appendix 1: metric conversion table

22
APPENDIX 1: METRIC CONVERSION TABLE Area Volume Mass Density Velocity Energy 1 in.= 25.44 mm [approximately 25 mm, then (mm/100) x 4=in.] 1ft= 304.8 mm (approximately 300 mm) 1 yd = 0.914 m (approximately 910 mm) 1 mile= 1.609 km (approximately H km) 1m= 3.281 ft= 1.094 yd (approximately 1.1 yd) (10m= 11 ydapproximately) 1 km = 0.621 mile (f mile approximately) 1 ftl = 0.093 m 2 1 yd 2 = 0.836 m 2 1 acre= 0.405 ha [1 ha (hectare)= 10 000 m 2 ] 1 mile 2 = 2.590 km 2 1 m 2 = 10.764 ft 2 = 1.196 yd 2 (approximately 1.2 yd 2 ) 1 ha = 2.4 71 acres (approximately 2! acres) 1 km 2 = 0.386 milel 1 ft 3 = 0.028 m 3 1 yd 3 =0.765 m 3 1m 3 = 35.315 ft 3 = 1.308 yd 3 (approximately 1.3 yd 3 ) 1 ft 3 = 28.32litre (1000 litre= 1m 3 ) 1 gal= 4.546litre llitre = 0.220 gal (approximately 4! litre to the gallon) 1lb = 0.454 kg (kilogram) 1 cwt = 50.80 kg (approximately 50 kg) 1 ton= 1.016t[l tonne= 1000kg=0.984ton] 1 kg= 2.205lb (approximately 2-!-lb) llb/ft 3 = 16.019 kg/m 3 1 kg/m 3 = 0.062lb/ft 3 1 ft/s = 0.305 m/s 1 mile/h = 1.609 km/h 1 therm= 105.506MJ 1 Btu= 1.055 kj 340

Upload: khangminh22

Post on 23-Jan-2023

1 views

Category:

Documents


0 download

TRANSCRIPT

APPENDIX 1: METRIC CONVERSION TABLE

Area

Volume

Mass

Density

Velocity

Energy

1 in.= 25.44 mm [approximately 25 mm, then (mm/100) x 4=in.]

1ft= 304.8 mm (approximately 300 mm) 1 yd = 0.914 m (approximately 910 mm)

1 mile= 1.609 km (approximately H km) 1m= 3.281 ft= 1.094 yd (approximately 1.1 yd)

(10m= 11 ydapproximately) 1 km = 0.621 mile (f mile approximately)

1 ftl = 0.093 m2

1 yd2 = 0.836 m2

1 acre= 0.405 ha [1 ha (hectare)= 10 000 m2]

1 mile2 = 2.590 km2

1 m2 = 10.764 ft2 = 1.196 yd2 (approximately 1.2 yd2)

1 ha = 2.4 71 acres (approximately 2! acres) 1 km2 = 0.386 milel

1 ft3 = 0.028 m3

1 yd3 =0.765 m3

1m3 = 35.315 ft3 = 1.308 yd3 (approximately 1.3 yd3)

1 ft3 = 28.32litre (1000 litre= 1m3)

1 gal= 4.546litre llitre = 0.220 gal (approximately 4! litre to the gallon)

1lb = 0.454 kg (kilogram) 1 cwt = 50.80 kg (approximately 50 kg) 1 ton= 1.016t[l tonne= 1000kg=0.984ton] 1 kg= 2.205lb (approximately 2-!-lb)

llb/ft3 = 16.019 kg/m3

1 kg/m3 = 0.062lb/ft3

1 ft/s = 0.305 m/s 1 mile/h = 1.609 km/h

1 therm= 105.506MJ 1 Btu= 1.055 kj

340

Thermal 1 Btu/ft2 h °F = 5.678 W /m2 °C conductivity

Temperature X°F=t(x-32)°C

Pressure

X°C=-!x+ 32°F 0 °C = 32 °F (freezing) 5°C=41 °F

10 °C =50 °F (rather cold) 15 °C = 59°F 20°C= 68 °F (quite warm) 25°C=77°F 30 °C = 86 °F (very hot)

1lbf/in.2 = 0.0069 N/mm2 = 6894.8 N/m2

(1 MN/m2 = 1 N/mm2)

1lbf/ft2 = 47.88 N/m2

1 tonf/in. 2 = 15.44 MN/m2

1 tonf/ft2 = 107.3 kN/m2

For speedy but approximate conversions

1 lbf/ftl = kN/m2 hence 40 lbf/ft2 = 2 kN/m2

20,

and tonf/ft2 = kN/m2 x 10, hence 2 tonf/ft2 = 20 kN/m2

341

Floor loadings office floors - general usage: 50 lbf/ft2 = 2.50 kN/m2

office floors- data-processing equipment: 70 lbf/ft2 = 3.50 kN/m2

factory floors: 100 lbf/ft2 = 5.00 kN/m2

Safe bearing 1 tonf/ft2 = 107.25 kN/m2

capacity 2 tonf/ft2 = 214.50 kN/m2

of soU 4 tonf/ft2 = 429.00 kN/m2

Stresses 100 lbf/in.2 = 0.70 MN/m2

in 1000 lbf/in. 2 = 7.00 MN/m2

concrete 3000 lbf/in.2 = 21.00 MN/m2

6000 lbf/in.2 = 41.00 MN/m2

Costs £1/m2 = £0.092/ft2

1 shilling (5p)/ft2 = £0.538/m2

£1/ft2 = £10. 764/m2 (approximately £11/m2)

£2.50/ft2 = £27/m2

£5/ft2 = £54Im2

£7.50/ft2 = £81/m2

£10/ftl = £108/m2

Y-.1 ~

N

APPE

NDIX

2: OC

CUPA

NCY

COST

ANA

LYSIS

: HOM

E FO

R TH

E AG

ED

(BUILD

ING M

AINTE

NANC

E CO

ST IN

FORM

ATION

SER

VICE)

BU

ILD

ING

TYP

E:

Old

Peo

ple'

s Ho

me i

n U

rban

Are

a O

WN

ER/O

CC

UPI

ER:

Soci

al S

ervi

ces

Dep

artm

ent

REG

ION

: In

land

Pro

vinc

ial

Town

D

ATE

OF

EREC

TIO

N:

1968

UPPE

R M

AN

AG

EMEN

T C

RIT

ERIA

To h

ave

brig

ht a

nd c

omfo

rtab

le s

urro

undi

ngs

for

resi

dent

s;

Safe

ty o

f pe

rson

nel;

To k

eep

wit

hin

pred

eter

min

ed c

ost

leve

ls;

To m

aint

ain

a C

apit

al A

sset

.

Estim

ate:

Cos

t co

ntro

l:

BU

DG

ET P

RO

CED

UR

E Fo

reca

st e

stim

ates

of

mai

nten

ance

rec

omm

ende

d by

the

Cou

nty

Arc

hite

ct a

re p

repa

red

annu

ally

and

the

se a

re

subm

itted

to

the

Dir

ecto

r of

Soc

ial

Serv

ices

for

app

rova

l.

