triviet steel buildings

60
TRIVIET STEEL BUILDINGS FOR PRE-ENGINEERED STEEL STRUCTURES www.trivietsteel.com SMART SOLUTIONS Design Erection Fabrication

Upload: khangminh22

Post on 16-Mar-2023

1 views

Category:

Documents


0 download

TRANSCRIPT

TRIVIET STEELBUILDINGS

FOR PRE-ENGINEERED STEEL STRUCTURESw w w. t r i v i e t s t e e l . c o m

SMART

SOLUTIONSDesign

ErectionFabrication

Letter Of Introduction

General Information

Iso 9001 : 2015 Certi�cate

Codes & Standards For Design

1 - 4INTRODUCTION

Organizational Chart

Board Of Director

5 - 10PERSONNEL ORGANIZATION

11DESIGN CAPACITY

12 - 21

Factory Introduction

Machineries & Equipment

Production Process

MANUFACTURING CAPACITY

22 - 26

Stages of Construction

Construction Progress & Safety

CONSTRUCTION CAPACITY

27 - 56TYPICAL PROJECTS

57CUSTOMERS & PARTNER

INDEX 0

INTRODUCTION 1

Triviet Steel Buildings is a professional company operating in pre-engineered steel buildings

industry in Vietnam. Having vision to become a leading supplier of pre-engineered steel structure, not only

fabricating and supplying steel structure products, but also o�ering “Total solution for pre-engineered steel

structures” for the customers with all-in services: Design – Fabrication – Erection.

Triviet Steel Buildings is always con�dent and proud of our capacity in order to bring the best

solutions to the customers, meet our clients’ demands with very competitive price. In order to meet high

technical demands of large-scale projects, Triviet Steel Buildings continuously improves specialized and

managed capabilities, and applies ISO 9001:2015 quality management system to our company. Furthermore,

Triviet Steel Buildings also encourages the favorable working environment, appoint the right people to key

position and facilitate employee develop that the company could sustainable business growth.

Triviet Steel Buildings owns a steel structure manufacturing factory with an area of 20,000 sqm;

fully equiped with automatic machineries & equipment with design capacity of 1,000 tons / month; 12,000

tons per annum. In 2018, We are building the second factory in Binh Duong province with an area of 40.000

sqm, increasing manufacturing capacity up to 36,000 tons per annum.

With professional and devoted engineers, we support and supply the free service of “Consulting,

supplying design solutions and making quotation” to customers. Therefore, no matter which phase your

project is currently in, we can always �nd the best solution to �t your requirements. Contact us to get the

fastest free-of-charge support.

Being a leading supplier of pre-engineered steel structure in Vietnam with the best quality and

service is Triviet Steel Buildings’ mission. Thus, we commit to ensure excellent quality of our products and

the satisfaction of our clients.

Many thanks for your attention to Triviet Steel Buildings. We hope to cooperate and serve you.

Best regards,

Letter of Introduction

GENERAL INFORMATION 2

Company name: TRIVIET STEEL BUILDINGS CO.,LTD

Represented by: Mr. Nguyen Phi Thuong - CEO

Email: [email protected]

Website: www.trivietsteel.com

Bank account: 040 0101 00 57080 at Maritime Commercial Joint Stock Bank – Ho Chi Minh Branch

Tax code: 3 7 0 0 5 7 0 3 0 7

• Head O�ce & Factory:

Address: Land Parcel No. 20, Map No. 14, Ong Dong Hamlet, Tan Hiep Ward, Tan Uyen Dist., Binh Duong, Vietnam.

Tel: (+84.274) 365.3080 - Fax: (+84.274) 365.3079

• Ho Chi Minh City O�ce:

Address: 3rd Floor, Carina Plaza, No. 1648 Vo Van kiet St., Ward 16, Dist. 8, HCM City, Vietnam.

