bojanala platinum distrct idp draft

248
1 1 2q BOJANALA PLATINUM DISTRCT IDP DRAFT 5 YEAR IDP DRAFT DOCUMENT 2022/2027 OFFICE OF THE MUNICIPAL MANAGER

Upload: khangminh22

Post on 06-May-2023

1 views

Category:

Documents


0 download

TRANSCRIPT

1

1

2q

BOJANALA

PLATINUM

DISTRCT IDP DRAFT

5 YEAR IDP DRAFT DOCUMENT

2022/2027

OFFICE OF THE MUNICIPAL

MANAGER

2

2

Table of Contents

2q 1

Acronyms and Abbreviations ....................................................................................... 5

FOREWORD BY THE EXECUTIVE MAYOR ................................................................... 6

MUNICIPAL MANAGER’S OVERVIEW ........................................................................... 8

INTRODUCTION AND BACKGROUND ........................................................................ 10

Our planning is not only focused on the immediate needs of our communities but it is also taking into consideration future needs, hence our planning has to have informed projections about the future demands, to ensure effective, efficient, and sustained service delivery over a short, medium and long term ................. 11

SECTION A .................................................................................................................... 11

1.1 EXECUTIVE SUMMARY ......................................................................................... 11

1.2 MUNICIPAL OVERVIEW ........................................................................................... 12

1.3 MUNICIPAL POWERS AND FUNCTIONS .............................................................. 13

1.4 MUNICIPAL SWOT ANALYSIS ................................................................................. 14

SECTION B ..................................................................................................................... 15

2.0 SITUATIONAL ANALYSIS OF THE DISTRICT...................................................... 15

2.1 DEMOGRAPHIC PROFILE ...................................................................................... 16

2.1.1 Total Population ............................................................................................... 16

2.1.2 Population Projections ..................................................................................... 17

2.1.3 Population Pyramid ........................................................................................... 17

2.1.4 Population by Group, Gender and Age ............................................................ 19

2.1.5 Population Density ........................................................................................... 19

2.1.6 Number of Households by Population Group ................................................. 20

2.1.7 Population Growth ............................................................................................ 20

2.1.8 Summary of key demographic challenges and opportunities ....................... 21

2.2 DEVELOPMENT PROFILE ...................................................................................... 22

2.2.1Poverty Index ........................................................................................................ 22

2.2.2 Inequality ........................................................................................................... 23

2.2.3 Employed /Unemployed .................................................................................... 24

2.2.4Crime ..................................................................................................................... 24

2.2.5Education and Skills Profile ................................................................................. 25

2.2.6Health Profile ......................................................................................................... 26

2.2.7 COVID - 19 ............................................................................................................ 27

2.3 SERVICE DELIVERY ............................................................................................... 29

2.3.1 Water and Sanitation ........................................................................................ 29

2.3.2 Human Settlement ............................................................................................ 30

2.3.3 Waste Management .......................................................................................... 31

2.3.4 Roads and Transport ....................................................................................... 31

2.3.5 Electricity .......................................................................................................... 32

2.4 ECONOMIC PROFILE OF THE DISTRICT .............................................................. 33

2.4.1 Key Drivers of the Economy ............................................................................. 33

3

3

2.4.2 Mining ................................................................................................................ 33

2.4.3 Tourism ............................................................................................................. 35

2.4.4 Agriculture ......................................................................................................... 35

2.5.1 Factors affecting the Agricultural Sector: ....................................................... 36

2.5.2 Manufacturing .................................................................................................. 37

2.5.3 Factors affecting Manufacturing ......................................................................... 37

2.6.1 Main employers of the Economy ...................................................................... 38

2.7.1 Key economic Opportunities and Potentials ................................................... 39

2.8.1 Economic positioning ....................................................................................... 39

2.8.2 Economic opportunities mapping ...................................................................... 40

2.9 Key planned investments and projects including locally made products .......... 40

2.9.1 Special Economic Zone .................................................................................... 41

SECTION C .................................................................................................................... 43

DISTRICT MUNICIPALITY’S VISION AND MISSION ................................................. 43

VISION ........................................................................................................................... 43

MISSION ........................................................................................................................ 43

SECTION D ..................................................................................................................... 45

4.1 SPATIAL DEVELOPMENT FRAMEWORK .............................................................. 45

4.2 Status quo on implementation of spatial planning and land use management act (SPLUMA) ................................................................................................................ 45

4.3 Status of by laws .................................................................................................... 46

4.4 Land use regulations- status of Municipal Planning Tribunal (MPT) .................. 47

4.5 Authorised official and Appeals Authority ............................................................ 47

4.6 Status of Approved Delegations/ Tariffs in Bojanala ........................................... 48

4.7 Status on Land Use Management Schemes ......................................................... 48

4.8 Status of Spatial Development Framework (SDF’s) for Local Municipalities ..... 49

SECTION E ..................................................................................................................... 50

5.2 IDP PROCESS PLAN FOR 2021/22 FINANCIAL YEAR AS ADOPTED BY COUNCIL . 51

5.7ROLE OF INTEGRATED DEVELOPMENT PLANNING ........................................... 55

5.10 Policy context and linkage to National Government .......................................... 63

SECTION F ..................................................................................................................... 68

8.1 GOVERNANCE AND INSTITUTIONAL PERFORMANCE ....................................... 68

8.1.1 Leadership ......................................................................................................... 68

8.1.2 Municipal Council Meetings ............................................................................ 68

8.1.3 Intergovernmental Relation (IGR) .................................................................... 68

8.5 KEY PERFORMANCE AREAS ................................................................................... 79

8.12 BPDM STRATEGIES, PROJECTS AND BUDGETS (CORPORATE SUPPORT SERVICES) .............................................................................................................. 84

8.13.5 AGRICULTURE AND RURAL DEVELOPMENT UNIT ....................................................... 118

SECTION G .................................................................................................................. 164

SECTION H .................................................................................................................. 173

10.1PERFORMANCE MANAGEMENT SYSTEM ............................................................ 173

SECTION I ................................................................................................................... 177

4

4

11.1 OPERATIONAL STRATEGIES .................................................................................. 177

11.1.1 FIRE MANAGEMENT STRATEGY .......................................................................... 177

11.1.2 DISASTER MANAGEMENT FRAMEWORK ........................................................... 178

DISASTER RISK MANAGEMENT PLAN .......................................................................... 179

11.1.5 LOCAL ECONOMIC DEVELOPMENT STRATEGY .......................................... 181

TOURISM DEVELOPMENT STRATEGY ..................................................................... 182

11.1.6 PMS FRAMEWORK .......................................................................................... 182

11.1.7 AIR QUALITY MANAGEMENT PLAN ................................................................ 183

11.1.8 ENVIRONMENTAL MANAGEMENT FRAMEWORK ........................................ 183

11.1.9 INTEGRATED WASTE MANAGEMENT PLAN ................................................. 183

11.1.10 INTERNAL AUDIT PLAN ................................................................................ 184

11.1.11 FRAUD POLICY AND RESPONSE PLAN ...................................................... 184

11.1.12 WORKPLACE SKILLS DEVELOPMENT PLAN ............................................. 184

SECTION J .................................................................................................................. 186

LIST OF PROJECTS FROM LOCAL MUNICIPALITIES AND SECTOR DEPARTMENTS ........ 186

SECTION H .................................................................................................................. 226

SECTION I ................................................................................................................... 233

5

5

Acronyms and Abbreviations ABBREVIATION INTERPRETATION

AC Audit Committee

AGSA Auditor General South Africa

BPDM Bojanala Platinum District Municipality

CAPEX Capital Expenditure

CFO Chief Financial Officer

COGTA North West Department of Cooperative Governance, Human Settlement and Traditional Affairs

DPIs Development Priority Issues

DEA Department of Environmental Affairs

DGP District Growth Point

DSD Department of and Social Development

DMR Department of Minerals Resources

DoARD Department of Agriculture and Rural Development

DoE Department of Education

DPWRI Department of Public Works, Roads and Infrastructure

DRMF Disaster Risk Management Forum

EEP Employment Equity Plan

EHS Environmental Health Services

EIA Environmental Impact Assessment

EM Executive Mayor

EMP Environmental Management Plan

EPWP Expanded Public Works Programme

FMG Financial Management Grant

GDP Gross Domestic Product

GDS Growth and Development Strategy

GIS Geographical Information System

GRAP Generally Recognized Accounting Practice

HH Households

HR Human Resource

ICT Information and Communication Technology

IDP Integrated Development Plan

IGR Intergovernmental Relations

IT Information & Technology

KPA Key Performance Area

KPI Key Performance Indicator

LED Local Economic Development

LGSETA Local Government Sector Education and Training Authority

LM Local Municipality

LUM Land Use Management

SDGs Sustainable Development Goals

MDMC Municipal Disaster Management Centre

MFMA Municipal Finance Management Act 56 of 2003

MGP Municipal Growth Point

MPAC Municipal Public Accounts Committee

M&E Monitoring and Evaluation

MHS Municipal Health Services

ABBREVIATION INTERPRETATION

MIG Municipal Infrastructure Grant

MM Municipal Manager

6

6

MMC Member of Mayoral Committee

MOU Memorandum of Understanding

MPAC Municipal Public Account Committee

MSA Municipal Systems Act 32 of 2000

MSIG Municipal System Improvement Grant

MTEF Medium Term Expenditure Framework

MTREF Medium Term Revenue and Expenditure Framework

MTSF Medium Term Strategic Framework

MWIG Municipal Water Infrastructure Grant

NEMA National Environmental Management Act 107 of 1998

NSDP National Spatial Development Perspectives

O&M Operations & Maintenance

OPEX Operational Expenditure

OTP Office of the Premier

PAIA Promotion of Access to Information Act

PMS Performance Management System

RRAMS Rural Road Asset Management System

RDP Reconstruction & Development Programme

REAL Revenue, Expenditure, Assets & Liability

SALGA South African Local Government Association

SCM Supply Chain Management

SDBIP Service Delivery & Budget Implementation Plan

SDF Spatial Development Framework

SDGs Sustainable Development Goals

SDI Spatial Development Initiatives

SETA Skills Education Training Authority

SLA Service Level Agreement

SODA State of the District Address

SPLUMA Spatial Planning and Land Use Management Act

STATSSA Statistic South Africa

SWOT Strength, Weaknesses, Opportunities and Threats

VAT Value Added Tax

WSP Work Skills Plan

FOREWORD BY THE EXECUTIVE MAYOR

It gives me great pleasure as the Executive Mayor of Bojanala Platinum District Municipality to

present to Council and the community at large, as well as to our stakeholders, our five (5) year

7

7

plan - Integrated Development Plan (IDP).

The Integrated Development Plan (IDP) seeks to integrate and balance the economic and social

pillars of sustainability within the Bojanala Platinum District Municipal area without compromising

the institutional capacity required to implement and coordinate the efforts needed across sectors

and relevant spheres of government.

The IDP is therefore the principal strategic planning instrument that guides and informs all

planning, budgeting and all development in the Municipal area. It is also the strategic planning

tool of the municipality and is prepared within the first year after the newly elected Council has

been appointed and will be reviewed annually during the Council’s term of office. The priorities

and actions identified in the IDP will inform the structure of the municipality, the service delivery

standards, all financial planning and budgeting as well as performance reported by the

municipality.

This five-year IDP (2022-2027) set out a timeline for the years ahead that calls for relentless

management of all programmes and a dedicated team to drive it. The Bojanala Platinum District

Municipality has no illusions about the enormity of the challenges facing the institution with various

references to partnerships and making use of skills available from the community and the delivery

team. As a delivery team, Bojanala Platinum District Municipality will ensure that its plans are fit

to the task and manageable.

It will further make sure that the delivery team responsible for its effectiveness is not

overwhelmed. It thus plans to use this process to assist in meeting the expectations of the various

political drivers and communities. Importantly, Bojanala Platinum District Municipality believes

that the way to success is through flawless and capable administration.

In line with the above, the Council and the Community can expect the following:

Development of implementation plans outlining each quarter’s work

Oversight meetings by council, the oversight committee and the audit committee

A performance driven organization that includes a culture of performance, monitoring and

evaluations.

Quarterly Performance Reports to Council, internal Audit, Provincial Department

responsible for Local Government and Finance as well as the National Treasury.

8

8

Our 2022/2027 Integrated Development Plan (IDP) will be amplified and reflect the provisions of

the District Development Model (DDM) as prescribed by the President.

In conclusion, I would like to share with you all my personal principle: “Life is a journey – let us all

enjoy this journey, and most importantly, let us keep safe all time – during the journey”.

--------------------------

CLLR MATLAKALA NONDZABA

EXECUTIVE MAYOR

MUNICIPAL MANAGER’S OVERVIEW

The Bojanala Platinum District is one of the four (4) district municipalities in the North West

9

9

Province. As a district municipality, we are compelled by legislation to ensure that we develop our

district by providing better services to our people to enable them to have better lives. One can

only do that through the development and successful implementation of the Integrated

Development Plan (IDP).

Integrated Development Plans are the most important mechanisms available to the government

to transform the structural differences in our previously divided society. Integrated development

planning is a process by which the planning efforts of different spheres and sectors of government

and other institutions are coordinated at the local government level. The IDP brings together

various economic, social, environmental, legal, infrastructural, and spatial aspects of a problem

or plan. This should take place in a way that enhances development and provides sustainable

empowerment, growth, and equity for the short, medium, and long term. Communities cannot

develop in isolation and integrated development planning ensures this.

The IDP review process aims to assess whether the Municipality is on course to deliver on the

strategic intent of the Council, and incorporates adjustments to be responsive to the ever-

changing realities that communities face.

One is confident that this IDP puts the finger on the pulse for the process propelled at the speed

of available resources to address challenges. As a district, we also position ourselves to secure

the most meaningful and beneficial strategic partnerships with willing stakeholders in both private

and public institutions to bring solutions for development challenges before us.

We have identified projects and programmes that will ensure a change in our district landscape.

We plan to have a district that is conducive to economic growth and more job creation.

This IDP document remains focused on ensuring that we, as a district,

Promote democratic and accountable local government;

Ensure the provision of services to communities in a sustainable manner;

Promote social and economic development;

Promote a safe and healthy environment; and

We encourage the involvement of communities and community organizations in the

matters of local government within our district

Ultimately, we will address these challenges through sustainable partnerships with our society

partners who will play a pivotal role in realizing our strategic programmes and projects

10

10

This IDP is the first step of a continuous good working relationship between the Council executing

its oversight role and the administration’s pursuit of strategic and operational best practices.

I THANK YOU

-----------------------------

MR. AMOS KHUMALO

ACTING MUNICIPAL MANAGER

INTRODUCTION AND BACKGROUND

Integrated Development Planning (IDP) is a process through which the municipality prepares a

11

11

strategic developmental plan, which is the principal strategic instrument guiding all planning,

management, investment, development, and implementation decisions, taking into account

inputs from all stakeholders.

The IDP crosses departmental divisions by linking the physical, social, institutional, and

economic components of planning and development with management and developmental

structure. It integrates and aligns planning in different spheres of government and therefore

enforces and upholds the spirit of cooperative governance in the public sector.

The Constitution of the Republic of South Africa (1996) commits the government to take

reasonable measures, within its available resources, to ensure that all South African have

access to adequate housing, health care, education, food, water, and social security.

The goal of our District Municipality is to establish a planning process, which is aimed at the

disposal of the imbalances created by the apartheid era. Developmental local government can

only be realized through integrated development planning and the compilation of the IDP.

The processes involved in compiling the municipal plan are inclusive, through the consultation

of the community and different stakeholders. The value of integrated development planning for

municipalities is embedded in the formulation of focused plans that are based on developmental

priorities. This approach will assist the municipality with the curbing of wasteful expenditure and

perpetual past spending patterns. Thus leading to a business-orientated approach that is aimed

at ensuring that our municipality is able to utilize the limited resources allocated as efficiently as

possible.

Our planning is not only focused on the immediate needs of our communities but it is also taking

into consideration future needs, hence our planning has to have informed projections about the

future demands, to ensure effective, efficient, and sustained service delivery over a short,

medium and long term

SECTION A

1.1 EXECUTIVE SUMMARY

12

12

This document is the District Municipality’s 5 years strategic plan that guides the development

processes in governance. Similarly, it is of paramount importance to note that Bojanala Platinum

District Municipality is a Category C municipality and is solely dependent on Equitable Shares.

The successful implementation of the IDP and Budget can be achieved only through a partnership

between the municipalities, the other spheres of government, and other district stakeholders such

as the mines to create a single window of coordination as reflected in Outcome 9. This should be

complemented by partnerships with local communities and key stakeholders.

This document details several areas that are important for any member of the Bojanala District or

interested party to have a full understanding of what is planned for the coming five years. This

strategic document will also be the basis upon which macro targets for service delivery in the

district, taking into account the allocated powers and functions, will be shaped.

The 6th Generation IDP which must be approved by Council is developed in line with the IDP

process plan that was approved by the council in August 2021. The IDP process plan seeks to

identify and coordinate key stakeholders in the planning process in the district municipality and

coordinate their contribution to the development of the IDP.

In the original 6th Generation IDP, when approved, the following key features as per section 26 of

the Municipal Systems Act, 32 of 2000, are incorporated:

an assessment of the existing level of development

the council’s development priorities and objectives

the council’s development strategies

the spatial development framework – albeit, the review of the SDF in line with the Spatial

Planning & Land Use Management Act (SPLUMA);

the council’s operational strategies;

the disaster management plan;

a financial plan, and

the Key Performance Indicators and performance targets

1.2 MUNICIPAL OVERVIEW

13

13

The Bojanala Platinum District Municipality is a Category C municipality situated in the North

West Province. It is bordered by the Waterberg District Municipality to the north, Dr. Kenneth

Kaunda District Municipality to the south, the City of Tshwane Metro to the east, West Rand

District Municipality to the southeast, and Ngaka Modiri Molema District Municipality to the

west. It is one of four district municipalities in the province and comprises five (5) local

municipalities (Kgetleng-Rivier LM, Madibeng LM, Moses-Kotane LM, Moretele LM, and

Rustenburg LM) and has a total of 139 wards.

The Bojanala Platinum District Municipality (BPDM) is the home of the cradle of humankind

and is strategically located on the ‘platinum belt’ of the north-eastern side of the North West

province. To the north, the BPDM is surrounded by Waterberg District Municipality (Limpopo

Province), Tshwane Metropolitan Municipality (Gauteng Province), and West-Rand District

Municipality (Gauteng Province) to the Southeast. To its south is Dr. Kenneth Kaunda District

Municipality and the Ngaka Modiri Molema District Municipality to the west.

1.3 MUNICIPAL POWERS AND FUNCTIONS

14

14

A municipality has all the powers and functions assigned to it in terms of sections 156 and 229

of the Constitution and must exercise them subject to Chapter 5 of the Municipal Structures

Act. The Municipal Structures Act of 1998 made provision for the division of powers and

functions between the district and local municipalities. It assigned district-wide functions to

district municipalities and most day-to-day service delivery functions to local municipalities. The

following are powers and functions assigned to the District:-

1.4 MUNICIPAL SWOT ANALYSIS

Section Powers and functions Performance

84(a) Integrated Dev. Planning √

84(b) Portable water supply systems X

84(c) Bulk supply of electricity X

84(d) Domestic wastewater & sewage disposal X

84(e) Solid waste disposal sites X

84(f) Municipal Roads X

84(g) Regulation of passenger TPT services Function still to be

performed

84(h) Municipal Airports X

84(i) Municipal Health Services √

84(j) Fire Fighting Services for the whole district √

84(k) Fresh Produce markets & Abattoirs X

84(l) Cemeteries & Crematoria X

84(m) Local Tourism for the whole district √

84(n) Municipal Public Works X

84(o) Receipt of Grants √

84(p) Taxes, Levies & Duties as authorized by Nat Legislation X

15

15

STRENGTHS WEAKNESSES

Adopted budget & IDP Equitable shares are the main source of income/funding

Political & Administrative Structure Municipal Policies are not reviewed annually

Good governance – Sec 79 committees in place The organizational structure that is not aligned to the District Mandate

Employment opportunities in the mining and construction sector

Unregulated informal markets

Silo operations within the municipality

Disclaimer of Audit Opinions five years consecutively

PMS is not cascaded to employees from middle management downwards

Not performing our Mandate as legislated

Lack of office space

OPPORTUNITIES THREATS

Collaborations with mining companies & partners Labour unrests

Tourism attractions Negative perception on the quality of municipal service provision at local municipalities

IGR/ stakeholder engagement (SALGA, LGSETA, LG& HS, etc.)

The district is a Covid_19 Hotspot Area

Growth and investment opportunities exist Land owned by traditional leadership

Bojanala is predominantly rural in nature and as a result there is an opportunity for agricultural development

Illegal/ informal settlements due to mining activities

SECTION B

2.0 SITUATIONAL ANALYSIS OF THE DISTRICT

16

16

2.1 DEMOGRAPHIC PROFILE

2.1.1 Total Population

With 1.81 million people, the Bojanala Platinum District Municipality housed 3.1% of South

Africa's total population in 2018. Between 2008 and 2018 the population growth averaged

2.64% per annum which is close to double than the growth rate of South Africa as a whole

(1.61%). Compared to North-West's average annual growth rate (1.97%), the growth rate

in Bojanala Platinum's population at 2.64% was slightly higher than that of the province.

TABLE 1: BOJANALA PLATINUM, NORTH-WEST AND NATIONAL TOTAL, 2008-2018 [NUMBERS PERCENTAGE]

Bojanala Platinum

North-West National Total

Bojanala Platinum as % of province

Bojanala Platinum as % of national

2008 1,400,000 3,350,000 49,500,000 41.7% 2.8% 2009 1,440,000 3,410,000 50,300,000 42.1% 2.9% 2010 1,480,000 3,480,000 51,100,000 42.5% 2.9% 2011 1,530,000 3,560,000 52,000,000 42.9% 2.9% 2012 1,570,000 3,630,000 52,900,000 43.3% 3.0% 2013 1,620,000 3,710,000 53,700,000 43.6% 3.0% 2014 1,660,000 3,780,000 54,600,000 43.8% 3.0% 2015 1,700,000 3,850,000 55,500,000 44.1% 3.1% 2016 1,740,000 3,930,000 56,400,000 44.3% 3.1% 2017 1,780,000 4,000,000 57,200,000 44.4% 3.1% 2018 1,810,000 4,070,000 58,100,000 44.5% 3.1%

Average Annual growth 2008-2018 2.64% 1.97% 1.61%

Source: IHS Markit Districtal eXplorer version 1803

When compared to other District, the Bojanala Platinum District Municipality accounts

for a total population of 1.81 million, or 44.5% of the total population in the North-West

Province, which is the most populous District in the North-West Province for 2018.

Bojanala

Platinum

Ngaka

Modiri

Molema

Dr Ruth

Segomotsi

Mompati

Dr

Kenneth

Kaunda

Total population North-West Province, 2018

Source: IHS Markit Regional eXplorer version 1803

17

17

The ranking in terms of the size of Bojanala Platinum compared to the other District

remained the same between 2008 and 2018. In terms of its share the Bojanala Platinum

District Municipality was significantly larger in 2018 (44.5%) compared to what it was in

2008 (41.7%). When looking at the average annual growth rate, it is noted that Bojanala

Platinum ranked highest (relative to its peers in terms of growth) with an average annual

growth rate of 2.6% between 2008 and 2018.

2.1.2 Population Projections

The population projection of Bojanala Platinum District Municipality shows an estimated

average annual growth rate of 1.7% between 2018 and 2023. The average annual growth

rate in the population over the forecasted period for North-West Province and South Africa

is 1.6% and 1.4% respectively and is lower than that the average annual growth in the

Bojanala Platinum District Municipality.

Table 2: Population Projection

Source: IHS Markit Districtal eXplorer version 1803

2.1.3 Population Pyramid

In 2018, the female population for the 20 to 34 years age group amounts to 14.0% of the

total female population while the male population group for the same age amounts to

16.9% of the total male population. In 2023, the male working age population at 15.2%

still exceeds that of the female population working age population at 12.5%, although both

are at a lower level compared to 2018.

Bojanala Platinum

North-West National Total

Bojanala Platinum as % of province

Bojanala Platinum as % of national

2018 1,810,000 4,070,000 58,100,000 44.5% 3.1% 2019 1,850,000 4,140,000 59,000,000 44.6% 3.1% 2020 1,880,000 4,210,000 59,800,000 44.7% 3.1% 2021 1,910,000 4,280,000 60,600,000 44.7% 3.2% 2022 1,940,000 4,340,000 61,500,000 44.8% 3.2% 2023 1,970,000 4,410,000 62,300,000 44.8% 3.2% Average Annual growth 2018-2023 1.72% 1.60% 1.38%

18

18

The population pyramid below reflects a projected change in the structure of the

population from 2018 and 2023.

BOJANALA PLATINUM DISTRICT MUNICIPALITY, 2018 VS 2023 (PERCENTAGE)

By comparing the population pyramid of Bojanala District with the national age structure,

the most significant differences are;

there is a significantly larger share of young working age people between 20 and 34

(30.9%), compared to what is estimated in 2023 (27.6%)

The fertility rate in 2023 is estimated to be slightly higher compared to that experienced

in 2018.

The share of children between the ages of 0 to 14 years is projected to be significant

smaller (24.1%) in 2023 when compared to 2018 (25.5%)

150,000 100,000 50,000 ,0 50,000 100,000 150,000

00-04

05-09

10-14

15-19

20-24

25-29

30-34

35-39

40-44

45-49

50-54

55-59

60-64

65-69

70-74

75+

Population structure Bojanala Platinum, 2018 vs. 2023

2018

2023

Male Female

Source: IHS Markit Regional eXplorer version 1803

19

19

2.1.4 Population by Group, Gender and Age

Table 4 - Bojanala Platinum and the rest of North-West Province, 2018 [Number].

Source: IHS Markit Districtal eXplorer version 1803

Male Female Total Bojanala Platinum 956,000 857,000 1,810,000 Ngaka Modiri Molema 461,000 486,000 947,000 Dr Ruth Segomotsi Mompati

247,000 268,000 515,000

Dr Kenneth Kaunda 390,000 407,000 797,000 North-West 2,050,000 2,020,000 4,070,000

Bojanala Platinum District Municipality's male/female split in population was 111.6 males

per 100 females in 2018. The Bojanala Platinum District Municipality has significantly more

males (52.73%) relative to South Africa (48.95%), and what is typically seen in a stable

population. This is usually because of physical labour intensive industries such as mining.

In total there were 857 000 (47.27%) females and 956 000 (52.73%) males. This

distribution holds for North-West as a whole where the female population counted

2.02 million which constitutes 49.56% of the total population of 4.07 million.

2.1.5 Population Density In 2018, with an average of 98.9 people per square kilometre, Bojanala Platinum District

Municipality had a higher population density than North-West (38.8 people per square

kilometre). Compared to South Africa (47.6 per square kilometre) it can be seen that there

are more people living per square kilometre in Bojanala Platinum District Municipality than

in South Africa.

,0

,20

,40

,60

,80

,100

,120

Bojanala Platinum North-West National Total

Population density - Number of people per km² Bojanala Platinum, North-West and National Total, 2018

Source: IHS Markit Regional eXplorer version 1803

20

20

2.1.6 Number of Households by Population Group

If the number of households is growing at a faster rate than that of the population it means

that the average household size is decreasing, and vice versa. In 2018, the Bojanala

Platinum District Municipality comprised of 587 000 households. This equates to an

average annual growth rate of 3.35% in the number of households from 2008 to 2018.

With an average annual growth rate of 2.64% in the total population, the average

household size in the Bojanala Platinum District Municipality is by implication decreasing.

This is confirmed by the data where the average household size in 2008 decreased from

approximately 3.3 individuals per household to 3.1 persons per household in 2018.

Bojanala

Platinum North-West National

Total Bojanala Platinum as % of province

Bojanala Platinum as % of national

2008 422,000 952,000 13,500,000 44.4% 3.1% 2009 448,000 996,000 13,900,000 45.0% 3.2% 2010 466,000 1,020,000 14,100,000 45.6% 3.3% 2011 485,000 1,050,000 14,400,000 46.0% 3.4% 2012 502,000 1,080,000 14,700,000 46.4% 3.4% 2013 517,000 1,110,000 15,000,000 46.8% 3.4% 2014 530,000 1,130,000 15,300,000 47.1% 3.5% 2015 549,000 1,160,000 15,700,000 47.3% 3.5% 2016 564,000 1,190,000 16,100,000 47.5% 3.5% 2017 574,000 1,200,000 16,400,000 47.7% 3.5% 2018 587,000 1,230,000 16,700,000 47.9% 3.5% Average Annual growth 2008-2018 3.35% 2.58% 2.13%

Source: IHS Markit Districtal eXplorer version 1803

Relative to the province, the Bojanala Platinum District Municipality had a higher average

annual growth rate of 3.35% from 2008 to 2018. In contrast, the South Africa had a total

of 16.7 million households, with a growth rate of 2.13%, thus growing at a lower rate than

the Bojanala Platinum.

2.1.7 Population Growth

Population growth of Bojanala district represented in the graph below shows that the total

population for local municipalities increased throughout the years. Rustenburg recorded

the most growing municipality in the district from 2013 to 2017. Kgetleng Rivier has the

lowest population growth in the district.

Figure 115: BPDM population by local municipality (2013 – 2017 with 2022 projections)

21

21

Data Source: IHS Global Insight (2018)

Bojanala platinum recorded a decreasing population growth from the period of 2006-2011

and 2017-2022. The District recorded the highest population growth rate at the beginning

of the period in 2006-2011 at 0.03 percent. The growth remained constant at 0.2 percent

for the period from 2011-2016 and 1996-2017. For the period 2017 to 2022, population

growth rate to decrease by 0.01.

Data Source: IHS Global Insight (2018)

2.1.8 Summary of key demographic challenges and opportunities BPDM hosts the highest population within the North West Province due to Economic

Opportunities presented by the locality and that has got its own challenges in social

and infrastructure burden

The numbers demonstrates clearly how the District is densely populated, with

Rustenburg the most dense, that could also indicates where the resources could

be channelled

Whilst BPDM has got the highest population, the pattern indicates a slight

decrease in growth, which has got its consequences in future planning.

Age of youthful population to be taken into consideration for planning purposes to

accommodate their needs and desire

0.03

0.02

0.02

0.01

0

0.005

0.01

0.015

0.02

0.025

0.03

2006-2011 2011-2016 1996-2017 2017-2022

1575331.0381731005.34

1828040.178

0

200000

400000

600000

800000

1000000

1200000

1400000

1600000

1800000

2000000

2013 2014 2015 2016 2017 2018 2019 2020 2021 2022

Bojanala Platinum Moretele Madibeng

Rustenburg Kgetlengrivier Moses Kotane

22

22

2.2 DEVELOPMENT PROFILE

2.2.1Poverty Index

In 2018, there were 959 000 people living in poverty, using the upper poverty line

definition, across Bojanala Platinum District Municipality - this is 8.96% higher than the

880 000 in 2008. The percentage of people living in poverty has decreased from 62.93%

in 2008 to 52.97% in 2018, which indicates a decrease of 9.97 percentage points.

NUMBER AND PERCENTAGE OF PEOPLE LIVING IN POVERTY - BOJANALA PLATINUM DISTRICT MUNICIPALITY, 2008-2018 [NUMBER PERCENTAGE]

In terms of the percentage of people living in poverty for each of the Municipality within

the Bojanala Platinum District Municipality, Moretele Local Municipality has the highest

percentage of people living in poverty, using the upper poverty line definition, with a total

of 74.4%. The lowest percentage of people living in poverty can be observed in the

Rustenburg Local Municipality with a total of 42.9% living in poverty, using the upper

poverty line definition.

0%

10%

20%

30%

40%

50%

60%

70%

,0

200,000

400,000

600,000

800,000

1000,000

1200,000

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Number and percentage of people in poverty Bojanala Platinum, 2008-2018

Number of people in poverty

Source: IHS Markit Regional eXplorer version 1803

23

23

2.2.2 Inequality

The Poverty gap rate graph below indicates that in 2018, the poverty gap rate was 31.3%

and in 2008 the poverty gap rate was 33.7%, it can be seen that the poverty gap rate

decreased from 2008 to 2018, which means that there were improvements in terms of

the depth of the poverty within Bojanala Platinum District Municipality. However the gap

between the rich and the poor remains high with a Gini Coefficient of 0,62 making it one

of the most unequal societies in South Africa

Since the advent of Democracy; one of the key objectives of our government has been

the reduction of poverty, inequality and unemployment. Poverty, which is defined in

various ways based on the approach that derives it, i.e., extent and profiling of the poor.

0.0%

20.0%

40.0%

60.0%

80.0%

Percentage of people living in poverty Bojanala Platinum District Municipality, 2018

Source: IHS Markit Regional eXplorer version 1803

28.0%

29.0%

30.0%

31.0%

32.0%

33.0%

34.0%

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Poverty gap rate Bojanala Platinum District Municipality, 2018

24

24

In recent years Stats SA has adopted the Multi-terminal Poverty Index to measures the

extent of poverty. This approach asses the simultaneous or joint deprivations poor people

or households experience in a set of indicators. The MPI comprise two measurers,

namely, poverty incidences (the percentage of population classified as multi-

dimensionally poor - poverty headcount) and poverty intensity (proportion of average

deprivation experienced by the poor).

2.2.3 Employed /Unemployed

In 2018 the labour force participation rate for Bojanala Platinum was at 52.4% which is

slightly lower when compared to the 56.7% in 2008. The participation rate is an efficient

indicator that measures the success rate of the labour force relative to employment. In

2008, the unemployment rate for Bojanala Platinum was 25% and increased overtime to

27.6% in 2018. The gap between the labour force participation rate and the

unemployment rate increased which indicates a positive outlook for the employment

within the Bojanala District.

The unemployment rate is 48,7% which is an above 3% increase from the 2008

registered 45,5%. In 2018, there were a total number of 180 000 people unemployed in

Bojanala Platinum, which is an increase of 44 900 from 135 000 in 2008. The total

number of unemployed people within Bojanala Platinum constitutes 48.66% of the total

number of the unemployed in North-West Province. The Bojanala Platinum District

Municipality experienced an average annual increase of 2.91% in the number of

unemployed people, which is worse than that of the North-West Province which had an

average annual increase in unemployment of 2.21%

2.2.4Crime

Low levels of skills, high rate of unemployment and abuse of substances in the Bojanala

has resulted in the district having the highest overall crime rate of the sub-regions within

the overall North West Province. Property crime is a major problem in the district, with

an index of 151 per 100 000.

However, this is indicative of the national and provincial challenge of this mode of crime.

Violent crimes are of concern in the district which indicator is not too far below the

provincial average of 80,9 per 100 000. The overall crime index comparison still puts

Bojanala Platinum District Municipality relatively low in comparison to the crime index

of both the Province and National.

25

25

2.2.5Education and Skills Profile

38,7% of the residents have completed matric and some 6% have no education at all.

This means the people with no education have decreased at an annual rate of 1,53%

per annum between 2008 and 2018. The number of people within the 'matric only'

category, increased from 228,000 to 377,000. The number of people with 'matric and a

certificate/diploma' increased with an average annual rate of 3.71%, with the number of

people with a 'matric and a Bachelor's' degree increasing with an average annual rate

of 5.51%. Overall improvement in the level of education is visible with an increase in the

number of people with 'matric' or higher education.

The number of people with 'matric and a certificate/diploma' increased with an average

annual rate of 3.71%, with the number of people with a 'matric and a Bachelor's' degree

increasing with an average annual rate of 5.51%. Overall improvement in the level of

education is visible with an increase in the number of people with 'matric' or higher

education.

The number of people without any schooling in Bojanala Platinum District Municipality

accounts for 30.93% of the number of people without schooling in the province. In 2018,

the number of people in this District Municipality with a matric only was 377,000 which is

a share of 52.49% of the province's total number of people that has obtained a matric.

The number of people with a matric and a Postgrad degree constitutes 39.83% of the

province and 1.68% of the national.

Bojanala has organised its education districts in accordance with municipal boundaries.

The District has over 37% of schools and 38% of learners in the province. There are 566

26

26

schools, 38 are independent schools. There are a total of 316 521 learners, 11 089 are

in independent schools supported by 10 592 educators. The Learner/Teacher Ratio in

the public schools is 1:31 and in the independent schools it is 1:15,3.

Despite these large numbers Bojanala does not have a university, however the

University of South Africa offers courses as does Orbit TVET College, which offers a

range of courses including engineering, public management, human resources, finance,

economics and accounting. There has been pressure to have a university in the district,

possibly in Rustenburg.

2.2.6Health Profile

Bojanala District has 125 healthcare facilities to provide Public Health Care across the

District. Out of the 125 Health Care Facilities in the District, only 10 are configured as

Community Health Centres and provide 24 hour services. There is an additional 17 Clinic

facilities providing 24 hour services to complement the work of the Community Health

Centres.

There is a total of 19 Mobile Clinics servicing 674 service points across the District. The

Mobile Clinics are mainly providing preventative and promotive health services with

minimum curative services0.3. The main interventions are done through referral to either

the Community Health Centres and or District Hospitals. The service in its nature is not

totally dependable as it is not available during bad weather, weekends and public

holidays. Plans are in place to gradually extend this service to weekends, holidays and

the provision of reliable appropriate vehicles.

Bojanala District faces the quadruple epidemic of disease such as HIV/AIDS,

Tuberculosis, Chronic diseases of lifestyle, Violence and trauma.

LEADING CAUSES OF DEATH:

Adults Children

1 HIV/AIDS & TB related complications 1 Diarrhoeal Disease

2 Tuberculosis 2 Lower respiratory tract infection

3 Lower respiratory tract infection 3 Preterm birth Complications

4 Hypertensive Diseases 4 Birth Asphyxia

5 Cerebrovascular Accidents 5 HIV/AIDS related complications

6 Interpersonal Violence 6 Malnutrition including severe acute malnutrition

7 Trauma due to road traffic accidents 7 Neonatal Sepsis

27

27

2.2.7 COVID - 19

Following Presidential announcement of nationwide lockdown which commenced in March

2020, stringent measures were applied to contain the virus so as to prepare the Health

System to respond to anticipated COVID-19 cases and minimise pressure thereof. The

pandemic has severely affected the economy where we witnessed business closures, job

losses and economic impacts that have led to declining income revenues and budget cuts

in municipalities which somehow put a strain in capability of municipalities to provide quality

services to communities. This happened while the country had already been downgraded

to junk status.

COVID-19 pandemic has highlighted the critical role played by municipalities in service

delivery, economic development and infrastructure investments.

The Council for Scientific and Industrial Research (CSIR) in collaboration with Albert

Luthuli Centre for Responsible leadership have developed a set of COVID-19 Vulnerability

Indicators using available data and knowledge. It identifies vulnerabilities present in

communities and identifying areas in need of targeted coordinated interventions and early

response. The purpose of the indicators is intended to support the early

prevention/mitigation and preparedness phase of the disaster management cycle and

informing disaster management decision making. It is not based on epidemiological

modelling but a response to highlighting intervention areas due to underlying situation. The

composition of the index follows two main factors, namely: transmission potential and

health susceptibility.

Transmission potential areas identify areas that prevent social distancing to be practiced

and where limitations of practicing good basic hygiene. The health susceptibility index

denotes areas where large number of people are potential more susceptible to being

adversely affected by COVID-19 due to factors such as age and underlying health

conditions. The Bojanala vulnerability profile is presented below. The map shows low

vulnerability areas (blue dotted areas) versus areas with higher vulnerability (red dotted

areas)

28

28

Vulnerability is generally along platinum belt with Rusternberg, Mooinoi and Brits showing

high vulnerability, particulalrly where there are informal settlements and townships. Letlabile

with its proximity to Mabopane (a Tshwane Hotspot) also displays some extreme vunerability.

Area specific live GIS vunerability maps are available curtosy of CSIR at:

The district established a Command Council under the leadership of Cllr Fetsang Mokati

that directs the Covid_19 response.

Bojanala Platinum District Municipality has been severely affected with the closure of mining

& tourism sectors which are the main employers in the district. This also have impacted on

municipal revenue and unemployment has increased due to retrenchments due to the

pandemic. This led to municipal revenue loss and potential jobs at risk due to instability. Other

impacted sectors are retail, manufacturing and transport. Decline in government grants

allocations for municipalities and National Treasury directed that budget be adjusted and

this will negatively affect service provision as most municipality are reliant on government

grants and revenue collection have declined. Having stated the above, the economy has

declined with high unemployment level and poverty. There is an increase demand to access

indigent programmes temporarily & COVID grants.

Bojanala Platinum District Municipality was the epicentre of the Province in terms of reported

positive cases of COVID-19 infections with Rustenburg as the leading town.

With the gradual opening of economy which started during lockdown level 3 and proceeded

to Level 1, there is some form of mobility with most the sectors opening. Opportunities are

29

29

there to revive the economic sector, i.e. one plan (DDM) through collaborations, relief

measures for business by municipalities, business support services, private sector etc.

2.3 SERVICE DELIVERY

2.3.1 Water and Sanitation

Bojanala Platinum District Municipality had a total number of 154 000 (or 25.83%)

households with piped water inside the dwelling, a total of 306 000 (51.32%) households

had piped water inside the yard and a total number of 7 180 (1.20%) households had no

formal piped water.

The water backlog (number of households below RDP-level) in 2008 were 66 400 within

Bojanala Platinum District Municipality, this decreased annually at -0.66% per annum to

62 200 in 2018.

Water backlog Bojanala Platinum, 2008-2018

80,000

70,000

60,000

50,000

40,000

30,000

20,000

10,000

,0

69801,5

66389,4 67273,7

72342,5

73375,6

75114

74691,3

73116,4

67648,5

62156

62150,1

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Water backlog - number of households below RDP-level

Source: IHS Markit Regional eXplorer version 1803

Bojanala Platinum District Municipality had a total number of 247 000 flush toilets

(41.47% of total households), 109 000 Ventilation Improved Pit (VIP) (18.33% of total

households) and 219 000 (36.67%) of total households’ pit toilets. The sanitation

backlog (number of households without hygienic toilets) in 2008 in Bojanala Platinum

District Municipality was 220 000, this increased annually at a rate of 0.86% to 240

000 in 2018.

30

30

Sanitation Backlog (2008-2018)

245,000

240,000

235,000

230,000

225,000

220,000

215,000

210,000

205,000

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Source: IHS Markit Regional eXplorer version 1803

2.3.2 Human Settlement

Bojanala Platinum District Municipality has a total number of 118 000 (19.79% of total

households) very formal dwelling units, a total of 320 000 (53.62% of total households)

formal dwelling units and a total number of 99 800 (16.73% of total households)

informal dwelling units.

Households by dwelling unit type Bojanala Platinum, North-West and National Total, 2018

100%

90%

80%

70%

60%

50%

40%

30%

20%

10%

0%

Other dwelling type

Traditional

Informal

Formal

Very Formal

Bojanala Platinum North-West National Total Source: IHS Markit Regional eXplorer version 1803

In 2008 the number of households not living in a formal dwelling were 131 000 within

Bojanala Platinum District Municipality. From 2008 this number increased annually at

1.95% to 159 000 in 201

31

31

2.3.3 Waste Management

Bojanala Platinum District Municipality had a total number of 353 000 (59.17%)

households which had their refuse removed weekly by municipalities, a total of 12 600

(2.11%) households had their refuse removed less often than weekly by the authority

and a total number of 192 000 (32.17%) households which had to remove their refuse

personally (own dump).

The number of households with no formal refuse removal in 2008 in Bojanala Platinum

District Municipality was 228 000, this increased annually at 0.14% per annum to 231

000 in 2018. The total number of households within Bojanala Platinum District

Municipality increased at an average annual rate of 3.35% from 2008 to 2018, which

is higher than the annual increase of 2.13% in the number of households in South

Africa.

Refuse removal Bojanala Platinum, 2008-2018

245,000

240,000

235,000

230,000

225,000

220,000

215,000

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Number of households with no formal refuse removal

Source: IHS Markit Regional eXplorer version 1803

2.3.4 Roads and Transport

Public transport vehicles operational within Bojanala district with regard to subsidized

bus transport, there are a total of 401 buses operational on the network, 232 belonging

to the Bojanala Bus Service, and 169 to Amarosa/Thari Bus service.

With regard to bus infrastructure there are 15 terminal facilities, 22 holding area and

an estimated 556 bus stops. Unfortunately, some of these facilities are in a poor

condition and there is generally considerable room for improvement of infrastructure,

and management and maintenance of the facilitie

32

32

2.3.5 Electricity

Bojanala Platinum District Municipality had a total number of 15 000 (2.51%)

households with electricity for lighting only, a total of 522 000 (87.54%) households

had electricity for lighting and other purposes and a total number of 59 300 (9.95%)

households did not use electricity.

When looking at the number of households with no electrical connection over time, it

can be seen that in 2008 the households without an electrical connection in Bojanala

Platinum District Municipality was 79 300, this decreased annually at -2.86% per

annum to 59 300 in 2018.

90,000

80,000

70,000

60,000

50,000

40,000

30,000

20,000

10,000

,0

Electricity connection Bojanala Platinum, 2008-2018

2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

Source : HIS .Markit Regional .eXplorer version 1803

Number of households with no electrical connect

33

33

2.4 ECONOMIC PROFILE OF THE DISTRICT

2.4.1 Key Drivers of the Economy

The location quotient determines the comparative advantage of Bojanala DM

relative to the North West Province i.e. the quotient gives an indication of the

more competitive location in producing a product or service. A location quotient

larger than one indicates a comparative advantage and a quotient smaller than

one indicates a comparative disadvantage in an economic activity.

It is evident that Bojanala has a comparative advantage in the Mining sector but

it has a disadvantage in all of the other Sectors. Besides the Mining activities all

the other Sectors in the District are seen as underdeveloped and not competitive

at the Provincial level.

For 2008 it was estimated that about 265 599 people were employed in Bojanala

DM.

2.4.2 Mining

This sector accounted for an estimated 34.6% of all formal employment

opportunities in Bojanala DM during 2008. Apart from this sector, the Services

and Trade sectors were also estimated to play a significant role in the

employment opportunities for the people of Bojanala DM in line with the

Provincial trend.

As mining plays a significant role within the Bojanala PDM a greater

understanding of the mines is necessary. Thus the mines within the district will

be examined. Map 3 illustrates the mines for Impala Platinum Limited, Anglo

Platinum and Lonmin Platinum Limited amongst others.

Bojanala PDM is blessed with mineral deposits and currently there are no signs

that these mineral reserves will be depleted. Mining trends. The mining sector

has been on upward trend specifically from 2002 onwards, this was due to the

increase in demand for platinum which exceeded supply, resulting in a deficit

34

34

and thus causing an increase in the price.

There has also been an increase in demand for coal as the stockpile used by

Eskom to generate electricity has been depleted. This may prove to be an

incentive to mining the assumed coal deposits within Moretele Local

Municipality. Availability of labour as with the agricultural sector most mining

activities require low levels of skill, which is quiet abundant in the District.

