transportation
Street Resurfacing Local Streets2
122,108$
Capitol Ave from N Peak St to N Carroll Ave Streets and Transportation
Street Resurfacing Local Streets2
171,962$
Commerce St from East Side Ave to Benson St Streets and Transportation
Street Resurfacing Local Streets2
68,874$
Congress Ave from Reagan St to Throckmorton St Streets and Transportation
Street Resurfacing Local Streets2
71,344$
Corinth St from S Hardwood St to S Cesar Chavez Blvd Streets and Transportation
Street Resurfacing Local Streets2
89,647$
Cortez Dr from Mixon Dr to Lenel Pl Streets and Transportation
Street Resurfacing Local Streets2
187,887$
Cortez Dr from Larga Dr to El Centro Dr Streets and Transportation
Street Resurfacing Local Streets2
158,891$
Delano Pl from N Haskell Ave to N Peak St Streets and Transportation
Street Resurfacing Local Streets2
119,741$
East Side Ave from S Haskell Ave to S Peak St Streets and Transportation
Street Resurfacing Local Streets2
140,699$
Fairmount St from Shelby Ave to Reagan St Streets and Transportation
Street Resurfacing Local Streets2
70,555$
Gould St from Mckee St to Beaumont St Streets and Transportation
Street Resurfacing Local Streets2
64,897$
Grandview Ave from Lindsley Ave to Santa Fe Ave Streets and Transportation
Street Resurfacing Local Streets2
234,135$
Hargrove Dr from Oradell Ln to Webb Chapel Ext Streets and Transportation
Street Resurfacing Local Streets2
57,075$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 10 of 87
Project Proposition DescriptionCouncil District Amount
Hawthorne Ave from Hartford St to Cedar Springs Rd Streets and Transportation
Street Resurfacing Local Streets2
111,644$
Henry St from Commerce St to Canton St Streets and Transportation
Street Resurfacing Local Streets2
83,246$
Kendall from Harry Hines Blvd to Macatee Dr Streets and Transportation
Street Resurfacing Local Streets2
176,068$
Knight St from Congress Ave to Dickason Ave Streets and Transportation
Street Resurfacing Local Streets2
98,235$
Lahoma St from Kings Rd to Crestview Dr Streets and Transportation
Street Resurfacing Local Streets2
294,085$
Monarch St from N Fitzhugh Ave to Bennett Ave Streets and Transportation
Street Resurfacing Local Streets2
87,122$
Moser Ave from Monarch St to Fuqua St Streets and Transportation
Street Resurfacing Local Streets2
117,203$
N Fitzhugh Ave from Bennett Ave to Manett St Streets and Transportation
Street Resurfacing Local Streets2
197,259$
N Prairie Ave from Junius St to Tremont St Streets and Transportation
Street Resurfacing Local Streets2
120,050$
N St Mary Ave from Columbia Ave to N Munger Blvd Streets and Transportation
Street Resurfacing Local Streets2
44,076$
Newmore Ave from Kaywood Dr to Robin Rd Streets and Transportation
Street Resurfacing Local Streets2
180,938$
Norwalk Ave from Timberline Dr to Hargrove Dr Streets and Transportation
Street Resurfacing Local Streets2
187,484$
Oradell Ln from Timberline Dr to Hargrove Dr Streets and Transportation
Street Resurfacing Local Streets2
269,509$
Pearlstone St from Dawson St to Hickory St Streets and Transportation
Street Resurfacing Local Streets2
97,785$
Pryor St from Main St to Commerce St Streets and Transportation
Street Resurfacing Local Streets2
42,704$
Ring St from East Grand Ave to Hay St Streets and Transportation
Street Resurfacing Local Streets2
82,429$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 11 of 87
Project Proposition DescriptionCouncil District Amount
River Bend Dr from N Stemmons Serv E to River Bend Dr Streets and Transportation
Street Resurfacing Local Streets2
427,902$
Roseland Ave from N Peak St to Ashby St Streets and Transportation
Street Resurfacing Local Streets2
77,381$
S Henderson Ave from Columbia Ave to Terry St Streets and Transportation
Street Resurfacing Local Streets2
237,237$
San Jacinto St from Bennett Ave to N Garrett Ave Streets and Transportation
Street Resurfacing Local Streets2
101,905$
Sheila Ln from Timberline Dr to Hargrove Dr Streets and Transportation
Street Resurfacing Local Streets2
243,433$
Summit Ave from Rowena St to Alta Ave Streets and Transportation
Street Resurfacing Local Streets2
166,527$
Summit Ave from Alta Ave to Sears St Streets and Transportation
Street Resurfacing Local Streets2
72,785$
Sylvester St from Vargas St to Knight St Streets and Transportation
Street Resurfacing Local Streets2
126,676$
Terry St from S Haskell Ave to S Peak St Streets and Transportation
Street Resurfacing Local Streets2
142,345$
Viceroy Dr from King George Dr to Regal Row Streets and Transportation
Street Resurfacing Local Streets2
273,786$
W Amherst Ave from Huron Dr to Thurston Dr Streets and Transportation
Street Resurfacing Local Streets2
204,040$
Webb Chapel Ext from Hargrove Dr to Larga Dr Streets and Transportation
Street Resurfacing Local Streets2
176,183$
Worth St from N Haskell Ave to N Peak St Streets and Transportation
Street Resurfacing Local Streets2
161,210$
Yellowstone Rd from Sleepy Hollow Dr to Record Crossing Rd
Streets and Transportation
Street Resurfacing Local Streets2
101,014$
Cadiz St from S Ervay St to Browder St Streets and Transportation
Street Resurfacing Thoroughfares2
147,464$
Military Pkwy from Dolphin Rd to Forney Rd Streets and Transportation
Street Resurfacing Thoroughfares2
242,873$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 12 of 87
Project Proposition DescriptionCouncil District Amount
N Hall St from Indiana St to Main St Streets and Transportation
Street Resurfacing Thoroughfares2
192,080$
Parry Ave from S Peak St to Ann Ave Streets and Transportation
Street Resurfacing Thoroughfares2
99,401$
S Barry Ave from East Grand Ave to Ware St Streets and Transportation
Street Resurfacing Thoroughfares2
305,031$
S Hall St from Chestnut St to Jeffries St Streets and Transportation
Street Resurfacing Thoroughfares2
135,485$
S Haskell Ave from Garland Ave to Parry Ave Streets and Transportation
Street Resurfacing Thoroughfares2
80,159$
S St Paul St from Young St to Marilla St Streets and Transportation
Street Resurfacing Thoroughfares2
84,229$
W Mockingbird Ln from N Stemmons Serv E to Brookriver Dr
Streets and Transportation
Street Resurfacing Thoroughfares2
314,098$
W University Blvd from Robin Rd to Inwood Rd Streets and Transportation
Street Resurfacing Thoroughfares2
103,472$
CBD Fair Park Link From Main to IH30 (Design And ROW)
Streets and Transportation
Thoroughfares2
1,500,000$
Columbia Ave/Main St (Complete Street) Streets and Transportation
Thoroughfares2
4,250,000$
2408-2564 Club Manor Dr & 2435-2549 Matland DR Streets and Transportation Alley Reconstruction 3 618,209$
5179-5107 Chalet & 1404-1550 Drury DrStreets and Transportation Alley Reconstruction 3 372,008$
5306-5342 Lake Placid Dr & 1572-1568 Drury PlStreets and Transportation Alley Reconstruction 3 198,107$
6216-6226 Autumn Woods Trl & 804-814 W Red Bird LN
Streets and Transportation Alley Reconstruction 3 139,822$
7501-7631 Ashcrest Ln & 7502-7578 Christie LnStreets and Transportation Alley Reconstruction 3 456,411$
Kimball Neighborhood Plus Target Area Sidewalk Improvements
Streets and Transportation Sidewalk Improvements 3 350,000$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 13 of 87
Project Proposition DescriptionCouncil District Amount
Dove Creek Way from Myrtlewood Drive to Swansee Street
Streets and Transportation
Street Reconstruction Local Streets3 1,305,305$
Grassy Ridge Trl from Penguin Dr to Scottsboro Ln Streets and Transportation
Street Reconstruction Local Streets3 912,209$
Pierce St from St Rita Dr to W Kiest Blvd Streets and Transportation
Street Reconstruction Local Streets3 1,377,905$
Preakness Ln from Polarity Dr to S Walton Walker Serv E
Streets and Transportation
Street Reconstruction Local Streets3 1,437,605$
NORTHBOUND S WESTMORELAND RD AT KIMBALL HIGH SCHOOL PARKING LOT (REDESIGN/CONSTRUCT HORIZONTAL CURVE IN ROADWAY)
Streets and Transportation
Street Reconstruction Thoroughfares
3 950,000$ Acapulco Dr from Bar Harbor Dr to Bar Harbord Dr Streets and
TransportationStreet Resurfacing Local Streets
3360,459$
Adler Dr from Adler Dr to Cockrell Hill Rd Streets and Transportation
Street Resurfacing Local Streets3
414,173$
Boca Chica Cir from End of Pavement to Boca Chica Dr Streets and Transportation
Street Resurfacing Local Streets3
44,796$
Boca Chica Dr from Boca Chica Cir to Bar Harbor Dr Streets and Transportation
Street Resurfacing Local Streets3
425,457$
Bonnywood Ln from S Hampton Rd to Wayland Dr Streets and Transportation
Street Resurfacing Local Streets3
356,034$
Club Manor Dr from S Hampton Rd to Club Wood Dr Streets and Transportation
Street Resurfacing Local Streets3
301,840$
Club Terrace Dr S Hampton Rd to Club Wood Dr Streets and Transportation
Street Resurfacing Local Streets3
261,469$
Elderleaf Dr from End of Pavement to Elder Oaks Ln Streets and Transportation
Street Resurfacing Local Streets3
186,523$
Elderoaks Ln from W. Camp Wisdom Rd to S. Hampton Rd
Streets and Transportation
Street Resurfacing Local Streets3
307,225$
Elderoaks Pl from End of Pavement to Elderoaks Lane Streets and Transportation
Street Resurfacing Local Streets3
87,259$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 14 of 87
Project Proposition DescriptionCouncil District Amount
Greenspan Ave from W Millet Dr to W Camp Wisdom Rd
Streets and Transportation
Street Resurfacing Local Streets3
721,398$
Harmony Ln from Singing Hills Dr to Lazy River Dr Streets and Transportation
Street Resurfacing Local Streets3
270,901$
Inca Dr from Eastgate Cir to Horizon Dr Streets and Transportation
Street Resurfacing Local Streets3
294,225$
Kiestmeadow Dr from Kiest Knoll Dr to End of Pavement
Streets and Transportation
Street Resurfacing Local Streets3
287,434$
Knoxville St from Golf Club Dr to W Illinois Ave Streets and Transportation
Street Resurfacing Local Streets3
444,322$
Matland Dr from S Hampton Dr to Club Wood Dr Streets and Transportation
Street Resurfacing Local Streets3
339,982$
Minuet Ln from Singing Hills Dr to Summertime Ln Streets and Transportation
Street Resurfacing Local Streets3
113,499$
Old Ox Rd from Glendale Park Enter to Caravan Trl Streets and Transportation
Street Resurfacing Local Streets3
310,312$
Randolph Dr from S Randolph Dr to Mt Ranier St Streets and Transportation
Street Resurfacing Local Streets3
193,349$
Randolph Dr from S Randolph Dr to Lakehurst Ct Streets and Transportation
Street Resurfacing Local Streets3
96,966$
RHAPSODY LN from Bowling Brook Dr to Lazy River Dr Streets and Transportation
Street Resurfacing Local Streets3
251,488$
Rio Grande Cir from Rio Grande Ave to Kimball Ridge Dr Streets and Transportation
Street Resurfacing Local Streets3
185,597$
S Franklin St from W Kiest Blvd to Southwood Dr Streets and Transportation
Street Resurfacing Local Streets3
306,745$
Scottsboro Ln from S Marsalis Ave to Grassy Ridge Trl Streets and Transportation
Street Resurfacing Local Streets3
219,791$
Songwood Dr from Blue Moon Dr to Lazy River Dr Streets and Transportation
Street Resurfacing Local Streets3
278,345$
Sunny Crest Ln from E Red Bird Ln to Woodburn Trl Streets and Transportation
Street Resurfacing Local Streets3
63,700$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 15 of 87
Project Proposition DescriptionCouncil District Amount
Trio Ln from Wagon Wheels Trl to Caravan Trl Streets and Transportation
Street Resurfacing Local Streets3
189,027$
W Pentagon Pkwy from Spruce Valley Ln to Coombs Creek Dr
Streets and Transportation
Street Resurfacing Local Streets3
259,445$
Cockrell Hill from Bronze Way to Bass Way Streets and Transportation
Street Resurfacing Thoroughfares3
427,893$
Mountain Creek Pkwy from Mountainview Dr to Eagle Ford Dr
Streets and Transportation
Street Resurfacing Thoroughfares3
222,676$
Camp Wisdom Rd from FM 1382 to Mountain Creek Pkwy
Streets and Transportation Thoroughfares 3
5,741,343$
Country Creek Dr-Road Closure/Turn Around Streets and Transportation
Traffic Intersection Capacity & Safety Improvement 3
428,750$
127-231 W Louisiana Ave & 118-228 Conrad StStreets and Transportation Alley Reconstruction 4
416,303$
1608-1620 Day Star Dr & 1603-1633 Hanging Cliff DrStreets and Transportation Alley Reconstruction 4
353,097$
1621-1631 Windchime Dr & 1614-1626 Vatican LnStreets and Transportation Alley Reconstruction 4
86,377$
1708-1920 Vatican Ln & 1705-1921 Windchime DrStreets and Transportation Alley Reconstruction 4
343,343$
2104-2336 Dugald Pl & 2005-2249 E Illinois AveStreets and Transportation Alley Reconstruction 4
674,981$
2211-2323 Deer Path Dr & 2905-3311 Kellogg AveStreets and Transportation Alley Reconstruction 4
561,444$
2603-2931 Garapan Dr & 2502-2922 Nicholson DrStreets and Transportation Alley Reconstruction 4
666,398$
3163-3241 E Ledbetter Dr & 3132-3244 Dahlia DrStreets and Transportation Alley Reconstruction 4
360,120$
3864-3872 Treeline Cir & 1618-1626 Five Mile CtStreets and Transportation Alley Reconstruction 4
266,871$
4307-4435 Bonnie View Rd & 4302-4446 Cicero StStreets and Transportation Alley Reconstruction 4
438,933$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 16 of 87
Project Proposition DescriptionCouncil District Amount
South Ewing Ave from Sleeth St to Ann Arbor Ave Streets and Transportation Street Petition Project 4
895,000$
10th St from I-35 to Clarendon Dr Streets and Transportation
Street Reconstruction Local Streets4
3,252,260$
Anzio Cir from Garapan Dr to S Polk St Streets and Transportation
Street Reconstruction Local Streets4
1,140,900$
Avenue H from E 11th St to Sanderson Ave Streets and Transportation
Street Reconstruction Local Streets4
842,916$
Bonnie View Rd from Ann Arbor Ave to Cummings St Streets and Transportation
Street Reconstruction Local Streets4
2,255,054$
Church St from I-35 to Cliff to End Streets and Transportation
Street Reconstruction Local Streets4
572,316$
E Corning Ave from Arizona to S Marsalis Ave Streets and Transportation
Street Reconstruction Local Streets4
944,622$
Galloway Ave from Fernwood Ave to S Denley Dr Streets and Transportation
Street Reconstruction Local Streets4
939,826$
Haas Dr from Kilburn Ave to 51st St Streets and Transportation
Street Reconstruction Local Streets4
1,200,000$
Marfa Ave from Fernwood Ave to S Lancaster Rd Streets and Transportation
Street Reconstruction Local Streets4
1,040,705$
Marfa Ave from Biglow St to Easter Ave Streets and Transportation
Street Reconstruction Local Streets4
651,412$
Maywood Ave from Frio Dr to S Denley Dr Streets and Transportation
Street Reconstruction Local Streets4
1,077,749$
Montague Ave from Vewpon Ave to Ramonia Streets and Transportation
Street Reconstruction Local Streets4
1,047,320$
N Cliff St from Hutchins Ave to Reverend CBT Smith St Streets and Transportation
Street Reconstruction Local Streets4
442,822$
Vanette Ln from Fitzsimmons Dr to S Marsalis Ave Streets and Transportation
Street Reconstruction Local Streets4
561,117$
Clarendon Dr (2-28' Lanes) from Ewing to Upton Streets and Transportation
Street Reconstruction Thoroughfares 4
1,510,514$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 17 of 87
Project Proposition DescriptionCouncil District Amount
E Overton Rd from S Marsalis Ave to S Ewing Streets and Transportation
Street Reconstruction Thoroughfares 4
1,325,977$
Morrell Ave from Bonnie View Rd to High St Streets and Transportation
Street Reconstruction Thoroughfares 4
452,301$
Adelaide Dr from Vewpon Ave to Ramonia Streets and Transportation
Street Resurfacing Local Streets4
209,470$
Atlas Dr from Frio Dr to S Lancaster Rd Streets and Transportation
Street Resurfacing Local Streets4
324,718$
Avenue F from E 11th St Sanderson Ave Streets and Transportation
Street Resurfacing Local Streets4
204,531$
E Jerden Ln from Rockwood St to Cumberland St Streets and Transportation
Street Resurfacing Local Streets4
55,052$
Edwards Cir from S Polk St to Savoy St Streets and Transportation
Street Resurfacing Local Streets4
158,603$
Engle Ave from S Waverly Dr to Clearview Cir Streets and Transportation
Street Resurfacing Local Streets4
84,275$
Exeter Ave from Sunnyvale St to Tacoma St Streets and Transportation
Street Resurfacing Local Streets4
190,537$
Hendricks Ave from Fernwood Ave to Cedar Haven Ave Streets and Transportation
Street Resurfacing Local Streets4
94,771$
Illinois Ave from Orial Ave to Brookhaven Streets and Transportation
Street Resurfacing Local Streets4
795,074$
Michigan Ave from E Illinois Ave to E Ohio Ave Streets and Transportation
Street Resurfacing Local Streets4
73,676$
S Ewing Ave from McVey Ave to Graceland Ave Streets and Transportation
Street Resurfacing Local Streets4
324,272$
S Montreal Ave from Barlow Ave to Savoy St Streets and Transportation
Street Resurfacing Local Streets4
140,356$
Shadow Wood Dr from W Saner Ave to S Edgefield Ave Streets and Transportation
Street Resurfacing Local Streets4
598,261$
W Grover C Washington Ave from Orial Ave to Taluca Ave
Streets and Transportation
Street Resurfacing Local Streets4
92,713$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 18 of 87
Project Proposition DescriptionCouncil District Amount
Winters St from S Ewing St to Harlandale Ave Streets and Transportation
Street Resurfacing Local Streets4
61,466$
E Kiest Blvd from Kellogg Ave to Bonnie View Rd Streets and Transportation
Street Resurfacing Thoroughfares4
1,481,143$
S Ewing Ave from Georgia Ave to E Louisiana Ave Streets and Transportation
Street Resurfacing Thoroughfares4
64,964$
Stella Ave from S Corinth St to Cedar Crest Blvd Streets and Transportation
Street Resurfacing Thoroughfares4
336,608$
Sunnyvale St from Ann Arbor Ave to Cummings St Streets and Transportation
Street Resurfacing Thoroughfares4
461,747$
12th St from Upton to 200 ft East of Upton Streets and Transportation
Target Neighborhood4
347,603$
Alley Reconstruction between 8th St & Church from IH 35E to N Cliff
Streets and Transportation
Target Neighborhood4
236,515$
Alley Reconstruction between 8th St and Church from I-35 E to N Cliff
Streets and Transportation
Target Neighborhood4
176,061$
Upton St from I-35 E to 12th St Streets and Transportation
Target Neighborhood4
566,909$
10005-10119 Shayna DR & 10002-10106 Hymire CirStreets and Transportation
Alley Reconstruction 5
225,817$
10315-10542 Castlerock Dr & 10315-10529 Checota Dr & 1608-1604 Gardenshire Dr
Streets and Transportation
Alley Reconstruction 5
503,230$
1611-1727 Red Cloud Dr & 9704-9780 Faircloud Dr (A7003)
Streets and Transportation
Alley Reconstruction 5
396,214$
1830-1886 Red Cloud Dr & 9803-9851 Glengreen Dr (A6972)
Streets and Transportation
Alley Reconstruction 5
221,995$
1885-2025 Red Cloud Dr & 2002-2080 Corvette Dr (A6966)
