Building Information Modeling : The Core of Construction Industry 4.0 Hari Nugraha Nurjaman Ketua Umum Ikatan Ahli Pracetak dan Prategang Indonesia Dewan Pembina Asosiasi Perusahaan Pracetak dan Prategang Indonesia www.iappi-Indonesia.org fb iappi twiter @iappi_Indonesia Instagram iappinesia KONSTRUKSI INDONESIA JIEXPO KEMAYORAN 6 – 8 NOVEMBER 2019

Upload: khangminh22

Post on 18-Jan-2023

0 views

Category:

Documents


0 download

TRANSCRIPT

Building Information Modeling : The Core of Construction Industry 4.0

Hari Nugraha Nurjaman Ketua Umum Ikatan Ahli Pracetak dan Prategang Indonesia

Dewan Pembina Asosiasi Perusahaan Pracetak dan Prategang Indonesiawww.iappi-Indonesia.org fb iappi twiter @iappi_Indonesia Instagram iappinesia

KONSTRUKSI INDONESIAJIEXPO KEMAYORAN 6 – 8

NOVEMBER 2019

Content

1.Pendahuluan2. “Conventional Way” dalam Desain dan

Pembangunan3.Building Information Modeling4. Implementasi di Indonesia 5.The Core of Construction Industry 4.0

I. Pendahuluan• Konstruksi Indonesia saat ini sedang dalam masa “Percepatan” Pembangunan

Infrastruktur sebagai Program Kabinet Kerja 2014-2019• Volume pekerjaan infrastruktur per tahun meningkat 2.5 x dari masa “normal”• Perlu suatu metoda perencanaan dan pembangunan yang dapat mendukung

percepatan dengan kualitas yang baik, efisien, dan memenuhi konseppembangunan berkelanjutan.

• Building Information Modelling dan Industri Konstruksi Berbasis Manufaktur ( Beton pracetak dan prategang, Baja, dan Bahan-bahan Prefabrikasi) adalahmetoda yang secara internasional menjadi trend di dunia karena memenuhikriteria obyektif yang selaras dengan kebutuhan percepatan pembangunaninfrastruktur. - Era 4.0

• Kementerian Pekerjaan Umum dan Perumahan Rakyat, sebagai Pembina IndustriKonstruksi Indonesia menurut amanat UU No.2/2017 tentang Jasa Konstruksi danIndustri konstruksi Indonesia harus segera mengantisipasi perkembangan ini untukmendukung percepatan pembangunan infrastruktur, dapat berpartisipasi aktif di Masyarakat Ekonomi ASEAN (sejak 2016) dan persiapan Pasar Global (2020)

I. PENDAHULUAN

Pertemuan 4 K/L/D/I Provider Infrastrukturdan stakeholder konstruksi 23 Desember 2014

PROGRAM STRATEGIS TAHUN 2015-2019

BIDANG BINA KONSTRUKSI

125 BUJKPeningkatan BUJK ke Kualifikasi Besar

10.000 OrangJumlah Tenaga

Ahli/Manajer Proyek Terlatih

40.000 OrangJumlah

Supervisor/ForemanTerlatih

10.000 orang

Jumlahinstruktur/asesor

pelatihan konstruksi

40%Pekerjaan

konstruksi yang menerapkan

manajemen mutudan tertib

penyelenggarankonstruksi

50.000 OrangJumlah insinyur baru

konstruksi bersertifikat

200.000Orang

Jumlah teknisi bersertifikat

500.000Orang

Jumlah tenaga terampil bersertifikat

Rp.15 Triliun

Ekspor jasa konstruksi ke luar

negeri

30%

Penggunaan beton pracetak

Peningkatan Sumber Daya

Pembangunan Infrastruktur

5

1. Pendahuluan

• Institut BIM Indonesia merupakan organisasi non-profit yang memulaimengembangkan Building Information Modelling (BIM) secara optimal, multi-disiplin, lintas platform dan terbuka di Indonesia.

1. Pendahuluan

• Institut BIM Indonesia merupakan organisasi non-profit yang memulaimengembangkan Building Information Modelling (BIM) secara optimal, multi-disiplin, lintas platform dan terbuka di Indonesia.