Economic linkages Most of the mining products extracted from BPDM are

beneficiated elsewhere. The local mining produce presents opportunities for

forward linkages such as the processing and beneficiation of mining products

such as the refining of minerals, manufacture of jewellery etc. Mining inputs,

such as machinery, piping, tubing, chemicals, mining timber, iron and steel

products, explosives, electrical machinery, cables and wiring and foodstuffs are

sourced from outside the North West, resulting in a massive income leakage

out of the area.

The mines potentially represent a substantial local market for these

manufactured products and by strengthening the local backward linkages, the

manufacturing sector can be stimulated. The mines also provide a market for

local SMME’s, which act as service providers to the mines, incl. brick making,

gearbox repair, general repairs, welding, office cleaning, catering, dry cleaning,

laundry services, etc. Technology change – The cost of extraction Overall

extraction costs are determined by a combination of variables such as grade of

ore, mining depth, geology, labour efficiency and technology. More efficient

technology and improved labour productivity can therefore increase the

profitability of the mines.

Small Scale Mining of Construction Minerals (i.e. small-scale mining of Tin,

Chrome, Slate, Lead and Granite) provides an opportunity to second economy

players to engage in first economy activities thus narrowing the gap between

the two.

The Department of Mineral & Energy promotes such activities through pre-

feasibility studies and expertise conducted in the following municipalities:

35

35

Kgetlengrivier LM

Moses Kotane LM

Madibeng LM

Rustenburg LM

2.4.3 Tourism

Areas in Bojanala PDM are the area’s most visited in the North West Province

according to the LED Strategy, 2003 for Bojanala PDM. 52% of all overseas

tourists to the North West Province visit Sun City and 35% of all overseas

tourists visit the Pilanesberg National Park.

According to the LED Plan for Bojanala DM the following areas are the main

tourist attraction for Bojanala DM: Sun City/Lost City Complex: This is one of

the main tourist attractions in Bojanala DM. These resorts are internationally

renowned and host many recreational activities such as golf, gambling and

water based entertainment. The Pilanesberg National Park is home to the ‘big

five’ and is situated in close proximity to Johannesburg and Pretoria.

Hartebeespoortdam and Magaliesberg Complex: Water-based sports, hiking

and climbing are some of the activities found within the area. The Magaliesberg

area had been declared a protected natural environment in 1977. Borakalalo

National Park is home to numerous species and also provides for fishing

enthusiasts. The Vaalkop Dam Nature Reserve is renowned for its angling and

bird watching facilities. Kgaswane Mountain Reserve has a variety of Antelope

and birdlife

2.4.4 Agriculture

Agricultural commodities that can be produced within BPDM (although these

commodities are not suitable for all local municipalities and even when there

are suitable they are subject to constraints such as water supply etc.):

Vegetables,

citrus,

winter grains,

summer grains,

fodder,

36

36

cattle,

goats,

sheep,

Poultry.

aloe production,

rosemary production,

oyster

mushroom

lavender

amaranth (Morogo)

Morula,

Paprika production.

2.5.1 Factors affecting the Agricultural Sector:

Land reform has created uncertainty and discouraged investment within

this sector and has resulted in many commercial farms becoming

subsistence farms. The mining industry receives priority in terms of land

use.

Many farms are being sold off for other development purposes.

A large portion of the land is under tribal rule.

Water scarcity and quality of water has been determined as factors which

negatively affect this sector.

Natural disasters

High input costs.

Safety & security.

Economic linkages Potential exists for forward linkages that result in a

greater value-addition to the agricultural produce

Technology change as land appears to be scarce with many constraints

placed upon this resource, improved technology is viewed as an

important factor to increase yields and improve the returns gained from

this sector Enabling environment Many farmers believe that they do not

have adequate support from government.

Farmers struggle to receive financing from commercial banks due to the

37

37

increased costs of inputs Availability of labour and skill

As this sector requires low skills level there is a significant pool of labour

available for the Agricultural sector. However, small-scale farming which

is encouraged as it has the ability to directly reduce poverty requires

higher skills level. In particular, entrepreneurial skill is of high importance

and the lack thereof of such skills has resulted in many unsuccessful

ventures.

2.5.2 Manufacturing

This sector is broadly defined as the physical or chemical transformation of

materials or compounds into new products and can be classified into 10 sub-

groups namely:

Food, beverages & tobacco

Textiles, clothing & leather goods

Wood, cork & related products, straw, paper & printing/publishing

Coke, refined petroleum & nuclear fuel, chemicals, rubber & plastic

Other non-metallic mineral products

Basic metals, fabricated metal products, machinery & equipment

Electrical machinery and apparatus

Radio, TV & communication equipment + medical & optical instruments

Transport equipment

Furniture & recycling

2.5.3 Factors affecting Manufacturing

Availability of Raw Materials Bojanala PDM is endowed, as previously

alluded to, with many resources such as minerals, and various fruits and

vegetables that are farmed there.

Economic linkages as indicated previously there is little or no value

addition to many of the primary sector produce such as those from the

mining and agricultural sector.

It has also been indicated previously that many of the inputs required are

not available locally. Therefore, there appears to be economic leakages

as many consumers spend their money outside the districts borders.

38

38

These linkages can be optimised through clustering and agglomeration

economies. This means that the centralisation of similar and other

businesses may amongst other reduce costs and increase productivity

within the district creating a comparative advantage.

Recent market trends indicate a shift towards alternative products which

are healthier and more environmentally friendly.

Waste management in many South African households is very poor.

Therefore, improved waste management by each household will help to

improve the environment in the long run. Africa’s production base is the

lowest in the world. This is because in most parts of the continent, South

Africa included, there is a small market for manufactured goods as the

majority have very low purchasing power. This trend is altering however,

with the increased demand for industrially-produced goods.

2.6.1 Main employers of the Economy

Mining

Mining sector created 51.2%, formal employment opportunities in the

District

Agriculture

Contributes about 2.6% to the total GDPR and 19% to formal employment

in the District

Tourism

Tourism created 5.6% employment in the District

Manufacturing

The Sector within Bojanala PDM was estimated to have contributed 7.1%

to total GGP and 10.1% for total employment

Construction

Construction only contributed 2.1% to the Gross Geographic Product of

Bojanala Platinum District Municipality employment.

Trade

Trade sector contributes 10.2% to the total Gross Geographic Product of

Bojanala Platinum District Municipality (BPDM) employment

Services

Services sector made up 27.8% of the Bojanala PDM GGP and it employed

28.1% of the total formal employment.

39

39

2.7.1 Key economic Opportunities and Potentials The district has the following key economic opportunities and potentials

Construction of luxurious Medical Facility and shopping mall at Moses

Kotane LM

Provide rural areas with increased levels of economic activity at Moses

Kotane, Kgetleng Rivier and Moretele Local Municipalities.

Revitalisation of CBD’s in the District because they are dilapidated and

negatively affect investment

Construction of physical Markets and Service Facilities such as abattoirs,

tanneries etc. to support rural development.

Development of Mining supply park to establish a one-stop shop for all the

mines around the Bojanala PDM

To establish markets in rural areas in order to ensure that produce within

rural finds consumers. The specifications of the market will be informed by

the unique characteristics of the various rural areas

Establishment of a dry Logistics hub - One-stop site catering for all logistical

requirements that includes a truck stop/inn

Ensure excellent telecommunications network to resolve any challenges

identified to ensure that proposed BPO (see services section) can be

implemented.

2.8.1 Economic positioning

Despite the poor state, Bojanala Platinum District Municipality has a massive

potential of economic prosperity through its mines, tourism and agriculture. the

challenge in the district has been how to tap into these economic activities as

municipalities and communities in the area.

There is existing mining, tourism and agricultural opportunities which include

game reserves, some of which are owned and shared by communities including

hotels and guest houses. Some of the natural resources include dams like

Hartebeespoort and Molatedi dam and Magaliesberg Biosphere. The district still

40

40

experiences high levels of unemployment, poverty and inequality mainly

amongst the youth, women and people with disabilities

While all of the opportunities are important, a focus on all of these issues

simultaneously may be counterproductive, as resources may be stretched too

thinly. To prioritise opportunities, a “voting” exercise was therefore undertaken,

where delegates were invited to indicate which of these opportunities should be

prioritised for action as soon as possible

2.8.2 Economic opportunities mapping

The following are prioritised for inclusion in the Regional Economic

Development planning initiatives or strategies for BPDM and its local

municipalities:

Bojanala sez

Local procurement

Mining beneficiation

Regional science, technology & innovation

SMME development and support

Tourism route

Agripark

Regional bulk water supply strategy

Fresh produce market/ hubs

2.9 Key planned investments and projects including locally made products

Dry logistic hub in Madibeng

Agripark in the District

Special Economic Zone at Moses Kotane LM

Tourism Route - BPDM

Theme park – Rustenburg

Revitalization of Borakalalo Game Park – Madibeng LM

Agricultural Processing facilities – Moses Kotane

Development of Koster Dam – Kgetleng River LM

41

41

Sutelong River Park – Moretele LM

Small Town Renewal Programme – Brits

Fresh Produce Market – Rustenburg LM

Mining Supplier Park – Rustenburg LM

2.9.1 Special Economic Zone

In Bojanala Platinum District Municipality, the targeted area for the

establishment of the SEZ based on the comparative advantage was

Rustenburg. Department of Trade and Industry appointed a Company called

Mott McDonald to conduct a feasibility study for the establishment of an SEZ

project and the outcome of the study outline that availability of land is a

challenge. Available is land in small portions which becomes difficult to

implement this type of massive investment with spin-offs like housing, road and

rail infrastructure, CBD, logistic hubs etc.

The pre-feasibility study indicated that Moses Kotane Industrial area is a viable

option because more than 100hectares of land with an advantage of water,

electricity and road infrastructure already exists. Rustenburg and Madibeng

Local Municipalities will be the direct affected Municipalities in terms of

infrastructure development on the land which will be identified for future

expansion of the SEZ to link Rosslyn Automobile and other factories.

Special Economic Zone (SEZ) programme was established by the Department

of Trade and Industry to provide special provisions to develop industrial growth

in particular geographical areas. SEZ uses support measures to attract targeted

domestic and foreign direct investment and enable community beneficiation of

mineral and natural resources.

This programme was designed to respond to the challenging global and

domestic economic conditions which demand a sharper focus on new sources

of competitiveness, entrenched base in skills, infrastructure and efficient and

responsive state action.

As according to National Development Plan and National Industrial Framework

Special Economic Zones measures must be implemented to:

42

42

Enhance domestic and regional demand,

Extend export promotion strategically,

Strengthen South African industries base

Promote labour-absorbing industrialization path

This initiative will create jobs for local communities and positively affect the

GDP of the District

43

43

SECTION C

DISTRICT MUNICIPALITY’S VISION AND MISSION

VISION

The IDP is guided by Municipal vision which states that “Bojanala Platinum District

Municipality, a model of cooperative governance for effective and efficient service

delivery in partnership with local municipalities and all stakeholders”.

MISSION

In order to achieve the vision, the district municipality has to adhere to its Mission

Statement and the elucidation of the strategic IDP Objectives through shared

services, will coordinate, facilitate and support local municipalities by equitable

sharing of resources and maximizing community benefit of natural resources in a safe

and healthy environment.

This document details several areas that are important for any member of the public

or interested party to have a fuller understanding of what is planned over four quarters

of a financial year. It will also be the basis upon which macro targets for service

delivery in the district, taking into account the allocated powers and functions, will be

shaped.

The IDP is developed in line with section 25 of the Local Government: Municipal

Systems Act, 2000 (Act 32 of 2000), which requires each newly elected municipal

council, to adopt a single, inclusive and strategic plan (Integrated Development Plan

or IDP) for the development of the municipality which links, integrates and

coordinates plans and takes into account proposals for the development of the

municipality and which aligns the resources and capacity of the municipality with the

implementation of the said plan.

The newly elected council of Bojanala Platinum District Municipality developed this

IDP as the principal strategic planning instrument to guide and inform all planning,

44

44

budgeting, management, and decision-making processes in line with the Local

Government Systems Act.

The 6th Generation IDP is developed in line with the IDP process plan which will be

approved by the council. The IDP process plan seeks to identify and coordinate key

stakeholders in the planning process in the district municipality and coordinate their

contribution to the development of the IDP.

When approved, the following key features as per section 26 of the Municipal

Systems Act, 32 of 2000, are included:

An assessment of the existing level of a development

The council’s development priorities and objectives

The council’s development strategies

The spatial development framework – albeit, the review of the SDF in line with

the Spatial Planning & Land Use Management Act (SPLUMA);

The council’s operational strategies;

The disaster management plan;

A financial plan, and

The key performance indicators and performance targets.

The IDP document will be reviewed at the end of each financial year after the

assessment of the performance of the municipality and an analysis of the situation at

the community level.

45

45

SECTION D

4.1 SPATIAL DEVELOPMENT FRAMEWORK

The Bojanala PDM SDF provides the spatial framework for development in the

District. The objectives of the SDF are as follows:

Manage and use the District’s natural and build environment in a

sustainable manner.

Accommodate and promote sustainable economic development

Ensure sustainable human settlements

Ensure accessibility through the promotion and support a multimodal

transportation system and network Promote and support viable and

efficient infrastructure provision and management

In achieving these objectives, the following strategies were determined:

To consolidate the development in peri-urban development areas.

To enhance the development potential in the urban development areas

To promote rural development.

The manage and protect District level open spaces and conservation areas

To plan and manage the interface areas with Tshwane, City of

Johannesburg and Mogale City.

4.2 Status quo on implementation of spatial planning and land use management act (SPLUMA)

The Bojanala District Municipality is one of the four districts in the North West

province that administers the implementation of the SPLUMA provisions as

alluded above.

It is geographically located in Rustenburg town and it consists of 5 local

Municipalities within its jurisdiction namely, Rustenburg, Madibeng, Kgetleng

Rivier and Moses Kotane Local Municipalities. See the map below for

reference:

46

46

All five (5) municipalities within Bojanala District have commenced with

SPLUMA compliance processes and are in different phases. The status of the

activities will be reflected per category (LUMS, SDF, MPT, Bylaws etc.)

4.3 Status of by laws

Draft bylaws

Customised bylaws

Council resoluitons

Public notice

Final draft bylaw

Adoption by council

Gazetting & date

Rustenburg

Done done done done Done Done

Moretele Done Done done Done done Done 18/3/2016

Moses Kotane

Done done done done Done Done 12/2/2016

Kgetleng Done done done Done done Done

47

47

Rivier 22/3/2016

Madibeng Done Done Done done Done Done

As per table abpve, all five municipalities within Bojanala District have finalised

their spatial planning and land use management by-laws.

4.4 Land use regulations- status of Municipal Planning Tribunal (MPT)

Local authority

MPT Option

Council resolution

Nominations

Council approval

Gazette notice

Status of MPT

Action

Rustenburg

single done Done done done Active None required

Moretele Single done Done done Done Active None

Moses Kotane

Single Done done Done Done Done Active None required

Kgetleng Rivier

Single Done done Done Done Done Active Review SDF for alignment

Madibeng Single done Done done done Active Finalise cuncil resolution

All municipalities within Bojanala District have established the MPTs as

required in terms of section 35(1) of SPLUMA, however ,Madibeng Local

Municipality is in a process of obtaining a revised council resolution reflecting

positions and appointment of new members who will serve as MPT members.

Some of the initially appointed members are no longer in the employ of

Madibeng L.M therefore new appointments are key.

4.5 Authorised official and Appeals Authority

Only Rustenburg L.M has established its Appelas Authority while the other

four municipalities have not established their Appeal Authorities due to several

reasons. The four outstanding municipalities will be engaged in remedying the

current state of affairs as Appeals Authority is concerned, and technical

48

48

support in obtaining council resolutions will be provided to these municipalities.

4.6 Status of Approved Delegations/ Tariffs in Bojanala

Out of five municipalities, Rustenburg L.M is the only one with approved

delegations and tariffs and implemented, and the remaining four do not have

council approval of the delegations (Moretele, Moses Kotane, Madibeng and

Kgetlengrivier L. M’s), however Kgetlengrivier is the only one with outstanding

council adoption for SPLUMA model tariffs the other four municipalities have

approved council resolution for SPLUMA model tariffs.

4.7 Status on Land Use Management Schemes

In terms of section 24(1) of SPLUMA a municipality must develop a single land

use scheme for its entire municipal area in order to regulate and evaluate

various land development applications that are lodged with it for approval

purposes. Therefore, out of five municipalities in Bojanala, only four have

developed their LUMS accordingly while Rustenburg is still busy finalizing its

LUMS. It is of great importance to note that DRDLR has funded several LUMS

in NW province as part of technical and financial support to local authorities

as expected. Below is a table indicating the status of LUMS Bojanala District

Municipality:

Local authority Wall to wall LUMS

Promulgated Funding Action

Rustenburg In process, estimated to be finalised

No Own funding

Engage RLM and provide support where needed to ensure compliance od section 24(1) of SPLUMA

Moretele Done Yes DALRAD None

Moses Kotane Done, 5/6/18 Done Own funding

None

Kgetleng Rivier Done, 31/10/18

Yes DRDLR Implementation of SPLUMA

Madibeng Still in draft stage

No Own funding

Engage MLM and provide support where needed to ensure compliance od section 24(1) of SPLUMA

49

49

4.8 Status of Spatial Development Framework (SDF’s) for Local Municipalities

Within Bojanala District, all local authorities have commenced in reviewing

their SDF’s to comply with section 12(1) of SPLUMA.

Local authority Reviewing SDF Not Reviewing SDF

Action

Rustenburg In process of reviews through Housing Development Agency

Engagement with RLM and re-evaluate the draft and see if the SDF is aligned with the provisions of SPLUMA

Moretele In the process of

review through

DALRAD and

Bojanala

Platinum District

DALRAD and Bojanala Platinum

District to finalize the process of

review

Moses Kotane Done No, 2010 version

NOne

Kgetleng Rivier Intervention to complete the review process

Consultation with DALRAD to complete the review process and see if the SDF is aligned with the provisions of SPLUMA

Madibeng Yes, 2018 version

Engagement with MLM and re-evaluate the draft and see if the SDF is aligned with the provisions of SPLUMA

50

50

SECTION E

5.1 PROCESS FOLLOWED TO DEVELOP THE IDP

The IDP guideline has set out a clear public participation process which is in

accordance with the Municipal Systems Act section 16. As the District Municipality,

we have always been following the process of collecting community needs from our

local municipalities.

During the analysis phase, councilors at local municipalities go out to their various

constituencies, meet with the communities assisted by their ward committee

members. Priority issues based on the community needs are determined in this

way. The exercise proves to be very fruitful and resulted in the councilors being the

link between the community and the municipality.

During the review process, the steering committee and in some instances the IDP

Representative forum as main participants attended the IDP Review process.

51

51

5.2 IDP PROCESS PLAN FOR 2021/22 FINANCIAL YEAR AS ADOPTED BY COUNCIL

Phases Activity Role Players Time Frames

Phase 1

Preparation

Preparatory plans for 2021/22 IDP Approval and circulation of Municipal Framework and process plan by the District Municipality’s Council Tabling of Budget Process Schedule 4th Quarter Performance and Budget Report submitted to Council

Council Executive Mayor MMC’s, Municipal Manager Senior Managers, Budget, IDP and PMS Managers

July – Sept 2021

Analysis

Community meetings Stakeholder meetings Surveys and Opinions Feedback on previous performance Analysis phase of IDP Priority needs (well understood)

Ward Councillors Stakeholders IDP, Budget, PMS Managers Municipal Officials

July – Sept 2021

Phase 2 Strategies

Municipal Visions (done every 5 years) Objectives, strategies, and projects identification Consultation with communities and stakeholders through IDP Rep forum Meetings with communities and stakeholders 1st Quarter Performance and Budget Report submitted to Council for approval

Council Executive Mayor MMC’s Municipal Manager Senior Managers Manager responsible for IDP Manager responsible for PMS Budget Managers

October – December 2021

Phase 3 Projects

Inputs to the IDP from Sector Departments Clear project details (who is benefiting from the project, how much is it costing, project funding model, time frames, project manager) Setting clear targets and indicators to measure performance as well as the impacts of individual projects

Sector Departments Municipal Manager Manager responsible for IDP Manager responsible for PMS Budget Managers

January – March 2022

52

52

Integration

Ensuring that identified projects contribute to the achievement of the objectives outlined in phase 2 to give an overall picture of the development plans Integration of development plans Integration of municipal strategies (HIV, Poverty Alleviation, Disaster Management strategies) with the IDP Tabling of municipal adjustment budget 2nd Quarter Performance and Budget Report submitted to Council Inputs to the IDP by sector Department Consultation with communities and stakeholders through IDP Rep forum Tabling of Annual draft Budget and IDP to Council

Council Executive Mayor MMC’s, IDP and Budget Steering Committee Municipal Manager Senior Managers, Budget, IDP and PMS Managers

January – March 2022

Phase 4 Approval

Consultation with communities and stakeholders through IDP Rep forum Adoption of the Budget and IDP for the next financial year Development and approval of SDBIP for the next Financial year in line with the adopted IDP

Council Executive Mayor MMC’s, IDP and Budget Steering Committee Municipal Managers Senior Managers, Budget, IDP and PMS Managers

April – June 2022

53

53

5.3 ROLES AND RESPONSIBILITIES

The main roles and responsibilities allocated to each of the internal and external

role-players relating specifically to the IDP Review Process are set out in the table

below.

5.4 INTERNAL ROLE PLAYERS AND RESPONSIBILITIES

STRUCTURES ROLES AND RESPONSIBILITIES

Council The overall responsibility of the council is to adopt the

Framework/Process Plan,

Be responsible for the overall management and coordination

of the planning process

Adopt the final IDP

To ensure that the Budgets, SDBIP, Performance

Agreements are based on the approved IDP

Executive Mayor Provides Political guidance over the IDP Review process

and priorities

Members of the

Mayor Committee

Overall management, coordination, and monitoring of the

IDP Review Process

Municipal Manager Municipal Manager has the following responsibilities, that are

assigned to the IDP Manager

Preparation of the process plan;

Day to day management and coordination of the IDP

process in terms of the time, resources, and people, and

ensuring:

The involvement of all relevant role-players, especially

officials management officials; to ensure that;

The timeframes are being adhered to;

That the planning process is horizontally and vertically

aligned and complies with national and provincial

requirements;

54

54

That condition for participation is provided and those

outcomes are documented.

IDP Manager Day to day management of the IDP process.

Coordination and facilitation of the IDP Review Process.

IDP/Budget Steering

Committee

Monitor, evaluate progress and provide feedback

Provide technical guidance to review process

Ensure alignment of the IDP and Budget

Record realistic revenue and expenditure projections for

current and future years

Take cognizance of national, provincial budgets, DORA, and

national fiscal and macro-economic policy

Municipal Officials Provide technical/sector expertise

Prepare selected Sector Plans

5.5 EXTERNAL ROLE PLAYERS AND RESPONSIBILITIES

ROLE PLAYER ROLES AND RESPONSIBILITIES

Sector Department

Officials

Provide sector information

Alignment of budgets with the IDP

Provide sector budget

Provide professional and technical support

Professionals/Service

Providers

Facilitation of planning workshops

Drafting sector plans

Assist with Performance Management System

Documentation of IDP

IDP Representative

Forum

Representing interest and contributing knowledge and

Ideas

55

55

5.6 INTEGRATED DEVELOPMENT PLANNING

Integrated Development Planning is the process through which the municipality

prepares a strategic developmental plan, which is the principal strategic instrument

guiding all planning, management, investment, development, and implementation

decisions, taking into account inputs from all stakeholders.

The IDP crosses departmental divisions by linking the physical, social, institutional,

and economic components of planning and development with management and

development structure. It also integrates and aligns planning in different spheres of

government and therefore enforcing and upholding the spirit of cooperative

governance in the public sector.

The constitution of the Republic of South Africa (1996) commits the government to

take reasonable measures, within its available resources, to ensure that all South

Africans have access to adequate housing, health care, education, food, water, and

social security. The current goal of municipalities is to establish a planning process,

which is aimed at the disposal of the imbalances created by the apartheid era.

Developmental local government can only be realized through integrated

development planning and the compilation of an Integrated Development Plan

(IDP).

5.7ROLE OF INTEGRATED DEVELOPMENT PLANNING

Integrated development planning (IDP) is an approach to planning which is aimed

at involving the municipality and the community to find the best possible solutions

towards sustainable development. Integrated development planning provides a

strategic planning instrument that manages and guides all planning, development,

and decision-making in the municipality. ‘Integration’ means to consolidate all

various plans and actions of the municipality in order to achieve its vision and

mission.

It is used by municipalities to plan short and long-term future developments in their

area of jurisdiction. IDP is not the sole responsibility of the municipality. It is

integrated in such a way that all the relevant stakeholders who have a responsibility

56

56

to develop our area are contributing. Sector departments and mines have to submit

their plans on how they are planning to provide service and develop our municipality.

Integrated development planning involves a process through which the municipality

compiles a five-year strategic plan, known as the Integrated Development Plan. This

plan is an overarching plan, which provides the framework for development and

planning in the area of the municipality. It is an operational and strategic planning

guideline that enables the municipality to fulfill its development mandate.

The purpose of integrated development planning is to better the quality of life of the

people living within the area of the municipality. It also provides guidelines as to how

to use the land within the municipality, which resources to use, and how to protect

the environment.

For our planning and programmes to be effective all strategic planning within the

municipality must take place within the framework of the IDP. Through integrated

development planning different plans are integrated, coordinated, and linked to the

use of natural, financial, human, and physical resources.

5.8 LEGAL FRAMEWORK FOR INTEGRATED DEVELOPMENT

PLANNING

According to the Constitution of the Republic of South Africa, the local sphere of

government is charged with the responsibility to implement developmental local

government as well as cooperative governance. The mandate to relate its

management, budgeting, and planning functions to its objectives gives a clear

indication of the intended purposes of municipal integrated development planning,

namely:

Ensure sustainable provision of services

Promote social and economic development

Promote a safe and healthy environment

Give priority to the basic needs of communities and

Encourage community involvement

The first piece of legislation drafted to reflect the responsibility of the local sphere of

government to implement integrated development planning by means of the

57

57

compilation of an IDP document, was the Local Government Transition Act (1993)

as amended by the Local Government Transition Second Amendment Act (1996).

In this legislation, the IDP was presented as the main planning instrument that

guides all planning and decision-making processes of the municipality.

In lieu of the fact that the Local Government Transition Act was only an interim piece

of legislation applicable to the local sphere of government until the demarcation of

municipalities was finalized, the need arose to enact legislation regulating integrated

development planning on a more permanent basis.

In 2000 the Municipal Systems Act 32 of 2000 (MSA) came into operation. Section

25(1) of the Act stipulates that each municipal council must, after the start of its

elected term, adopt a single, inclusive, and strategic plan for the development of the

municipality which:

Links, integrates, and co-ordinates plans and takes into account proposals for

the development of the municipality;

Aligns the resources and capacity of the municipality with the implementation

of the plan;

Forms the policy framework and general basis on which annual budget must

be based; and

Is compatible with national and provincial development plans and planning

requirements binding on the municipality in terms of legislation.

The Municipal Systems Act is therefore the principal piece of legislation governing

integrated development planning at the municipal level. Municipalities are therefore

bound by and must ensure its implementation.

Other legislation and policy documents that contain a reference to integrated

development planning are:

The Constitution of the Republic of South Africa Act 108 of 1996;

Reconstruction and Development Programme (RDP);

Growth, employment and Redistribution Strategy (GEAR);

58

58

Tourism Act 72 of 1993;

Development Facilitation Act 67 of 1995;

National Water Act 36 0f 1997;

Housing Act 107 of 1997;

White Paper on Local Government of 1998;

Local Government: Municipal Structures Act 117 of 1998;

National Environmental Management Act 107 of 1998;

National Land and Transportation Transition Act 22 of 2000;

Disaster Management Act 52 of 2002;

The Finance Municipal Management Act 56 0f 2003

National Development Plan

A further piece of legislation that has a tremendous impact on the IDP is the

Municipal Finance Management Act (MFMA). Due to the coming into effect of this

Act, the revision of the IDPs must be aligned with the stipulations and timeframes

as set out in this Act. Section 35 of the MSA states explicitly that an integrated

development plan adopted by the municipal council is the principal strategic

planning instrument that:

Guides and informs all planning and development, and all decisions with

regard to planning, management, and development in the municipality;

Binds the municipality in the exercise of its executive authority, except to

the extent of any inconsistency between a municipality’s IDP and national

or provincial legislation, in which case such legislation prevails; and

Binds all other persons to the extent that those parts of the IDP that impose

duties or affect the rights of those persons have been passed as a by-law.

The legislation stipulates clearly that a municipality must not only give effect to

its IDP, but must also conduct its affairs in a manner that is consistent with its

IDP.

59

59

5.9 IDP PROCESS

5.9.1ANALYSIS PHASE

Process

The analysis phase deals with the current existing situation at the ward level and

institutionally. It is the focused analysis of the type of problems faced by the people

in the municipal area. The issues normally range from lack of basic services to crime

and unemployment. The problems identified are weighed according to their urgency

and/or importance to come up with priority issues.

During this phase, the municipality considers people’s perceptions of their problems

and needs, but also facts and figures. This phase does not deal only with the

symptoms, but also with the causes of the problems in order to make informed

decisions on appropriate solutions. Stakeholders and community participation are

60

60

critical during this phase.

Outputs:

The outputs of the analysis phase are:

Assessment of existing levels of

development

Priority issues or problems

Information on causes of priority

issues/problems

Information on available resources

5.9.2 STRATEGIES PHASE

Process

After having analyzed the problems affecting the people of the area and their

causes, it is necessary to formulate solutions to address the identified problems.

Activities during this phase included the formulation of:

The municipal vision

The vision is a statement indicating the ideal situation that the municipality would

like to achieve in the long term. This is the situation the municipality would find

itself in, once it has addressed the problems identified in the analysis phase.

The development objectives

Once the priority issues are identified in the analysis phase, they need to be

translated into objectives. Development objectives are statements of what the

municipality would like to achieve in the medium term in order to address the

issues (problems) and also contribute to the realization of the vision. The

objectives should bridge the gap between the current reality and the vision.

The development strategies

Once the municipality knows where it wants to go (vision) and what it needs to

achieve and realize the vision (objectives), it must then develop strategies, to

provide answers to the question of how the municipality will reach its objectives.

61

61

Project identification

Once the strategies are formulated, they result in the identification of projects.

Outputs

The outputs of this phase are:

The municipal vision

Objectives

Strategies

5.9.3 PROJECTS PHASE

Process

Phase 3 is about the design and specification of projects for implementation. The

municipality must make sure that the projects identified have a direct linkage to the

priority issues and the objectives that were identified in the previous phases. It

must also be clear on the target group (intended beneficiaries), the location of the

project, when it will commence and end, who will be responsible for managing it,

how much it will cost and where the money will come from. It must also identify

indicators to measure the performance and impact of the project.

Outputs

The outputs of this phase include:

Project output, targets, location

Project-related activities and time scheduled

Cost and budget estimates

Performance indicators

5.9.4 INTEGRATION PHASE

Process

Once the projects are identified, it is imperative to ensure that they are in line with

the municipality’s objectives and strategies, the resource framework, and comply

with the legal requirements. Furthermore, this phase is an opportunity for the

62

62

municipality to harmonize the project in terms of contents, location, and timing in

order to arrive at a consolidated and integrated set of programs. E.g. a local

economic development program, spatial development framework, etc.

Outputs

The output of this phase is an operational strategy that includes:

5-year financial plan

5-year capital investment programme

Integrated Spatial Development Framework

Integrated sectoral programmes (LED, HIV, poverty alleviation, gender

equity, etc.)

Consolidated monitoring/performance management system

Disaster management plan

Institutional plan

Reference to sector plans

Phase 5: Approval

Process

Once the IDP has been completed, it has to be submitted to the municipal council

for consideration and approval. The council must look at whether the IDP identifies

the issues (problems) that affect the areas and the extent to which the strategies

and projects will contribute to addressing the problems. The council must also

ensure that the IDP complies with the legal requirements before it is approved.

Furthermore, before the approval of the IDP, the municipality must give the

opportunity to the public to comment on the draft. Once the IDP is amended

according to the inputs from the public, the council considers it for approval.

Outputs

The output of this phase is an approved IDP document for the municipality.

63

63

5.10 Policy context and linkage to National Government

Policy context

The Constitution stipulates that all three spheres of governance are autonomous

but interdependent. This, therefore, calls for closer collaboration between all these

spheres of governance. Needless to mention, a number of national policies have

a particular bearing on the provincial and local spheres of government. A few

critical ones are highlighted below.

5.11 Medium Term Strategic Framework

The Medium Term Strategic Framework is a statement of government intent. It

identifies the development challenges facing South Africa and outlines the

medium-term strategy for improving the living conditions of South Africans. The

MTSF base document is meant to guide planning and resource allocation across

all spheres of government. National and provincial departments need to develop

their five-year strategic plans and budget requirements, taking into account the

medium-term imperatives.

Municipalities are also expected to adapt their integrated development plans in line

with the national medium-term priorities.

The MTSF identifies the following five development objectives:

To halve poverty and unemployment by 2014

To ensure more equitable distribution of the benefits of economic growth and

reduce inequality

To improve the nation’s health profile and skills base and ensure universal

access to basic services

To build a nation free of all forms of racism, sexism, tribalism, and xenophobia

To improve the safety of citizens by reducing incidents of crime and corruption

64

64

5.12 The Government 12 Outcomes

From the development focus of the MTSF, the government has derived twelve (12)

outcome areas that set the guidelines for more results-driven performance.

The TWELVE (12) KEY OUTCOMES that have been identified and agreed upon by

the Cabinet are:

1. Improved quality of basic education

2. A long and healthy life for all South Africans

3. All people in South Africa are and feel safe

4. Decent employment through inclusive economic growth

5. A skilled and capable workforce to support an inclusive growth path

6. An efficient, competitive, and responsive economic infrastructure network

7. Vibrant, equitable and sustainable rural communities with food security for all

8. Sustainable human settlements and improved quality of household life

9. A responsive, accountable, effective, and efficient local government system

10. Environmental assets and natural resources that are well protected and

continually enhanced

11. Create a better South Africa and contribute to a better and safer Africa and

world

12. An efficient, effective, and development-oriented public service and an

empowered, fair and inclusive citizenship

Of the 12 outcomes above, Outcome 9 is closest to local government. The

champion of the goal is the national Department of Cooperative Governance and

Traditional Affairs. In order to achieve the vision of a “Responsive, accountable,

effective and efficient local government system”, seven (7) outputs have been

identified:

Output 1: Implement a differentiated approach to municipal financing, planning,

and support

Output 2: Improving Access to Basic Services

Output 3: Implementation of the Community Work Programme

Output 4: Actions supportive of the human settlement outcomes

65

65

Output 5: Deepen democracy through a refined Ward Committee model

Output 6: Administrative and financial capability

Output 7: Single Window of Coordination

5.13 National Development Plan

The South African Government, through the Presidency, has published a National

Development Plan. The Plan aims to eliminate poverty and reduce inequality by

2030. The Plan has the target of developing people’s capabilities to improve their

lives through education and skills development, health care, better access to public

transport, jobs, social protection, rising income, housing, basic services, and

safety. It proposes the following strategies to address the above goals:

1. Creating jobs and improving livelihoods

2. Expanding infrastructure

3. Transition to a low-carbon economy

4. Transforming urban and rural spaces

5. Improving education and training

6. Providing quality health care

7. Fighting corruption and enhancing accountability

8. Transforming society and uniting the nation

At the core of the Plan is to eliminate poverty and reduce inequality is a

special focus on the promotion of gender equity and addressing the

pressing needs of youth.

More importantly for efficiency in local government, the NDP proposes 8 targeted

actions listed below:

Stabilize the political-administrative interface

Make public service and local government careers of choice

Develop technical and specialist professional skills

Strengthen delegation, accountability, and oversight

Improve interdepartmental coordination

Take a proactive approach in improving national, provincial, and local

government relations

Strengthen local government

Clarify the governance of SOE’s

66

66

The National Development Plan 2030 has been adopted by the National Cabinet in

August 2012 and this place an injunction on the state and its agencies (including

municipalities) to implement the Plan.

The Plan makes the following policy pronouncements and proposes performance

targets that intersect with developmental mandates assigned to local government.

Importantly, municipalities are expected to respond to these developmental

imperatives when reviewing their Integrated Development Plan and developing the

corresponding three-year Medium Term Revenue and Expenditure Frameworks:

Youthful population presents opportunities to boost economic growth,

employment and reduce poverty;

Strengthen youth service programmes – community-based programmes to

offer young people life skills training, entrepreneurship training;

Increase employment from 13 million in 2010 to 24 million in 2030;

Ensure that skilled, technical, professional, and managerial posts better

reflect the country’s racial, gender, and disability makeup;

Establish effective, safe, and affordable public transport;

Produce sufficient energy to support the industry at competitive prices;

Ensure that all South African have access to clean running water in their

homes;

Make high-speed broadband internet universally accessible at competitive

prices;

Ensure household food and nutrition security;

Realize a developmental, capable, and ethical state that treats citizens with

dignity;

Ensure that all people live safely, with an independent and fair criminal justice

system;

Broaden social cohesion and unity while addressing the inequities of the

past;

Public infrastructure investment focusing on transport, energy, and water;

Ensure environmental sustainability

Professionalize the public service, strengthen accountability, improve co-

ordination and prosecute corruption

Reduce the cost of living for low-income and working-class households –

67

67

(cost of food, commuter transport, and housing should be reduced);

Invest in new infrastructure in areas affecting the poor (food value chain,

public transport);

Prioritize infrastructure investment in – upgrading informal settlements,

public transport, establishing municipal fiber optic network

Ensure spatial transformation by 2030 – increased urban densities,

reliable public transport,

Protect the natural environment in all respects, leaving subsequent

generations with a least an endowment of at least an equal value;

Reduce greenhouse gas emissions and improve energy efficiency;

Review the allocation of powers and functions (Schedules 4& 5 of the

Constitution) – housing, water, sanitation, electricity and public transport

Fight corruption at three fronts – deterrence, prevention, and education;

5.14 DISTRICT DEVELOPMENT MODEL

The new District-based model was announced by President Cyril Ramaphosa in his

third state of the nation address in June 2019. Addressing the need for a capable and

developmental state, the President said a district-based approach, which will focus

on the 44 Districts and 8 Metros nationwide, will ensure that municipalities are

properly supported and adequately resourced.

The new model as “an important innovation” in the implementation of service

delivery will ensure coherent planning, budgeting, and implementation of service

delivery projects in all districts by all three spheres of government - national,

provincial, and local. The model is meant to enhance other alignment initiatives such

as integrated development plans (IDPs) with “a clear focus” of implementing one

plan in each district across all spheres of government. -

68

68

SECTION F

8.1 GOVERNANCE AND INSTITUTIONAL PERFORMANCE

8.1.1 Leadership

The Council of the District Municipality consists of 72 Councillors and has 29

full time Coucillors, 43 part-time Councillors and 10 Magosi.The majority of

Councillors (41) are members of the African National Congress ( ANC);

followed by the Economic Freedom Fighters (EFF) with 12 members and the

Democratic Alliance (DA) with 09 members, VfrheidFront Plus (VF) with 04

members; Forum for Service Delivery (F4SD) with 1 members, Save Madibeng

(SAVE MAD) with 01 member, Tsogang with one (03) member and 1 member

from AIC

8.1.2 Municipal Council Meetings The Municipal Structures Act (Section 18(2)) provides that a municipal Council must

meet at least quarterly. The objective of the Municipal Council is to , amongst

others,

provide democratic and accountable government for local communities to

ensure the provision of services to communities in a sustainable manner;

to promote social and economic development and to promote a safe and

healthy environment

8.1.3 Intergovernmental Relation (IGR) The District Municipality has established the District IGR to:-

avoid municipalities working in silo’s

to improve the relationship between municipalities including Directors,

Managers, Sector Departments and Councils

The following technical forums has also been established

Municipal Managers Forum

IDP Forums

CFO Forums

LED Forums

Infrastructure forums

69

69

8.2 POLITICAL LEADERSHIP

8.3 ADMINISTRATIVE STRUCTURE

EXEC

UTI

VE

MA

YO

R:

CLL

R M

NO

ND

ZAB

A

Office of the Municipal

Manager

PORTFOLIO COMMITTEE

HEAD

Budget and Treasury

Office

Office of the Executive

Mayor

Economic Development

& Tourism

Sports, Arts & Culture

Community Development

Services

Technical Services

Corporate Support

Services

PC

CORE FUNCTIONS DEPARTMENT

Ignatius Msoki

MMC IDP, PMS

Vincent Phusoane

MMC BTO

Suzan Nthangeni

MMC CSS

Annitjie Selebogo

MMC TS

Cyril Ramokadi

MMC CDS

Lucky Malope

MMC SAC

Mahommed Karani

MMC Economic Dev

Winnie Sono

MMC SPECIAL PROJECT

Legal Services, Information &

Technology, Internal Audit, PMS and IDP

Asset Management, Supply Chain

Management, Budget, Expenditure

Management

Human Resource Management, Records,

Administration & Fleet Management,

Water & Sanitation, Roads and Storm water,

Transport, Housing

Fire Services, Disaster, Social

Development

Sport, Arts and Culture

Economic Development &

Tourism

Special Projects

1

2

5

4

3

8

7

10

Health & Environmental

Services

Thomas Maremo

MMC H&ES

Municipal Health, Waste & Bio diversity

Management, Air Quality 6

Agriculture & Rural

Development

Tshidi Mangwathe

MMC ARD

Agriculture and Rural Development

9

SINGLE WHIP

CLLR DIREMELO

SPEAKER OF COUNCIL

CLLR MADIBA

ACCOUNTABLE OFFICIAL PC

CORE FUNCTIONS DEPARTMENTS

70

70

AC

TIN

G M

UN

ICIP

AL

MA

NA

GER

: MR

A K

HU

MA

LO

Office of the Municipal

Manager

Budget and Treasury

Office

Office of the Executive

Mayor

EDTAR

Health and

Environmental Services

Community Development

Services

Technical Services

Corporate Support

Services

Vacant

Manager OMM

Morena Mofokeng

Acting CFO

Amos Khumalo

Overseer CSS

Amos Khumalo

Director TS

Gladys Skhosana

Director CDS

Tshepo Lenake

Director HES

Beauty Makganye

Director EDTAR

Chief of staff

Lucas Mokgara

Legal Services, Information &

Technology, Internal Audit, PMS and IDP

Asset Management, Supply Chain

Management, Budget, Expenditure

Management

Human Resource Management, Records,

Administration & Fleet Management,

Administration

Water & Sanitation, Roads and Storm water,

Transport, Housing

Fire Services, Sports Arts and Culture,

Disaster, Social Development

Municipal Health, Waste & Bio diversity

Management, Air Quality

Tourism, Agriculture, Economic

Development

Communications, IGR

1

2

5

4

3

7

6

8

Office of the Single Whip Manager Office of the

Singe Whip

Office of the Speaker

Manager Office of the

Speaker

Benneth Matlala

Council Administration

Communications, IGR

9

10

63

63

8.4 MUNICIPAL ORGANOGRAM

OFFICE OF THE EXECUTIVE MAYOR

SECRETARY TO MMC’S

LEKALAKALA, G.K; MMOPE, N.K; NGOMANE, Z; MOTHIBEDI, O.J; BOGATSU, K; LETUPU,

N.S; FIHLA, I.J; SERUMOLA, B.LEVEL 9

64

64

OFFICE OF THE SPEAKER

SPEAKER OF COUNCIL

L MADIBA

MPAC CHIARPERSON

T MASHOMO

MANAGER: OFFICE OF THE

SPEAKER

B MATLA

LEVEL 2A

CORDINATOR

MPAC

M. RAMAKOBYA

LEVEL 6

SECRETARY TO THE SPEAKER

T MOLETE

LEVEL 9

CORDINTOR OFFICE OF

THE SPEAKER X 2

B CHIDI

1 VACANT (LEVEL 5)

RESEACHER

MPAC

LEVEL 5

VACANT

SECRETARY

MPAC

VACANT

LEVEL 9

DRIVER X 1

LEVEL 14

VACANT

65

65

OFFICE OF THE SINGLE WHIP

SINGLE WHIP OF

COUNCIL

L DIREMELO

SECRETARY TO THE SINGLE

WHIP

J MTHETHWA

LEVEL 9

MANAGER – OFFICE OF THE

SINGEL WHIP

VACANT

LEVEL 2A

CO-ORDINATOR

LEVEL 5

VACANT

CO-ORDINATOR

LEVEL 5

VACANT

RESEARCHER

LEVEL 14

VACANT

66

66

OFFICE OF THE MUNICIPAL MANAGER

MUNICIPAL MANAGER

VACANT

EXECUTIVE SECRETARY TO

THE MM

G KEKANA

LEVEL 7

CHIEF

FINANCIAL

OFFICER

VACANT

DIRECTOR - TS

MR. A KHUMALO

DIRECTOR

EDTAR

Ms. B MAKGANYE

DIRECTOR - CDS

Ms. G T MAHLANGU

DIRECTO- H&ES

MR. T LENAKE

MANAGER

PMS

N QAYISO

LEVEL 2A

MANAGER INTERNAL AUDIT

R MOKOTJO

LEVEL 2A

MANAGER OFFICE OF THE

MM

(VACANT)

LEVEL 2A

MANAGER IT

V MOGALE

LEVEL 2A

MANAGER LEGAL

SERVICES

ME NGWASHENG

LEVEL 2A

DIRECTOR - CSS

VACANT

PMS CO-

ORDINATOR

T DIKGOLE

LEVEL 5

INTERNAL

AUDTOR

L DICHABA

LEVEL 5

INTERNAL

AUDTOR

C TSHIKUKUVHE

LEVEL 5

PMS CLERK X 2

VACANT (L 9)

IDP CO-ORDINATOR

K DILWANE

LEVEL 5

RISK OFFICER

T SEBOPELA

LEVEL 5

IT TECHNICIANS X 3

SS MOLEFE

EK PHATLHANE

J VAN HEERDEN

LEVEL 5

LEGAL

SERVICES

OFFICER

VACANT

LEVEL 5 PMS CLERK X 2

VACANT (L 9)

MMC IDP, PMS,

MONITORING &

EVALUATION

I MSOKI

67

67

TECHNICAL SERVICES (A) DIRECTOR TECHNICAL

SERVICES

A KHUMALO

Ms. B Matlhase

SECRETARY

LEVEL 9

MANAGER: LAND, HOUSING

&ELECTRICITY

LEVEL 2(A)

SJ SELEPE

MANAGER: WATER

& SANITATION

LEVEL 2(A)

M.M.C:

TECHNICAL SERVICES

A SELEBOGO

Mrs K Monamodi

MANAGER:

ROADS & STORM WATER

LEVEL 2(A)

CIVIL

TECHNICIAN

PS MAKHAYE

Mr. Neo Mokone

SOCIAL FACILITATOR

LEVEL 5

MANAGER:

TRANSPORT PLANNING

VACANT

LEVEL 2A

CIVIL

TECHNICIAN

VACANT

LEVEL5

CIVIL

TECHNICIAN

VACANT

LEVEL5

GENERAL

MAINTANANCE

VACANT

LEVEL15

68

68

TECHNICAL SERVICES (B)

MANAGER: TRANSPORT

PLANNING

(VACANT)

LEVEL 2(a)

DIRECTOR: TECHNICAL

SERVICES

PERMIT CORDINATOR

DM KHETHANI

LEVEL 5

TRANSPORT PLANNING

CORDINATOR

KK MOILWA

LEVEL 5

ADMINISTATOR

DORAH DIBETSO

LEVEL 8

ROAD TRANSPORT

LEGISLATION

CORDINATOR

S MAGAKWE

LEVEL 5

69

69

CORPORATE SUPPORT SERVICES A

DIRECTOR CORPORATE SUPPORT

SERVICES

VACANT

SECRETARY

S RAMASIA

LEVEL 9 MANAGER: ADMINISTRATION

M MAAPE

Level 2 (A)

M.M.C:

Corporate Support Services

S NTHANGENI

PRINTING

OFFICER

C LEKABE

ADMIN SUPPORT OFFICER: COMMITTES

F MASILO

LEVEL 6

COUNCIL SECRETARY X 3

R TSATSANE

T MOGAPI

T MAIMELA

LEVEL 8

SUPERVISOR:

GENERAL WORKERS

B RAMONG LEVEL (14)

DRIVERS X5

S MOSAJWANE

S KGAKOE

B DIALE

M KUBAYIG

MKENGU

LEVEL 14

MESSENGERS X 2

L MABELE

B ZITHA

LEVEL 16

GENERAL WORKERS X15

M MOTSAPI

D KGWADI S POOE

D MAHUMA M MSIBI

I TSHOKOTSI MK MOOKETSI

M SEBEGO THWALA S

J SEDUMEDI MMOPE B

M LETSHOLO

B MOLEFE

J RAMOKOKA

G MALEBYE

K CUNA

B MARURE LEVEL 15

RECEPTIONISTS

X3

F MONYANA

E PHAKA

N SENELO

LEVEL 12

LOGISTICS OFFICER

S RAMAKHULA

LEVEL 7

70

70

CORPORATE SUPPORT SERVICES B (HR UNIT)

DIRECTOR CORPORATE

SUPPORT SERVICES

VACANT

HR MANAGER

KH MPETE

(LEVEL 2(A)

LABOUR RELATIONS OFFICER

K RAMOKOPELWA

LEVEL 5

HR ADMIN OFFICER

N MPETE

LEVEL 7

OHS SAFETY OFFICER

K MOLAPISI

LEVEL (6)

HRD & OD

(LEVEL 5)

VACANT

HR ADMIN OFFICER

VACANT

LEVEL 7

71

71

CORPORATE SUPPORT SERVICES C – RECORDS UNIT

DIRECTOR: CORPORATE SUPPORT

SERVICES

VACANT

RECORDS OFFICER: Records Keeping

D MMUSHI

LEVEL 7

RECORDS OFFICER: Archives

D MOGOTSI

LEVEL 7

FILING CLERK X 2

M MAFATLHE

H MOTSHABI

LEVEL 9

M TSHUKUDU

RECORD MANAGER

LEVEL (2A)

RECORDS CLERK

A MODISANE

C KGARIMETSA

R TSHOKE

O MOLEFI

LEVEL 9

72

72

DEPARTMENT OF ECONOMIC DEVELOPMENT, TOURISM, AGRICULTURE & RURAL DEVELOPMENT (EDTAR)

DIRECTOR – ECONOMIC DEVELOPMENT, AGRICULTURE &

RURAL DEVELOPMENT

B MAKGANYE

SECRETARY

EA STROCH

LEVEL 9

MANAGER

TOURISM, MARKETING & DEVELOPMENT

VACANT

LEVEL 2(A)

MANAGER

RURAL DEVELOPMENT, AGRICULTURE

MOKGATSI L.M

LEVEL 2(A)

M.M.C: ECONOMIC DEV, TOURISM,

AGRIC & RURAL DEV.