Streets and Transportation
Alley Reconstruction 5
473,291$
Council District 5 Sidewalk ImprovementsStreets and Transportation
Sidewalk Improvements5
600,000$
Donnybrook Ln from N Prairie Creek Rd to Riverway Dr Streets and Transportation
Street Reconstruction Local Streets5
657,200$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 19 of 87
Project Proposition DescriptionCouncil District Amount
Hodde St from Woodmont Dr to N Jim Miller Rd Streets and Transportation
Street Reconstruction Local Streets5
1,630,432$
Palisade Dr from N Prairie Creek Rd to Riverway Dr Streets and Transportation
Street Reconstruction Local Streets5
901,459$
Rayenell Ave from Hodde St to CF Hawn Serv S Streets and Transportation
Street Reconstruction Local Streets5
1,733,626$
Checota Dr from N Masters Dr to Ammity Ln Streets and Transportation
Street Resurfacing Local Streets5
283,935$
Christensen Dr from Latta St to Glover Pass Streets and Transportation
Street Resurfacing Local Streets5
243,736$
Cricket Dr from S Trego St to S Pleasant Woods Dr Streets and Transportation
Street Resurfacing Local Streets5
175,479$
Dale Glade Dr from E Shore Dr to N St Augustine Dr Streets and Transportation
Street Resurfacing Local Streets5
233,240$
Danville Dr from Holcomb Rd to Oak Hill Cir Streets and Transportation
Street Resurfacing Local Streets5
157,094$
Fairhaven Ln from McCutcheon Ln to Blanton St Streets and Transportation
Street Resurfacing Local Streets5
480,577$
Hillburn Dr from Bruton Rd to Ravehill Ln Streets and Transportation
Street Resurfacing Local Streets5
365,925$
Hillburn Dr from Umphress Rd to Tillman St Streets and Transportation
Street Resurfacing Local Streets5
217,496$
Holcomb Rd from Eden Valley Ln to Files St Streets and Transportation
Street Resurfacing Local Streets5
295,838$
Hymie Circle from Glengreen Dr to Shayna Dr Streets and Transportation
Street Resurfacing Local Streets5
153,440$
Jennie Lee Cir from Jennie Lee Ln to End of Pavement Streets and Transportation
Street Resurfacing Local Streets5
69,412$
Mack Lane from Bruton Rd to Ravehill Ln Streets and Transportation
Street Resurfacing Local Streets5
253,683$
Military Cir from Military Pkwy to End of Pavement Streets and Transportation
Street Resurfacing Local Streets5
31,583$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 20 of 87
Project Proposition DescriptionCouncil District Amount
Oak Creek Cir from Urban Ave to Military Serv S Streets and Transportation
Street Resurfacing Local Streets5
385,909$
Pindar Ave from Godfrey Ave to Sarah Lee Dr Streets and Transportation
Street Resurfacing Local Streets5
168,550$
Ravehill Ln from Santa Cruz Dr to Waycross Dr Streets and Transportation
Street Resurfacing Local Streets5
196,779$
Sunbriar Ave from Godfrey Ave to Sarah Lee Dr Streets and Transportation
Street Resurfacing Local Streets5
163,165$
Tara Ln from Edgeglen Dr to Uarda Dr Streets and Transportation
Street Resurfacing Local Streets5
74,637$
Utica Dr from Cordell Dr to Jennie Lee LnStreets and Transportation
Street Resurfacing Local Streets5
142,722$
Utica Dr from Bruton Rd to Cordell Dr Streets and Transportation
Street Resurfacing Local Streets5
171,808$
Woodmont Dr from Elam Rd to Lucy St Streets and Transportation
Street Resurfacing Local Streets5
286,611$
N Prairie Creek Rd from Lake June Rd to Palisade Dr Streets and Transportation
Street Resurfacing Thoroughfares5
1,534,411$
Rosemont Rd from Buckner to HillburnStreets and Transportation
Target Neighborhood5
1,522,200$
Rosemont Rd from Hillburn to Jim MillerStreets and Transportation
Target Neighborhood5
3,268,505$
Cheyene from Big Thickett to ElamStreets and Transportation
Thoroughfares5
4,500,000$
Military Parkway from Elva Ave to Rockbluff Dr (Complete Street)
Streets and Transportation
Thoroughfares5
2,000,000$
3004-3150 Kinkaid Dr & 3045-3155 Park LnStreets and Transportation
Alley Reconstruction6
796,250$
3105-3171 Newcastle Dr & 3104-3170 Walnut HillStreets and Transportation
Alley Reconstruction6
305,442$
3505-3523 Park Ln & 3511 Valley Ridge RdStreets and Transportation
Alley Reconstruction6
114,979$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 21 of 87
Project Proposition DescriptionCouncil District Amount
3506-3658 High Vista Dr & 11960 Highdale DrStreets and Transportation
Alley Reconstruction6
458,322$
3903-3991 Cortez Dr & 3904-3990 Durango DrStreets and Transportation
Alley Reconstruction6
384,430$
Babcock Dr from Bernal Dr to Canada Dr Streets and Transportation
Street Reconstruction Local Streets6
436,425$
Geraldine DR from Kendale Dr to Lombardy Ln Streets and Transportation
Street Reconstruction Local Streets6
851,847$
Halifax St from Cash Rd to Pulaski St Streets and Transportation
Street Reconstruction Local Streets6
1,056,682$
Lenel Pl from Lively Ln to Clover Ln Streets and Transportation
Street Reconstruction Local Streets6
963,242$
Lenel Pl from Wemdon Dr to Mixon Dr Streets and Transportation
Street Reconstruction Local Streets6
1,515,109$
Lenel PL (Partnership W/ Dist 2) from Clover Ln to Wemdon Dr
Streets and Transportation
Street Reconstruction Local Streets6
786,854$
N Morocco Ave from Goodman St to N Justin Ave Streets and Transportation
Street Reconstruction Local Streets6
698,992$
Nagle St from Denton Dr to Overlake Dr Streets and Transportation
Street Reconstruction Local Streets6
1,125,377$
Quebec St from Sharp St to Mockingbird Ln Streets and Transportation
Street Reconstruction Local Streets6
714,916$
Shaw St from Navaro St to Harston St Streets and Transportation
Street Reconstruction Local Streets6
978,855$
Canada Dr from Babcock Dr to Leesburg St Streets and Transportation
Street Reconstruction Thoroughfares 6
768,994$
Cole St from N Riverfront Blvd to Slocum St Streets and Transportation
Street Resurfacing Local Streets6
245,794$
Crossman Ave from Pueblo St to Nomas St Streets and Transportation
Street Resurfacing Local Streets6
57,590$
Edison St from Slocum St to Hi Line Dr Streets and Transportation
Street Resurfacing Local Streets6
208,853$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 22 of 87
Project Proposition DescriptionCouncil District Amount
Esmalda Dr from Toronto St to Nomas St Streets and Transportation
Street Resurfacing Local Streets6
120,599$
Fabrication St from Topeka Ave to Sylvan Ave Streets and Transportation
Street Resurfacing Local Streets6
51,313$
Grissom Ln from Royal Ln to Nova Dr Streets and Transportation
Street Resurfacing Local Streets6
896,633$
Keeneland Pkwy from Bluegrass Dr to Cherry Laurel Ln Streets and Transportation
Street Resurfacing Local Streets6
165,257$
Lenel PL from Walnut Hill Ln to Lively Streets and Transportation
Street Resurfacing Local Streets6
443,225$
Nomas Sr from N Westmoreland Rd to Furey St Streets and Transportation
Street Resurfacing Local Streets6
157,094$
Payne St from Levee St to N Riverfront Blvd Streets and Transportation
Street Resurfacing Local Streets6
249,052$
Bickers St from Melinda Hills Dr to N Westmoreland Rd Streets and Transportation
Street Resurfacing Thoroughfares6
175,513$
Brockbank Dr from Coogan Dr to Royal Ln Streets and Transportation
Street Resurfacing Thoroughfares6
242,741$
Forest Ln from Grissom Ln to Josey Ln Streets and Transportation
Street Resurfacing Thoroughfares6
654,856$
French Settlement Rd from La Reunion Pkwy to Norwich St
Streets and Transportation
Street Resurfacing Thoroughfares6
512,408$
N Hampton Rd from Dennison St to Kraft St Streets and Transportation
Street Resurfacing Thoroughfares6
279,133$
N Hampton Rd from I-30 W Commerce St Streets and Transportation
Street Resurfacing Thoroughfares6
955,255$
N Westmoreland Rd from Bickers St to Bernal Rd Streets and Transportation
Street Resurfacing Thoroughfares6
216,193$
Postal Way from I-30 Frontage Rd to Lone Star Dr Streets and Transportation
Street Resurfacing Thoroughfares6
105,758$
Postal Way from W Commerce St to Lone Star Dr Streets and Transportation
Street Resurfacing Thoroughfares6
499,785$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 23 of 87
Project Proposition DescriptionCouncil District Amount
Royal Ln from Harry Hines Blvd to Grissom Ln Streets and Transportation
Street Resurfacing Thoroughfares6
584,815$
Shady Trl from Manana Dr to Andjon Dr Streets and Transportation
Street Resurfacing Thoroughfares6
113,670$
Timberline Dr from Community Dr to Kendale Dr Streets and Transportation
Street Resurfacing Thoroughfares6
107,085$
W Commerce St from N Hampton Rd to Postal Way Streets and Transportation
Street Resurfacing Thoroughfares6
639,078$
W Mockingbird Ln from W John Carpenter Fwy to N Stemmons Serv E
Streets and Transportation
Street Resurfacing Thoroughfares6
406,695$
Webb Chapel Ext from Larga Dr to Webb Chapel Rd Streets and Transportation
Street Resurfacing Thoroughfares6
484,899$
Webb Chapel Rd from Forest Ln to LBJ Service S Streets and Transportation
Street Resurfacing Thoroughfares6
390,163$
N Arcadia Dr from S Ira Ave S Tillery Ave Streets and Transportation
Target Neighborhood6
928,355$
N Ira Ave from N Arcadia Dr to W Jefferson Blvd Streets and Transportation
Target Neighborhood6
651,477$
Sylvan Ave Phase II (Provides Funding The Pedestrian Lightings)
Streets and Transportation
Thoroughfares6
250,000$
2306 - 2440 Bluffton Dr & 2307 - 2439 Blayton Dr Streets and Transportation
Alley Reconstruction7
351,624$
2507 - 2537 Blaydon Dr & 2506 - 2536 Bluffton Dr Streets and Transportation
Alley Reconstruction7
167,212$
2703-2829 Klondike & Dr 2704-2830 Lockhart Ave Streets and Transportation
Alley Reconstruction7
293,020$
2703-2831 Scottsbluff Dr & 2802-2826 La Prada Ct Streets and Transportation
Alley Reconstruction7
363,090$
2707 - 2757 Runningbrook Ln & 2700 N Buckner Blvd Streets and Transportation
Alley Reconstruction7
301,301$
2707 - 2837 Blyth Dr & 2706-2838 Gross Rd Streets and Transportation
Alley Reconstruction7
296,842$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 24 of 87
Project Proposition DescriptionCouncil District Amount
4403-4451 Cinnabar Dr & 6102-6150 Symphony Ln Streets and Transportation
Alley Reconstruction7
321,367$
4804-4950 Ashbrook Rd & 4803-4945 Chilton Dr Streets and Transportation
Alley Reconstruction7
486,668$
5005-5207 Banting Way & 5411-5445 Endlery Pl Streets and Transportation
Alley Reconstruction7
398,762$
5107-5143 Breakwood Dr & 5116-5152 Colter Dr Streets and Transportation
Alley Reconstruction7
171,672$
5303-5347 Blaney Way & 5204-5240 Banting Way Streets and Transportation
Alley Reconstruction7
373,282$
5605-5831 Everglade Rd & 5606-5824 Twineing St Streets and Transportation
Alley Reconstruction7
465,010$
5620-5832 Everglade Rd & 5707-5861 Marview Ln Streets and Transportation
Alley Reconstruction7
489,853$
5710-5814 Meadowick Ln & 5274-5290 Ponderosa Cir Streets and Transportation
Alley Reconstruction7
169,124$
6024-6300 Samuell Blvd & 6205-6441 Symphony Ln Streets and Transportation
Alley Reconstruction7
476,476$
6206-6440 Symphony Ln & 4307-4339 Cinnabar Dr Streets and Transportation
Alley Reconstruction7
309,264$
7027-7203 Hunnicut Rd & 7012-7108 Belteau Ln Streets and Transportation
Alley Reconstruction7
261,170$
7129-7195 Elliott Dr & 7130-7184 Rolling Fork Dr Streets and Transportation
Alley Reconstruction7
282,191$
2205-2341 Freeland Way & 2336-2328 Homeway Cir & 2204-2340 Babalos Ln
Streets and Transportation
Alley Reconstruction 7
393,985$
2711-2733 Groveridge Dr, 9606-9674 Briggs St, 9605-9621 Altacrest Dr & 2712-2768 N St Augustine Dr
Streets and Transportation
Alley Reconstruction 7
469,151$
Baraboo Dr from highland Hills Dr to End of Pavement Streets and Transportation
Sidewalk Improvements7
58,223$
Cherbroug St from Carbondale St to Dutch Harbor Ave Streets and Transportation
Sidewalk Improvements7
33,413$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 25 of 87
Project Proposition DescriptionCouncil District Amount
Driskell St from Colonial Ave to S Central Ser Rd Streets and Transportation
Sidewalk Improvements7
20,990$
Everglade Rd from N Jim Miller Rd to Symphony Lane Streets and Transportation
Sidewalk Improvements7
60,188$
Fellows Ln from Carbondale St to Hull Ave Streets and Transportation
Sidewalk Improvements7
25,703$
Ferguson Rd Sidewalk Improvement from Rocky Glen to Gray Cliff (east side only)
Streets and Transportation
Sidewalk Improvements7
245,000$
Kiska St from Yancy St to Fellows Ln Streets and Transportation
Sidewalk Improvements7
81,164$
Park Row Ave from South Central Expy to Jeffries St Streets and Transportation
Sidewalk Improvements7
161,848$
Rothington Rd from Chariot Dr to S Buckner Blvd Streets and Transportation
Sidewalk Improvements7
41,216$
South Blvd from South Central Expy to Meadow St Streets and Transportation
Sidewalk Improvements7
224,789$
Wendelkin St from Pennsylvania Ave to Driskell St Streets and Transportation
Sidewalk Improvements7
119,945$
Park Row Ave from South Central Expy to Jeffries St Streets and Transportation
Street Lighting7
424,000$
South Blvd from South Central Expy to Meadow St Streets and Transportation
Street Lighting7
604,800$
Street Lights at Parkdale Dr and Lawnview Ave Streets and Transportation
Street Lighting7
16,000$
Street Lights Weldelkin St Streets and Transportation
Street Lighting7
112,000$
Street Lights Within Claremont Neighborhood Streets and Transportation
Street Lighting7
600,000$
Carpenter Ave from S Malcom X Blvd to Meadow St Streets and Transportation
Street Reconstruction Local Streets7
255,210$
Hazelhurst Ln from Hovenkamp Dr to Marview Ln Streets and Transportation
Street Resurfacing Local Streets7
106,913$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 26 of 87
Project Proposition DescriptionCouncil District Amount
Banting Way from Enchanted Ln to Ashbrook Rd Streets and Transportation
Street Resurfacing Local Streets7
178,017$
Beechmont Dr from Ferguson Rd to Felicia Ct Streets and Transportation
Street Resurfacing Local Streets7
206,245$
Bluffton from Freeport Dr to End of Pavement Streets and Transportation
Street Resurfacing Local Streets7
276,458$
Chariot Dr from Trace Rd to Wimbelton Way Streets and Transportation
Street Resurfacing Local Streets7
338,061$
Dorrington Dr from Ferguson Rd to Telegraph Ave Streets and Transportation
Street Resurfacing Local Streets7
319,573$
Elihu St from End of Pavement to JB Jackson Jr Blvd Streets and Transportation
Street Resurfacing Local Streets7
122,005$
Enchanted Ln from Breakwood Dr to Urban Crest Rd Streets and Transportation
Street Resurfacing Local Streets7
326,149$
Enderly Pl from Banting Way to Samuell Blvd Streets and Transportation
Street Resurfacing Local Streets7
108,765$
Fallon Pl from Hazelhurst Ln to Hazelhurst Ln Streets and Transportation
Street Resurfacing Local Streets7
193,726$
Gross Rd from N Buckner Blvd to Peavy Rd Streets and Transportation
Street Resurfacing Local Streets7
330,275$
Hazelhurst Ln from Ashbrook Rd to Fallon Pl Streets and Transportation
Street Resurfacing Local Streets7
103,552$
Hunnicut Rd from Highland Rd to Dorrington Dr Streets and Transportation
Street Resurfacing Local Streets7
618,120$
Jennie Lee Ln from N Prairie Creek Rd to Cypress Ave Streets and Transportation
Street Resurfacing Local Streets7
346,910$
Lockhart Ave from Rustown Dr to Shiloh Dr Streets and Transportation
Street Resurfacing Local Streets7
481,572$
Meadow St from Pennsylvania Ave to Tuskegee St Streets and Transportation
Street Resurfacing Local Streets7
486,248$
Park Row Ave from Malcolm X Blvd to Jeffries St Streets and Transportation
Street Resurfacing Local Streets7
102,900$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 27 of 87
Project Proposition DescriptionCouncil District Amount
Pine St from Holmes St to S Central Serv W Streets and Transportation
Street Resurfacing Local Streets7
272,857$
Sandstone Dr from Jennie Lee Ln to Cypress Ave Streets and Transportation
Street Resurfacing Local Streets7
137,317$
South Blvd from Malcolm X Blvd to Meadow St Streets and Transportation
Street Resurfacing Local Streets7
411,600$
St Francis Ave from Ferguson Rd to Hunnicut Rd Streets and Transportation
Street Resurfacing Local Streets7
797,990$
St Francis Ave from Ralph Ln to S Buckner Blvd Streets and Transportation
Street Resurfacing Local Streets7
410,468$
Elsie Faye Heggins St from S Central Expy to S Malcolm X Blvd
Streets and Transportation
Street Resurfacing Thoroughfares7
1,388,876$
Elsie Faye Heggins St from S Malcolm X Blvd to Meadow St
Streets and Transportation
Street Resurfacing Thoroughfares7
617,469$
Jennie Lee Ln from N St Augustine Dr to A7014 Streets and Transportation
Street Resurfacing Thoroughfares7
247,132$
Martin Luther King Jr from S Ervay St to S Central Serv W
Streets and Transportation
Street Resurfacing Thoroughfares7
500,780$
Ferguson Rd and Lakeland Dr Intersection Improvements
Streets and Transportation
Streetscape / Urban Design7
750,000$
Ferguson Rd from Oates Dr to Lakeland Dr Streets and Transportation
Streetscape / Urban Design7
521,250$
7704-78400 Carbondale St & 7703-7835 Brownville Ave (Alley Improvements)
Streets and Transportation
Target Neighborhood7
352,261$
Burma from Kiska St to Saipan St Streets and Transportation
Target Neighborhood7
640,662$
Fellows Ln from Saipan St to End of Pavement Streets and Transportation
Target Neighborhood7
563,267$
Trojan St from Burma Rd to Fellows Ln Streets and Transportation
Target Neighborhood7
767,030$
1225-1423 Kirnwood Dr & 7601 S Polk St Streets and Transportation
Alley Reconstruction8
362,453$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 28 of 87
Project Proposition DescriptionCouncil District Amount
207-347 Bettyrae Way & 7708-7770 Ryanridge Dr Streets and Transportation
Alley Reconstruction8
425,835$
2304-2348 Hunters Run Dr & 7407-7415 Mesa Verde Trl
Streets and Transportation
Alley Reconstruction8
406,406$
299-385 Stoneport Dr & 320 Pemberton Hill Rd Streets and Transportation
Alley Reconstruction8
411,184$
7306-7540 Gayglen Dr & 7303-7533 Neuhoff Dr Streets and Transportation
Alley Reconstruction8
513,104$
7905-7933 Olusta Dr & 7932 Great Trinity Forest Way Streets and Transportation
Alley Reconstruction8
190,782$
806-954 Ivywood Dr & 807-951 Jadewood Dr Streets and Transportation
Alley Reconstruction8
385,704$
Council District 8 Sidewalks Streets and Transportation
Sidewalk Improvements8
620,000$
Simpson Stuart Rd from Bonnie View Rd to Lancaster Rd
Streets and Transportation
Street Lighting8
350,000$
Arborcrest Dr from Bluewood Dr to Partridge Dr Streets and Transportation
Street Reconstruction Local Streets8
906,420$
Burroaks Cir from Burroaks Dr to End of Pavement Streets and Transportation
Street Reconstruction Local Streets8
435,000$