Tel: (+84.28) 6298 5703-6298 5704- 6298 5530 - Fax: (+84.28) 6298 5630 - Hotline: (+84) 9 82 84 98 99

• Myanmar Branch O�ce:

Address: No. H39, 3rd Main Road, Thiri Yadanar Wholesales Complex Market, North Okkalapa Township, Yangon,

Myanmar

Tel: (+95) 9953 345 789

Business license: In Vietnam: No. 4602001062 by the Department of Planning and Investment of Binh Duong province in 2004.

In Myanmar: No. 913 FC/2017-2018 (YGN) by the Government of the Public of the Union of Myanmar – Ministry of

Planning and Finance

Main business activities:

1. Fabrication, business, erection of pre-engineered steel buildings, lightweight steel buildings

2. Fabrication, business of mechanical machineries

3. Civil, industrial construction

ISO 9001:2015 CERTIFICATE 3

Triviet Steel Buildings Co., Ltd has associated with Vietnam Certi�cation Corporation (VCA) - an organization

certi�ed by Vietnam and GCERI - a certi�cation organization in Korea to issue the certi�cate ISO 9001: 2015 for

the implementation and maintenance of quality management system in Triviet Steel Buildings Co., Ltd.

CODES & STANDARDS FOR DESIGN 4

• AWS D1.1 Edition 2006 – American Welding Society

• AISC. 2005 – American Institute of Steel Constructions

• MBMA. 2002 – Metal Building System Manufacturer Association

• Quality Manual

• TCXD VN 5575-2012 - Steel Structures - Design standards

• TCVN 2737-1995 - Standards for size of load and impact

• TCXD VN 170-1989 - Standards for the erection process

• TCVN 1691-1975 - Electric arc welding

• TCVN 3223 : 1994 - Welding electrodes for carbon steel and low alloy steel.

• TCVN 1916 : 1995 - Bolts, screws, nuts and screws implanted. Technical Requirements.

• MNBC - 2016 - Myanmar National Building Code – 2016.

INTERNATIONAL STANDARD

• TPI - Third Party Inspection

• NDT - Non-Destructive Testing

• MPI - Magnetic Particle Inspection

CHECK LABS

REFERENCE STANDARD

ORGANIZATIONAL CHART 5

ORGANIZATIONAL CHART

ORGANIZATIONAL CHART OF FACTORY

CHAIRMANCEO

DEPUTYDIRECTOR

MARKETINGDEPARTMENT

SALETEAM

CONSULTANCY DETAILDESIGN

STRUCTUREDESIGN

QA-QCTEAM

PLANNINGTEAM

SITEMANAGER

PROJECTMANAGER

QSTEAM

COSTCONTROL

METHODERECTION

TEAMASSISTANT

TEAMHSE

TEAMSTORAGE

TEAMPRICETEAM

TENDERTEAM

SALEDEPARTMENT

HRDEPARTMENT

ACCOUNTANTDEPARTMENT

TECHNICALDEPARTMENT

ITDEPARTMENT

PURCHASINGDEPARTMENT

PROJECTMANAGER

DEPARTMENT

INTERNATIONALINVEST

DEPARTMENT

ISODEPARTMENT

RESEARCH ANDDEVELOPMENTDEPARTMENT

ASSISTANTDIRECTOR

ASSISTANTDIRECTOR

FACTORYDIRECTOR

TRUCKCOORDINATING

SUPERVISORTEAM

SUPERVISOR 2 SUPERVISOR 3SUPERVISOR 1

CUTTING &ACCESSORY TEAM

JOINING &WELDING TEAM

CLEANING &PAINTING TEAM

PACKAGETEAM

CO2 WELDINGTEAM

GRINDING &SHOOTING BLAST

TEAM

FABRICATIONTEAM

ACCOUNTANTAND STORAGE SHOP DESIGNHR SAFETY

CONTROLLER QC MAINTENANCEPRODUCTIONCHECK

PRODUCTIONDEPARTMENT

BOARD OF DIRECTOR 6

CHAIRMAN - CEONGUYEN PHI THUONG

Experience: 17 years.Lecturer of Polytechinic University - Falculty of Civil Engineering

"We always spend more time with our customers together, to understand

and deeper our customer's needs ... so that we can advise and provide our

customers with" smart solutions "that meet their needs. Most customers, at

a reasonable cost budget, and quality assured. "

FACTORY DIRECTORNGUYEN TRI THUC

Experience: 14 years.