Com

petit

ive

tend

ers

are

invi

ted

for

all

mai

nten

ance

wor

ks a

nd i

f w

ithi

n th

e su

ms

incl

uded

in

the

budg

et,

cont

ract

s ar

e pl

aced

. An

y te

nder

s in

exc

ess

of t

he s

um i

nclu

ded

in e

stim

ates

are

rev

iew

ed b

y th

e Co

mm

ittee

and

onl

y ap

prov

ed i

f th

e ad

diti

onal

fin

ance

can

be

met

from

sav

ings

fro

m o

ther

ite

ms.

MA

INTE

NA

NC

E M

AN

AG

EMEN

T A

ND

OPE

RA

TIO

N

Res

pons

ibil

ity:

R

espo

nsib

ilit

y fo

r th

e m

aint

enan

ce o

f al

l Co

trnty

Cou

ncil

's p

rope

rtie

s is

ves

ted

in t

he C

ount

y A

rchi

tect

. T

otal

est

ate:

Th

e bu

ildi

ngs

whi

ch f

orm

the

sub

ject

of

this

par

ticu

lar

surv

ey a

re t

he m

ain

buil

ding

, ga

rage

blo

ck a

nd

hand

ym<m

's ho

use.

R

outin

e in

spec

tion

s:

Reg

ular

vis

its

are

mad

e to

the

pre

mis

es b

y B

uild

ing

Surv

eyor

s of

the

Cou

nty

Arc

hite

ct's

Dep

artm

ent,

but

min

or m

aint

enan

ce i

s ca

rrie

d ou

t on

a r

equi

siti

on b

asis

by

the

head

of

the

prem

ises

. Pa

inti

ng f

requ

enci

es:

The

prem

ises

are

nor

mal

ly r

epai

nted

ext

erna

lly

ever

y fi

ve y

ears

and

int

erna

lly

ever

y se

ven

or e

ight

yea

rs.

Cos

t re

cord

s an

d fe

edba

ck:

The

Dir

ecto

r of

Soc

ial

Serv

ices

has

a s

taff

who

kee

p a

cons

tant

che

ck o

n ex

pend

iture

to

ensu

re t

hat

it i

s co

ntai

ned

wit

hin

the

budg

et.

Dir

ectl

y em

ploy

ed l

abou

r:

The

only

dir

ectl

y em

ploy

ed l

abou

r is

a m

obile

tea

m o

f gr

ound

smen

ope

rati

ng u

nder

the

dir

ecti

on o

f th

e Cm

rnty

Est

ates

Off

icer

and

Val

uer.

Wor

k do

ne b

y DE

L:

NIL%

and

con

trac

ted

out

100%

Fo

rms

of c

ontr

act:

St

anda

rd f

orm

of

fixe

d pr

ice

cont

ract

dev

ised

by

the

Coun

ty C

ounc

il C

ontr

act

supe

rvis

ion:

All

bui

ldin

g w

ork

is c

arri

ed o

ut u

nder

the

dir

ecti

on o

f th

e Co

unty

Arc

hite

ct's

Div

isio

nal

Bui

ldin

g Su

rvey

or a

nd s

uper

vise

d by

the

Are

a B

uild

ing

Surv

eyor

con

cern

ed.

~

""'"' ~

BU

ILD

ING

FU

NC

TIO

N

Spac

e us

e:

Main

use

s; r

esid

enti

al a

ccom

mod

atio

n, b

edro

oms,

sitt

ing

room

s, di

ning

adm

inis

trat

ion

etc

Num

ber

of o

ccup

ants

: O

rigi

nall

y de

sign

ed f

or 4

0 re

side

nts

with

two

uni

ts o

f fa

mily

acc

omm

odat

ion

for

Mat

ron

and

Ass

ista

nt

Mat

ron

and

one

hand

yman

. D

esig

n cr

iter

ia:

The

buil

ding

was

ere

cted

as

an O

ld P

eopl

e's

Home

to

conf

orm

to

stan

dard

s la

id d

own

by t

he D

epar

tmen

t of

Soc

ial

Serv

ices

.

Stru

ctur

e:

Ext

erna

l w

alls

: W

indow

s: Ro

of:

Inte

rnal

par

titi

ons:

Fl

oor

stru

ctur

e:

Floo

r fi

nish

es:

Fitt

ings

& fi

xtur

es:

Inte

rnal

dec

orat

ion:

FOR

M O

F C

ON

STR

UC

TIO

N

Load

bear

ing

bric

k w

alls

, pr

ecas

t co

ncre

te f

loor

bea

ms.

Cav

ity b

rickw

ork

and

som

e tim

ber

wind

ow w

alli

ng.

He ta

l T

iled

and

low

pit

ched

ove

r m

ain

bloc

k, f

lat

and

asph

alt

cove

red

over

sin

gle

stor

ey.

Mai

nly

light

wei

ght

bloc

k.

Prec

ast

conc

rete

bea

ms.

Vin

yl t

ilin

g m

ainl

y, q

uarr

y ti

le i

n ki

tche

n.

Fitt

ed w

ardr

obes

and

han

d ba

sins

in

bedr

oom

s Em

ulsio

n an

d vi

nyl

wal

l co

veri

ng.

Ext

erna

l de

cora

tion:

G

loss

pai

nt.

Plum

bing

: Co

pper

and

gal

vani

se.

Hea

ting

and

vent

ilat

ing:

O

il f

ired

low

pre

ssur

e ho

t w

ater

. L

ifts

and

esc

alat

ors:

Ele

ctri

c pa

ssen

ger

lift

to

firs

t fl

oor.

O

ther

M&E

ser

vice

s:

None

Gro

ss f

loor

are

a:

1,69

2 2 m

m2

PAR

AM

ETER

S

Hei

ght

to r

idge

H

eigh

t to

eav

es

6.70

0 m

Sto

reys

abo

ve (

and

incl

udin

g) g

roun

d fl

oor

2 No

. A

rea

of p

itch

ed r

oofs

(on

pla

n)

418

Are

a of

fla

t ro

ofs

(on

plan

) 85

8 m

A

rea

of e

xter

nal

glaz

ing

259

m 2 2

5.26

0 m

Flo

ors

belo

w g

roun

d fl

oor

NIL

Floo

r to

cei

ling

hei

ght

Are

a of

ext

erna

l w

orks

6,

949

m2

CO

tA'II

ENTS

2. 5

90 m

w ......

......

Elem

mt

Tot

al£

FINA

NCIA

L ST

ATEM

ENT

FOR

YEAR

19

72/7

3

Gro

ss f

loor

are

a: ..

. 1.>.?

.9.2 ..

.... m

>

Cos

t per

100

m>

floc.

