triviet steel buildings
TRANSCRIPT
TRIVIET STEELBUILDINGS
FOR PRE-ENGINEERED STEEL STRUCTURESw w w. t r i v i e t s t e e l . c o m
SMART
SOLUTIONSDesign
ErectionFabrication
Letter Of Introduction
General Information
Iso 9001 : 2015 Certi�cate
Codes & Standards For Design
1 - 4INTRODUCTION
Organizational Chart
Board Of Director
5 - 10PERSONNEL ORGANIZATION
11DESIGN CAPACITY
12 - 21
Factory Introduction
Machineries & Equipment
Production Process
MANUFACTURING CAPACITY
22 - 26
Stages of Construction
Construction Progress & Safety
CONSTRUCTION CAPACITY
27 - 56TYPICAL PROJECTS
57CUSTOMERS & PARTNER
INDEX 0
INTRODUCTION 1
Triviet Steel Buildings is a professional company operating in pre-engineered steel buildings
industry in Vietnam. Having vision to become a leading supplier of pre-engineered steel structure, not only
fabricating and supplying steel structure products, but also o�ering “Total solution for pre-engineered steel
structures” for the customers with all-in services: Design – Fabrication – Erection.
Triviet Steel Buildings is always con�dent and proud of our capacity in order to bring the best
solutions to the customers, meet our clients’ demands with very competitive price. In order to meet high
technical demands of large-scale projects, Triviet Steel Buildings continuously improves specialized and
managed capabilities, and applies ISO 9001:2015 quality management system to our company. Furthermore,
Triviet Steel Buildings also encourages the favorable working environment, appoint the right people to key
position and facilitate employee develop that the company could sustainable business growth.
Triviet Steel Buildings owns a steel structure manufacturing factory with an area of 20,000 sqm;
fully equiped with automatic machineries & equipment with design capacity of 1,000 tons / month; 12,000
tons per annum. In 2018, We are building the second factory in Binh Duong province with an area of 40.000
sqm, increasing manufacturing capacity up to 36,000 tons per annum.
With professional and devoted engineers, we support and supply the free service of “Consulting,
supplying design solutions and making quotation” to customers. Therefore, no matter which phase your
project is currently in, we can always �nd the best solution to �t your requirements. Contact us to get the
fastest free-of-charge support.
Being a leading supplier of pre-engineered steel structure in Vietnam with the best quality and
service is Triviet Steel Buildings’ mission. Thus, we commit to ensure excellent quality of our products and
the satisfaction of our clients.
Many thanks for your attention to Triviet Steel Buildings. We hope to cooperate and serve you.
Best regards,
Letter of Introduction
GENERAL INFORMATION 2
Company name: TRIVIET STEEL BUILDINGS CO.,LTD
Represented by: Mr. Nguyen Phi Thuong - CEO
Email: [email protected]
Website: www.trivietsteel.com
Bank account: 040 0101 00 57080 at Maritime Commercial Joint Stock Bank – Ho Chi Minh Branch
Tax code: 3 7 0 0 5 7 0 3 0 7
• Head O�ce & Factory:
Address: Land Parcel No. 20, Map No. 14, Ong Dong Hamlet, Tan Hiep Ward, Tan Uyen Dist., Binh Duong, Vietnam.
Tel: (+84.274) 365.3080 - Fax: (+84.274) 365.3079
• Ho Chi Minh City O�ce:
Address: 3rd Floor, Carina Plaza, No. 1648 Vo Van kiet St., Ward 16, Dist. 8, HCM City, Vietnam.
Tel: (+84.28) 6298 5703-6298 5704- 6298 5530 - Fax: (+84.28) 6298 5630 - Hotline: (+84) 9 82 84 98 99
• Myanmar Branch O�ce:
Address: No. H39, 3rd Main Road, Thiri Yadanar Wholesales Complex Market, North Okkalapa Township, Yangon,
Myanmar
Tel: (+95) 9953 345 789
Business license: In Vietnam: No. 4602001062 by the Department of Planning and Investment of Binh Duong province in 2004.