"The quality of our products is always a top priority, so we always ensure the

quality of the product through each step from the raw materials to the

installation."

DEPUTY DIRECTOR - MANAGER OF PROJECT DEPTNGUYEN BINH PHUONG

Experience: 14 years.

"Each client's project is the important project with us. We always consider

the production, construction and installation to keep the progress, safety

and economy to always be your companion on every construction."

BOARD OF DIRECTOR 7

DEPUTY DIRECTORLE VAN HUNG

Experience: 22 years.

"Every day, I inspire my sta� to be optimistic, go along and develop with the

company. The North market is a potential market that I have been building.

I believe that Triviet Steel will succeed and develop not only in the North

but also in the three regions of Vietnam."

MYANMAR BRANCH REPRESENTITIVECHEONG CHOONG SIN

With me, Myanmar is a real potential market for pre-engineered steel struc-

ture products of Triviet Steel Buildings. As well as great opportunities for

me and my team.

Creating a plan with the perfect penetration strategy that I am pursuing. I

believe that Triviet will soon be successful in the Myanmar market and

moreover in the Southeast Asian market.

DEPUTY DIRECTOR - MANAGER OF BUSINESS DEPTVU TRONG HOANG

“In addition to coordinating with other departments in the company to

bring the best quality of service. We always spend a lot of time work togeth-

er with clients, our customer service team always improve skills to be able

to consult timely arising problem arise and take good care of their custom-

ers. The interests of clients are always considered the best important and be

the guide to Triviet Steel prosperity.”

BOARD OF DIRECTOR 8

HUMAN RESOURCE MANAGERLE THI HONG VAN

“We always pay attention to and apply good compensation to engineers, workers,

employees, ... We focus on to create the best working environment, each employee is

a member in the big Triviet Steel family. Stick together and develop the career in long

term with Triviet Steel.”

ACCOUNTANT MANAGERTRAN NGOC THU

"Our customers, our suppliers, our strategic partners ... are all partners in a spirit of

mutual cooperation and development prosperity."

MARKETING MANAGERNGUYEN HOANG ANH

“Triviet Steel that mean Vietnamese's wisdom, steel of Vietnam, we were a leading

brand - Top 4 Pre-Engineered Steel Buildings in Vietnam. We believe that with the

strength of people & technology, Triviet Steel will be developed not only in the coun-

try but also in the international market.”

PURCHASING MANAGERNGUYEN THI ANH THUYEN

“The premise for the company's development is quality in the product. Our depart-

ment is always looking for partners to provide the best materials. To me, each suppli-

er is a true partner, sticking together and growing together.”

BOARD OF DIRECTOR 9

IT MANAGERBUI THANH KHANG

"When deploying ERP at Triviet Steel, this is a di�cult time, but now it can be con�rmed that

the ERP system has helped Triviet Steel to control the losses very well, making quick

decisions to increase revenue. In addition, Triviet Steel is aiming for multinational develop-

ment, and our partners choose Triviet Steel based on a variety of factors including transpar-

ency of information and the ERP system has satis�ed that."

CHIEF OF DESIGN DEPT.LE VAN NHUT

One of the important things, determining the quality of pre-engineered steel prod-

ucts is design standard. The motto in my job is “Smart solutions”, We always o�er the

best solution, suitable for customers with the most appropriate fee.