Laurel Hill Dr from Kleberg Rd to Budeudy Dr Streets and Transportation
Street Reconstruction Local Streets8
577,820$
Laurel Hill Dr from Budeudy Dr to End of Pavement Streets and Transportation
Street Reconstruction Local Streets8
94,098$
Myers Cir from Myers Cir to Elam Rd Streets and Transportation
Street Reconstruction Local Streets8
1,029,459$
Oak Plaza from Kleberg Rd to End of Pavement Streets and Transportation
Street Reconstruction Local Streets8
706,482$
Park Manor Dr from Simpson Stuart Rd to Happy Canyon Dr
Streets and Transportation
Street Reconstruction Local Streets8
137,757$
S Murdeaux Ln from Great Trinity Forest Way to Olusta Dr
Streets and Transportation
Street Reconstruction Local Streets8
700,363$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 29 of 87
Project Proposition DescriptionCouncil District Amount
Woodwick Dr from W Camp Wisdom Ed to Clearwood Dr
Streets and Transportation
Street Reconstruction Local Streets8
406,326$
Morgan Dr from Plaza Blvd to Nandina Dr Streets and Transportation
Street Reconstruction Thoroughfares 8
689,779$
Allegro Dr from Balalaika Rd to Firebird Dr Streets and Transportation
Street Resurfacing Local Streets8
146,770$
Antoinette St from Greenhaven Dr to Hillburn Dr Streets and Transportation
Street Resurfacing Local Streets8
182,819$
Arborcrest Dr from Glencairn Dr to S RL Thornton Serv W
Streets and Transportation
Street Resurfacing Local Streets8
93,741$
Atha Dr from N Longacre Ln to Tina Ln Streets and Transportation
Street Resurfacing Local Streets8
135,279$
Atha Dr from Tina Ln to Woodmont Dr Streets and Transportation
Street Resurfacing Local Streets8
57,418$
Balalaika Rd from Allegro Dr to Laura Ln Streets and Transportation
Street Resurfacing Local Streets8
58,790$
Balalaika Rd from Duet Dr to Allegro Dr Streets and Transportation
Street Resurfacing Local Streets8
63,832$
Bambi St from Murdock Rd to Elkton Cir Streets and Transportation
Street Resurfacing Local Streets8
143,408$
Bambi St from Melkton Cir to Dowdy Ferry Rd Streets and Transportation
Street Resurfacing Local Streets8
60,471$
Baraboo Dr from End of Pavement to Tioga St Streets and Transportation
Street Resurfacing Local Streets8
151,675$
Bishop College Dr from Lovingood Dr to End of Pavement
Streets and Transportation
Street Resurfacing Local Streets8
16,636$
Bissonet Ave from Atha Dr to Antler Ave Streets and Transportation
Street Resurfacing Local Streets8
167,727$
Cliff Creek Crossing Dr from Kirnwood Dr to Marvin D Love Serv E
Streets and Transportation
Street Resurfacing Local Streets8
443,979$
Creek Cove Dr from Great Trinity Forest Way to Ezekial Ave
Streets and Transportation
Street Resurfacing Local Streets8
197,602$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 30 of 87
Project Proposition DescriptionCouncil District Amount
Dart Ave from Woodmont Dr to Bissonet Ave Streets and Transportation
Street Resurfacing Local Streets8
179,698$
Deepwood St from Carter Rd to Western Hills Dr Streets and Transportation
Street Resurfacing Local Streets8
250,973$
Dolores way from Mckissick Ln to Indian Ridge Trl Streets and Transportation
Street Resurfacing Local Streets8
132,741$
Edgedale Dr from Silverdale Dr to Racine Dr Streets and Transportation
Street Resurfacing Local Streets8
53,542$
Egyptian Dr from Mckissick Ln to Indian Ridge Trl Streets and Transportation
Street Resurfacing Local Streets8
114,528$
Ella Ave from Ezekial Ave to Alcorn Ave Streets and Transportation
Street Resurfacing Local Streets8
165,703$
Firebird Dr from Postglen Dr to Troyglen Dr Streets and Transportation
Street Resurfacing Local Streets8
145,604$
Golden Hills Dr from Bellcrest Dr to Bishop College Dr Streets and Transportation
Street Resurfacing Local Streets8
226,826$
Greenhaven Dr from Antoinette St to CF Hawn Serv S Streets and Transportation
Street Resurfacing Local Streets8
220,240$
Groveway Dr from Kirnwood Dr to Cleardale Dr Streets and Transportation
Street Resurfacing Local Streets8
136,343$
Happy Canyon Dr from Baraboo Dr to Park Manor Dr Streets and Transportation
Street Resurfacing Local Streets8
331,715$
Highland Hills Dr from Bonnie View Rd to Simpson Stuart Rd
Streets and Transportation
Street Resurfacing Local Streets8
354,771$
Highland Woods Cir from Highland Woods Dr to End of Pavement
Streets and Transportation
Street Resurfacing Local Streets8
59,716$
Judge Dupree Dr from Gentle River Dr to Silverhill Dr Streets and Transportation
Street Resurfacing Local Streets8
144,918$
Kirnwood Ct from End of Pavemen to Kirnwood Dr Streets and Transportation
Street Resurfacing Local Streets8
66,679$
Komalty Dr from Oklaunion Dr to Tiawah Dr Streets and Transportation
Street Resurfacing Local Streets8
107,085$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 31 of 87
Project Proposition DescriptionCouncil District Amount
Mclarty Dr from Wild Honey Dr to Stagecoach Trl Streets and Transportation
Street Resurfacing Local Streets8
125,812$
Mehalia Dr from Baraboo Dr to Flagstaff Dr Streets and Transportation
Street Resurfacing Local Streets8
188,650$
Mirage Valley Dr from Kirnwood Dr to Aldenwood Dr Streets and Transportation
Street Resurfacing Local Streets8
66,885$
Mirage Valley Dr from Aldenwood Dr to Mill Stream Dr Streets and Transportation
Street Resurfacing Local Streets8
104,546$
Mojave Dr from Texoma Way to Plaza Blvd Streets and Transportation
Street Resurfacing Local Streets8
190,365$
Moonstone Dr from Highland Hills Dr to Moonstone Dr Streets and Transportation
Street Resurfacing Local Streets8
101,494$
Motor City Blvd from Peterbilt Ave to S Lancaster Rd Streets and Transportation
Street Resurfacing Local Streets8
216,981$
N Murdeaux Ln from Antoinette St to CF Hawn Serv S Streets and Transportation
Street Resurfacing Local Streets8
286,679$
Oceanview Dr from Greenspan Ave to Silverdale Dr Streets and Transportation
Street Resurfacing Local Streets8
192,389$
Ravenview Rd from Appleberry Dr to Shepherd Ln Streets and Transportation
Street Resurfacing Local Streets8
258,073$
Ravenview Rd from Smoke Tree Ln to Garden Grove Dr Streets and Transportation
Street Resurfacing Local Streets8
112,504$
Ridge Park Ln from End of Pavemetn to Indian Ridge Trl Streets and Transportation
Street Resurfacing Local Streets8
48,294$
Ridgemoor Cir from Highland Woods Dr to End of Pavement
Streets and Transportation
Street Resurfacing Local Streets8
77,244$
Seabeach Rd from Greenspan Ave to Silverdale Dr Streets and Transportation
Street Resurfacing Local Streets8
168,379$
Silverdale Dr from Oceanview Dr to Seabeach Rd Streets and Transportation
Street Resurfacing Local Streets8
55,738$
Silverhill Dr from Baraboo Dr to A9958 Streets and Transportation
Street Resurfacing Local Streets8
85,476$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 32 of 87
Project Proposition DescriptionCouncil District Amount
Stagecoach Trl from Maxine Dr to Stagecoach Cir Streets and Transportation
Street Resurfacing Local Streets8
53,199$
Stagecoach Trl from Mclarty Dr to Sebring Dr Streets and Transportation
Street Resurfacing Local Streets8
51,176$
Tina Ln from Atha Dr to A4938 Streets and Transportation
Street Resurfacing Local Streets8
26,685$
Wild Honey Dr from Tioga St to A11316 Streets and Transportation
Street Resurfacing Local Streets8
27,028$
Woodshire Dr from Kirnwood Dr to Cleardale Dr Streets and Transportation
Street Resurfacing Local Streets8
233,583$
Woodspan Dr from Emberwood Dr to Fairwood Dr Streets and Transportation
Street Resurfacing Local Streets8
53,199$
E Pentagon Pkwy from Veterans Dr to End of Pavement Streets and Transportation
Street Resurfacing Thoroughfares8
189,679$
Rylie Rd from S St Augustine Dr to Thorne St Streets and Transportation
Street Resurfacing Thoroughfares8
332,607$
Rylie Rd from Thorne St to Bloomfield Dr Streets and Transportation
Street Resurfacing Thoroughfares8
259,856$
S Belt Line Rd from Sarah Ln to Greengrove Ln Streets and Transportation
Street Resurfacing Thoroughfares8
165,875$
S Belt Line Rd from Fish Rd to W Lawson Rd Streets and Transportation
Street Resurfacing Thoroughfares8
146,713$
S Belt Line Rd from W Lawson Rd to Sarah Ln Streets and Transportation
Street Resurfacing Thoroughfares8
146,701$
Tioga St from La Grange Dr to Bonnie View Rd Streets and Transportation
Street Resurfacing Thoroughfares8
64,175$
Crouch Rd from Old Ox Rd to S Lancaster Rd Streets and Transportation
Thoroughfares8
4,159,814$
Edd Rd From Seagoville To Garden Grove (Design and ROW only)
Streets and Transportation
Thoroughfares 8
750,000$
11133-11139 Cotillion Dr & 3609 Bon Park CtStreets and Transportation Alley Reconstruction 9 103,025$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 33 of 87
Project Proposition DescriptionCouncil District Amount
11205-11335 Buchannan Dr & 11200-11298 Ferguson Rd
Streets and Transportation Alley Reconstruction 9 406,250$
11306-11340 Dumbarton Dr & 11323-11357 Glen Cross Dr
Streets and Transportation Alley Reconstruction 9 205,400$
11312-11344 Glen Cross Dr & 11341-11367 Drummond Dr
Streets and Transportation Alley Reconstruction 9 242,450$
3609-3615 Bon Park Ct & 3608-3614 Parader CtStreets and Transportation Alley Reconstruction 9 88,075$
6816-6858 Freemont St & 6809-6851 Whitehill StStreets and Transportation Alley Reconstruction 9 210,925$
6906-6954 Kingsbury Dr & 6907-6949 Winchester StStreets and Transportation Alley Reconstruction 9 232,050$
6915-6965 Freemont St & 6914-6964 Wakefield StStreets and Transportation Alley Reconstruction 9 227,825$
7005-7065 Freemont St & 7006-7066 Wakefield StStreets and Transportation Alley Reconstruction 9 273,650$
7023-7031 Wakefield St & 7049-7053 Wakefield CirStreets and Transportation Alley Reconstruction 9 86,775$
Council District 9 Sidewalks (Locations TBD) Streets and Transportation
Sidewalk Improvements9
$ 476,776
Milhof Dr from Barnes Bridge Rd to Plummer DrStreets and Transportation Street Reconstruction Local Streets 9 1,030,121$
Dixie Ln from Ash Creek Dr to Mariposa DrStreets and Transportation Street Resurfacing Local Streets 9 182,750$
Annapolis Ln from Ridgelawn Dr to Berwyn LnStreets and Transportation Street Resurfacing Local Streets 9 228,198$
Axton Infrom Abrams Rd to Kelman StStreets and Transportation Street Resurfacing Local Streets 9 165,189$
Belford Dr from Ashford Dr to Ravendale LnStreets and Transportation Street Resurfacing Local Streets 9 94,599$
Benedict Dr from Chapel Hill Rd to Kimberly LnStreets and Transportation Street Resurfacing Local Streets 9 277,761$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 34 of 87
Project Proposition DescriptionCouncil District Amount
Bennington Dr from Trammel Dr to Middlebury DrStreets and Transportation Street Resurfacing Local Streets 9 150,337$
Berwyn Ln from Ridgelawn Dr to E University BlvdStreets and Transportation Street Resurfacing Local Streets 9 141,556$
Blanch Cir from Hillside Dr to Nonesuch RdStreets and Transportation Street Resurfacing Local Streets 9 162,068$
Blessing Cir from End of Pavement to Blessing DrStreets and Transportation Street Resurfacing Local Streets 9 58,550$
Bluff Dale Dr from Berkinshire Dr to Brookhurst DrStreets and Transportation Street Resurfacing Local Streets 9 93,570$
Branchfield Dr from W Lawther Dr to Fisher RdStreets and Transportation Street Resurfacing Local Streets 9 224,288$
Brandeis Ln from Creighton Dr to Ridgelawn DrStreets and Transportation Street Resurfacing Local Streets 9 173,284$
Brendenwood Dr from Gaston Ave to Avalon AveStreets and Transportation Street Resurfacing Local Streets 9 96,829$
Brennans Pl from End of Pavement to Brennans DrStreets and Transportation Street Resurfacing Local Streets 9 42,429$
Broadmoor Dr from Broadmoor Drto Garland RdStreets and Transportation Street Resurfacing Local Streets 9 127,013$
Brookhurst Dr from Edgelake Dr to Northcliff DrStreets and Transportation Street Resurfacing Local Streets 9 322,763$
Bucknell Dr from Bennington Dr to Trammel DrStreets and Transportation Street Resurfacing Local Streets 9 117,375$
Carissa Dr from Ridgelake Dr to Sunland StStreets and Transportation Street Resurfacing Local Streets 9 214,855$
Carissa Dr from Carissa Cir to Jupiter RdStreets and Transportation Street Resurfacing Local Streets 9 147,799$
Carnegie Dr from Carnegie Pl to Peavy RdStreets and Transportation Street Resurfacing Local Streets 9 97,241$
Carrousel Cir from Lyre Ln to Lyre lnStreets and Transportation Street Resurfacing Local Streets 9 148,553$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 35 of 87
Project Proposition DescriptionCouncil District Amount
Champa Dr from Blanning Dr to Hambrick RdStreets and Transportation Street Resurfacing Local Streets 9 52,685$
Chapel Hill Rd from Cathedral Dr to Kimberly LnStreets and Transportation Street Resurfacing Local Streets 9 103,860$
Chapel Hill Rd from W Lawther Dr to Cathedral DrStreets and Transportation Street Resurfacing Local Streets 9 169,065$
Clarksdale Pl from Clarksdale Dr to End of PavementStreets and Transportation Street Resurfacing Local Streets 9 53,474$
Classen Dr from Northlake Dr to Waterview RdStreets and Transportation Street Resurfacing Local Streets 9 222,950$
Classen Dr from E Northwest Hwy to Van Dyke RdStreets and Transportation Street Resurfacing Local Streets 9 383,062$
Clearbrook Ln from Duxbury Dr to Cheswick StStreets and Transportation Street Resurfacing Local Streets 9 238,316$
Coleridge St from Easton Dd to Sasanqua LnStreets and Transportation Street Resurfacing Local Streets 9 30,664$
Cotillion Dr from Ferguson Rd to Puerto Rico DrStreets and Transportation Street Resurfacing Local Streets 9 99,642$
Creel Creek Cir from Creel Creek to End of PavementStreets and Transportation Street Resurfacing Local Streets 9 60,745$
Creel Creek Dr from Creel Creek Cir to Springwater DrStreets and Transportation Street Resurfacing Local Streets 9 49,152$
Creel Creek Dr from Mercer Dr to Creel Creek CirStreets and Transportation Street Resurfacing Local Streets 9 161,313$
Dawn Dr from Gus Thomasson Rd to Thale DrStreets and Transportation Street Resurfacing Local Streets 9 174,827$
Daytonia Ave from Sanford Ave to Tavaros AveStreets and Transportation Street Resurfacing Local Streets 9 113,842$
Desdemona Dr from Barnes Bridge Rd to Housley DrStreets and Transportation Street Resurfacing Local Streets 9 103,517$
Diceman Dr from Sanford Ave to Tavaros AveStreets and Transportation Street Resurfacing Local Streets 9 117,375$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 36 of 87
Project Proposition DescriptionCouncil District Amount
Estacado Dr from Coldwater Cir to Ash Creek DrStreets and Transportation Street Resurfacing Local Streets 9 209,607$
Fernald Ave from Dixfield Dr to Lochwood BlvdStreets and Transportation Street Resurfacing Local Streets 9 350,032$
Fernald Ave from Yeager Dr to Holt DrStreets and Transportation Street Resurfacing Local Streets 9 209,093$
Galena St from Norwood Dr to Fenwick DrStreets and Transportation Street Resurfacing Local Streets 9 177,331$
Gardenia Pl from Gardenia Dr to Gardenia DrStreets and Transportation Street Resurfacing Local Streets 9 59,442$
Gaston Pkwy from Old Gate Ln to Knob Oak DrStreets and Transportation Street Resurfacing Local Streets 9 121,456$
Gatewood Pl from End of Pavement to Jupiter RdStreets and Transportation Street Resurfacing Local Streets 9 168,173$
Greentree Ln from Greenbrook Ln to West Circle DrStreets and Transportation Street Resurfacing Local Streets 9 212,660$
Hambrick Rd from Champa Dr to Northlake DrStreets and Transportation Street Resurfacing Local Streets 9 127,870$
Haverford Dr from Trammel Dr to Middlebury DrStreets and Transportation Street Resurfacing Local Streets 9 156,065$
Haverford Dr from Bucknell Dr to Trammel DrStreets and Transportation Street Resurfacing Local Streets 9 190,674$
Hillbrook St from South Ridge Dr to North Ridge DrStreets and Transportation Street Resurfacing Local Streets 9 53,542$
Holt Dr from Strand St to Dorchester DrStreets and Transportation Street Resurfacing Local Streets 9 53,714$
Housley Dr from Housley Dr to Joaquin DrStreets and Transportation Street Resurfacing Local Streets 9 107,942$
Housley Dr from Desdemona Dr to Housley DrStreets and Transportation Street Resurfacing Local Streets 9 71,618$
Joaquin Dr from Housley Dr to San Francisco DrStreets and Transportation Street Resurfacing Local Streets 9 147,559$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 37 of 87
Project Proposition DescriptionCouncil District Amount
Kelman St from Trammel Dr to Axton LnStreets and Transportation Street Resurfacing Local Streets 9 61,809$
Kilarney Dr from Tranquilla Dr to Peavy RdStreets and Transportation Street Resurfacing Local Streets 9 127,184$
Kilkirk Ln from Ruidosa Ave to End of PavementStreets and Transportation Street Resurfacing Local Streets 9 376,065$
Lingo Ln from Hartline Dr to San Marcus AveStreets and Transportation Street Resurfacing Local Streets 9 104,032$
Lippitt Ave from Jupiter Rd to Mayfair BlvdStreets and Transportation Street Resurfacing Local Streets 9 115,008$
Lippitt Ave from Sahara Waytoneering DrStreets and Transportation Street Resurfacing Local Streets 9 53,885$
Loree Dr from Carnegie Dr to Mercer DrStreets and Transportation Street Resurfacing Local Streets 9 57,110$
Loving Ave from Pasadena Ave to Winsted DrStreets and Transportation Street Resurfacing Local Streets 9 35,466$
Loving Ave from Shook Ave to Wildgrove AveStreets and Transportation Street Resurfacing Local Streets 9 65,719$
Marlin Dr from Modlin St to La Prada DrStreets and Transportation Street Resurfacing Local Streets 9 175,136$
Materhorn Dr from Shiloh Rd to Crest Ridge DrStreets and Transportation Street Resurfacing Local Streets 9 155,551$
Meadowlark Ln from Aanta Maria Ln to Sperry StStreets and Transportation Street Resurfacing Local Streets 9 106,399$
Mercer Dr from N Buckner Blvd to Mariposa DrStreets and Transportation Street Resurfacing Local Streets 9 305,922$
Middlebury Dr from Rutgers Dr to Haverford DrStreets and Transportation Street Resurfacing Local Streets 9 106,570$
Middlebury Dr from Rockhurst Dr to Rutgers DrStreets and Transportation Street Resurfacing Local Streets 9 30,596$
Modlin St from Hillglenn Rd to Marlin DrStreets and Transportation Street Resurfacing Local Streets 9 93,570$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 38 of 87
Project Proposition DescriptionCouncil District Amount
Myrtice Dr from Ruidosa Ave to Tisinger AveStreets and Transportation Street Resurfacing Local Streets 9 219,417$
Neering Dr from Lippitt Ave to Lanewood CirStreets and Transportation Street Resurfacing Local Streets 9 74,671$