In Myanmar: No. 913 FC/2017-2018 (YGN) by the Government of the Public of the Union of Myanmar – Ministry of
Planning and Finance
Main business activities:
1. Fabrication, business, erection of pre-engineered steel buildings, lightweight steel buildings
2. Fabrication, business of mechanical machineries
3. Civil, industrial construction
ISO 9001:2015 CERTIFICATE 3
Triviet Steel Buildings Co., Ltd has associated with Vietnam Certi�cation Corporation (VCA) - an organization
certi�ed by Vietnam and GCERI - a certi�cation organization in Korea to issue the certi�cate ISO 9001: 2015 for
the implementation and maintenance of quality management system in Triviet Steel Buildings Co., Ltd.
CODES & STANDARDS FOR DESIGN 4
• AWS D1.1 Edition 2006 – American Welding Society
• AISC. 2005 – American Institute of Steel Constructions
• MBMA. 2002 – Metal Building System Manufacturer Association
• Quality Manual
• TCXD VN 5575-2012 - Steel Structures - Design standards
• TCVN 2737-1995 - Standards for size of load and impact
• TCXD VN 170-1989 - Standards for the erection process
• TCVN 1691-1975 - Electric arc welding
• TCVN 3223 : 1994 - Welding electrodes for carbon steel and low alloy steel.
• TCVN 1916 : 1995 - Bolts, screws, nuts and screws implanted. Technical Requirements.
• MNBC - 2016 - Myanmar National Building Code – 2016.
INTERNATIONAL STANDARD
• TPI - Third Party Inspection
• NDT - Non-Destructive Testing
• MPI - Magnetic Particle Inspection
CHECK LABS
REFERENCE STANDARD
ORGANIZATIONAL CHART 5
ORGANIZATIONAL CHART
ORGANIZATIONAL CHART OF FACTORY
CHAIRMANCEO
DEPUTYDIRECTOR
MARKETINGDEPARTMENT
SALETEAM
CONSULTANCY DETAILDESIGN
STRUCTUREDESIGN
QA-QCTEAM
PLANNINGTEAM
SITEMANAGER
PROJECTMANAGER
QSTEAM
COSTCONTROL
METHODERECTION
TEAMASSISTANT
TEAMHSE
TEAMSTORAGE
TEAMPRICETEAM
TENDERTEAM
SALEDEPARTMENT
HRDEPARTMENT
ACCOUNTANTDEPARTMENT
TECHNICALDEPARTMENT
ITDEPARTMENT
PURCHASINGDEPARTMENT
PROJECTMANAGER
DEPARTMENT
INTERNATIONALINVEST
DEPARTMENT
ISODEPARTMENT
RESEARCH ANDDEVELOPMENTDEPARTMENT
ASSISTANTDIRECTOR
ASSISTANTDIRECTOR
FACTORYDIRECTOR
TRUCKCOORDINATING
SUPERVISORTEAM
SUPERVISOR 2 SUPERVISOR 3SUPERVISOR 1
CUTTING &ACCESSORY TEAM
JOINING &WELDING TEAM
CLEANING &PAINTING TEAM
PACKAGETEAM
CO2 WELDINGTEAM
GRINDING &SHOOTING BLAST
TEAM
FABRICATIONTEAM
ACCOUNTANTAND STORAGE SHOP DESIGNHR SAFETY
CONTROLLER QC MAINTENANCEPRODUCTIONCHECK
PRODUCTIONDEPARTMENT
BOARD OF DIRECTOR 6
CHAIRMAN - CEONGUYEN PHI THUONG
Experience: 17 years.Lecturer of Polytechinic University - Falculty of Civil Engineering
"We always spend more time with our customers together, to understand
and deeper our customer's needs ... so that we can advise and provide our
customers with" smart solutions "that meet their needs. Most customers, at
a reasonable cost budget, and quality assured. "
FACTORY DIRECTORNGUYEN TRI THUC
Experience: 14 years.
"The quality of our products is always a top priority, so we always ensure the
quality of the product through each step from the raw materials to the
installation."
DEPUTY DIRECTOR - MANAGER OF PROJECT DEPTNGUYEN BINH PHUONG
Experience: 14 years.
"Each client's project is the important project with us. We always consider
the production, construction and installation to keep the progress, safety
and economy to always be your companion on every construction."
BOARD OF DIRECTOR 7
DEPUTY DIRECTORLE VAN HUNG
Experience: 22 years.
"Every day, I inspire my sta� to be optimistic, go along and develop with the
company. The North market is a potential market that I have been building.
I believe that Triviet Steel will succeed and develop not only in the North
but also in the three regions of Vietnam."