II. Conventional Way of Design and

Construction

I Want a Building What Should I do ???

Conventional Way of Design and

Construction

Call Consultant Architect Civil Engineer

Mechanical Electrical and Plumbing Engineer

Let’s disscus our architectural design concept

Plan View Section

3D Just an ImageWorks in 2D

Give to Civil & MEP Engineer

Civil EngineerWork also in 2D

Mechanical Electrical and Plumbing Engineer

Usually work in skematik

DETIL BALKON

STR

DEEP WEEL

PI PA CASING Ø200

FROM PDAM

Ø50

METERANØ65

JOHNSON SCREEN

R.POMPAGWT-2 GWT-1

250 M3 250 M3

Ø50

Ø50

Ø50

LET’S SUPERIMPOSE

Superimpose Architec & Civil Engineer

Superimpose Architec & MEP ???

Superimpose Civil Engineer & MEP ???

BUILDING INFORMATION MODELLING2D Superimpose handle design Revision

2D Arsitek2D Struktur + Arsitek2D Struktur + Arsitek + MEP

TENDER DOCUMENT

Drawing, Budget, Specificarion

CALL CONTRACTORSPLEASE MAKE

BIDDING WITH A REASONABLE

PRICE

OK, BOSSI DO

ANYTHING FOR YOU

At Limited Time Contractor Make Bidding From 2D Drawing

The Most Importan things, we win the Contract

When the Contractors do Shop Drawing

Design Drawing Conflict each other, what we must do ???

THE PROFESSIONAL CONTRACTORS WILL DO ………..

Hey Boss, I think something wrong with Design, we must hold the works until it’s clear.

RFI#1……….1000

Architect Civil Engineer

Mechanical Electrical and Plumbing

Engineer

What’s?? Consultant Check!!RFI# 1………1000

SHIT!!!(my Retention only 5 %)

Architect

Boss, we need

added CCOTo fix this problem

Hey Who will pay this ?!!

mmm….The Consultan

slow to Responsour RFI

Lest Decide

ourselves

OMG…My Investment?!

III. BUILDING INFORMATION MODELLING

HOUSE PROJECT

•Revit Architec

•Revit MEP

•Tekla StructureSeveral 3D softwareWith data base andCan communicated each other

III. BUILDING INFORMATION MODELLING

FlATS PROJECT

•Revit Architec •Revit MEP

•Tekla Structure

III. Building Information Modelling

• Suatu cara kerja yang

ENGKE KUMAHA

• Dibanding cara kerja konvensional

KUMAHA ENGKE

BUILDING INFORMATION MODELLINGEasy to handle design Revision

CLASH Warning

TeklaEditing In the model

Automaticaly 2D dwaringWas change

BUILDING INFORMATION MODELLING

ZERO RFI !!!!

Comparative Study

Fig. 4: Eficiencies of BIM Technology in each Stage of Construction (Heino,2012)

PROMISE BY BIM !

IV. Implementasi di Indonesia

• 2010 : IAPPI dan Tekla bertemu• IAPPI melihat BIM adalah ‘Next Future’• Berapa Biaya ?

US$ 22.000.No Problemo !

• Important thingMembuat customer bisa menggunakan untuk

mengefisiensikan kegiatan konstruksi sehari-hari

3. Implementasi di Indonesia

• Carilah ilmu sampai ke negeri China

2012 : IAPPI studi banding ke Finlandia

learn directly from the source, see the real application,and hear some testimony from customer

• Jika ingin belajar…..carilah Guru Terbaik !

MOU IAPPI – TEKLA untuk membuat“Competency Centre”

Comparative Study

3. Implementasi di Indonesia• Belajar BIM lebih ke “mental” , mau maju ?

THROW CAD 2 D to the Garbage !