Newcombe Dr from San Juan Ave to Crest Ridge DrStreets and Transportation Street Resurfacing Local Streets 9 171,946$
Nonesuch Ed from Blanch Cir to Westlake AveStreets and Transportation Street Resurfacing Local Streets 9 141,488$
North Ridge Dr from Hillbrook St to Sperry StStreets and Transportation Street Resurfacing Local Streets 9 180,727$
Northcliff Dr from N buckner Blvd to Harter RdStreets and Transportation Street Resurfacing Local Streets 9 160,078$
Northcliff Dr from Bondstone Dr to Classen DrStreets and Transportation Street Resurfacing Local Streets 9 86,265$
Northlake Dr from Coolair Dr to Kirkwood DrStreets and Transportation Street Resurfacing Local Streets 9 157,231$
Northlake Dr from Kirkwood Dr to Hambrick RdStreets and Transportation Street Resurfacing Local Streets 9 108,251$
Norwood Dr from Newcombe Dr to Galena StStreets and Transportation Street Resurfacing Local Streets 9 52,856$
Old Gate Ln from San Leandro Dr to Groveland DrStreets and Transportation Street Resurfacing Local Streets 9 50,009$
Pasadena Pl from Pasadena Ave to Winsted DrStreets and Transportation Street Resurfacing Local Streets 9 52,376$
Pearson Dr fro Mavalon Ave to Lakewood BlvdStreets and Transportation Street Resurfacing Local Streets 9 85,304$
Province Ln from Tellerson Ave to Casa Oaks DrStreets and Transportation Street Resurfacing Local Streets 9 211,631$
Ravendale Ln from Belford Dr to Rockaway DrStreets and Transportation Street Resurfacing Local Streets 9 149,102$
Ravendale Ln from Lange Cir to Belford DrStreets and Transportation Street Resurfacing Local Streets 9 218,868$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 39 of 87
Project Proposition DescriptionCouncil District Amount
Redstart Ln from Lyre Ln to Santa Barbara DrStreets and Transportation Street Resurfacing Local Streets 9 150,817$
Rexton Ln from Glennox Ln to E Lovers LnStreets and Transportation Street Resurfacing Local Streets 9 61,466$
Ridgemeadow Dr from Lochwood Blvd to Midlake DrStreets and Transportation Street Resurfacing Local Streets 9 83,761$
Ridgemont Dr from Highgate Ln to Santa Anita DrStreets and Transportation Street Resurfacing Local Streets 9 155,722$
Rio Verde Way from Shiloh Rd to Kilkirk LnStreets and Transportation Street Resurfacing Local Streets 9 121,285$
Ruidosa Ave from Featherbrook Dr to Cotillion DrStreets and Transportation Street Resurfacing Local Streets 9 100,671$
Rutgers Dr from Trammel Dr to Middlebury DrStreets and Transportation Street Resurfacing Local Streets 9 144,918$
San Diego Dr from Shiloh Rd to Santa Anna AveStreets and Transportation Street Resurfacing Local Streets 9 335,283$
San Fernando Way from Whittier Ave to Lakeland DrStreets and Transportation Street Resurfacing Local Streets 9 154,213$
San Juan Ave from Newcombe Dr to Crest Ridge DrStreets and Transportation Street Resurfacing Local Streets 9 172,289$
San Marcus Ave from Lingo Ln to Ferguson RdStreets and Transportation Street Resurfacing Local Streets 9 154,213$
Santa Anna Ave from Shiloh Rd to Vista Mar DrStreets and Transportation Street Resurfacing Local Streets 9 104,718$
Santa Barbara Dr from Santa Maria Ln to E Mockingbird Ln
Streets and Transportation Street Resurfacing Local Streets 9 171,877$
Santa Teresa Ave from Materhorn Dr to Santa Garza DrStreets and Transportation Street Resurfacing Local Streets 9 179,218$
Sinclair Ave from Sunland St to Jupiter RdStreets and Transportation Street Resurfacing Local Streets 9 293,745$
Sinclair Ave from Jupiter Rd to Gaston PkwyStreets and Transportation Street Resurfacing Local Streets 9 189,165$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 40 of 87
Project Proposition DescriptionCouncil District Amount
South Ridge Dr from Sperry St to Wildbriar LnStreets and Transportation Street Resurfacing Local Streets 9 253,683$
Sperry St from Meadowlark Ln to Santa Barbara DrStreets and Transportation Street Resurfacing Local Streets 9 113,842$
Sperry St from Williamson Rd to Lyre LnStreets and Transportation Street Resurfacing Local Streets 9 74,808$
Springhill Dr from Mercer Dr to Stanwood DrStreets and Transportation Street Resurfacing Local Streets 9 77,004$
St Francis Ave from San Leandro Dr to Barbaree BlvdStreets and Transportation Street Resurfacing Local Streets 9 117,066$
Sylvania Dr from Sinclair Ave to Vinemont StStreets and Transportation Street Resurfacing Local Streets 9 180,898$
Sylvia Dr from Crest Ridge Dr to Desdemona DrStreets and Transportation Street Resurfacing Local Streets 9 124,749$
Syracuse Dr from Wake Forrest Dr to Wake Forrest DrStreets and Transportation Street Resurfacing Local Streets 9 240,512$
Tisinger Ave from Tascosa St Toulloa LnStreets and Transportation Street Resurfacing Local Streets 9 52,685$
Trammel Dr from Clemson Dr to E Northwest hwyStreets and Transportation Street Resurfacing Local Streets 9 216,982$
Trammel Dr from Bennington Drto Clemson DrStreets and Transportation Street Resurfacing Local Streets 9 164,228$
Trammel Dr from Fisher Rd to Bennington DrStreets and Transportation Street Resurfacing Local Streets 9 421,204$
Tuscany Way from Sinclair Ave to Lippitt AveStreets and Transportation Street Resurfacing Local Streets 9 150,337$
Vinemont St from Forestgrove Dr to Easton RdStreets and Transportation Street Resurfacing Local Streets 9 136,994$
Wake Forrest Dr from Lehigh Dr to Trammel DrStreets and Transportation Street Resurfacing Local Streets 9 52,513$
Waterview Rd from Bondstone Dr to Classen DrStreets and Transportation Street Resurfacing Local Streets 9 56,081$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 41 of 87
Project Proposition DescriptionCouncil District Amount
West Bay Cir from W Lawther Dr to Branchfield DrStreets and Transportation Street Resurfacing Local Streets 9 342,520$
Westlake Ave from Velasco Ave to Wendover RdStreets and Transportation Street Resurfacing Local Streets 9 82,937$
Whittier Ave from Santa Clara Dr to San Benito WayStreets and Transportation Street Resurfacing Local Streets 9 142,379$
Whittier Ave from San Benito Way to San Leandro DrStreets and Transportation Street Resurfacing Local Streets 9 80,228$
Winsted Dr from Lakeforest Ct to Pasadena PlStreets and Transportation Street Resurfacing Local Streets 9 107,256$
Winsted Dr from White Rock Rd to Tokalon DrStreets and Transportation Street Resurfacing Local Streets 9 136,891$
Winsted Dr from Westlake Ave to Meadow Lake AveStreets and Transportation Street Resurfacing Local Streets 9 63,009$
Winsted Dr from Lakewood Blvd to Westlake AveStreets and Transportation Street Resurfacing Local Streets 9 66,714$
Winsted Dr from Pasadena Pl to White Rock RdStreets and Transportation Street Resurfacing Local Streets 9 51,515$
Wyatt St from Maplegrove Ln to Wyatt CirStreets and Transportation Street Resurfacing Local Streets 9 53,199$
Yorkmont Cir from End of Pavement to Evangeline WayStreets and Transportation Street Resurfacing Local Streets 9 157,231$
Yorksprings Dr from Valley Spring Dr to Meadow Spring Ln
Streets and Transportation Street Resurfacing Local Streets 9 199,317$
Yorksprings Dr from Meadow Spring Ln to Yorksprings Pl
Streets and Transportation Street Resurfacing Local Streets 9 117,718$
Abrams Rd from E University Blvd to Chesley LnStreets and Transportation Street Resurfacing Thoroughfares 9 450,000$
Abrams Rd from Glennox Ln to E Lovers LnStreets and Transportation Street Resurfacing Thoroughfares 9 129,585$
Abrams Rd from Trammel Dr to E University BlvdStreets and Transportation Street Resurfacing Thoroughfares 9 145,981$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 42 of 87
Project Proposition DescriptionCouncil District Amount
E Mockingbird Ln from Yosemite Ln to Williamson RdStreets and Transportation Street Resurfacing Thoroughfares 9 431,494$
E Mockingbird Ln from Hillside Dr to Yosemite LnStreets and Transportation Street Resurfacing Thoroughfares 9 217,119$
Easton Rd from Garland Rd to San Felipe DrStreets and Transportation Street Resurfacing Thoroughfares 9 191,394$
Easton Rd from San Felipe Dr to Losa DrStreets and Transportation Street Resurfacing Thoroughfares 9 137,200$
Easton Rd from Losa Dr to Hermosa DrStreets and Transportation Street Resurfacing Thoroughfares 9 203,851$
Easton Rd from Hermosa Dr to Gus Thomasson RdStreets and Transportation Street Resurfacing Thoroughfares 9 107,565$
Gus Thomasson Rd from Easton Rd to Sylvia DrStreets and Transportation Street Resurfacing Thoroughfares 9 365,021$
Gus Thomasson Rd from Sylvia Dr to Dawn DrStreets and Transportation Street Resurfacing Thoroughfares 9 90,243$
Gus Thomasson Rd from Dawn Dr to Desdemona DrStreets and Transportation Street Resurfacing Thoroughfares 9 90,552$
Gus Thomasson Rd from Libby Ln to Maylee BlvdStreets and Transportation Street Resurfacing Thoroughfares 9 155,070$
Gus Thomasson Rd from Materhorn Dr to Libby LnStreets and Transportation Street Resurfacing Thoroughfares 9 251,968$
Peavy Rd from Hermosa Dr to E Zacha DrStreets and Transportation Street Resurfacing Thoroughfares 9 219,625$
Peavy Rd from Garland Rd to Losa DrStreets and Transportation Street Resurfacing Thoroughfares 9 277,761$
Peavy Rd from Losa Dr to Hermosa DrStreets and Transportation Street Resurfacing Thoroughfares 9 329,878$
Council District 9 traffic signals improvements (locations for three traffic signals tbd)
Streets and Transportation
Traffic Intersection Capacity & Safety Improvement 9
$ 846,000
10106-10160 Caribou Trail & 10127-10143 Ferndale Rd Streets and Transportation
Alley Reconstruction10
264,992$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 43 of 87
Project Proposition DescriptionCouncil District Amount
10163-10199 Vistadale Dr & 10200-10200 Trailcliff Dr Streets and Transportation
Alley Reconstruction10
228,046$
9003-9131 Webb Kay Dr & 9006-9132 Windy Crest Dr Streets and Transportation
Alley Reconstruction10
493,675$
9506-9650 Dartridge Dr & 9605-9679 Covemeadow Dr Streets and Transportation
Alley Reconstruction10
447,811$
9603-9616 Greensprint Drive & 9626-9626 Church Rd Streets and Transportation
Alley Reconstruction10
103,513$
9606-9734 Shady Dale Lane & 9709-9733 Shoreview Rd Streets and Transportation
Alley Reconstruction10
268,814$
9805-8805 Buxhill Dr & 9804-9846 Chiswell Rd & 8805-8817 Fenchurch Rd
Streets and Transportation
Alley Reconstruction10
299,096$
Arbor Park Dr from Robin Meadow Dr to Whitehurst Dr Streets and Transportation
Street Reconstruction Local Streets10
1,339,207$
Boundbrook Ave from Greenville Ave to Woodbrook Dr Streets and Transportation
Street Reconstruction Local Streets10
408,807$
Broken Bow Rd from 9635 Broken Bow Rd to Fieldcrest Dr
Streets and Transportation
Street Reconstruction Local Streets10
601,802$
Chimney Hill Ln from Abrams Rd to Wightman Pl Streets and Transportation
Street Reconstruction Local Streets10
1,726,846$
Lanshire Dr from Chiswell Rd to Audelia Rd Streets and Transportation
Street Reconstruction Local Streets10
620,156$
Lockhaven Dr from Lockyer Dr to Lynford Dr Streets and Transportation
Street Reconstruction Local Streets10
463,381$
Lockhaven Dr from Lynford Dr to Lanshire Dr Streets and Transportation
Street Reconstruction Local Streets10
259,804$
Lockhaven Dr from E Northwest Hwy to Lockyer Dr Streets and Transportation
Street Reconstruction Local Streets10
447,836$
Lynford Dr from Ferndale Rd to Lockhaven Dr Streets and Transportation
Street Reconstruction Local Streets10
732,115$
Rolling Rock Ln from Hackney Ln to Fern Hollow Dr Streets and Transportation
Street Reconstruction Local Streets10
525,396$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 44 of 87
Project Proposition DescriptionCouncil District Amount
Westfield Dr from Woodbrook Dr to Gladwood Ln Streets and Transportation
Street Reconstruction Local Streets10
574,182$
Westfield Dr from Gladwood Ln to Clearwater Dr Streets and Transportation
Street Reconstruction Local Streets10
534,988$
Woodbrook Dr from Graywood Dr to Westfield Dr Streets and Transportation
Street Reconstruction Local Streets10
257,324$
Woodbrook Dr from Clearwater Dr to Graywood Dr Streets and Transportation
Street Reconstruction Local Streets10
255,670$
Remove Dip on EB Royal Ln 400 Ft East of Greenvile Ave
Streets and Transportation
Street Reconstruction Thoroughfares 10
75,000$
Adleta Blvd from Adleta Ct to Adleta Blvd Streets and Transportation
Street Resurfacing Local Streets10
443,396$
Amberton Pkwy from Greenville Ave to Emberglow Ln Streets and Transportation
Street Resurfacing Local Streets10
367,284$
Amberton Pkwy from Emberglow Ln to Chimneysweep Ln
Streets and Transportation
Street Resurfacing Local Streets10
203,120$
Amberton Pkwy from Chimneysweep Ln to Chimney Corner
Streets and Transportation
Street Resurfacing Local Streets10
126,190$
Arborhill Dr from Arborhill Dr to Arbor Park Dr Streets and Transportation
Street Resurfacing Local Streets10
165,532$
Brentridge Ct from Brentridge Dr to End of Pavement Streets and Transportation
Street Resurfacing Local Streets10
111,406$
Brentridge Dr from Deermont Trl to Brentridge Ct Streets and Transportation
Street Resurfacing Local Streets10
64,690$
Caulan Dr from Willowdell Dr to Galva Dr Streets and Transportation
Street Resurfacing Local Streets10
54,057$
Center Court Dr from Baseline Dr to Chimney Hill Ln Streets and Transportation
Street Resurfacing Local Streets10
92,233$
Charing Cross Ln from Staffordshire Dr to Flicker Ln Streets and Transportation
Street Resurfacing Local Streets10
96,280$
Chesterton Dr from Lynbrook Dr to Lanward Dr Streets and Transportation
Street Resurfacing Local Streets10
110,446$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 45 of 87
Project Proposition DescriptionCouncil District Amount
Chiswell Rd from Lanshire Dr to Audelia Rd Streets and Transportation
Street Resurfacing Local Streets10
86,470$
Church Cir from End of Pavement to Church Rd Streets and Transportation
Street Resurfacing Local Streets10
64,278$
Claybrook Dr from Cliffrose Ln to Walnut Hill Ln Streets and Transportation
Street Resurfacing Local Streets10
165,189$
Clearwater Dr from Westfield Dr to Stults Rd Streets and Transportation
Street Resurfacing Local Streets10
207,480$
Clearwater Dr from Woodbrook Dr to Angleton Pl Streets and Transportation
Street Resurfacing Local Streets10
101,013$
Clearwater Dr from Angleton Pl to Westfield Dr Streets and Transportation
Street Resurfacing Local Streets10
156,064$
Club Glen Dr from Whitehurst Dr to Arbor Trail Dr Streets and Transportation
Street Resurfacing Local Streets10
155,551$
Cosgrove Dr from Merriman Pkwy to Tabor Dr Streets and Transportation
Street Resurfacing Local Streets10
150,321$
Covey Ct from Quail Run to End of Pavement Streets and Transportation
Street Resurfacing Local Streets10
100,000$
Deermont Trl from Brentridge Dr to Whispering Hills Dr Streets and Transportation
Street Resurfacing Local Streets10
146,735$
Dove Meadow Dr from Whitehurst Dr to Middle Glen Dr
Streets and Transportation
Street Resurfacing Local Streets10
192,732$
Echo Valley Dr from Loma Vista Dr to Raeford Dr Streets and Transportation
Street Resurfacing Local Streets10
50,833$
Echo Valley Dr from Raeford Dr to Whitehurst Dr Streets and Transportation
Street Resurfacing Local Streets10
168,893$
Faircrest Dr from A11639 to Ferndale Rd Streets and Transportation
Street Resurfacing Local Streets10
118,232$
Fenchurch Rd from Shadydale Ln to Buxhill Dr Streets and Transportation
Street Resurfacing Local Streets10
58,962$
Fenchurch Rd from Fitzroy Dr to Shadydale Ln Streets and Transportation
Street Resurfacing Local Streets10
52,205$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 46 of 87
Project Proposition DescriptionCouncil District Amount
Fenchurch Rd from Buxhill Dr to Lanshire Dr Streets and Transportation
Street Resurfacing Local Streets10
118,061$
Ferris Branch Blvd from Whitehurst Dr to W Ferris Branch Blvd
Streets and Transportation
Street Resurfacing Local Streets10
175,582$
Ferris Creek Ln from Chimney Hill Ln to End of Pavement
Streets and Transportation
Street Resurfacing Local Streets10
145,809$
Fitzroy Dr from Audelia Rd to Fenchurch Rd Streets and Transportation
Street Resurfacing Local Streets10
98,510$
Glen Springs Cir from End of Pavement to Glen Springs Dr
Streets and Transportation
Street Resurfacing Local Streets10
55,840$
Glen Springs Dr from Glen Springs Cir to Whitehurst Dr Streets and Transportation
Street Resurfacing Local Streets10
71,310$
Glen Springs Dr from Robin Meadow Dr to Glen Springs Cir
Streets and Transportation
Street Resurfacing Local Streets10
82,251$
Green Oaks Cir from Greenville Ave to End of Pavement Streets and Transportation
Street Resurfacing Local Streets10
163,268$
Hedgeapple Dr from Desert Willow Dr to Buckingham Rd
Streets and Transportation
Street Resurfacing Local Streets10
81,050$
Kingsley Rd from Crofton Dr to Winedale Dr Streets and Transportation
Street Resurfacing Local Streets10
116,311$
Lakemere Dr from Lynbrook Dr to Plano Rd Streets and Transportation
Street Resurfacing Local Streets10
166,355$
Lavalle Ln from Woodbrook Dr to Greenville Ave Streets and Transportation
Street Resurfacing Local Streets10
111,990$
Linkwood Dr from Ferndale Rd to Lockhaven Dr Streets and Transportation
Street Resurfacing Local Streets10
152,018$
Liptonshire Dr from Mccree Rd to Lakemere Dr Streets and Transportation
Street Resurfacing Local Streets10
219,589$
Loma Vista Dr from Club Meadows Dr to Echo Valley Dr Streets and Transportation
Street Resurfacing Local Streets10
260,954$
Longmeadow Dr from Larchwood Dr to Liptonshire Dr Streets and Transportation
Street Resurfacing Local Streets10
50,833$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 47 of 87
Project Proposition DescriptionCouncil District Amount
Longmeadow Dr from Ferndale Rd to Larchwood Dr Streets and Transportation
Street Resurfacing Local Streets10
55,738$
Longmeadow Dr from Liptonshire Dr to Leaside Dr Streets and Transportation
Street Resurfacing Local Streets10
52,513$
Maple Glen Dr from Westbend Dr to Arborgate Dr Streets and Transportation
Street Resurfacing Local Streets10
143,751$
Maple Glen Dr from A3677 to Westbend Dr Streets and Transportation
Street Resurfacing Local Streets10
84,309$
Merriwood Dr from End of Pavement to Church Rd Streets and Transportation
Street Resurfacing Local Streets10
141,488$
Middle Glen Dr from Dove Meadow Dr to Mill Hollow Dr
Streets and Transportation
Street Resurfacing Local Streets10
155,551$
Moss Meadows Dr from Arborside Dr to Abrams Rd Streets and Transportation
Street Resurfacing Local Streets10
215,678$
Park Highlands Dr from Plano Rd to Walnut Hill Ln Streets and Transportation