MYANMAR BRANCH REPRESENTITIVECHEONG CHOONG SIN
With me, Myanmar is a real potential market for pre-engineered steel struc-
ture products of Triviet Steel Buildings. As well as great opportunities for
me and my team.
Creating a plan with the perfect penetration strategy that I am pursuing. I
believe that Triviet will soon be successful in the Myanmar market and
moreover in the Southeast Asian market.
DEPUTY DIRECTOR - MANAGER OF BUSINESS DEPTVU TRONG HOANG
“In addition to coordinating with other departments in the company to
bring the best quality of service. We always spend a lot of time work togeth-
er with clients, our customer service team always improve skills to be able
to consult timely arising problem arise and take good care of their custom-
ers. The interests of clients are always considered the best important and be
the guide to Triviet Steel prosperity.”
BOARD OF DIRECTOR 8
HUMAN RESOURCE MANAGERLE THI HONG VAN
“We always pay attention to and apply good compensation to engineers, workers,
employees, ... We focus on to create the best working environment, each employee is
a member in the big Triviet Steel family. Stick together and develop the career in long
term with Triviet Steel.”
ACCOUNTANT MANAGERTRAN NGOC THU
"Our customers, our suppliers, our strategic partners ... are all partners in a spirit of
mutual cooperation and development prosperity."
MARKETING MANAGERNGUYEN HOANG ANH
“Triviet Steel that mean Vietnamese's wisdom, steel of Vietnam, we were a leading
brand - Top 4 Pre-Engineered Steel Buildings in Vietnam. We believe that with the
strength of people & technology, Triviet Steel will be developed not only in the coun-
try but also in the international market.”
PURCHASING MANAGERNGUYEN THI ANH THUYEN
“The premise for the company's development is quality in the product. Our depart-
ment is always looking for partners to provide the best materials. To me, each suppli-
er is a true partner, sticking together and growing together.”
BOARD OF DIRECTOR 9
IT MANAGERBUI THANH KHANG
"When deploying ERP at Triviet Steel, this is a di�cult time, but now it can be con�rmed that
the ERP system has helped Triviet Steel to control the losses very well, making quick
decisions to increase revenue. In addition, Triviet Steel is aiming for multinational develop-
ment, and our partners choose Triviet Steel based on a variety of factors including transpar-
ency of information and the ERP system has satis�ed that."
CHIEF OF DESIGN DEPT.LE VAN NHUT
One of the important things, determining the quality of pre-engineered steel prod-
ucts is design standard. The motto in my job is “Smart solutions”, We always o�er the
best solution, suitable for customers with the most appropriate fee.
DEPUTY OF ENGINEERING MANAGER AND CHIEF OF DRAFTING DEPT.NGUYEN GIA HOANG
The optimal cost and e�ciency savings for each project is the motto in my sta� train-
ing document. Based on the new design standards of advanced countries such as
USA, UK, Japan, ... I always con�dently do requests from the most demanding clients.
DEPUTY MANAGER OF ISO DEPT.TRAN HUYNH VAN NHI
Building a sustainable and improved quality management system is the direction we
have been working on to get a solid and powerful system.
PROJECT MANAGER BOARD 10
PROJECT MANAGEMENT BOARD
LE VAN MINH VU BA THANG LE HOANG DUY HUNG
NGUYEN THANH NHUT NGUYEN VANG NGUYEN THANH PHUOC
Project ManagerExperience: 12 years Experience: 9 years Experience: 7 years
Experience: 6 years Experience: 3 years Experience: 3 years
Project Manager Project Manager
Project Manager Project Manager Project Manager
DESIGN CAPACITY 11
TECHNICAL DESIGN CAPACITY
Design and planning:
• Our professional sta�s will give clients devoted consultancy and help the owners to choose the optimal
solution.
• Triviet is proud to have a team of professional engineering designers who are able to transfer investors’ ideas
and requirements into architecture and structural drawings with cost - e�ective and most optimal solution.
Design shop drawings:
• According to the structural design drawings, technician team will detail the components for production to
manufacture.