DEPUTY OF ENGINEERING MANAGER AND CHIEF OF DRAFTING DEPT.NGUYEN GIA HOANG

The optimal cost and e�ciency savings for each project is the motto in my sta� train-

ing document. Based on the new design standards of advanced countries such as

USA, UK, Japan, ... I always con�dently do requests from the most demanding clients.

DEPUTY MANAGER OF ISO DEPT.TRAN HUYNH VAN NHI

Building a sustainable and improved quality management system is the direction we

have been working on to get a solid and powerful system.

PROJECT MANAGER BOARD 10

PROJECT MANAGEMENT BOARD

LE VAN MINH VU BA THANG LE HOANG DUY HUNG

NGUYEN THANH NHUT NGUYEN VANG NGUYEN THANH PHUOC

Project ManagerExperience: 12 years Experience: 9 years Experience: 7 years

Experience: 6 years Experience: 3 years Experience: 3 years

Project Manager Project Manager

Project Manager Project Manager Project Manager

DESIGN CAPACITY 11

TECHNICAL DESIGN CAPACITY

Design and planning:

• Our professional sta�s will give clients devoted consultancy and help the owners to choose the optimal

solution.

• Triviet is proud to have a team of professional engineering designers who are able to transfer investors’ ideas

and requirements into architecture and structural drawings with cost - e�ective and most optimal solution.

Design shop drawings:

• According to the structural design drawings, technician team will detail the components for production to

manufacture.

MANUFACTURING CAPACITY 12

FACTORY INTRODUCTION

A. MANPOWER:

• Currently, Triviet Steel Buildings’ factory has about 250 sta�s consist of 200 manufacturing & maintenance work-

ers (team leaders included); 30 engineers in charge of manufacture & quality management, 20 sta�s in charge of

administrative work, security, accounting, warehouse keeping, car & truck driving, factory cleaning,…

• There are 7 seperated manufacturing teams as: Cutting Team, Accessories Team, Assembling Team, Finishing

Team, Surface-cleaning Team, Painting Team and Welding Team. Every team has team leader to manage and

supervise each manufacturing process.

MANUFACTURING CAPACITY 13

B. SAFETY EQUIPMENT:

• All sta�s and workers at the manufacturing zone is equipped with hard hats, protective clothing, steel tip shoes,

gloves, etc… which fully comply with safety regulations for mechanical engineering.

• We also strictly observe periodic check and maintenance of our factory’s machineries & equipment

• Besides, depending on the speci�c requirements for the specialized manufacturing work such as cutting, welding,

drilling, painting, etc... our workers are equipped properly with welding shields, tight-�tting eye goggles, face

shields etc…

C. MANUFACTURING PLANT LAYOUT:

• Our factory is located in Binh Duong Province which is about 45 km away from Ho Chi Minh City. It is our

private-owned campus reaching the total area approximately 20,000 sqm whereas the manufacturing site accounts

for 17,000 sqm and the remaining 3000 sqm is for �nished product storage. Moreover, we set up main o�ces, cafeteria,

parking lot, addition material room in a separated area from the main manufacturing site to ensure their utilities.

MANUFACTURING CAPACITY 14

MANUFACTURING CAPACITY

• With an area of 20,000 sqm, Our factory is fully equiped with automatic machineries & equipment with design

capacity of 1,000 tons / month; 12,000 tons per annum.

• We are now planning for our second factory also in Binh Duong province with an area of 40.000 sqm, increas-

ing our manufacturing capacity up to 36,000 tons per year.