• Penerapan di Indonesia mulai di Industri– PT JHS– PT Mextron– PT Margusta– PT Wijaya Karya Beton– PT Pembangunan Perumahan– PT Adhi Karya– PT Wijaya Karya

• Pemilik Bangunan– PT Pelindo– PT Jasindo

PROJECT APPLICATION

•Tekla Struktur

PROJECT APPLICATION

•Revit MEP

Trial Licence Period

• Integrated Building Design and Construction

Open by Minster of Public Works at 9 October 2014

PROJECT APPLICATION

• Precast Structure Building

Fig. 9: BIM Application in Precast Concrete Detailer in Low Cost Housing of Ministry of Public Works 1

Trial Licence Period

• Precast Structure Building

Fig. 9: BIM Application in Precast Concrete Detailer in Low Cost Housing of Ministry of Public Works 1 (Putra,2012)

PROJECT APPLICATION

Minggu 10 Minggu 11 Minggu 12

Minggu 14 Minggu 18 Minggu 22

Contoh Implementasi di Pembangunan Rusun Sewa Pekerja Semarang 2015

PROJECT APPLICATION

1.1 ERECTION KOLOM

1

Penegakan Kolom Pengangkatan Kolom

Joint Kolom-Kolom

Support Kolom

PRECAST CAROLUS

PRESSS SISTEM

Hospital 20174. Application

Carolus Hospital 2017

Ruko 20164. Application

Cikopo, Purwakarta, Jawa Barat

PRECAST PIPERACK

PRECAST JALAN

Advance PRECAST PAVEMENT DI INDONESIA

• Slab beton prategang : perkuatan paska tarik unbonded dan sambungan dissipater

Jalan Pracetak di Klaten

Advance PRECAST PAVEMENT DI INDONESIA

• Slab beton prategang : perkuatan paska tarik unbonded dan sambungan dissipater

Jalan Pracetak di Banjarnegara

PRECAST FACADE

IV. INOVASI PENGENDALIAN MUTU, SKEDUL, BIAYA

R/C slab, fabrikasi di lapangan, PC Preslab produksi pabrik

Stok Half/Pre slab, Erection slab precast

IV. INOVASI PENGENDALIAN MUTU, SKEDUL, BIAYA

Dinding dalam

Dinding facade Kamar mandi

FOTO RUSUN KEMAYORAN

Blok D 10

PROJECT APPLICATION

• Intermediate Training ( ) for 12 participant• Application in some projects

Stairs in extreme contour condition

Trial Licence Period

• Prefabrication Product

PC Pile

Hollow Core Slab

PC Segmental Girder

Trial Licence Period

• Prefabrication Product

PC Post Tension Girder

PC Post Segmental Box Girder

PRODUCT SERIES PRECAST for BRIDGE & FLYOVER

BOX GIRDER

1.000 segmens, produced within

200 working days

Trial Licence Period

• New Innovative Precast Structure

Fig. 8: BIM Application on the Design of Precast Structure in Pipe Rack of Petrochemical Industry (PT Petro Jordan Abadi,2012)

PROJECT APPLICATION

PROJECT APPLICATION

PROJECT APPLICATION

PROJECT APPLICATION

PROJECT APPLICATION

PROJECT APPLICATION

A

D

C

BEF

G H

KETERANGAN :A.DINDING PANEL HOLLOWCORE

(600 X 2200mm)B.KOLOM PRECAST

(150X150X2400mm)C. RINGBALOK

(150X150)D.ATAP BAJA RINGANE.KUSEN ALUMUNIUMF.PINTU MULTIPLEKSG.LIST BETON CETAK

RUMAH INSTANT

PROJECT APPLICATION

RUMAH INSTANT

PROJECT APPLICATION

Pengarahan oleh Dirjen Penyediaan Perumahan Kemen PU PR, komponen dinding ringan, erection ring balok, atap baja ringan, dan panel dinding ringan

Rumah instan tipe 36, peresmian oleh Dirjen Bina Marga Kemen PU PR

Rumah Rp 22 juta Tipe 21 untuk MBR affordabilitas Rp 500.000/bulan Perumnas

PEMASANGAN TULANGAN WIREMESH

PENGECORAN DINDING BETON PRECAST

Sistem Produksi menggunakan Pola Produksi Facad Bangunan TinggiCetakan Baja cukup mahal sehingga akan ada jumlah unit yang cukupbesar agar biaya cetakan dapat tertutup.

PENGANGKATAN PANEL DINDING

Penggunaan beton massif membuat komponen cukup beratsehingga memerlukan crane untuk pemasangan. Hal inimenyebabkan di perlukan jumlah unit yang cukup banyak agar biayacrane tertutup.