MANUFACTURING CAPACITY 12
FACTORY INTRODUCTION
A. MANPOWER:
• Currently, Triviet Steel Buildings’ factory has about 250 sta�s consist of 200 manufacturing & maintenance work-
ers (team leaders included); 30 engineers in charge of manufacture & quality management, 20 sta�s in charge of
administrative work, security, accounting, warehouse keeping, car & truck driving, factory cleaning,…
• There are 7 seperated manufacturing teams as: Cutting Team, Accessories Team, Assembling Team, Finishing
Team, Surface-cleaning Team, Painting Team and Welding Team. Every team has team leader to manage and
supervise each manufacturing process.
MANUFACTURING CAPACITY 13
B. SAFETY EQUIPMENT:
• All sta�s and workers at the manufacturing zone is equipped with hard hats, protective clothing, steel tip shoes,
gloves, etc… which fully comply with safety regulations for mechanical engineering.
• We also strictly observe periodic check and maintenance of our factory’s machineries & equipment
• Besides, depending on the speci�c requirements for the specialized manufacturing work such as cutting, welding,
drilling, painting, etc... our workers are equipped properly with welding shields, tight-�tting eye goggles, face
shields etc…
C. MANUFACTURING PLANT LAYOUT:
• Our factory is located in Binh Duong Province which is about 45 km away from Ho Chi Minh City. It is our
private-owned campus reaching the total area approximately 20,000 sqm whereas the manufacturing site accounts
for 17,000 sqm and the remaining 3000 sqm is for �nished product storage. Moreover, we set up main o�ces, cafeteria,
parking lot, addition material room in a separated area from the main manufacturing site to ensure their utilities.
MANUFACTURING CAPACITY 14
MANUFACTURING CAPACITY
• With an area of 20,000 sqm, Our factory is fully equiped with automatic machineries & equipment with design
capacity of 1,000 tons / month; 12,000 tons per annum.
• We are now planning for our second factory also in Binh Duong province with an area of 40.000 sqm, increas-
ing our manufacturing capacity up to 36,000 tons per year.
MACHINERY AND EQUIPMENT 15
MAIN MACHINERIES & EQUIPMENT:
A.1 USAMulti blade cutting machine 20131
A.2 TaiwanShearing machine 8m 20001
A.3 ChinaSemi automatic oxy gas cutter 20164
A.4 VietnamCNC Plasma & dry Cutting 13 torches 20161
A.5 JapanMulti blade cutting machine 20001
A.6 JapanBond Saw cutting Amada 20001
A.7 JapanShearing machine Kruman 2M 35MM 20162
A.8 ChinaCNC Plasma and Oxy cutting 11 torches 20181
A.9 JapanMulti Cutting iron worker 20102
A.11 KoreaShearing machine 6M 20101
A.10 JapanDrilling Takeda 4020 20101
CUTTING EQUIPMENTSA YEAR ORIGINQUANTITY
B.1 China3D drilling machines Fincm 20131
B.2 JapanDrilling machine table Amada 20163
B.3 ChinaDrilling machine table Sunrise 20161
B.4 ChinaDrilling, punching plate Tianchen 20162
B.5 ChinaH Beam assembly machine 20171
B.6 ChinaH Beam assembly machine 20151
B.7 ChinaH Beam Total assembly machine 20162
B.8 ChinaH Beam re-straightening machine 20162
B.9 JapanPlate bending machine 400 tons 4M 20101
B.11 ChinaH Beam 3D drilling Daito 1000 20101
B.10 ChinaH Beam 3D drilling Amada 4700 20051
B.12 KoreaAngle cutting and punching 20001
MECHANICAL EQUIPMENTSB YEAR ORIGINQUANTITY
C.1 VietnamAC welding machine 2007-20172
C.2 ChinaMulti operator welding machine x 2 torches 2006-20124
C.3 ChinaMulti operator welding machine x 4 torches 20162
WELDING EQUIPMENTSC YEAR ORIGINQUANTITY
D.1 JapanAir compressor Fuseng 2012-20164
D.2 JapanDry air compressor 20161
D.4 USAPainting equipments 2002-20066
D.3 ChinaBall blasting equipments 2007-20164
CLEANING AND PAINTING EQUIPMENTSD YEAR ORIGINQUANTITY
MACHINERY AND EQUIPMENT 16
MAIN MACHINERIES & EQUIPMENT:
E.1 VietnamCrane Q= 3 - 5ton 2013-201628
E.2 VietnamGantry Crane Q= 15 tons 20151