MACHINERY AND EQUIPMENT 15

MAIN MACHINERIES & EQUIPMENT:

A.1 USAMulti blade cutting machine 20131

A.2 TaiwanShearing machine 8m 20001

A.3 ChinaSemi automatic oxy gas cutter 20164

A.4 VietnamCNC Plasma & dry Cutting 13 torches 20161

A.5 JapanMulti blade cutting machine 20001

A.6 JapanBond Saw cutting Amada 20001

A.7 JapanShearing machine Kruman 2M 35MM 20162

A.8 ChinaCNC Plasma and Oxy cutting 11 torches 20181

A.9 JapanMulti Cutting iron worker 20102

A.11 KoreaShearing machine 6M 20101

A.10 JapanDrilling Takeda 4020 20101

CUTTING EQUIPMENTSA YEAR ORIGINQUANTITY

B.1 China3D drilling machines Fincm 20131

B.2 JapanDrilling machine table Amada 20163

B.3 ChinaDrilling machine table Sunrise 20161

B.4 ChinaDrilling, punching plate Tianchen 20162

B.5 ChinaH Beam assembly machine 20171

B.6 ChinaH Beam assembly machine 20151

B.7 ChinaH Beam Total assembly machine 20162

B.8 ChinaH Beam re-straightening machine 20162

B.9 JapanPlate bending machine 400 tons 4M 20101

B.11 ChinaH Beam 3D drilling Daito 1000 20101

B.10 ChinaH Beam 3D drilling Amada 4700 20051

B.12 KoreaAngle cutting and punching 20001

MECHANICAL EQUIPMENTSB YEAR ORIGINQUANTITY

C.1 VietnamAC welding machine 2007-20172

C.2 ChinaMulti operator welding machine x 2 torches 2006-20124

C.3 ChinaMulti operator welding machine x 4 torches 20162

WELDING EQUIPMENTSC YEAR ORIGINQUANTITY

D.1 JapanAir compressor Fuseng 2012-20164

D.2 JapanDry air compressor 20161

D.4 USAPainting equipments 2002-20066

D.3 ChinaBall blasting equipments 2007-20164

CLEANING AND PAINTING EQUIPMENTSD YEAR ORIGINQUANTITY

MACHINERY AND EQUIPMENT 16

MAIN MACHINERIES & EQUIPMENT:

E.1 VietnamCrane Q= 3 - 5ton 2013-201628

E.2 VietnamGantry Crane Q= 15 tons 20151

E.3 VietnamGantry Crane Q= 20 tons 20071

E.4 JapanForklift 20072

LIFTING EGUIPMENTSE YEAR ORIGINQUANTITY

I.1 TaiwanBoom lift Genie G45 20104

I.2 USACissor Lift Genie 20152

I.3 VietnamCissor Lift Yamada 20151

I.4 USASemi-automatic Lifting machines 20151

INSTALLATION EQUIPMENTSI YEAR ORIGINQUANTITY

F.1 TaiwanUltrasonic Flaw detector 20161

F.2 TaiwanMeasuring equipments OTK 20161

- Coating thickness tester

- Micrometer Caliper, Caliper rule

TESTING EQUIPMENTSF YEAR ORIGINQUANTITY

H.1 KoreaHeavy truck 30 tons 20165

H.2 KoreaVan 5 - 44 tons 20162

TRANSPORTATIONH YEAR ORIGINQUANTITY

G.1 VietnamMax seam forming machine 20051

G.2 Vietnam6 Ribs forming machine 20062

G.3 Vietnam5 Ribs forming machine 20141

G.4 VietnamKlip-Lock forming machine 20051

G.5 VietnamSeam-Lock forming machine 20142

G.6 VietnamDecking forming machine 20141

G.7 ChinaSteel plate pressing for accessories 20081

G.8 ChinaSteel plale folding machines 20141

G.9 ChinaSteel sheet bending and cutting 20161

G.11 China7 and 9 Ribs forming machine 20171

G.13 ChinaKliplok 920 forming machine 20171

G.10 China5 and 11 Ribs forming machine 20171

G.12 ChinaKliplok 420 forming machine 20171

ROOFING EQUIPMENTSG YEAR ORIGINQUANTITY

PRODUCTION PROCESS 17

PASS

4. Welding

PASS

9. Storage

PASS

7. Shot Blasting

PASS

8. Painting

PASS

10. Transportation

PASS

6. Finishing

PASS

5. Straightening

PASS

1. Materials

PASS

3. Assembling

PASS

2. Cutting

PRODUCTION PROCESS 18

RAW MATERIALS

CUTTING

ASSEMBLING

CNC Cutting Machine Hydraulic Cutting Machine

Hydraulic Assembling Machine Hydraulic Assembling Machine

PRODUCTION PROCESS 19

WELDING

STRAIGHTENING

Accessories Welding Automatic Welding Machine

Straightening Machine

Hydraulic Assembling Machine

PRODUCTION PROCESS 20

SHOT BLASTING AND SURFACE CLEANING

Cleaning Surface

Products After Shot Blasting

Shot Blasting Machine

FINISING

Finishing Welding

PRODUCTION PROCESS 21

CHECKING AND STORAGE

PAINTING

Painting

Completed Products

CONSTRUCTION CAPACITY 22

STAGES OF CONSTRUCTION

1. Receiving, storage and handling of construction materials:

• We receive and control construction materials to ensure the right quality and quantity are available when needed.

• Material management plays a vital role in construction quality. Therefore, we assure no deformations, no scratches

on the delivered structures to control our construction quality.

• Check the materials carefully prior to erection.

2. Installation of foundation bolts:

CONSTRUCTION CAPACITY 23

3. Erection of primary structure:

• Erection of primary members needs to be in a synchronized manner complying with erection plan to ensure a

hundred percent of correct angles and heights.

• Machineries & equipment are used throughout the erection process such as: truck cranes, forklifts, digital theodolite,

laser projectors, etc…

• Safety equipment are furnished for workers at job site, especially for those who work at height.

CONSTRUCTION CAPACITY 24

4. Installation of roof panels:

• The installation of the roof panel begins after completion of primary structure including anchor bolts and bracing

systems.

• We set up the roof carefully for installation to ensure quality and aesthetic appeal of the building.

5. Installation of wall panels:

6. Completion of construction:

• The �nal stage is to check in details the �nished phases for acceptance.

CONSTRUCTION CAPACITY 25

CONSTRUCTION CAPACITY 26

CONSTRUCTION PROGRESS

• Construction time: thanks to the close cooperation between departments in o�ce and factory, our work strictly

follows the project progress.

• Method to keep progress: site supervisor is in charge of updating and reporting regularly to the main o�ce to

handle the current situation in the construction site.

CONSTRUCTION SAFETY

• Triviet’s safety board has broadcasted Occuppational Safety & Health Laws and Regulations to our workers who

participate from manufacturing process to construction process.

• We highly invest in safety and protective equipment and carry out safety observation not only at manufacturing

site but also at job site.

TYPICAL PROJECTS 27

ANG SON II CEMENT FACTORY Workload: 800 tonsLocation: Quang Binh Province

NGHI PHONG FOOTWEAR EXPORT FACTORYWorkload: 480 tonsLocation: Cao Lanh, Dong Thap Province

TYPICAL PROJECTS 28

OMEXEY FURNITURE FACTORYArea: 31,920 sqm

Location: Tan Uyen, Binh Duong Province

TAFETA FOMOSA FACTORYArea: 18,960 sqm

Location: Nhon Trach IP, Dong Nai Province

TYPICAL PROJECTS 29

NYLON CHEMPACK-VINA FACTORYArea: 13,125 sqmLocation: Tam Phuoc IP, Dong Nai Province

HIGH POINT WORKSHOPArea: 80,000 sqm - Workload: 3,000 tonsLocation: Tan Uyen, Binh Duong Province

TYPICAL PROJECTS 30

KIM TIN MDF FACTORYArea: 15,628 sqm

Location: Phuoc Long, Binh Phuoc Province

JRD OTO MANUFACTORYArea: 26,640 sqm

Location: An My, Phu Yen Province

TYPICAL PROJECTS 31

MAPLETREE VIETNAM WAREHOUSEArea: 114,382 sqmLocation: VSIP II, Binh Duong Province