T MANGOATHE & M KARANI

MANAGER:

MINING & ENTERPRISE

DEVELOPMENT

K.P MASEMOLA

2(A)

COORDINATOR: MINING &

ENTERPRISE DEVELOPMENT

MASHOMO T.M

LEVEL 5

COORDINATOR: AGRICULTURE &

RURAL DEVELOPMENT

M.D LETLAPE

LEVEL 5

OFFICER TOURISM & MARKETING

ENTERPRISE DEVELOPMENT

MATSHEGO O

LEVEL 5

CORDINATOR

AGRICULTURE AND RURAL

DEVELOPMENT

MOFOKENG KP

LEVEL 5

73

73

DEPARTMENT OF MUNICIPAL HEALTH & ENVIRONMENTAL SERVICES A (HES)

MANAGER: WASTE MANAGEMENT &

BIODIVERSITY

J MASEBE

LEVEL 2A

M.M.C: HEALTH & ENVIRONMENT

T MAREMO

MANAGER: AIR QUALITY & REGULATORY

SERVICE (C)

LEVEL 2A

A BUBU

ADMINISTRATIVE OFFICER

LEBUSA MM

LEVEL 8

COORDINATOR BIODIVERSITY &

WASTE MANGEMENT

PROGRAMME

J BALOYI

LEVEL 5

SENIOR SPECIALIST WASTE POLICY

PLANNING & INFORMATION

R MKHONDO

LEVEL 5

INFORMATION

MANAGEMENT OFFICER

VR MOGOROSI

LEVEL 5

ENVIRONMENTAL PLANNING

OFFICER (VACANT)

LEVEL 6

LAW ENFORCEMENT

OFFICER

K Masemola

LEVEL 5

SECRETARY

A MODIBEDI

LEVEL 9

DIRECTOR

T LENAKE

MANAGER MUNICIPAL HEALTH &

ENVIROMENTAL SERVICES NOZI

MASEKWANE

LEVEL 2A

74

74

DEPARTMENT OF MUNICIPAL HEALTH & ENVIRONMENTAL SERVICES B (HES)

MANAGER: MUNICIPAL HEALTH &

ENVIROMENTAL SERVICES

MOSEKWANE N

LEVEL 2A

Administrative Officer

RAKGOKONG MM

LEVEL 8

Assistant Manager Municipal

Health RUSTENBURG

L MONGOLOGA

LEVEL 4A

Chief EHPX1

Level 5 (Vacant)

Senior EHP x 2(1

VACANT) Level 6

EHP x 4

Environmental Education

Officer

VACANT x 2

LEVEL 7

Admin Officer

THWANE B

Level 8

Assistant Manager Municipal

Health MOSES KOTANE

MOLOBI MJP

LEVEL 4A

Assistant Manager Municipal

Health MADIBENG

J MOSS

LEVEL 4A

Assistant Manager Municipal

Health KGETLENGRIVIER

CHUMA FS

LEVEL 4A

Assistant Manager

Municipal Health

MORETELE

J MASHONGOANE

Admin Officer MOSENEKE MM

Level 8

Admin Officer

TP MAREMO

Level 8

Admin Officer

LETSHOLO MJ

Level 8

Admin Officer

THEKISO MI

Level 8

Chief EHPX1

Level 5 (Vacant)

Senior EHP x 2 Level

6

EHP x 2

Chief EHPX1

Level 5 (Vacant)

Senior EHP x 2 Level

6

EHP x2

Chief EHPX1

Level 5 (Vacant)

Senior EHP x 2 Level

6

EHP x 2

Chief EHPX1

Level 5 (Vacant)

Senior EHP x 2

Level 6

Environmental

Epidemiology Officer

MOSOTHOANE O LEVEL 6

75

75

DEPARTMENT OF MUNICIPAL HEALTH & ENVIRONMENTAL SERVICES (C)

MANAGER: AIR QUALITY &

REGULATORY SERVICE

A BUBU

LEVEL (2a)

Administrative Officer

A Aphiri

LEVEL 8

Co-ordinator: Air Quality

and Regulatory Services

VACANT

LEVEL (5)

Climate Change and Cleaner

Production Officers

P MATHEBA

W MANGANYI

LEVEL 5

Compliance Monitoring

Officers

T PUSHOYABONE

A MUCHIPI

Emission Licensing

Officer

LEVEL (6)

Air Quality

Control officer

LEVEL (6)

Senior Specialist:

Permitting and Air

Quality (Management

T MATHEKGA

LEVEL 5

76

76

DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES (A)

DIRECTOR COMMUNITY

DEVELOPMENT SERVICES

G MAHLANGU

MANAGER: FIRE

SERVICES

P DIRAPELO

LEVEL 2(a)

MANAGER: DISASTER

MANAGEMENT

VACANT

LEVEL 2(a)

M.M.C: COMMUNITY

DEVELOPMENT SERVICES

C RAMOKGADI

MANAGER: SOCIAL

DEVELOPMENT

J MOSETE

LEVEL 2(a)

ADMINISTRATIVE

OFFICER

VACANT

GIS OFFICER

T MALEBO

LEVEL 6

DISASTER

MANAGEMENT

FIELD OFFICER

D MAKGALE

S NCONGOLOX

LEVEL 9

MANAGER: SPORTS,

ARTS & CULTURE

M RADITLADI

LEVEL 2(a)

COMMUNICATION &

TRAINING OFFICER

I KGOMO

LEVEL 7

RISK OFFICER

K MOLAO

LEVEL 7

DISASTER

ASSESSMENT

OFFICER

P TSELAPEDI

LEVEL 7 RADIO CONTROL

OFFICER X 3

P LEKOTLOANE

R MOLOKWANE

T MASHIACHIDI

LEVEL 9

SECRETARY

L MODISE

LEVEL 9

COORDINATOR

COMMUNITY SAFETY

K DIKOBE

LEVEL 5

SOCIAL

DEVELOPMENT

COORDINATOR X2

M MALETE

N MOGOTSI

LEVEL 5

77

77

DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES (B) – FIRE SERVICES

Chief Fire Officer:

Kgetleng Fire Station :

P.D.S.Mosito

Level 4A Assistant Chief Fire Officer

A.Mphahlele

Level 5

Chief Fire Officer:

Moretele Fire

Station:D.S.Khunou

Level 4A

Chief Fire Officer:

Mogwase Fire Station

:F.J.Mogale

Level 4A

Assistant Chief Fire Officer

P LEPHEANE

Level 5

Assistant Chief Fire Officer

:N.F.Tsitsi

Level 5

Manager: Fire Services:

P.Dirapelo

Level 2 a

STATION OFFICER

X18

2 VACANT Level 7

LEADING FIRE FIGHTER

X21

4 VACANT Level 8

SENIOR FIRE FIGHTER

X54

1 VACANT Level 9

FIRE FIGHTER

X18

4 VACANT Level 10

TRAINEE FIRE FIGHTER

X16

14 VACANT

Level 12

78

78

CO-ORDINATOR: ARTS &

CULTURE

K MALAO

LEVEL 5

MANAGER: SPORTS, ARTS &

CULTURE

M RADITLADI

LEVEL 2a

SPORTS CO-ORDINATOR

X 2

KHUNOU K

MAGWETE J

LEVEL 5

DIRECTOR:

COMMUNITY DEVELOPMENT SERVICES

G MAHLANGU

DEPARTMENT OF COMMUNITY DEVELOPMENT SERVICES: SPORTS, ARTS AND CULTURE (C)

MMC SPORTS, ARTS

AND CULTURE

L MALOPE

79

79

8.5 KEY PERFORMANCE AREAS

The objectives represent the link between the strategy and the operations. Through the

objectives, the vision, mission, and priorities are cascaded and operationalized to enable

monitoring and continuous reporting. These objectives are derived from the 2017/2021 IDP

but due to their long-term nature, they are still relevant to focusing the municipality on critical

areas that will expedite service delivery and improve the quality of life of the people of the

district.

The five (05) Key Performance Areas for the District Municipality are the following:-

Basic Service Delivery and Infrastructure Development

Municipal Institutional Development and Transformation

Municipal Financial Viability and Management

Local Economic Development

Good Governance and Public Participation

8.6 BASIC SERVICE DELIVERY AND INFRASTRUCTURE DEVELOPMENT

We are compelled by the Constitution to ensure that communities within our local municipalities have access

to the following basic service delivery:

Water

Sanitation

Human Settlement

Waste Management

Roads and Transport, and

Electricity

The above-mentioned services are performed by our local municipalities in terms of their legislated powers and

functions

80

80

8.7 MUNICIPAL INSTITUTIONAL DEVELOPMENT AND TRANSFORMATION

We have an IT unit which is not fully functional. Policies have been developed in relation to

Information Technology and they need to be reviewed. Employees will be trained on the

adopted IT policies.

All senior and middle management managers have the required skills to perform the jobs

they are employed to do, however, the Organizational structure needs to be reviewed as a

matter of urgency to ensure that it is aligned to the District Powers and Functions.

Council has last reviewed the current structure in May 2019. There is a need to review the

organizational structure to ensure that it is aligned to the IDP and the municipality’s powers

and functions

8.8 MUNICIPAL FINANCIAL VIABILITY AND MANAGEMENT

Financial viability is about being able to generate sufficient income to meet operating and

capital payments and where applicable, to allow growth while maintaining service levels. The

financial resources of municipalities also affect the extent to which services can be delivered.

The key challenge is to maximize revenue (generation and collection). Since the scrapping

of the RSC levies, there has been a need to look at other alternative sources of revenue for

financial sustainability. The municipality is dependent on grant allocations. In order for BPDM

to be self-sustainable, the following measures are, tariff setting, technical analysis of

potential billable areas have to be undertaken to ensure that there is cost recovery.

The municipality has adopted a number of policies that are assisting in achieving financial

viability:

Supply Chain Management Policy

Unauthorized, Irregular, Fruitless and Wasteful Expenditure Policy

Cost Containment Policy

81

81

Budget Policy

Subsistence and Travel Allowance Policy

Virement Policy

Assets Management Policy

The municipality has been obtaining a disclaimer Audit Opinion from the Office of the Auditor-General, however,

internal controls are continuously improved to ensure that the municipality obtains an improved audit outcome

8.9 LOCAL ECONOMIC DEVELOPMENT

The District 2040 Growth and Development Strategy (GDS), which guides investment

attraction, economic growth, and development for the next 30 years was approved in 2018,

after a long consultative process with various stakeholders.

Despite the poor state, Bojanala Platinum District Municipality has massive potential for

economic prosperity through its mines, tourism, and agriculture. The challenge in the district

has been how to tap into these economic activities as municipalities and communities in the

area.

There are existing mining, tourism, and agricultural opportunities which include game

reserves, some of which are owned and shared by communities including hotels and guest

houses. Some of the natural resources include dams like Hartebeespoort and Molatedi dam

and Magaliesberg Biosphere. The district still experiences high levels of unemployment,

poverty, and inequality mainly amongst the youth, women, and people with disabilities

The mining sector is the largest within Bojanala Platinum District Municipality accounting for

R 71.5 billion or 52.1% of the total GVA in the district municipality's economy. The sector that

contributes the second most to the GVA of the Bojanala Platinum District Municipality is the

community services sector at 12.6%, followed by the finance sector with 10.5%. The sector

that contributes the least to the economy of Bojanala Platinum District Municipality is the

agriculture sector with a contribution of R 1.43 billion or 1.04% of the total GVA.

82

82

8.10 GOOD GOVERNANCE AND PUBLIC PARTICIPATION

The Municipal System Act states that the Municipality must have a five (5) year vision

for the long-term development of the Municipality and development priorities, which

must be aligned with national and provincial sectoral plans and priorities. The IDP and

Service Delivery Budget Implementation Plan (SDBIP) are reviewed and adopted

annually by the council. Municipal Performance is measured through the SDBIP.

Annually the Municipality must base its performance against performance measures as

clearly outlined in the SDBIP. The SDBIP includes the annual delivery agenda of the

Municipality as it is spelled out in the IDP document.

8.10.1 MUNICIPAL COUNCIL MEETINGS

The Municipal Structures Act (Section 18(2)) provides that a Municipal Council must

meet at least quarterly. The objective of the municipal council is to provide a democratic

and accountable government for local communities; to ensure the provision of services

to communities in a sustainable manner; to promote social and economic development

and to promote a safe and healthy environment

8.10.2 MAYORAL COMMITTEE MEETINGS

Mayoral committee meetings have been sitting as per the approved Council Corporate

calendar.

8.10.3 AUDIT COMMITTEE COMPOSITION

The Audit and Performance Committee is established in accordance with the prescripts

of the MFMA no.56 of 2003, section 166.

Primary functions of the audit committee include:

Monitoring the integrity of Council financial statements

Reviewing the effectiveness of Council’s internal control and risk

management

Overseeing the relationship between management and the municipality’s

external auditors

The Committee will make recommendations to management via Council,

83

83

resulting from activities carried out by the Committee in terms of the

reference

The compilation of reports to Council, at least twice during a financial year

To review the quarterly reports submitted to it by the Internal Audit

Evaluate the activities of the Internal Audit function in terms of their role as

prescribed by legislation

Review audit results and actions plans implemented by management; and

Making recommendations to Council and also carrying out its responsibility

to implement the recommendations

8.11 MUNICIPAL PUBLIC ACCOUNTS COMMITTEE (MPAC)

MPAC was established in terms of section 79 of the Municipal Structures Act, 117 of

1998.

The primary objectives of MPAC is to:-

To consider and evaluate the content of the annual report and make

recommendations

To examine financial statements and audit report of the municipality

To promote good governance, transparency and accountability on the

use of municipal resources

To recommend or undertake any investigation in its area of responsibility, after

viewing any investigation report already undertaken by the municipality of Audit

committee; and

To perform any other function assigned to it through a resolution of Council

within its area of responsibility

84

84

8.12 BPDM STRATEGIES, PROJECTS AND BUDGETS (CORPORATE SUPPORT SERVICES)

MUNICIPAL TRANSFORMATION AND DEVELOPMENT

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government System

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 6 Administrative and financial capability

Key Strategic Organizational Objectives: To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance

Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Labour Relations

Institutional Records

Management

To promote Local Labour Relations

To achieve sound and proper

records management

To achieve sound labour and

positive employee climate

Promoting Local

Labour Relations

Implementing Proper

Records Management

Occupational Health

and safety

Number of reports on

the local labour forum

meetings coordinated

Coordination of

LLF meetings

4 Reports on LLF meetings coordinated

4 Reports on

LLF meetings

coordinated

4 Reports on

LLF meetings

coordinated

4 Reports on

LLF meetings

coordinated

4 Reports on

LLF meetings

coordinated

Number of District

Records Management

Forum meetings held

Coordination of

District Records

Management

Forum

4 District

Records

Management

Forum meeting

held

4 District

Records

Management

Forum meeting

held

4 District

Records

Management

Forum meeting

held

4 District

Records

Management

Forum

meeting held

4 District

Records

Management

Forum meeting

held

Number of reports on

Occupational Health and

Safety (OHS) committee

meetings held

Coordination of

Occupational

Health & Safety

Committee

meetings

4 Occupational Health and Safety Committee (OHS) meetings held

4 Occupational

Health and

Safety

Committee

(OHS)

meetings held

4 Occupational

Health and

Safety

Committee

(OHS)

meetings held

4

Occupational

Health and

Safety

Committee

(OHS)

meetings held

4 Occupational

Health and

Safety

Committee

(OHS) meetings

held

85

85

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government System

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 6 Administrative and financial capability

Key Strategic Organizational Objectives: To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance

Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

To achieve sound labour &

positive employee climate

Sound labour and

positive employee

climate

Implementation of

Employee Assistance

programme

Implementation of the

Employment Equity

Implementation of the

Employment Equity

Number of reports on the

review of HR Policies

Coordination of

HR policy review

1 Report on the review of HR Policie

1 Report on the review

of HR Policie

1 Report on the review

of HR Policie

1 Report on the review

of HR Policie

1 Report on the review

of HR Policie

Number of reports on the

implementation of

Employee Assistance

Programme (EAP)

Coordination of

employee

assistance

programme

4 Reports on the

implementation of

Employee Assistance

Programs (EAP)

4 Reports on the

implementation of

Employee Assistance

Programs (EAP)

4 Reports on the

implementation of

Employee Assistance

Programs (EAP)

4 Reports on the

implementation of

Employee Assistance

Programs (EAP)

4 Reports on the

implementation of

Employee Assistance

Programs (EAP)

Number of Employment

Equity Plan (EEP)

developed and submitted

Department of Labour

Submission of

Employment

Equity Plan (EEP)

to Department of

Labour

Employment Equity Plan (EEP) submitted to Department of Labour

Employment Equity

Plan (EEP) submitted

to Department of

Labour

Employment Equity

Plan (EEP) submitted

to Department of

Labour

Employment Equity

Plan (EEP) submitted

to Department of

Labour

Employment Equity

Plan (EEP) submitted

to Department of

Labour

Number of Employment

Equity Committee meetings

convened

Employment

Equity Committee

meetings

2 Employment Equity Committee meetings convened

2 Employment Equity

Committee meetings

convened

2 Employment Equity

Committee meetings

convened

2 Employment Equity

Committee meetings

convened

2 Employment Equity

Committee meetings

convened

Work Skill Plan To achieve sound labour & positive employee climate

Submission of work skills plan

Number of WSP reports

developed and submitted to

LGSETA

WSP report

submitted to

LGSETA

1 WSP report developed and submitted to LGSETA

1 WSP report

developed and

submitted to LGSETA

1 WSP report

developed and

submitted to LGSETA

1 WSP report

developed and

submitted to LGSETA

1 WSP report

developed and

submitted to LGSETA

86

86

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government System

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 6 Administrative and financial capability

Key Strategic Organizational Objectives: To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance

Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Enhance Employees

Skills

Organisational

Structure

Leave automation

Skills development

To achieve sound labour and

positive employee climate

To achieve sound labour and

positive employee climate

To achieve sound labour and

positive employee climate

To achieve sound labour and

positive employee climate

Coordinating bursary

committee meetings

Review of the

organizational

structure

Automated leave for

BPDM employees

Implementation of

skills programme

Number of bursary

committee meetings

coordinated

Bursaries

Committee

meetings

coordinated

2 Bursary committee meeting coordinated

2 Bursary committee

meeting coordinated

2 Bursary committee

meeting coordinated

2 Bursary committee

meeting coordinated

2 Bursary committee

meeting coordinated

Number of organizational

structures reviewed and

submitted to Council

Organizational

Structure

Reviewed and

Submitted to

Council

1 Organizational

Structure Reviewed

and submitted to

council

1 Organizational

Structure Reviewed

and submitted to

council

1 Organizational

Structure Reviewed

and submitted to

council

1 Organizational

Structure Reviewed

and submitted to

council

1 Organizational

Structure Reviewed

and submitted to

council

Number of reports on

Implementation

(automation) of leave for

BPDM employees

submitted to the

Accounting officer

Implementation of

leave for BPDM

employees

4 Reports on the Implementation of leave for BPDM employees submitted to the Accounting Officer

4 Reports on the

Implementation of

leave for BPDM

employees submitted

to the Accounting

Officer

4 Reports on the

Implementation of

leave for BPDM

employees submitted

to the Accounting

Officer

4 Reports on the

Implementation of

leave for BPDM

employees submitted

to the Accounting

Officer

4 Reports on the

Implementation of

leave for BPDM

employees submitted

to the Accounting

Officer

Number of reports on the

implementation of skills

programme submitted to the

Accounting Officer

Implementation

of skills

programme

3 Reports on the implementation of skills programme submitted to the Accounting Officer

3 Reports on the

implementation of skills

programme submitted

to the Accounting

Officer

3 Reports on the

implementation of skills

programme submitted

to the Accounting

Officer

3 Reports on the

implementation of skills

programme submitted

to the Accounting

Officer

3 Reports on the

implementation of skills

programme submitted

to the Accounting

Officer

87

87

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government System

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 6 Administrative and financial capability

Key Strategic Organizational Objectives: To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance

Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Council and Council

Committees

Council and Council

Committees

Records Management

To promote good governance through the

provision of administrative support

To promote good governance through the

provision of administrative support

To achieve sound and proper records

management

Portfolio Administrative

support

Mayoral Committee

Administrative support

Convening District

Records Management

Forum meetings

Number of reports on

portfolio committee

meetings held

Portfolio

committee

meetings

4 Reports on Portfolio committee meetings convened

4 Reports on

Portfolio

committee

meetings

convened

4 Reports on

Portfolio

committee

meetings

convened

4 Reports on

Portfolio

committee

meetings

convened

4 Reports on

Portfolio

committee

meetings

convened

Number of mayoral

committee meetings

convened

Mayoral

committee

meetings

8 Mayoral

Committee

meetings convened

8 Mayoral

Committee

meetings

convened

8 Mayoral

Committee

meetings

convened

8 Mayoral

Committee

meetings

convened

8 Mayoral

Committee

meetings

convened

Number of Records

Management Reports

submitted to Accounting

Officer

Records

Management

Reports

4 Records Management Reports submitted to the Accounting Officer

4 Records

Management

Reports submitted

to the Accounting

Officer

4 Records

Management

Reports

submitted to

the Accounting

Officer

4 Records

Management

Reports

submitted to

the Accounting

Officer

4 Records

Management

Reports

submitted to

the Accounting

Officer

Coordinating Ethics

programme

Number of reports on

Ethics programme

coordinated

Ethics

Programme

coordinated

1 Report on Ethics programme coordinated

1 Report on Ethics

programme

coordinated

1 Report on

Ethics

programme

coordinated

1 Report on

Ethics

programme

coordinated

1 Report on

Ethics

programme

coordinated

88

88

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government System

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 6 Administrative and financial capability

Key Strategic Organizational Objectives: To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance

Indicators

Proposed

Project

5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Administrative Management Fleet Management

To promote good through provision

of administrative support

Submitting Fleet

Management Reports

to the accounting

oficer

Procure Fleet

management

Number of fleet

management reports

submitted to the

Accounting officer

Fleet

Management

Reports

4 Fleet management reports submitted to Accounting Officer

4 Fleet management

reports submitted to

Accounting Officer

4 Fleet management

reports submitted to

Accounting Officer

4 Fleet management

reports submitted to

Accounting Officer

4 Fleet management

reports submitted to

Accounting Officer

Number of vehicles

procurementand delivered

Procurement

of a

municipal

vehicle

1 Municipal Vehicle

procured and delivered

N/A N/A N/A N/A

To achieve sound labour and

positive employee climate

Awarding employee

bursary Number of reports on

awarding of employee

bursaries

Awarding of

employee

bursaries

2 Reports on awarding

of employee bursaries

2 Reports on

awarding of

employee bursaries

2 Reports on

awarding of

employee bursaries

2 Reports on

awarding of

employee bursaries

2 Reports on

awarding of

employee bursaries

To achieve sound labour and

positive employee climate

Submission of

management labour

reports

Number of quarterly

reports on management of

labour cases submitted to

the Accounting Officer

Management

of labour

cases

4 Quarterly reports on

management of labour

cases submitted to the

Accounting Officer

4 Quarterly reports on

management of

labour cases

submitted to the

Accounting Officer

4 Quarterly reports on

management of

labour cases

submitted to the

Accounting Officer

4 Quarterly reports on

management of

labour cases

submitted to the

Accounting Officer

4 Quarterly reports on

management of

labour cases

submitted to the

Accounting Officer

89

89

8.13.1 OFFICE OF THE MUNICIPAL MANAGER

Key Performance Area (KPA) MUNICIPAL INSTITUTIONAL DEVELOPMENT AND TRANSFORMATION

Outcome 9 Responsive, Accountable, Effective, and Efficient Local Government Systems

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 6 Administrative and financial capability

Key Strategic Organizational Objective Develop and strengthen a politically and administratively stable system of a municipality

Priority Area Strategic Objectives

Strategies Key Performance Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Institutional Performance,

Monitoring and

Evaluation

To enhance

organizational

performance

Performance

Management

Number of institutional SDBIP developed and reviewed

Development and

review of Institutional

SDBIP

1 institutional SDBIP developed and reviewed

1 institutional SDBIP developed and reviewed

1 institutional SDBIP developed and reviewed

1 institutional SDBIP developed and reviewed

1 institutional SDBIP developed and reviewed

Number of quarterly institutional performance reports developed and submitted to the council

Development and

submission of

performance reports

4 quarterly institutional performance reports developed and submitted to the council

4 quarterly institutional performance reports developed and submitted to the council

4 quarterly institutional performance reports developed and submitted to the council

4 quarterly institutional performance reports developed and submitted to the council

4 quarterly institutional performance reports developed and submitted to the council

Number of mid-term performance reports developed and submitted to council

Development and

submission of Mid-

term Reports

1 mid-term performance reports developed and submitted to council

1 mid-term performance reports developed and submitted to council

1 mid-term performance reports developed and submitted to council

1 mid-term performance reports developed and submitted to council

1 mid-term performance reports developed and submitted to council

Number of performance reviews conducted and submitted to council

Conduct performance

reviews

2 performance reviews conducted and submitted to council

2 performance reviews conducted and submitted to council

2 performance reviews conducted and submitted to council

2 performance reviews conducted and submitted to council

2 performance reviews conducted and submitted to council

Number of PMS policy reviewed Review of PMS policy 1 PMS policy reviewed

1 PMS policy

reviewed

1 PMS policy

reviewed

1 PMS policy

reviewed

1 PMS policy

reviewed

90

90

Key Performance Area (KPA) MUNICIPAL INSTITUTIONAL DEVELOPMENT AND TRANSFORMATION

Outcome 9 Responsive, Accountable, Effective and Efficient Local Government Systems

Output1 Implement a differentiated approach to municipal financing, planning and support

Output 6 Administrative and financial capability

Key Strategic Organizational Objective Develop and strengthen a politically and administratively stable system of a municipality

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project

5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Institutional

Performance,

Monitoring, and

Evaluation

To enhance

organizational

performance

Performance

Management

Number of Annual Reports developed and submitted to council

Development

and submission

of Annual

Report

1 Annual Report

developed and

submitted to council

1 Annual Report

developed and

submitted to

council

1 Annual Report

developed and

submitted to

council

1 Annual Report

developed and

submitted to

council

1 Annual Report

developed and

submitted to council

Number of performance

agreements developed

and signed

Development of

performance

agreements

7 performance agreements developed and signed

7 performance agreements developed and signed

7 performance

agreements

developed and

signed

7 performance

agreements

developed and

signed

7 performance

agreements

developed and

signed

91

91

Key Performance Area (KPA) GOOD GOVERNANCE AND PUBLIC PARTICIPATION

Outcome 9: Responsive, Accountable, Effective, and Efficient Local Government Systems

Output 1 Implement a differentiated approach to municipal financing, planning, and support

Output 3 Implementation of the community work programme

Output 5 Deepen democracy through a refined ward committee model

Output 7 Single window of coordination

Key Strategic Organizational Objective Support Local Governance Structure

Priority Area Strategic Objectives Strategies Key Performance Indicators Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Internal Audit

Services

To strengthen accountability within the municipality

Provide assurance

and consulting audit

services

Number of risk-based audit plans developed and approved by the Audit Committee

Development of the

risk-based audit plan

1 risk-based audit plan developed and approved by the Audit Committee

1 risk-based audit

plan developed and

approved by the

Audit Committee

1 risk-based

audit plan

developed and

approved by the

Audit Committee

1 risk-based

audit plan

developed and

approved by the

Audit Committee

1 risk-based audit

plan developed

and approved by

the Audit

Committee

Number of quarterly IA reports on IA activities submitted to the Audit Committee

Development of

quarterly Internal

Audit Reports

4 Quarterly IA reports on IA activities submitted to the Audit Committee

4 Quarterly IA reports on IA activities submitted to the Audit Committee

4 Quarterly IA reports on IA activities submitted to the Audit Committee

4 Quarterly IA reports on IA activities submitted to the Audit Committee

4 Quarterly IA reports on IA activities submitted to the Audit Committee

Number of Internal audit reports

submitted to the Accounting

Officer

Development of

Internal Audit Reports

11 Internal Audit reports submitted to the Accounting Officer

12 Internal Audit reports submitted to the Accounting Officer

12 Internal

Audit reports

submitted to the

Accounting

Officer

12 Internal Audit

reports

submitted to the

Accounting

Officer

12 Internal Audit

reports

submitted to the

Accounting

Officer

92

92

Number of Combined Assurance Frameworks developed

Development of a

Combined Assurance

Framework

1 Combined Assurance Framework developed

N/A N/A N/A N/A

Key Performance Area (KPA) GOOD GOVERNANCE AND PUBLIC PARTICIPATION

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 3 Implementation of the community work programme

Output 5 Deepen democracy through a refined ward committee model

Output 7 Single window of coordination

Key Strategic Organizational Objective Support Local Governance Structure

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project

5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Internal Audit Services

To strengthen accountability

within the municipality

Provide assurance and

consulting audit

services

Provide assurance

and consulting audit

services

Assessment

of Internal

Audit function

by Audit

Committee

Provide

assurance and

consulting audit

services

Provide

assurance

and

consulting

audit services

Provide

assurance

and

consulting

audit

services

Provide

assurance

and

consulting

audit

services

Provide

assurance and

consulting audit

services

Number of Internal

Audit Charters

Reviewed and

approved by the

Audit Committee

Review of

Internal Audit

Charters

1 Internal Audit Charters reviewed and approved by the Audit Committee

1 Internal Audit Charters reviewed and approved by the Audit Committee

1 Internal Audit Charters reviewed and approved by the Audit Committee

1 Internal Audit Charter reviewed and approved by the Audit Committee

1 Internal Audit Charters reviewed and approved by the Audit Committee

93

93

Provide oversight on

financial/non-financial

reporting processes,

internal controls, risk,

ethics and compliance

Number of Audit Committee meetings convened

Convene

quarterly Audit

Committee

meetings

4 audit committee meeting convened

4 audit committee meeting convened

4 audit committee meeting convened

4 audit committee meeting convened

4 audit committee meeting convened

Number of BPDM

Audit Committee

Reports adopted by

Council

Submission of

quarterly Audit

Committee

Reports

4 Audit

Committee

Reports adopted

by Council

4 Audit

Committee

Reports

adopted by

Council

4 Audit

Committee

Reports

adopted by

Council

4 Audit

Committee

Reports

adopted by

Council

4 Audit

Committee

Reports adopted

by Council

Key Performance Area (KPA) GOOD GOVERNANCE AND PUBLIC PARTICIPATION

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 3 Implementation of the community work programme

Output 5 Deepen democracy through a refined ward committee model

Output 7 Single window of coordination

Key Strategic Organizational Objective Support Local Governance Structure

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Audit Committee advisory services

Provide oversight on

financial/non-financial

reporting processes,

internal controls, risk,

ethics, and compliance

Number of Audit Committee Charters reviewed and adopted by Council

Review of Audit

Committee

Charters

1 Audit Committee Charter reviewed and adopted by Council

1 Audit

Committee

Charter reviewed

and adopted by

Council

1 Audit

Committee

Charter

reviewed and

adopted by

Council

1 Audit

Committee

Charter

reviewed and

adopted by

Council

1 Audit

Committee

Charter reviewed

and adopted by

Council

94

94

Disciplinary Board Services

To strengthen

accountability within the

municipality

Investigate financial

misconduct of Unauthorised,

Irregular, Fruitless, and

Wasteful expenditure and

other related financial

misconduct.

Number of DB Terms of References developed and adopted by Council

Development of the

DB Terms of

References

1 Terms of Reference developed and adopted by Council.

1 Terms of

Reference

reviewed and

adopted by

Council.

1 Terms of

Reference

reviewed and

adopted by

Council.

1 Terms of

Reference

reviewed and

adopted by

Council.

1 Terms of

Reference

reviewed and

adopted by

Council.

Number of Disciplinary Board meetings held

Conduct

Disciplinary Board

Meetings

4 Disciplinary Board meetings held

4 Disciplinary Board meetings held

4 Disciplinary Board meetings held

4 Disciplinary Board meetings held

4 Disciplinary Board meetings held

Number of Disciplinary Board reports submitted to Council

Submission of

Disciplinary Board

Reports to Council

4 Disciplinary Board reports submitted to Council

4 Disciplinary Board reports submitted to Council

4 Disciplinary Board reports submitted to Council

4 Disciplinary Board reports submitted to Council

4 Disciplinary Board reports submitted to Council

95

95

Key Performance Area (KPA) MUNICIPAL INSTITUTIONAL DEVELOPMENT AND TRANSFORMATION

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 6 Administrative and financial capability

Key Strategic Organizational Objective Develop and strengthen a politically and administratively stable system of a municipality

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Risk Management

To protect the

municipality from

potential risk

Risk Management

Number of institutional risk

registers developed and

reviewed

Review of the

institutional risk

register

1 institutional

risk register

developed and

reviewed

1 institutional risk

register developed and

reviewed

1 institutional

risk register

developed and

reviewed

1 institutional

risk register

developed and

reviewed

1 institutional risk

register

developed and

reviewed

Number of reports on risk registers updated

Developemnt and

updating of Risk

registers

4 Reports Risk

Registers

updated

4 Reports Risk

Registers updated 4 Reports Risk

Registers

updated

4 Reports Risk

Registers

updated

4 Reports Risk

Registers

updated

Number of reports on reviewed Risk Management Framework

Review of Risk

Management

Framework

1 Report on the

review of Risk

Management

Framework

1 Report on the review

of Risk Management

Framework

1 Report on

the review of

Risk

Management

Framework

1 Report on

the review of

Risk

Management

Framework

1 Report on the

review of Risk

Management

Framework

Number of reports on risk

management training

conducted

Risk Management

training

2 Reports on risk management training conducted

2 Reports on risk

management training

conducted

2 Reports on

risk

management

training

conducted

2 Reports on

risk

management

training

conducted

2 Reports on risk

management

training

conducted

Number of combined

assurance plans

developed and submitted

to the Accounting Officer

Development of

combined assurance

plan

N/A

1 combined assurance plan developed and submitted to the Accounting Officer

N/A N/A N/A

96

96

Key Performance Area (KPA) MUNICIPAL INSTITUTIONAL DEVELOPMENT AND TRANSFORMATION

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 6 Administrative and financial capability

Key Strategic Organizational Objective Develop and strengthen a politically and administratively stable system of a municipality

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project

5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Information, Communication And Technology Services

To ensure effective and

efficient ICT services within

BPDM

Provision of

Information,

Communication And

Technology Services

Number of the ICT

Governance Committee

meetings convened

ICT

Governance

Committee

4 ICT

governance

committee

meeting

convened

4 ICT

governance

committee

meeting

convened

4 ICT

governance

committee

meeting

convened

4 ICT

governance

committee

meeting

convened

4 ICT

governance

committee

meeting

convened

Number of District ICT

Forum convened

District

ICT

Forum

4 District ICT Forum convened

4 District ICT

Forum

convened

4 District ICT

Forum convened

4 District ICT

Forum

convened

4 District ICT

Forum

convened

Number of computer

licenses renewed

annually

Renewal

of

computer

license

4 Computer licenses renewed annually

4 Computer

licenses

renewed

annually

4 Computer

licenses

renewed

annually

4 Computer

licenses

renewed

annually

4 Computer

licenses

renewed

annually

Number of ICT

Infrastructural Systems

Upgraded

Upgrading of

ICT

infrastructure

3 ICT Infrastructural systems upgraded

3 ICT

Infrastructural

systems

upgraded

3 ICT

Infrastructural

systems

upgraded

3 ICT

Infrastructural

systems

upgraded

3 ICT

Infrastructural

systems

upgraded

Number of reports on the

updated ICT Infrastructure

Update of ICT

Infrastructure

12 Reports on the updated ICT infrastructure

12 Reports on

the updated

ICT

infrastructure

12 Reports on

the updated ICT

infrastructure

12 Reports on

the updated

ICT

infrastructure

12 Reports on

the updated

ICT

infrastructure

97

97

Information, Communication And Technology Services

To ensure effective and

efficient ICT services within

BPDM

Provision of Information, Communication And Technology Services

MFMA Section 75 key

reports and information

uploaded on the municipal

website

Website

Upload

MFMA Section

75 key reports

and

information

uploaded on

the municipal

website

MFMA Section

75 key reports

and

information

uploaded on

the municipal

website

MFMA Section

75 key reports

and information

uploaded on the

municipal

website

MFMA Section

75 key reports

and

information

uploaded on

the municipal

website

MFMA Section

75 key reports

and

information

uploaded on

the municipal

website

Number of reports on the

ICT systems maintened

Maintenance

of ICT

systems

4 Reports on

the ICT

systems

maintained

4 Reports on

the ICT

systems

maintained

4 Reports on the

ICT systems

maintained

4 Reports on

the ICT

systems

maintained

4 Reports on

the ICT

systems

maintained

Key Performance Area (KPA) MUNICIPAL INSTITUTIONAL DEVELOPMENT AND TRANSFORMATION

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 6 Administrative and financial capability

Key Strategic Organizational Objective Develop and strengthen a politically and administratively stable system of a municipality

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Legal Services

To provide legal services Provide internal and

legal services and

soliciting services of

external law firms as

and when required

Number of litigation reports

submitted to the

Accounting Officer

Litigation Reports 4 Litigation

reports

submitted to

the Accounting

Officer

4 Litigation

reports

submitted to

the Accounting

Officer

4 Litigation

reports

submitted to

the Accounting

Officer

4 Litigation

reports

submitted to

the

Accounting

Officer

4 Litigation

reports

submitted to

the Accounting

Officer

98

98

Key Performance Area (KPA) 2: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government System

Outputs 1 & 7: Improving access to basic services • Actions supportive of human settlement outcome

Key Strategic Organizational Objectives: • To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Develop and strengthen a

politically and

administratively stable

system of a municipality

Organize and convene

strategic planning

sessions

Consult and

coordinate stakeholder

engagements

Coordinate District

Planning Forums

Number of strategic planning

sessions convened

Strategic Session

Planning

1 strategic

planning session

convened

1 strategic

planning

session

convened

1 strategic

planning

session

convened

1 strategic

planning session

convened

1 strategic

planning

session

convened

Number of IDP reviewed

and amended

IDP Review

and

amendment

IDP Review and

amendment

IDP Review

and

amendment

IDP Review

and

amendment

IDP Review and

amendment

IDP Review

and

amendment

Number of District IDP

Process Plan submitted

to council

District IDP

Process plan

1 District IDP

Process Plan

submitted to

council

1 District IDP

Process Plan

submitted to

council

1 District IDP

Process Plan

submitted to

council

1 District IDP

Process Plan

submitted to

council

1 District IDP

Process Plan

submitted to

council

Number of IDP Rep

Forum meetings

coordinated

IDP Rep

Forum

2 IDP Rep Forum coordinated

2 IDP Rep

Forum

coordinated

2 IDP Rep

Forum

coordinated

2 IDP Rep

Forum

coordinated

2 IDP Rep

Forum

coordinated

Number of District Planning

Forums coordinated

District Planning

Forum

4 District

Planning Forums

coordinated

4 District

Planning

Forums

coordinated

4 District

Planning

Forums

coordinated

4 District

Planning Forums

coordinated

4 District

Planning

Forums

coordinated

99

99

8.13. 2BUDGET AND TREASURY OFFICE: MUNICIPAL FINANCIAL VIABILITY

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Eflcient Local Government System

Outputs 1 & 7: • Implement a differentiated approach to municipal financing, planning and support • Administrative and financial capability

Key Strategic Organizational Objectives:

• To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Financial Management

To prepare and submit

credible financial

information

Monthly

monit

oring finance

processes

Number of quarterly

financial reports

submitted to stakeholders

Submission of

AFSs to

stakeholders

4 quarterly financial reports submitted to stakeholder

4 quarterly

financial reports

submitted to

stakeholder

4 quarterly

financial reports

submitted to

stakeholder

4 quarterly

financial reports

submitted to

stakeholder

4 quarterly financial

reports submitted to

stakeholder

Number of annual financial

statements submitted to

Auditor General by 31st

August

Submission of

Annual Financial

Statements

1 annual financial

statements

submitted to the

Auditor General

by 31st August

1 annual financial

statements

submitted to the

Auditor General

by 31st August

1 annual financial

statements

submitted to the

Auditor General

by 31st August

1 annual financial

statements

submitted to the

Auditor General

by 31st August

1 annual financial

statements submitted

to the Auditor General

by 31st August

Number of monthly Budget

Statements (Section 71)

reports submitted to the

Executive Mayor and

National and Provincial

Treasuries

Submission of

Section 71 reports

12 Budget Statements (Section 71) reports submitted to the Executive Mayor, National and Provincial Treasuries

12 Budget

Statements

(Section 71)

reports submitted

to the Executive

Mayor, National

and Provincial

Treasuries

12 Budget

Statements

(Section 71)

reports submitted

to the Executive

Mayor, National

and Provincial

Treasuries

12 Budget

Statements

(Section 71)

reports submitted

to the Executive

Mayor, National

and Provincial

Treasuries

12 Budget Statements

(Section 71) reports

submitted to the

Executive Mayor,

National and Provincial

Treasuries

Number of Annual Budgets

submitted to Council for

approval

Submission of

annual budget

1 Annual Budget

submitted to

Council for

approval

1 Annual Budget

submitted to

Council for

approval

1 Annual Budget

submitted to

Council for

approval

1 Annual Budget

submitted to

Council for

approval

1 Annual Budget

submitted to Council

for approval

10

0

100

Number of Adjustment

Budget submitted to

Council for approval

Submission of

adjustment budget

1 Adjustment

Budget submitted

to Council for

approval

1 Adjustment

Budget submitted

to Council for

approval

1 Adjustment

Budget submitted

to Council for

approval

1 Adjustment

Budget submitted

to Council for

approval

1 Adjustment Budget

submitted to Council

for approval

Training

and

developmen

t

To achieve a

positive employee

climate

Training of BTO

personnel

Number of reports on

BTO personnel trained

Training of BTO

personnel

1 Report on BTO

personnel trained

1 Report on BTO

personnel trained 1 Report on BTO

personnel trained 1 Report on BTO

personnel trained 1 Report on BTO

personnel trained

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Eflcient Local Government System

Outputs 1 & 7: • Implement a diffeerntiated approach to municipal financing, planning and support • Administrative and financial capability

Key Strategic Organisational Objectives:

• To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key PerformanceIndicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Supply

Chain

Managemen

t

To ensure that the

resources required to

fulfil the needs

identified in the

strategic plan of the

institution are efficient

and effective

Adherence to

Supply Chain

Management

Policy.