Atap Metal

Septic tank

Dinding Panel

Rangka Atap

Lampu dan Instalasi

Closed

Instalasi Pipa Air Bersih

Instalasi Air KotorSaklarInstalasi Air Kotor

Lampu dan Instalasi

Pipa Conduit

Instalasi Saklar

Instalasi Pipa Air Bersih

Instalasi Pipa Air Kotor

PROJECT APPLICATIONKETERANGAN :A.DINDING PANEL HOLLOWCORE

(600 X 2200mm)B.KOLOM PRECAST (300X400mm)C. RINGBALOK (300X400mm)D.ATAP BAJA RINGANE.KUSEN ALUMUNIUMF.PINTU UTAMA PANEL KAYU

PINTU KAMAR MULTIPLEKSG.LIST BETON CETAK

A B

C

D

E

F

PROJECT APPLICATION

PROJECT APPLICATION

PROJECT APPLICATION

PROJECT APPLICATION

PRECAST HOUSE PANTAI MUTIARA

PROJECT APPLICATION

PROJECT APPLICATION

PROJECT APPLICATION

PROJECT APPLICATION

V. BIM The Core of Construction Industry 4.0

In next 5 Years the infrastructure and Housing market is US $ 430 billion , we need The Ultimate Solutions

POSSIBLE ?

DIFFICULT….BUT MAKE IT POSSIBLE

11/6/2019

V. BIM The Core of Construction Industry 4.0

30% Gov Budget : 70% PPP

Pemerintah saat ini mempersiapkan industri konstruksi nasional…..Perlu tanggapan yang responsive….Jika tidak…….silakan gigit jari di negeri sendiri…….

V. BIM The Core of Construction Industry 4.0

Matchmaking with Tekla Germany

German manufacture industry supply precast machinery production to all over the world

Ready to aid Indonesia to implement BIM in precast industry

BIM IN CONSTRUCTION

Fig. 2: Iconic and complex building which was elaborated by BIM Technology (Heino,2012)

BIM IN CONSTRUCTION

Fig. 3: Precast/Prestressed Building using BIM Techmology (Heino,2012)

US Trimble buy Tekla !• Impression for site visit

– Iconic project Apple Headquarter using precast by Clark Pacific

A flying saucer form of 710.000 m2 area in Cupertino which use precast system because the excellency in quality and fast construction

V. BIM The Core of Construction Industry 4.0

V. BIM The Core of Construction Industry 4.0

V. BIM The Core of Construction Industry 4.0

V. BIM The Core of Construction Industry 4.0

• Tender Pelindo III : Design & Build Harus BIM

SOFTWARE PERENCANAAN YANG DIGUNAKAN

• ETABS• PCA COLUMN• Ms EXCEL• Desain Spektra Indonesia, dari www.puskim.pu.go.id• BIM - TEKLA

MODE SHAPE / PERIODE GETAR GEDUNG PELINDO OFFICE

MODE SHAPE / PERIODE GETAR GEDUNG PELINDO PARKING

V. BIM The Core of Construction Industry 4.0

V. BIM The Core of Construction Industry 4.0

PROSES PERSIAPAN PELAKSANAAN

Volume Komponen Struktur output Tekla

V. BIM The Core of Construction Industry 4.0

PROSES PERSIAPAN PELAKSANAAN

Volume Komponen Struktur output Tekla

V. BIM The Core of Construction Industry 4.0

PROSES PELAKSANAAN

V. BIM The Core of Construction Industry 4.0

PROSES PELAKSANAAN

V. BIM The Core of Construction Industry 4.0

PROSES PELAKSANAAN

V. BIM The Core of Construction Industry 4.0

PROSES PELAKSANAAN

V. BIM The Core of Construction Industry 4.0

• Jasindo : Tender Design & Build Precast & BIM

V. BIM The Core of Construction Industry 4.0

PIPERACK JTB

JTB Project – May 2019

JTB Project – Juni 2019

JTB Project – Juli 2019

JTB Project – Agustus 2019

JTB Project – September 2019

JTB Project – Oktober 2019

V. BIM The Core of Construction Industry 4.0

LAPORAN TEKLA

TRIMBLE PRECAST

STUDY TRIP DI IRLANDIA9 – 13 SEPTEMBER 2018

Pendahuluan

Sampo Pilli-SihvolaDirector of Tekla TrimbleHari Nugraha NurjamanChairman of IAPPITero KauttoBusiness development manager Tekla TrimbleHarri NiemiProduct Specialist Tekla Trimblke