KIRIN ACECOOK FACTORYArea: 14,676 sqmLocation: My Phuoc 2, Binh Duong Province

TYPICAL PROJECTS 32

KINGJIM FACTORY Area: 18,000 sqm

Location: My Phuoc, Binh Duong Province

LIKSIN PACKAGE WORKSHOP Area: 17,600 sqm

Location: Duc Hoa, Long An Province

TYPICAL PROJECTS 33

HOA PHAT BD STEEL FACTORYArea: 13,400 sqmLocation: Song Than, Binh Duong Province

BACH TUYET PAINT FACTORYArea: 10,000 sqmLocation: Hiep Phuoc, Nha Be, HCMC

TYPICAL PROJECTS 34

HUNG CA COLD STORE – FACTORY Area: 10,148 sqm

Location: Sa Dec, Dong Thap Province

DAI DONG TIEN PLASTIC FACTORYArea: 10,000 sqm

Location: Nhon Trach IP, Dong Nai Province

TYPICAL PROJECTS 35

HA NOI BEER FACTORY (CARLSBERG BEER)Area: 11,251 sqmLocation: Phu My, Vung Tau Province

HUNG VUONG TAY NAM WAREHOUSEArea: 11,000 sqmLocation: Sa Dec, Dong Thap Province

TYPICAL PROJECTS 36

MASAN FACTORYArea: 7,300 sqm

Workload: 300 tons

TAN SON NHAT AIRPORT - BILLBOARD & SHELVESWorkload: 2,100 tons

Location: Ho Chi Minh City

TYPICAL PROJECTS 37

PANDORA TRADE CENTERLocation: Ho Chi Minh City

POUHUNG WORKSHOPWorkload: 520 tonsLocation: Cha La IP, Tay Ninh Province

TYPICAL PROJECTS 38

STEEL FLOOR IN BASEMENT BITEXCOWorkload: 150 tons

Location: Ho Chi Minh City

BUON MA THUOT AIRPORT - PASSENGER SHELTERSWorkload: 600 tons

Area: 27.000 sqm

TYPICAL PROJECTS 39

TAY NINH KUO YUEN BATING FACTORYArea: 13,469 spmLocation: Tay Ninh Province

AN THIEN PHARMACEUTICAL FACTORYArea: 11,600 sqmLocation: Hiep Phuoc, Nha Be, HCMC