-ar

ea

Bri

ef d

escr

ipti

on

of

wo

rk

I 0. ~--· &

odop

tetio

ns

IE N

il

IE-N

il

I 1

---------

--

-1.

D

ecor

atio

n 1.

1 Ex

tern

al d

ecor

atio

n 65

3.71

38

.63

1.2

In

tern

al d

eco

rati

on

10

4.94

6.

20

Sub-

tota

l E

75

8.65

£

44.8

3 2.

Fa

lwic

2

1 Ex

ta-n

al w

alls

19

.31

1.14

2.2

Roo

fs

20.9

7 1.

24

'

2.3

O

ther

str

uct

ura

l ite

ms

9.88

0.

59

2.4

F

itti

ng

s &

fix

ture

s 83

.59

4.94

2.5

Inte

rnal

fin

ish

es

18.5

8 1.

10

Sub-

tota

l £

152.

33

£ 9.

01

3.

Ser

vice

s 3.

1 P

lum

bing

& i

nte

rnal

dra

inag

e 40

.12

2.37

3.2

Hea

ting

& v

enti

lati

ng

69.4

7 4.

11

Ser

vici

ng a

nd r

epai

rs t

o b

oil

er b

urne

rs a

nd p

umps

3.3

lift

s &

esc

alat

ors

118.

53

7.01

M

aint

enan

ce s

ervi

ce a

nd n

ew l

ift

safe

ty r

epai

rs

3.4

E

lect

ric

po

wer

& l

igh

tin

g

77.4

4 4.

57

Gen

eral

rep

airs

and

rep

lace

men

ts

3.5

Oth

er M

& E

sur

face

s 42

.00

2.48

R

epai

rs a

nd s

ervi

cing

to

kitc

hen

equi

pmen

t

Sub-

tota

l £

347.

56

E

20.5

4 4.

C

leon

ing

4.1

Win

dow

s 29

.20

1. 73

4.2

Exte

rnal

sur

face

s -

-4.

3 In

tern

al

7,62

9.21

45

0.90

Sub·

tot•

l rJ

,658

.41

£ 45

2.63

UJ

~

v.

5.

Uti

liti

es

5.1

Gas

5.2

Ele

ctri

ci tv

5.3

Fuel

oil

5.4

Solid

fue

l

5.5

W

ater

rat

es

5.6

E

fflu

ents

& d

rain

age

char

ges

Sub·

tota

l

6.

Ad

min

istr

ati

ve

co

sts

6. 1

S

ervi

ces

atte

nd

ants

6.2

Laun

dry

6.3

Port

erag

e

6.4

Secu

rity

6.5

R

ub

bis

h d

isp

osa

l

6.6

Pro

pert

y m

anag

emen

t

Sub·

tota

l

7.

Ove

rhea

ds

7.1

Pro

per

ty i

nsu

ran

ce

7.2

R

ates

Sob-

tota

l

TO

TA

L

Exte

rnal

are

a i\J?

.l.'.'"()J

(.?ClCl

CJn2

8.

Ext4

WIIa

l w

orks

8.1

Rep

airs

& d

eco

rati

on

8.2

E

xter

nal

se

rvic

es

8.3

Cle

anin

g

8.4

G

ard

enin

g

Ext

erna

l W

orks

To

tal

£

210.

59

12.4

5

392.

41

23.1

9

875.

77

51.7

6

--

195.

44

11.5

5

--

1:1.

,674

.21

£ 98

.95

--

417.

13

24.6

5

248.

96

14.7

1

248.

96

14.7

1

--

--

£ 91

5.05

£

54.0

7

97.6

4 5.

77

1 ,3

94. 2

5 82

.40

£1

491.

89

£ 88

.17

£12,

998.

10

£ 76

8.20

Ext

erna

l w

orks

C

ost

per

10

0m

2 B

rief

des

crip

tio

n o

f w

ork

Tot

al£

of e

xter

n a

I ar

ea

53.7

0 0.

77

Nil

Nil

£

APPE

NDIX

3: OC

CUPA

NCY

COST

ANA

LYSIS

: OFFI

CE B

LOCK

(BU

ILDING

MAIN

TENA

NCE

COST

INFO

RMAT

ION S

ERVIC

E) B

UIL

DIN

G T

YPE:

OF

FICE

BLO

CK

OW

NER

/OC

CU

PIER

: CE

NTRA

L GO

VERN

MENT

REG

ION

: ST

EVEN

AGE,

HERT

FORD

SI-IIR

E D

ATE

OF

EREC

TIO

N:

1964

UPPE

R M

AN

AG

EMEN

T C

RIT

ERIA

The

buil

ding

is

mai

ntai

ned

to e

nsur

e th

e he

alth

, sa

fety

and

wel

fare

of

the

staf

f in

ord

er t

o pr

eser

ve a

hig

h le

vel

of e

ffic

ienc

y in

dea

ling

wit

h m

embe

rs of

the

pub

lic

and

to r

eali

se t

he b

uild

ing'

s ec

onom

ic l

ife,

est

imat

ed t

o be

60

yea

rs.

BU

DG

ET P

RO

CED

UR

E

Est

imat

e:

Est

imat

es a

nnua

lly

for

mai

nten

ance

job

s ov

er £

250,

rem

aind

er f

rom

bul

k es

tim

ate

cove

ring

all

bui

ldin

gs i

n de

pot

esta

te a

nd b

ased

on

expe

ndit

ure

in t

he p

revi

ous

year

s.

Bud

get:

Ann

ual

prov

isio

n of

fun

ds b

ased

on

esti

mat

es.

Cos

t C

ontr

ol:

Yea

rly

com

pute

r pr

into

ut o

f ex

pend

iture

on

the

buil

ding

. tt

mth

ly r

evie

w t

o re

conc

ile

expe

ndit

ure

and

com

mitm

ent

wit

h bu

dget

.

MA

INTE

NA

NC

E M

AN

AG

EMEN

T A

ND

OPE

RA

TIO

N

Res

pons

ibil

ity:

~bin D

epot

Sup

erin

tend

ent

Tot

al e

stat

e:

All

Cen

tral

Gov

ernm

ent

buil

ding

s w

ithi

n D

epot

Are

a co

veri

ng m

ainl

y N

& E

Her

tfor

dshi

re a

nd

Stev

enag

e d

istr

icts

. R

outin

e in

spec

tion

s:

Yea

rly.

Pa

inti

ng f

requ

enci

es:

Ext

erna

l 4

yrs.

In

tern

al 8

yrs

. C

ost

reco

rds

and

feed

back

: A

nnua

l co

mpu

ter

prin

tout

of

mai

nten

ance

cos

t on

eac

h co

ded

buil

ding

. D

irec

tly

empl

oyed

lab

our:

A

ppro

x 4

hour

s pe

r w

eek.

Trad

es:

Boi

ler

Att

enda

nt

Nun

ber:

I 1

Ince

ntiv

e sc

hem

es:

Whe

re t

he d

irec

tly

empl

oyed

lab

our

forc

e is

ltli

ed .