E.3 VietnamGantry Crane Q= 20 tons 20071
E.4 JapanForklift 20072
LIFTING EGUIPMENTSE YEAR ORIGINQUANTITY
I.1 TaiwanBoom lift Genie G45 20104
I.2 USACissor Lift Genie 20152
I.3 VietnamCissor Lift Yamada 20151
I.4 USASemi-automatic Lifting machines 20151
INSTALLATION EQUIPMENTSI YEAR ORIGINQUANTITY
F.1 TaiwanUltrasonic Flaw detector 20161
F.2 TaiwanMeasuring equipments OTK 20161
- Coating thickness tester
- Micrometer Caliper, Caliper rule
TESTING EQUIPMENTSF YEAR ORIGINQUANTITY
H.1 KoreaHeavy truck 30 tons 20165
H.2 KoreaVan 5 - 44 tons 20162
TRANSPORTATIONH YEAR ORIGINQUANTITY
G.1 VietnamMax seam forming machine 20051
G.2 Vietnam6 Ribs forming machine 20062
G.3 Vietnam5 Ribs forming machine 20141
G.4 VietnamKlip-Lock forming machine 20051
G.5 VietnamSeam-Lock forming machine 20142
G.6 VietnamDecking forming machine 20141
G.7 ChinaSteel plate pressing for accessories 20081
G.8 ChinaSteel plale folding machines 20141
G.9 ChinaSteel sheet bending and cutting 20161
G.11 China7 and 9 Ribs forming machine 20171
G.13 ChinaKliplok 920 forming machine 20171
G.10 China5 and 11 Ribs forming machine 20171
G.12 ChinaKliplok 420 forming machine 20171
ROOFING EQUIPMENTSG YEAR ORIGINQUANTITY
PRODUCTION PROCESS 17
PASS
4. Welding
PASS
9. Storage
PASS
7. Shot Blasting
PASS
8. Painting
PASS
10. Transportation
PASS
6. Finishing
PASS
5. Straightening
PASS
1. Materials
PASS
3. Assembling
PASS
2. Cutting
PRODUCTION PROCESS 18
RAW MATERIALS
CUTTING
ASSEMBLING
CNC Cutting Machine Hydraulic Cutting Machine
Hydraulic Assembling Machine Hydraulic Assembling Machine
PRODUCTION PROCESS 19
WELDING
STRAIGHTENING
Accessories Welding Automatic Welding Machine
Straightening Machine
Hydraulic Assembling Machine
PRODUCTION PROCESS 20
SHOT BLASTING AND SURFACE CLEANING
Cleaning Surface
Products After Shot Blasting
Shot Blasting Machine
FINISING
Finishing Welding
CONSTRUCTION CAPACITY 22
STAGES OF CONSTRUCTION
1. Receiving, storage and handling of construction materials:
• We receive and control construction materials to ensure the right quality and quantity are available when needed.
• Material management plays a vital role in construction quality. Therefore, we assure no deformations, no scratches
on the delivered structures to control our construction quality.
• Check the materials carefully prior to erection.
2. Installation of foundation bolts:
CONSTRUCTION CAPACITY 23
3. Erection of primary structure:
• Erection of primary members needs to be in a synchronized manner complying with erection plan to ensure a
hundred percent of correct angles and heights.
• Machineries & equipment are used throughout the erection process such as: truck cranes, forklifts, digital theodolite,
laser projectors, etc…
• Safety equipment are furnished for workers at job site, especially for those who work at height.
CONSTRUCTION CAPACITY 24
4. Installation of roof panels:
• The installation of the roof panel begins after completion of primary structure including anchor bolts and bracing
systems.
• We set up the roof carefully for installation to ensure quality and aesthetic appeal of the building.
5. Installation of wall panels:
6. Completion of construction:
• The �nal stage is to check in details the �nished phases for acceptance.
CONSTRUCTION CAPACITY 25
CONSTRUCTION CAPACITY 26
CONSTRUCTION PROGRESS
• Construction time: thanks to the close cooperation between departments in o�ce and factory, our work strictly
follows the project progress.
• Method to keep progress: site supervisor is in charge of updating and reporting regularly to the main o�ce to
handle the current situation in the construction site.
CONSTRUCTION SAFETY
• Triviet’s safety board has broadcasted Occuppational Safety & Health Laws and Regulations to our workers who
participate from manufacturing process to construction process.
