2015 annual report - mass.gov
TRANSCRIPT
2015 Annual Repor t
Office of the State TreasurerExecutive Office of Administration and Finance
Massachusetts Department of Environmental Protection
Table of ConTenTs
Message from the Chair.........………………………………….....................i
Introduction…………………………………………………………..................1
Clean Water SRF Annual Summary…………………………......................2
Drinking Water SRF Annual Summary…………………….........................8
SRF Financial Summary……………………………………….......................16
Appendices………………………………………………………….................20
September 30, 2015
The Massachusetts Clean Water Trust (the Trust) is pleased to submit its Clean Water and Drinking Water State Revolving Fund (SRF) Annual Report for State Fiscal Year (SFY) 2015.
The Trust is a collaborative effort between the Treasurer’s Office, the Executive Office for Administration and Finance, and the Massachusetts Department of Environmental Protection (MassDEP). Our leveraged financing program enables us to maximize the impact of our efforts throughout the Commonwealth. To date, the Trust has used approximately $2.2 billion in federal grants and state matching funds to finance nearly $6.3 billion in clean water and drinking water construction projects.
As our water infrastructure continues to age, now is the time for municipalities to invest in protecting both the health of their citizens and the environment, while supporting economic development in their communities. Easy access to financing is essential in order to achieve these goals. The Trust continues to do its part by providing subsidized loans backed by its AAA credit. In SFY 2015 the Trust provided approximately $327.0 million in commitments for low interest rate loans to cities and towns across the state. The commitment amount will support an estimated 1,960 construction and engineering jobs. This financing provides vast benefits to the quality of the state’s waterways. The funding also protects public health through projects such as combined sewer overflow removal, wastewater treatment plant upgrades, sewer system construction and rehabilitation, septic system repairs, drinking water treatment facilities, treated water storage and water main replacement and rehabilitation.
The Trust continues to be a leader in the SRF arena. In January, the Trust was one of the first SRFs to issue Green Bonds. The sale of $228 million of Green Bonds went to finance water and wastewater projects and provided the Trust with an opportunity to showcase the vital work being done by our cities and towns. The Trust led the SRF industry with its Green Bond disclosure, which has been used by other SRFs that issued Green Bonds. The Annual Report provides an update to the disclosure in the Appendix as to the use of proceeds.
I would like to thank the staff of the Trust and our partners at MassDEP. We wish to also acknowledge the excellent work of everyone at the Environmental Protection Agency Region One for all of their efforts this year. Without the combined efforts of these organizations, our state’s innovative economic and environmental initiatives would not be possible.
Finally, I would like to thank our borrowers, the cities and towns within the Commonwealth. Their dedication to protecting the environment and the public health of their citizens drives our program’s success. My office looks forward to serving as an accessible partner in this vital work.
Sincerely,
Deborah B. GoldbergChairMassachusetts Clean Water Trustwww.mass.gov/treasury
M e s s a G efRoM THe CHaIR
2015 SRF ANNUAL REPORT | 1
InTRoduCTIonThe Massachusetts Clean Water Trust (the Trust), in partnership with the Massachusetts Department of Environmental Protection (MassDEP) provides cities and towns of the Commonwealth with low interest rate loans for water infrastructure projects. MassDEP manages project development and approval while the Trust manages the flow of money to the communities. Each year, MassDEP prepares the Intended Use Plan (IUP) of projects as required by the Environmental Protection Agency (EPA). The IUP establishes the Commonwealth’s project priorities for the upcoming year. This is accomplished through two programs – the Clean Water State Revolving Fund (SRF) and the Drinking Water SRF. The EPA requires reporting on both of the programs through the Clean Water SRF Annual Report and the Drinking Water SRF Biennial Report. These reports have been combined into this report, which covers the State Fiscal Year (SFY) ending June 30, 2015.
An estimated 97% of Massachusetts citizens have benefited from these essential projects. In SFY 2015, the Trust provided binding commitments for 40 clean water projects, including the Community Septic Management Program (CSMP), totaling over $246.2 million and 25 drinking water projects totaling $81.0 million.