Street Resurfacing Local Streets10
199,557$
Quail Run from Capri Dr to Rolling Rock Ln Streets and Transportation
Street Resurfacing Local Streets10
60,642$
Queenswood Ln from Walnut Hill Ln to Knoll Krest Dr Streets and Transportation
Street Resurfacing Local Streets10
139,361$
Shadow Way from Audelia Rd to Creekspan Dr Streets and Transportation
Street Resurfacing Local Streets10
145,226$
Shadow Way from Creekspan Dr to Candlebrook Dr Streets and Transportation
Street Resurfacing Local Streets10
229,433$
Shady Valley Dr from Shady Valley Dr to Winding Ridge Dr
Streets and Transportation
Street Resurfacing Local Streets10
89,695$
Shady Valley Dr from Royal Highlands Dr to Shady Valley Dr
Streets and Transportation
Street Resurfacing Local Streets10
103,689$
Strathmore Dr from E Northwest Pkwy to Flicker Ln Streets and Transportation
Street Resurfacing Local Streets10
152,018$
Strathmore Dr from Flicker Ln to Kingspoint Dr Streets and Transportation
Street Resurfacing Local Streets10
51,622$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 48 of 87
Project Proposition DescriptionCouncil District Amount
Tabor Dr from Kenwhite Dr to Cosgrove Dr Streets and Transportation
Street Resurfacing Local Streets10
141,693$
Tobian St from Bellafonte Dr to Dandridge Dr Streets and Transportation
Street Resurfacing Local Streets10
106,399$
Westover Dr from Arborside Dr to Ridgemar Dr Streets and Transportation
Street Resurfacing Local Streets10
156,923$
Wickersham Rd from Mccree Rd to Wallbrook Dr Streets and Transportation
Street Resurfacing Local Streets10
76,249$
Wightman Pl from Baseline Dr to Chimney Hill Ln Streets and Transportation
Street Resurfacing Local Streets10
52,033$
Willowdell Dr from Caulan Dr to Towns St Streets and Transportation
Street Resurfacing Local Streets10
388,688$
Winding Ridge from 9800 Winding Ridge Dr to Church Rd
Streets and Transportation
Street Resurfacing Local Streets10
85,750$
Winedale Dr from Walnut Hill Ln to Lacrosse Dr Streets and Transportation
Street Resurfacing Local Streets10
136,742$
Woodbrook Dr from Ashcroft Ave to Stillwater Dr Streets and Transportation
Street Resurfacing Local Streets10
73,642$
Audelia Rd from Faircrest Dr to Royal Ln Streets and Transportation
Street Resurfacing Thoroughfares10
571,847$
Royal Ln from Ashcroft Ave to Greenville Ave Streets and Transportation
Street Resurfacing Thoroughfares10
500,238$
Skillman at Walnut Hill (Complete Street/Pedestrian Safety Improvements and Traffic Calming along Skillman)
Streets and Transportation
Traffic Intersection Capacity & Safety Improvement
10
1,591,747$
15632-15724 GOLDEN CREEK RD & 6231 - 6239 LA COSA DR & 15503-15531 BAY POINT DR
Streets and Transportation
Alley Reconstruction11
360,000$
6506-6556 CRESTMERE DR & 6515-6555 MEADOWCREEK DR
Streets and Transportation
Alley Reconstruction11
250,660$
6510-6580 CALAIS DR & 6509-6565 CRESTMERE DR Streets and Transportation
Alley Reconstruction11
283,465$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 49 of 87
Project Proposition DescriptionCouncil District Amount
6808-7038 HUNTERS RIDGE DR & 6807-6959 TOWN BLUFF DR
Streets and Transportation
Alley Reconstruction11
503,548$
6920-7038 MIDBURY DR & 6919-7033 NORTHAVEN RD Streets and Transportation
Alley Reconstruction11
43,730$
7309-7435 TANGLEGLEN DR & 7364-7450 TOPHILL LN Streets and Transportation
Alley Reconstruction11
293,000$
7405-7443 LYNWORTH DR & 7408-7438 CHATTINGTON DR
Streets and Transportation
Alley Reconstruction11
214,032$
7606-7672 ROLLING ACRES DR & 7615-7651 TOPHILL LN
Streets and Transportation
Alley Reconstruction11
253,207$
6906-7030 ORCHID LN & 6909-7007 MEADOEBRIAR LN & 7017 PEMBERTON DR
Streets and Transportation
Alley Reconstruction 11
355,348$
Willow Ln from Preston Rd to Hillcrest RdStreets and Transportation
Sidewalk Improvements11
1,363,027$
Blossomheath Ln from LBJ Serv N to Thistle LnStreets and Transportation
Street Reconstruction Local Streets11
447,009$
Blossomheath Ln from Thistle Ln to Alpha RdStreets and Transportation
Street Reconstruction Local Streets11
509,024$
Brookshire Dr from Orchid Ln to Brookshire CirStreets and Transportation
Street Reconstruction Local Streets11
316,032$
Clearsprings Rd from Coit Rd to Sapling WayStreets and Transportation
Street Reconstruction Local Streets11
473,965$
Currin Dr from St Michaels Dr to Pebbledowne DrStreets and Transportation
Street Reconstruction Local Streets11
809,511$
Currin Dr from Pebbledowne Dr to End of PavementStreets and Transportation
Street Reconstruction Local Streets11
184,889$
Edelweiss Cir from Hillcrest Rd to End of PavementStreets and Transportation
Street Reconstruction Local Streets11
356,383$
Greenhollow Ln from Coit Rd to Sapling WayStreets and Transportation
Street Reconstruction Local Streets11
469,004$
Hughes Ln from Wilderness Ct to Preston RdStreets and Transportation
Street Reconstruction Local Streets11
925,108$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 50 of 87
Project Proposition DescriptionCouncil District Amount
Meadow Park Dr from Stone Canyon Rd to Regal Park LnStreets and Transportation
Street Reconstruction Local Streets11
775,443$
Northaven Rd from Royalshire Dr to Crest Brook DrStreets and Transportation
Street Reconstruction Local Streets11
799,423$
Northcreek Ln from L B J Serv N to End of PavementStreets and Transportation
Street Reconstruction Local Streets11
794,462$
Sapling Way from Clearsprings Rd to Greenhollow LnStreets and Transportation
Street Reconstruction Local Streets11
245,913$
Alpha Rd from Barton Dr to Noel RdStreets and Transportation
Street Reconstruction Thoroughfares 11
1,066,503$
Alpha Rd from Noel Rd to Montfort DrStreets and Transportation
Street Reconstruction Thoroughfares 11
2,029,317$
Alpha Rd from End of Pavement to Barton DrStreets and Transportation
Street Reconstruction Thoroughfares 11
1,167,548$
Merit Dr from Clodus Fields Dr to Churchill WayStreets and Transportation
Street Reconstruction Thoroughfares 11
2,559,840$
Briar Tree Dr from Village Ln to Village LnStreets and Transportation
Street Resurfacing Local Streets11
244,559$
Briaridge Rd from Spring Creek Rd to Coit RdStreets and Transportation
Street Resurfacing Local Streets11
211,803$
Carillon Dr from Rolling Hills Ln to Peyton DrStreets and Transportation
Street Resurfacing Local Streets11
113,842$
Carillon Dr from Spring Grove Ave to Rolling Hills LnStreets and Transportation
Street Resurfacing Local Streets11
52,513$
Carriage Ln from Dentcrest Dr to Belt Line RdStreets and Transportation
Street Resurfacing Local Streets11
52,376$
Clearsprings Rd from Sapling Way to Waterfall WayStreets and Transportation
Street Resurfacing Local Streets11
163,851$
Clearsprings Rd from Waterfall Way to Maham RdStreets and Transportation
Street Resurfacing Local Streets11
171,603$
Cypress Hills Dr from Black Berry Ln to La Cosa DrStreets and Transportation
Street Resurfacing Local Streets11
66,371$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 51 of 87
Project Proposition DescriptionCouncil District Amount
Cypress Hills Dr from Fox Trl to Black Berry LnStreets and Transportation
Street Resurfacing Local Streets11
201,170$
Dove Brook Cir from Stone Canyon Rd to End of PavemeStreets and Transportation
Street Resurfacing Local Streets11
87,911$
Forest Ct from End of Pavement to Forest LnStreets and Transportation
Street Resurfacing Local Streets11
121,868$
Gladeside Ct from Gladeside Ct to Preston Trail DrStreets and Transportation
Street Resurfacing Local Streets11
109,932$
Greenwich Ln from Hampstead Ln to Forest LnStreets and Transportation
Street Resurfacing Local Streets11
162,136$
Haraby Ct from Preston Trail Dr to End of PavementStreets and Transportation
Street Resurfacing Local Streets11
83,040$
Haymeadow Dr from Coit Rd to Spring Valley RdStreets and Transportation
Street Resurfacing Local Streets11
530,964$
Hickory Hill Dr from Golden Creek Rd to End of PavemenStreets and Transportation
Street Resurfacing Local Streets11
131,506$
Kalani Pl from Hughes Ln to End of PavementStreets and Transportation
Street Resurfacing Local Streets11
145,466$
Knollview Dr from Hillcrest Rd to Hillcrest RdStreets and Transportation
Street Resurfacing Local Streets11
200,141$
Meadowside Dr from Laurel Wood Ln to Kendallwood DStreets and Transportation
Street Resurfacing Local Streets11
197,294$
Orchid Ln from Hillcrest Rd to Forestglade CirStreets and Transportation
Street Resurfacing Local Streets11
130,066$
Overview Dr from Village Trail Dr to Dentcrest DrStreets and Transportation
Street Resurfacing Local Streets11
37,353$
Purple Sage Rd from Alpha Rd to Meandering WayStreets and Transportation
Street Resurfacing Local Streets11
124,132$
Purple Sage Rd from Meandering Way to Willow Bend RStreets and Transportation
Street Resurfacing Local Streets11
139,189$
Ramblewood Trl from Clearsprings Rd to Greenhollow LnStreets and Transportation
Street Resurfacing Local Streets11
157,574$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 52 of 87
Project Proposition DescriptionCouncil District Amount
Shiremont Dr from Talmadge Ln to End of PavementStreets and Transportation
Street Resurfacing Local Streets11
59,373$
Southern Knoll Dr from Trails End Dr to Golden Creek RdStreets and Transportation
Street Resurfacing Local Streets11
165,360$
Steuben Ct from Preston Trail Dr to Steuben CtStreets and Transportation
Street Resurfacing Local Streets11
167,487$
Valley View Ln from Valley View Ln to L B J ServStreets and Transportation
Street Resurfacing Local Streets11
86,402$
Woodthrush Dr from Boedeker St to Stone Canyon RdStreets and Transportation
Street Resurfacing Local Streets11
141,007$
Campbell Rd from Preston Rd to Preston Trail DrStreets and Transportation
Street Resurfacing Thoroughfares11
165,943$
Maham Rd from Spring Valley to N Central Serv WStreets and Transportation
Street Resurfacing Thoroughfares11
1,226,602$
Meandering Way from L B J Serv N to Brushcreek LnStreets and Transportation
Street Resurfacing Thoroughfares11
179,373$
Meandering Way from Alpha Rd to Purple Sage RdStreets and Transportation
Street Resurfacing Thoroughfares11
1,032,767$
Meandering Way from Brushcreek Ln to Alpha RdStreets and Transportation
Street Resurfacing Thoroughfares11
189,199$
Meandering Way from Purple Sage Rd to Spring Grove AStreets and Transportation
Street Resurfacing Thoroughfares11
76,240$
Meandering Way from Spring Grove Ave to Far Hills LnStreets and Transportation
Street Resurfacing Thoroughfares11
220,069$
Midpark Rd from Goldmark Dr to N Central Serv EStreets and Transportation
Street Resurfacing Thoroughfares11
264,007$
Royal Ln from St Judes Dr to Lavendale AveStreets and Transportation
Street Resurfacing Thoroughfares11
300,125$
18603-18707 AMADOR AVE & 6505-6511 VILLA RD Streets and Transportation
Alley Reconstruction12
549,731$
19003-19039 BILBROOK LN Streets and Transportation
Alley Reconstruction12
344,617$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 53 of 87
Project Proposition DescriptionCouncil District Amount
2703-2743 APRIL HILL LN & 2710-2750 STEVENS POINT LN
Streets and Transportation
Alley Reconstruction12
275,821$
4104-4124 FIREBRICK LN & 4103-4119 COUNTRY BROOK DR
Streets and Transportation
Alley Reconstruction12
150,969$
4202-4272 TIMBERGLEN RD & 4203-4231 LAWNGATE DR
Streets and Transportation
Alley Reconstruction12
218,491$
5501-5527 HARBOR TOWN DR & 5506-5530 TAMARON CT
Streets and Transportation
Alley Reconstruction12
260,215$
6020-6040 FIELDSTONE Streets and Transportation
Alley Reconstruction12
269,500$
6302-6326 OAKLEAF RD & 6301-6323 WARM MIST LN Streets and Transportation
Alley Reconstruction12
214,669$
7103-7133 ECHO BLUFF DR & 7202-7226 RUSTIC VALLEY DR
Streets and Transportation
Alley Reconstruction12
285,695$
7105-7227 BLUEFIELD DR & 7311- 7427 CARTA VALLEY DR
Streets and Transportation
Alley Reconstruction12
428,750$
7151-7203 GRACEFIELD LN & 7101-7145 CROOKED OAK DR
Streets and Transportation
Alley Reconstruction12
456,411$
7206 -7446 LA SOBRINA DR & 7223-7441 WHISPERING PINE DR
Streets and Transportation
Alley Reconstruction12
522,659$
7604-7608 DORNOCH LN & 7603-7605 LAIRDS LN Streets and Transportation
Alley Reconstruction12
106,061$
7607-777 LA SOBRINA DR & 7624-7772 QUERIDA LN Streets and Transportation
Alley Reconstruction12
557,694$
7620-7768 LA MANGA DR & 7625-7771 QUERIDA LN Streets and Transportation
Alley Reconstruction12
504,504$
7805-7871 LA VERDURA DR & 7806-7846 EL PASTEL DR Streets and Transportation
Alley Reconstruction12
269,770$
7805-7887 QUERIDA LN & 7808-7858 LA MANGA DR Streets and Transportation
Alley Reconstruction12
273,592$
7806-7870 QUERIDA LN & 7807-7867 LA SOBRINA DR Streets and Transportation
Alley Reconstruction12
333,470$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 54 of 87
Project Proposition DescriptionCouncil District Amount
FRANKFORD (SOUTH SIDE) FROM DICKERSON ST TO COIT RD
Streets and Transportation
Sidewalk Improvements12
100,000$
6100 blk of Calm Meadow Streets and Transportation
Street Reconstruction Local Streets12
528,539$
Crownover Ct from Genstar Ln to End of Pavement Streets and Transportation
Street Reconstruction Local Streets12
844,405$
Frankford Rd from Frankford Rd to Aramis Ln Streets and Transportation
Street Reconstruction Local Streets12
381,520$
Mimms Dr from Featherwood Dr to Mimms Dr Streets and Transportation
Street Reconstruction Local Streets12
807,857$
Timber Oaks Dr from Shadow Ridge Dr to Shadow Ridge Dr
Streets and Transportation
Street Reconstruction Local Streets12
808,518$
Davenport Rd from Winding Creek Rd to Creek Bend Rd Streets and Transportation
Street Reconstruction Thoroughfares 12
776,761$
Frankford Rd (Wb Lane Only) from City Limit to Appleridge Dr
Streets and Transportation
Street Reconstruction Thoroughfares 12
1,353,262$
Carrollwood Dr from Briarnoll Dr to Debbe Dr Streets and Transportation
Street Resurfacing Local Streets12
195,098$
Debbe Dr from Briarnoll Dr to Carrollwood Dr Streets and Transportation
Street Resurfacing Local Streets12
144,746$
Debbe Dr from Meandering Way to Briarnoll Dr Streets and Transportation
Street Resurfacing Local Streets12
143,889$
Debbe Dr from Judi St to Meandering Way Streets and Transportation
Street Resurfacing Local Streets12
137,646$
Flanary Ln from Garlinghouse Ln to Amador Ave Streets and Transportation
Street Resurfacing Local Streets12
163,165$
Kirkmeadow Ln from Midway Rd to Timberglen Rd Streets and Transportation
Street Resurfacing Local Streets12
182,236$
Laurel Valley Rd from Golden Creek Rd to Brook Lake Dr
Streets and Transportation
Street Resurfacing Local Streets12
182,373$
Lovington Dr from Genstar Ln to Amador Ave Streets and Transportation
Street Resurfacing Local Streets12
163,851$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 55 of 87
Project Proposition DescriptionCouncil District Amount
Middle Cove Dr from Meadowcreek Dr to Windy Meadow Dr
Streets and Transportation
Street Resurfacing Local Streets12
232,588$
Old Bent Tree Ln from Dallas Pkwy to Parkway Ln Streets and Transportation
Street Resurfacing Local Streets12
109,143$
Querida Ln from Spring Creek Rd to La Manga Dr Streets and Transportation
Street Resurfacing Local Streets12
202,336$
Rooster Ln from Seedling Ln to Daybreak Dr Streets and Transportation
Street Resurfacing Local Streets12
50,181$
Shadow Ridge Dr from Timber Oaks Dr to Timber Oaks Dr
Streets and Transportation
Street Resurfacing Local Streets12
203,468$
Arapaho Rd from Golden Creek Rd to Meadowcreek Dr Streets and Transportation
Street Resurfacing Thoroughfares12
870,363$
Arapaho Rd from Hillcrest Rd to Meandering Way Streets and Transportation
Street Resurfacing Thoroughfares12
1,002,109$
Arapaho Rd from Meadowcreek Dr to Hillcrest Rd Streets and Transportation
Street Resurfacing Thoroughfares12
714,949$
Campbell Rd from Preston Rd to Preston Bend Ct Streets and Transportation
Street Resurfacing Thoroughfares12
733,506$
Campbell Rd from Colegrove Dr to Hillcrest Rd Streets and Transportation
Street Resurfacing Thoroughfares12
316,418$
Campbell Rd from Hillcrest Rd to Meadering Way Streets and Transportation
Street Resurfacing Thoroughfares12
928,467$
Campbell Rd from Meandering Way to Coit Rd Streets and Transportation
Street Resurfacing Thoroughfares12
1,378,860$
Frankford Rd from Hillcrest Rd to Coit Rd Streets and Transportation
Street Resurfacing Thoroughfares12
2,212,007$
Frankford Rd from Preston Rd to Hillcrest Rd Streets and Transportation
Street Resurfacing Thoroughfares12
1,754,016$
Hillcrest Rd from Mccallum Blvd to Riseden Dr Streets and Transportation
Street Resurfacing Thoroughfares12
814,911$
Kelly Blvd from Old Mill Rd to Harbinger Ln Streets and Transportation
Street Resurfacing Thoroughfares12
367,147$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 56 of 87
Project Proposition DescriptionCouncil District Amount
Kelly Blvd from Harbinger Ln to Frankford Rd Streets and Transportation
Street Resurfacing Thoroughfares12
374,590$
Marsh Ln from Briargrove Ln to Frankford Rd Streets and Transportation
Street Resurfacing Thoroughfares12
597,883$
17604-17630 Davenport Alley ConstructionStreets and Transportation
Target Neighborhood12
500,579$
10445 - 10461 CARRY BACK CIR & 10419 - 10427 CARRY BACK PL
Streets and Transportation
Alley Reconstruction13
115,934$
3105-3161 WALDROP DRIVE & 3106-3160 ROTAN LANE Streets and Transportation
Alley Reconstruction13
322,959$
3206-3232 ROTAN LANE & 3207-3233 WALDROP DRIVE Streets and Transportation
Alley Reconstruction13
188,871$
3207 - 3349 CITATION DR & 3208 - 3330 TIMBERVIEW RD
Streets and Transportation
Alley Reconstruction13
290,472$
3544 - 3638 AINSWORTH DR & 3615 - 3675 NORCROSS LN
Streets and Transportation
Alley Reconstruction13
311,175$
3610-3668 WEEBURN DR & 3623-3651 MIDPINES DR Streets and Transportation
Alley Reconstruction13
251,615$
5737-5763 CARUTH BLVD & 5708-5728 SURREY SQUARE LANE
Streets and Transportation
Alley Reconstruction13
150,651$
6407-6475 GLENDORA AVE & 6406-6474 MEADOW ROAD
Streets and Transportation
Alley Reconstruction13
317,545$
6421-6543 NORTHWOOD ROAD & 6426-6542 DELOACHE AVE
Streets and Transportation
Alley Reconstruction13
333,470$
6505-6635 MIMOSA LN & 6506-6630 LAKEHURST AVE Streets and Transportation
Alley Reconstruction13
309,901$
6607-6831 DESCO DRIVE & 6706-6838 PRESTONSHIRE LANE
Streets and Transportation
Alley Reconstruction13
426,790$
Aberdeen Ave from Edgemere Rd to Thackery St Streets and Transportation
Street Reconstruction Local Streets13
793,965$
Joyce Way from Thackery St to Hillcrest Rd Streets and Transportation
Street Reconstruction Local Streets13