Irlandia – Techcrete Plant• Software : Tekla Precast

– 3 D & 6 D – Precast Design, connection, moulding, production– Contoh Dundee Museum dengan sirip façade mendapat

penghargaan dari British Precast• Precast Plant

– Otomatisasi pada mesin potong tulangan– Cetakan besi untuk repetisi besar– Cetakan kayu untuk tailor made; Paling banyak dipakai 6 kali– Arsitektural : single, double, finish bata, polish dan sand

blasting, berbagai varian art finish– Manajemen stocking sudah pakai bar code

Irlandia : Techcrete Precast Plant

Techcrete Precast Plant : Perusahaan precast yang lebih konsentrasi ke produk arsitektur

Irlandia – Techcrete PlantContoh Penerapan BIM 3D – 6D pada Proyek Dundee Museum yang mendapat penghargaan dari British Precast

Precast façade ‘flip’

Model 3D Analisis 6D

Model 3D Sambungan

Gambar kerja sambungan Model 3 D Cetakan

Cetakan dan produk real

Irlandia : Techcrete Precast Plant

Sistem produksi sebagian besar masih manual karena produk banyak yang tailor made. Yang sudah otomatis mesin pemotong tulangan

Rakit tulangan Cetakan kayu untuk produk tailor made

Cetakan baja untuk produk massal

Cetakan dengan finish arsitektur Komponen yang dibuat 2 tahap Komponen yang perlu difurnish

Finishing komponen arsitektur Finishing sandblasting

Irlandia : Techcrete Precast Plant

Sistem stocking yang rapi dan menggunakan bar code diperlukan mengingat banyaknya tipe produk

Berbagai jenis produk dengan variasi bentuk dan finish arsitektur. Harga produk bisa e 700/m2, beberapa diantaranya sampai e 50000 per panel (yang sangat artistik)

Irlandia – O’Reilly Precast• Usia perusahaan sudah 80 tahun• Software : Tekla

– 3 D & 6 D – Mulai BIM sejak 2006, transformasi dari 2D sekitar 6 bulan– Tahun 2016, Departemen Pendidikan Irlandia mewajibkan penggunaan BIM– Proyek umumnyan didapat dengan mengkonversi desain beton konvensional atau struktur baja ke

struktur baja dengan menawarkan kecepatan dan harga yang kompetitif.– Next futurenya augmented reality di pabrik maupun di lapangan.

• Precast Plant– Khusus untuk elemen struktur : dinding, kolom, balok,hollow core ground tank– Produksi elemen 8 - 12 ton– Mesin transportasi elemen di pabrik yang unik– Otomatisasi pada mesin potong tulangan– Cetakan besi untuk repetisi besar– Cetakan kayu untuk tailor made

Irlandia – O’Reilly Precast

Plant di Ballyhoe umumnya masih manual, yang otomatis adalah mesin pemotong tulangan. Gambar yang sampai ke plant adalah gambar kerja produk dari Tekla 3D dan 6D

Cetakan landasan baja, pembatas kayu atau baja

Produk umumnya komponen struktur, dengan berat 8 -12 ton, Contoh dinding dan Tangki air

Label produk

Crane unik yang membuat fleksibilitas di stocking area

Irlandia – O’Reilly Precast

Konferensi di Cabra Castle Hotel – Heritage Living Building – Penerapan BIM di O’Reilly Precast

Portofolio Perusahaan dan Penggunaan BIM

2006 beralih ke BIM dalam waktu 6 bulan 2014 Dep.Pendikan mewajibkan BIM

Next future : otomatisasi produksi, augmented reality di lapangan

Irlandia – O’Reilly Precast

Presentasi Proyek-Proyek Baja dan Beton Konvensional yang dikonversi menjadi beton pracetak dengan bantuan BIM

Waterford IT Sport Arena dari Baja Albert Quay, Cork dari Beton, hemat 6 minggu

Central Park – Design & Build Mandatory Precast karena lokasi dan batas waktu ketat