• We highly invest in safety and protective equipment and carry out safety observation not only at manufacturing
site but also at job site.
TYPICAL PROJECTS 27
ANG SON II CEMENT FACTORY Workload: 800 tonsLocation: Quang Binh Province
NGHI PHONG FOOTWEAR EXPORT FACTORYWorkload: 480 tonsLocation: Cao Lanh, Dong Thap Province
TYPICAL PROJECTS 28
OMEXEY FURNITURE FACTORYArea: 31,920 sqm
Location: Tan Uyen, Binh Duong Province
TAFETA FOMOSA FACTORYArea: 18,960 sqm
Location: Nhon Trach IP, Dong Nai Province
TYPICAL PROJECTS 29
NYLON CHEMPACK-VINA FACTORYArea: 13,125 sqmLocation: Tam Phuoc IP, Dong Nai Province
HIGH POINT WORKSHOPArea: 80,000 sqm - Workload: 3,000 tonsLocation: Tan Uyen, Binh Duong Province
TYPICAL PROJECTS 30
KIM TIN MDF FACTORYArea: 15,628 sqm
Location: Phuoc Long, Binh Phuoc Province
JRD OTO MANUFACTORYArea: 26,640 sqm
Location: An My, Phu Yen Province
TYPICAL PROJECTS 31
MAPLETREE VIETNAM WAREHOUSEArea: 114,382 sqmLocation: VSIP II, Binh Duong Province
KIRIN ACECOOK FACTORYArea: 14,676 sqmLocation: My Phuoc 2, Binh Duong Province
TYPICAL PROJECTS 32
KINGJIM FACTORY Area: 18,000 sqm
Location: My Phuoc, Binh Duong Province
LIKSIN PACKAGE WORKSHOP Area: 17,600 sqm
Location: Duc Hoa, Long An Province
TYPICAL PROJECTS 33
HOA PHAT BD STEEL FACTORYArea: 13,400 sqmLocation: Song Than, Binh Duong Province
BACH TUYET PAINT FACTORYArea: 10,000 sqmLocation: Hiep Phuoc, Nha Be, HCMC
TYPICAL PROJECTS 34
HUNG CA COLD STORE – FACTORY Area: 10,148 sqm
Location: Sa Dec, Dong Thap Province
DAI DONG TIEN PLASTIC FACTORYArea: 10,000 sqm
Location: Nhon Trach IP, Dong Nai Province
TYPICAL PROJECTS 35
HA NOI BEER FACTORY (CARLSBERG BEER)Area: 11,251 sqmLocation: Phu My, Vung Tau Province
HUNG VUONG TAY NAM WAREHOUSEArea: 11,000 sqmLocation: Sa Dec, Dong Thap Province
TYPICAL PROJECTS 36
MASAN FACTORYArea: 7,300 sqm
Workload: 300 tons
TAN SON NHAT AIRPORT - BILLBOARD & SHELVESWorkload: 2,100 tons
Location: Ho Chi Minh City
TYPICAL PROJECTS 37
PANDORA TRADE CENTERLocation: Ho Chi Minh City
POUHUNG WORKSHOPWorkload: 520 tonsLocation: Cha La IP, Tay Ninh Province
TYPICAL PROJECTS 38
STEEL FLOOR IN BASEMENT BITEXCOWorkload: 150 tons
Location: Ho Chi Minh City
BUON MA THUOT AIRPORT - PASSENGER SHELTERSWorkload: 600 tons
Area: 27.000 sqm
TYPICAL PROJECTS 39
TAY NINH KUO YUEN BATING FACTORYArea: 13,469 spmLocation: Tay Ninh Province
AN THIEN PHARMACEUTICAL FACTORYArea: 11,600 sqmLocation: Hiep Phuoc, Nha Be, HCMC
TYPICAL PROJECTS 40
PTSC 1 & 2 WORKSHOP Location: Vung Tau Province
COMPLEX MANUFACTURING NGHE ANWorkload: 523 tons
Location: Nghe An Province
TYPICAL PROJECTS 41
YOUNG IL WORKSHOPLocation: Bourbon IP, Tay Ninh Province
VINCOM SUPERMARKET – THU DUCWorkload: 400 tonsLocation: Thu Duc, HCMC
TYPICAL PROJECTS 42
MERCEDES – BENZ FACTORY
LONG YI WORKSHOPArea: 9,800 sqm
Location: My Phuoc 2, Binh Duong Province
Area: 30,000 sqmLocation: Go Vap, HCMC
TYPICAL PROJECTS 43
BIG C NHA TRANG TRADE CENTER