852,674$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 57 of 87
Project Proposition DescriptionCouncil District Amount
Meadow Crest Dr from Inwood Road to Lamplighter Lane
Streets and Transportation
Street Reconstruction Local Streets13
778,586$
Mimosa Ln from Edgemere Rd to Hillcrest Rd Streets and Transportation
Street Reconstruction Local Streets13
1,562,892$
Webb Chapel Rd from Silverton Dr to Northaven Rd Streets and Transportation
Street Reconstruction Thoroughfares 13
3,018,832$
Bonham St from Midway Rd to End of Pavement Streets and Transportation
Street Resurfacing Local Streets13
294,397$
Charlestown Dr from Nuestra Dr to Preston Rd Streets and Transportation
Street Resurfacing Local Streets13
411,943$
Cochran Chapel Cir from Midway Rd to Cochran Chapel Cir
Streets and Transportation
Street Resurfacing Local Streets13
140,000$
Cromwell Dr from Whirlaway Rd to Flaxley Dr Streets and Transportation
Street Resurfacing Local Streets13
364,609$
Gooding Dr from Killion Dr to Merrell Rd Streets and Transportation
Street Resurfacing Local Streets13
261,332$
Jubilee Trl from Webb Chapel Rd to Marsh Ln Streets and Transportation
Street Resurfacing Local Streets13
830,643$
Kelsey Rd from Inwood Rd to Meaders Ln Streets and Transportation
Street Resurfacing Local Streets13
412,526$
Lamplighter Ln from Meadow Crest Dr to Del Roy Dr Streets and Transportation
Street Resurfacing Local Streets13
115,351$
Norcross Ln from Castlegate Dr to Marsh Ln Streets and Transportation
Street Resurfacing Local Streets13
246,754$
Northaven Rd from Marsh Ln to Cox Ln Streets and Transportation
Street Resurfacing Local Streets13
372,361$
Planters Glen Dr from Harvest Hill Rd to Sugar Mill Rd Streets and Transportation
Street Resurfacing Local Streets13
146,941$
Princess Ln from Marquis Ln to Marsh Ln Streets and Transportation
Street Resurfacing Local Streets13
448,095$
Regent Dr from Cromwell Dr to Lathrop Dr Streets and Transportation
Street Resurfacing Local Streets13
255,878$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 58 of 87
Project Proposition DescriptionCouncil District Amount
Satsuma Dr from Dennis Rd to Sundial Dr Streets and Transportation
Street Resurfacing Local Streets13
458,694$
Shady Oak Ln from End of Pavement to Timberview Rd Streets and Transportation
Street Resurfacing Local Streets13
110,000$
Silverton Dr from Caraway Dr to Webb Chapel Rd Streets and Transportation
Street Resurfacing Local Streets13
315,183$
St Croix Dr from End of Pavement to Dartmoor Dr Streets and Transportation
Street Resurfacing Local Streets13
312,199$
Stefani Dr from Hillcrest Rd to Boedeker St Streets and Transportation
Street Resurfacing Local Streets13
446,576$
Sundial Dr from Dennis Rd to Satsuma Dr Streets and Transportation
Street Resurfacing Local Streets13
404,637$
Tulip Ln from Camellia Dr to Thackery St Streets and Transportation
Street Resurfacing Local Streets13
580,150$
Vinecrest Dr from Cox Ln to End of Pavement Streets and Transportation
Street Resurfacing Local Streets13
231,525$
Waldorf Dr from Cromwell Dr to Lathrop Dr Streets and Transportation
Street Resurfacing Local Streets13
252,174$
Weeburn Dr from Marsh Ln to Cox Ln Streets and Transportation
Street Resurfacing Local Streets13
370,028$
Woodleigh Dr from Timber Trail Dr to Marsh Ln Streets and Transportation
Street Resurfacing Local Streets13
237,287$
Douglas Ave from Luther Ln to W Northwest Hwy Streets and Transportation
Street Resurfacing Thoroughfares13
267,403$
Harvest Hill Rd from Spurling Dr to Preston Rd Streets and Transportation
Street Resurfacing Thoroughfares13
321,940$
Hillcrest Rd from Park Ln to Walnut Hill Ln Streets and Transportation
Street Resurfacing Thoroughfares13
1,004,133$
Park Ln from Greenville Ave to Fair Oaks Ave Streets and Transportation
Street Resurfacing Thoroughfares13
558,541$
Park Ln from Hillcrest Rd to Sarah Nash Ct Streets and Transportation
Street Resurfacing Thoroughfares13
762,592$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 59 of 87
Project Proposition DescriptionCouncil District Amount
Royal Ln from Brockbank Dr to Coogan Dr Streets and Transportation
Street Resurfacing Thoroughfares13
455,127$
Royal Ln from Cromwell Dr to Marsh Ln Streets and Transportation
Street Resurfacing Thoroughfares13
742,321$
Sherry Ln from Douglas Ave to Preston Rd Streets and Transportation
Street Resurfacing Thoroughfares13
230,393$
W Lovers Ln from Menier St to Preston Park Dr Streets and Transportation
Street Resurfacing Thoroughfares13
317,995$
W University Blvd from Inwood Rd to Eastern Ave Streets and Transportation
Street Resurfacing Thoroughfares13
429,539$
Walnut Hill Ln from Strait Ln to Surrey Oaks Dr Streets and Transportation
Street Resurfacing Thoroughfares13
201,513$
Walnut Hill Ln from Thackery St to Hillcrest Rd Streets and Transportation
Street Resurfacing Thoroughfares13
470,356$
Walnut Hill Ln from Midway Rd to Crestline Ave Streets and Transportation
Street Resurfacing Thoroughfares13
498,036$
Walnut Hill Ln from Chireno St to Marsh Ln Streets and Transportation
Street Resurfacing Thoroughfares13
414,501$
Northwest Highway/Preston Parking/Transportation Interface Streets and
Transportation
Includes enhancements to parking, transportation access and a texas u-turn 13 10,000,000
5500-5552 LONGVIEW ST & 5503-5549 MCCOMMAS BLVD
Streets and Transportation
Alley Reconstruction14
240,786$
5601-5639 MORNINGSIDE AVE & 5602-5634 MCCOMMAS BLVD
Streets and Transportation
Alley Reconstruction14
205,751$
5703-5747 VANDERBILT AVE & 5710-5750 MARQUITA AVE
Streets and Transportation
Alley Reconstruction14
214,351$
6103-6129 MERCEDES AVE & 6100-6126 MORNINGSIDE AVE
Streets and Transportation
Alley Reconstruction14
138,548$
6139-6179 MONTICELLO AVE & 6202-6238 MERCEDES AVE
Streets and Transportation
Alley Reconstruction14
200,974$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 60 of 87
Project Proposition DescriptionCouncil District Amount
6201- 6333 BRYAN PKWY & 5808-5842 LIVE OAK ST Streets and Transportation
Alley Reconstruction14
223,906$
MC KINNEY AVE PEDESTRIAN SAFETY IMPROVEMENT Streets and Transportation
Sidewalk Improvements14
750,000$
Adair St from Cobb St to 500 Ft North Of Cobb St Streets and Transportation
Street Reconstruction Local Streets14
81,530$
Cobb St from Cobb St to Adair St Streets and Transportation
Street Reconstruction Local Streets14
110,305$
Concho St from Richmond Ave to Belmont Ave Streets and Transportation
Street Reconstruction Local Streets14
393,262$
Gilbert Ave from Oak Lawn Ave to Reagan St Streets and Transportation
Street Reconstruction Local Streets14
425,675$
Goodwin Ave from Laneri Ave to Glencoe St Streets and Transportation
Street Reconstruction Local Streets14
622,968$
Mccommas Blvd from Mcmillan Ave to Worcola St Streets and Transportation
Street Reconstruction Local Streets14
611,557$
Ridgedale Ave from Mcmillan Ave to Worcola St Streets and Transportation
Street Reconstruction Local Streets14
613,211$
San Jacinto St from N Pearl St to Crockett St Streets and Transportation
Street Reconstruction Local Streets14
423,691$
Willis Ave from Mcmillan Ave to Worcola St Streets and Transportation
Street Reconstruction Local Streets14
614,037$
Lemmon Ave from Douglas Ave to Wycliff Ave Streets and Transportation
Street Reconstruction Thoroughfares 14
1,144,230$
Lemmon Ave E from Lemmon Ave E to Oak Grove Ave Streets and Transportation
Street Reconstruction Thoroughfares 14
577,490$
Maple Ave from Mahon St to Cedar Springs Rd Streets and Transportation
Street Reconstruction Thoroughfares 14
547,557$
Maple Ave from Mckinney Ave to Mahon St Streets and Transportation
Street Reconstruction Thoroughfares 14
1,132,488$
Maple Ave from Randall St to Wolf St Streets and Transportation
Street Reconstruction Thoroughfares 14
489,841$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 61 of 87
Project Proposition DescriptionCouncil District Amount
N Fitzhugh Ave from Mckinney Ave to Cole Ave Streets and Transportation
Street Reconstruction Thoroughfares 14
956,033$
N Hall St from Ross Ave to Munger Blvd Streets and Transportation
Street Reconstruction Thoroughfares 14
765,799$
N Hall St from Munger Ave to Cochran St Streets and Transportation
Street Reconstruction Thoroughfares 14
359,856$
N Hall St from Cochran St to Central Expwy Srv Rd Streets and Transportation
Street Reconstruction Thoroughfares 14
516,797$
N Munger Blvd from Tremont St to Worth St Streets and Transportation
Street Reconstruction Thoroughfares 14
695,402$
N Munger Blvd from Worth St to Junius St Streets and Transportation
Street Reconstruction Thoroughfares 14
620,156$
N Munger Blvd from Junius St to Gaston Ave Streets and Transportation
Street Reconstruction Thoroughfares 14
848,539$
Alcott St from N Fitzhugh Ave to Lee St Streets and Transportation
Street Resurfacing Local Streets14
74,568$
Belmont Ave from Summit Ave to Greenville Ave Streets and Transportation
Street Resurfacing Local Streets14
111,304$
Belmont Ave from Matilda St to Skillman St Streets and Transportation
Street Resurfacing Local Streets14
465,382$
Concho St from Monticello Ave to Mercedes Ave Streets and Transportation
Street Resurfacing Local Streets14
58,790$
Concho St from Mccommas Blvd to Martel Ave Streets and Transportation
Street Resurfacing Local Streets14
104,546$
Cragmont Ave from Abbott Ave to Glenwood Ave Streets and Transportation
Street Resurfacing Local Streets14
135,041$
Douglas Ave from Wycliff Ave to Herschel Ave Streets and Transportation
Street Resurfacing Local Streets14
70,144$
Douglas Ave from Herschel Ave to Prescott Ave Streets and Transportation
Street Resurfacing Local Streets14
70,555$
Douglas Ave from Newton Ave to Wycliff Ave Streets and Transportation
Street Resurfacing Local Streets14
57,727$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 62 of 87
Project Proposition DescriptionCouncil District Amount
Gilbert Ave from Knight St to Douglas Ave Streets and Transportation
Street Resurfacing Local Streets14
88,082$
Hawthorne Ave from Bowser Ave to Holland Ave Streets and Transportation
Street Resurfacing Local Streets14
68,909$
Holland Ave from Turtle Creek Blvd to Bowser Ave Streets and Transportation
Street Resurfacing Local Streets14
106,399$
Holland Ave from Douglas Ave to Wycliff Ave Streets and Transportation
Street Resurfacing Local Streets14
107,393$
Junius St from N Munger Blvd to Dumas St Streets and Transportation
Street Resurfacing Local Streets14
69,217$
Ledge Stone Dr from Crestmont Dr to Abrams Rd Streets and Transportation
Street Resurfacing Local Streets14
329,691$
Llano Ave from Matilda St to Delmar Ave Streets and Transportation
Street Resurfacing Local Streets14
112,504$
Matilda St from Winton to Penrose Ave Streets and Transportation
Street Resurfacing Local Streets14
337,300$
Matilda St from Penrose Ave to Martel Ave Streets and Transportation
Street Resurfacing Local Streets14
80,811$
Matilda St from Martel Ave to Mccommas Blvd Streets and Transportation
Street Resurfacing Local Streets14
135,657$
Matilda St from Mccommas Blvd to Vanderbilt Ave Streets and Transportation
Street Resurfacing Local Streets14
437,047$
Matilda St from Vanderbilt Ave to Velasco Ave Streets and Transportation
Street Resurfacing Local Streets14
370,028$
Matilda St from Velasco Ave to Belmont Ave Streets and Transportation
Street Resurfacing Local Streets14
341,182$
Matilda St from Belmont Ave to Oram St Streets and Transportation
Street Resurfacing Local Streets14
305,000$
Matilda St from Oram St to Ross Ave Streets and Transportation
Street Resurfacing Local Streets14
263,493$
Merrimac Ave from Laneri Ave to Glencoe St Streets and Transportation
Street Resurfacing Local Streets14
129,894$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 63 of 87
Project Proposition DescriptionCouncil District Amount
Monticello Ave from Monticello Ave to Homer St Streets and Transportation
Street Resurfacing Local Streets14
111,269$
Morningside Ave from Worcola St to Greenville Ave Streets and Transportation
Street Resurfacing Local Streets14
107,016$
N Collett Ave from Reiger Ave to Victor St Streets and Transportation
Street Resurfacing Local Streets14
120,565$
N Hall St from Welborn St to Oak Lawn Ave Streets and Transportation
Street Resurfacing Local Streets14
86,710$
N Hall St from Oak Lawn Ave to Reagan St Streets and Transportation
Street Resurfacing Local Streets14
88,871$
Oak Grove Ave from N Hall St to Lemmon Ave Streets and Transportation
Street Resurfacing Local Streets14
123,171$
Palo Pinto Ave from Concho St to Skillman St Streets and Transportation
Street Resurfacing Local Streets14
131,163$
Prospect Ave from Matilda St to Delmar Ave Streets and Transportation
Street Resurfacing Local Streets14
130,957$
Reagan St from Lemmon Ave to Bowser Ave Streets and Transportation
Street Resurfacing Local Streets14
75,632$
Richmond Ave from Abrams Rd to Skillman St Streets and Transportation
Street Resurfacing Local Streets14
704,600$
Richmond Ave from Matilda St to Skillman St Streets and Transportation
Street Resurfacing Local Streets14
571,644$
Rock Creek Dr from Stonebridge Dr to Rock Creek Dr Streets and Transportation
Street Resurfacing Local Streets14
44,590$
Santa Fe Ave from Cordova St to Clermont Ave Streets and Transportation
Street Resurfacing Local Streets14
56,595$
Santa Fe Ave from Clermont Ave to Monte Vista Dr Streets and Transportation
Street Resurfacing Local Streets14
61,294$
Sevilla St from Valencia St to Cordova St Streets and Transportation
Street Resurfacing Local Streets14
39,376$
Skillman St from Gaston Ave to Swiss Ave Streets and Transportation
Street Resurfacing Local Streets14
100,156$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 64 of 87
Project Proposition DescriptionCouncil District Amount
State St from Routh St to Boll St Streets and Transportation
Street Resurfacing Local Streets14
76,215$
Willis Ave from Worcola St to Greenville Ave Streets and Transportation
Street Resurfacing Local Streets14
85,476$
Valencia St from Sevilla St to East Grand Ave Streets and Transportation
Street Resurfacing Local Streets14
112,504$
Vandelia St from Prescott Ave to Hawthorne Ave Streets and Transportation
Street Resurfacing Local Streets14
82,080$
Vickery Blvd from Laneri Ave to Glencoe St Streets and Transportation
Street Resurfacing Local Streets14
129,380$
Allen St from Mckinney Ave to Laclede St Streets and Transportation
Street Resurfacing Thoroughfares14
155,482$
Blackburn St from Turtle Creek Blvd to Travis St Streets and Transportation
Street Resurfacing Thoroughfares14
267,774$
Blackburn St from Turtle Creek Blvd to Oak Lawn Ave Streets and Transportation
Street Resurfacing Thoroughfares14
261,538$
Blackburn St from N Haskell Ave to Noble Ave Streets and Transportation
Street Resurfacing Thoroughfares14
168,962$
Cedar Springs Rd from Fairmount St to Routh St Streets and Transportation
Street Resurfacing Thoroughfares14
447,855$
Harry Hines Blvd from Moody St to N Field St Streets and Transportation
Street Resurfacing Thoroughfares14
73,471$
Lemmon Ave from Reagan St to Throckmorton St Streets and Transportation
Street Resurfacing Thoroughfares14
195,956$
Lemmon Ave from Lemmon Ave to Howell St Streets and Transportation
Street Resurfacing Thoroughfares14
98,990$
Lemmon Ave from Throckmorton St to Knight St Streets and Transportation
Street Resurfacing Thoroughfares14
236,876$
Lemmon Ave E from Noble Ave to Mckinney Ave Streets and Transportation
Street Resurfacing Thoroughfares14
98,613$
Maple Routh Conn from Thomas Ave to Mckinney Ave Streets and Transportation
Street Resurfacing Thoroughfares14
139,430$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 65 of 87
Project Proposition DescriptionCouncil District Amount
Mckinney Ave from Maple Routh Conn to Leonard St Streets and Transportation
Street Resurfacing Thoroughfares14
67,159$
Mckinney Ave from Boll St to Worthington St Streets and Transportation
Street Resurfacing Thoroughfares14
114,905$
Mckinney Ave from Worthington St to Allen St Streets and Transportation
Street Resurfacing Thoroughfares14
128,351$
Mckinney Ave from Allen St to Oak Grove Ave Streets and Transportation
Street Resurfacing Thoroughfares14
117,752$
Mckinney Ave from N Hall St to Lemmon Ave Streets and Transportation
Street Resurfacing Thoroughfares14
155,516$
Mckinney Ave from Fairmount St to Routh St Streets and Transportation
Street Resurfacing Thoroughfares14
116,345$
Mckinney Ave from Routh St to Boll St Streets and Transportation
Street Resurfacing Thoroughfares14
112,333$
N Fitzhugh Ave from Abbott Ave to Turtle Creek Bnd Streets and Transportation
Street Resurfacing Thoroughfares14
179,218$
N Hall St from Gaston Ave to Floyd St Streets and Transportation
Street Resurfacing Thoroughfares14
114,665$
N Hall St from Floyd St to Swiss Ave Streets and Transportation
Street Resurfacing Thoroughfares14
58,790$
N Munger Blvd from Gaston Ave to Live Oak Streets and Transportation
Street Resurfacing Thoroughfares14
620,165$
N. Hall St from Welborn St to Turtle Creek Blvd Streets and Transportation
Street Resurfacing Thoroughfares14
231,525$
Skillman St from Richmond Ave to Llano Ave Streets and Transportation
Street Resurfacing Thoroughfares14
654,770$
Turtle Creek Blvd from Turtle Creek Blvd to Turtle Creek Blvd
Streets and Transportation
Street Resurfacing Thoroughfares14
210,739$
Wycliff Ave from Holland Ave to Gilbert Ave Streets and Transportation
Street Resurfacing Thoroughfares14
77,175$
N PEARL ST / FLORA ST STREETSCAPE AND PEDESTRIAN IMPROVEMENTS (POSSIBLE MATCHING FUNDS)
Streets and Transportation
Streetscape / Urban Design14
1,000,000$
2017 Capital Bond Program - Proposition A: Streets and Transportation
Page 66 of 87
Project Proposition DescriptionCouncil District Amount
ROUTH ST GATEWAY STREETSCAPE AND PEDESTIAN IMPROVEMENTS (POSSIBLE MATCHING FUNDS)
Streets and Transportation
Streetscape / Urban Design14
250,000$
5701-5745 PALO PINTO AVE & 5702-5746 VELASCO AVE (ALLEY IMPROVEMENT)
Streets and Transportation
Target Neighborhood14
211,484$
WESTSHORE FROM SANTA FE TRAIL TO ALLEY NORTH OF CORONADO (NEW ROADWAY/DRAINAGE AND SIDEWALK)
Streets and Transportation
Target Neighborhood
14
918,750$
ABRAMS RD FROM GASTON AVE To S BEACON ST (COMPLETE STREET IMPROVEMENT INCLUDING BIKE LANES)
Streets and Transportation
Thoroughfares
14
3,750,000$
COLLETE AT TREMONT AND JUNIUS (PILOT PROJECT TO CONSTRUCT MINI-ROUNDABOUTS)
Streets and Transportation
Traffic Intersection Capacity & Safety Improvement 14
85,750$
COUNCIL DISTRICT 14 PEDESTRIAN SAFETY/CROSSWALK PROGRAM
Streets and Transportation
Traffic Intersection Capacity & Safety Improvement 14
150,000$