Irlandia – Shay Murtagh

• Menggunakan BIM untuk produksi otomatis – robotic• Komunikasi dilakukan dari berbagai tempat di beberapa negara dengan

teleconference • Next future BIM 3D-6D dengan Artificial Intelegent• BIM juga digunakan untuk membuat penawaran cepat, dalam waktu 2

– 3 minggu untuk bangunan 5 lantai.• Proses produksi, pengecekan mold, pemasangan tulangan, pengecoran

dengan self compacting concrete, curing dalam oven,• Mold berjalan dari satu tempat ke tempat lain untuk tiap tahap (Sistem

Carousel)• Produktifitas 1 shift +/- 250 m3 dengan 26 pekerja

Irlandia – Shay Murtagh

Pabrik Precast Otomatis-Robotic Sistem Carousel dengan kendali dari BIM

File BIM dimasukkan ke komputer pengendali dalam Sistem ERP

Komputer mengendalikan robot meletakkan ’magnetic shutter’ untuk membentuk cetakan

Perakitan tulangan, pengecoran self compacting concrete, oven, produk jadi

Irlandia – Shay Murtagh

BIM dan Koneksi Global

BIM dan komunikasi dengan lingkungan

BIM dan Kerjasama global

BIM bisa membantu sales. Gedung 5 lantai bisa dibuat quotation dalam 2 – 3 minggu

Contoh Proyek dengan BIM 4 D – 5D

BIM kedepan 3D – 6D Artificial Intelegent

Irlandia – Oran Precast

• Menggunakan BIM untuk produksi otomatis – robotic– Gambar model 3D Tekla diekspor ke bahasa standar mesin unitechnic file– Pembersihan mold– Plotter otomatis untuk menggambarkan posisi shuttering magnet – Pemotongan dan pemasangan tulangan, – Pengecoran dan internal vibrator– Pembalikkan elemen untuk double wall

• Visit ke Athenry Project kepunyaan Kementerian Pendidikan– Full BIM dan Precast (balok, kolom, hollow core dan dinding struktur) – 9200 m2, diselesaikan dalam waktu 5.5 bulan– Kontraktor memilih sistem precast karena lebih cepat– Prelim di Irlandia antara E5000 – 20000/bulan, jadi percepatan program akan memberikan efisiensi

yang signifikan– BIM membantu proyek sehingga dapat dikerjakan tanpa komponen reject dan zero waste

Irlandia – Oran Precast

Conference in Moldron Hotel

Diskusi alasan Oran adopsi BIM dan problem untuk mengoptimalkannya : Training dan integrasi ke sistem perusahaan

BIM Process : Kolaborasi antar BIM dan komunikasi dengan mesin dengan format unitechnik file

Irlandia – Oran Precast

Conference in Moldron Hotel : Contoh penerapan BIM pada beberapa proyek

BIM sangat membantu industri precast dalam desain dan produksi yang membutuhkan ketelitian tinggi

Irlandia – Oran Precast

Fasilitas produksi manual dan Hollow core

Cetakan landasan baja, pembentuk kayu, pembentuk baja Gambar kerja dari BIM Tekla

Perakitan tulangan dari mesin potong otomatis Hasil produk

Sistem produksi Hollow Core Bar code sebagai rekaman data produk

Irlandia – Oran Precast

Sistem produksi otomatis. Dari BIM Tekla di transfer ke mesin lewat unitechnik format

Pemasukkan file Pembersihan cetakan, plotter peletakkan shutter magnetik

Pemasangan shutter magnetik untuk dinding cetakan, pemasangan tulangan otomatis

Pengecoran, internal vibrasi, pembalikkan produk untuk double wall

Irlandia – Athenry Project

Proyek pembangunan Athenry Project (anggaran pemerintah) seluas 9200 m2, Komponen pracetak : Kolom, Balok, Solid Wall, Double wall. Dibangun dalam 5.5 bulan oleh JJ Rhatigan Building Contractor dengan support dari Oran Precast. Pada pelaksanaannya sama sekali tidak ada komponen reject dan zero waste