~Q ••

~ is

add

ed t

o ba

sic

labo

ur r

ates

and

cos

t of

mat

eria

ls e

x-st

ore.

W

ork

done

by

DEL

.. l .

. % an

d co

ntra

cted

out

•.•

•• %

I

Form

s of

con

trac

t: M

easu

rec

and

Day

wor

k Te

rm C

ontr

acts

and

com

peti

tive

ten

der

Con

trac

t su

perv

is,o

n: B

y lle

pot

Tec

hnic

al S

taff

~--·-------

I

BU

ILD

ING

FU

NC

TIO

N

Spac

e U

se:

C,ov

ernm

ent

Dep

arm

ent

Off

ices

(87

t O

ffic

e Sp

ace,

7%

Publ

ic S

pace

, 6%

Sta

ff f

acil

itie

s)

Num

ber

of o

ccup

ants

: 40

0 st

aff

Des

ign

crit

eria

:

Chan

ge o

f us

e:

Stru

ctur

e:

Ext

erna

l w

alls

: W

indow

s Ro

of:

Inte

rnal

par

titi

ons:

Fl

c·•or

str

uctu

re:

Floo

r fi

nish

es:

Cen

tral

Gov

ernm

ent

adm

inis

trat

ion

N/A

FOR

M O

F C

ON

STR

UC

TIO

N

Con

cret

e fr

ar1e

. ~bin el

evat

iort

. Pr

e-ca

st c

one.

pan

els.

En

d el

evat

ion

pate

nt c

oncr

ete

prof

iled

blo

ck a

t gr

ound

lev

el

with

fac

ing

bric

ks a

bove

· G

alva

nise

d st

eel

pain

ted.

A

sJ.lh

alt

on s

cree

d on

cas

t in

-sit

u co

ncre

te s

lab.

H

am p

arti

tion

s -

ligh

twei

ght

bloc

k pl

aste

red.

R

emai

nder

-"P

arar

ount

" or

sim

ilar

. C

ast

in s

itu

con

cret

e.

Fit

ting

s an

d fi

xtur

es:

Gen

eral

ly l

ino

wit

h so

me

viny

l ti

les.

Te

rraz

zo t

o to

ilet

s, s

tair

s an

d la

ndin

gs.

Bui

lt i

n so

ftwoo

d ca

shie

rs d

esks

. ~~tal gr

ille

s ov

er.

Inte

rnal

dec

orat

ion:

E

ruls

ion

wal

ls.

Oil

pai

nt w

oodw

ork.

E

xter

nal

deco

ratio

n:

Oil

pai

nt t

o w

indo

ws

and

fram

es.

Plum

bing

: Se

rvic

es c

oppe

r pi

pe.

Wat

er m

ain

cast

iro

n.

Dra

inag

e ca

st i

ron.

H

eatin

g an

d ve

ntil

atin

g: 2

l\o.

Oil

fir

ed L

01v P

ress

ure

hot

wat

er b

oile

rs e

ach

1,55

4,00

0kJ

(tot

al 3

,108

,000

kJ)

1 lio

. 8

pass

enge

r 54

4 kg

. 1

Ko.

10 p

asse

nger

/goo

ds 7

14 k

g.

Lif

ts a

nd e

scal

ator

s:

Oth

er M

& E

serv

ices

: N

il

Gro

ss f

loor

are

a:

5515

Are

a of

pit

ched

roo

fs (

on p

lan)

••.

•.•.

•..

Are

a of

fla

t ro

ofs

(on

plan

) .•

•.•.

. !~~

~ ..

Are

a of

,ext

erna

l gl

azin

g ••

••••

•..•

!~?~

..

PAR

AM

ETER

S

m2

Hei

ght

to r

idge

2

J!l m2

!I

eigh

t to

eav

es .

. l3,

0 ••

.•..

ll

.O

m

m

m2

Are

a of

ext

erna

l wo

rks~

~?~ •

• m2

CO

MM

ENTS

Stor

eys

abov

e (a

nd i

nclu

ding

gro

und

floo

r).4

.• N

o. Fl

oors

bel

ow g

roun

d fl

oor

.!.~~~~!~~-~~~~l ..

No.

Floo

r to

cei

ling

hei

ght

.•. ~'

:'. ~1

!1 •••

••••

••••

••••

•••••••••••••••••••••••••••••••••••••••••••••••

ll

Oth

er r

elev

ant

data

: lt

:tor

ised

sto

rage

rac

king

ins

tall

ed f

or L

and

Reg

istr

y at

cos

t of

£7,

000.

w

ould

be

take

n aw

ay i

f bu

ildi

ng u

se c

hang

ed.

This

is

rem

ovab

le a

nd

w ~

00

Elem

..,t

0.

lmpr

ovan

ento

& -

.,ca

tio

ns

1.

Dec

orat

ion

1.1

Ext

ern

al d

eco

rati

on

1.2

Inte

rnal

dec

ora

tio

n Su

b-to

tal

z. f*

ic

2.1

l;.lct

... na

l w

alls

2.2

Roof

s

2.3

O

ther

str

uct

ura

l ite

ms

2.4

Fit

tin

gs

& f

ixtu

res

2.5

Inte

rnal

fin

ish

es

Sub-

tota

l

3.

Ser

vice

s 3.

1 P

lum

bing

& i

nter

nal

ck'a

inag

e

3.2

Hea

ting

& v

entil

atin

g

3.3

Lift

s. &

esc

alat

ors

3.4

Elec

tric

pow

er &

lig

htin

g

3.5

Oth

er M

& E

surf

aces

Sub-

tota

l

4.

Cle

anin

g 4.

1 W

indo

ws

4.2

E

xter

nal

su

rfac

es

4.3

lnt!J

'nal

Sub-

tota

l

Tota

l £

£ 83

5.10

-26

90.0

0

£

- -47

3.00

42.0

0

437.

61

£

522.

ll

237.

87

50.0

0

81.8

5 -£

266.

80

-43

94.0

0

£

NOTE

: N

umbe

r o

f oc

cupa

nts

incr

ease

d to

5CO

FINA

NCIA

L ST

ATEM

ENT

FOR

YEAR

. ~9 .

?~(3 ..

... .

Gro

ss f

loor

•ea

: ...

. 5.5 ~

~ .....

.. m

'

Cos

t per

100

m'

Brie

f de

scri

ptio

n of

wor

k flo

or

area

£ 15

.14

Supp

ly a

nd f

ix a

ir c

ondi

tion

ers.

A

lter

par

titi

on

s.

-

53.6

7 G

ener

ally

thr

ough

out

2960

.00

£ 53

.67

- - 8.58

S

tair

rep

airs

0. 76

Su

ndry

not

iceb

oard

s pr

ovid

ed

7.93

P

last

er r

epai

rs p

rio

r to

re-

deco

rati

on

952.