RICHMOND AVE AT SKILLMAN ST INTERSECTION IMPROVEMENTS (REMOVE CHANNELIZED/FREE RIGHT TURNS; INCLUDE NEW TRAFFIC SIGNAL)
Streets and Transportation
Traffic Intersection Capacity & Safety Improvement
14
350,000$
SW = System Wide Total $533,981,000
2017 Capital Bond Program - Proposition B: Parks and Recreation
Page 67 of 87
Project Proposition DescriptionCouncil District
Amount
Downtown Parks Parks and RecreationFunding to re-develop/develop three downtown parks: Carpenter Park, Harwood and the West End Plaza
2, 14 35,000,000$
Circuit Trail Parks and RecreationMatching funding for the Trinity Forest Spine Trail, Trinity Skyline Trail Link, Baker Pump Station Gateway and Circuit Trail Connection
2, 4, 5, 6, 7, 9 20,000,000$
Aquatics Master Plan Phase I Parks and Recreation
Supplemental funding for Phase 1 Aquatic Centers: Fretz Park RFAC, Samuell Grand Park RFAC, Crawford Park RFAC, Kidd Springs Park CFAC, Lake Highlands North Park CFAC and Tietze Park NFAC
1, 2, 5, 10, 11 11,000,000$
Aquatics Master Plan Phase 2A - Parks and RecreationNeighborhood Aquatics Centers at Exline and Improvements to Bahama Beach
3, 7 13,200,000$
Land Acquisition Parks and Recreation Land acquisition for future parks SW 2,200,000$
Lake Highlands Trails Parks and RecreationConnect Lake Highlands Trail Phase 1 to White Rock Creek Trail and from Lake Highlands HS to Watercrest Park
10 2,300,000$
Bachman Lake Skate Park Phase I Parks and Recreation Creation of a new major skate park in Dallas 6 4,000,000$
Garland Rd Sidewalk at the Arboretum Parks and RecreationSidewalk connection from E. Lawther to Gaston Pkwy
9 400,000$
White Rock Lake Trail Parks and RecreationCompletion of White Rock Lake Loop Trail Improvements to current trail standards from Bath House to Sunset Bay
9 3,500,000$
ADA - Code Compliance Parks and RecreationBring park amenities into compliance with ADA and other regulatory codes
SW 150,000$
Crawford Memorial Park Parks and RecreationPhase 1 development of signature park, includes creation of a lake and a reconstruction of southern loop trail
5 7,700,000$
Timberglen Trail Parks and RecreationTrail from Timberglen Park to Preston Ridge Trail
12 4,165,000$
2017 Capital Bond Program - Proposition B: Parks and Recreation
Page 68 of 87
Project Proposition DescriptionCouncil District
Amount
Flag Pole Hill Park Parks and Recreation Implement Phase 1 of the park master plan 10 400,000$
Flag Pole Hill Playground Parks and RecreationSupplemental funding for a playground which is under design
10 165,000$
Singing Hills Replacement Recreation Center Parks and RecreationSinging Hills Recreation Center Replacement - Gym addition and connection to the DART Station
8 8,000,000$
Bachman Rec Center Renovation Parks and Recreation Facility - interior renovation 6 3,900,000$
Willie B. Johnson Recreation Center Parks and RecreationAdd a senior addition to the existing recreation center
10 3,800,000$
Willie B. Johnson Recreation Center Parks and RecreationAdd a gym addition to the existing recreation center
10 7,800,000$
Thurgood Marshall Recreation Center Parks and RecreationThurgood Marshall Recreation Center - Interior renovation
3 1,400,000$
Midtown Park Parks and RecreationLand Acquisition and initial funding for the planning of Midtown Park located northwest of LBJ and Preston Road
11 6,000,000$
White Rock Lake Park - Stone Tables Parks and RecreationMatch funding for restoration of the historic stone tables, ADA accessible parking and additional improvements
9 280,000$
Dallas Zoo Parks and RecreationCritical Parking Enhancement and Improvements
4 3,500,000$
Dallas Arboretum Parks and RecreationFunding to construct additional restrooms to accommodate increase visitors
9 1,000,000$
Southern Gateway Public Green Parks and RecreationMatch funding for the structural accommodation of a deck park at I-35 and Ewing
1, 4 7,100,000$
Kleberg Trail Parks and RecreationLinear Trail - From Buckner DART Station to Crawford Memorial Park
5 1,200,000$
Northaven Trail Parks and RecreationConnection of Northaven Trail west of US Hwy 75 to White Rock Creek Greenbelt Trail. Also includes amenities to enhance the trail head
11 2,615,000$
2017 Capital Bond Program - Proposition B: Parks and Recreation
Page 69 of 87
Project Proposition DescriptionCouncil District
Amount
Partnership Land Acquisition and Match Funding
Parks and RecreationLand acquisition for future parks and partnership match funding
SW 5,000,000$
Dallas Water Gardens Parks and Recreation Match funding for a new water garden park 2 7,500,000$
Klyde Warren Park Parks and RecreationMatch funding for the expansion of Klyde Warren Park
14 10,000,000$
Roofing and waterproofing improvements at five recreation centers
Parks and RecreationIncludes Fretz Park, Harry Stone, Hattie R. Moore, K.B. Polk, and Umphress Recreation Centers
SW 1,600,000$
HVAC, Plumbing, Electrical and Mechanical improvements at six facilities
Parks and Recreation
Includes Grover C. Keeton Golf Course, and Martin L. King, Jr., Mildred Dunn, Pike, Ridgewood / Belcher, and Tommie Allen Recreation Centers
SW 700,000$
Kidd Springs Park Parks and RecreationNatural spring daylighting, erosion control, landscaping, lake de-silting, and Japanese Garden Restoration Phase I
1 1,600,000$
Coombs Creek Trail Parks and Recreation Hampton/Davis to Moss Park 1 2,000,000$ Elmwood Pkwy Trail Parks and Recreation Elmwood Parkway to Polk to Gannon Park 1 2,000,000$ Martin Weiss Park Parks and Recreation Loop Trail Extension to Greenbelt 1 1,300,000$ Westmount Park - Site development Parks and Recreation Site development 1 200,000$
Maria Luna Park Parks and RecreationDog park, basketball court, pavilion restoration, walking trail and soccer field
2 1,115,000$
Monarch Park Parks and RecreationPlayground replacement, parking and ADA improvements
2 250,000$
Grauwyler Park Parks and Recreation Sprayground 2 2,000,000$ Samuell Grand Park Parks and Recreation Shade Structure at playground 2 150,000$
K. B. Polk Park Parks and RecreationSprayground, walking trail, playground and shade pavilion
2 2,000,000$
Land Acquisition Parks and Recreation Land acquisition for the Cedars 2 500,000$ Phase I site development for new park in the Cedars
Parks and Recreation Development of a new park in the Cedars 2 500,000$
2017 Capital Bond Program - Proposition B: Parks and Recreation
Page 70 of 87
Project Proposition DescriptionCouncil District
Amount
Neighborhood Park - Site development (location TBD)
Parks and Recreation Site development (location TBD) 2 1,085,000$
Bachman Lake Park Parks and Recreation Regional Family Aquatic Center Phase I 2 2,500,000$ Emerald Lake Park Parks and Recreation Dam safety and erosion control 3 2,075,000$ Twin Falls Parks and Recreation Parking lot 3 200,000$ Thurgood Marshall Recreation Center Parks and Recreation Supplemental funding for renovation 3 200,000$ Glendale Park Parks and Recreation Parking and lighting 3 400,000$ Sharrock Niblo Park Parks and Recreation Historic barn restoration 3 725,000$
Singing Hills Replacement Recreation Center Parks and RecreationSenior Addition - Supplemental Funding (with CD 8)
3 1,000,000$
Bonnie View Park Parks and Recreation Playground expansion 4 150,000$ Eloise Lundy Parks and Recreation Playground expansion 4 150,000$ Land Acquisition Parks and Recreation Land Acquisition for future sites 4 400,000$ Cummings Park Parks and Recreation Parking lot (rear) renovation and walking trail 4 350,000$ Cummings Park Parks and Recreation Walking loop tail - 6' wide - 1/4 mi. new 4 150,000$ Derek L. Geter (Scotland) Park Parks and Recreation Park furnishings 4 60,000$ Beckley Saner Park Parks and Recreation Renovate backstop at two softball fields 4 400,000$ West Trinity Heights Park Parks and Recreation Develop Master Plan 4 40,000$ Herndon Park Parks and Recreation Playground expansion 4 150,000$ Kiest Park Parks and Recreation Memorial Tree Grove Phase I 4 250,000$ Devon Anderson Park Parks and Recreation Playground equipment 5 100,000$ Guard Dr. Park Parks and Recreation Site development - Phase 2 5 600,000$ Bitter Creek Park Parks and Recreation Creek bank stabilization 5 273,000$ Bisbee Park Parks and Recreation Parking lot, clearing and signage 5 150,000$ Land acquisition Parks and Recreation Football complex 5 3,300,000$
Holcomb Park Parks and RecreationWalking trail, park furnishings, drinking fountain and facility enclosure
5 400,000$
Pleasant Oaks Park Parks and Recreation Walkways and security lighting 5 150,000$ Glover Park Parks and Recreation Parking lot, lighting, land acquisition 5 127,000$ Brownwood Park Parks and Recreation Erosion control 6 400,000$ Brownwood Park Parks and Recreation Soccer field 6 200,000$ Overlake Park Parks and Recreation Bleachers 6 50,000$
2017 Capital Bond Program - Proposition B: Parks and Recreation
Page 71 of 87
Project Proposition DescriptionCouncil District
Amount
Jaycee Zaragoza Park Parks and Recreation Sprayground 6 1,885,000$ Nash Davis Park Parks and Recreation Sprayground 6 2,000,000$
Frances Rizo Park Parks and RecreationPlayground replacement, ADA drinking fountain (with dog fountain) and park furnishings
6 250,000$
Stafford Park - Playground and park furnishings
Parks and Recreation Playground and park furnishings 6 220,000$
Hattie R. Moore Park Parks and Recreation Master Plan and Phase I implementation 6 350,000$ Nash Davis Park Parks and Recreation Master Plan 6 40,000$ Arcadia Park Parks and Recreation Lighting at outdoor basketball gym 6 30,000$ Bachman Lake Park Parks and Recreation Regional Family Aquatic Center Phase I 6 3,500,000$ Pueblo Park Parks and Recreation Park furnishings package and drinking fountain 6 40,000$ Tipton Park Parks and Recreation Picnic pavilion and water fountain 6 300,000$ Bishop Flores Park Parks and Recreation Connecting walkway to neighborhood 6 775,000$ Eladio Martinez Park Parks and Recreation Park furnishings, fencing and drinking fountain 6 60,000$ Everglade Park Parks and Recreation Exercise stations at loop trail 7 150,000$ J. J. Craft Park Parks and Recreation Historic bench restoration 7 10,000$ Martin Luther King Jr. Park Parks and Recreation Playground replacement 7 250,000$ Martin Luther King Jr. Recreation Center Parks and Recreation Gym floor cover 7 12,155$ Ferguson Park Parks and Recreation Portable toilet enclosure 7 70,000$ Hillview Park Parks and Recreation Site improvements 7 661,845$ Juanita J. Craft Park Parks and Recreation ADA drinking fountain 7 11,000$
Parkdale Park Parks and RecreationADA drinking fountain and portable facility enclosure
7 75,500$
Sand Springs Park Parks and RecreationADA drinking fountain, park furnishings and signage
7 42,000$
Wahoo Park Parks and Recreation New basketball court and ADA drinking fountain 7 85,500$
Wheatley Park Parks and RecreationADA drinking fountain, park furnishings and sidewalk replacement
7 70,000$
Willie Mae Butler Park Parks and RecreationConvert tennis court to basketball, ADA drinking fountain, park furnishings and portable facility enclosure
7 162,000$
Willoughby Park Parks and Recreation Playground replacement 8 200,000$
2017 Capital Bond Program - Proposition B: Parks and Recreation
Page 72 of 87
Project Proposition DescriptionCouncil District
Amount
Danieldale Park Parks and Recreation Playground replacement (at end of life) 8 220,000$
Singing Hills Park (new) Parks and RecreationSupplemental funding for Recreation Center plaza development
8 200,000$
Singing Hills Replacement Recreation Center Parks and RecreationSupplemental funding for technology and senior center addition
8 3,000,000$
Kleberg-Rylie Park Parks and Recreation Sprayground 8 1,480,000$ White Rock Hills Park Parks and Recreation Site development (Phase II) 9 200,000$ Casa Linda Park Parks and Recreation Picnic pavilion and basketball 9 460,000$ Casa View Park Parks and Recreation Walking trail 9 400,000$ Cotillion Park Parks and Recreation Player bench enclosure and security lighting 9 74,493$ Dixon Branch Greenbelt Parks and Recreation Park furnishings 9 65,507$
Lakewood Park Parks and RecreationBasketball renovation, pedestrian bridge, ADA parking, park furnishings and drinking fountain
9 415,000$
Ridgewood Park Parks and Recreation Sidewalk along Fisher Rd 9 250,000$
Lochwood Park Parks and RecreationField grading and irrigation, parking furnishings and ADA drinking fountain
9 165,000$
Harry Stone Park Parks and Recreation Neighborhood family aquatic center 9 6,200,000$
Friendship Park Parks and RecreationSite development, security lights, walking trail, exercise stations and picnic pavilion
10 600,000$
Hamilton Park Parks and Recreation Parking lot expansion at Recreation Center 10 223,000$
Flag Pole Hill Park Parks and Recreation Historic restoration - pavilion 10 200,000$
McCree Park Parks and RecreationPortable facility enclosure, park furnishings and parking lot lighting
10 200,000$
R.P. Brooks Park Parks and Recreation Walking trail 10 300,000$ Timberleaf Park Parks and Recreation New playground 10 260,000$
Flag Pole Hill Park Parks and RecreationSupplemental funding for Master Plan Implementation
10 1,100,000$
Flag Pole Hill Park Parks and RecreationPayground Replacement (Supplemental Funding)
10 135,000$
Lake Highland North Park Parks and RecreationSite development and recreation center improvements
10 400,000$
2017 Capital Bond Program - Proposition B: Parks and Recreation
Page 73 of 87
Project Proposition DescriptionCouncil District
Amount
B. B. Owen Park Parks and Recreation Site development 10 250,000$ KCS Corridor Connection Trail Parks and Recreation Trail Design 10 300,000$ Lake Highlands Trails Parks and Recreation Supplemental funding 10 500,000$ Land acquisition Parks and Recreation (to match $1M from System-wide Allowance) 10 1,000,000$
Site - TBD Parks and RecreationSpraygrounds or other recreational amenity (TBD)
10 332,000$
Anderson Bonner Park Parks and RecreationCreek bank stabilization, playground and soccer field renovation
11 500,000$
Anderson Bonner Park Parks and Recreation New playground 11 220,000$
Anderson Bonner Park Parks and RecreationRenovate Soccer Field #3 with lights and bleachers
11 500,000$
Churchill Recreation Center Parks and Recreation Major maintenance and HVAC 11 250,000$ Cottonwood Park Parks and Recreation Playground equipment 11 150,000$ Fretz Park Parks and Recreation Parking lot expansion and playground 11 650,000$ Fretz Park Recreation Center Parks and Recreation Acoustical treatment 11 95,000$ Kiowa Parkway Parks and Recreation Pedestrian bridge 11 350,000$
Land Acquisition Parks and RecreationFor development of a neighborhood/community park
11 4,000,000$
Land acquisition Parks and Recreation TBD 11 1,600,000$ Northaven Trail Parks and Recreation Supplemental funding for bridge at I-75 11 385,000$ Wagging Tail Dog Park Parks and Recreation New parking area 11 400,000$
Moss Glen Park Parks and RecreationPhase II site development - playground and pond improvements
12 1,400,000$
Forston Park Parks and Recreation New park with furnishings 12 220,000$
Shadybank Park Parks and RecreationTrail connection with low water crossing at Kiowas Branch
12 700,000$
Campbell Green Park Parks and Recreation Site improvements 12 900,000$
Timberglen Park Parks and RecreationSoftball outfield fence, sprayground and pavilion
12 2,600,000$
Timberglen Trail Parks and Recreation Supplemental funding 12 6,500,000$ Bentwood Park Parks and Recreation Tennis court benches and park furnishings 12 50,000$ Frankford Park Parks and Recreation Park furnishings 12 32,000$
2017 Capital Bond Program - Proposition B: Parks and Recreation
Page 74 of 87
Project Proposition DescriptionCouncil District
Amount
Timberglen Trail Parks and Recreation Supplemental Funding 12 500,000$ Twin Lakes Park Parks and Recreation Park furnishings 12 50,000$
Barry Barker Park Parks and RecreationPavilion, park furnishings, ADA drinking fountain and lighting
12 650,000$
Preston Green Park Parks and Recreation Park furnishings and ADA drinking fountain 12 100,000$
Rose Haggar Park Parks and Recreation Walking trail and park furnishings 12 400,000$ Glen Meadow Park Parks and Recreation Playground replacement 13 220,000$ Marcus Park Park Parks and Recreation Playground replacement 13 200,000$ Jamestown Park Parks and Recreation Playground equipment and park furnishings 13 200,000$ Walnut Hill Park Parks and Recreation Basketball court and softball field renovations 13 390,000$
Bluffview Park Parks and RecreationPlayground expansion, shade structure and site development
13 350,000$
Vickery Meadows Parks and Recreation Playground at Library site 13 240,000$
Lindsley Park Parks and RecreationSidewalk extension and playground replacement
14 415,000$
Oak Lawn Park (Arlington Hall) Parks and Recreation Historic restroom renovation 14 200,000$
Tietze Park Parks and RecreationADA parking, site improvements and shade structure
14 200,000$
Munger Park Parks and Recreation Shade structure 14 100,000$ Craddock Park Parks and Recreation Playground expansion 14 200,000$ Junius Gateway Parks and Recreation Park furnishings 14 15,000$ Randall Park Parks and Recreation Historic pavilion restoration 14 250,000$ Central Square Park Parks and Recreation Playground replacement 14 220,000$ SW = System Wide Total 261,807,000$
2017 Capital Bond Program - Proposition C: Fair Park
Page 75 of 87
Project Proposition Description Council District Amount
African American MuseumFair Park
Resolve water intrusion; repair interior finishes; flush condenser water system; complete mechanical and electrical repairs
SW$2,000,000
Hall of State
Fair Park
Hall of State - Cleaning/restoration of exterior wall; plaza restoration; exterior drainage and lighting; roof repairs; repair or replace exterior doors and windows; other architectural interior and exterior repairs; repair sump pump; other plumbing repairs; address dehumidification issues; replace heaters and other mechanical repairs; electrical repairs; elevator; ADA; and other necessary repairs
SW
$14,410,000
Music Hall
Fair Park
Music Hall - Elevator, replace old plumbing pipes, security, ADA improvements; electrical, exterior lighting, paving replacement/repairs, and other necessary repairs
SW
$4,300,000Texas Discovery Garden cooling tower and pump replacement Fair Park Replace chiller at the facility SW $300,000
Food and Fiber Building Fair ParkStructural stabilization; repair damaged finishes; and other necessary repairs SW $1,500,000
ColiseumFair Park
Water infiltration repairs; flooring; plumbing; electrical/mechanical; restrooms; and other necessary repairs
SW$9,500,000
Tower BuildingFair Park