V. BIM The Core of Construction Industry 4.0

V. BIM The Core of Construction Industry 4.0

V. BIM The Core of Construction Industry 4.0

V. BIM The Core of Construction Industry 4.0

147

ADOPSI

• Stakeholder konstruksimengadopsi BIM

• Penyusunanstandard BIM Nasional (SNI)

• BIM sebagaistandar kurikulumdan kompetensiuntuk universitasdan asosiasi profesi

DIGITALISASI

• Perizinan• Monitoring dan

supervisi• Dimulainya pasar

digital untuksektor konstruksi

KOLABORASI

• Standar aturanterkait kolaborasiindustrikonstruksi

• ImplementasiVirtual Design dan Lean Contruction

• ImplementasiBIM (3D s/d 7D)

2017 2024

ROADMAP KONSTRUKSI DIGITAL I N D O N E S I A

INTEGRASI

• Implementasicloud construction management

• Integrasi sistemproses konstruksi(periinan, claim, commisioning, handover, danlain-lain)

BalitbangPUPR

PROGRES DAN RENCANAPenerapan BIM di lingkungan

Kementerian PUPR

Pembekalan Teknis BIM ke-1 : IntroductionR. Rapat Puslitbang KPT, 13 – 14 Februari 2018

Agenda :• Memahami cara

menganalisa output data dan informasi BIM

• Mengetahui penggunaan BIM pada beberapa proyek infrastruktur

• Mengetahui perkembangan adopsi BIM di dunia

• Memahami langkah-langkah adopsi danimplementasi BIM dalam sebuah organisasi

Pembekalan Teknis BIM ke-2 : Design & Engineering

FTSP UII, 27 Februari – 2 Maret 2018

Agenda :• Memahami implementasi

BIM pada proyekinfrastruktur

• Memahami workflow penggunaan BIM authoring software pada faseperencanaan(project setup, architectural + MEP modelling, collaboration, design coordination, pre-clash detection, quantity take-off, structural modeling, quantity listing)

Pembekalan Teknis BIM ke-3 : Construction

T. Sipil ITB, 24 – 27 April 2018

Agenda :• Memahami workflow

mulai dari fabrikasi hinggakonstruksi selesai

• Menghitung quantity take-off, jumlah material, jumlah tenaga kerja, potensi konflik antarelemen struktur (pre-clash detections), scheduling).

• Finalisasi BIM MorotaiProject

Tekla BIM Innovation Conference Bintaro, 8 Mei 2018

Agenda :• Keynote speech Kabalitbang PUPR• Kolaborasi PUPR dengan BIM Authoring Software :

Tekla akan memberikan free licence software Teklafull version untuk PUPR

BIM INNOVATION CONFERENCE 2018: Construct with Confidence

BIM Project Demo : Morotai ProjectKolaborasi PUPR dengan Authoring Software

dan UII & ITBAuditorium PUPR, 9 Mei 2018

Agenda :• Demo BIM project

Morotai menggunakanteknologi mixed reality

• Kolaborasi PUPR dengan UII dan ITB sebagai Center of Excellence (CoE) untuktraining, sertifikasi, dan litbang

• Peluncuran website & panduan adopsi BIM PUPR

Penyederhanaan perizinan tanpa menghilangkan filtering kelayakan suatu bangunan(wacana penghapusan IMB dan SLF)

Implementasi BIM pada pembangunan infrastruktur PUPR khususnya Rumah Susun. Pemanfaatan BIM juga mengandung fungsi Asset/Facility Management sebagai pengendali pemanfaatan sarpras agar efektif dan efisien.

Penguatan kelembagaan melalui pembentukan Komite BIM (seperti Komite Keselamatan Konstruksi) agar BIM bisa diimplementasikan dan diadopsi dengan baik oleh para pelaku industri konstruksi di Indonesia.

Identifikasi lokasi pembangunan Rumah Susun yang akan menggunakan Teknologi BIM mulai dari fase perencanaan, fase konstruksi, hingga asset/facility management.

Identifikasi Rumah Susun yang saat ini telah terbangun, untuk diterapkan teknologi BIM di sisi asset/facility management-nya.

V. BIM The Core of Construction Industry 4.0

We Are IBMI and Precaster can provide fast and precise design with aid of BIM

Don’t give up for Indonesian……We are in the same boat