Number of municipal

procurement plan

developed and submitted

to the Accounting Officer

Demand

management

1 Municipal

Procurement plan Developed and submitted to the Accounting Officer

1 Municipal

Procurement plan Developed and submitted to the Accounting Officer

1 Municipal

Procurement plan Developed and submitted to the Accounting Officer

1 Municipal

Procurement plan Developed and submitted to the Accounting Officer

1 Municipal

Procurement plan Developed and submitted to the Accounting Officer

Number of quarterly

supply chain

management reports

submitted to Council

Supply chain reporting

4 quarterly supply chain management reports submitted to Council

4 quarterly supply

chain management

reports submitted

to Council

4 quarterly supply

chain management

reports submitted

to Council

4 quarterly supply

chain management

reports submitted

to Council

4 quarterly supply

chain management

reports submitted to

Council

AaAssets

Management To ensure proper

valuation,

safeguarding,

optimization and

disposal of municipal

assets in compliance

with relevant legislation

Coding of items,

setting of

inventory levels,

placing of orders,

receiving and

distribution

Number of reports on asset

verifications conducted

Asset and Logistics management

2 Reports on asset verification conducted

2 Reports on asset verification conducted

2 Reports on asset verification conducted

2 Reports on asset verification conducted

2 Reports on asset verification conducted

10

1

101

a Number of inventory and

asset registers compiled

and updated

Asset and

Logistics

management

1 Inventory and Asset register compiled and updated

1 Inventory and Asset register compiled and

1 Inventory and Asset register compiled and

1 Inventory and Asset register compiled and

1 Inventory and Asset register compiled and

Expend

iture

Manage

ment

To ensure effective

and eflcient payment

of salaries and

related costs

Accurate payment

of salaries and

related costs within

set time

Number of payroll runs

and reconciliations

performed

Employee cost

(payroll run)

12 payroll runs

and reconciliations

performed

12 payroll runs

and reconciliation s performed

12 payroll runs

and reconciliation s performed

12 payroll runs

and reconciliation s performed

12 payroll runs and

reconciliation s performed

Number of reports on

employee cost benefit

evaluations performed

Employee benefits 1 Report on

employee cost

benefit

evaluation

performed

1 Report on employee

cost benefit

evaluation

performed

1 Report on employee

cost benefit

evaluation

performed

1 Report on employee

cost benefit

evaluation

performed

1 Report on employee

cost benefit evaluation

performed

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Eflcient Local Government System

Outputs 1 & 7: • Implement a differentiated approach to municipal financing, planning and support • Administrative and financial capability

Key Strategic Organisational Objectives:

• To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Expend

iture

Manage

ment

To ensure effective

and eflcient payment

of liabilities within

set time frame and

in compliance with

MFMA

Adhere to service

standards and

MFMA

for payment of liabilities

Number of reports on

creditors reconciliation and

payments within 30 days of

receipts of an invoice by

finance.

Payables Number of reports

on creditors

reconciliation and

payments within 30

days of receipts of

an invoice by

finance.

Number of reports

on creditors

reconciliation and

payments within 30

days of receipts of

an invoice by

finance.

Number of reports

on creditors

reconciliation and

payments within 30

days of receipts of

an invoice by

finance.

Number of reports

on creditors

reconciliation and

payments within 30

days of receipts of

an invoice by

finance.

Number of reports on

creditors reconciliation

and payments within 30

days of receipts of an

invoice by finance.

10

2

102

8.13.3 BASIC SERVICE DELIVERY AND INFRASTRUCTURE DEVELOPMENT

Key Performance Area (KPA) 4: Basic Service Delivery and Infrastructure Development

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government System

Outputs 2 Improving access to basic services

Output 4 Actions supportive of the human settlement outcome

10 POINT PLAN Improve the quantity and quality of municipal basic services to the people in the area of access to water, sanitation, electricity, waste management, roads and disaster management

Key Strategic Organisational Objectives:

• To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project

5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

To ensure provision of

effective Municipal Health

Services in the District

Gazetting and submitting the

air quality and municipal

health by-laws to the

accounting officer.

Submitting status quo report

and update on latest

reviewed legislation.

Rehabilitation of illegal

dumping

Submission of awareness

programs reports to the

accounting officer

Number of By-laws

Gazzeted

By-Laws

Gazzeted for Air

Quality and

Municipal Health

Two By Laws gazzetted

n/a n/a n/a n/a

Number of Integrated

waste Management

plan Reviewed

Review of

Integrated Waste

Management

Plan

1 Integrated Waste

Management Plan

reviewed

1 Integrated

Waste

Management

Plan reviewed

1 Integrated

Waste

Management

Plan reviewed

1 Integrated

Waste

Management

Plan reviewed

1 Integrated

Waste

Management

Plan reviewed

Number of illegal

dumping Rehabilitation

program.

Rehabilitations

of illegal

dumping

2 Illegal dumping rehabilitation program

2 Illegal dumping

rehabilitation

program

2 Illegal dumping

rehabilitation

program

2 Illegal dumping

rehabilitation

program

2 Illegal

dumping

rehabilitation

program

Number of blitz

operations reports

submitted to the MM

Blitz operations

reports

12 Blitz operations reports submitted to MM

12 Blitz

operations

reports

submitted to MM

12 Blitz

operations

reports

submitted to MM

12 Blitz

operations

reports

submitted to MM

12 Blitz

operations

reports

submitted to MM

Number of Health

Awareness programs

coordinated

Health

awareness

programmes

coordinated

20 Health awareness programmes coordinated

20 Health

awareness

programmes

coordinated

20 Health

awareness

programmes

coordinated

20 Health

awareness

programmes

coordinated

20 Health

awareness

programmes

coordinated

10

3

103

Key Performance Area (KPA) 4: Basic Service Delivery and Infrastructure Development

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government System

Outputs 2 Improving access to basic services

Output 4 Actions supportive of the human settlement outcome

10 POINT PLAN Improve the quantity and quality of municipal basic services to the people in the area of access to water, sanitation, electricity, waste management, roads and disaster management

Key Strategic Organisational Objectives:

• To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project

5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

To ensure provision of

effective Municipal Health

Services in the Distrit

To ensure the

improvement of air quality

and compliance with

relevant regulations

To ensure that compliance

with relevant legislation

Sampling of water sources

Submiting Environmental

Awareness reports to the

accounting officer

Submitting climate change

awareness programme

report

Number of reports on

food and water quality

samples conducted

Food and water

quality monitoring

and sampling

12 Reports on food

and water quality

samples conducted

12 Reports on

food and water

quality samples

conducted

12 Reports on

food and water

quality samples

conducted

12 Reports on

food and water

quality samples

conducted

12 Reports on

food and water

quality samples

conducted

Number of reports on air

Quality Programmes

coordinated

Air quality

management

programmes

3 Reports on air quality

programmes

coordinated

3 Reports on air

quality

programmes

coordinated

3 Reports on air

quality

programmes

coordinated

3 Reports on air

quality

programmes

coordinated

3 Reports on air

quality

programmes

coordinated

Number of

Environmental

Awareness

Programmes Co

ordinated

Environmental

awareness

programmes co

ordinated

12 Environmental

awareness

programmes

coordinated

12

Environmental

awareness

programmes

coordinated

12

Environmental

awareness

programmes

coordinated

12

Environmental

awareness

programmes

coordinated

12

Environmental

awareness

programmes

coordinated

Number of climate

change awareness

programmes

implemented

Climate change

programmes

implemented

4 Climate change awareness programmes implemented

4 Climate

change

awareness

programmes

implemented

4 Climate

change

awareness

programmes

implemented

4 Climate

change

awareness

programmes

implemented

4 Climate

change

awareness

programmes

implemented

10

4

104

To ensure compliance with

waste management and

bio-diversity within the

district

Submitting Biodiversity

programs to MM

Number of Biodiversity

programs submmited to

MM

Biodiversity

programs

4 Biodiversity programs submitted to MM

4 Biodiversity

programs

submitted to MM

4 Biodiversity

programs

submitted to MM

4 Biodiversity

programs

submitted to MM

4 Biodiversity

programs

submitted to MM

10

5

105

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government System

Outputs 1 & 7: • Implement a diffeerntiated approach to municipal financing, planning and support • Administrative and financial capability

Key Strategic Organisational Objectives: • To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance Indicators Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Disaster Management Services To support local

municipalities to improve the

quantity and quality of

municipal disaster

management

To implement disaster

management plans or

policies to strengthen

its ability to respond to

disaster

Number of Disaster Risk

Assessments completed

Disaster Risk

Assessment

12 Disaster

Risk

Assessment

completed

12 Disaster

Risk

Assessment

completed

12 Disaster

Risk

Assessment

completed

12 Disaster

Risk

Assessment

completed

12 Disaster Risk

Assessment

completed

Number of Public

Awareness campaigns

conducted

Public

awareness and

training

12 public

awareness

campaigns

conducted

12 public

awareness

campaigns

conducted

12 public

awareness

campaigns

conducted

12 public

awareness

campaigns

conducted

12 public awareness

campaigns

conducted

Number of Municipal

Advisory Forum meetings

conducted

Disaster

Management

Advisory Forum

4 Municipal

Advisory

Forum

meetings

conducted

4 Municipal

Advisory

Forum

meetings

conducted

4 Municipal

Advisory

Forum

meetings

conducted

4 Municipal

Advisory

Forum

meetings

conducted

4 Municipal Advisory

Forum meetings

conducted

Number of support activities

to Local Municipalities in

disaster response incidents

Support to Local

Municipality

OPEX OPEX OPEX OPEX OPEX

10

6

106

Key Performance Area (KPA) 2: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government System

Outputs 1 & 7: Improving access to basic services • Actions supportive of human settlement outcome

Key Strategic Organizational Objectives: • To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project

5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Social Development Services To promote and sustain an

integrated approach to Social

Development Services of CDS

Effective implementation of

Social Development

Services policies

Number of NGOs

supported in all 5 Local

Municipalities

5 NGO’s

supported in all 5

local

municipalities

5 NGO’s

supported in all

5 local

municipalities

5 NGO’s

supported in all

5 local

municipalities

5 NGO’s

supported in all

5 local

municipalities

5 NGO’s

supported in all

5 local

municipalities

5 NGO’s

supported in all

5 local

municipalities

Number of Food

parcels supported to 5

local municipalities

Support to

all 5 Local

Municipaliti

es

100 food

parcels

supported to 5

local

municipalities

100 food

parcels

supported to 5

local

municipalities

100 food

parcels

supported to 5

local

municipalities

100 food

parcels

supported to 5

local

municipalities

100 food

parcels

supported to 5

local

municipalities

Number of NGOs

supported through EPWP

in 5 local municipalities.

Support to all 5

Local

Municipalities

through EPWP

5 NGOs supported through EPWP in 5 local municipalities

5 NGOs

supported

through EPWP

in 5 local

municipalities

5 NGOs

supported

through EPWP

in 5 local

municipalities

5 NGOs

supported

through EPWP

in 5 local

municipalities

5 NGOs

supported

through EPWP

in 5 local

municipalities

10

7

107

Key Performance Area (KPA) 2: Basic Services Delivery

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government System

Outputs: Improving access to basic services

Actions supportive of human settlement outcome

Key Strategic Organizational Objectives: To provide sustainable basic services and infrastructure development

Priority Area Strategic

Objectives

Strategies Key Performance Indicator Proposed Project

5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Sport and

Recreation, Arts

and Culture

Coordination

To promote sports

and recreation,

Arts, and Culture

within the District.

Ensuring coordination

and development as

well as promotions of

sports, recreation, and

Arts and Culture in the

district

Number of sports and recreation programs supported

Organization/support of Sports program

3 sports and

recreation programs

supported

3 sports and

recreation

programs

supported

4 sports and

recreation

programs

supported

4 sports and

recreation

programs

supported

4 sports and

recreation

programs

supported

Number of sporting codes

provided with sports

equipment

Provision of

basic sports

equipment

4 sporting codes provided with sports equipment

4 sporting codes

provided with

sports equipment

4 sporting codes

provided with

sports equipment

4 sporting codes

provided with

sports equipment

4 sporting codes

provided with

sports equipment

Number of Arts and culture

programs coordinated

Coordination of Arts and culture programs

3 Arts and Cultural programs coordinated

3 Arts and

cultural programs

coordinated

3 Arts and culture

programs

coordinated

3 Arts and culture

programs

coordinated

3 Arts and culture

programs

coordinated

Review of Sports and Arts and Culture Policies and submitted for adoption

Policy review Sports and Arts and

Culture Policy

reviewed and

submitted for

adoption

Sports and Arts

and Culture

Policy reviewed

and submitted for

adoption

Sports and Arts

and Culture

Policy reviewed

and submitted for

adoption

Sports and Arts

and Culture Policy

reviewed and

submitted for

adoption

Sports and Arts

and Culture

Policy reviewed

and submitted for

adoption

Number of Sports, Arts, and Culture District Meetings coordinated

District Sports

and Recreation

Meetings

4 Sports, Arts, and

Culture District

meetings

coordinated

4 Sports, Arts,

and Culture

District meetings

coordinated

4 Sports, Arts,

and Culture

District meetings

coordinated

4 Sports, Arts, and

Culture District

meetings

coordinated

4 Sports, Arts,

and Culture

District meetings

coordinated

Number of Arts and Culture forum meetings conducted

District Arts and

Culture Forum

Meetings

coordinated

4 Arts and culture

forum meetings

conducted

4 Arts and

culture forum

meetings

conducted

4 Arts and

culture forum

meetings

conducted

4 Arts and culture

forum meetings

conducted

4 Arts and culture

forum meetings

conducted

10

8

108

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Eflcient Local Government System

Outputs 1 & 7: • Implement a diffeerntiated approach to municipal financing, planning and support • Administrative and financial capability

Key Strategic Organisational Objectives: • To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance Indicators Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Fire and Emergency Services To ensure the

provision of effective

firefighting and rescue

services in the district.

Improve capacity to

render the services

through personnel,

equipment, partnerships

and facilities

Number of diving equipment

procured and delivered to 3

Fire Stations

Procurement

and delivery of

diving

equipment for 3

Fire Stations

4 sets of diving equipment procured and delivered to 3 Fire Stations

None 4 sets of diving equipment procured and delivered to 3 Fire Stations

None None

Number of fencing

equipment procured and

delivered to Kgetleng Fire

Station

Procurement and

delivery of fencing

materials

Fencing material

procured and

delivered to Kgetleng

Rivier Fire Station

None None None None

Number of water borehole

procured for Kgetleng,

Moretele and Mogwase fire

station and satellite fire

stations

Procurement of

water borehole and

equipment

3 water boreholes procured for Kgetleng, Moretele, and Mogwase fire stations and satellite fire stations

1 water

borehole

procured for

Swartruggens

satellite fire

station

None None None

Procurement and delivery of

simulation equipment for

Airports/Airstrips

Procurement and

delivery of simulation

equipment

Procurement and delivery of simulation equipment for Airports/Airstrips

None Procurement and delivery of simulation equipment for Airports/Airstrips

None Procurement and delivery of simulation equipment for Airports/Airstrips

10

9

109

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Eflcient Local Government System

Outputs 1 & 7: • Implement a diffeerntiated approach to municipal financing, planning and support • Administrative and financial capability

Key Strategic Organisational Objectives: • To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Fire and Emergency

Services

To ensure provision

of effective firefighting

and rescue services in

the district.

Improve capacity to render

the services through

personnel, equipment,

partnerships and facilities

Number of personnel

protective

equipment/clothing

procured and delivered

Procurement and delivery of Personnel Protective Equipment/clothing

108 personnel protective equipment/clothing procured and delivered

None None 108 personnel protective equipment/clothing procured and delivered

None

Number of Extrication

Equipment procured and

delivered

Procurement and

delivery of

extrication

equipment

2 Sets of extrication

equipment procured

and delivered

1 Set of extrication

equipment procured

and delivered

None 1 Set of

extrication

equipment

procured and

delivered

1 Set of

extrication

equipment

procured and

delivered

Number of Compressed Air

Foam Systems and Vehicle

procured and delivered

Procurement and

delivery

Compressed Air

Foam System and

vehicles

2 Compressed Air Foam System and vehicles procured and delivered

1 Compressed Air

Foam System and

vehicles procured

and delivered

None 1 Compressed

Air Foam System

and vehicles

procured and

delivered

None

Number Breathing

Apparatus sets procured

and delivered

Procurement and

delivery of Breathing

Apparatus sets

20 sets of breathing apparatus procured and delivered

20 sets of breathing apparatus procured and delivered

20 sets of breathing apparatus procured and delivered

None None

11

0

110

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Eflcient Local Government System

Outputs 1 & 7: • Implement a diffeerntiated approach to municipal financing, planning and support • Administrative and financial capability

Key Strategic Organisational Objectives: • To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Fire and Emergency

Services

To ensure provision of

effective firefighting and

rescue services

in the district.

Improve capacity to

render the services

through personnel,

equipment, partnerships

and facilities

Number of set of

Fire Fighting

equipment and

tools procured for

3 Fire Stations

Procurement of

miscellaneous

equipment and tools for

3 Fire Stations.

1 Set of of Fire Fighting equipment and tools procured for Kgetleng Fire Stations

1 Set of of Fire Fighting equipment and tools procured for Mogwase Fire

1 Set of of Fire Fighting equipment and tools procured for Moretele Fire

None None

Number of firefighting

water tankers

procured and

delivered

Procurement and delivery

of Firefighting water

tankers

1 firefighting water

tanker procured and

delivered

1 firefighting

water tanker

procured and

delivered

None None 1 firefighting

water tanker

procured and

delivered

Number of dual

response vehicles

procured and delivered

Procurement and delivery

of 2 dual response vehicles

2 dual response vehicle procured and delivered

1 dual response

rescue vehicle

procured and

delivered for

None None None

Number of standard

uniform for BPDM fire

personnel procured

and delivered

Procurement and delivery

of Standard Uniform for

BPDM fire personnel

108 standard uniform for BPDM fire personnel procured and delivered

None None 108 standard uniform for BPDM fire personnel procured and delivered

None

Fire and Emergency

Services

To ensure provision of

effective firefighting and

rescue services

in the district.

Improve capacity to

render the services

through personnel,

equipment, partnerships

and facilities

Number of hazardous

materials equipment

procured and delivered

for 3 Fire Stations

Procurement and

delivery of hazardous

equipment for 3 Fire

Stations

3 sets of hazardous materials equipment procured and delivered for 3 Fire Stations

None 3 sets of hazardous materials equipment procured and delivered for 3 Fire Stations

None None

11

1

111

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Eflcient Local Government System

Outputs 1 & 7: • Implement a diffeerntiated approach to municipal financing, planning and support • Administrative and financial capability

Key Strategic Organisational Objectives: • To enhance financial viability and management

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Fire and Emergency Services To ensure provision

of effective firefighting

and rescue services in

the district.

Improve capacity to

render the services

through personnel,

equipment, partnerships

and facilities

Number of Backup power

generation systems

procured for 3 fire stations

and satellite stations

Procurement and

delivery of solar

power systems for 3

fire stations

3 Backup power generation systems procured for 3 Fire stations and satellite stations

None 1 Backup power generation systems procured for 3 Fire stations and satellite stations

None none

Number of portable

firefighting pumps procured

and delivered for 3 fire

stations

Procurement and

delivery of portable

fire fighting pumps for

the 3 fire stations

3 Portable firefighting pumps procured and delivered for 3 fire stations

None 3 Portable firefighting pumps procured and delivered for 3 fire stations

None None

11

2

112

Key Performance Area (KPA)

BASIC SERVICE DELIVERY AND INFRASTRUCTURE DEVELOPMENT

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

Output 2 Improving access to basic services

Output 4 Actions supportive of the human settlement outcome

10 POINT PLAN NUMBER 1

Improve the quantity and quality of municipal basic services to the people in the area of access to water, sanitation, electricity, waste management, roads and disaster management

Key Strategic Organizational Objective

Develop and strengthen a politically and administratively stable system of a municipality

Priority Area Strategic Objectives

Strategies Key Performance Indicator

Proposed Project 5-year target

22/23 23/24 24/25 25/26 26/27

Integrated Transport Planning

To promote and coordinate a safe road network, efficient, accessible and affordable transport services

Implement

and ,

monitor

integrated

transport

plans

Number of rural roads

assets management

systems (RRAMS)

developed

Development of rural

roads assets

management system

1 RRAMS

Developed

1 RRAMS

Developed

1 RRAMS

Developed

1 RRAMS

Developed

1 RRAMS

Developed

Number of Integrated transport plans reviewed

Review of Integrated

Transport Plan (ITP)

with Public Transport

Strategy (PTS)

N/a

1 District Integrated Transport Plan reviewed

N/a N/a

1 District Integrated Transport Plan reviewed

Number of Transport Forums meetings coordinated

Transport Forum

meetings

Transport Forum meetings coordinated

Transport Forum meetings coordinated

Transport Forum meetings coordinated

Transport Forum meetings coordinated

Transport Forum meetings coordinated

Number of reports on

monitoring of public

transport facilities

Monitoring of

public

transport

facilities

10 reports on monitoring of public transport facilities

10 reports on monitoring of public transport facilities

10 reports on monitoring of public transport facilities

10 reports on monitoring of public transport facilities

10 reports on

monitoring of

public transport

facilities

Provide road

safety

Number of reports on

road safety awareness

programmes submitted

Road Safety

awareness

programmes

4 reports on

road safety

awareness

4 reports on

road safety

awareness

4 reports on

road safety

awareness

4 reports on

road safety

awareness

4 reports on road

safety awareness

programmes

submitted

11

3

113

programmes

submitted

programmes

submitted

programmes

submitted

programmes

submitted

Key Performance Area (KPA)

BASIC SERVICE DELIVERY AND INFRASTRUCTURE DEVELOPMENT

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

Output 2 Improving access to basic services

Output 4 Actions supportive of the human settlement outcome

10 POINT PLAN NUMBER 1

Improve the quantity and quality of municipal basic services to the people in the area of access to water, sanitation, electricity, waste management, roads and disaster management

Key Strategic Organizational Objective

Develop and strengthen a politically and administratively stable system of a municipality

Priority Area Strategic Objectives

Strategies Key Performance Indicator

Proposed Project 5 year target

2022/23 2023/24 2024/25 2025/26 2026/27

Roads Development

To provide a safe road network, in support of Local Municipalities

To Provide

roads

Number of reports on

stakeholder engagements

on MIG funding for Roads

Stakeholder

engagements on

roads

4 reports on

Stakeholder

engagements

on MIG

funding for

Roads

1 Road project

constructed

1 Road project constructed

1 Road project constructed

1 Road project constructed

Water Infrastructure Development

To provide safe drinking water, in support of Local Municipalities

Provision of water to communities

Number of reports on

stakeholder engagements

on MIG funding for water

Stakeholder

engagements in

water

4 reports on Stakeholder engagements on MIG funding for water

1 Water

infrastructure

constructed

1 Water infrastructure constructed

1 Water infrastructure constructed

1 Water infrastructure constructed

Sanitation Infrastructure Development

To provide sanitation infrastructure, in support of Local Municipalities

Provision of sanitation services to the community

Number of reports on

stakeholder engagements

on MIG funding for

sanitation

Stakeholder

engagements in

sanitation

4 reports Stakeholder engagements on MIG funding for sanitation

1 Sanitation

projected

constructed

1 Sanitation projected constructed

1 Sanitation projected constructed

1 Sanitation projected constructed

Electricity Infrastructure Development

To provide electricity infrastructure, in support to Local Municipalities

Provision of electricity services to the community

Number of reports on

stakeholder engagements

on MIG funding for

electricity

Stakeholder

engagements in

electricity

4 reports on Stakeholder engagements on MIG funding for electricity

1 Electricity

project

developed

1 Electricity project developed

1 Electricity project developed

1 Electricity project developed

11

4

114

Housing Infrastructure Development

To provide housing infrastructure, in support to Local Municipalities

Provision of housing services to the community

Number of reports on

stakeholder engagements

on MIG funding for

housing

Stakeholder

engagements in

housing

4 reports Stakeholder engagements on MIG funding for housing

1 Housing

project

constructed

1 Housing project constructed

1 Housing project constructed

1 Housing project constructed

Roads Development

To provide a safe road network, in support of Local Municipalities

To provide routine road maintenance

Number of reports on

stakeholder engagements

on MIG funding for roads

maintenance

Stakeholder

engagements in

roads

maintenance

4 reports

Stakeholder

engagements

on MIG

funding for

roads

maintenance

4 Reports on

roads

maintenance

4 Reports on roads maintenance

4 Reports on roads maintenance

4 Reports on roads maintenance

BPDM office maintenance

To provide health and safety of employees

Maintenance

of BPDM

offices

Number of reports on

office maintenance

work

Office Maintenance

4 Reports on

office

maintenance

work

4 Reports on office maintenance work

4 Reports on

office

maintenance

work

4 Reports on office maintenance work

4 Reports on

office

maintenance

work

BPDM New Offices To provide a

conducive working environment to all employees

To ensure

the

development

of the New

Office

Building

Number of New office

building plans

developed

New office

buildings

1 Report on

new office

building plans

Developed

1 Report on the Construction Phase

1 Report on the

Construction

Phase

N/a N/a

Sector Plans

To promote bulk Integrated planning

To ensure

access to

roads

Services.

Number of roads and

storm water master

plans developed

Roads and Storm-

water Master Plan

1 Road and

Storm-water

Master Plan

Developed.

N/a N/a N/a

1 Road and

Storm-water

Master Plan

Reviewed

Sector Plans

To promote bulk Integrated planning

To ensure

access to

electricity

Services.

Number of electricity

master plans developed

Electricity master

plans

1 Electricity

Master Plan

Developed.

N/a N/a N/a 1 Electricity

Master Plan

Reviewed

11

5

115

Key Performance Area (KPA) GOOD GOVERNANCE AND PUBLIC PARTICIPATION

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 3 Implementation of the community work programme

Output 5 Deepen democracy through a refined ward committee model

Output 7 Single window of coordination

Key Strategic Organizational Objective

Develop and strengthen a politically and administratively stable system of a municipality

Priority Area Strategic Objectives Strategies Key Performance Indicator

Proposed Project 5 year target

22/23 23/24 24/25 25/26 26/27

Project Management To ensure project specifications are implemented with the allocated timeframes and to promote quality work

To ensure

proper

monitoring and

evaluation of

the projects

Number of

Consultants

meetings

convened

Consultants

Meetings

4 Consultants

Meetings

convened

4 Consultants Meetings convened

4 Consultants Meetings convened

4 Consultants Meetings convened

4 Consultants Meetings convened

Key Performance Area (KPA) LOCAL ECONOMIC DEVELOPMENT

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

Output 3 Implementation of the community work programme

Key Strategic Organizational Objective

Enhance the municipal contribution to job creation and sustainable livelihoods through Local Economic Development

Priority Area Strategic Objectives Strategies Key Performance Indicator

Proposed Project 5 year target

22/23 23/24 24/25 25/26 26/27

Local Economic Development To provide job creation through Expanded Public Works Programme

Implementation

n of EPWP

programmes in

the infrastructure

sector

Number of

EPWP work

opportunities

created

EPWP projects

implementation

60 EPWP work

opportunities

created

65 EPWP work opportunities created

65 EPWP

work

opportunities

created

65 EPWP work opportunities created

65 EPWP work

opportunities

created

11

6

116

8.13.4 LOCAL ECONOMIC DEVELOPMENT

Key Performance Area (KPA) 4: Basic Services Delivery

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

Outputs 1 & 7: Implement a differentiated approach to municipal financing, planning and support

Administrative and financial capability

Key Strategic Organisational Objectives: To provide sustainable Tourism and Marketing development

Priority Area Strategic Objectives Strategies Key Performance Indicators Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Tourism & Marketing To promote District Tourism

development

To ensure sustainable

Tourism Trainings &

Capacity building

Number of District Tourism

Trainings & Capacity

building conducted.

District Tourism

Trainings &

Capacity

building

Conducted

2 District Tourism Trainings & Capacity building Conducted

2 District Tourism Trainings & Capacity building Conducted

2 District Tourism Trainings & Capacity building Conducted

2 District Tourism Trainings & Capacity building Conducted

2 District Tourism Trainings & Capacity building Conducted

Tourism & Marketing

To promote District Tourism

development

To ensure sustainable

Tourism Awareness

Campaigns

Number of Tourism

Awareness Campaigns

conducted

Tourism

Awareness

Campaigns

Conducted

2 Tourism

Awareness

Campaigns

Conducted

2 Tourism Awareness Campaigns Conducted

2 Tourism Awareness Campaigns Conducted

2 Tourism Awareness Campaigns Conducted

2 Tourism

Awareness

Campaigns

Conducted

Tourism & Marketing To promote District Tourism

development

To ensure sustainable

Tourism Development

Support

Number of Tourism

Development Support

conducted

Tourism Support

Development

Conducted

5 Tourism Development Support Conducted

5 Tourism

Development

Support

Conducted

5 Tourism

Development

Support

Conducted

5 Tourism

Development

Support

Conducted

5 Tourism

Development

Support

Conducted

Tourism & Marketing To promote District Tourism

development

To ensure sustainable

Tourism Development

Support

Number of District Tourism

Strategy Reviewed

District Tourism

Strategy

Reviewed

1 District Tourism Strategy Reviewed

1 District Tourism Strategy Reviewed

1 District Tourism Strategy Reviewed

1 District Tourism Strategy Reviewed

1 District Tourism Strategy Reviewed

11

7

117

Tourism & Marketing To promote District Tourism

development

To ensure sustainable

Tourism Development

Support

Number of District Tourism

Infrastructure Programme

supported

District Tourism

Infrastructure

programme

supported

3 District Tourism Infrastructure programme

supported

1 District Tourism Infrastructure programme

supported

1 District Tourism Infrastructure programme

supported

1 District Tourism Infrastructure programme

supported

1 District Tourism Infrastructure programme

supported

Tourism & Marketing To promote District Tourism

development

To ensure sustainable

participation of Tourism

Exhibitions

Number of Tourism

Exhibitions Participated

Participation of

Tourism

Exhibitions

4 Tourism

Exhibitions

Participated

4 Tourism

Exhibitions

Participated

4 Tourism

Exhibitions

Participated

4 Tourism

Exhibitions

Participated

4 Tourism

Exhibitions

Participated

Tourism & Marketing To promote District Tourism

development

To ensure sustainable

Tourism Branding &

Promotion

Number of Tourism Branding &

Promotions Developed

Tourism

Branding &

Promotions

2 Tourism Branding & Promotions developed

2 Tourism

Branding &

Promotions

developed

2 Tourism

Branding &

Promotions

developed

2 Tourism

Branding &

Promotions

developed

2 Tourism

Branding &

Promotions

developed

Tourism & Marketing To promote District Tourism

development

To ensure sustainable

District Tourism Routes Number of District Tourism

Routes Supported

District Tourism

Routes

1 District Tourism Routes suported

1 District

Tourism

Routes

suported

1 District

Tourism

Routes

suported

1 District

Tourism

Routes

suported

1 District

Tourism

Routes

suported

Tourism & Marketing To promote District Tourism

development

To ensure sustainable

District Tourism Forums Number of District Tourism

Forums Conducted

District Tourism

Forums

4 District Tourism Forums conducted

4 District Tourism Forums conducted

4 District Tourism Forums conducted

4 District Tourism Forums conducted

4 District Tourism Forums conducted

11

8

118

8.13.5 AGRICULTURE AND RURAL DEVELOPMENT UNIT

Outcom

e 9

OUTPUT 3 Implementation of the community work programme

Priority

Area

Strategic

Objective

Strategies

Key Performance

Indicator

Proposed Projects BUDGET Five Year Targets

2026/27 2022/23 2023/24 2024/25 2025/26

Number of District

agriculture & Rural

Development

strategies Reviewed

District agriculture &

Rural Development

strategy reviewed

N/A 1 District agriculture &

Rural Development

strategy reviewed

1 District agriculture

& Rural

Development

strategy reviewed

1 District

agriculture & Rural

Development

strategy reviewed

1 District

agriculture & Rural

Development

strategy reviewed

1 District agriculture &

Rural Development

strategy reviewed

To improve

agriculture and

rural

development in

the district

Number of AgriPark

supported in the

District

AgriPark supported in

the district

R1 500 000

2 Agripark supported in

the district.

2 Agripark supported

in the district.

2 Agripark

supported in the

district.

2 Agripark

supported in the

district.

2 Agripark supported in the

district.

Number of reports

on youth and

Women in

Agriculture

supported

Youth and Women in

agriculture supported

R1 250 000 4 Reports on youth and

Women in agriculture

supported

4 Reports on youth

and Women in

agriculture supported

4 Reports on youth

and Women in

agriculture

supported

4 Reports on youth

and Women in

agriculture

supported

4 Reports on youth and

Women in agriculture

supported

Number of reports

on fresh produce

marked submitted

Fresh produce market R5 000 000 1 Report on fresh

produce market

submitted

1 Report on fresh

produce market

submitted

1 Report on fresh

produce market

submitted

1 Report on fresh

produce market

submitted

1 Report on fresh produce

market submitted

Number of reports

on agricultural

Cooperatives/

individual farmer

submitted annually

Agricultural

Cooperatives/individua

l farmer supportted

R2 500 000

4 Reports on agricultural

cooperatives/individual

farmers submitted

annually

4 Reports on

agricultural

cooperatives/individu

al farmers submitted

annually

4 Reports on

agricultural

cooperatives/indivi

dual farmers

submitted annually

4 Reports on

agricultural

cooperatives/indivi

dual farmers

submitted annually

4 Reports on agricultural

cooperatives/individual

farmers submitted annually

11

9

119

Number of reports

on farmers capacity

building programme

submitted annually

Farmers capacity

building programme

R 1 000 000

4 Reports on farmers

Capacity building

programmes submitted

annually

4 Reports on farmers

Capacity building

programmes

submitted annually

4 Reports on

farmers Capacity

building

programmes

submitted annually

4 Reports on

farmers Capacity

building

programmes

submitted annually

4 Reports on farmers

Capacity building

programmes submitted

annually

Number of reports

on game farming

submitted annually

Game farming

R800 000

4 reports on game

farming submitted

annually

4 Reports on game

farming submitted

annually

4 reports on game

farming submitted

annually

4 reports on game

farming submitted

annually

4 reports on game farming

submitted annually

Outcome

9

OUTPUT 3 Implementation of the community work programme

Priority

Area

Strategic

Objective

Strategies

Key Performance

Indicator

Proposed Projects BUDGET Five Year Targets

2026/27 2022/23 2023/24 2024/25 2025/26

Number of reports on

LED Forum submitted

annually

LED Forum

R 500 000

4 Reports on LED Forum

submitted annually

4 Reports on LED

Forum submitted

annually

4 Reports on LED

Forum submitted

annually

4 Reports on LED

Forum submitted

annually

4 Reports on LED Forum

submitted annually

Number of LED

strategies reviewed

LED Strategy

Reviewed

R 1 million

1 LED strategy reviewed

annually

1 LED strategy

reviewed annually

1 LED strategy

reviewed annually

1 LED strategy

reviewed annually

1 LED strategy reviewed annually

12

0

120

To provide and

promote

enterprise

development

initiatives

Number of reports on

cooperatives/SMMEs

Enterprises submitted

annually

Support of

Cooperatives/SMME

Enterprises

R 3 million 4 reports on

cooperatives/SMMEs

Enterprises submitted

annually

4 reports on

cooperatives/SMME

s Enterprises

submitted annually

4 reports on

cooperatives/SMM

Es Enterprises

submitted annually

4 reports on

cooperatives/SMM

Es Enterprises

submitted annually

4 reports on cooperatives/SMMEs

Enterprises submitted annually

Number of reports on

Small Town

Regeneration

Programmes

submitted annually

Small Town

Regeneration

Programmes

R 2 million

1 report on Small Town

Regeneration

Programmes submitted

annually

1 report on Small

Town Regeneration

Programmes

submitted annually

1 report on Small

Town

Regeneration

Programmes

submitted annually

1 report on Small

Town

Regeneration

Programmes

submitted annually

1 report on Small Town

Regeneration Programmes

submitted annually

Number of reports on

Industrial Development

submitted annually

Support to Industrial

Development (SEZ)

R 100 000 1 report on Industrial

Development submitted

annually

1 report on Industrial

Development

submitted annually

1 report on

Industrial

Development

submitted annually

1 report on

Industrial

Development

submitted annually

1 report on Industrial Development

submitted annually

Number of reports on

mining Forums

submitted annually

Mining forum

R 200 000 1 reports on mining

Forums submitted

annually

1 reports on mining

Forums submitted

annually

1 reports on mining

Forums submitted

annually

1 reports on mining

Forums submitted

annually

1 reports on mining Forums

submitted annually

Number of report on

Disake Sewing Factory

submitted annually

Conclusion of Disake

Sewing Factory

activities

R 500 000

4 reports on Disake

Sewing Factory

submitted annually

4 reports on Disake

Sewing Factory

submitted annually

4 reports on

Disake Sewing

Factory submitted

annually

4 reports on

Disake Sewing

Factory submitted

annually

4 reports on Disake Sewing

Factory submitted annually

12

1

121

8.14 GOOD GOVERNANCE AND PUBLIC PARTICIPATION

8.14.1 OFFICE OF THE EXECUTIVE MAYOR

Key Performance Area (KPA)

MUNICIPAL INSTITUTIONAL DEVELOPMENT AND TRANSFORMATION

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

OUTPUT 1 Implement a differentiated approach to municipal financing, planning and support

OUTPUT 6 Administrative and financial capability

Key Strategic Organizational

Objective

Develop and strengthen a politically and administratively stable system of a municipality

Priority Area Strategic

Objectives Strategies

Key Performance Indicator

Proposed Project

5 year target

22/23 23/24 24/25 25/26 26/27

Advocacy for the rights of the elderly, children, women and persons with disability

To support and

coordinate for

various advocacy

group

Establish and

coordinate district

forum of various

advocacy group

Number of Disability Program Supported per plan

Disability Program 4 Disability Program Supported per plan

4 Disability Program Supported per plan

4 Disability Program Supported per plan

4 Disability Program Supported per plan

4 Disability Program Supported per plan

Number of Awareness Campaigns for advocacy of elderly rights Program held

Awareness

campaign for Elderly

4 Awareness Campaigns for advocacy of elderly rights Program held

4 Awareness Campaigns for advocacy of elderly rights Program held

4 Awareness Campaigns for advocacy of elderly rights Program held

4 Awareness Campaigns for advocacy of elderly rights Program held

4 Awareness Campaigns for advocacy of elderly rights Program held

Number of ECDs supported per plan ECD Programs

4 ECDs supported per plan

4 ECDs supported per plan

4 ECDs supported per plan

4 ECDs supported per plan

4 ECDs supported per plan

Number of Youth Development Programs supported per plan

Youth Development

Programs

4 Youth development Programs supported per plan

4 Youth development Programs supported per plan

4 Youth development Programs supported per plan

4 Youth development Programs supported per plan

4 Youth development Programs supported per plan

Number of Girl Child taken to practical work environment

25 Girl Child taken to work Environment

25 Girl Child taken to practical work Environment

25 Girl Child taken to practical work Environment

25 Girl Child taken to practical work Environment

25 Girl Child taken to practical work Environment

25 Girl Child taken to

practical work

Environment

Number of Woman Program supported per plan

5 Woman Program

supported per plan

5 Woman Program

supported per plan

5 Woman Program supported per plan

5 Woman Program supported per plan

5 Woman Program supported per plan

5 Woman Program supported per plan

12

2

122

Key Performance Area (KPA)

MUNICIPAL INSTITUTIONAL DEVELOPMENT AND TRANSFORMATION

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

OUTPUT 1 Implement a differentiated approach to municipal financing, planning and support

OUTPUT 6 Administrative and financial capability

Key Strategic Organizational

Objective

Develop and strengthen a politically and administratively stable system of a municipality

Priority Area Strategic

Objectives Strategies

Key Performance Indicator

Proposed Project

5 year target

22/23 23/24 24/25 25/26 26/27

To develop and promote Community Based Organizations

To support and

mobilize

different

organizations

within the

community

Coordinate and

empower

various

advocacy group

Number of CBO Programs Supported per plan

CBO Program 4 CBO Program

supported per plan

4 CBO Program supported per plan

4 CBO Program supported per plan

4 CBO Program supported per plan

4 CBO Program supported per plan

Number of HIV/AIDS Awareness programs supported

HIV/AIDS

Program

1 HIV/AIDS Program Awareness supported

1 HIV/AIDS Program Awareness supported

1 HIV/AIDS Program Awareness supported

1 HIV/AIDS Program Awareness supported

1 HIV/AIDS Program Awareness supported

Number of Moral Regeneration programs supported

Moral

Regeneration

program

4 Moral Regeneration Program Supported

4 Moral Regeneration Program Supported

4 Moral Regeneration Program Supported

4 Moral Regeneration Program Supported

4 Moral Regeneration Program Supported

To enhance and strengthen Intergovernemtal Relations (IGR)

To support different IGR initiatives

Coordinate IGR

initiatives

Number of IGR initiatives supported per plan

IGR Initiative

4 IGR initiatives supported per plan

4 IGR initiatives supported per plan

4 IGR initiatives supported per plan

4 IGR initiatives supported per plan

4 IGR initiatives supported per plan

Public participation To engage in programmes that foster public participation, interaction and partnership

Public

participation

Number of State of the District Address coordinated

State of the

District

Address

1 State of the District Address coordinated

1 State of the District Address coordinated

1 State of the District Address coordinated

1 State of the District Address coordinated

1 State of the District Address coordinated

Special Programmes

To promote the needs and interests of special focus

Special

Programmes

Number of Community Bursaries awarded

Number of

Community

Bursaries

awarded

50 Community

Bursaries awarded

50 Community Bursaries awarded

50 Community Bursaries awarded

50 Community Bursaries awarded

50 Community Bursaries awarded

12

3

123

groupings

Procurement of Marketing and Communications items

To support marketing and communications programmes

Procurement of

marketing and

communication

materials

Number of reports on Marketing and communications material procured

Marketing and

Communicatio

ns materials

4 Reports of marketing and Communications material procured

4 Reports of marketing and Communications material procured

4 Reports of marketing and Communications material procured

4 Reports of marketing and Communications material procured

4 Reports of marketing and Communications material procured

Marketing and Communications To support

marketing and communications programmes

Implementing

marketing and

communication

programme

Number of reports on Marketing and Communication programmes implemented

Marketing and

communicatio

ns program

4 Reports of Communication and marketing programmes implemented

4 Reports of Communication and marketing programmes implemented

4 Reports of Communication and marketing programmes implemented

4 Reports of Communication and marketing programmes implemented

4 Reports of Communication and marketing programmes implemented

12

4

124

8.14.2 OFFICE OF THE SPEAKER

Key Performance Area (KPA) GOOD GOVERNANCE AND PUBLIC PARTICIPATION

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 3 Implementation of the community work programme

Output 5 Deepen democracy through a refined ward committee model

Output 7 Single window of coordination

Key Strategic Organizational Objective Support Local Governance Structure

Priority Area Strategic Objectives Strategies Key Performance Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Council and Council Committees Public Participation

To Promote good

governance through

provision of

administrative support

To ensure good

governance and effective

public participation

Council Administrative support

Number of Council

Meetings coordinated Council Meetings

8 Council

Meetings

coordinated

8 Council

Meeting

Coordinated

8 Council

meeting

Coordinated

8 Council Meeting Coordinated

8 Council

Meeting

Coordinated

Number of ward

committee capacity

building programmes

coordinated

Number of ward

committee capacity

building programmes

coordinated

Ward committee

capacity building

programmes

4 ward committee

capacity building

programmes

coordinated

4 ward

committee

capacity

building

programmes

coordinated

4 ward

committee

capacity

building

programmes

coordinated

4 ward

committee

capacity

building

programmes

coordinated

4 ward

committee

capacity

building

programmes

coordinated

Number of mandatory

Speaker’s forum

coordinated

Mandatory

Speaker’s forum

4 Mandatory

Speaker’s forum

coordinated

4 Mandatory

Speaker’s forum

coordinated

4 Mandatory

Speaker’s forum

coordinated

4 Mandatory

Speaker’s forum

coordinated

4 Mandatory

Speaker’s forum

coordinated

Number of District

Batho Pele Monitoring

Campaigns conducted

District Batho

Pele Monitoring

Campaigns

conducted

2 District Batho

Pele Monitoring

Campaigns

conducted

2 District Batho

Pele Monitoring

Campaigns

conducted

2 District Batho

Pele Monitoring

Campaigns

conducted

2 District Batho

Pele Monitoring

Campaigns

conducted

2 District Batho

Pele Monitoring

Campaigns

conducted

12

5

125

Number of District

Batho Pele Forum

meetings coordinated

District Batho

Pele Forum

meetings

coordinated

1 District Batho

Pele Forum

meeting

coordinated

1 District Batho

Pele Forum

meeting

coordinated

1 District Batho

Pele Forum

meeting

coordinated

1 District Batho

Pele Forum

meeting

coordinated

1 District Batho

Pele Forum

meeting

coordinated

Number of Public Participation coordinated

Public Participation

4 Public

Participation

Coordinated

4 Public

Participation

Coordinated

4 Public

Participation

Coordinated

4 Public

Participation

Coordinated

4 Public

Participation

Coordinated

Number of training and

development

coordinated

Training and

Development

6 Trainings

development

coordinated

6 Trainings

development

coordinated

6 Trainings

development

coordinated

6 Trainings

development

coordinated

6 Trainings

development

coordinated

Number of Anti-

corruption strategy

reviewed

Review of Anti-

corruption

strategy

1 Anti-corruption

strategy Reviewed

1 Anti-corruption

strategy

Reviewed

1 Anti-corruption

strategy

Reviewed

1 Anti-corruption

strategy

Reviewed

1 Anti-corruption

strategy

Reviewed

Number of Anti-

corruption wareness

campaigns conducted

Anti-corruption

awareness

campaign

4 Anti-corruption

wareness

campaigns

conducted

4 Anti-corruption

wareness

campaigns

conducted

4 Anti-corruption

wareness

campaigns

conducted

4 Anti-corruption

wareness

campaigns

conducted

4 Anti-corruption

wareness

campaigns

conducted

12

6

126

8.14.3 MPAC

Key Performance Area (KPA) GOOD GOVERNANCE AND PUBLIC PARTICIPATION

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 3 Implementation of the community work programme

Output 5 Deepen democracy through a refined ward committee model

Output 7 Single window of coordination

Key Strategic Organizational Objective Support Local Governance Structures

Priority Area Strategic Objectives Strategies Key Performance Indicators Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

To Promote Good

Governance and

Community Participation

Ensuring

accountability and

oversight within

the institution

Number of MPAC meetings convened

MPAC meetings 4 MPAC meeting

convened

4 MPAC meeting

convened

4 MPAC

meeting

convened

4 MPAC

meeting

convened

4 MPAC meeting

convened

Number of MPAC reports submitted to

Council

MPAC

Reports 4 MPAC report

submitted to

Council

4 MPAC report

submitted to

Council

4 MPAC

reports

submitted to

Council

4 MPAC report

submitted to

Council

4 MPAC report

submitted to

Council

Number of District MPAC

Chairpersons’ Forum meetings

convened

District

MPAC

Chairperson

Forum

meetings

4 District MPAC

Chairpersons

Forum meeting

convened

4 District MPAC

Chairpersons

Forum meeting

convened

4 District

MPAC

Chairpersons

Forum meeting

convened

4 District

MPAC

Chairpersons

Forum meeting

convened

4 District

MPAC

Chairpersons

Forum meeting

convened

Number of MPAC Annual Work Plan

submitted to Council

MPAC

Annual Work

Plan

1 MPAC Annual

Work Plan submitted

to Council

1 MPAC Annual

Work Plan

submitted to

Council

1 MPAC Annual

Work Plan

submitted to

Council

1 MPAC Annual

Work Plan

submitted to

Council

1 MPAC Annual

Work Plan

submitted to

Council

12

7

127

8.14.4 OFFICE OF THE SINGLE WHIP

Key Performance Area (KPA) GOOD GOVERNANCE AND PUBLIC PARTICIPATION

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 3 Implementation of the community work programme

Output 5 Deepen democracy through a refined ward committee model

Output 7 Single window of coordination

Key Strategic Organizational Objective Support Local Governance Structures

Priority Area Strategic Objectives

Strategies Key Performance Indicators

Proposed Project

5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Convening and Coordination of

Chief Whips Forum meeting

To promote and

enhance good

governance

Whippery meetings

Number of District

Whippery Forum

meetings coordinated

District Whippery

Forum

4 District Whippery Forum meetings Coordinated

4 District Whippery Forum

meetings Coordinated

4 District Whippery

Forum meetings

Coordinated

4 District Whippery

Forum meetings

Coordinated

4 District Whippery

Forum meetings

Coordinated

Number of Multi-party

Whippery meetings

coordinated

Multi-party

Whippery

meetings

8 Multi-party Whippery

meetings coordinated

8 Multi-party Whippery

meetings coordinated

8 Multi-party

Whippery meetings

coordinated

8 Multi-party

Whippery meetings

coordinated

8 Multi-party

Whippery meetings

coordinated

Number of Ward Based

Whippery meetings

coordinated

Ward Based

Whippery

meetings

5 Ward Based Whippery meetings coordinated

5 Ward Based Whippery

meetings coordinated

5 Ward Based

Whippery meetings

coordinated

5 Ward Based

Whippery meetings

coordinated

5 Ward Based

Whippery meetings

coordinated

Number of Extended

Whippery meetings

coordinated.