61

£ 17

.27

9.47

H

ygie

ne t

reat

men

t.

Che

ck a

nd r

ewas

her

taps

.

4.31

B

oile

r fi

ttin

gs,

hea

ting

con

trol

s, c

heck

fue

l ga

uges

, re

pai

r va

lves

. 0.

91

lift

gat

es r

epai

red.

1.48

T

raci

ng a

nd r

epai

ring

fau

lts.

In

stal

l 13

arnp

soc

ket

ou

tlet

s.

-

891.

83

£ 16

.17

4.84

By

cli

ent

cont

ract

.

-No

off

icia

l pr

ovis

ion.

79.6

7 By

cli

ent

cont

ract

4660

.80

£ 84

.51

w ~

\0

5.

Uti

liti

es

5.1

Gas

5.2

Elec

trici

ty

5.3

Fuel

oil

5.4

Solid

fuel

5.5

W

ater

rat

es

5.6

E

fflu

ents

&:

dra

inag

e ch

arg

es

Sub

-tot

al

6.

Adm

inis

trat

ive

cost

s 6.

1 S

ervi

ces

atte

ndan

ts

6.2 Laun~

6.3

Porte

rage

6.4

Secu

rity

6.5

Rubb

ish d

ispos

al

6.6

Prop

erty

man

agem

ent

Sub

-tot

al

7.

Ovl

ll'ha

ods

7.1

Pro

per

ty i

nsu

ran

ce

7.2

Rates

Sub

-tot

al

TO

TA

L

Exter

nal a

rea

.... ~~8

.5 ...

....

. m'

8.

Ext

amo

lwar

ka

8.1

Repa

irs &

dec

orat

ion

8.2

E

xter

nal

serv

ices

8.3

Clea

ning

8.4

Gar

deni

ng

Ex

-1 W

orks

Tot

al

145.

00

1643

.00

2200

.00

-

845.

00

4833

.00

-

190.

98

-

1034

.80 -

2~81.56

£ 34

07.3

4

-8,

828.

52

£ 18

,828

.52

£36,

534.

10

Ext

erna

l w

orks

To

tal£

59.5

8

460.

35

-87

.56

£ 60

7.49

I 2.

63

Coo

king

29.7

9 G

ener

al

39.8

9 H

eati

ng

-

15.3

3 M

eter

ed s

uppl

y

87.6

4

-(D

EL B

oile

r ho

use

atte

ndan

t no

t in

clud

ed)

3.46

By

con

trac

t

-18

.76

Nig

ht W

atchm

an

-No

1111

al ru

bbis

h co

vere

d by

cle

anin

g (i

tem

4. 3

) &

rat

es

(7. 2

) pa

per

rubb

ish

by c

ontr

act

at n

o co

st.

39.5

6

I £

61.7

8

-No

ins

uran

ce .

I 34

1.41

A

sses

sed

cont

ribu

tion

.

£ 34

1.41

£

662.

45

Cos

t pe

r 10

0 m

2 B

rief

des

crip

tion

of w

ork

of e

xter

nal

area

1.27

Fe

nce

repa

irs,

roa

d m

arki

ngs.

9.83

D

rain

rep

airs

.

- 1.87

G

rass

cut

ting

.

£ 12

.97

APPENDIX 4: CLASSIFICATION OF MAINTENANCE OPERATIONS AND REPAIRS

Primary Code

1. External decoration 2. Internal decoration 3. Main structure

4. Internal construction

5. Finishes and fittings

6. Plumbing and sanitary services

7. Mechanical services including heating and ventilation and gas installations

Secondary Code

31. Foundations and basements 32. Frame 33. External walls, chimneys and flues

(excluding boiler flues) 34. External windows and doors includ-

ing glazing 35. Roofstructure 36. Roof coverings 3 7. Rooflights and glazing 38. Gutters and ramwater pipes

41. Ground floors (where not part of foundation slab)

42. Upper floors 43. Staircases and steps 44. Internal walls and partitions 4 5. Doors and screens including glazing

51. Ceiling finishes 52. Wall finishes 53. Floor finishes 54. Shelves, built-in furniture and

miscellaneous joinery 55. Ironmongery 56. Cloakroom and similar miscellaneous

fittings

61. Cold water service pipes, storage tanks, cisterns and valves

62. Hot water service pipes, storage tanks and cylinders, domestic boilers, valves and insulation

63. Sanitary fittings including taps and traps

64. Waste, soil and vent pipes

71. Boilers, firing, instrumentation and automatic controls, flues

72. Steam and hot water distribution including heat exchangers and heating appliances

Source: Department of the Environment, Maintenace Manuals for Buildings (H.M.S.O., 1970).

350

Primary Code Secondary Code

8. Electrical services and kitchen equipment (all types)

9. External and civil engineering works

0. Miscellaneous and ancillary works

73. Workshop equipment, lifting appli­ances and special industrial equip­ment

74. External water supply, treatment and storage plant

75. Lifts 76. Air conditioning, ventilation and

refrigeration 77. General utilities 78. Gas installations and equipment

(except kitchen equipment)

81. Electrical generation and prime movers

82. Electrical transmission and distri­bution

83. Electrical installations (wiring switch and control gear)

84. Electrical appliances and fittings (except kitchen equipment)

85. External lighting and airfield lighting 86. Lightning protection, EL V systems

and equipment 87. Kitchen equipment

91. Roads, car parks, parade grounds, hardstandings and runways

92. Paths, playgrounds and general paved areas

93. Fences, gates and boundary walls 94. Drains and ditches 9 5. Sewage disposal 96. Water storage tanks and reservoirs 97. Railway tracks, platform docks,

wharves and jetties, sea defence walls

98. Horticultural and arboricultural works

99. Miscellaneous external works

01. Adaptations and minor new works 02. Replacement of fire damage 03. Routine cleaning

351

INDEX

Abstracting 193 Accounts 215-16, 24Q-1, 247, 310-11 Agrement certificates 173-4 Air conditioning 125-6 Air locks 123 Air seasoning 68 Alkali resistant primers 114 Alterations, examples of 144-9

grants for 152-6 pricing of 213-15 scope of 141-52 sequence of 151-2

Aluminium sheeting 53 Ambrosia beetles 7 4 Analyses 285, 342-5 Antiquities 242 Approximate quantities estimates 201

-2, 204-5 Arbitration 242 Architect, access for 233

functions of 229 instructions of 231-2

Articles of agreement 227, 231 Asphalt floors 77 Asphalt measurement 196-7 Asphalt roofs 83-4, 332 Asphalt tanking 36 Assignment 235 Avoidable maintenance 2