NAM YANG FACTORYWorkload: 800 tonsLocation: Trang Bom, Dong Nai Province
Location: Nha Trang, Khanh Hoa Province
TYPICAL PROJECTS 44
HAIDFEED FEEDSTUFFS FACTORYArea: 28,000 sqm
Location: Dau Giay, Dong Nai Province
YUEN FOONG YU (VINH PHONG) PAPER FACTORYArea: 35,000 sqm - Workload: 2,000 tons
Location: Cu Chi, HCMC
TYPICAL PROJECTS 45
BINH AN BONDED WAREHOUSEArea: 36,000 sqmWorkload: 1,300 tons
Area: 116,000 sqmLocation: Cu Chi, HCMC FIRST SOLAR FACTORY
TYPICAL PROJECTS 46
FACTORY OF SUPER FOAM VIETNAM LIMITEDArea: 23,500 sqm
Location: Binh Duong Province
GREEN FEED FACTORYArea: 23,000 sqm
Location: Vinh Long Province
TYPICAL PROJECTS 47
FACTORY OF NET DETERGENT JSCArea: 36,000 sqmLocation: Dong Nai Province
FACTORY OF ROCHDALE SPEAR FURNITUREArea: 86,000 sqm - Workload: 2,000 tonsLocation: Binh Duong Province
NUMBER ONE CHU LAI FACTORYArea: 260,000 sqm
Location: Quang Nam Province
TYPICAL PROJECTS 48
NUMBER ONE HAU GIANG FACTORYArea: 41,100 sqm
Location: Hau Giang Province
DAI NAM RACE COURSEArea: 10,000 sqm - Workload: 1,500 tonsLocation: Binh Duong Province
TYPICAL PROJECTS 49
PHU MY II BONDED WAREHOUSEArea: 29,700 sqmLocation: Vung Tau Province
TYPICAL PROJECTS 50
OMRON HEALTHCARE MANUFACTURE FACTORYArea: 2,000 sqm - Workload: 100 tons
Location: Binh Duong Province
DAN ON FACTORYArea: 11,500 sqm
Location: Binh Duong Province
TYPICAL PROJECTS 51
LOCK & LOCK FACTORYArea: 10,000 sqmLocation: Vung Tau Province
TEX RAY GARMENT FACTORYArea: 12,700 sqm - Workload: 400 tonsLocation: Tan An City, Long An Province
TYPICAL PROJECTS 54
ADIDAS SHOE FACTORYArea: 28,000 sqm - Workload: 2,300 tons
Location: Dong Nai Province
TYPICAL PROJECTS 55
VINH HUNG ALUMINUM FACTORYArea: 55,000 sqm - Workload: 1,600 tonsLocation: Tien Giang Province
TYPICAL PROJECTS 56
KIM DUC FABRIC BAG FACTORY Area: 50,000 sqm - Workload: 1,400 tons
Location: Long An Province
Email: [email protected] Website: www.trivietsteel.com
HCM O�ce: 3rdFloor Carina Plaza,1648 Vo Van Kiet St., W.16, Dist.8, HCMC, Vietnam.Tel: (+84) 28 6298 5703Fax: (+84) 28 6298 5630
Factory: Ong Dong, Tan Hiep W., Tan UyenDist., Binh Duong Province, Vietnam.Tel: (+84) 274 365 3080Fax: (+84) 274 365 3079
Myanmar Branch O�ce: No. H39, 3rd Main Road,Thiri Yadanar Wholesales Complex Market,North Okkalapa Township, Yangon, MyanmarTel: (+95) 9953 345 789
TRIVIET STEEL BUILDINGS CO.,LTD
Triviet Steel Buildings is a leading company in the �eld of pre-engineered steel structures in Vietnam. Triviet Steel Buidings not only manufacture and supply steel structure products, but more than that, we provide ‘’a total solution of pre-engineered steel structures’’ for clients with full service: Design - Fabrication - Erection.
Triviet Steel Buidings has the vision to bring the best solutions and products. O�ering smart solutions together with clients in
each project, Triviet’s products will always be optimal to suit each
di�erent needs of the project.