Extended

Whippery

meetings

4 Extended Whippery meetings coordinated

4 Extended Whippery meetings coordinated

4 Extended Whippery meetings coordinated

4 Extended Whippery meetings coordinated

4 Extended Whippery meetings coordinated

12

8

128

Key Performance Area (KPA) GOOD GOVERNANCE AND PUBLIC PARTICIPATION

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government Systems

Output 1 Implement a differentiated approach to municipal financing, planning and support

Output 3 Implementation of the community work programme

Output 5 Deepen democracy through a refined ward committee model

Output 7 Single window of coordination

Key Strategic Organizational Objective Support Local Governance Structures

Priority Area Strategic Objectives Strategies Key Performance

Indicators

Proposed Project 5 Years Targets

2022/23 2023/24 2024/25 2025/26 2026/27

Good Governance & Public

Participation

Proper coordination

and synchronization

of critical matters

Stakeholder

engagement

Ensuring the

provision of effective

and efficient political

oversight by all

parties represented

in the BPDM and at

local municipalities

Number of District

Home Affairs

Stakeholders Forum

meetings coordinated

District Home

Affairs

Stakeholders

Forum

4 District Home Affairs

Stakeholders Forum

meetings coordinated

4 District Home Affairs

Stakeholders Forum

meetings coordinated

4 District Home

Affairs

Stakeholders

Forum meetings

coordinated

4 District Home

Affairs

Stakeholders

Forum meetings

coordinated

4 District Home

Affairs

Stakeholders

Forum meetings

coordinated

Number of Whippery

Training Workshops

coordinated

Whippery

Training

Workshops

6 Whippery Training

Workshops coordinated

6 Whippery Training

Workshops coordinated 6 Whippery

Training

Workshops

coordinated

6 Whippery

Training

Workshops

coordinated

6 Whippery

Training

Workshops

coordinated

12

9

129

8.15 PROJECT LIST AND BUDGET

TECHNICAL SERVICES DEPARTMENT

Project

Number

Project Name

Project

Description

(major activities)

Location

Key

Performance

Indicator

MTERF Targets MTERF Budget R Source of

Funding

Implementing

Agent

EIA/B

AR/ EMP 2022/23 2023/24 2024/25 2022/23 2023/24 2024/25

INFR-01

RRAMS

Implementation and

monitoring of RRAMS

Programme

BPDM

Number of rural

roads assets

management

system (RRAMS)

developed

1 RRAMS

developed 1 RRAMS

developed 1 RRAMS

developed

2 529 000

2 539 000

2 631 000

Equitable

shares

And Dora

Grant

Technical Services

N/A

INFR-02

Transport Forum To conduct transport

forums

BPDM

Number of

Transport Forums

coordinated

4 Transport

forum

coordinated

4 Transport

forum

coordinated

4 Transport

forum

coordinated

150 000

170 000

190 000

Equitable

shares

Technical Services

N/A

INFR-03 public transport

facilities

Monitoring of public

transport facilities to

ensure compliance with

legislations

BPDM

Number of reports

on public transport

facilities monitored

10 reports on

public

transport

facilities

monitored

10 reports on

public transport

facilities

monitored

10 reports on

public transport

facilities

monitored

119 800

130 000

150 000

Equitable

shares

Technical Services

N/A

INFR 04 Road Safety

awareness

programme

To facilitate and conduct

road safety awareness

BPDM Number of reports

on road safety

awareness

programme

submitted

4 reports on

road safety

awarenesspr

ogrammes

submitted

4 reports on

road safety

awarenessprog

rammes

submitted

4 reports on road

safety

awarenessprogra

mmes submitted

180 000 190 000 200 000 Equitable

shares

Technical Services

N/A

INFRA 05 Office Maintenance General Office

maintenance work

BPDM Number of reports

on office

maintenance work

4 reports on

office

maintenance

work

4 reports on

office

maintenance

work

4 reports on

office

maintenance

work

2000 000 1 500 000 1 500 000 Equitable

shares

Technical Services

N/A

13

0

130

INFRA 06 Sector Plans Development of roads

and stormwater master

plan

BPDM Number of roads

and stormwater

master plans

developed

1 roads and

stormwater

master plan

developed

N/a N/a 1 500 000 N/a N/a Equitable

shares

Technical Services

N/A

INFRA 07 Sector Plans Development of master

plan

BPDM Number of

electricity master

plans developed

1 electricity

master plan

developed

N/a N/a 1 500 000 N/a N/a Equitable

shares

Technical Services

N/A

INFRA 08 EPWP projects

implementation

Basic Maintenance of

municipal infrastructure

such as roads; street

lighting;Office Buildings

and community

halls;Cleaning and

Clearing of storm-water

culverts;Basic

maintenance on water

treatment works;

andBasic maintenance

on sewer treatment

works.

BPDM Number of EPWP

work opportunities

created

55 Work

opportunities

created

65 Work

opportunities

created

65 Work

opportunities

created

1 585 000 1 585 000 158 000 Equitable

shares

Technical Services N/A

TOTAL BUDGET O&M CAPEX

13

1

131

Project No. Project Name Project Description (major activities)

Location Key performance indicator

MTERF Targets MTERF Budget (R) Source of

Funding

Implementin

g Agent

EIA/BA

R/EMP 2022/23 2023/24 2024/25 2022/23 2023/24 2024/25

CDS-01 Public Awareness Campaigns

Public Awareness

Campaigns

All 5 Local Municipalities

Number of

Public

Awareness

campaigns

conducted

20 Public

Awareness

campaigns

20 Public

Awareness

campaigns

20 Public

Awareness

campaigns

600 000 660 000 726 000 Equitable

Share

BPDM N/A

CDS-02 Risk Assessment Risk Assessment All 5 Local Municipalities

Number of Risk Assessment Conducted

20 Risk

Assessment

20 Risk

Assessment

20 Risk

Assessment

120 000 132 000

145 200 Equitable

Share

BPDM N/A

CDS-03 Advisory Forum Advisory Forum All 5 Local Municipalities

Number of

Advisory Forum

4 Advisory

Forum

meetings

4 Advisory Forum meetings

4 Advisory Forum meetings

320 000 352 000 387 200 Equitable

Share

BPDM N/A

CDS-04 GIS Organize GIS day All 5 Local Municipalities

Number of GIS

day(s)

conducted

GIS day GIS day GIS day 50 000 55 000 60 500 Equitable

Share

BPDM N/A

CDS-05 Communication Maintenance of two way digital radios

All 5 Local Municipalities

Maintenance of two way digital radios

5 Visits at all 5 local Municipalities

5 Visits at all 5 local Municipalities

5 Visits at all 5 local Municipalities

350 000 385 000 423 500 Equitable

Share

BPDM N/A

CDS-06 Disaster Relief

Materials

Relief assistance during incidents and disasters

All 5 Local Municipalities

Disaster Response and Recovery

Number of incidents

Number of

incidents

Number of

incidents

2 500 000

2 610 000

2 719 000

Equitable

Share

BPDM N/A

CDS-07 Workshop and

Registration

Workshop and Registration

National Annual membership renewal

2 Annual Disaster conferences

2 Annual

Disaster

conferences

2 Annual

Disaster

conferences

200 000 208 000 217 569 Equitable

share

BPDM N/A

13

2

132

COMMUNITY DEVELOPMENT SERVICES

Project No. Project Name Project

Description (major

activities)

Location Key

performance

indicator

MTERF Targets MTERF Budget (R) Source of

Funding

Implem

ent ing

Agent

EIA/BA

R/EMP 2022/23 2023/24 2024/25 2022/23 2023/24 2024/25

CMSD-01 Bojanala Half Marathon

Athletics running

event

BPDM Number of Sport

programmes

organised

1 event held 1 event held 1 event held 300 000 314 000 328 000 Equitable

Share

BPDM N/A

CMSD-02 Recreational

Programmes

Indigenous games BPDM Number of Recreation programmes organised

1 event held 1 event held 1 event held OPEX OPEX OPEX Equitable

Share

BPDM N/A

CMSD-03 Soccer

Development

Soccer Development

Tournament

BPDM Number of Sport

programmes

organised

1 event held 1 event held 1 event held 224 000 234 000 245 081 Equitable

Share

BPDM N/A

CMSD-04 Bojanala Netball

Championship

Netball development

Tournament

BPDM Number of sport

programmes

organised

1 event held 1 event held 1 event held 237 500 248 900 259 851 Equitable

Share

BPDM N/A

CMSD-05 Cricket

development

Cricket development

programme

BPDM Number of sport

programmes

organised

1 event held 1 event held 1 event held OPEX OPEX OPEX Equitable

Share

BPDM N/A

CMSD-06 Provision of sport

equipment

Provision of basic sports equipment

BPDM Number of sporting codes provided with sports equipment

4 sporting codes

4 sporting codes

4 sporting codes

150 000 165 000 181 000 Equitable

Share

BPDM N/A

CMSD-07 Heritage day

celebration

Cultural event BPDM Number of cultural

programmes

organised

1 event held 1 event held 1 event held 78 000 81 744 85340 Equitable

Share

BPDM N/A

CMSD-08 Visual / Fine arts

program

Arts exhibition BPDM Number of arts

programmes

organised

1 event held 1 event held 1 event held 50 000 52 400 54 705 Equitable

Share

BPDM N/A

CMSD-09 Drama workshop Drama workshop/

capacity building

BPDM Number of arts

programmes

organised

1 event held 1 event held 1 event held 50 000 52 400 54 705 Equitable

Share

BPDM N/A

13

3

133

CMSD-10 Performing Arts Performing arts

programme

BPDM Number of arts

programmes

organised

1 event held 1 event held 1 event held OPEX OPEX OPEX Equitable

Share

BPDM N/A

Project No. Project Name Project

Description (major

activities)

Location Key

performance

indicator

MTERF Targets MTERF Budget (R) Source of

Funding

Implem

enting

Agent

EIA/BA

R/EMP 2022/23 2023/24 2024/25 2022/23 2023/24 2024/25

CDS-01 Food Parcels Procurement of food

parcels

All 5 Local Municipalities

Number of food

parcels

distributed

150 food

parcels to

be

distributed

150 food

parcels to be

distributed

150 food

parcels to

be

distributed

500 000 524 000 547 056 Equitable

Share

BPDM N/A

CDS-02 NGOs support Financial assistance All 5 Local Municipalities

Number of NGOs supported

5 NGOs to

be assisted

5 NGOs to be

assisted

5 NGOs to

be assisted

500 000 524 000 547 056 Equitable

Share

BPDM N/A

CDS-03 NGOs support

through EPWP

Volunteers to assist

at NGOs

All 5 Local Municipalities

Number of NGOs

supported

through EPWP

Appointme

nt of 47

EPWP

volunteers

Appointment of 47 EPWP volunteers

Appointment of 47 EPWP volunteers

600 000 628 800 656 467 Equitable

Share

BPDM N/A

CDS-04 Volunteer’s Day Celebrate the work of

volunteers

All 5 Local Municipalities

Number of

volunteers

supported

Number of

volunteers

to be

identified

Number of volunteers to be identified

Number of volunteers to be identified

300 000 314 400 328 233 Equitable

Share

BPDM N/A

Project No. Project Name Project

Description (major

activities)

Location Key

performance

indicator

MTERF Targets MTERF Budget (R) Source of

Funding

Impleme

nting

Agent

EIA/BA

R/EMP 2022/23 2023/24 2024/25 2022/23 2023/24 2024/25

CDS-01 Public Awareness Campaigns

Public Awareness

Campaigns

All 5 Local Municipalities

Number of Public

Awareness

campaigns

conducted

20 Public

Awareness

campaigns

20 Public

Awareness

campaigns

20 Public

Awareness

campaigns

600 000 660 000 726 000 Equitable

Share

BPDM N/A

CDS-02 Risk Assessment Risk Assessment All 5 Local Municipalities

Number of Risk Assessment Conducted

20 Risk

Assessment

20 Risk

Assessment

20 Risk

Assessment

120 000 132 000 145 200 Equitable

Share

BPDM N/A

13

4

134

CDS-03 Advisory Forum Advisory Forum All 5 Local Municipalities

Number of

Advisory Forum

4 Advisory

Forum

meetings

4 Advisory Forum meetings

4 Advisory Forum meetings

320 000 352 000 387 200 Equitable

Share

BPDM N/A

CDS-04 GIS Organize GIS day All 5 Local Municipalities

Number of GIS

day(s) conducted

GIS day GIS day GIS day 50 000 55 000 60 500 Equitable

Share

BPDM N/A

CDS-05 Communication Maintenance of two way digital radios

All 5 Local Municipalities

Maintenance of two way digital radios

5 Visits at all 5 local Municipalities

5 Visits at all 5 local Municipalities

5 Visits at all 5 local Municipalities

350 000 385 000 423 500 Equitable

Share

BPDM N/A

CDS-06 Disaster Relief

Materials

Relief assistance during incidents and disasters

All 5 Local Municipalities

Disaster Response and Recovery

Number of incidents

Number of

incidents

Number of

incidents

2 500 000 2 750 000 3 025 000 Equitable

Share

BPDM N/A

CDS-07 Workshop and

Registration

Workshop and Registration

National Annual membership renewal

2 Annual Disaster conferences

2 Annual

Disaster

conferences

2 Annual

Disaster

conferences

200 000 220 000 242 000 Equitable

share

BPDM N/A

Project No. Project Name Project

Description (major

activities)

Location Key

performance

indicator

MTERF Targets MTERF Budget (R) Source of

Funding

Implemen

ting

Agent

EIA/BA

R/EMP 2022/23 2023/24 2024/25 2022/23 2023/24 2024/25

CDS-01 Food Parcels Procurement of

food parcels

All 5 Local Municipalities

Number of food

parcels

distributed

150 food

parcels to

be

distributed

150 food

parcels to be

distributed

150 food

parcels to

be

distributed

500 000 550 000 605 000 Equitable

Share

BPDM N/A

CDS-02 NGOs support Financial assistance

All 5 Local Municipalities

Number of NGOs supported

5 NGOs to

be

assisted

5 NGOs to

be assisted

5 NGOs to

be

assisted

500 000 550 000 605 000 Equitable

Share

BPDM N/A

CDS-03 NGOs support

through EPWP

Volunteers to assist

at NGOs

All 5 Local Municipalities

Number of

NGOs

supported

through EPWP

Appointm

ent of 47

EPWP

volunteers

Appointment of 47 EPWP volunteers

Appointment of 47 EPWP volunteers

600 000 660 000 726 000 Equitable

Share

BPDM N/A

CDS-04 Volunteer’s Day Celebrate the work

of volunteers

All 5 Local Municipalities

Number of

volunteers

supported

Number of

volunteers

to be

identified

Number of volunteers to be identified

Number of volunteers to be identified

300 000 330 000 363 000 Equitable

Share

BPDM N/A

13

5

135

Project No. Project Name Project Description (major activities)

Location Key performance indicator

MTERF Targets MTERF Budget (R) Source of

Funding

Implem

enting

Agent

EIA/B

A

R/EM

P

2022/23 2023/24 2024/25 2022/23 2023/24 2024/25

CDSF-01 Extrication Equipment Procurement of

extrication

equipment

CDS- all

stations

Number of set

of extrication

equipment

Procured.

2 set of

extrication

equipment

procured

1 set of

extrication

equipment

procured

1 set of

extrication

equipment

procured

1400 000 750 000 770 000 Equitable

Share

BPDM N/A

CDSF-02 Fire safety awareness

programme

Fire safety week CDS- all

stations

Number of Fire safety awareness events held.

1 fire safety

awareness

event held.

1 fire safety

awareness

event held.

1 fire safety

awareness

event held.

None 116 600 128 260 Equitable

Share

BPDM N/A

CMSD-03 Fire Equipment Procurement of

small gear

equipment and

tools

CDS- all

stations

Number of set of

small gear

equipment and

tools procured

1 set of small

gear

equipment and

tools

procured

1 set of small

gear

equipment

and tools

procured

1 set of small

gear

equipment and

tools

procured

900 000 950 000 100 000 Equitable

Share

BPDM N/A

CDSF-04 Compressed Air Foam

systems (CAFS) and vehicles

Procurement of

Compressed Air

Foam Systems

and vehicles

CDS-

Kgetleng,M

oretele

Number of

CAFS units

procured

2 CAFS units

procured

1 high CAFS

units procured

None 2 900 000 1 450 000 None Equitable

Share

BPDM N/A

CDSF-05 Complete Breathing

Apparatus sets

Procurement of complete Breathing Apparatus sets

CDS- all

stations

Number set of complete Breathing Apparatus sets

20 set of complete Breathing Apparatus

15 set of complete Breathing Apparatus

15 set of

complete

Breathing

Apparatus

400 000 330 000 363 000 Equitable

Share

BPDM N/A

CDSF-06 Medium Fire Tanker Procurement of 2 medium Fire Tankers

CDS-

Kgetleng,M

oretele

Number of Medium Fire Tankers Procured

2x Medium Fire Tanker Procured

1 Medium Fire Tanker Procured

1 Medium Fire

Tanker

Procured

11 000

000

605 000 6 655 000 Equitable

Share

BPDM N/A

CDSF-07 Rapid dual Response vehicle Procurement of dual Response vehicle

CDS-

Mogwase,K

getleng

Number of dual Response vehicles Procured

2 dual response vehicle Procured

1 dual response vehicle Procured

1 dual

response

vehicle

Procured

12 000

000

6 000 000 6 057 000 Equitable

Share

BPDM N/A

13

6

136

CDSF-08 Personnel Protective equipment Procurement of

Personnel

Protective

Equipment

CDS –all

stations

Number of PPE

Procured for fire

personnel

PPE for fire

personnel

Procured

PPE for fire

Personnel

Procured

PPE for fire

Personnel

Procured

5 768 400 None 6 862 152 Equitable

Share

BPDM N/A

CDSF-09 Fire personnel standard uniform Procurement of Fire

Personnel Standard

Uniform

CDS-all

station’s

Number of

Standard uniform

Procured

Standard

Uniform

Procured

Standard

Uniform

Procured

Standard

Uniform

Procured

1 300 000 None 1 505 918 Equitable

Share

BPDM N/A

CDSF-10 Complete Diving Equipment Procurement of

complete Diving

Equipment

CDS-all

stations

Number of Diving

Equipment

Procured

Complete Diving

set Procured

Complete

Diving set

Procured

Complete Diving

set Procured

250 000 270 800 None Equitable

Share

BPDM N/A

CDSF-11 Office Stationery Procurement of

Office Stationery

CDS- all

stations

Number of Office

Stationery

Procured

Office

Stationery

Procured

Office

Stationery

Procured

Office Stationery

Procured

98 150 105 765 116 342 Equitable

Share

BPDM N/A

CDS-12 Cleaning Materials Procurement of

Cleaning Materials

CDS- all

stations

Number of

Cleaning

Materials

Procured

Cleaning

Materials

Procured

Cleaning

Materials

Procured

Cleaning

Materials

Procured

130 290 112 519 123 771 Equitable

Share

BPDM N/A

CDS-13 Support To FPAs Procurement of

portable firefighting

equipment

CDS- all

Locals

Number of

firefighting

equipment

Procured

Firefighting

equipment

Procured

Firefighting

equipment

Procured

Firefighting

equipment

Procured

1 000 000 859 000 944 900 Equitable

Shares

BPDM N/A

CDS-14 Fire Personnel Medical

Programme surveillance Procurement of

Medical surveillance

Service

CDS -stations Number of

Medical

surveillance

conducted

Medical surveil

lance conducted

Medical

surveillance

conducted

Medical

surveillance

conducted

380 000 396 200 413 820 Equitable

Shares

BPDM N/A

CDS-15 Water Borehole Procurement of

water borehole

CDS

Kgetleng

Fire,

Mogwase.

And Moretele

Number of water

borehole

completed

Water borehole

completed

Water borehole

completed

Water borehole

completed

120 000 None 90 750 Equitable

Shares

BPDM N/A

CDS-16 Satellite Fire new fencing Procurement of new fencing equipment

CDS-

Kgetleng

Number of new fencing equipment procured

Kgetleng Satellite fire station new fencing

Kgetleng Satellite fire station new fencing

Kgetleng

Satellite fire

station new

fencingas

104 260 None 114 686 Equitable Shares

BPDM N/A

13

7

137

CDS-17 Office Furniture Procurement of office furniture

CDS – all

stations

Number of office furniture Procured

Office furniture Procured

Office furniture procured

Office furniture

Procured

200 000 100 300 150 930 Equitable

Shares

BPDM N/A

CDS-18 Complete Hazmat

set/equipment

Procurement of Hazmat equipment

CDS – all

stations

Number of Hazmat equipment Procured

Hazmat set equipment Procured

Hazmat set equipment Procured

Hazmat

equipment set

Procured

600 000 600 000 484 000 Equitable

Shares

BPDM N/A

CDS-19 Small breaking tools and

equipment

Procurement of small breaking tools

CDS- all

stations

Number of small braking tools Procured

Small miscellaneous tools procured

Small miscellaneous tools procured

Small

miscellaneous

tools procured

890 300 None 107 726 Equitable

Shares

BPDM N/A

CDS-20 Computers and Equipment Procurement of computers and equipment

CDS- all

stations

Number of computers and equipment procured

Computers and equipment procured

Computers and equipment procured

Computers and

equipment

procured

75 000 82 500 90 750

Equitable

Shares

BPDM N/A

CDS - 21 Vehicle Repairs and

Maintenance

Procurement of fire services fleet repairs and Maintenance

CDS – all

BPDM fire

stations

Number of repairs and maintenance procured

Repairs and maintenance procured

Repairs and maintenance procured

Repairs and

maintenance

procured

1 800 000 1 980 000 2 178 000 Equitable

Shares

BPDM N/A

CDS - 22 Fire personnel Membership

fees

Procurement of Membership payments fire personnel

CDS – all

BPDM fire

personnel

Number of membership payments procured(108)

SAESI membership payments procured

SAESI membership payments procured

SAESI

membership

payments

procured

80 000 84 600 85 860 Equitable

Shares

BPDM N/A

CDS - 23 Conference, Workshop

Attendance

Procurement of workshops conference attendance

CDS – all

BPDM fire

personnel

Number of workshops and conference procured

Workshops and conferences attended

Workshops and conferences attended

Workshops

and

conferences

attended

120 000 132 000 145 200 Equitable

Shares

BPDM N/A

CDS - 24 Airports/Strips Simulation

Support

Procurement of District Annual Airport/Strips Simulation support

CDS –

Moses

Kotane

Local

Municipality

Number of District Annual Airport/Strips supported in simulation exercise

Airport/ Strips Annual simulation exercise procured

Airport/Strips Annual simulation exercise procured

Airport/Strips

Annual

simulation

exercise

procured

80 000 88 000 96 800 Equitable

Shares

BPDM N/A

13

8

138

CDS - 25 Library and Training Materials Procurement of BPDM fire stations Library and Training materials

CDS – all

BPDM

stations

Number of Library and Training materials procured

Library and Training materials procured

Library and Training materials procured

Library and

Training

materials

procured

78 300 86 130 94 743 Equitable

Shares

BPDM N/A

CDS - 26 EPWP BPDM Fire Services

General workers

Procurement of EPWP BPDM Fire Services General Workers

CDS – all

BPDM Fire

Stations

Number of EPWP Fire Services general Workers Procured

15 EPWP Fire Services General workers procured

15 EPWP Fire Services General Workers procured

15 EPWP Fire

Services

General

Workers

procured

414 000 455 400 500 940 Equitable

Shares

BPDM N/A

CDS-27 Portable Fire Pumps Procurement of Portable Fire Pumps

CDS – all

BPDM Fire

Stations

Number of Portable Fire Pumps Procured

3 Portable Fire Pumps Procured

3 Portable Fire Pumps Procured

None 750 000 790 000 Equitable

shares

BPDM N/A

CDS-28 Backup Power Generation

System

Procurement of Solar power systems

CDS – all

BPDM Fire

Stations

Number of Solar power Systems procured

3 Solar power systems procured

600 000 400 000 100 000 Equitable

shares

BPDM N/A

13

9

139

MUNICIPAL HEALTH AND ENVIRONMENTAL SERVICES

Project No. Project Name Project Description (major activities)

Location Key performance indicator

MTERF Targets MTERF Budget (R) Source of

Funding

Implementi

ng Agent

EIA/BA

R/EMP 2022/23 2023/24 2024/25 2022/23 2023/24 2024/25

HES-01 Gazzeting of By laws Gazzeting of 2 By

laws, MHS and Air

quality

BPDM Number of By

laws

Gazzeted

2 By

Laws

gazzetted

N/A NA 1,600 000 R1,664000 R1,

730560

Equitable

Share

BPDM N/A

HES-02 Review of integrated

waste management plan

Review of 1

integrated waste management plan

BPDM Number of

Integrated

waste

Management

plan Reports

Reviewed

1 Report

per annum

1 Integrated

Waste

Management

Report

reviewed per

annum

1 Report per

annum

500 000 R520 000 R540 800 Equitable

Share

BPDM N/A

HES-03 Rehabilitation of illegal

dumps

Rehabilitation of 2

illegal dumps

BPDM Numbr of illegal

dumps

Rehabilitated.

2 Reports

per

annum

2 Reports per

annum

2 Reports per

annum

445 000 465 800 R483 312 Equitable

Share

BPDM N/A

HES-04 Coordination of health

awareness programs

Coordination of 20

health awareness

programs

BPDM Number of

Health

Awareness

programs Co

ordinated

20

Reports

per

annum

20 Reports

per annum

20 Reports

per annum

496 000 517 825 R539 572 Equitable

Share

BPDM N/A

HES-05 Food and Water quality sampling

12 Food and Water quality sampling

BPDM Number of

food and

water quality

sampling

12

Reports

per

annum

12 Reports

per annum

12 Reports

per annum

250 000 262 000 R273 528 Equitable Share

BPDM N/A

HES-06 Coordination of

Environmental

awareness programs

Coordination of 12

Environmental

awareness programs

BPDM Number of

Environmental

Awareness

Programmes

Co ordinated

12

Reports

per annum

12 Reports

per annum

12 Reports

per annum

R341 000 200 000 200 000 Equitable Share

BPDM N/A

HES-07 Coordination of climate

change programs

Coordination of 4

climate change programs

BPDM Number of

Climate

Change

programmes

Co ordinated

4 Reports

per

annum

4 Reports per

annum

4 Reports per

annum

R349 800 R350 000 R351

000

Equitable

Share

BPDM N/A

14

0

140

HES-08 Coordination of air quality

programs

Coordination of 4 air

quality programs

BPDM Number of Air

Quality

Programmes

Co ordinated

4 Reports

per annum 4 Reports per

annum 4 Reports per

annum R315 000 R328 860 R343 329 Equitable

Share

BPDM N/A

HES-09 Coordination of

biodiversity greening

projects

Coordination of 4

biodiversity greening

projects

BPDM Number of

Biodiversity

greening

Projects Co

ordinated

4 Reports

per

annum

4 Reports per

annum 4 Reports per

annum R351 000 R367 848 R384 033 Equitable

Share

BPDM N/A

HES-10 Coordination of waste recovery programs

Coordination of 4 waste recovery

programs

BPDM Number of

Waste

recovery

programmes

Co ordinated

4 Reports

per annum

4 Reports per

annum 4 Reports per

annum R359 300 R373 675 R388619 Equitable

Share

BPDM N/A

HES-11 Environmental

Rehabilitation programs

2 Environmental

Rehabilitation

programs

BPDM Number of

Environmental

Rehabilitation

programmes

2 Reports

per

annum

2 Reports per

annum 2 Reports per

annum R350 000 R365 4000 R381 477 Equitable

Share

BPDM N/A

14

1

141

CORPORATE SUPPORT SERVICES

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government System

Outputs 1 & 7: • Implement a differentiated approach to municipal financing, planning and support

Administrative and financial capability Key Strategic Organizational Objectives:

To enhance financial viability and management

Priority Area

Strategic Objectives Strategies Key Performance Indicators

Proposed Project 3 year targets MTREF

2022/23 2023/24 2024/25 2022/23 2022/23 2022/23 Source of

funding

Implementing

Agent

EIA/BAR/EM

P

Labour

Relations

To achieve sound labour

and positive employee

climate

Local Labour

Forum

Number of

reports on the

local labour

forum meetings

Coordination of

LLF meetings

4 meetings per

annum

4 meetings

per annum

4 meetings per

annum

100 000 100 000 100 000 Equitable

Share

BPDM N/A

Institutional Records Management

To achieve sound and

proper records

management

Proper

Records

Management

Number of

District Records

Management

Forum meetings

held

Coordination of

the District

Records

Management

Forum

4 meetings per

annum

4 meetings per annum

4 meetings per annum

8 400 9000 9500 Equitable

Share BPDM N/A

Employee

Wellness

To achieve sound labour

and positive employee

climate

Occupational

Health and

safety

Number of

occupational

Health and

safety committee

meetings held

Coordination of

Occupational

Health & Safety

Committee

meetings

4 meetings per

annum

4 meetings

per annum

4 meetings per

annum

12 320 12 500 13 000 Equitable

Share BPDM N/A

Labour

Relations

To promote Labour

Relations

Labour

Relations

Number of

labour relations

workshops held

Coordination of

labour relations

workshop

4 workshop per annum

4 workshop per annum

4 workshop per annum

12 320 12 500 13 000 Equitable

Share BPDM N/A

14

2

142

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government System

Outputs 1 & 7: • Implement a differentiated approach to municipal financing, planning and support • Administrative and financial capability

Key Strategic Organizational Objectives:

• To enhance financial viability and management

Priority Area

Strategic Objectives Strategies Key Performance Indicators

Proposed Project 3 year targets MTREF

2022/23 2023/24 2024/25 2022/23 2023/24 2024/25 Source of

funding

Implementing

Agent

EIA/BAR/EM

P

Positive employee relations

To achieve sound labour

and positive employee

climate

Sound labour and

positive employee

climate

Number of

workshops on

the review of HR

policies

Coordination of

HR policy review

1 review per

annum

1 review per

annum

1 review per

annum

R15 120 R16

120

R17 120 Equitable

Share

BPDM N/A

Employee Wellness

To achieve sound labour

and positive employee

climate

Implementation of

Employee

Assistance

programme

Number of

reports on the

implementation

of employee

assistance

programme

(EAP)

Coordination of

employee

assistance

programme

4 employee

assistance

programme

per annum

4 employee assistance programme per annum

4 employee assistance programme per annum

R65 000 R70 000 R75 000 Equitable

Share BPDM N/A

Employment Equity

To achieve sound labour

& positive employee

climate

Implementation of the Employment Equity

Number of

Employment Equity

Committee

meetings held

Employment Equity

committee meetings

2 employment equity committee meetings per annum

2 employment

equity committee

meetings per

annum

2 employment

equity

committee

meetings per

annum

R12 320 R13 320 R14 320 Equitable

Share BPDM N/A

Employment Equity

To achieve sound labour

& positive employee

climate

Implementation of the Employment Equity

Number of

Employment Equity

Committee

meetings held

Employment Equity

committee meetings

2 employment equity committee meetings per annum

2 employment

equity committee

meetings per

annum

2 employment

equity

committee

meetings per

annum

R12 320 R13 320 R14 320 Equitable

Share BPDM N/A

14

3

143

Work Skill Plan

To achieve sound labour & positive employee climate

-

Submission of work skills plan

Number of WSP

reports developed &

submitted to

LGSETA

WSP submitted to

LGSETA

1 per annum

1 per annum 1 per annum R1559 500 R1 659

500

R1 759 500 Equitable

Share BPDM N/A

Key Performance Area (KPA) 4: Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government System

Outputs 1 & 7: • Implement a differentiated approach to municipal financing, planning and support • Administrative and financial capability

Key Strategic Organizational Objectives:

• To enhance financial viability and management

Priority Area

Strategic Objectives Strategies Key Performance Indicators

Proposed Project 3 year targets MTREF

2022/23 2023/24 2024/25 2022/23 2023/24 2024/25 Source of

funding

Implementing

Agent

EIA/BAR/E

MP

Bursaries for employees

To achieve sound

labour and positive

employee climate

Awarding of

bursaries to

employees

Number of

reports on

awarding of

employees

bursaries

Bursaries

awarded to

employees

2 Reports per annum

2 Reports per

annum

2 Reports per

annum R3 000 000 R3 000 000

R3 000

000

Equitable

Share

BPDM N/A

Organisational Structure

To achieve sound

labour and positive

employee climate

Review of the

organogram

Number of

organizational

structures

reviewed &

submitted to the

Council

Review of

Organizational

Structure

1 review per annum

1 review per

annum

1 review per

annum

Operational Operational Operation

al

Equitable

Share BPDM N/A

Leave Automation

To achieve sound

labour and positive

employee climate

Automated Leave for BPDM

Number of reports

on Implementation

(automation) of

leave submitted to

the Accounting

Report on

implementation of

Leave Automation

4 Reports per annum

4 Reports per

annum

4 Reports per

annum

R200 000 R100 000 R100 000 Equitable

Share BPDM N/A

14

4

144

Skills Development

To achieve sound

labour and positive

employee climate

Implementation of skills programmes

Number of skills

program

implemented

Report on

implementation of

Skills

programmes

4 Reports per

annum 4 Reports per

annum

4 Reports per

annum Operational Operational Operation

al

Equitable

Share BPDM N/A

Council and Council Committees

To promote good

governance through

the provision of

administrative support

Council

Administrative

support

Number of

portfolio

committee

meetings held

Reports of the

portfolio

committee

meetings

4 Reports per

annum

4 Reports per

annum

4 Reports per

annum

R201 600 R203600 R205 600 Equitable

Share BPDM N/A

Council and Council Committees

To promote good

governance through the

provision of

administrative support

Mayoral

Committee

Administrative

support

Number of

mayoral

committee

meetings held

Mayoral

committee

meetings

8 meetings per

annum

8 meetings per

annum

8 meetings per

annum

Operational Operational Operation

al

Equitable

Share

BPDM N/A

Council and Council Committees

To promote good

governance through

the provision of

administrative support

Council

Administrative

support

Number of

council

meetings held

Council

meetings

6 meetings per

annum

6 meetings per

annum

6 meetings per

annum+

Operational Operational Operation

al Equitable

Share

BPDM N/A

14

5

145

Key Performance Area (KPA) 4:

Municipal Financial Viability and Management

Outcome 9: Responsive, Accountable, Effective and Efficient Local Government System

Outputs 1 & 7: • Implement a differentiated approach to municipal financing, planning and support • Administrative and financial capability

Key Strategic Organizational Objectives:

• To enhance financial viability and management

Priority Area Strategic Objectives

Strategies Key Performance Indicators

Proposed Project

3 year targets MTREF

2022/23 2023/24 2024/25 2022/23 2023/2024 2024/25 Source of

funding

Implementing

Agent

EIA/BAR/E

MP

Records Management

To promote a sound

records management

Implementati

on of proper

records

management

Number of records

management

reports submitted

to the Accounting

Officer

Reports on

records

managemen

t

4 Reports per

annum

4 Reports per

annum

4 Reports per

annum

R300 000

R300 000

R300 000

Equitable

Share

BPDM N/A

Administration management

Fleet management Procurement

of a

municipal

vehicle

Number of

vehicles procured

and delivered

Procuremen

t of 1x 10

seater

municipal

vehicle

1 Report N/A N/A R900 000 N/A N/A Equitable

Share

BPDM N/A

Administration management

Fleet management

Fleet Reports Number of fleet

management reports

submitted to the

Accounting officer

Submission of

fleet

management

Reports to the

Accounting

officer

4 Reports on

fleet

management

4 Reports per

annum

4 Reports per

annum

Operational Operational Operational Equitable

Share BPDM N/A

14

6

146

ECONOMIC DEVELOPMENT TOURISM AND AGRICULTURE

Project

Number

Project Name

Project

Description

(major

activities)

Location

Key

Performance

Indicator

MTERF Targets MTERF Budget R Sourc

e of

Fundi

ng

Implem

enting

Agent

EIA/B

AR/

EM

P

2022/23 2023/24 2024/25 2022/23 2023/24 2024/25

EDTAR -01 LED stakeholder

engagement

Hosting of LED

forum meetings

to integrate

plans

EDTAR Number of LED

Forum Meetings

held

District wide

LED Forum

held quarterly

District wide

LED Forum

held quarterly

District wide

LED Forum

held quarterly

200 000 200 000 200 000

Equitabl

e Share

EDTAR

EDTAR- 02 Sector plans -

LED Strategy

Review

Review of

LED

Strategy

EDTAR Number of LED

Strategies

reviewed

developed

Review and update of the strategy

Review and update of the LED strategy

Review and update of LED strategy

250 000

250 000 250 000

Equitabl

e share

EDTAR

EDTAR-03

Support to

Cooperatives/SM

ME Enterprises

Support to

Cooperatives/S

MME

Enterprises

EDTAR

Number of

cooperatives/SM

MEs Enterprises

supported

Identification

and support

to

cooperative/S

MME

enterprises

with capacity

building and

equipment’s

Identification

and support

to

cooperative/S

MME

enterprises

with capacity

building and

equipment’s

Identification and support to cooperative/SMME enterprises with capacity building and equipment’s

R 3 million

R 3 million R 3 million Equitabl

e share

EDTAR

EDTAR-04

Small Town

Regeneration

Programmes

Number of

Small Town

Regeneration

Programmes

supported

EDTAR

Number of Small

Town

Regeneration

Programmes

supported

Support

towards

implementatio

n of the STR

Support for

planning,

design and

implementatio

n of STR

Programme

Support

towards

implementatio

n of the STR

programme

R 2 million

R 2 million R 2 million Equitabl

e share

EDTAR

14

7

147

EDTAR-05

Support to

Industrial

Development

(SEZ)

Support to

Industrial

Development

(SEZ)

Number of

Industrial

Development

supported

Support in the

planning and

implementatio

n of SEZ

Support in the

planning and

implementatio

n of SEZ

Support in the

planning and

implementatio

n of SEZ

R 100 000 R 100 000 R 100 000 Equitabl

e share

EDTAR

EDTAR-06

District Mining

forum

To conduct

mining forum

EDTAR Number of

District mining

Forums

Conducted

2 mining

Forums

Conducted

2 mining

Forums

Conducted

2 mining

Forums

Conducted

R300 000 R300 000 R300 000 Equitabl

e share

EDTAR

EDTAR-07

Disake Sewing

Factory

.

Support for

Disake Sewing

Factory

Number of

activities to be

completed at

Disake Sewing

Factory

Identification

of outstanding

activities to be

supported and

implemented

in the Factory

Implementatio

n and

Monitoring

and

Evaluation

Monitoring

and

Evaluation

R 500 000 R 500 000 R 500 000 Equitabl

e share

EDTAR

EDTAR-08 Sector plans -

Tourism

Development

Strategy

review

Review of

Tourism

Developm

ent

Strategy

EDTAR Number of

Tourism

Development

Strategies

reviewed

Review of Tourism Development Strategy

Review of Tourism Development Strategy

Review of Tourism Development Strategy

250 000

250 000 250 000

Equitabl

e share

EDTAR

EDTAR-09 BPDM

Economic

Profile

Compilatio

n of district

economic

profile

EDTAR Number of

District Economic

Profiles produced

200 000

Equitabl

e share

EDTAR

EDTAR-10 Tourism

awareness

Participatio

n in and

hosting of

Tourism

EDTAR Number of

Tourism

Awareness

2 Tourism

Awareness

2 Tourism

Awareness

2 Tourism Awareness Campaigns Conducted

300 00 Equitabl

e share

EDTAR

14

8

148

exhibitions

&

campaign

Campaigns

conducted

Campaigns

Conducted

Campaigns

Conducted

EDTAR-11 Tourism

training &

capacity

building

District

Tourism

Trainings

& Capacity

building

Conducted

EDTAR Number of

District

Tourism

Trainings &

Capacity

building

conducted.

2 District

Tourism

Trainings &

Capacity

building

Conducted

2 District Tourism Trainings & Capacity building Conducted

2 District Tourism Trainings & Capacity building Conducted

R500 000

Equitabl

e share

EDTAR

EDTAR-12 Tourism

Branding &

Promotions

Conduncti

ng tourism

branding &

branding

initiatives

Number of

Tourism Branding

& Promotions

Developed

2 Tourism

Branding &

Promotions

2 Tourism Branding & Promotions

2 Tourism Branding & Promotions

R600 000

Equitabl

e share

EDTAR

EDTAR-13 Tourism

awareness

Participatio

n of torism

exhibitions

EDTAR

Number of

Tourism

Exhibitions

Participated

Participation

of Tourism

Exhibitions

Participation

of 4 Tourism

Exhibitions

Participation of 4 Tourism Exhibitions

R600 00 Equitabl

e share

EDTAR

EDTAR-14 District Tourism

Routes

Developing

district &

supporting

LMs to

develop

tourism routes

EDTAR Number of District

Tourism Routes

Supported

1 District

Tourism

Routes

Support for LMs to develop Tourism Routes

Support for LMs to develop Tourism Routes

R300 000

Equitabl

e share

EDTAR

EDTAR-15 District Tourism

Forums

Number of

District Tourism

4 District

Tourism

Forums

4 District Tourism Forums

4 District Tourism Forums

R160 000

Equitabl

e share

EDTAR

14

9

149

Forums

Conducted

EDTAR–16 EPWP grant

project

implementation

Implementatio

n of EPWP

grant

EDTAR Number of EPWP work opportunities created

20 Work

opportunities

created

20 Work

opportunities

created

20 Work

opportunities

created

300 000

300 000

300 000

Equitabl

e share

EDTAR

EDTAR-17 District

agriculture &

Rural

Development

strategy

Developmen

t of District

agriculture &

Rural

Developmen

t strategy

Number of District

agriculture &

Rural

Development

strategies

developed

1 District

agriculture &

Rural

Development

strategy

developed

1 District

agriculture &

Rural

Development

strategy

reviewed

1 District

agriculture &

Rural

Development

strategy

reviewed

R200

000

Equitabl

e Share

EDTAR

EDTAR-18 Support to

Farmer

Production

Support Units in

five Local

Municipalities

To provide

and facilitate

support

Support to

Farmer

Production

Support

Units in five

Local

Municipalitie

s

Number of

AgriPark (Farmer

Production

Support Unit)

supported in the

District

Support to

Moses Kotane

and Madibeng

LM FPSU’s Support to

Moses Kotane

and Madibeng

LM FPSU’s

Support to

Moretele,

Rustenburg

and Kgetleng

FPSU’s

R1 500

000

Equitabl

e Share

EDTAR

EDTAR-19

Fresh produce

market

Number of Fresh produce market supported

Stakeholder

engagement,

Assessment,

allocation and

zoning

planning, land

Investment

attraction

Establishment

of the project

R5 000

000

Equitabl

e Share

EDTAR

15

0

150

EDTAR-20 Agricultural

Cooperatives/indi

vidual farmer

support

Support farmers

with production

inputs,

Number of

Agricultural

Cooperatives/indi

vidual farmer

supported

Support

farmers with

production

inputs,

Support

farmers with

production

inputs,

Support

farmers with

production

inputs,

R 500 000

Equitabl

e Share

EDTAR

EDTAR-21 Farmers capacity

building

programme

Number of

Farmers capacity building programme implemented

2 farmers

Capacity

building

programmes

implemented

2 farmers

Capacity

building

programmes

implemented

2 farmers

Capacity

building

programmes

implemented

R 500 000

Equitabl

e Share

EDTAR

EDTAR-22 game farming

Number of

game farming

programmes

supported

Number of game

farming

programmes

supported

Identification

of areas with

game farming

potential and

develop a

programme to

support and

encourage

game farming

in the District

Involvement

of all relevant

stakeholders

and

capacitate

beneficiaries

on the

importance of

game farming

Implementatio

n, monitoring

and

evaluation of

the

programme

R500

000

Equitabl

e Share

EDTAR

EDTAR-23 Veld management

Veld

managemen

t

(establishme

nt of

pastures

and control

of bush

Number of Veld

management

(establishment of

pastures and

control of bush

encroachment)pre

program

supported

Development

and

implementatio

n of veld

management

programme

which

includes

Development

and

implementatio

n of veld

management

programme

which

includes

Development

and

implementatio

n of veld

management

programme

which

includes

R500

000

Equitabl

e Share

EDTAR

15

1

151

encroachme

nt)

control of

bush

encroachment

and pasture

establishment

in rural

villages

control of

bush

encroachment

and pasture

establishment

in rural

villages

control of

bush

encroachment

and pasture

establishment

in rural

villages

TOTAL BUDGET:

8 15.1 OFFICE OF THE MUNICIPAL MANAGER

LEGAL SERVICES

Project

No.