Ball valves 119, 121 Garston 121

Banwell report 226 Bark pocket 69 Basements 35-6

353

Bedrock costs 274, 275 Billing 193-4 Bills of quantities 190-4, 228 Bills of quantities contracts 223 Bitumen-felt roofs 82-3, 333 Bituminous paints 57-8 Blistering of paintwork 111, 336 Block plans 260 Bloom 113 Blowing of plaster 101 Boiler, chimneys for 63-4, 124

hot-water 124 Bonus payments 317-18, 319 Boundaries 269 Boundary walls 39 Breakdown maintenance 277 Bricks, requirements for 330-1

specification of 178, 182 types of 42-3

Brickwork, cracks in 47-9 defects in 42-8 frost action on 46, 331 measurement of 195-6 moisture penetration in 55-7 mortars for 43-4, 48, 50, 331 pricing of 209-11 settlement of 46-7 specification of 187-9 stability of 47 stains in 45 sulphate attack on 45-6 supervision of 330-2

British Standards 170-2 Budgeting 273-7 Builders' accounts 215-16,24Q-1,247,

310-11

354 Index

Building, dangerous 265-6 inspection of 267-8 setting out of 325-6 supervision of 323-38

Building contracts 4, 221-4 Building control 249, 267-8 Building control officer 230, 267-8 Building incentive schemes 316-19 Building lines 265 Building Maintenance Cost Information

Service 285, 342-5 Building maintenance depots 298-9 Building managers 315 Building notices 267-8 Building operatives 315-16 Building records 283, 338 Building regulations 249-54 Building regulations applications 251-

3 Building regulations registers 253, 254,

267 Building reports 163-4 Building supervisors 315 Building surveyors 8, 315

Cables 126 Carpentry, supervision of 333-4

timbers 75, 79-80 Carpets 78 Catalogues 174, 312-13 Cement paint 57 Cement rubber latex flooring 78 Cellar fungus 71, 72 Certificates 220, 239-40, 244-5 Cesspools 129 Chain link fences 39 Chalkiness 101 Check 69 Chestnut pale fences 38 Chimneys 61-4 Chipped grain 70 Chlorinated rubber paint 57 Claddings 41-2, 52-3 Claims 245-6 CLASP 29 Clay floor tiles 77 Clean Air Act 266

Cleaning, execution of 135-6 Cleaning cycles 280-1, 305 Cleaning facilities 136 Cleaning frequencies 136 Cleaning of brickwork 49 Cleaning of flooring 136-7 Cleaning of kitchens 137 Cleaning of sanitary appliances 137 Cleaning of stonework 51-2 Cleaning of windows 136 Cleaning schedule 289 Clerk of works 230, 233, 323-5 Climbing plants 49 Close boarded fences 38 Code for the Measurement of Building

Work in Small Dwellings 191, 194-9

Codes of practice 172-3 Colourless repellent liquids 51 Colourless stone preservatives 51 Colourless waterproofers 58 Committed costs 275 Common furniture beetle 73, 74, 80 Completion 235, 236-7 Composite price rates 202, 204-5 Computer 282, 312-13 Concrete, aggregates for 330

curing of 229-30 gauging of 329 laying of 329 measurement of 195 mixing of 328-9, 330 pricing of 208-9 reinforcement of 329 specification of 182 supervision of 328-30

Concrete beds 76 Concrete flags 37-8 Concrete foundations 26-7, 328 Concrete frames 53-4 Concrete panels 52-3 Concrete paving 37 Concrete roof tiles 81 Condensation 58-61 Conduits 126 Coniophora cerebella 71, 72 Construction Industry Training Board

314

Contingency sum 182 Contract, building 220-1

conditions of 180-1 cost plus 221-2 determination of 237-8 Faculty of Architects and Sur-

veyors 243 form of 217-20 JCT conditions of 231-42 lump sum 223 maintenance 224-5 measure and value 222-3 package deal 223-4 parties involved in 229-30 remedies for breach of 219-20 schedule 222-3 target cost 222 types of 221-4 validity of 218-19

Contract documents 227-9, 232, 244 Contract drawings 228-9 Contract labour 296-8 Contract for minor works 242-3 Contract procedures 243-7 Contractor 229-30, 238 Conversions, grants for 153-4

scope of 148-9 Copper roofs 84, 333 Cork tiles 78 Cost analyses 285, 342-5 Cost benefit analysis 158-60 Cost classification 283-4 Cost control 276-7, 282, 283 Cost discounting 17, 19 Cost in use 15-19, 290 Cost plus contracts 221-2 Cost records 283-5 Cost yardsticks 12-13 Cowls 63 Cracks, causes of 11-12 Cracks in asphalt 83 Cracks in brick walls 47-8 Cracks in concrete and calcium silicate

bricks 49 Cracks in external renderings 106 Cracks in plaster 98, 99, 102 Cracks in shrinkable clay 22, 24, 25 Cracks in wall claddings 41-2

Index 355

Critical path method 313-14 Cube estimates 200-1 Cupping 70 Cycles, cleaning 280-1, 305

painting 108-9, 279-80 services 303

Damages 219, 237 Dampness, causes of 54-6

treatment of 56-8 Damp-proofing, specification of 182-

3, 189 Damp-proofing methods 56, 332 Dangerous buildings 265-6 Daywork 245, 310-11 Dead shores 25, 31-3, 35 Deadwood 69 Death watch beetle 73, 74 Decorations 107-14 Defective Premises Act 5, 267 Defects liability period 243 Demolition work 327-8 Department of the Environment 10 Depots 299-301

mobile 300-1 Design of buildings 12-14 Determination 237-8 Development 256 Development plans 258-9 Dew point 58 Dilapidations, liability for 160-1 Dilapidations schedule preparation

161-2, 166-7 Direct labour 296-8 Discoloration 112 Discounting costs 17, 19 District surveyor 230 Doors, defects in 95-7, 334

security of 130 specification of 185

Doorway, pricing of 214-15 Dormers 148 Dote 70 Double glazed windows 88, 89, 115 Dovecote 63 Drainage, defects in 128-9

easements for 269

356 Index

Drainage continued French 57 inspection of 267 land 57 measurement of 199 sealing old 327 setting out 326, 337 specification of 187 supervision of 337-8 testing 337-8

Drawings 228-9 Dry rot 68, 70-1, 72, 75, 80, 93-4

Easements 268-9 Economic life 11 Efflorescence 44-5, 100 Electrical installations, disconnecting

old services 327 fire risks in 131-2 measurement of 198

Electrical installations as PC item 187 Electrical installations regulations 267 Electrical installations requirements

126-7 Electro-osmosis damp-proofing 56 Elemental classification 350-1 Employer 229, 237-8 Emulsion paint 57 Enforcement notices 268 Engineered costs 275 Engineers 229 Entire contracts 220 Environmental works 155 Estimates, approximate 200-2, 204-5

approximate quantities 201-2, 204-5

conditions of 206 cube 200-1 floor area 200 preparation of 202-15 schedule of claim 166-7 storey enclosure 201 unit 201

Excavation, inspection of 267 measurement of 195 pricing of 207-8 supervision of 328

timbering to 328 Extension of time 237 Extractor fans 60, 61 Extraordinary traffic 265