Water infiltration repairs; interior renovation; plumbing; mechanical/electrical; and other necessary repairs
SW$3,500,000
Centennial BuildingFair Park
Roof repair; interior, exterior; electrical/mechanical; mural and base relief conservation; and other necessary repairs
SW$4,400,000
2017 Capital Bond Program - Proposition C: Fair Park
Page 76 of 87
Project Proposition Description Council District Amount
Pan American Complex
Fair Park
Poultry - Exterior restoration, repair interior doors; Sheep and Goat: Renovation of concrete columns and stucco; Police Mounted Unit - repair concrete, stucco, doors, columns, ventilation for electrical and elevator rooms: Arena roof and louver; and other necessary repairs
SW
$3,480,000
Science Place 1 - Phase I
Fair Park
Water infiltration repairs; conduct mold testing; replace plumbing fixtures and water heater; replace aged mechanical equipment; security equipment; and other necessary repairs
SW
$5,110,000
Aquarium Annex
Fair Park
Roof repairs and complete façade repairs; replace some interior finishes; replace plumbing fixtures; upgrade fire alarm system; provide new security and telecom systems, and other necessary repairs
SW
$600,000
Magnolia LoungeFair Park
Roof replacement; repair façade; minor interior work; replace heat pumps and FCUs; replace interior lighting; install security system
SW$900,000
SW = System Wide Total 50,000,000$
2017 Capital Bond Program - Proposition D: Flood Control and Storm Drainage
Page 77 of 87
Project Proposition DescriptionCouncil District Amount
Turtle Creek - Trib 1 Culvert (Joint NCTCOG project) Flood Control and Storm Drainage Flood Management SW $250,000Misc Public erosion control Flood Control and Storm Drainage Erosion Control SW $310,000Wynnewood Village Drainage Improvements* (partial funding) Flood Control and Storm Drainage
Storm Drainage1 1,727,000
Lake Cliff at Colorado Blvd H&H study Flood Control and Storm Drainage
Flood Management1
$59,000Kidd Springs Detention study Flood Control and Storm Drainage Flood Management 1 $89,000Coombs Creek - Hampton to Davis Flood Control and Storm Drainage Erosion Control 1 $2,625,000Gilford - Roanoke Area Relief System - Phase II, Brookhollow Bridge Flood Control and Storm Drainage
Storm Drainage2 $1,640,000
Junius Street @ Baylor University Medical Center Flood Control and Storm Drainage
Flood Management2 $820,000
Munger, 1301 N Flood Control and Storm Drainage Storm Drainage 2 $40,000Putting Green, 6521, 6629, 6637, 6729 Flood Control and Storm Drainage
Erosion Control3 $800,000
Deep Hill Circle, 2625, 2641, 2663, 2667, 2687, 2691 Flood Control and Storm Drainage
Erosion Control3 $1,370,000
Shady Hollow Ct. 3300 Blk & Boulder Drive 4120, 4207 Flood Control and Storm Drainage
Erosion Control3 $1,700,000
Sorcey Road @ White Ash Flood Control and Storm Drainage Storm Drainage 3 $65,000Kiesthill Drive 3335: private erosion control Flood Control and Storm Drainage
Erosion Control3 $300,000
Talbot Parkway, 6760: Private erosion control Flood Control and Storm Drainage
Erosion Control3 $365,000
Kings Branch Culvert @ Georgia Flood Control and Storm Drainage Flood Management 4 $200,000Morning Dew Circle 3844 (RL Area 39) Flood Control and Storm Drainage
Storm Drainage4 $135,000
Kings Branch Culvert @ Edgemont Flood Control and Storm Drainage Flood Management 4 $173,000Kings Branch Culvert @ Woodin Flood Control and Storm Drainage Flood Management 4 $212,000Kings Branch Culvert @ Stella Flood Control and Storm Drainage Flood Management 4 $190,000Kings Branch Culvert @ Louisiana Flood Control and Storm Drainage Flood Management 4 $370,000
2017 Capital Bond Program - Proposition D: Flood Control and Storm Drainage
Page 78 of 87
Project Proposition DescriptionCouncil District Amount
Kings Branch Culvert @ Denley Flood Control and Storm Drainage Flood Management 4 $480,000Kings Branch @ Genoa Flood Control and Storm Drainage Flood Management 4 $260,000Pentagon Parkway W. 1122 Flood Control and Storm Drainage Erosion Control 4 $480,000Prairie Oak Drive 9321 (RL Area 33) Flood Control and Storm Drainage Storm Drainage 5 $425,000Greendale 1721, 1716 Flood Control and Storm Drainage Storm Drainage 5 $105,000Oak Creek Circle 3504 & 3508 RL Voluntary Purchase Flood Control and Storm Drainage
Flood Management5 $170,000
Urban 3100 Private Erosion Control Flood Control and Storm Drainage Flood Management 5 $250,000Loganwood 3602 Flood Control and Storm Drainage Storm Drainage 5 $256,000Prairie Creek Channel & Bridge Improvement @ 175 Flood Control and Storm Drainage
Flood Management5 $1,217,000
Hatfield Branch @ Seagoville Channel improvements Flood Control and Storm Drainage
Flood Management5 $487,000
Lake June @ St. Augustine Flood Control and Storm Drainage Flood Management 5 $721,000Milverton @ Palisade Flood Control and Storm Drainage Storm Drainage 5 $870,000Hampton Gate Flood Control and Storm Drainage Flood Management 6 $500,000Lively Lane 3808 Flood Control and Storm Drainage Storm Drainage 6 $80,000Hearne @ Commerce Flood Control and Storm Drainage Storm Drainage 6 $246,000Joe's Creek Channel - W Fork to Willowbrook Flood Control and Storm Drainage
Flood Management6 $470,000
Turnpike Distribution IV - IH30 to Commerce Flood Control and Storm Drainage
Storm Drainage6 $224,000
Chalk Hill Branch -I30/Loop 12 Flood Control and Storm Drainage Flood Management 6 $780,000Fort Worth at Villbig Flood Control and Storm Drainage Storm Drainage 6 $200,000Hollow Ridge 4804 Flood Control and Storm Drainage Storm Drainage 7 $350,000Abshire Lane, 1916 Flood Control and Storm Drainage Storm Drainage 7 $945,000Parkdale Bridge @White Rock Creek Tributary Flood Control and Storm Drainage
Erosion Control7 $97,000
Cypress Branch Culvert @ Jennie Lee Flood Control and Storm Drainage Flood Management 7 $183,000Highland Rd. 2447 Flood Control and Storm Drainage Erosion Control 7 $195,000El Cerrito, 2470 Flood Control and Storm Drainage Storm Drainage 7 $200,000El Cerrito 2420, 2460, 2522 Flood Control and Storm Drainage Erosion Control 7 $528,000
2017 Capital Bond Program - Proposition D: Flood Control and Storm Drainage
Page 79 of 87
Project Proposition DescriptionCouncil District Amount
Bonnie View over Five Mile Creek Flood Control and Storm Drainage Erosion Control 8 $645,000Nandina - Pine Trail Area Flood Control and Storm Drainage Storm Drainage 8 $910,000Pruitt Branch Tributary Culvert Imprv @ Kingsfield Flood Control and Storm Drainage
Flood Management8 $420,000
Greenspan - Kirnwood Area Flood Control and Storm Drainage Storm Drainage 8 $525,000Clearbrook Lane 10500 Blk Flood Control and Storm Drainage Erosion Control 9 $150,000Vinemont Channel Flood Control and Storm Drainage Flood Management 9 $5,600,000Hillside Drive, 3604 Flood Control and Storm Drainage Erosion Control 9 $150,000Oates Drive 1407 Flood Control and Storm Drainage Erosion Control 9 $190,000Meadowcliff 10720, 10726 Flood Control and Storm Drainage Erosion Control 10 $853,000Clubcreek Circle 8903, 8907, 8911 Flood Control and Storm Drainage Erosion Control 10 $877,000Forest Ridge 9700 Block-Chiswell 9600 Block Flood Control and Storm Drainage
Storm Drainage10 $1,700,000
Brittania Way, 8470-8506, Erosion Control Pilot Flood Control and Storm Drainage
Erosion Control10 $270,000
Lake Highlands Town Center, Dredge Project Flood Control and Storm Drainage
Flood Management10 $800,000
Discretionary Unallocated Flood Control and Storm Drainage 10 $1,000,000Hughes Lane @ Kalani Place Flood Control and Storm Drainage Storm Drainage 11 $800,000Royal Lane 7012 Flood Control and Storm Drainage Storm Drainage 11 $1,050,000Teakwood-Elmridge Drainage Relief Flood Control and Storm Drainage Storm Drainage 11 $650,000Stedman Cir 17309 & 17315 Flood Control and Storm Drainage Erosion Control 12 $300,000Riverhill Drive, 17418 Flood Control and Storm Drainage Erosion Control 12 $188,000Tree Shadow Trail, 5910 Flood Control and Storm Drainage Storm Drainage 12 $914,000Brushy Creek Trail, 5719 Flood Control and Storm Drainage Erosion Control 12 $315,000Creek Bend Road 7028 Flood Control and Storm Drainage Storm Drainage 12 $82,000Meandering Way 16209 Flood Control and Storm Drainage Storm Drainage 12 $74,000Claren Court 7106, 7110, 7114 Flood Control and Storm Drainage Erosion Control 12 $173,000Nedra Way, 15821, 15827 Flood Control and Storm Drainage Erosion Control 12 $145,000Baymar Lane, 6201 Flood Control and Storm Drainage Erosion Control 12 $200,000Country Brook Pond Improvements Flood Control and Storm Drainage Flood Management 12 $110,000Royal Lane 3162 (RL Area 7) Flood Control and Storm Drainage Storm Drainage 13 $220,000
2017 Capital Bond Program - Proposition D: Flood Control and Storm Drainage
Page 80 of 87
Project Proposition DescriptionCouncil District Amount
Rexford Drive @ Shorecrest Drive Flood Control and Storm Drainage Storm Drainage 13 $168,000Betty Jane, 10225 Flood Control and Storm Drainage Erosion Control 13 $197,000Joe's Creek - TXU ROW and 3900 Block Vinecrest Flood Control and Storm Drainage
Erosion Control13 $350,000
Preston Hollow Channel, Phases 1 & 2, Desco Drainage Flood Control and Storm Drainage
Flood Management13 $1,859,000
Versailles, 3500 Flood Control and Storm Drainage Storm Drainage 13 $206,000Munger, 1300 Flood Control and Storm Drainage Storm Drainage 14 $40,000State-Thomas - Hallsville/Worthington Flood Control and Storm Drainage Storm Drainage 14 $636,000Alderson 3700 Flood Control and Storm Drainage Storm Drainage 14 $1,188,000State-Thomas - Flora/Boll to Fairmount Flood Control and Storm Drainage Storm Drainage 14 $495,000Homer Street 3215 Flood Control and Storm Drainage Storm Drainage 14 $141,000SW = System Wide Total $48,750,000
2017 Capital Bond Program - Proposition E: Library Facilities
Page 81 of 87
Project Proposition Description Council District Amount
Vickery Meadow Branch Library Library FacilitiesConstruct a new branch library in the Vickery Meadow neighborhood at 8255 Park Lane 13 $7,700,000
Forest Green Branch Library Library FacilitiesReplace the existing Forest Green Branch Library with a new facility located at 3728 High Vista Dr 10 $7,790,000
J. Erik Jonnson Central Library Library Facilities Roofing and plumbing improvements 2 $99,000SW = System Wide Total $15,589,000
2017 Capital Bond Program - Proposition F: Cultural and Performing Arts Facilities
Page 82 of 87
Project Proposition DescriptionCouncil District Amount
Bath House Cultural Center Cultural and Performing ArtsADA restrooms; plumbing improvements; kitchen/interior renovations 9 $1,500,000
Dallas Heritage VillageCultural and Performing Arts
Refurbishment and renovation of historic house, including roofing and security improvements
2$250,000
Dallas Museum of ArtCultural and Performing Arts
Waterproofing; exterior building drainage; fire alarm panel replacement; mechanical for server room and building controls
14$6,000,000
Kalita Humphreys TheaterCultural and Performing Arts
Electrical improvements; repair access to rooftop due to water damage; repair water infiltration leaks; repair/replace roof-top chiller and ductwork 14 $525,000
Meyerson Symphony Center
Cultural and Performing Arts
Address water infiltration (upper and mid roof; seal conoid windows); update lighting/mechanical/acoustic controls systems; passenger elevator enhancements
14
$3,800,000Oak Cliff Cultural Center Cultural and Performing Arts Replace HVAC system 1 $110,000
Sammons Center
Cultural and Performing Arts
Erosion control at Robert E. Cullum entrance; repave and re-landscape; upgrade building security and fire systems, including security cameras and improved exterior lighting 2 $900,000
Dallas Black Dance Theatre Cultural and Performing Arts Façade repair and roofing 14 $900,000
South Dallas Cultural Center Cultural and Performing ArtsWaterproofing and exterior restoration (windows, doors, and cracks) 7 $250,000
SW = System Wide Total 14,235,000$
2017 Capital Bond Program - Proposition G: Public Safety Facilities
Page 83 of 87
Project Proposition DescriptionCouncil District Amount
Fire Rescue Training Center Public Safety FacilitiesRepair/replace site pole lights and bases; new LED lighting; complete re-wire 2 $150,000
Fire Station #36 ReplacementPublic Safety Facilities
Replace Fire Station currently located at 3241 N. Hampton Rd.
6$6,990,000
Fire Station #46 Replacement Public Safety FacilitiesReplace Fire Station currently located at at 331 E. Camp Wisdom Rd 3 $7,525,000
Future fire station - Jim Miller & Loop 12 Public Safety Facilities New Fire Station at Jim Miller and Loop 12 8 $6,900,000
Fire Station Renovations
Public Safety Facilities
Waterproofing, HVAC, Plumbing, Electrical and Mechanical at 12 Fire Stations (5, 8, 9, 11, 12, 13, 18, 24, 25, 43, 51, 53), Training Center, and the Life Safety & Professional Standards Bureau
SW
$1,222,000
Fire Station Interior Renovations Public Safety FacilitiesInterior renovation (kitchens, showers, and living quarters) at 15 fire stations
SW $1,125,000
Jack Evans Police Headquarters Public Safety FacilitiesSecurity Enhancements at Jack Evans Police Headquarters 2 $1,250,000
Central Patrol Station Public Safety Facilities Security Enhancements at the Central Patrol Station 2 $593,000
Northeast Patrol StationPublic Safety Facilities
Security Enhancements at the Northeast Patrol Station 10 $1,075,000
Northwest Patrol StationPublic Safety Facilities
Security Enhancements at the Northwest Patrol Station 6 $775,000
North Central Patrol Station Public Safety FacilitiesSecurity Enhancements at the North Central Patrol Station 12 $750,000
Southeast Patrol Station Public Safety FacilitiesSecurity Enhancements at the Southeast Patrol Station 5 $775,000
South Central Patrol Station Public Safety FacilitiesSecurity Enhancements at the South Central Patrol Station 8 $775,000
Southwest Patrol Station Public Safety FacilitiesSecurity Enhancements at the Southwest Patrol Station 3 $775,000
Central Patrol Station Electrical Public Safety Facilities Electrical Improvements 2 $151,000Southwest Patrol Station Parking Public Safety Facilities Parking Lot Expansion 3 $1,250,000SW = System Wide Total 32,081,000$
2017 Capital Bond Program - Proposition H: City Facilities
Page 84 of 87
Project Proposition DescriptionCouncil District Amount
Mosquito abatement equipment and supply storage building City Facilities
New 2,000 SF storage facility to eliminate need for mosquito abatement crews in NE Dallas to travel to SW Dallas for supplies
10$325,000
Waterproofing, HVAC, Plumbing, Electrical and Mechanical improvements at nine facilities
City FacilitiesWaterproofing, HVAC, Plumbing, Electrical and Mechanical improvements at nine facilities
SW
$1,802,000
City Hall City Facilities
Waterproofing, electrical, restroom accessibility improvements
2$7,000,000
Oak Cliff Municipal Center Renovation, Phase 1 City Facilities Interior Renovations 1 $2,000,000West Dallas Multipurpose Center Expansion and electrical improvements City Facilities
8,000 SF expansion for additional services; space for lease to partners and Community Court; replace electrical panels
6$2,500,000
Electrical panel replacements City Facilities Replacement of electrical panels at 37 facilities SW $1,300,000Unspecified accessibility improvements City Facilities Improvements at facilities to meet ADA Compliance SW $3,230,000SW = System Wide Total 18,157,000$
2017 Capital Bond Program - Proposition I: Economic Development
Page 85 of 87
Project Proposition DescriptionCouncil District Amount
Economic Development Funding Economic Development
Funding to facilitate the revitalization of commercial corridors, transit oriented development, mixed income housing, mixed use development and neighborhood revitalization
SW
5,500,000
Economic Development Funding Economic Development
Funding to facilitate the revitalization of commercial corridors, transit oriented development, mixed income housing, mixed use development and neighborhood revitalization
1
3,000,000
Economic Development Funding Economic Development
g corridors, transit oriented development, mixed income housing, mixed use development and
2500,000
Economic Development Funding Economic Development
Funding to facilitate the revitalization of commercial corridors, transit oriented development, mixed income housing, mixed use development and neighborhood revitalization
3
5,400,000
Economic Development Funding Economic Development
Funding to facilitate the revitalization of commercial corridors, transit oriented development, mixed income housing, mixed use development and neighborhood revitalization
4
10,000,000
Economic Development Funding Economic Development
Funding to facilitate the revitalization of commercial corridors, transit oriented development, mixed income housing, mixed use development and neighborhood revitalization
5
3,000,000
Economic Development Funding Economic Development
Funding to facilitate the revitalization of commercial corridors, transit oriented development, mixed income housing, mixed use development and neighborhood revitalization
6
2,000,000
Economic Development Funding Economic Development
Funding to facilitate the revitalization of commercial corridors, transit oriented development, mixed income housing, mixed use development and neighborhood revitalization
7
10,000,000
2017 Capital Bond Program - Proposition I: Economic Development
Page 86 of 87
Project Proposition DescriptionCouncil District Amount
Economic Development Funding Economic Development
Funding to facilitate the revitalization of commercial corridors, transit oriented development, mixed income housing, mixed use development and neighborhood revitalization
8
7,000,000
Economic Development Funding Economic Development
Funding to facilitate the revitalization of commercial corridors, transit oriented development, mixed income housing, mixed use development and neighborhood revitalization
10
3,000,000
Economic Development Funding Economic Development
Funding to facilitate the revitalization of commercial corridors, transit oriented development, mixed income housing, mixed use development and neighborhood revitalization
11
3,000,000
Economic Development Funding Economic Development
Funding to facilitate the revitalization of commercial corridors, transit oriented development, mixed income housing, mixed use development and neighborhood revitalization 12 3,000,000
SW = System Wide Total 55,400,000$
2017 Capital Bond Program - Proposition J: Homeless Assistance Facilities
Page 87 of 87
Project Proposition DescriptionCouncil District Amount
Homeless Assistance Facilities Homeless Assistance FacilitiesFunding for transitional and permanent supportive housing. SW 20,000,000$
SW = System Wide Total 20,000,000$