Project Name Project

Description

(major activities)

Location Key

performance indicator

MTERF Targets MTERF Budget (R) Source

of Funding

Implem

enting

Agent

EIA/B

AR/E MP

2021/22 2022/23 2023/24 2021/22 2022/23 2023/24

OMM -01 Attendance and

management of

effective litigation

Litigation

Managemen

t

BPDM Percentage

attendance and

management of

litigation cases

100% attendance

and management

of all cases

instituted or

defended

100% attendance

and management

of all cases

instituted or

defended

100%

attendance and

management of

all cases

instituted or

defended

7 500 000 5 000 000 4 000 000 Equitable

Shares

BPDM N/A

TOTAL :LEGAL SERVICES 7 500 000 5 000 000 4 000 000

15

2

152

PERFORMANCE MANAGEMENT SYSTEM

Project

No.

Project Name Project

Description (major

activities)

Location Key

performance indicator

MTERF Targets MTERF Budget (R) Source

of Funding

Implem

enting

Agent

EIA/B

AR/E

MP

2022/23 2023/24 2024/25 2022/23 2023/24 2024/25

OMM2 Development and review of institutional SDBIP

Develop and review the institutional SDBIP

BPDM Number of institutional SDBIPs developed and reviewed

1 institutional SDBIP developed and reviewed

1 institutional

SDBIP developed

and reviewed

1 institutional

SDBIP developed

and reviewed Opex Opex Opex

Equitable shares

PMS N/A

OMM3

Develop and submit quarterly institutional performance reports to Council for adoption

Develop and submit quarterly institutional performance reports

BPDM

Number of quarterly institutional performance reports submitted to Council for adoption

4 quarterly institutional performance reports submitted to Council for adoption

4 quarterly

institutional

performance

reports submitted to

Council for adoption

4 quarterly

institutional

performance

reports submitted

to Council for

adoption

Opex Opex Opex

Equitable

shares PMS N/A

OMM4 Conduct and submit performance reviews to Council

Conduct performance reviews

BPDM Number of performance reviews conducted and submitted to Council

2 performance reviews conducted and submitted to Council

2 performance

reviews conducted

and submitted to

Council

2 performance

reviews

conducted and

submitted to

Council

Opex Opex Opex

Equitable

shares PMS N/A

OMM5 Review PMS policy Review of PMS

policy BPDM Number of PMS

policies reviewed

1 PMS policy reviewed

1 PMS policy reviewed

1 PMS policy reviewed

Opex Opex Opex Equitable

shares PMS

N/A

OMM6 Annual report

submission

Develop and

submit Annual

report to Council

BPDM Number of Annual

Reports developed

and submitted to

Council

1 Annual Report developed and submitted to Council

1 Annual Report developed and submitted to Council

1 Annual Report developed and submitted to Council

Opex Opex Opex

Equitable

shares PMS N/A

OMM7 Signing of

performance

agreements

Development

and signing of

performance

agreements

BPDM Number of

performance

agreements

developed and signed

7 performance agreements developed and signed

7 performance agreements developed and signed

7 performance agreements developed and signed

Opex Opex Opex

Equitable

shares PMS N/A

TOTAL :PERFORMANCE MANAGEMENT SYSTEM 0 0 0

15

3

153

INTERNAL AUDIT

Project

No.

Project Name Project

Description

(major activities)

Location Key

performance indicator

MTERF Targets MTERF Budget (R) Source

of Funding

Implem

enting

Agent

EIA/B

AR/E

MP

2022/23 2023/24 2024/25 2022/23 2023/24 2024/25

OMM8

Development of a risk

based audit plan

Develop a risk

based audit plan BPDM

Number of risk based audit plans developed and approved by the Audit Committee

1 risk based audit plan developed and approved by the Audit Committee

1 risk based audit

plan developed and

approved by the

Audit Committee

1 risk based audit

plan developed

and approved by

the Audit

Committee

Opex Opex Opex Equitable shares

IA N/A

OMM9

Development of

quarterly Internal Audit

Reports

Develop quarterly

Internal Audit

Reports

BPDM Number of quarterly IA reports on IA activities submitted to the Audit Committee

4 Quarterly IA reports on IA activities submitted to the Audit Committee

4 Quarterly IA reports on IA activities submitted to the Audit Committee

4 Quarterly IA reports on IA activities submitted to the Audit Committee

Opex Opex Opex

Equitable

shares IA N/A

OMM10

Development of Internal

Audit Reports

Develop Internal

Audit Reports

BPDM Number of Internal

audit reports

submitted to the

Accounting Officer

11 Internal Audit

reports submitted

to the Accounting

Officer

12 Internal Audit

reports submitted

to the Accounting

Officer

12 Internal Audit

reports

submitted to the

Accounting

Officer

Opex Opex Opex

Equitable

shares IA N/A

OMM11 Development of a

Combined Assurance

Framework

Develop a

Combined

Assurance

Framework

BPDM

Number of Combined Assurance Frameworks developed

1 Combined Assurance Framework developed

N/A N/A Opex Opex Opex

Equitable

shares

IA N/A

OMM12

Assessment of Internal

Audit function by Audit

Committee

Assess the Internal

Audit function

BPDM Number of Internal Audit assessments conducted by the Audit Committee

1 Internal Audit assessment conducted by the Audit Committee

1 Internal Audit

assessment

conducted by the

Audit Committee

1 Internal Audit

assessment

conducted by the

Audit Committee

Opex Opex Opex

Equitable

shares IA

N/A

15

4

154

OMM13

Review of Internal Audit

Charters

Review Internal

Audit Charters

BPDM Number of Internal Audit Charters Reviewed and approved by the Audit Committee

1 Internal Audit Charters reviewed and approved by the Audit Committee

1 Internal Audit Charters reviewed and approved by the Audit Committee

1 Internal Audit Charters reviewed and approved by the Audit Committee

Opex Opex Opex

Equitable

shares

IA N/A

OMM14

Convene quarterly Audit

Committee meetings

Convene quarterly

Audit Committee

meetings

BPDM Number of Audit Committee meetings convened

4 audit committee meeting convened

4 audit committee meeting convened

4 audit committee meeting convened

R450 000.00 Opex Opex Equitable

shares IA N/A

OMM15

Submission of quarterly

Audit Committee Reports

Submit quarterly

Audit Committee

Reports

BPDM Number of BPDM Audit

Committee Reports

adopted by Council

4 Audit Committee

Reports adopted

by Council

4 Audit Committee

Reports adopted by

Council

4 Audit

Committee

Reports adopted

by Council

Opex Opex Opex

Equitable

shares IA N/A

OMM16

Review of Audit

Committee Charters

Review Audit

Committee

Charters

BPDM Number of Audit Committee Charters reviewed and adopted by Council

1 Audit Committee Charter reviewed and adopted by Council

1 Audit Committee

Charter reviewed

and adopted by

Council

1 Audit

Committee

Charter reviewed

and adopted by

Council

Opex Opex Opex

Equitable

shares

IA N/A

OMM17 Number of DB Terms of References developed and adopted by Council

Develop DB Terms of References for adoption by Council

BPDM Number of DB Terms of References developed and adopted by Council

4 audit committee meeting convened

4 audit committee meeting convened

4 audit committee meeting convened

Opex Opex Opex

Equitable

shares IA N/A

OMM18

Number of Disciplinary Board meetings held

Disciplinary Board meetings held

BPDM Number of Disciplinary Board meetings held

4 Audit Committee

Reports adopted

by Council

4 Audit Committee

Reports adopted by

Council

4 Audit

Committee

Reports adopted

by Council

Opex Opex Opex

Equitable

shares IA N/A

OMM19

Number of Disciplinary Board reports adopted by Council

Develop Disciplinary Board reports for adoption by Council

BPDM

Number of Disciplinary Board reports adopted by Council

1 Audit Committee Charter reviewed and adopted by Council

1 Audit Committee

Charter reviewed

and adopted by

Council

1 Audit

Committee

Charter reviewed

and adopted by

Council

Opex Opex Opex

Equitable

shares

IA N/A

TOTAL :INTERNAL AUDIT 0 0 0

15

5

155

8.15.2 Risk Management Project

No.

Project Name Project

Description (major

activities)

Location Key

performance indicator

MTERF Targets MTERF Budget (R) Source

of Funding

Implem

enting

Agent

EIA/B

AR/E

MP

2021/22 2022/23 2023/24 2021/22 2022/23 2023/24

Development of institutional risk register

Develop and monitor risk management register of BPDM

BPDM No of institutional risk registers developed

1 institutional risk register developed

1 institutional risk register developed

1 institutional risk register developed

OPEX OPEX OPEX Equitable share

BPDM N/A

Risk monitoring reports

Institutional Risk monitoring

BPDM

No of risk monitoring reports submitted to the Accounting Officer

4 risk monitoring reports submitted to the Accounting Officer

4 risk monitoring reports submitted to the Accounting Officer

4 risk monitoring reports submitted to the Accounting Officer

OPEX OPEX OPEX

Equitable

share BPDM N/A

Risk Management Framework review

Review of the Risk Management Framework

Review of the Risk Management Framework

1 Risk Management Framework reviewed

1 Risk Management Framework reviewed

1 Risk Management Framework reviewed

OPEX OPEX OPEX

Equitable

share BPDM N/A

Risk Management training

Training of all personnel within BPDM on Risk Management Processes

No of risk management training conducted for employees

2 risk management trainings conducted

2 risk management trainings conducted

2 risk management trainings conducted

OPEX OPEX OPEX

Equitable

share

BPDM N/A

Fraud prevention

programmes

(awareness

campaign)

Conducting

awareness

on fraud and

fraud

prevention

Development of fraud

and corruption

framework

1 fraud and corruption framework developed

1 fraud and corruption framework reviewed

1 fraud and corruption framework reviewed

OPEX OPEX OPEX

Equitable

share

TOTAL :RISK MANAGEMENT 0 0 0

15

6

156

8 .15.3 INFORMATION TECHNOLOGY Project

No.

Project Name Project

Description (major

activities)

Location Key

performance indicator

MTERF Targets MTERF Budget (R) 000 Source

of Funding

Implem

enting

Agent

EIA/B

AR/E

MP

2021/22 2022/23 2023/24 2021/22 2022/23 2023/24

OMM -20

Procure and deliver computer hardware

Procurement and delivery of computer hardware

BPDM Procurement and delivery of computer hardware

Computer hardware procured and delivered

Computer hardware procured and delivered

Computer hardware procured and delivered

1 240 000 1 240 000 1 240 000 Equitable shares

IT N/A

OMM -21

Maintenance of ICT systems

100% maintenance of ICT systems

BPDM Percentage of ICT systems maintained

100% ICT systems maintained

100% ICT systems maintained

100% ICT systems maintained Opex Opex Opex

Equitable shares

IT N/A

OMM -22

Maintenance of computer equipment

100% maintenance of computer equipment

BPDM Percentage of computer equipment maintained

100% computer equipment maintained

100% computer equipment maintained

100% computer equipment maintained 250 000 250 000 250 000

Equitable shares IT N/A

OMM -23 Maintenance of ICT licences

100% maintenance of ICT licences

BPDM Percentages of ICT licences maintained

100% of ICT licences maintained

100% of ICT licences maintained

100% of ICT licences maintained

4 158 500 4 158 500 4 158 500

Equitable shares

IT N/A

OMM -24 Implementation of server room monitoring

Monitoring of

server room BPDM

Number of server

room monitoring

system implemented

1 server room monitored

1 server room monitored

1 server room monitored

800 000 800 000 800 000

Equitable shares IT N/A

OMM -25

Development of intranet

Development

and

maintenance of

intranet

BPDM

Number of intranet

developed and

maintained for

BPDM

1 intranet developed for BPDM

1 intranet maintained for BPDM

1 intranet maintained for BPDM

200 000 200 000 200 000

Equitable shares

IT N/A

OMM -26 Procurement and delivery of network storage devices

Procure and

deliver network

storage devices

BPDM

Number of network

access storage

devices procured

and delivered

1 network storage device procured and delivered

1 network storage device procured and delivered

1 network storage device procured and delivered

1 000 000 1 000 000 1 000 000

Equitable shares

IT N/A

15

7

157

OMM -27

Website update

Upload and

update key

reports on the

municipal

website

BPDM

MFMA Section 75

key reports and

information

uploaded on the

municipal website

MFMA Section 75 key reports and information uploaded on the municipal website

MFMA Section 75 key reports and information uploaded on the municipal website

MFMA Section 75 key reports and information uploaded on the municipal website

100 000 100 000 100 000

Equitable shares

IT N/A

OMM -28

Internal communication system

Upgrading of

communication

system in

Council

Chamber

BPDM

Number of

communication

systems upgraded in

Council Chamber

1 communication system upgraded in Council Chamber

None None 200 000 200 000 200 000

Equitable shares

IT N/A

OMM -29 Upgrading of ICT infrastructure

Upgrading of

ICT

infrastructure

BPDM Percentage upgrade

of ICT infrastructure

100% upgrade of ICT infrastructure

None None 1 000 000 1 000 000 1 000 000

Equitable shares IT N/A

TOTAL :INFORMATION TECHNOLOGY 6 240 000 6 240 000 6 240 000

8.15.4 INTERGRATED DEVELOPMENT PLANNING

Project

No.

Project Name Project

Description (major

activities)

Location Key

performance indicator

MTERF Targets MTERF Budget (R)000 Source

of Funding

IA EIA

2021/22 2022/23 2023/24 2021/22 2022/23 2023/24

OMM -30

Develop/review IDP and submit to Council

Develop/review IDP

BPDM

Number of IDPs developed/reviewed and submitted to Council for adoption

1 IDP developed/reviewed and submitted to Council for adoption

1 IDP developed/reviewed and submitted to Council for adoption

1 IDP developed/reviewed and submitted to Council for adoption

120 000 120 000 120 000 Equitable shares

IDP N/A

OMM -31

Convene IDP Representative Forums

Convene IDP Representative Forums

BPDM Number of IDP Representative Forums convened

4 IDP Representative Forums convened

4 IDP Representative Forums convened

4 IDP Representative Forums convened

1 743 000 1 743 000 1 743 000

Equitable shares

IDP N/A

15

8

158

OMM -32 Organize and convene strategic planning sessions

Organize and convene strategic planning sessions

BPDM Number of strategic planning sessions convened

1 strategic planning session convened

1 strategic planning session convened

1 strategic planning session convened

Opex Opex Opex

Equitable shares

IDP N/A

OMM -33

Develop and review Spatial Planning Development Framework

Develop and

review Spatial

Planning

Development

Framework and

submit to

Council for

adoption

BPDM

Number of Spatial

Planning

Development

Framework

developed and

reviewed and

submitted to Council

for adoption

1 Spatial Planning Development Framework developed and submitted to Council for adoption

1 Spatial Planning Development Framework reviewed and submitted to Council for adoption

1 Spatial Planning Development Framework reviewed and submitted to Council for adoption

Opex Opex Opex

Equitable shares

IDP N/A

OMM -34 Coordination of District Planning Forums

Coordinate

District Planning

Forums

BPDM Number of District

Planning Forums

coordinated

4 District Planning Forums coordinated

4 District Planning Forums coordinated

4 District Planning Forums coordinated

Opex Opex Opex

Equitable shares

IDP N/A

TOTAL :INTERGRATED DEVELOPMENT PLANNING

15

9

159

8.15.5 BUDGET AND TREASURY OFFICE

Project

No.

Project Name Project

Description (major

activities)

Location Key

performance indicator

MTERF Targets MTERF Budget (R)000 Source

of Funding

IA EIA

2022/23 2023/24 2024/25 2022/23 2023/24 2024/25

OMM -30 Submission of AFSs

to stakeholders

Submission of AFSs

to stakeholders

BPDM

Number of section

52 (d) quarterly

financial reports

submitted to

stakeholders

4 section 52 (d) quarterly financial reports

4 section 52 (d) quarterly financial reports

4 section 52 (d) quarterly financial reports

Opex Opex Opex Equitable shares

IDP N/A

OMM -31 Submission of

Annual Financial

Statements

Submission of

Annual Financial

Statements BPDM

Number of annual

financial statements

submitted to Auditor

General by 31st

August

1 annual financial

statements

submitted to the

Auditor

General by 31st

August

1 annual financial

statements

submitted to the

Auditor by 31st

August

1 annual financial statements submitted to the Auditor by 31st August

1 000 000 Opex Opex

Equitable shares

IDP N/A

OMM -32 Submission of

Section 71 reports

Submission of

Section 71 reports

BPDM

Number of monthly

Budget Statements

(Section 71)

submitted to the

Executive Mayor and

National and

Provincial Treasuries

12 Budget Statements (Section 71) reports submitted to the Executive Mayor, National and Provincial Treasuries

12 Budget Statements (Section 71) reports submitted to the Executive Mayor, National and Provincial Treasuries

12 Budget Statements (Section 71) reports submitted to the Executive Mayor, National and Provincial Treasuries

Opex Opex Opex

Equitable shares

IDP N/A

OMM -33 Submission of

annual budget

Submission of

annual budget BPDM

Number of Annual

Budgets submitted to

Council for approval

1 Annual Budget submitted to Council for approval

1 Annual Budget submitted to Council for approval

1 Annual Budget submitted to Council for approval

Opex Opex Opex

Equitable shares

IDP N/A

OMM -34 Submission of

adjustment budget

Submission of

adjustment budget BPDM

Number of

Adjustment Budget

submitted to Council

for approval

1 Adjustment Budget submitted to Council for approval

1 Adjustment Budget submitted to Council for approval

1 Adjustment Budget submitted to Council for approval

Opex Opex Opex

Equitable shares IDP N/A

Demand

management

Demand

management

BPDM Number of

municipal

procurement plan

developed

1 Municipal

Procurement plan developed

1 Municipal

Procurement plan developed

1 Municipal

Procurement

plan developed

Opex Opex Opex

Equitable shares IDP N/A

16

0

160

Supply chain reporting

Supply chain reporting

BPDM Number of

quarterly supply

chain management

reports submitted

to Council

4 quarterly supply chain management reports submitted to Council

4 quarterly supply chain management reports submitted to Council

4 quarterly supply chain management reports submitted to Council

Opex Opex Opex

Equitable shares

IDP N/A

Asset and

Logistics

management

Asset and

Logistics

management

BPDM Number of asset

verifications performed

2 asset

verification

performed

2 of asset

verification

performed

2 asset

verification

performed Opex Opex Opex

Equitable shares IDP N/A

Asset and

Logistics

management

Asset and

Logistics

management

BPDM Number of asset

registers compiled

1 Asset register compiled and updated

1 Asset register compiled and

1 Asset register compiled and Opex Opex Opex

Equitable shares IDP N/A

Employee cost

(payroll run)

Employee cost

(payroll run)

BPDM Number of payroll

runs and

reconciliations

performed

12 payroll runs

and reconciliations

performed

12 payroll runs

and reconciliation s performed

12 payroll runs

and reconciliation s performed

Opex Opex Opex

Equitable shares

IDP N/A

Employee benefits Employee benefits BPDM Number of employee

cost benefit

evaluations

performed

1 employee cost

benefit

evaluation

1 employee cost

benefit evaluation performed

1 employee cost

benefit

evaluation performed

R50 000 R50 000 R50 000

Equitable shares

IDP N/A

Management of creditors

Management of creditors

BPDM Percentage creditors

paid within 30 days of

receipts of an invoice

by finance.

100% of

creditors

reconciled and

paid within 30

days

100% of

creditors

reconciled and

paid within 30

days

100% of

creditors

reconciled and

paid within 30

days

Opex Opex Opex

Equitable shares

IDP N/A

TOTAL BUDGET :Budget and Treasury Office 1050 000 50 000 50 000

16

1

161

8.15.6 OFFICE OF THE SPEAKER: PROJECT AND PROGRAMME LIST AND BUDGET

Project

Number

Project Name

Project Description (major activities)

Location

Key Performance Indicator

MTERF Targets MTERF Budget R Source of Funding

Implementing Agent

EIA/B

AR/ EMP

2021/22 2022/23 2023/24 2021/22 2022/23 2023/24

OFS- 01 Council

Meetings

Coordination of

Council Meetings

BPDM Number of

Council Meeting

Coordinated

8 Council meetings Coordinated

8 Council meeting Coordinated

8 Council meeting Coordinated

345 680 345 680 345 680 Equitable

share

BPDM N/A

OFS-02 Ward

Committee

Support

Strengthen capacity

of Ward Committees

BPDM Number of capacity building programmes coordinates

2 Ward Committee capacity Building prgramme coordinated

2 Ward Committee Capacity Prohramme coordinates

2 Ward

Committee

Capacity

Programme

Coordinated

532 500 532 500 532 500 Equitable

Share

BPDM N/A

OFS-O3 Public

Participation

Coordination of

Public

Participation

BPDM Number of Public Participation coordinated

2 Public Participation Coordinated

2 Public Participation Coordinated

2 Public Participation Coorinated

532 500 532 500 532 500 Eqiutable

Share

BPDM N/A

OFS-04 Public

Participation

Coordination of

Batho Pele Forum

campaign and

awareness

BPDM Number of Batho Pele campaign and Forum

conducted

1 District Batho Pele Campaign conducted

1 District Batho Pele Campaign conducted

1 District Batho Pele Campaign Conducted

482 100 482 100 482 100 Eqiutable

share

BPDM N/A

OFS-05 Speaker’s Forum Coordination of

Speaker’s Forum

BPDM Number of Speaker’s Forum Cordinated

4 District Speaker’s Forum Coordinated

4 District Speaker’s Forum Coordinated

4 District Speaker’s Forum Coordinated

Opex Opex Opex Equitable

Share

BPDM N/A

OFS-07 Councillor

Development

Coordination of

Councillor

Training

BPDM Number of Councillor Development programmes coordinated

6 Trainings coordinated

6 Trainings

coordinated 6 Trainings

coordinated 1 339 750 1 339 750 1 339 750

Equitable

Share

BPDM N/A

16

2

162

Number of Anti-

corruption strategy reviewed

Review of Anti-corruption strategy annually

Review of Anti-

corruption

strategy annually

Review of Anti-

corruption

strategy annually

OPEX OPEX OPEX

TOTAL BUDGET : OFFICE OF THE SPEAKER 3 232 530 3 232 530 3 232 530

8.15.7 OFFICE OF THE EXECUTIVE MAYOR

Project

No.

Project Name Project

Description (major

activities)

Location Key

performance indicator

MTERF Targets MTERF Budget (R) Source

of

Fundin

g

Implem

enting

Agent

EIA/B

AR/E

MP

2022/23 2023/24 2024/25 2022/23 2023/24 2024/25

Disability Program BPDM Number of Disability Program Supported per plan

4 Disability Program Supported per plan

4 Disability Program

Supported per plan 4 Disability Program

Supported per plan R200 000,00 R230 000,00

R260 000,00

Equitable shares

BPDM

Awareness campaign for Elderly

BPDM

Number of Awareness Campaigns for advocacy of elderly rights Program held

4 Awareness Campaigns for advocacy of elderly rights Program held

4 Awareness

Campaigns for

advocacy of elderly

rights Program held

4 Awareness

Campaigns for

advocacy of elderly

rights Program held R200 000,00 R230 000,00 R260 000,00

Equitable

shares BPDM

ECD Programs BPDM Number of ECDs supported per plan

4 ECDs supported

per plan 4 ECDs supported per

plan 4 ECDs supported

per plan R200 000,00 R230 000,00

R260 000,00

Equitable

shares

BPDM

Youth development

Programs BPDM Number of Youth Development Programs supported per plan

4 Youth development Programs supported per plan

4 Youth development

Programs supported

per plan

4 Youth

development

Programs supported

per plan

R400 000,00 R440 000,00 R480 000,00

Equitable

shares BPDM

16

3

163

25 Girl Child taken to

work Environment

25 Girl Child taken to

practical work

Environment

25 Girl Child taken to

practical work

Environment

25 Girl Child taken

to practical work

Environment

OPEX OPEX OPEX

5 Woman Program

supported per plan BPDM Number of Girl Child taken to practical work environment

5 Woman Program

supported per plan

5 Woman Program

supported annually 5 Woman Program

supported per plan Opex Opex Opex Equitable

shares BPDM

4 CBO Program BPDM Number of CBO

Programs Supported

per plan

4 CBO Program

supported per plan

4 CBO Program

supported per plan 4 CBO Program

supported per plan R100 000,00 R100 000,00 R100 000,00 Equitable

shares BPDM

HIV/AIDS Program

Awareness BPDM

Number of HIV/AIDS Awareness Program supported per plan

1 HIV/AIDS Program

Awareness

supported per plan

1 HIV/AIDS Program

Awareness supported

per plan

1 HIV/AIDS

Program Awareness

supported per plan

Equitable

shares

Moral Regeneration

Progra BPDM Number of Moral

Regeneration

programs supported

per plan

4 Moral

Regeneration

Program Supported

per plan

4 Moral Regeneration

Program Supported

per plan

4 Moral

Regeneration

Program Supported

per plan

R200 000,00 R240 000,00 R280 000,00

Equitable

shares BPDM

IGR initiatives BPDM Number of IGR initiatives supported per plan

4 IGR

initiatives

supported per

plan

4 IGR initiatives

supported per plan 4 IGR initiatives

supported per plan OPEX

OPEX OPEX Equitable

shares

Marketing &

Communication

programmes

Number of Marketing & Communication programmes implemented

Marketing &

Communication

programmes

implemented

Marketing &

Communication

programmes

implemented

Marketing &

Communication

programmes

implemented

R150 000,00

R150 000,00 R150 000,00

Marketing and

Communications

material

Marketing and Communications items procured

Marketing and

Communications

material procured

Marketing and

Communications

material procured

Marketing and

Communications

material procured

R500 000,00 R500 000,00 R500 000,00

16

4

164

SECTION G

9.1 FINANCIAL MANAGEMENT/ PLAN

Section 16 (2) of the Municipal Finance Management Act, Act No 56 of 2003

indicates that the Mayor of the Municipality must table annual budget at Council

meeting at least 90 days before the start of the budget year

As prescribed by Section 17 (1), the annual budget of a Municipality must be a

schedule in the prescribed format –

(a) setting out realistically anticipated revenue for the budget year from each

revenue source;

(b) appropriating expenditure for the budget year under the different votes of the

Municipality

(c) setting out indicative revenue per revenue source and projected expenditure

by vote for the two financial years following the budget year

(d) setting out

(i) estimated revenue and expenditure by vote for the current year; and

(ii) actual revenue and expenditure by vote for the financial year

preceding the current year

National Treasury circulars 115 seeks to provide guidance to Municipalities with the

compilation of 2022/2023 Medium Terms and Revenue Expenditure Framework

(MTREF) which is linked to the Municipal Budget Reporting Regulation (MBRR).

The circular also wishes to demonstrate how municipalities should undertake the

annual budget preparation in accordance with the budget and financial reform

agenda and the associated factors, taking into consideration the 2021 local

government elections that will take place on a date to be confirmed.

The circular identifies the following key focus areas for the 2022/23 budget process

9.1.1 Local government conditional grants allocations

Over the 2022 MTEF period, direct transfers to municipalities will grow above

16

5

165

inflation, at an annual average rate of 7.9 per cent. Direct conditional grants grow at

an annual average rate of 5.3 per cent over the MTEF, while the Local Government

Equitable Share (LGES) grows faster, at an annual average rate of 10.3 per cent

over the same period.

9.1.2 Changes to gazetted frameworks and allocations

Municipal Systems Improvement Grant – Over the MTEF, a portion of the grant will

be utilised to continue to support institutionalisation of the district development

model.

Local Government Financial Management (FMG) Grant – Over the 2022 MTEF, the

grant framework for the FMG will make provision for the preparation of asset

registers.

9.1.3 Employee related costs

The Salary and Wage Collective Agreement for the period 01 July 2021 to 30 June

2024 dated 15 September 2021 through the agreement that was approved by the

Bargaining Committee of the Central Council in terms of Clause 17.3 of the

Constitution should be used when budgeting for employee related costs for the

2022/23 MTREF. In terms of the agreement, all employees covered by this

agreement shall receive with effect from 01 July 2022 and 01 July 2023 an increase

based on the projected average CPI percentages for 2022 and 2023. The forecasts

of the Reserve Bank, in terms of the January 2022 and January 2023, shall be used

to determine the projected average CPI. Municipalities are encouraged to perform

an annual head count and payroll verification process by undertaking a once-a-year

manual salary disbursement, in order to root out ghost employees.

9.1.4 Remuneration of Councillors

Municipalities are advised to budget for the actual costs approved in accordance

with the Government Gazette on the Remuneration of Public Office Bearers Act:

Determination of Upper Limits of Salaries, Allowances and Benefits of different

members of municipal councils published annually between December and January

by the Department of Cooperative Governance. It is anticipated that this salary

determination will also take into account the fiscal constraints. Municipalities should

also consider guidance provided above on salary increases for municipal officials

16

6

166

during this process. Any overpayment to councillors contrary to the upper limits as

published by the Minister of Cooperative Governance and Traditional Affairs will be

irregular expenditure in terms of Section 167 of the MFMA and must be recovered

from the councillor(s) concerned.

This then dictates that the below mentioned macro-economic forecasts be

considered when preparing the 2021/22 MTREF for municipal budgets

Fiscal Year 2020/21 2021/22 2022/23 2023/24 2024/25

Actual Estimate Forecast

CPI Inflation 2.9% 4.5% 4.8% 4.4% 4.5%

MFMA circulars 98, circular 97 were issued to assist municipalities and municipal

entities to implement cost containment measures in an effort to address the impact

of the country’s economic challenges and to promote growth, address

unemployment and equality, amongst others, consistent with the municipal cost

containment regulation.

9.2 REVENUE PER REVENUE SOURCE

CONSOLIDATED OVERVIEW OF THE 2022/2023 to 2024/25 MTREF

9.2.1REVENUE PER REVENUE SOURCE

The Municipality is dependent on equitable share which is allocated in terms of the

Division of Revenue Act (DORA). According to the Act, the Municipality has been

allocated R381 952 000 for the 2022/2023 financial year, which is 3% more than

the 2021/2022 allocation.

Transfers recognised includes the local government equitable share and other

operating grants from national and provincial government. It needs to be noted that

in real terms the grants receipts from national government are growing rapidly over

the MTREF for the outer years. The equitable share remains to be the most

important part of the municipality’s revenue base as no services are rendered for

DescriptionTotal Budget

2021/2022

Budget

2022/23

Budget

2023/24

Budget

2024/25

Total Revenue R383,631,000 R393,127,000 R405,985,000 R421,652,000

Expenditure R349,142,220 R379,627,784 R364,676,920 R382,738,434

Surplus/(Deficit) R 34,488,780 R 13,499,216 R 41,308,080 R 38,913,566

16

7

167

which revenue can be collected.

Equitable share represents 98% of the Municipality’s total revenue and the

remaining 2% is made up of other conditional grants of which can only be realised

as an incoming after it meets its condition after the expenditure and the other is

interest on investment as well as revenue collected in respect of municipal by-laws

Total operating revenue has decreased by R9 496 000 for the 2022/2023 financial

year when compared to the 2021/2022 budget. For the outer year, operational

revenue will increase by R12 858 000 and R15 667 000 respectively.

For Bojanala Platinum District Municipality to continue improving the quality of

services provided to its citizens and local municipalities it needs to generate the

required revenue. In these tough economic times strong revenue management is

fundamental to the financial sustainability of every municipality. The reality is that

the municipality is faced with development backlogs and poverty. The expenditure

required to address these challenges will inevitably always exceed available

funding; hence difficult choices have to be made in balancing expenditures against

realistically anticipated revenues.

The Municipality has been allocated conditional grants to the value of R5 925 000.

These grants are made of the Finance Management Grant, Extended Public Works

Program as well as the Rural Asset Management Grants. Total conditional grants

represent 1.5% of total revenue of the Municipality.

With the monthly cash flow projections, the Municipality aims to keep and maintain

an investment portfolio which will generate money from interest on investments. An

amount of R5 000 000 has been projected in that regard.

Description 2021/2022 2022/2023 2023/2024 2024/2025

Equitable Share R 369,847,000 381,952,000R 395,846,000R 410,921,000R

RAMS 2,416,000R 2,529,000R 2,539,000R 2,631,000R

FMG 1,650,000R 1,850,000R 1,850,000R 1,850,000R

EPWP 1,468,000R 1,546,000R -R -R

Interest 8,000,000R 5,000,000R 5,500,000R 6,000,000R

Other Income 250,000R 250,000R 250,000R 250,000R

Total Revenue 383,631,000R 393,127,000R 405,985,000R 421,652,000R

Revenue

16

8

168

9.2.2 EXPENDITURE PER VOTE

Expenditure per department/office summarises the budget allocation, highlighting

those that carries the most allocation as opposed to the lowest.

The 2022/2023 draft budget is R430 709 824, which in an increase by R4 265 9917

as compared to the February 2021 adjustment. The two outer years will decrease

by 4.4% and increase by 4.5% respectively.

Community Development Services carries the bigger portion of the budget to the

tune of R159 1287 873. This department is made up of the three fire stations,

disaster services as well as community development. The total allocation

constitutes 37% of the total budget of R430 766 824. The department intends to

acquire fire vehicles, fire equipment as well as personal protective equipment.

Office of the Municipal Manager is the second highest with an allocation of 11%

with a total budget amount of R48 765 144. The bulk of the allocation relates to

security services, telephone systems, information technology services and legal

services.

Health and Environmental Services is the third highest with an allocation of

R46 966 160. The bulk of the allocation relates to gazetting of bylaws, awareness

programs and the development of a waste management plan.

Corporate Support Services is the fourth highest with an allocation of R46 573 339.

The department carries the most of municipal day-to-day activities including but not

limited to Bursaries and skills development for municipal employees, rental of office

No Department 2022/23 2023/24 2024/25

1 CDS 159,128,873R 126,945,478R 126,396,995R

2 OMM 48,765,144R 48,450,152R 49,650,677R

3 CSS 46,573,339R 46,503,191R 47,380,951R

4 TEC 22,165,602R 20,119,616R 21,190,743R

5 BTO 39,253,610R 39,313,386R 41,811,129R

6 HES 46,966,160R 46,622,295R 49,338,850R

7 Executive 43,135,198R 44,582,016R 47,092,308R

8 EDTAR 24,778,899R 9,181,633R 9,714,531R

430,766,824R 381,717,767R 392,576,183R

16

9

169

buildings, SALGA fees, machine rentals as well as municipal rates and taxes. The

department also plans to acquire new municipal fleet

9.2.3 EXPENDITURE PER EXPENDITURE TYPE

Total operating expenditure for the 2021/2022 financial year has been appropriated

at R379 627 920 and translates into a budgeted surplus of R13 499 216. When

compared to the 2021/22 Adjustments Budget, operational expenditure has

increased by R30 485 563 in the 2022/23, the reason for the increase is due to

funding of Economic Development Tourism Agriculture and Recreation projects as

well as increased funding for service delivery related programs in Health and

Environmental Services and Community Development Services.

In line with the formats prescribed by the Municipal Budget and Reporting

Regulations, capital transfers and contributions are excluded from the operating

statement, as inclusion of these revenue sources would distort the calculation of the

operating surplus/deficit.

9.2.4 CAPITAL EXPENDITURE

The Municipality has no infrastructure assets and this expenditure relates to

acquisition of Municipal assets ranging fire tankers, computer equipment, office

furniture as well as other municipal vehicles. A total amount of R51 139 040 has

been projected for these acquisitions, which is R12 231 353 more than the 2021/22.

EXPENDITURE BUDGET

2021/2022

Employee Related Cost 224,938,000R R - R 224,938,000 R 233,077,679 R 247,062,339 R 261,886,080

Remuneration of councillors 20,690,000R R - R 20,690,000 R 19,570,281 R 20,744,498 R 21,989,168

Depreciation & asset impairment 10,000,000R -R 4,000,000 R 6,000,000 R 6,000,000 R 4,448,000 R 4,672,068

Finance charges 300,000R R - R 300,000 R 120,000 R 120,000 R 120,000

Contracted services 40,866,000R R 2,485,539 R 43,351,539 R 79,132,704 R 60,682,600 R 60,663,188

Other expenditure 46,039,000R R 7,823,681 R 53,862,681 R 41,727,120 R 31,619,482 R 33,407,930

Subtotal 342,833,000R 6,309,220R 349,142,220R 379,627,784R 364,676,920R 382,738,434R

Capital 15,810,000R 23,097,687R R 38,907,687 R 51,139,040 R 17,040,848 R 9,837,749

TOTAL BUDGET 358,643,000R 29,406,907R 388,049,907R 430,766,824R 381,717,767R 392,576,183R

Total Adjusted Budget Adjustment Budget February 2022 Budget 2022/23 Budget 2023/24 Budget 2024/25

17

0

170

9.2.5 DEPRECIATION AND AMORTISATION

The Municipality projected R6 000 000 for these non-cash items as they are used to

calculate the value of Municipal assets overtime. It is set aside to record loss of

value of municipal asset. Financial statements as at 30 June 2021 recorded

depreciation and amortisation to the tune of R3 619 682.

9.2.6 CREDITORS

The Municipality has R28 223 000 owed to different creditors, Creditors should be

paid within 30 days as stipulated by the MFMA except where there disputes

between the municipality and the creditors of which the municipality has. Of the

total outstanding amount R26 843 875 is in dispute while R1 379 125 is payable

within 30 days.

9.2.7 SALARIES

The employee cost is based on the Salary and Wage Collective Agreement for the

period 01 July 2021 and will remain in effect until 30 June 2024. The increases are

based on the projected CPI percentage issued out by the Reserve Bank. The

Description 2022/23

Boreholes and Jojo tanks 345,000R

Computers 1,983,000R

Equipments and Furniture 3,391,500R

Generator( power backup system) 600,000R

IT Infrastructure 950,000R

RAMS 2,529,000R

Stationery and Cleaning materials 1,440,540R

Vehicles 39,900,000R

51,139,040R

Budget Year 2020/21

R thousands

Creditors Age Analysis By Customer Type

Bulk Electricity 0100 – – – – – – – – – –

Bulk Water 0200 – – – – – – – – – –

PAYE deductions 0300 – – – – – – – – – –

VAT (output less input) 0400 – – – – – – – – – –

Pensions / Retirement deductions 0500 – – – – – – – – – –

Loan repayments 0600 – – – – – – – – – –

Trade Creditors 0700 450 225 193 – – – 5 9 772 10 644 10 644

Auditor General 0800 – – – – – – – – – –

Other 0900 369 0 2 0 0 8 (646) 17 845 17 578 17 578

Total By Customer Type 1000 819 225 194 0 0 8 (641) 27 616 28 223 28 223

Prior year totals

for chart (same

period)

DC37 Bojanala Platinum - Supporting Table SC4 Monthly Budget Statement - aged creditors - M08 February

181 Days -

1 Year

Over 1

Year

Total61 -

90 Days

91 -

120 Days

121 -

150 Days

151 -

180 Days

Description NT

Code0 -

30 Days

31 -

60 Days

17

1

171

Municipalities projected an increment of salaries to 4%, which is in-line with the

Reserve Banks inflation targeting. This 4% bring the salaries and wages to an

increase to R233 077 679. Salaries and Councillor Allowances amounts to

R252 647 960 and constitutes 67% of the total expenditure, 32% more than the

35% norm of the salary bill as stipulated in circular 71 of the MFMA.

9.2.8 COUNCILLORS

Remuneration of councillors Municipalities are advised to budget for the actual

costs approved in accordance with the Government Gazette on the Remuneration

of Public Office Bearers Act: Determination of Upper Limits of Salaries, Allowances

and Benefits of different members of municipal councils published annually

between December and January by the Department of Cooperative Governance. It

is anticipated that this salary determination will also take into account the fiscal

constraints. . Councillor allowances has been decreased by 5% from R20 690 000

to R19 570 281. This will be in line with the current trajectory where public office

bearers have received zero percent increase in the 2021/22 financial year and to

reduce the inflationary increase which was incorporated in the 2021/22 budget, but

was not realised due to the gazette issued by the Minister responsible for local

government.

9.2.9 DEPRECIATION AND AMORTISATION

The Municipality projected an amount of R6 000 000 for depreciation and

amortisation for the 2022/23 financial year.

9.2.10 FINANCE COST

The Municipality projected an amount of R120 000 for finance cost for the 2022/23

financial year.

9.2.11 CONTRACTED SERVICES

Contracted services are projected to R79 132 704 as compared to R43 351 539 in

the budget adjustment of February 2022. The amounts are mainly made out of

disaster relief material, vehicle maintenance, supporting of sports and culture, legal

fees, Security, telephone and data, Human Resource and Coida, training,

formulation of sector plans and gazetting of bylaws.

17

2

172

9.2.12 OTHER EXPENDITURE

Other expenditure is projected to R41 727 120 as compared to R53 862 681 in the

budget adjustment of February 2022. The amounts are mainly made out insurance,

SALGA fees, audit fees, uniform and protective clothing, IT systems, skills

development and LED programs.

17

3

173

SECTION H

10.1PERFORMANCE MANAGEMENT SYSTEM

Strategic management of human capital requires that the municipality develop a

performance system that will measure the performance of the organization and the

contribution each individual makes to achieve organizational goals.

Performance management is a tool that we utilize to measure if the organizational

objectives have been achieved. Performance management process is used to

communicate organizational strategic goals, reinforce individual employee

accountability for meeting the set goals, track and evaluate organization

performance results.

Municipal Systems Act requires that a municipality establish a performance

management systems that is commensurate with its resources, best suited for its

circumstances, in line with their priorities, indicators and targets that are in the IDP.

The performance management process involves:

Performance planning

Monitoring organizational and employee performance

Employee development

Evaluating employee performance and

Recognition

Performance Management System Policy was reviewed by Council on the 26

September 2013. PMS is part of the broader system of strategic management.

Performance management is designed to assist the District Municipality in

achieving its objectives as set out in the IDP.

The IDP, Budgeting and PMS should be seen as a seamless documents aimed at

taking the municipality forward.

17

4

174

10.1.1 Reporting

Monthly reporting

Section 71 of the MFMA stipulates that reporting on actual revenue targets and

spending against the budget should occur on a monthly basis. This reporting must

be conducted by the accounting officer of a municipality no later than 10 working

days, after the end of each month. Reporting must include the following:

Actual revenue, per source

Actual borrowings

Actual expenditure per vote

Actual capital expenditure, per vote

The amount of any allocations received

If necessary the information has got to include explanation in the monthly reports

on:

Variances on the projected revenue by sources from the expenditure

projects per vote

Any material variances from the SDBIP

Any remedial or corrective steps taken or to be taken to ensure that the

projected revenue and expenditure remain within the municipal approved

budget

10.1.2 Quarterly reporting

MFMA Section 52 (d) compels the Municipal Mayor to submit a report to Council

on the implementation of the budget and the financial state of affairs of the

municipality within 30 days of the end of each quarter.

The quarterly performance projections captured in the SDBIP will form the basis

for the Mayor’s quarterly report.

The municipality has been consistent in submitting quarterly reports and reports

for the past two (2) quarters have been submitted and adopted by Counci

17

5

175

10.1.3 Mid-year reporting

MFMA Section 72 (1) (a) states clearly the requirements for mid-year reporting.

The accounting officer is required by the 25th January of each year to assess the

performance of the municipality during the first half of the year taking into account:

Monthly statements referred to in section 71 of the MFMA

Municipality’s service delivery performance during the first half of the

financial year

The past year’s annual report and progress made in resolving challenges

identified in the annual report

10.1.4 Annual Reporting

Section 121 of the MFMA stipulates that every municipality and every municipal

entity must for each financial year prepare an annual report. The Council of a

municipality must within nine (9) months after the end of the financial year deal

with the annual report of the municipality.

The purpose of the annual report is:

To provide a record of activities of the municipality or municipal entity during

the financial year

To provide a report on performance against the budget of the municipality

or municipal entity for the financial year

To promote accountability to the local community for decisions made

throughout the year by the municipality

The SDBIP informs the performance of the municipality and it will strengthen and

guide the preparation and adoption of the annual report, which will serve as part

of accountability to the stakeholders as required by the law.

10.1.5 Service Delivery Budget Implementation Plan

SDBIP has to be submitted by the mayor not later than 28th day after the municipal

budget has been approved. The SDBIP is a tool that the municipality uses to

implement and monitor the IDP and budget.

17

6

176

10.1.6 Performance Agreements

Section 53 (c) (iii) of the MFMA requires that the Mayor ensures that the annual

performance agreement be signed for the municipal manager and all section 57

managers in terms of section 57 (1) of the Municipal Systems Act.

10.1.7The performance Agreements must:

Comply with the MFMA and section 57 of the Municipal Systems Act

Must be linked to measurable performance objectives as per the approved

IDP and SDBIP

Are made public together with SDBIP

Mayor has to ensure that the performance agreements have to be submitted to

the MEC for local government in the province, together with the SDBIP.

10.1.8 Council oversight

All the committees of Council have been seating consistently and receiving the

quarterly reports from administration. Committees have been providing political

leadership and oversight by monitoring the implementation of the IDP.

10.1.9 CONCLUSION

This draft IDP presents a significant paradigm shift on how we have been drafting

and presenting our reports. This Draft IDP gives Council and stakeholders insight

into what we have achieved. This IDP provides a basis for the planning for the next

financial year. We are shifting towards excelling in our mandate

17

7

177

SECTION I

11.1 OPERATIONAL STRATEGIES

11.1.1 FIRE MANAGEMENT STRATEGY

Section 156(1)(a) of the Constitution of the Republic of South Africa, Act 108 of

1996, deals with the powers and functions of municipalities and specifies that “a

municipality has executive authority in respect of and has the right to administer the

local government matters listed in Part B of Schedule 4 and Part B of Schedule 5”.

Firefighting is listed as a local government function in Schedule 4 Part B. Fire

Fighting is also governed by the Municipal Structures Act number 117 of 1998 Sec

84 (j) and the Fire Brigade Act number 99 of 1987 Sec 13.

Section 83 & 84 of the Local Government Municipal Structures Act 117 of 1998 divide

Functions and powers in case of the district municipality and the Local municipalities

within the area of the district municipality. The district has the following functions and

powers in terms of section 84 (j) of the act: Support to local Firefighting services

(operating on 24 hours rotational 12 hour shift system) serving the area of district

municipality as a whole.

DISTRICT FIRE BRIGADE SERVICE

The main functions of a fire service are to prevent fires and to protect life and property

should a fire occur. To carry out these functions the service must be well organised

and equipped. . Two essentials for protection against fire are an efficient fire service

and an adequate water supply. Fire Strategy is a guideline in order to assist with the

planning and implementation of measures to ensure that the communities of the

District are protected by efficient, adequate and effective fire brigade services within

the area of jurisdiction of the Bojanala Platinum District Municipality.

17

8

178

The objectives of the Fire Risk Management Plan are:

To reduce the number of human-induced bush/veld fire ignitions that cause

damage to life, property and the environment.

Manage fuel to reduce the rate of spread and intensity of bush/veld fires, while

minimizing environmental/ecological impacts.