Factories Acts 1, 2, 266 Faculty of Architects and Surveyors

short form of contract 243 Failures 14, 41 Fair wages 235 Fair wear and tear 161 Fencing, maintenance of 38-9

measurement of 199 Filters 125 Final account 247 Finishings 107 Fire alarms 133, 292 Fire precautions 131-4 Fire fighting arrangements 134 Fire fighting equipment 132-4, 292 Fire hazards 131-2 Fire insurance 292 Fire precautions 131-4 Fire Precautions Act 267 Fireplace, closing openings 64 Flanking transmission 85 Flashings 80 Flats 146, 147 Flood damage 137-8 Floor, floating 86, 121

hardwood strip 78 solid 76 sound insulation of 86 specification of 184, 186 suspended timber 75-6, 333-4 thermal insulation to 87 wood block 78

Floor area estimates 200 Floor cleaning 136 Floor coverings 76-9 Floor levels 326 Floor noises 75 Floor seals 78-9 Floor strutting 31, 35, 75 Floor tiles 77 Fluctuations 241, 246-7 Flue liners 46, 63

Flying shores 25, 32, 34 Food cupboards 185-6 Food Hygiene Regulations 266 Foreman 230, 233 Formula price adjustment 246-7 Foundations, inspection of 267

levels of 326 pedatified 30-1 requirements of 26-7

French drains 57 Frost precautions, brickwork 46, 331

concrete 24, 27 plumbing 119-21

Full cell process 68 Fungal attack 70-1, 333 Furniture beetle 73, 74, 80 Furring 124

Gantries 327 Garston ball valve 121, 123 Gas installations 127-8 General development order 257, 259 Glass 115, 184 Glazing, measurement of 198-9

pricing of 211-12 supervision of 336

Glazing requirements 114-15 Granolithic floors 76 Grants, buildings and plant 290-2

improvement 152-6 payment of 155-6

Grass cutting 38 Gravel 36 Grit blasting 51 Ground beams 30 Gutters 80, 333

Hand pumps 134 Health and Safety at Work Act 6 Heating requirements 60, 61 Heating systems 124, 144 High alumina cement 54 Highways Act 264-5 Hoardings 327 Hot water supply 123-4, 336-7 House longhorn beetle 73, 74, 80

Index 357

Hygrometer 60

Improvement, environmental works 155

Improvement grants 152-6 Improvement lines 265 Improvements, scope of 141-52 Incentive schemes 316-19 Incinerators 128 Industrial development certificates

258 Information systems 282-3 Injunction 219-20 Injury to persons and property 235-6 Insect attack 71, 73-4 Insecticides 73, 74 Inspection chambers 338 Inspection cycles 278-9 Inspection of building work 267-8 Insulation, sound 84-7

thermal 60, 87-9, 266, 333 Insurance 236,290-2 Intermediate grants 154-5 Internal finishings 107 Interstitial condensation 58, 61, 88 Iron 98 Ironmongery 97 Ivy 49

Jacking 30 Job cards 308 Joinery, defects in 93-7

measurement of 197 pricing of 211 supervision of 334

Joint Contracts Tribunal 227

Kiln seasoning 68 Kitchen cleaning 136 Kitchen improvements 143, 185-6 Knots 69 Knotting 111, 335

Labour, direct 296-8 oncosts 206-7

358 Index

Land drains 57 Layout plans 260 Lead roofs 84, 333 Liability for maintenance 4-6 Lichens 49 Lifts 129 Lighting 127 Linoleum 77 Lives of buildings 10-11, 16 Local government operational research

unit 6, 83, 279 Local plans 259 Lofts 148 Luminaires 127 Lump sum contracts 223 Lyctus powder post beetle 73, 74

Magnesium oxychloride floorings 78 Maintenance, avoidable 2

breakdown 277 budgeting for 273-7 computerised 282 definition of 1 economics of 19-20 elemental classification of 350-1 nature of 8-10 organisation of 304, 305-13 planned 277-82

corrective 2, 277 preventive 2, 277

predictable 2 shut down 277 significance of 2-3 standards of 272-3 supervision of 323-38 technology of 11-12 training for 314-16 unplanned 2

Maintenance contracts 224-5 Maintenance cost records 283-5 Maintenance cycles 303 Maintenance data 282-5 Maintenance depots 299-301 Maintenance incentive schemes 316-

19 Maintenance liability 4-6 Maintenance manuals 285-90

Maintenance needs 6-7 Maintenance planning 270-l Maintenance policy formulation 27 I-

2 Maintenance programme 301-3, 305,

313-14 Maintenance research 10 Maintenance resources 7-8 Manholes 129, 339 Manuals 285-90 Measure and value contracts 222-3 Measurement procedures 190-9 Measurement units 194-9 Merulius lacrymans 68, 70-1, 72, 75,

80, 93-4 Metalwork, corrosion of 48-9, 97-8

measurement of 198 painting of 110, 111

Metrication 14-15, 340-1 Mining subsidence 29-31 Mobile depots 300-1 MOATS 177 Modernisation of dwellings 144-7 Mortars 43-4, 48, 50, 331 Moulds 49, 100

National Building Specification 175-6 Newtonite 57 NHBC scheme 4 Noises, floor 75

hot water supply 123-4 plumbing 121-2

Normalised level difference 85

Occupancy cost analyses 285, 342-5 Office development permits 258 Offices, Shops and Railway Premises

Act 266 Open cell process 68 Operating costs 274 Organisation 298-9, 304, 305-13 Outline applications 260-1 Overflows 118, 123 Overheads 207 Oxidation 83

Package deal contracts 223-4 Paint primers 111, 114 Paint removers 110 Painting, blistering of 111, 336

defects in 108 discoloration in 112 measurement of 199 metalwork 111 pricing of 205-6, 212-13 quality of 108 specification of 184, 185 supervision of 335-6

Painting asbestos cement 114 Painting cycles 108-9, 279-80 Painting of ceilings 113-14, 336 Painting of masonry 114 Painting of steelwork 110, 111, 335 Painting of walls 113-14, 336 Painting of woodwork 109-13, 335-6 Painting procedures 107-14 Paints, bituminous 57-8

cement 57 chlorinated rubber 57 emulsion 57, 113 specification of 183-4

Paperhanging 336 Paraffin heaters 59 Pattern staining 114 Pavings 36-8 Pebble dashing 57, 103, 104-5, 106 Performance specifications 177-8 Permitted development 257-8 Petroleum storage 266 Pipes, classification of 179

drain 129, 337 easements for 269 service 118, 119, 120, 121, 122,

336-7 Planned corrective maintenance 2,

277 Planned lighting maintenance 127 Planned preventive maintenance 2,

277 Planning, development plans 258-9

permitted development 257-8 Planning applications 259-63 Planning approval 263 Planning certificates 261