TYPICAL PROJECTS 40

PTSC 1 & 2 WORKSHOP Location: Vung Tau Province

COMPLEX MANUFACTURING NGHE ANWorkload: 523 tons

Location: Nghe An Province

TYPICAL PROJECTS 41

YOUNG IL WORKSHOPLocation: Bourbon IP, Tay Ninh Province

VINCOM SUPERMARKET – THU DUCWorkload: 400 tonsLocation: Thu Duc, HCMC

TYPICAL PROJECTS 42

MERCEDES – BENZ FACTORY

LONG YI WORKSHOPArea: 9,800 sqm

Location: My Phuoc 2, Binh Duong Province

Area: 30,000 sqmLocation: Go Vap, HCMC

TYPICAL PROJECTS 43

BIG C NHA TRANG TRADE CENTER

NAM YANG FACTORYWorkload: 800 tonsLocation: Trang Bom, Dong Nai Province

Location: Nha Trang, Khanh Hoa Province

TYPICAL PROJECTS 44

HAIDFEED FEEDSTUFFS FACTORYArea: 28,000 sqm

Location: Dau Giay, Dong Nai Province

YUEN FOONG YU (VINH PHONG) PAPER FACTORYArea: 35,000 sqm - Workload: 2,000 tons

Location: Cu Chi, HCMC

TYPICAL PROJECTS 45

BINH AN BONDED WAREHOUSEArea: 36,000 sqmWorkload: 1,300 tons

Area: 116,000 sqmLocation: Cu Chi, HCMC FIRST SOLAR FACTORY

TYPICAL PROJECTS 46

FACTORY OF SUPER FOAM VIETNAM LIMITEDArea: 23,500 sqm

Location: Binh Duong Province

GREEN FEED FACTORYArea: 23,000 sqm

Location: Vinh Long Province

TYPICAL PROJECTS 47

FACTORY OF NET DETERGENT JSCArea: 36,000 sqmLocation: Dong Nai Province

FACTORY OF ROCHDALE SPEAR FURNITUREArea: 86,000 sqm - Workload: 2,000 tonsLocation: Binh Duong Province

NUMBER ONE CHU LAI FACTORYArea: 260,000 sqm

Location: Quang Nam Province

TYPICAL PROJECTS 48

NUMBER ONE HAU GIANG FACTORYArea: 41,100 sqm

Location: Hau Giang Province

DAI NAM RACE COURSEArea: 10,000 sqm - Workload: 1,500 tonsLocation: Binh Duong Province

TYPICAL PROJECTS 49

PHU MY II BONDED WAREHOUSEArea: 29,700 sqmLocation: Vung Tau Province

TYPICAL PROJECTS 50

OMRON HEALTHCARE MANUFACTURE FACTORYArea: 2,000 sqm - Workload: 100 tons

Location: Binh Duong Province

DAN ON FACTORYArea: 11,500 sqm

Location: Binh Duong Province

TYPICAL PROJECTS 51

LOCK & LOCK FACTORYArea: 10,000 sqmLocation: Vung Tau Province

TEX RAY GARMENT FACTORYArea: 12,700 sqm - Workload: 400 tonsLocation: Tan An City, Long An Province

TYPICAL PROJECTS 52

BAC HOANG FACTORYArea: 24,000 sqm

Location: Dong Nai Province

TYPICAL PROJECTS 53

REHAB ITALIAN DESIGN FACTORYArea: 3,800 sqmLocation: Binh Duong Province

TYPICAL PROJECTS 54

ADIDAS SHOE FACTORYArea: 28,000 sqm - Workload: 2,300 tons

Location: Dong Nai Province

TYPICAL PROJECTS 55

VINH HUNG ALUMINUM FACTORYArea: 55,000 sqm - Workload: 1,600 tonsLocation: Tien Giang Province

TYPICAL PROJECTS 56

KIM DUC FABRIC BAG FACTORY Area: 50,000 sqm - Workload: 1,400 tons

Location: Long An Province

CUSTOMERS & PARTNERS 57

version 1 - 8.5.2018

Email: [email protected] Website: www.trivietsteel.com

HCM O�ce: 3rdFloor Carina Plaza,1648 Vo Van Kiet St., W.16, Dist.8, HCMC, Vietnam.Tel: (+84) 28 6298 5703Fax: (+84) 28 6298 5630

Factory: Ong Dong, Tan Hiep W., Tan UyenDist., Binh Duong Province, Vietnam.Tel: (+84) 274 365 3080Fax: (+84) 274 365 3079

Myanmar Branch O�ce: No. H39, 3rd Main Road,Thiri Yadanar Wholesales Complex Market,North Okkalapa Township, Yangon, MyanmarTel: (+95) 9953 345 789

TRIVIET STEEL BUILDINGS CO.,LTD

Triviet Steel Buildings is a leading company in the �eld of pre-engineered steel structures in Vietnam. Triviet Steel Buidings not only manufacture and supply steel structure products, but more than that, we provide ‘’a total solution of pre-engineered steel structures’’ for clients with full service: Design - Fabrication - Erection.

Triviet Steel Buidings has the vision to bring the best solutions and products. O�ering smart solutions together with clients in

each project, Triviet’s products will always be optimal to suit each

di�erent needs of the project.