Reduce the communities’ vulnerability to bush/veld fires by improving

preparedness.

Effectively contain fires with a potential to cause damage to life, property and

the environment.

Regulate the use/risks associated with liquefied petroleum gas.

Regulate the use/risks associated with flammable liquids (petrol, diesel etc.)

The aim of the Fire Risk Management Plan is to:

Achieve acceptable levels of fire risk.

Promote compliance with various legislation relating to fire risk.

Minimise the negative impact of fires on life, property and the environment.

Promote the involvement of all stakeholders in fire risk management.

Set up institutional and stakeholder mechanisms to implement the Plan.

Development of fire risk reduction strategies for priority fire risks.

Integrate fire risk management into all aspects of BPDM and stakeholder functions

11.1.2 DISASTER MANAGEMENT FRAMEWORK

The strategy of the framework is to provide a coherent, transparent and inclusive

policy on disaster management in the District Municipality and also to provide

municipalities in the Bojanala Platinum District Municipality, role-player

departments, NGO’s, CBO’s and other agencies with guidelines which will enable

these to establish structures and programs to empower communities to jointly

reduce their vulnerability, by the implementation of a process whereby such

communities can prevent disasters from occurring, mitigate against disasters,

prepare and respond to the consequences of any hazard or disaster situation that

communities can be confronted with. The strategic objectives aim to enable the

17

9

179

policy framework to strengthen its ability to prepare and respond to disasters.

DISASTER RISK MANAGEMENT PLAN

BPDM has a Disaster Management Plan as part of its Integrated Development

Plans, according to the Municipal Systems Act. Disaster management aims to

reduce the occurrence of disasters and to reduce the impact of those that cannot be

prevented. The purpose of the plan, therefore, is to provide municipalities in the

Bojanala Platinum District Municipality, role-player departments, NGO’s, CBO’s and

other agencies with guidelines which will enable these to establish structures and

programs to empower communities to jointly reduce their vulnerability, by the

implementation of a process whereby such communities can prevent disasters from

occurring, mitigate against disasters, prepare and respond to the consequences of

any hazard or disaster situation that communities can be confronted with.

The Municipal Disaster Risk Management Plan should:-

Form an integral part of the Bojanala Platinum District Municipality IDP so that

disaster risk reduction activities can be incorporated into its developmental

initiatives;

Anticipate the likely types of disaster that might occur in the District Municipal area

and their possible effects;

Identify the communities at risk;

Provide for appropriate prevention, risk reduction and mitigation strategies;

Identify and address weaknesses in capacity to deal with possible disasters

Facilitate maximum emergency preparedness;

Establish the disaster risk management policy framework and organisation that will

be utilized to mitigate any significant emergency or disaster affecting the District

Municipality;

Establish the operational concepts and procedures associated with day-to-day

operational response to emergencies by District, Departments and other entities.

These SOPs will also form the basis for a more comprehensive disaster response

document;

Incorporate all special Hazard / Risk-specific and Departmental DRM Plans and

18

0

180

related emergency procedures that are to be used in the event of a disaster. These

will provide for:-

o the allocation of responsibilities to the various role players and co-ordination in the

carrying out

o of those responsibilities;

o prompt disaster response and relief;

o disaster recovery and rehabilitation focused on risk elimination or mitigation;

o the procurement of essential goods and services;

o the establishment of strategic communication links;

o the dissemination of information.

11.1.3 SOCIAL DEVELOPMENT MANDATE

Social Development Unit, has a mandate to provide social development services

within the district.

• The following programmes are provided by Social Development Unit:

• Non Governmental Organisastion (NGOs/NPO’) Support Programme

• Expanded Public Works Programme

• NGO/NPO SUPPORT PROGRAMME

• The Bojanala Volunteers Awards Day’ initiative has been established since

2007 as a significant annual programme that continues to honour, recognize

and reward efforts by volunteers from different NGO’s who have dedicated

their lives to contribute in bringing a better life for their communities . These

NGOs voluntarism efforts assist government tirelessly by caring and providing

for, the sick, orphaned and vulnerable children and the needy.

11.1.4 SPORT ARTS AND CULTURE UNIT

• The Sport, Arts and Culture unit is guided by the White Paper on Sport and

Recreation and the White Paper on Arts, Culture and Heritage and also the

National Sport and Recreation Plan. The National Sport and Recreation Plan

is an implementation plan for the sport and recreation policy framework as

captured in the White Paper. The Unit’s role is also support the local

municipalities as their roles differ from the districts. The Sport Arts and Culture

18

1

181

Unit is partnering with the Provincial Department of Sport Arts and Culture in

all their programs, this is assisting in terms of financial resources. The

partnership is also done with all Arts and Culture Associations, federations and

other institutions.

11.1.5 LOCAL ECONOMIC DEVELOPMENT STRATEGY

The purpose of the LED Strategy is to position the Bojanala Platinum District

Municipality as a centre of sustainable economic growth and development. The LED

is in partial fulfilment of the district’s IDP goals which will position the district in

attaining its vision as a “model of cooperative governance for effective and efficient

service delivery in partnership with local municipalities and all stakeholders”. The

LED strategy has an objective of economic growth for next 5 years; reduce

unemployment below in five years; decrease the number of households below

poverty line; increase and develop access to economic opportunities and expand

the municipal revenue base.

TOURISM

Tourism is identified as a sector with high potential. Key interventions in the areas

of marketing, developing identified tourist attractions, packaging and promoting

tourist destinations. The need to improve tourism research through different efforts

such as coordinating and engaging industry players, promoting trade relations and

supporting the development of community and local tourism should be explored.

Agriculture

Has a role to play in the District economy. The climatic and soil conditions may not

be the best; however, technological advances may lead to improved productivity in

this industry. Partnerships with research institutions such as the Agricultural

Research Council are required to explore high value crops and different production

methods and techniques. Forty one villages in the Amatole District municipality are

said to be benefiting from a similar partnership. Agro-processing is also viewed as

an industry with a lot of potential. This would add value to the raw materials the

District and the Province export for processing elsewhere.

18

2

182

TOURISM DEVELOPMENT STRATEGY

This Strategy acts as a strategic planning document to provide direction to BPDM

on tourism development issues. The strategy aims to guide and coordinate

sustainable tourism development from a land use planning perspective within the

district in recognition of the important role that tourism plays in an economic, social

and environmental perspective.

11.1.6 PMS FRAMEWORK

The PMS framework is meant to provide measures and practical guidelines for the

optimal management of all aspects of the performance of BPDM as an organization

as well as individuals who work in BPDM in a manner that aligns their efforts and

achievements to increase the levels of service delivery in the municipality currently

deemed to be most appropriate. The framework is seen as a process that will

specifically contribute to the achievement of establishing an improved performance

culture in BPDM by planning, measuring, communicating, recognising and

rewarding performance and also serving as a vehicle for implementing BPDM’s

goals and strategies by facilitating continuous performance improvement,

individual and organisational development and continuously enhancing employees’

competence through the identification of KRA’s as well as career related training

and development needs and strategies to deliver the best training available while

communicating the standards and performance expectations of each employee by

evaluating performance fairly and objectively.

The MSA emphasises the need for performance management in local government

and requires municipalities to develop a Service Delivery and Budget

Implementation Plan (SDBIP) as the Municipal Planning and Performance

Management Regulations (2001) stipulate that a “Municipality’s Performance

Management System entails a framework that describes and represents how the

municipality’s cycle and processes of performance planning, monitoring,

measurement, reviewing and reporting and improvement will be conducted,

organized and managed, including determining the roles of the different role players”

(Chapter 3, Section 7, Municipal Planning and Performance Management

18

3

183

Regulations, 2001). There is a Municipal Scorecard (SDBIP) that is critical

institutional performance management document that links strategic planning and

IDP processes. The municipal scorecard captures the key aspects of the IDP and

the Strategic Plan in terms of, inter alia:

Key Performance Areas;

Strategic objectives;

Key Performance Indicators;

Baseline;

Targets

11.1.7 AIR QUALITY MANAGEMENT PLAN

The National Environment Management: Air Quality Act, 2004 requires that a local

authority prepare a plan for the preservation or the improvement of air quality within

their area jurisdiction. BPDM Air Quality Management Plan is primarily directed at

protecting the valuable asset of good air quality in the district and particularly of

ensuring that adverse air quality does not impact on the most vulnerable of the

population. The district is currently reviewing the Air Quality Management Plan.

11.1.8 ENVIRONMENTAL MANAGEMENT FRAMEWORK Environmental issues have become an important part of developmental thinking

and decision making in South Africa and the Integrated Environmental Plan (IEP)

is therefore an important sector plan of the Integrated Development Plan (IDP),

which serves as a useful tool for the evaluation and alignment of development

proposals with the principles of sustainable development.

This Environmental Management Framework has been completed and is awaiting

authority from the Minister and the Provincial MEC before it can be gazette.

11.1.9 INTEGRATED WASTE MANAGEMENT PLAN

Waste Management Plan has a key role to play in achieving sustainable waste

management. Their main purpose is to give an outline of waste streams and

treatment options. More specifically it aims to provide a planning framework for the

18

4

184

following:

Compliance with waste policy and target achievement;

Outline of waste characteristics and sufficient capacity for managing waste;

Control of technological measures; and

Outline of economy and investment requirements. 11.1.10 INTERNAL AUDIT PLAN

The internal audit plan sets out the Strategic Three Year Rolling Internal Audit Plan

as well as the Annual Internal Audit Plan for the financial year ending 30 June 2020.

The approach was to formulate a risk-based plan to align the priorities of the

internal audit function with the strategic objectives and goals of BPDM and related

strategic risks as identified by management.

11.1.11 FRAUD POLICY AND RESPONSE PLAN This policy is intended to set down the stance of BPDM to fraud and corruption and

to reinforce existing systems, policies and procedures of BPDM aimed at deterring,

preventing, detecting, reacting to and reducing the impact of fraud and corruption.

The policy of BPDM is zero tolerance to fraud and corruption. In addition, all fraud

and corruption will be investigated and followed up by the application of all remedies

available within the full extent of the law and the implementation of appropriate

prevention and detection controls. These prevention controls include the existing

financial and other controls and checking mechanisms as prescribed in the

systems, policies and procedures of BPDM.

11.1.12 WORKPLACE SKILLS DEVELOPMENT PLAN

Workplace Skills Plan (WSP) it is a well-researched and reasoned plan for

developing the skills needed by the institution. It includes a survey of the

qualifications and roles of the staff and an analysis of the institution's expected future

trends. The plan is developed for every financial year.

11.1.13 RISK MANAGEMENT

Risk management is the identification, evaluation and prioritization of risk followed

18

5

185

by coordinated and economical application of resources to minimize, monitor, and

control the probability or impact of unfortunate events or to maximise the realization

of opportunities.

Risk can come from various sources including threats from project failures (at any

phase in design, development, production, or sustaining of life-cycle), legal

liabilities, credit risk, accidents, natural causes and disasters, deliberate attack from

an adversary, or events of uncertain or unpredictable root-cause

Risk management is an important process because it empowers an organisation

with the necessary tools so that it can adequately identify and deal with potential

risks. Moreover, the management will have the necessary information that they can

use to make informed decisions and ensures that business remains profitable

The risk assessment of the Bojanala Platinum District municipality is principally

motivated by the following prescripts:-

- Section 62(1) (c) (i) of the Municipal Finance Management Act requires that

the Accounting Officer for a municipality must take all reasonable steps to

ensure that the municipality has and maintains an effective, efficient and

transparent system of financial, risk management and internal control.

- The Council, is responsible for the governance of risk. The council shall

delegate to management the responsibility to design, implement and monitor

risk management plans. It is thus the responsibility of the council through

management to ensure that thorough risk assessments are performed on a

continual basis. These should be followed by risk responses, risk monitoring,

risk assurance and risk disclosures.

The Municipality should ensure that it has effective, efficient, and transparent

systems of financial and risk management and internal controls.

18

6

186

SECTION J

LIST OF PROJECTS FROM LOCAL MUNICIPALITIES AND SECTOR DEPARTMENTS LIST OF CAPITAL PROJECTS AT LOCAL MUNICIPALITIES

MORETELE

CAPITAL BUDGET 2022/23 OUTER YEARS

Description MIG Budget 2022/23

WSIG Budget 2022/23

INTERNAL FUNDING

Total Budget 2021/22

MIG Budget 2023/24

WSIG Budget 2023/24

MIG Budget 2024/25

WSIG Budget 2024/25

WATER 45,000,000.00

65,000,000.00

-

110,000,000.00

59,991,094.86

75,000,000.00

54,989,050.00

80,000,000.00

Ward 25 Water Reticulation and Yard Connections (Motla, Ratjiepane)

15,000,000.00

15,000,000.00

21,582,523.43

19,989,050.00

Ward 6 Water reticulation and yard connections (Ngobi)

15,000,000.00

15,000,000.00

19,000,000.00

20,000,000.00

Ward 1 water reticulation and yard connections (Ruigtesloot)

15,000,000.00

15,000,000.00

19,408,571.43

15,000,000.00

18

7

187

Drilling of boreholes and installation of steel tank with package plant in Mmakaunyane

20,000,000.00

20,000,000.00

Water supply in Ward 21 - Phase 2

5,000,000.00

5,000,000.00

Installation of package plant in Ward 1

10,000,000.00

10,000,000.00

10,000,000.00

Ward 25 Yard Connections (Msholozi)

25,000,000.00

10,000,000.00

Ward 9 Yard Connections (Motla)

30,000,000.00

Water supply in ward 17 (one & ten)

-

20,000,000.00

Drilling of boreholes in various villages with package plants

40,000,000.00

SANITATION 14,232,502.03

-

-

14,232,502.03

14,867,605.00

-

16,000,000.00

-

Ward 5 Basic Sanitation

5,000,000.00

5,000,000.00

6,000,000

8,000,000

18

8

188

Mathibestad Basic Sanitation

4,232,502.03

4,232,502.03

Ward 26 basic sanitation

5,000,000.00

5,000,000.00

8,000,000

Ward 13&14 Basic Sanitation

-

8,867,605.00

ROADS 36,000,000.00

-

-

36,000,000.00

40,000,000.00

-

36,000,000.00

-

Upgrading of internal roads in Motla

12,000,000.00

12,000,000.00

15,000,000

12,000,000

Internal Roads & Stormwater Makapanstad (Ex ward 25)

12,000,000.00

12,000,000.00

15,000,000

Greater Maubane Internal roads

12,000,000.00

12,000,000.00

12,000,000

Swartdam Internal Roads

-

10,000,000

12,000,000

HIGH MAST LIGHTING

22,447,497.97

-

-

22,447,497.97

6,000,000.00

-

18,000,000.00

-

Instalation of High Mast Lights in Ward 9 (Ga-Motla)

4,096,947.25

4,096,947.25

Instalation of High Mast Lights in

5,006,507.20

5,006,507.20

18

9

189

Ward 12 (Mathibestad)

Ward 13 High Mast Lights

2,226,285.84

2,226,285.84

6,000,000

Instalation of High Mast Lights in ward 14

9,065,300.00

9,065,300.00

6,000,000

Construction of High Mast Lights in ward 17

2,052,457.68

2,052,457.68

Ward 20 High Mast Lights

6,000,000

6,000,000

COMMUNITY FACILITIES

8,000,000.00

-

1,000,000.00

9,000,000.00

10,000,000.00

-

12,000,000.00

-

Construction of Community hall in ward 15

8,000,000.00

8,000,000.00

Ward 1 Community Hall

1,000,000.00

1,000,000.00

Construction of Ward Community Hall in Ward 18

-

10,000,000

Construction of Community Hall in Ward 20

12,000,000

19

0

190

OTHER -

-

-

-

-

-

-

-

-

Total Capital Budget

125,680,000.00

65,000,000.00

1,000,000.00

191,680,000.00

130,858,699.86

75,000,000.00

136,989,050.00

80,000,000.00

RUSTENBURG LOCAL MUNICIPALITY

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/01 Office and Specialized Library Furniture ALL - 500,000 574,176 Grant: CATA

IDP/22/23/02 Air Conditioners ALL 248,734 45,762 Grant: CATA

IDP/22/23/03 Water tanks and pumps ALL 130,000 100,000 Grant: CATA

IDP/22/23/04 Carport - Boitekong Library 20/21/40 150,000 - - Grant: CATA

IDP/22/23/05 Burglar proofing - Rustenburg Library 42 70,000 - - Grant: CATA

IDP/22/23/06 Installation of water gysers ALL - 100,000 Grant: CATA

IDP/22/23/07 Library counter - Tlhabane Library 11 20,000 - - Grant: CATA

IDP/22/23/08 Integrated National Electrification Programme (New

Boitekong 88/11kv Substation)

20/21/40 30,000,000 31,015,000 32,408,000 Grant: INEP

IDP/22/23/09 Upgrading of Rietvlei Cemetery Phase 2 16 5,000,000 10,000,000 - Grant: MIG

19

1

191

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/23 Installation of High Mast Light in Mosenthal/Ikageng

- Phase A

44 5,000,000 3,000,000 2,500,000 Grant: MIG

IDP/22/23/24 Installation of High Mast Light in Kanana Phase 2 23 5,000,000 - 2,500,000 Grant: MIG

IDP/22/23/25 Installation of Highmast lights in Kanana - Phase A 23 5,000,000 - - Grant: MIG

IDP/22/23/26 Installation of High Mast Light in Robega Phase 2 2 5,000,000 - - Grant: MIG

IDP/22/23/27 Installation of High Mast Light in Robega Phase 2 -

Phase A

2 5,000,000 - - Grant: MIG

IDP/22/23/28 Construction of Bospoort Bulk Water Pipeline 23 5,000,000 8,000,000 2,000,000 Grant: MIG

IDP/22/23/29 Bulk, Storage and Water Reticulation in Lekgalong 44 1,500,000 3,500,000 5,000,000 Grant: MIG

IDP/22/23/30 Bulk Augmentation and Water Reticulation in

Izwelakhe

All 1,500,000 2,000,000 5,000,000 Grant: MIG

IDP/22/23/31 Water Reticulation in New RDP Bokamoso 34 3,000,000 5,500,000 5,000,000 Grant: MIG

IDP/22/23/32 Boitekong Hawkers Stalls 20/21/40 3,000,000 5,000,000 8,000,000 Grant: MIG

IDP/22/23/33 PPEQ : TLHABANE TRADING HUB 10-Nov 11,000,000 11,484,000 11,989,296 Grant: MIG

IDP/22/23/34 PPEQ : LETHABONG BEEHIVES 27&28 14,000,000 14,616,000 15,259,104 Grant: MIG

IDP/22/23/35 Furniture ALL 500,000 550,000 600,000 Grant: MIG

19

2

192

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/36 Municipal Information Systems (New) ALL 600,000 200,000 200,000 Grant: MIG

IDP/22/23/37 Laptops ALL 450,000 500,000 750,000 Grant: MIG

IDP/22/23/38 Project Management Systems (ISO/QMS Standard) ALL 2,000,000 1,500,000 900,000 Grant: MIG

IDP/22/23/39 Phatsima Roads And Stormwater Drainage Phase 5 1 2,000,000 4,000,000 5,000,000 Grant: MIG

IDP/22/23/40 Boitekong Ward 19 Roads And Stormwater Drainage

Phase

20/21/40 5,000,000 4,000,000 4,000,000 Grant: MIG

IDP/22/23/41 Constrcution of roads and stormawater in Marikana

- Phase A

31/32 5,000,000 4,000,000 6,000,000 Grant: MIG

IDP/22/23/42 Construction of roads and stomwater in Phatsima -

Phase A

1 3,000,000 4,000,000 6,000,000 Grant: MIG

IDP/22/23/43 Construction of roads and stomwater in Phatsima -

Phase B

1 3,000,000 4,000,000 6,000,000 Grant: MIG

IDP/22/23/44 Construction of roads and stomwater in Phatsima -

Phase C

1 3,000,000 4,000,000 4,000,000 Grant: MIG

IDP/22/23/45 Construction of roads and stomwater in Phatsima -

Phase D

1 5,000,000 4,000,000 4,482,450 Grant: MIG

IDP/22/23/46 Construction of roads and stormawater in Marikana

- Phase B

31/32 5,000,000 4,000,000 6,000,000 Grant: MIG

IDP/22/23/47 Construction of roads and stormawater in Marikana

- Phase C

31/32 3,000,000 5,500,000 8,000,000 Grant: MIG

19

3

193

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/48 Construction of roads and stormawater in Marikana

- Phase D

31/32 3,000,000 5,500,000 8,000,000 Grant: MIG

IDP/22/23/49 Construction of roads and stormwater in Boitekong -

Phase A

20/21/40 4,450,000 4,000,000 4,000,000 Grant: MIG

IDP/22/23/50 Construction of roads and stormwater in Boitekong -

Phase B

20/21/40 5,000,000 4,000,000 4,000,000 Grant: MIG

IDP/22/23/51 Construction of roads and stormwater in Boitekong -

Phase C

20/21/40 5,000,000 4,000,000 6,000,000 Grant: MIG

IDP/22/23/52 Construction of roads and stormwater in Cluster A 3,000,000 5,500,000 8,000,000 Grant: MIG

IDP/22/23/53 Construction of roads and stormwater in Cluster B 1,500,000 2,000,000 5,000,000 Grant: MIG

IDP/22/23/54 Construction of roads and stormwater in Cluster C 3,000,000 5,500,000 5,000,000 Grant: MIG

IDP/22/23/55 Construction of roads and stormwater in Kanana -

Phase A

23 5,000,000 4,000,000 4,000,000 Grant: MIG

IDP/22/23/56 Construction of roads and stormwater in Kanana -

Phase B

23 5,000,000 4,000,000 4,000,000 Grant: MIG

IDP/22/23/57 Construction of roads and stormwater in Lethabong

Ward 27

27 3,000,000 5,500,000 8,000,000 Grant: MIG

IDP/22/23/58 Construction of roads and stormwater in Lethabong

Ward 28

28 3,000,000 5,500,000 8,000,000 Grant: MIG

19

4

194

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/59 Construction of roads and stormwater in

Mathopestad

36 3,000,000 5,500,000 8,000,000 Grant: MIG

IDP/22/23/60 Construction of roads and stormwater in Photsaneng 45 1,500,000 3,500,000 5,000,000 Grant: MIG

IDP/22/23/61 Construction of roads and stormwater in Robega 2 5,000,000 4,000,000 6,000,000 Grant: MIG

IDP/22/23/62 Construction of roads and stormwater in Robega -

Phase A

2 5,000,000 4,000,000 4,000,000 Grant: MIG

IDP/22/23/63 Construction of roads and stormwater in Robega -

Phase B

2 5,000,000 4,000,000 4,000,000 Grant: MIG

IDP/22/23/64 Construction of roads and stormwater in Tlaseng 26 5,000,000 4,000,000 4,000,000 Grant: MIG

IDP/22/23/65 Construction of roads and stormwater in Tlaseng -

Phase A

26 5,000,000 4,000,000 4,000,000 Grant: MIG

IDP/22/23/66 Construction of roads and stormwater in Tlaseng -

Phase B

26 5,000,000 4,000,000 4,000,000 Grant: MIG

IDP/22/23/67 Construction of roads and stormwater in Tlaseng -

Phase C

26 5,000,000 4,000,000 4,000,000 Grant: MIG

IDP/22/23/68 Construction of roads and stormwater in Tlaseng -

Phase D

26 5,000,000 4,000,000 4,000,000 Grant: MIG

IDP/22/23/69 Construction of roads and stormwater Makolokwe 29 3,000,000 5,500,000 8,000,000 Grant: MIG

19

5

195

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/70 Freedom Park Ward 24 Roads and Stormwater

Drainage

24/38 5,000,000 4,000,000 5,000,000 Grant: MIG

IDP/22/23/71 Freedom Park Ward 24 Roads and Stormwater

Drainage - Phase A

24/38 5,000,000 4,000,000 6,000,000 Grant: MIG

IDP/22/23/72 Freedom Park Ward 24 Roads and Stormwater

Drainage - Phase B

24/38 5,000,000 4,000,000 6,000,000 Grant: MIG

IDP/22/23/73 Marikana Roads & Stormwater Drainage Phase 5 31/32 5,000,000 4,000,000 6,000,000 Grant: MIG

IDP/22/23/74 Upgrading and Construction of Internal Access Roads

in Kanana Phase 2

23 5,000,000 4,000,000 4,000,000 Grant: MIG

IDP/22/23/75 AIRCONDITIONERS ALL 300,000 Grant: PTNG

IDP/22/23/76 BUS DEPOT ALL 31,131,249 32,376,499 33,671,559 Grant: PTNG

IDP/22/23/77 DESIGN, BUILDING AND OPERATIONS ALL 15,000,000 15,600,000 16,224,000 Grant: PTNG

IDP/22/23/78 EQUIPMENT ALL 20,000 28,000 39,200 Grant: PTNG

IDP/22/23/79 FURNITURE ALL 100,000 104,000 108,160 Grant: PTNG

IDP/22/23/80 LAPTOPS/DESKTOPS ALL 109,616 114,001 118,561 Grant: PTNG

IDP/22/23/81 MACHINERY AND EQUIPMENT ALL 404,373 420,548 437,370 Grant: PTNG

IDP/22/23/82 NON MOTORISED WALK AWAY ALL 3,000,000 3,120,000 - Grant: PTNG

IDP/22/23/83 STATIONS ALL 10,000,000 - - Grant: PTNG

19

6

196

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/84 TURNAROUND FACILITY ALL 10,000,000 Grant: PTNG

IDP/22/23/85 UPGRADE OF RRT OFFICE ALL 2,000,000 - - Grant: PTNG

IDP/22/23/86 Water Conservation and Demand Management All 41,908,211 50,672,173 51,381,748 Grant: WSIG

IDP/22/23/87 New mains from Cashan Resevoir to Geelhout and

Industrial reservoir

17 17,671,789 18,449,347 19,261,119 Grant: WSIG

IDP/22/23/88 Augmentation of groundwater supply to Makolokwe

village

29 10,420,000 10,878,480 11,357,133 Grant: WSIG

IDP/22/23/89 FURNITURE AND FITTINGS All 60,000 Own Revenue

IDP/22/23/90 CAMERAS All 80,000 - Own Revenue

IDP/22/23/91 RECORDERS All 80,000 - Own Revenue

IDP/22/23/92 Computer server All 3,500,000 Own Revenue

IDP/22/23/93 aircons All 500,000 300,000 Own Revenue

IDP/22/23/94 FURNITURE AND FITTINGS All 54,497 56,894 59,398 Own Revenue

IDP/22/23/95 REVAMP OF MPHENI All 5,413,190 5,651,370 5,900,031 Own Revenue

IDP/22/23/96 REVAMP_CIVIC CENTRE All 2,165,276 2,260,548 2,360,012 Own Revenue

IDP/22/23/97 Renovation of Rankelenyane RCC 29 768,673 802,495 837,804 Own Revenue

19

7

197

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/98 Renovation of Boitekong RCC 20/21/40 974,374 1,017,247 1,062,006 Own Revenue

IDP/22/23/99 Renovation of East End Sport Facility All 747,020 779,889 814,204 Own Revenue

IDP/22/23/100 Installation of emergency escape route for Speakers

Office

All 216,528 226,055 236,001 Own Revenue

IDP/22/23/101 Renovation of Harry Waffle Hall All 520,013 542,893 566,781 Own Revenue

IDP/22/23/102 Installation of fence at various facilities All 1,732,221 1,808,439 1,888,010 Own Revenue

IDP/22/23/103 Furniture(Chairs and Tables) All 250,000 260,500 271,441 Own Revenue

IDP/22/23/104 council chamber PA SYSTEM All 3,000,000 Own Revenue

IDP/22/23/105 Blower Machine All 5,000 - - Own Revenue

IDP/22/23/106 Rebuilding of Sunrisepark hall 19 2,500,000 1,000,000 500,000 Own Revenue

IDP/22/23/107 Grab truck All 2,000,000 - - Own Revenue

IDP/22/23/108 Capex : P.P.E > Brushcutters - Parks All - 300,000 - Own Revenue

IDP/22/23/109 05 tractor slashers All 300,000 - - Own Revenue

IDP/22/23/110 Ride On Lawn Mower All 220,000 - - Own Revenue

IDP/22/23/111 Blower Machine All 5,000 - - Own Revenue

IDP/22/23/112 Brush Cutters All 100,000 - 60,000 Own Revenue

19

8

198

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/113 Construction of outdoor gym x1 All 350,000 700,000 750,000 Own Revenue

IDP/22/23/114 Tractor Slashers All 170,000 - 100,000 Own Revenue

IDP/22/23/115 Motors and Pumps All 100,000 105,000 110,000 Own Revenue

IDP/22/23/116 Blower Machine All 5,000 - - Own Revenue

IDP/22/23/117 Brush Cutters All 60,000 - 60,000 Own Revenue

IDP/22/23/118 Ride on Lawn Mower All 220,000 - - Own Revenue

IDP/22/23/119 Money Safes All 12,000 - Own Revenue

IDP/22/23/120 Fencing - Waste Management Depot All 1,000,000 - - Own Revenue

IDP/22/23/121 Mesh burglar proofing - Waste Depot All 1,500,000 - - Own Revenue

IDP/22/23/122 Carports - Waste Management Depot All 100,000 - - Own Revenue

IDP/22/23/123 Air conditioners - (All offices - Waste Depot) All 80,000 - - Own Revenue

IDP/22/23/124 Restoration of water supply for Waterval Landfill site 35 200,000 - - Own Revenue

IDP/22/23/125 Horse and trailor - Truck head and lowbwed trailer All 4,500,000 - - Own Revenue

IDP/22/23/126 Data rojector All 30,000 Own Revenue

19

9

199

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/127 Computer Equipment/Acquisitions/Transfer from

Operational Revenue/Information

Technology/Administrative or Head Office (Including

Satellite Offices)/Default/INFORMATION

TECHNOLOGY [CORPORATE SUPPORT SERVICES]

All 1,500,000 1,000,000 1,000,000 Own Revenue

IDP/22/23/128 Land Acquisition All 6,252,000 6,527,088 6,814,279 Own Revenue

IDP/22/23/129 STOVES All 1,563,000 1,631,772 1,703,570 Own Revenue

IDP/22/23/130 SECURITY SYSTEMS & CCTV CAMERAS All 700,000 1,000,000 1,500,000 Own Revenue

IDP/22/23/131 BIOMETRICS SYSTEM All 500,000 1,000,000 1,000,000 Own Revenue

IDP/22/23/132 VEHICLES (TOWING VEHICLES 4 TON, TRUCK WITH

CANOPY, CANOPIES)

All 1,200,000 2,000,000 100,000 Own Revenue

IDP/22/23/133 PORTABLE OFFICE All - 700,000 - Own Revenue

IDP/22/23/134 EQUIPMENT (PORTABLE RADIO, FIREARMS) All 70,000 70,000 100,000 Own Revenue

IDP/22/23/135 POUND REFURBISHMENT All 50,000 1,000,000 50,000 Own Revenue

IDP/22/23/136 OFFICE FURNITURE All 20,000 30,000 50,000 Own Revenue

IDP/22/23/137 BLUE LIGHT MANAGERS All 10,000 50,000 20,000 Own Revenue

IDP/22/23/138 6 X Aero Drones All 500,000 200,000 100,000 Own Revenue

20

0

200

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/139 10 x DOUBLE CAB BAKKIES WITH CANOPIES All 500,000 200,000 100,000 Own Revenue

IDP/22/23/140 DISASTER VEH- (SKIT UNIT, CABS, COMBI, PANEL

MINI TRUCK)

All 4,000,000 2,000,000 7,000,000 Own Revenue

IDP/22/23/141 REFURBISHMENT OF FIRE STATIONS X 3 All 1,000,000 1,000,000 500,000 Own Revenue

IDP/22/23/142 WATER TOWER AT MARIKANA FIRE HOUSE 31/32 1,000,000 1,000,000 - Own Revenue

IDP/22/23/143 OFFICE FURNITURE & EQUIPMENT (FRIDGE,

MICROWAVE, AIRCON)

All 310,000 143,000 148,000 Own Revenue

IDP/22/23/144 COMPUTERS/LAPTOP All 50,000 20,000 20,000 Own Revenue

IDP/22/23/145 UPGRADING OF EMERGENCY COMMUNICATION

SYSTEM

All 2,000,000 500,000 100,000 Own Revenue

IDP/22/23/146 FURNITURE AND EQUIPMENT All 120,000 - 60,000 Own Revenue

IDP/22/23/147 FLOOR TILE All 100,000 - - Own Revenue

IDP/22/23/148 CURTAINS All 30,000 - - Own Revenue

IDP/22/23/149 FRIDGE All 15,000 - - Own Revenue

IDP/22/23/150 AIR CONDITIONER All 80,000 - - Own Revenue

IDP/22/23/151 PROJECTOR All 25,000 - - Own Revenue

20

1

201

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/152 CLEANING MACHINE HOOVER All 8,000 - - Own Revenue

IDP/22/23/153 STANDBY GENERATOR All 1,500,00 500,000 500,000 Own Revenue

IDP/22/23/154 BAKKIE WITH CANOPY FOR WARRANTS All - 300,000 - Own Revenue

IDP/22/23/155 PORTABLE RADIO All 80,000 50,000 50,000 Own Revenue

IDP/22/23/156 BLUE LAMPS FOR MANAGERS All 50,000 30,000 30,000 Own Revenue

IDP/22/23/157 OFFICE FURNITURE All 50,000 20,000 50,000 Own Revenue

IDP/22/23/158 CARPORTS FOR COUNCIL VEHICLES All - - - Own Revenue

IDP/22/23/159 AIRCONDITIONER All 100,000 50,000 20,000 Own Revenue

IDP/22/23/160 ANPR BUS FITMENT WITH EQUIPMENT (ROAD

BLOCK BUS)

All 350,000 - - Own Revenue

IDP/22/23/161 SPEED AND RED LIGHT PERMANENT CAMERA All 400,000 400,000 200,000 Own Revenue

IDP/22/23/162 BREAKDOWN TRUCK All 1,000,000 500,000 - Own Revenue

IDP/22/23/163 STANBY GENERATOR All 1,500,00 500,000 500,000 Own Revenue

IDP/22/23/164 Distribution - Refurbishment of 11KV Substation

Buildings

All 3,126,000 3,263,544 3,407,140 Own Revenue

IDP/22/23/165 Electrical Tools and Equipment All 2,500,000 2,610,000 2,724,840 Own Revenue

20

2

202

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/166 Capex : HV Test machine and Equipment

(replacement)

All 2,084,000 2,175,696 2,271,427 Own Revenue

IDP/22/23/167 Capex : Distribution - Replacement of Hydraulic

Hand Tools In Store Room

All 208,400 217,570 227,143 Own Revenue

IDP/22/23/168 Capex : Injection tester - Primary and secondary All 1,250,400 1,305,418 1,362,856 Own Revenue

IDP/22/23/169 Capex : Distribution - Replacement of Electricians

Tool Boxes

All 521,000 543,924 567,857 Own Revenue

IDP/22/23/170 Capex : Batteries and Chargers All 1,042,000 1,087,848 1,135,713 Own Revenue

IDP/22/23/171 Dinie Estate - Electrification - Bulk line All 4,376,400 4,568,962 4,769,996 Own Revenue

IDP/22/23/172 NW373_310 - INTA - Software : Acquisitions

Supervisory Ctrl & Data Acquisition (S.C.A.D.A)

System

All 8,420,000 8,878,480 9,357,133 Own Revenue

IDP/22/23/173 Refurbishment of Traffic Light Intersections All 8,420,000 8,878,480 9,357,133 Own Revenue

IDP/22/23/174 Distribution - Refurbishment of 11kV Substation

Equipment

All 8,420,000 8,878,480 9,357,133 Own Revenue

IDP/22/23/175 Refurbishment of vandilized network All 13,756,000 14,581,264 14,442,840 Own Revenue

IDP/22/23/176 Refurbishment of Aged Rural Network All 13,025,000 13,598,100 14,196,416 Own Revenue

IDP/22/23/177 Replacement of 33 kV Cables (Noord Sub, Munic

Sub,etc)

All 30,043,100 31,672,996 32,374,608 Own Revenue

20

3

203

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/178 Capex : P.P.E > Upgrading - Electricity Network All 3,126,000 3,263,544 3,407,140 Own Revenue

IDP/22/23/179 Furniture All 156,300 163,177 170,357 Own Revenue

IDP/22/23/180 Mobile Compressor All 26,050 27,196 28,393 Own Revenue

IDP/22/23/181 Portpack All 20,840 21,757 22,714 Own Revenue

IDP/22/23/182 Mobile Generator All 26,050 27,196 28,393 Own Revenue

IDP/22/23/183 Mobile Welding All 93,780 97,906 102,214 Own Revenue

IDP/22/23/184 Tool Boxes All 364,700 380,747 397,500 Own Revenue

IDP/22/23/185 Filters, Boilemakers and Air con tech All 156,300 163,177 170,357 Own Revenue

IDP/22/23/186 Upgrading of Boitekong Ext 8 Pump Station 20/21/40 3,126,000 3,263,544 3,407,140 Own Revenue

IDP/22/23/187 Savanna Falls - Sewer connection All 1,042,000 1,087,848 1,135,713 Own Revenue

IDP/22/23/188 PPEQ : REFURBISHMENT OF HAWKER STALLS All 500,000 522,000 544,968 Own Revenue

IDP/22/23/189 PPEQ : SHOWGROUNDS MAINTENANCE AND

UPGRADE

All 500,000 522,000 544,968 Own Revenue

IDP/22/23/190 PPEQ : LETHABONG BEEHIVES 27/28 6,000,000 6,264,000 6,539,616 Own Revenue

20

4

204

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/191 PPEQ : REFURBISHMENT OF ZINNIAVILLE FACTORY

SHOPS

43 1,000,000 1,044,000 1,089,936 Own Revenue

IDP/22/23/192 PPEQ : REFURBISHMENT OF INDUSTRIAL SHOPS All - - - Own Revenue

IDP/22/23/193 PPEQ : SMME TRAINING CENTRE All 200,000 208,800 217,987 Own Revenue

IDP/22/23/194 PPEQ - OUTDOOR FURNITURE All 1,050,000 1,096,200 1,144,433 Own Revenue

IDP/22/23/195 INT ASSET : DATABASE SOFTWARE All 260,500 271,962 283,928 Own Revenue

IDP/22/23/196 PPEQ : COMPUTERS AND LAPTOPS All 150,000 156,600 163,490 Own Revenue

IDP/22/23/197 PPEQ : FURNITURE AND OFFICE EQUIPMENT All 250,000 261,000 272,484 Own Revenue

IDP/22/23/198 PPEQ : RENOVATION OF FARMER'S PRODUCTION

SUPPORT UNIT (FPSU)

All 4,000,000 4,176,000 4,359,744 Own Revenue

IDP/22/23/199 PPEQ : UPGRADING OF CHILDERN PLAY AREA All 300,000 313,200 326,981 Own Revenue

IDP/22/23/200 STAFF & PUBLIC TOILETS (MARIKANA REGISTERING

AUTHORITY & ROBEGA)

2/31/32 - 600,000 Own Revenue

IDP/22/23/201 OFFICE EQUIPMENT (FRIDGE x3, DUST HOOVERS,

WATER COOLERS, WATER PURIFIER, SCANNERS,

AIRCON)

All 110,000 775,000 Own Revenue

IDP/22/23/202 PUBLIC PARKING FOR ROBEGA 2 - 300,000 Own Revenue

IDP/22/23/203 REPLACEMENT OF WEIGH BRIDGE All 2,500,000 - Own Revenue

20

5

205

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/204 Laptops All 50,000 - 50,000 Own Revenue

IDP/22/23/205 Hard drive All 3,500 - 3,500 Own Revenue

IDP/22/23/206 Tools of Trade All 70,000 - - Own Revenue

IDP/22/23/207 Laptops All 80,000 Own Revenue

IDP/22/23/208 Funiture All 250,000 - - Own Revenue

IDP/22/23/209 Appliance(Bar Fridge, Microwave) All 50,000 - - Own Revenue

Audit software All 280,000 - - Own Revenue

IDP/22/23/210 Furniture All 500,000 - - Own Revenue

IDP/22/23/211 IT Hardware and Equipment Monnakato 25 103,000 - - Own Revenue

IDP/22/23/212 FURNITURE MONNAKATO RCC 25 8,680 - - Own Revenue

IDP/22/23/213 FURNITURE LETHABONG RCC 27&28 14,960 - - Own Revenue

IDP/22/23/214 FURNITURE BOITEKONG RCC 20/21/40 89,326 - - Own Revenue

IDP/22/23/215 FURNITURE PHATSIMA RCC All 30,354 - - Own Revenue

IDP/22/23/216 FURNITURE MARIKANA RCC All 38,144 - - Own Revenue

IDP/22/23/217 FURNITURE TLHABANE RCC All 79,487 - - Own Revenue

20

6

206

Project No. Project Description Location/

Ward

2022-2023

Budget

2023-2024

Budget

2024-2025

Budget

Funding

Source

IDP/22/23/218 FURNITURE RANKELENYANE RCC All 144,964 - - Own Revenue

IDP/22/23/219 CONCRETE PALLISADE FENCING TLHABANE RCC 10 &11 120,000 - - Own Revenue

IDP/22/23/220 CONCRETE PALLISADE FENCING MONNAKATO RCC 25 120,000 - - Own Revenue

IDP/22/23/221 CONCRETE PALLISADE FENCING IKAGENG RCC 44 75,000 - - Own Revenue

IDP/22/23/222 CONCRETE PALLISADE FENCING LETHABONG RCC 20/21/40 120,000 - - Own Revenue

IDP/22/23/223 CONCRETE PALLISADE FENCING PHATSIMA RCC 1 120,000 - - Own Revenue

IDP/22/23/224 CONCRETE PALLISADE FENCING PHATSIMA RCC 1 60,000 - - Own Revenue

MOSES KOTANE LOCAL MUNICIPALITY

MSCOA Line Item No. Project No Project Description Ward Status Total Capital Budget Funder

2020/ 2021 2021/ 2022 2022/ 2023 2023/2024

Water Projects : Infrastructure and Technical Services

Financial Year 2020/2021 39056445020WSE26ZZ29 MKW – 65 Ledig Bulk Water Supply 14/28/30 Ongoing 3,628,500 WSIG

39056446020FBC59ZZ18 MKW – 75 Pella Water Supply 18 Adjusted 5,755,297 MIG

39056446020WSE08ZZ20 MKW – 76 Tlokweng Water Supply : Phase I 20 New 664,334 WSIG

39056446020WSE39ZZ20 MKW – 87 Lerome Bulk Water Augmentation 15 Adjusted 11,422,140 WSIG

39056446020FBC59ZZ18 MKW – 93 Pella Bulk Water Augmentation 18 / 19 Adjusted 18,658,923 WSIG

MKW - 124 Sandfontein Construction of Boreholes, Pipelines and

10 New BPDM

20

7

207

MSCOA Line Item No. Project No Project Description Ward Status Total Capital Budget Funder

2020/ 2021 2021/ 2022 2022/ 2023 2023/2024

Storage tank

39056446020WSE09ZZ20 MKW – 128 Tlokweng Water Supply : Phase II 20 New 4,779,600 WSIG

Rolled Over Projects

39056445020CCD42ZZ17 MKW – 130 Seolong Rural Bulk Water Supply 23 Adjusted 10,000,000 PIG

Financial Year 2020/2021 – 2021/2022 39056446020FBD76ZZ20 MKW – 114 Design Sandfontein Water Supply 10 Adjusted 1,006,789 14,000,000 MIG

39056446020FBD77ZZ20 MKW – 115 Design Maologane Water Supply 27 Adjusted 1,000,000 9,000,000 MIG

39056446020FBE38ZZ20 MKW – 116 Ledig Water Supply Various Sections 14/28/30 Adjusted 4,962,978 18,197,227 MIG

39056445020WSE28ZZ29 MKW – 117 Upgrading of Madikwe Water Treatment Plant (Phase I), Phase II (Bulk Water Supply) (Madikwe, Vrede, Seshibitswe)

19 Phase I Completed

6,000,000 12,000,000

WSIG

15,000,000 PIG

39056446020WSE32ZZ20 MKW – 118 Letlhakane/Kortloof Water Supply 18 New 1,120,000 6,880,000 WSIG

39056446020WSE33ZZ20 MKW – 119 Construction of Pitsedisulejang Water Supply

2 Adjusted 8,147,988 755,074

WSIG

39056446020WSE34ZZ20 MKW – 120 Losmetjerie to Goedehoop Water Supply

1 Adjusted 627,428 4,800,000 WSIG

39056446020WSE35ZZ20 MKW – 121 Construction of Letsheng Section Water Supply

32 Adjusted 8,664,763 WSIG

39056446020WSE36ZZ20 MKW – 122 Refurbishment of Makoshong Water Supply

24/26 Adjusted 4,809,250 WSIG

39056446020WSE37ZZ20 MKW – 123 Refurbishment of Tweelaagte Water Supply

26 New 4,391,838 WSIG

Financial Year 2021/2022 – 2022/2023 3905644020FBC50ZZ17 MKW – 74 Lerome (Thabeng Section) Water

Supply (Upgrading) 15 Ongoing 1,000,000 R0,00

39056446020WSE40ZZ20 MKW – 79 Manamakgotheng Reservoir and Bulk Water Supply

22/31 New 13,208,308 6,791,691 WSIG

39056446020WSE39ZZ29 MKW – 94 Mahobieskraal Bulk Water Supply and Reticulation

30 New 9,000,723 3,791,692 WSIG

39056446020WSE37ZZ20 MKW – 123 Tweelaagte Water Supply: Phase II 26 10,756,044 6,791,692 WSIG

39056445020WSE27ZZ29 MKW – 126 Lerome Water Supply 17 New 8,000,000 WSIG

Financial Year 2022/2023

39056446020FBE31ZZ20 MKW – 125 Maeraneng Water Supply 22 New 16,125,000 WSIG

39056446020FBE30ZZ20 MKW – 127 Segakwaneng Water Supply 31 New 15,000,000 WSIG

MKW – 128 Upgrading of Mogwase Sewer Plant 33 New 10,000,000

20

8

208

MSCOA Line Item No. Project No Project Description Ward Status Total Capital Budget Funder

2020/ 2021 2021/ 2022 2022/ 2023 2023/2024

MKW – 129 Tweelagte Water Supply – Phase 3 (New Stands)

26 New 8,000,000 MIG

MKW – 130 Sandfontein Water Supply – Phase 2 (Boikhutso Extension)

10 New 10,000,000 MIG

MKW – 131 Manamakgotheng Water Reticulation(Leagajang Extension)

31 New 10,000,000 MIG

MKW – 132 Molatedi Water Treatment Plant (Upgrading)

1 New 18,000,000 MIG

MKW – 133 Mogwase Replacement of Asbestos Pipes

13/15/33 New 21,030,849 MIG

MKW – 135 Mabeskraal to Uitkyk (Various Villages)