Index 359

Planning control 255-63 Planning maintenance 270-1 Planning notices 261, 263, 268 Planning register 261 Plans, block 260

layout 260 site 260

Plant 203, 311-12 Plasterwork, defects in 98-102, 335

measurement of 198 painting of 113-14 pricing of 211 specification of 183 supervision of 335

Plastic repairs to stonework 50-1 Plastics pipes 119 Plastics sheeting 53 Plastics wastes 337 Plumbing, defects in 118-23

measurement of 198 noises in 121-2 single stack 122, 337 supervision of 336-7

Plumbing appliances 122-3, 336 Policy formulation 271-2 Polystyrene 88 Popping of plaster 101 Preambles 194 Predictable maintenance 2 Prefabricated building extensions

149, 151 Preliminaries 175, 180-2, 194, 203,

207 Preservation of timber 68-9 Pricing of alterations 213-15 Pricing of building work 202-13 Pricing of repairs 166-7 Primers 111, 114 Programme, cleaning 280-1

costs 274 maintenance 279, 301-3, 305,

313-14 services 281-2

Proofs of evidence 164-7 Protimeter 60 Public inquiries 263-4 Putty 115, 184 PVC floor tiles 77, 128

360 Index

Quantity surveyor 229 Quantum meruit 220

Raking shores 25, 32, 33-4, 35 Records, building work 338

clerk of works 324 cost 283-5

Rectification work 9 Refuse collection from flats 128 Rehabilitation, advantages of 156-7

cost benefit studies in 158-60 financing of 157-8

Reinforced concrete 54 Relative humidity 58 Renderings 57, 102-6 Renovations 9 Repairs grants 155 Replacements 9 Reports, clerk of works 325

technical 162-4 Rescission 220 Research 10 Resin pocket 69 Retention money 220, 240 Ribbing 70 Rights, drainage 269

light 268 support 268 way 268-9

Rindgall 69 Ring mains 126 Rising damp 55-7 Roofs, asphalt 83-4, 332

bitumen-felt 82-3, 333 copper 84, 333 flashings for 80 flat, construction 81-2 gutters for 80, 333 lead 84, 333 measurement of 197 metal flat 84 moisture penetration in 55 pitched, coverings 80-1, 332

timbers 79-80, 334 pricing of 211 slates 80-1, 332 supervision of 332-3

thermal insulation of 87, 88, 89, 333

tiles 80-1, 332 zinc 84, 333

Roughcast 57, 104-6 Rubber flooring 77

Safety 129-30 Sanitary appliances 121, 122, 336 Schedule contracts 222-3 School conversion 149, 150 Seasoning timber 67-8 Security 130-1 Selective tendering 226 Serial contracting 223 Services, improvement of 143, 144

maintenance of 118-129 programme 281-2

Servicing 8 Setting out 232, 325-6 Settlement 23-7, 27-31, 46-7, 240-1,

247 Shakes 69 Sheeriness 113 Shoring 25, 31-5 Showers 123 Shrinkable clay 23-4, 27-9 Shrinkage, brickwork 49

clay 27 paint 84 plaster 98 timber 67

Shut-down maintenance 277 Siliconate rubber latex 56 Single stack plumbing 122 Site arrangements 203, 205 Site boundaries 269 Site conditions 170 Site huts 203 Site investigations 22 Site meetings 325 Site plans 260 Skirtings, hollow detachable 126-7

roof82 Slates 80-1, 332 Slenderness ratio 47 Smoke detectors 132-3

Smoky chimneys 61-3 Socket outlets 126 Soils 23-6 Sound insulation 84-7 Special grants 155 Specification, drafting of 178-80

National Building 175-6 performance 177-8 purpose of 227-8 sources of information for 169-

74 typical 180-9

Specification format 174-5 Specific performance 219 Split 70 Sprinklers 134, 292 Stable conversion 149, 150 Stains 45, 59, 101 Staircases 79 Standard Method of Measurement of

Building Works 191, 194 Standard times 318 Standards of maintenance 272-3 States of asphalt 83 Statutory requirements 4-6, 232 Steelwork, demolition of 328

measurement of 197-8 painting of 110, 111, 335 setting out 326 treatment of 98 weathering of 54

Steelwork frames 53-4 Stock control 312-13 Stonework, cleaning of 51-2

colourless treatments for 51 defects in 49-50, 332 measurement of 196 repairs to 50-1

Stools 30 Stop notice 268 Storage tanks 121 Stores, computerised 312-13

requisitions 312 Storey enclosure estimates 201 Structural life 11 Structure plans 258-9 Subcontractors 230, 238-9, 245 Sulphate attack 22, 45-6

Index 361

Supervision of maintenance work 323-38

Suppliers 239 Surface condensation 58, 59 Suspended floors 75-6

Taking-off 191-2 Tanks 121 Target cost contracts 222 Target times 318, 319 Tarmacadam 36-7 Taxation 19, 290-2 Tell-tales 28 Tenants' request cards 308 Tendering 221, 225-7

selective 226 Terotechnology 12 Terrazzo floors 76-7 Testing of bricks 330-1 Testing of cement 330 Testing of drains 337-8 Testing of sand 330 Thermal insulation 60, 87-9, 266, 333 Thermoplastic floor tiles 77 Throat restrictor 62 Tie rods 47 Tiles, external wall 106-7

internal wall 183 roof 80-1, 332

Timber, defects in 69-73, 74, 333-4 preservation of 68-9 seasoning of 67-8 specification of 183 treatment of 73-5 types of 67

Timber floors 75-6, 78, 333-4 Timber roofs 79-82, 334 Timber staircases 79 Torn grain 70 Trade catalogues 174 Training, industrial 314 Training of managers 315 Training of operatives 315-16 Training of supervisors 315 Tree roots 24, 25, 29 Trench timbering 328

362 Index

Underpinning 25, 28, 30, 196, 332 Unit estimates 201 Unplanned maintenance 2 Urea formaldehyde resin 88 Use classes 256-7 U-value 60, 87

Valuation tables 17 Vapour barrier 81-2, 88 Variations 233-4, 244 Varnish 111 Ventilation 59, 60, 64, 125-6 Vermiculite 88 Vibration 89

Walls, boundary 39 brick 42-9 cavity 331 defects in 41-2 external tiling on 106-7 insulation of 87-8 light claddings for 52-3 rubble 196 setting out 326 stone 49-52

Waney edge 70

Warp 70 Water buckets 134 Water by-laws 266-7 Water closets 122-3 Water hammer 122, 124 Water spraying 51 Water test 337-8 W eatherboarding 53 Wet rot 71, 72, 79, 94 Windows, cleaning of 136

decay of 93-5 defects in 334 double glazing of 88 security of 130 sound insulation of 85-6 specification of 185 strutting for 25, 31 thermal insulation of 87, 88, 89

Wood block flooring 78 Wood-boring beetles 74 Working up 192-4 W rinkling 114

Yardsticks 12-13

Zinc roofs 84, 333