10
33 NOS X 1.5 Mega Watt GENERATION DESIGN BY Dr. C. S. BHASKAR CASCADING POWER WITH FLOW OF WATER

Upload: independent

Post on 23-Feb-2023

1 views

Category:

Documents


0 download

TRANSCRIPT

33 NOS X 1.5 Mega Watt GENERATION DESIGN

BY Dr. C. S. BHASKAR

CASCADING POWER WITH FLOW OF WATER

OVERALL PICTURE

• RAW MATERIAL WATER TO GENERATE POWER

• WATER FOR FIRST TIME FILLING• 720 MEGA WATTS EVERY 24 HOURS• 33 INDEPENDENT POWER PLANTS IN CASCADE

• 1000 METERS LONG WATER RESERVOIR OF 20 METER WIDTH AND 2 METER DEEP PLACED AT THE GROUND LEVEL

SINGLE POWER GENERATION UNIT

• EACH TURBINE IS OF 1.5 MEGA WATT

• HEAD FOR EACH TURBINE IS 6 METERS

• EACH TURBINE IS HAVING GAP OF 30 METER

• INLET 6 METERS OUTLET 2 METERS RADIUS

• CONSTENT FLOW OF WATER @30 CUBIC METERS PER SECOND INTO EACH TURBINE

Power Generation design

SINGLE CASCADING PROCESS

CASCADING PROCESS• OUTER LAYER OF PIPE IS CONCRETE• INTENAL LAYER IS EXPOXY PAINT COATING

• PIPE IS MADE UP OF ANTICORROSIVE STEEL WITH THICKNESS OF 50MM

• PIPE HEAD IS 6 METER, FLOW IS 30m3/SEC CONTINUES WATER FLOW IN ALL PIPES

COST FOR PRODUCTION

• 330 CRORES INVESTMENT FOR 720MEGA WATT GENERATION PER DAY

COST FOR SALEEACH DAY 720000 UNITS 240000 UNITS @ 1RUPEES FOR INDUSTRY

240000 UNITS @ 25 PAISA FOR DOMESTIC

240000 UNITS IS FREE FOR AGRICULTUR

EVERY DAY

REVENUE • INDUSTRY SALE 365 DAYS 87600000 RUPEES

• DOMESTIC SALE 365 DAYS 21900000 RUPEES

• EVERY YEAR REVENUE IS 109500000 RUPEES

Thank you