New 21,778,925 WSIG

Sanitation Provision MSCOA Line Item No. Project No Project Description Ward Status 2020/2021 2021/2022 2022/2023 2023/2024 Funder

Financial Year 2020/2021

38156449420FBE02ZZ02 MKS – 71 Makgophe Rural Sanitation (283) 27 Adjusted 7,221,761 MIG

38156449420FBD58ZZ02 MKS – 72 Disake Rural Sanitation (115) 5 Adjusted 2,611,395 MIG

38156449420FBD60ZZ02 MKS – 73 Ramokokastad Rural Sanitation (464) 12 Adjusted 11,003,531 MIG

38156449420FBD59ZZ02 MKS – 75 Bojating Rural Sanitation (205) 11 Adjusted 1,522,590 MIG

38156449420FBE05ZZ02 MKS – 76 Mabeskraal Rural Sanitation (212) 23 Adjusted 4,262,195 MIG

38156449420FBD62ZZ02 MKS – 77 Losmetjerie Rural Sanitation (137) 1 Adjusted 2,954,648 MIG

38156449420FBD63ZZ02 MKS – 78 Mabele a Podi Rural Sanitation (141) 13 Adjusted 2,828,190 MIG

38156449420FBE05ZZ24 MKS – 79 Mabeskraal Rural Sanitation (207) 24 Adjusted 4,146,525 MIG

38156449420FBD65ZZ02 MKS – 80 Sandfontein Rural Sanitation (285) 10 Adjusted 5,680,696 MIG

38156449420FBE01ZZ02 MKS – 82 Lerome (Thabeng Section) (182) 15 New 3,125,273 MIG

Financial Year 2021/2022 38156449420FBC64ZZ02 MKS – 51 David Katnagel Rural Sanitation 2 New R0,00 MIG

38156449420FBC68ZZ17 MKS – 52 Leruleng Rural Sanitation 17 New R0,00 MIG

38156449420FBC78ZZ26 MKS – 54 Phalane Rural Sanitation 26 New R0,00

MIG

38156449420FBC70ZZ22 MKS – 55 Manamakgotheng Rural Sanitation 22/31 New R0,00 MIG

38156449420FBD61ZZ24 MKS – 74 Makoshong Rural Sanitation 24/26 New R0,00 MIG

38156449420FBE10ZZ02 MKS – 83 Segakwana Rural Sanitation 31 New R0,00 MIG

Roads & Storm Water

Financial Year 2020/2021 – 2021/2022 37156472420FBE11ZZ32 MKRS – 62 Greater Moruleng Storm water Master

Plan 9/32 Adjusted 6,100,000 MIG

20

9

209

MSCOA Line Item No. Project No Project Description Ward Status Total Capital Budget Funder

2020/ 2021 2021/ 2022 2022/ 2023 2023/2024

37156472420FBD29ZZ32 MKRS – 82 Paving of Mabodisa internal road 32 Adjusted 7,466,665 MIG

37156472420FBD27ZZ11 MKRS – 83 Paving of Mmorogong internal road 11 Adjusted 6,450,674 MIG

37156472420FBD26ZZ02 MKRS – 84 Paving of Montsana internal road 2 Adjusted 518,178 MIG

37156472420FBD28ZZ17 MKRS – 85 Paving of Leruleng internal road 17 Adjusted 6,059,206 MIG

37156472420FBE07ZZ32 MKRS – 87 Paving of Madikwe (China section) internal roads

19 New 12,936,920 MIG

37156472420FBD69ZZ32 MKRS – 88 Paving of Ramoga internal roads 9 New 11,425,000 MIG

37156472420FBE12ZZ32 MKRS – 89 Vrede Storm water (Phase 1) 21 Adjusted 2,000,000 9,563,028 MIG

37156472420FBD67ZZ32 MKRS – 94 Paving of Tlokweng internal road 20 Adjusted 14,996,159 MIG

MKRS - 95 Lugkraal Internal road 22 Adjusted 1,315,656 MIG

Financial Year 2021/2022 – 2022/2023 37156472420FBE13ZZ32 MKRS – 90 Paving of Lerome (Thabeng

Section) internal road 15 New 15,460,174 2,990,714

MKRS – 91 Paving of Phalane internal road 26 New 16,537,516 2,990,714 MIG

37156472420FBE15ZZ32 MKRS – 92 Paving of Mononono internal road 8 New 16,537,515 2,990,714 MIG

MKRS – 93 Paving of Pella internal road (Phase 3) Moses Kotane Cemetery

18 New 26,000,000 MIG

Electricity: High Mast Lights

Financial Year 2020/2021 MSCOA Line Item No. Project No Project Description Ward Status 2020/2021 2021/2022 2022/2023 2023/2024 Funder 37206433020FBC97ZZ32 MKELC- 58 Energising of high mast lights

Moruleng (3) 9 Adjusted 183,735 MIG

37206433020FBD20ZZ01 MKELC- 74 Energising of high mast lights Goedehoop (1)

1 Adjusted 61,245 MIG

37206433020FBD21ZZ02 MKELC- 75 Energising of high mast lights Sesobe (1)

2 Adjusted 61,245 MIG

37206433020FBD24ZZ03 MKELC- 78 Energising of high mast lights Motlhabe (2)

6 Adjusted 122,490 MIG

37206433020FBC98ZZ209 MKELC- 79 Energising of high mast lights Moruleng (5)

32 Adjusted 306,225 MIG

37206433020FBD15ZZ17 MKELC- 80 Energising of high mast lights (Lerome) Leruleng, Phola Park, Mositwane (9)

17 Adjusted 551,205 MIG

37206433020FBD16ZZ11 MKELC- 82 Energising of high mast lights Phadi (4)

11 Adjusted 244,980 MIG

37206433020FBD16ZZ11 MKELC- 83 Energising of high mast lights Greater Ledig (7)

14/28/30 Adjusted 428,715 MIG

37206433020FBD18ZZ01 MKELC- 84 Energising of high mast lights Losmetjerie (4)

1 Adjusted 244,980 MIG

37206433020FBD19ZZ12 MKELC- 85 Energising of high mast lights Ramokokastad (5)

12 Adjusted 273,000

MIG

21

0

210

MSCOA Line Item No. Project No Project Description Ward Status Total Capital Budget Funder

2020/ 2021 2021/ 2022 2022/ 2023 2023/2024

37206433020FBD13ZZ02 MKELC- 86 Energising of high mast lights Khayakhulu (7)

2 Adjusted 428,715 MIG

37206433020FBE18ZZ15 MKELC- 89 Installation of high mast lights Mopyane (5)

34 New 1,727,796 MIG

37206433020FBE19ZZ15 MKELC- 90 Installation of high mast lights Ramotlhajwe (4)

2 Adjusted 1,629,155 MIG

37206433020FBE20ZZ15 MKELC- 91 Energising of high mast lights David Katganel (4)

2 Adjusted 1,836,744 MIG

37206433020FBE21ZZ15 MKELC- 92 Installation of high mast lights Pitsedisulejang (5)

2 New 1,962,763 MIG

37206433020FBE22ZZ15 MKELC- 93 Installation of high mast lights Letlhakeng (5)

2 New 1,727,796 MIG

37206433020FBE23ZZ15 MKELC- 94 Installation of high mast lights Ramokgolelwa(3)

2 Adjusted 1,360,653 MIG

MKELC- 101 Installation of high mast lights Ramokokastad (5)

12 Adjusted 720,000 MIG

MKELC- 102 Energizing of high mast lights & community halls constructed in prior years

2,817,913 MIG

Financial Year 2021/2022 37206433020FBE24ZZ15 MKELC- 95 Installation of high mast lights

Bapong - 4 25 New 1,866,095 MIG

37206433020FBE25ZZ15 MKELC- 96 Installation of high mast lights Pella 19 New 1,874,821 MIG

37206433020FBC89ZZ13 MKELC- 97 Installation of high mast lights Mabele a Podi - 3

13 New 960,000 MIG

37206433020FBE03ZZ15 MKELC- 98 Installation of high mast lights Masekolane - 2

3 New 960,000 MIG

37206433020FBE17ZZ15 MKELC- 99 Installation of high mast lights Greater Ledig - 17

14/28/30 New 7,832,169 MIG

37206433020FBE04ZZ15 MKELC- 100 Installation of high mast lights Molatedi - 3

1 New 1,410,874 MIG

Financial Year 2022/2023 MKELC- 106 Installation of high mast lights

Dwarsberg/Dinokaneng 1 New 2,280,000 MIG

MKELC- 107 Installation of high mast lights Uitkyk

4 New 2,280,000 MIG

MKELC- 108 Installation of high mast lights Molorwe

6 New 2,280,000 MIG

MKELC- 109 Installation of high mast lights Mapaputle

6 New 2,280,000 MIG

21

1

211

MSCOA Line Item No. Project No Project Description Ward Status Total Capital Budget Funder

2020/ 2021 2021/ 2022 2022/ 2023 2023/2024

MKELC- 110 Installation of high mast lights Ntswanalemetsing

8 New 2,280,000 MIG

MKELC- 111 Installation of high mast lights Lerome (Mositwana East)

17 New 2,280,000 MIG

Institutional Development

Financial Year 2020/2021 – 2021/2022 34256473520FBE06ZZ12 MKID- 85 Phola Park Community Hall 17 New 9,040,420 MIG

MKID - 86 Mogwase Fresh Produce Market 33 New MIG

Ramokoka Community Hall 12 328,547 MIG

Mogwase Trading stalls 33 566,100

Sports / Parks / Recreation: Community Services

Financial Year 2020/2021 – 2021/2022 35306456020CCC03ZZHO MKSAC – 19 Purchasing of bush cutters & lawn

mowers Mogwase Ongoing OPEX

35306473520FBE41ZZ12 MKSAC – 30 Upgrading of Mogwase Sports Park 33 Adjusted 11,455,409 MIG

MKSAC - 31 Upgrading of Mogwase Sports Park Phase II

33 New 9,665,126 MIG

MKSAC – 32 Upgrading of Madikwe Sports Park 19 New 8,875,390

MIG

Solid Waste and Environment : Community Services

Financial Year 2020/2021 – 2022/2023 35356450020FBD87ZZ19 MKSWE - 01 Rehabilitation of Madikwe Landfill Site 19 New 3,000,000 3,076,847 20,000,000 MIG

Good Governance, Community Consultation & Communication

Financial Year 2020/2021 – 2021/2022

MKCP – 01 2018/2019 IDP/PMS/Budget review Public Participation

Ongoing 4,000,000 3,193,884 OPEX

MKCP – 08 Letsema Ongoing 500,000 444,366 OPEX

MKCP – 09 Business Awareness Ongoing 2,000,000 2,000,000 OPEX

MKCP – 10 Physically Challenged / Disabled Ongoing 500,000 500,000 OPEX

MKCP – 11 Youth Programmes Ongoing 1,000,000 1,000,000 OPEX

21

2

212

MADIBENG LOCAL MUNICIPALITY

DESCRIPTION WARDS BUDGET 2022/23 BUDGET 2023/24 BUDGET 2024/25 Funding Source

KLIPGAT EXTENTION WATER SUPPLY 24,8,36,37 R 6 000 000,00 R 15 000 000,00 MIG

HEBRON/ KGABALATSANE/ ROCKVILLE/ITSOSENG/ WATER 10,15,16,41 R 9 000 000,00 R 30 000 000,00 R 55 000 000,00 MIG

AUGMENTATION OF WATER SUPPLY THROUGH EXPLORATION OF UNDERGROUND WATER

ALL R 15 000 000,00 R 30 000 000,00 R 55 000 000,00 MIG

KLIPGAT SANITATION ( RETICULATION AND PACKAGE PLANT) 24,8,36,37 R 23 500 000,00 R 20 000 000,00 R 55 000 000,00 MIG

WARD 1 VIP TOILETS 1 R 16 000 000,00 R 25 000 000,00 MIG

VIP TOILETS 34 R 8 000 000,00 R 10 000 000,00 MIG

VIP TOILETS 27 R 22 000 000,00 MIG

UPGRADING OF MOTHOTLUNG OUTFALL SEWER 20 R 30 000 000,00 R 10 000 000,00 MIG

UPGRADING OF OUKASIE OUTFALL SEWER 13;14;22, R 25 000 000,00 R 30 300 000,00 MIG

HIGH MASS LIGHT ENERGISING 10,15,16,41 R 1 500 000,00 R - MIG

HIGH MASS LIGHT (Solar energy) ALL WARDS R 32 000 000,00 R 55 000 000,00 R 38 000 000,00 MIG

BAPONG CONNECTOR ROAD 28 R 7 550 000,00 R - MIG

UPGRADING OF MOTHOTLUNG ROMAN CHURCH SECTION INTERNAL ROAD 20 R 7 250 000,00 R - MIG

UPGRADING OF ITSOSENG INTERNAL ROADS: CEMETERY ROAD 16 R 7 550 000,00 R - MIG

UPGRADING OF KGABALATSANE INTERNAL ROAD: FREEDOM ROAD 10 R 14 853 933,73 MIG

UPGRADING OF INTERNAL ROADS OF CLUSTER 5 ( MAPANTSOLENG ROAD) 11 R 11 000 000,00 MIG

UPGRADING OF INTERNAL ROADS OF CLUSTER 4 (Madibeng Hills Ext of Taxi Road)

3,8,24,36,37 R 8 000 000,00 R - MIG

UPGRADING OF INTERNAL ROADS OF CLUSTER 6 ( Jericho Taxi Road)(Sephai 23/24)

1,2 R 7 550 000,00 R 12 000 000,00 MIG

LETHABONG INTERNAL TAXI ROUTE 5 R 10 860 000,00 R - MIG

MMAKAU WARD 17 POLONIA INTERNAL ROAD 17 R 12 330 000,00 R - MIG

REHABILITATION AND RESEALING OF TAXI ROUTE- LETLHABILE 9,11,12,38,35 R 8 000 000,00 R 8 000 000,00 R 8 000 000,00 MIG

REHABILITATION AND RESEALING OF TAXI ROUTE- MOTHOTLUNG 20,21 R 8 000 000,00 R 8 000 000,00 R 8 000 000,00 MIG

REHABILITATION AND RESEALING OF TAXI ROUTE- OUKASIE 13,14,22 R 8 000 000,00 R 8 000 000,00 R 8 000 000,00 MIG

REHABILITATION AND RESEALING OF TAXI ROUTE- DAMONSVILLE 21 R 1 500 000,00 R 6 500 000,00 MIG

21

3

213

REHABILITATION AND RESEALING OF TAXI ROUTE- BRITS 23 R 3 500 000,00 MIG

REHABILITATION AND RESEALING OF TAXI ROUTE- HARTEBEES 30 R 1 500 000,00 MIG

MMAKAU LIBRARY 17,18,19 R 2 000 000,00 MIG

OUKASIE TAXI RANK 13,14,39;22 R 1 500 000,00 MIG

MADIBENG SMME DEVELOPMENT HUB- BRITS ALL WARDS R 2 500 000,00 MIG

MADIBENG SPECIALIESD VEHICLES FOR WASTE MANAGEMENT ALL WARDS R 8 500 000,00 MIG

KLIPGAT FIRE STATION 3,8,24,36 R 10 000 000,00 MIG

OUKASIE CEMETERY 12,14,22 R 15 000 000,00 R - MIG

UPGRADING OF VUKA INTERNAL ROADS IN OUKASIE 39 R 17 398 956,63 MIG

UPGRADING OF KL TO CHECKERS ROAD MABOLOKA 6 R 14 113 078,88 MIG

MMAKAU WARD 18 CLINIC ROAD 18 R 8 180 000,00 MIG

MMAKAU WARD 19 ROAD ( FROM CHIPPA TO MAUMONG STORE RING ROAD)

19 R 7 720 000,00 MIG

FORMALISATION OF HEBRON STREAM AND STORMWATER 15;16 R 12 000 000,00 R 20 000 000,00 MIG

UPGRADING OF MOTHOTLUNG PHASE 2 ROAD ( Ext 2 TO THARI) 20,21 R 9 500 000,00 MIG

OUKASIE PHASE 5 ROAD 13,14,22 R 8 000 000,00 MIG

LEGONYANE INTERNAL ROAD 1 R 7 550 000,00 MIG

DLTC UPGRADE 13,14,39,22 R 1 500 000,00 MIG

UPGRADING OF BRITS FIRE STATION 3,8,24,36 R 10 000 000,00 MIG

BRITS FRESH PRODUCE MARKET 17,18,19 R 2 000 000,00 MIG

MABOLOKA SPORTS FACILITY PHASE 2 5 R 1 800 000,00

MIG

UPGRADING OF LETLHABILE SPORTS FACILITY 3;11;12 R 5 000 000,00 R 10 000 000,00 MIG

UPGRADING OF MOTHOTLUNG SPORTS FACILITY 20;21 R 5 000 000,00 R 10 000 000,00 MIG

PMU OPERATION MANAGEMENT R 9 464 066,27 R 10 409 964,49 R 10 703 000,00 MIG

TOTAL MIG R 324 408 000,00 R 339 702 000,00 R 355 973 000,00 MIG

LETHLABILE SUBSTATION R 45 500 000,00 R 25 000 000,00 R 26 123 000,00 INEP

TOTAL CAPITAL EXPENDITURE R 369 908 000,00 R 364 702 000,00 R 382 096 000,00

21

4

214

KGETLENG-RIVIER LOCAL MUNICIPALITY

MIG 2022-23 FY PROJECTS

ITEM PROJECT NAME BUDGETED AMOUNT FOR 2022-23 FY

1

Construction of Precast Flushing Toilets in Reagile Ext 8 R11 645 895.7

2 Upgrading of Borolelo storage facility R4 423 918.44

3

Construction of Internal roads & stormwater in Reagile ext 6&7 R11 533 385.86

Total allocation R27 603 200

WSIG 2022-23 FY PROJECTS

ITEM PROJEC NAME BUDGETED AMOUNT FOR 2022-23 FY

1 Replacement of AC pipes in Koster R17 000 000.00

2 Upgrading of boreholes in Derby R5 000 000.00

3 Upgrading of Borolelo Booster Pump Station R5 000 000.00

4 Construction of elevated tank in Koster WTP R5 000 000.00

5 Construction of Koster raw water bulk pipeline R10 000 000.00

Total allocation R42 000 000.00

21

5

215

SECTOR PLANS PROJECTS LIST

SOCIAL DEVELOPMENT

1. PROGRAMME

: OLDER PERSONS

SERVICE POINT NO. OF BUSINESS PLANS SUBMITTED

NO OF SLAs SIGNED

NO. OF SLAs IN PAYMENT

ALLOCATED BUDGET

EXPENDITURE YTD % EXPENDITURE

BUDGET BALANCE

CATEGORY

NO

1. MORETELE Service Clubs 6 0 0 876 000.00 599 999.80 68% 276 000.20

Service

Centres

-

-

-

-

-

-

-

Old Age

Homes

- - -

- - -

-

2. MADIBENG Service Clubs 0 472 000.00 80 400.00 17% 391 600.00

Service

Centres

- - - - - - -

Old Age

Homes

2 1 1 3 143 800.00 2 670 800.00 85% 473 000.00

3. KGETLENG Service Clubs 2 2 1 183 000.00 183 000.00 100% 0

Service

Centres

- - - - - - -

21

6

216

Old Age

Homes

2 2 1 1 693 000.00 1 459 729.56 86% 233 270.44

4. MOSES KOTANE Service Clubs 2 0 0 0 1 024.00 0% -1 024.00

Service

Centres

- - - - - - -

Old Age

Homes

- - - - - - -

5. RUSTENBURG Service Clubs 0 0 0 0 40 641.60 0% -40 641.60

Service

Centres

1 01 0 267 886.00 267 886.00 100% 0

Old Age

Homes

2 0 0 2 041 561.00 1 671 242.72 82% 370 318.28

SUB TOTAL 20 4 4 8 677 247.00 6 911 723.36 80% 1 765 523.64

2.PROGRAMME

HIV & AIDS

SERVICE POINT NO. OF BUSINESS PLANS SUBMITTED

NO OF SLAs SIGNED

NO. OF SLAs IN PAYMENT

ALLOCATED BUDGET

EXPENDITURE YTD % EXPENDITURE BUDGET BALANCE

CATEGORY

NO

MORETELE HCBC 2 2 2 2 308 176.00 2 308 176.00 100%

0

MADIBENG HCBC 4 4

4 5 985 360.00 5 985 360.00

100%

0

21

7

217

KGETLENG HCBC 1 1 1 1 633 392.00 1 633 392.00 100%

0

MOSES KOTANE HCBC 4 4 4 4 874 808.00 4 874 808.00 100%

0

RUSTENBURG HCBC 3 3 3 4 436 476.00 4 436 476.00 100%

0

SUB TOTAL 14 14 14 19 238 212.00 19 238 212.00 100%

0

3.PROGRAMME

PERSONS WITH DISABILITIES

SERVICE POINT NO. OF BUSINESS PLANS

SUBMITTED NO OF SLAs SIGNED

NO. OF SLAs IN PAYMENT

ALLOCATED BUDGET

EXPENDITURE YTD % EXPENDITURE BUDGET BALANCE

CATEGORY

NO

MORETELE PERSONS

WITH

DISABILITY

1 1 1

487 000.00 426 753.16 88%

60 246.84

MADIBENG PERSONS WITH DISABILITY

1 1 1 400 000.00 350 734.76 88% 49 265.24

KGETLENG PERSONS WITH DISABILITY

1 1 1 286 000.00 233 633.36 82% 52 366.64

MOSES KOTANE PERSONS WITH DISABILITY

1 1 1 500 000.00 468 908.52 94% 31 091.48

RUSTENBURG PERSONS WITH DISABILITY

2 1 1 4 063 000.00 3 431 180.00 84% 631 820.00

SUB TOTAL 6 5 5 5 736 000.00 4 911 209.80 86% 824 790.20

21

8

218

4. PROGRAMME

CHILD CARE & PROTECTION

SERVICE POINT NO. OF BUSINESS PLANS SUBMITTED

NO OF SLAs SIGNED

NO. OF SLAs IN PAYMENT

ALLOCATED BUDGET

EXPENDITURE YTD % EXPENDITURE BUDGET BALANCE

CATEGORY

NO

MORETELE Drop in centre - - - - - - -

CYCC - - - - - - -

CPO - - - - - - -

MADIBENG Drop in centre - - - - - - -

CYCC 2 2 0 2 400 000 2 116 000.00 88% 284 000

CPO 1 1 1 552 069 279 344.50 51% 272 730

KGETLENG Drop in centre - - - - - - -

CYCC - - - - - - -

CPO - - - - - - -

MOSES KOTANE Drop in centre - - - - - - -

CYCC - - - - - - -

CPO - - - - - - -

RUSTENBURG Drop in centre - - - - - - -

CYCC 2 2 2 6 240 000 6 560 000.00 100% -320

21

9

219

CPO 4 4 4 3 163 002 775 630.25 25% 2 387 872

SUB TOTAL 9 2 0 9 403 002 7 335 630.25 78% 0

5. PROGRAMME

FAMILY CARE AND SUPPORT

SERVICE POINT NO. OF BUSINESS PLANS SUBMITTED

NO OF SLAs SIGNED

NO. OF SLAs IN PAYMENT

ALLOCATED BUDGET

EXPENDITURE YTD % EXPENDITURE BUDGET BALANCE

CATEGORY

NO

MORETELE Family

preservation

-

MADIBENG Family

preservation

01 01 1 1 288 800.00 953 912.00 74% 334 888.00

KGETLENG Family

preservation

- - - - - - -

MOSES KOTANE Family

preservation

- - - - - - -

RUSTENBURG Family

preservation

01 01 01 1 471 100.00 1 471 100.00 100% 0

SUB TOTAL 02 02 01 2 759 900 2 425 012.00 88% 334 888.00

6. PROGRAMME

VEP

SERVICE POINT NO. OF BUSINESS PLANS SUBMITTED

NO OF SLAs SIGNED

NO. OF SLAs IN PAYMENT

ALLOCATED BUDGET

EXPENDITURE YTD % EXPENDITURE BUDGET BALANCE

22

0

220

CATEGORY

NO

MORETELE VES 1 1 1 700 000.00 356 760.00 51%

343 240.00

MADIBENG VES 2 2 2 1 850 000.00 1 430 544.00 77% 419 456.00

KGETLENG VES - - - - - - -

MOSES KOTANE VES 2 2 2 1 200 000.00 930 099.00 78% 269 901.00

RUSTENBURG VES 2 2 2 1 330 000.00 679 140.00 51% 650 860.00

SUB TOTAL 07 07 07 5 080 000.00 3 396 543.00 67% 1 683 457.00

7. PROGRAMME

SUBSTANCE ABUSE

SERVICE POINT NO. OF BUSINESS PLANS SUBMITTED

NO OF SLAs SIGNED

NO. OF SLAs IN PAYMENT

ALLOCATED BUDGET

EXPENDITURE YTD % EXPENDITURE BUDGET BALANCE

CATEGORY

NO

MORETELE PREVENTION

PROGRAMME

01 01 01

600 000.00 445 289.50 74%

154 710.50

MADIBENG PREVENTION PROGRAMME

0 0 0 0 0 0%

0

KGETLENG PREVENTION PROGRAMME

0 0 0 0 0 0 0

MOSES KOTANE PREVENTION PROGRAMME

01 01 01 450 000.00 340 500.00 76% 109 500.00

RUSTENBURG PREVENTION PROGRAMME

0 0 0 0 0 0% 0

SUB TOTAL 02 02 02 1 050 000.00 785 789.50 75% 264210.50

22

1

221

8. PROGRAMME

RESTORATIVE JUSTICE

SERVICE POINT NO. OF BUSINESS PLANS SUBMITTED

NO OF SLAs SIGNED

NO. OF SLAs IN PAYMENT

ALLOCATED BUDGET

EXPENDITURE YTD % EXPENDITURE BUDGET BALANCE

CATEGORY

NO

MORETELE SOCIAL CRIME

PREVENTION

0 0 0 0 0 0 0

MADIBENG SOCIAL CRIME

PREVENTION

01 01 01 450 000.00 337 425.00 75%

112 575.00

KGETLENG SOCIAL CRIME

PREVENTION

0 0 0 0 0 0 0

MOSES KOTANE SOCIAL CRIME

PREVENTION

0 0 0 0 0 0 0

RUSTENBURG SOCIAL CRIME

PREVENTION

0 0 0 0 0 0 0

9. PROGRAMME

COMMUNITY DEVELOPMENT

SERVICE POINT NO. OF BUSINESS PLANS SUBMITTED

NO OF SLAs SIGNED

NO. OF SLAs IN PAYMENT

ALLOCATED BUDGET

EXPENDITURE YTD % EXPENDITURE BUDGET BALANCE

CATEGORY

NO

MORETELE CNDC 2 2 0 2 534 827.18 2 346 224.89 93%

188 602.29

MADIBENG CNDC 2 2 0 1 403 618.36 1 026 420.76 73% 377,197.60

22

2

222

KGETLENG CNDC 1 1 0 701 809.18 513 206.90 73% 188 602.28

MOSES KOTANE CNDC 3 3 0 2 047 475.25 794 259.19 39% 1 253 216.06

RUSTENBURG CNDC 3 3 0 2 227 978.74 1 297 367.29 58% 930 611.45

SUB TOTAL 11 11 0 8 915 708.71 6 007 479.74 67% 2 908 228.97

10. PROGRAMME

ECD & PARTIAL CARE

SERVICE POINT NO. OF BUSINESS PLANS SUBMITTED

NO OF SLAs SIGNED

NO. OF SLAs IN PAYMENT

ALLOCATED BUDGET

EXPENDITURE YTD % EXPENDITURE BUDGET BALANCE

CATEGORY

NO

MORETELE Equitable 0 4 4 920 000.00 919 986.80 100% 13.20

Conditional 0 4 4 1 650 000.00 1 649 086.90 100% 913.00

MADIBENG Equitable 10 0 0 2 000 000.00 1 820 632.00 91% 179 368.00

Conditional 20 4 2 5 000 000.00 2 210 340.00 44% 2 789 660.00

KGETLENG Equitable 7 7 2 1 100 000.00 831 402.00 76% 268 598.00

Conditional 5 5 2 1 080 000.00 1 079 061.20 100% 938.80

MOSES KOTANE Equitable 18 4 0 2 500 000.00 1 540 701.80 62% 959 298.20

Conditional 14 0 0 1 000 000.00 1 010 922.00 101% -10 922.00

RUSTENBURG Equitable 17 1 0 2 000 000.00 1 702 522.80 85% 297 477.00

22

3

223

Conditional 10 0 0 1 725 000.00 1 724 488.00 100% 512.00

SUB TOTAL 101 21 14 18 975 000.00 14 489 143.50 76% 4 485 856.50

22

4

224

LOCAL MUNICIPALITY’S PRIORITIES

The priorities of the district municipality are directly influenced by the priorities of

its five (05) local municipalities. As a category C municipality, Bojanala Platinum

District Municipality is responsible for supporting service delivery initiatives

undertaken by its local municipalities within the district:-

Kgetleng Rivier

Madibeng

Moretele

Moses Kotane, and

Rustenburg.

The priorities tabulated here below, arise from the commonly identified needs of

communities at ward level and submitted to the district municipality to inform planning

at local and district level. The needs reflected in the tables below are the District

Priorities as a cumulative priorities of local municipalities

MUNICIPALITY PRIORITIES

1 2 3 4 5

Kgetlengrivier Water &

Sanitation

Roads and

Storm-water

Local Economic

Development

Township

Establishment

Amenities

Madibeng Roads &

Stormawater

Water &

Sanitation

Land & Housing Electricity Social Services

Moretele Water Housing Internal Roads Stormwater

Drainage

High Mast

Lights

Moses Kotane Water &

Sanitation

Roads &

Stormwater

Sports &

Recreation

Municipal

Budget

allocated to

Projects

Institutional

Development

Rustenburg Water &

Sanitation

Roads &

stormwater

Electricity Land & Housing Sustainable

Rural

development

22

5

225

THE DISTRICT-WIDE PRIORITIES

It is evident from the submissions received by our local municipalities that all the

priorities are not our District functions. Our main function as a District Municipality

is to support our local municipalities.

Should a request be received from our local municipalities indicating that they

need to be supported as per our District Functions, a Memorandum of

Understanding between the local municipality as well as the District Municipality

shall be entered into which will detail how the project or support shall unfold, who

shall be responsible for what and when.

22

6

226

SECTION H

13 THE DISTRICT DEVELOPMENT MODEL

The District Development Model (DDM) is an operational model for improving

cooperative governance aimed at building a capable, ethical, and developmental

State. It embodies an approach by which the three spheres of government and state

entities work collaboratively in an impact-oriented way, and where there is higher

performance and accountability for coherent service delivery and development

outcomes. Furthermore, the DDM is an intergovernmental approach focusing on 52

district and metropolitan spaces as IGR impact zones for more effective joint planning,

budgeting, and implementation over multi-year planning and electoral cycles. Although

each sphere, sector, or entity has its distinct constitutional powers, functions, and

responsibilities, they cooperate and undertake collaborative planning, budgeting, and

implementation processes converging developmental efforts at the

district/metropolitan level. Accordingly, this joint work is expressed through the

formulation and implementation of a “One Plan” which is a long-term strategic

framework guiding investment, service delivery, and development in relation to each

of the district and metropolitan spaces.

In strengthening Cooperative Governance, the Constitution places an obligation on

National and Provincial Government to work with Local Government: Section 154 of

the Constitution:

“The national government and provincial government, by legislative and other

measures, must support and strengthen the capacity of municipalities to manage

their own affairs, to exercise their powers and to perform their functions.”

The adoption of the district development model presents us with an opportunity to

partner with all three spheres of government; society and the communities we serve.

This model enables us to:

22

7

227

a) Continue implementing our existing constitutional framework whilst

strengthening the regulatory framework for Cooperative Governance

b) Reinforce Local Government and its proximity to communities

c) Distinction between long-term and Medium-term Strategic Planning /

Implementation Mechanisms

d) Build on Existing Good Practices

The district development model tries to solve:

1. Solve the Silos at a horizontal and vertical level.

2. Narrow the distance between the people and government by strengthening

the coordination role and capacities at the District and City levels as it is the

penultimate sphere closer to the people afterward and local.

3. Deliver Integrated Services whilst strengthening Monitoring and Evaluation

and impact at district and local levels.

4. Ensuring inclusive and gender mainstreamed budgets based on the needs

and aspirations of our people and communities at a local level.

5. Maximising impact and aligning resources at our disposal.

6. Changing the face of our rural and urban landscapes by ensuring

complementarity between urban and rural development, with a deliberate

emphasis on Local Economic Development.

7. Ensure sustainable development whilst accelerating initiatives to promote

poverty eradication, employment, and equality.

The model is not new. It is not presenting anything new, but simply taking us to our

Constitutional basics mandate, where we were tasked to:

a). provide a democratic and accountable government for local communities;

b). ensure the provision of services to communities in a sustainable manner;

22

8

228

c). promote social and economic development;

d). promote a safe and healthy environment, and

e). encourage the involvement of communities and community organizations in

the matters of local government.

Mutual Beneficial Partnerships with Institutions of Traditional Leadership

Crucial to the implementation of the DDM, will be the building of systemic and mutually

beneficial partnerships with institutions of Traditional Leadership. This includes the

active involvement of Traditional Leaders in developing One Plan. Furthermore,

through programmes such as the Agrarian Revolution, the Community Work

Programme, and other development initiatives, traditional leaders will be integral

partners in process of implementation

By crowding in public, private, and not for profit investments to a district locality, in an

all-inclusive manner as directed by one plan, the model aims at maximizing impact

whilst capitalizing on a window of opportunity (over the next twelve to eighteen

months) whilst addressing the ‘burning’ and ‘stabilization’ challenges faced by local

municipalities who are seen as critical building blocks towards the realization of the

objectives of the model and the development aspirations of our people. By laying a

solid foundation in the short term a long-term, spatially relevant plan for South Africa

will be secured through the sum total of the District Implementation Plans into the One

Plan, which aligns and mutually reinforces the District Plans. In so doing the One Plan,

will:

Focus on the District/Metropolitan spaces as the appropriate scale and arena for

intergovernmental planning and coordination.

Focus on the 44 Districts + 8 Metros as developmental spaces (IGR Impact Zones)

that will be strategically aligned platforms for all three spheres of government.

Produce a Spatially Integrated Single Government Plan (as Intergovernmental

Compact) for each of the spaces that guides and directs all strategic investment

22

9

229

spending and project delivery across government and forms the basis for

accountability.

Reinforce an outcomes-based IGR system where there is a systematic IGR

programme and process associated with the formulation and implementation of a

single government plan.

Take development to our communities as key beneficiaries and actors of what

government does.

Single Joined-Up plans will take the form of prioritized spatial expressions over the

long term and will be divided into 5 and 10-year implementation plans supported by

annual operation plans, which will be based on commonly agreed diagnostics,

strategies, and actions. Each sphere and sector department will have to elaborate in

more detail their own plans and actions.

The content of the Plans will elaborate on the key transformation processes required

to achieve long-term strategic goals and the desired future in each of the 44 districts

and 8 metro spaces.

DDM FOCUS AREAS

FOCUS AREA 1: FEW ECONOMIC INFRASTRUCTURE PROJECTS THAT

REQUIRE UNBLOCKING

FOCUS AREA 2: KEY CATALYTIC PROJECTS

FOCUS AREA 3: SPATIAL RESTRUCTURING AND ENVIRONMENTAL

SUSTAINABILITY

FOCUS AREA 4: KEY PROJECTS THAT ARE AIMED AT STIMULATING AN

DIVERSIFYING THE ECONOMY

FOCUS AREA 5: IMMEDIATE LG STABILIZATION AND INSTITUTIONAL

STRENGTHENING ACTIONS

23

0

230

DDM HIGH IMPACT PROJECTS

No. Project Name Project

Objective

Lead Total

Budget

Required

Budget

Committed

2021/22

Budget

Committed

202/23

Budget

Committed

2023/24

Duration

of

Project

Local

Municipality

Focus

Area

1 Development of

Klipvoor Dam as a

Bulk Water

Provision of

Water Supply

BPDM 3.5

Billion

0 0 0 3 years Moretele LM

and Madibeng

LM

1

2 Development of

Molatedi Dam as Bulk

Water Scheme

Provision of

Water Supply

BPDM 1.5 0 0 0 3 years Moses Kotane

and Kgetleng-

Rivier LM

3 Replacement of aged

water Infrastructure

Reduce

interruption of

services and

increase

water quality

BPDM 200

million

Over 3

years

All LM’s

4 Upgrading of Brits

Water Treatment

Works

Provision of

water supply

BPDM 300

million

Over 3

years

Madibeng LM

5 Upgrading of

Electrical Main-Sub

Provision of

water supply

BPDM 50

million

Over 2

years

Kgetleng-Rivier

LM

23

1

231

Station in

Swartruggens and

Derby

6 Waste to energy Provision of

electricity

BPDM 13 billion Over 3

years

All LM’s

7 Bojanala SEZ

Mogwase

SEZ is aimed

at

transforming

the Bojanala

region into a

sustainable

hub for PGM

minerals,

capital

equipment,

renewable

energy

components.

BPDM 3 billion 50 years Moses Kotane

LM

23

2

232

8 Rustenburg Tertiary

Hospital

To improve

the level of

health care

BPDM 3 billion 3 years Rustenburg

9 Marikana Housing

Project (3000 units).

To provide

formal

housing and

social

facilities

BPDM 500

million

2 years Rustenburg

10 Rustenburg Airport

Development

To promote

local tourism,

training

facilities for

aviation and

job creation

BPDM 32

million

10 years Rustenburg LM

23

3

233

SECTION I

14 GENDER-BASED VIOLENCE & FEMICIDE

The National Strategic Plan (NSP) on Gender-Based Violence and Femicide (GBVF)

sets out to provide a cohesive strategic framework to guide the national response to

this scourge. Recognizing the significance of preventing GBV, the NSP also draws

from the White Paper on Safety and Security as the overarching policy framework for

safety, crime, and violence prevention in the country and builds onto the six themes it

has identified. Furthermore, the NSP recognizes the strategic relevance of addressing

GBV as key to all seven priority areas that South Africa has identified for the next five

years

14.1 LEGISLATIVE AND POLICY FRAMEWORK TO RESPOND TO GBV IN SOUTH

AFRICA

The Constitution of South Africa sets the framework for an effective legislative

response to GBV: Chapter 1 positions human dignity, the achievement of equality, and

the advancement of human rights and freedoms as well as non-racialism and non-

sexism are founding principles. Chapter 2 affirms equality, human dignity, life,

freedom, and security of the person. These rights underscore a national commitment

to building a society that is free from all forms of violence and that respects, protects,

and fulfills the human rights principles of bodily integrity and autonomy. A number of

policies and legislation are in place to respond to GBV:

1. The National Crime Prevention Strategy (NCPS) 1996 establishes crimes of

violence against women and children as a national priority.

2. The Criminal Law Amendment Act 105 of 1997 establishes mandatory

minimum sentences for certain rapes.

3. The Criminal Procedure Second Amendment Act 85 of 1997 allows for bail

conditions to be tightened in cases of those charged with rape.

23

4

234

4. 4 The Domestic Violence Act 116 of 1998 sets out to offer options to victims of

abuse through identifying certain obligations on law enforcement bodies and

making provision for interim protection orders.

5. The Criminal Law (Sexual Offences and Related Matters) Amendment Act 32

of 2007 codified and broadened the definition of rape and other sexual offenses

and introduced new offenses that relate to GBV, including using or exposing

children to child pornography and pornography (both off- and online). It provides

for the National Policy Framework on the Management of Sexual Offences

Matters, 2012.

6. The Criminal Law (Sexual Offences and Related Matters) Amendment Act 6 of

2012 was passed to provide for effective prosecution and conviction of

offenders. The National Development Plan, the Integrated Social Crime

Prevention Strategy (2011), and the White Paper on Safety and Security.

14.2 PRINCIPLES

The Principles that guide the implementation of the NSP's programmes are:

1. A multi-sectoral approach to optimally harness the roles, responsibilities,

resources, and commitment across government departments, different tiers of

government, civil society, movements, youth structures, development

agencies, the private sector, academic institutions, and all stakeholders;

2. Complementing and augmenting existing strategies, instruments, and national

initiatives on GBVF and overall safety in the country;

3. Active and meaningful participation of communities, civil society, movements,

and those most affected by GBVF in the design, implementation, monitoring,

and evaluation of the strategic plan;

4. A visionary, gender-responsive, and transformative approach that takes

account of inequality and gender-driven differences driving GBVF, and the need

for men specifically, to transform;

5. A human rights-based, survivor-centered approach to the provision of services

that reaches all, without the risk of financial hardship;

23

5

235

6. An inter-generational, youth-friendly approach;

7. Progressive realization of outcomes through the prioritization of reforms and

strategic partnerships to address wider systemic challenges;

8. Forward-looking towards co-creation of social cohesion underpinned by

respect, compassion, and human dignity for all;

9. Mutual accountability for changes recognizing that meeting these outcomes

requires government, civil society, communities, social movements, the private

sector, development partners, and all stakeholders to work together to drive the

agenda forward;

10. Inclusiveness, embracing diversity and Intersectionality, recognizing the

importance of being rooted in women’s experiences who are most marginalized

by poverty, race, age, disability, sexual orientation, sexual identity, gender

identity, and nationality

23

6

236

The NSP sets out to achieve the following outcomes over the next five years:

Pillar One:

Accountability,

Coordination, and

Leadership

Five-Year Outcomes

1.1. Bold leadership strengthened accountability across government and society that responds to GBVF

strategically with clear messaging and adequate technical and financial resources;

1.2. Strengthened multi-sectoral coordination and collaboration across different tiers of government and

sections of society based on relationships of trust that give effect to the pillars of the NSP.

Pillar Two: Prevention

and Rebuilding Social

Cohesion

2.1. Strengthened delivery capacity in South Africa to roll out evidence-based prevention programmes;

2.2. Changed behavior and social norms within key groups as a result of the rollout of evidence-based

prevention interventions;

2.3. Shifts away from toxic masculinities towards embracing positive alternative approaches for expressing

masculinities and other sexual and gender identities, within specific communities/groups;

2.4. Optimally harnessed VAC programmes that have an impact on GBV eradication;

2.5. Increased cross-fertilization and integration of prevention interventions on violence against LGBTQIA+

persons with broader GBVF prevention and violence prevention interventions;

2.6. Strengthened programming that addresses the restoration of human dignity, build caring communities,

and responds to historic and collective trauma;

2.7. Public spaces are made safe and violent free for all, particularly women and children.

23

7

237

Pillar Three: Justice,

Safety and Protection

3.1. All GBV survivors are able to access efficient and sensitive criminal justice that is quick, accessible,

responsive, and gender-inclusive;

3.2. Strengthened capacity within the criminal justice system to address all impunity, effectively respond to

femicide, and facilitate justice for GBV survivors;

3.3. Amended legislation related to GBV areas that build on legislative reforms initiated under the

Emergency Response Action Plan.

Pillar Four: Response,

Care, Support and

Healing

4.1. Strengthened existing response, care, and support services by the state and civil society in ways that

are victim-centered and survivor-focused to facilitate recovery and healing;

4.2. Secondary victimization is eliminated through addressing specific individual and systemic factors that

drive it;

4.3. Victims feel supported by the system to access the necessary psychosocial, material, and other support

required to assist them with their healing;

4.4. Strengthened community and institutional responses to provide integrated care and support to GBVF

survivors and their families that take into account linkages between substance abuse and HIV and AIDS.

Pillar Five: Economic

Power

5.1. Accelerated initiatives that address women’s unequal economic and social position, through access to

government and private sector procurement, employment, housing, access to land, financial resources, and

income other generating initiatives;

23

8

238

5.2. Safe workplaces that are free of violence against women and LGBTQIA+ persons, including but not

limited to sexual harassment;

5.3. Demonstrated commitment through policy interventions, by the South African state, private sector, and

other key stakeholders to eliminate the impact of economic drivers of GBV;

5.4. Strengthened child maintenance and related support systems to address the economic vulnerability of

women

Pillar Six: Research and

Information Management

6.1. Improved understanding of the extent and nature of GBVF, broadly and in relation to specific groups

and forms in South Africa; 6.2. Adoption of GBV policies and programming interventions that are informed

by existing evidence-based research;

6.3. GBVF related information across different government management information systems, is readily

used to address systemic challenges and facilitate effective solutions and responses

23

9

239

14.3 STRATEGIES:

The outcomes listed above directly flow from the overarching high-level strategies

that will be used to drive the GBVF national agenda in the country over the next 10

years:

a) Strengthening state and societal accountability, at all levels, driven by bold

leadership and high-level political commitment

b) Driving prevention, addressing harmful social and gender norms, facilitating

healing and rebuilding social cohesion;

c) Locating response to GBVF as integral to responding to violence, poverty, and

inequality;

d) Widening the lens, deepening the understanding, and rooting the response in

communities

14.4 IMPLEMENTATION MODALITIES:

The roles and responsibilities of various stakeholders to accelerate, advance, and

realize the vision and outcomes of the strategic plan are outlined below:

The National Council on Gender-based Violence and Femicide (NCGBVF), a

national multi-sectoral structure championed by the President and mandated

through the Summit declaration, is the custodian of the plan and plays the role

of strategic oversight for the realization of the national outcomes outlined in

the plan;

Parliament to ensure that the Structure is governed by a statutory framework;

The NCGBVF reports to the President through the Minister in the Presidency

for Women, Youth, and Persons with Disabilities;

The Presidency to ensure government allocates adequate resources for the

optimal functioning of the Structure;

Guided by the NCGBVF, the secretariat, which will have the required sectoral

proficiencies, and will drive technical support in rolling out the six pillars;

24

0

240

The Minister in the Presidency for Women, Youth, and Persons with

Disabilities provides the overall coordination of the Inter-Ministerial Committee

(IMC), government departments, and processes in ensuring the successful

implementation of the GBVF NSP;

The new structure should be inclusive, with at least 51% of its members

coming from civil society

Respective government departments, as articulated in respective sections of

the plan, will align related outputs within their respective five-year strategic

plans

The Presidency, led by the Department of Women, Children, and Persons with

Disabilities (DWYPD), will facilitate institutional coherence across

government;

The Commission for Gender Equality (CGE), as a chapter 9 institution with a

constitutional mandate to promote respect for gender equality, and the

protection, development, and attainment of gender equality will regularly

assess and monitor progress in the implementation of the GBVF NSP.

The Secretariat and strategic partners will support respective structures in

embedding and aligning the plan within their institutional arrangements;

The Structure shall regularly monitor and evaluate the NSP using a monitoring

and evaluation tool to be developed and adopted within six (6) months after

its establishment;

Harmonization of laws and policies, respective standardization of

implementation frameworks, comprehensive sector-wide monitoring and

evaluation (M&E) system, and integrated management information systems

will contribute to facilitating delivery on and accountability for the NSP.