The SRF loan program receives funding from the EPA in the form of an annual grant, supplemented
by state matching grants and the repayment of loans from borrowers. In addition, the Trust issues bonds guaranteed by pledged assets that are funded by federal and state grants. The Trust’s lending and bond issuance programs are structured in such a way that ensure adequate cash flows to fund its loans and to repay its bonds to maturity. The Trust’s bonds are secured by a
combination of pledged sources which include loan repayments, contract assistance from the Commonwealth and interest earnings on debt service reserve funds. The “Financial Summary” section provides additional details on the financial management activities and most recent bond issue of the SRF program.
Since its inception in 1989, the SRF loan program has provided over $6 billion in loans to nearly 300 borrowers to improve and maintain the quality of water in the Commonwealth.
The Clean Water SRF provided $246.2 million of project financing to create an estimated
1,477 construction and engineering jobs.
The Drinking Water SRF provided $81.0 million of project financing to create an estimated 486 construction and
engineering jobs.
This report covers the State Fiscal Year ending June 30, 2015
2015 SRF ANNUAL REPORT | 2
Extended Term Financing As in previous years, the Trust continues to offer extended term financing up to 30 years to its participants. Extended term financing is available for Clean Water projects that can demonstrate that the project’s useful life is at least as long as the term of the loan. The term can be extended to a maximum of thirty years.
DisbursementsDuring 2015, the Trust disbursed $207.2 million for Clean Water projects to various local governmental entities through the program project funds and interim loans. Of this amount, $0.9 million was disbursed in the form of additional subsidy with repayment not required, to either “Renewable Energy” projects or projects in “Environmental Justice” communities. These projects have already received $2.7 million in subsidies.
Administrative Expenses For SFY 2015, $1.4 million of annual Clean Water SRF grant administration funds were spent by MassDEP. This consisted of $1.0 million in federal funds and $0.4 million in state matching funds. These costs were associated with construction management of the Clean Water SRF program. An additional amount of $4.3 million was spent from the Trust’s Administrative Fund to supplement MassDEP administrative costs for both the Clean
2015 Clean Water Program ResultsIn 2015, the Trust continued to expand its program by providing new commitments of over $246.2 million in financing for 40 loans to communities across the Commonwealth. Of the 40 loans, 4 were provided to the Community Septic Management Program (CSMP). The CSMP provides low interest financing to Massachusetts’ cities and towns to assist homeowners in the repair of failed septic systems.
Interim Loans The Trust makes funds available to eligible projects on the IUP through its Interim Loan Program year round. Borrowers can enter into a short term loan that enables projects to proceed prior to a Trust bond sale. The Trust is capable of funding a project prior to a bond sale by extending the use of program equity funds as a source of capital. The interest is accrued monthly on the basis of the balance drawn on the construction account. The interest rate is set at one-half of the one year Massachusetts Municipal Depository Trust (MMDT) rate. The average interest rate charged in SFY 2015, accruing only on drawn funds, was 0.10%. During SFY 2015, 97 projects had drawn $119.5 million of interim loan funds.
Clean WaTeR sRf annual suMMaRy
SFY 2015 Clean Water Disbursements
Amount# of
Loans
Interim Loans $119,450,441 97
Program Project Funds 87,772,403 57
Total $207,222,844 154
Clean Water Grant Awards
SFY 2015 Grant Awards
Program to date Grant Awards
Federal $47,603,000 $1,373,250,761
State 9,520,600 248,038,692
Total $57,123,600 $1,621,289,453
Massachusetts continues to finance projects that focus on rehabilitation of wastewater infrastructure which promotes sustainability and smart growth principles. The SRF program provides additional subsidy to designated low income Environmental Justice Communities and continues to perform outreach activities to help borrowers realize opportunities to implement energy efficiency/alternative energy projects.
2015 SRF ANNUAL REPORT | 3
and Drinking Water programs as well as fund the administrative costs of the Trust. The Trust also provided the final payment of the total $3.5 million commitment, funding $0.5 million to the Cape Cod Commission in SFY 2015 to help with the overall costs in developing a regional wastewater management plan called for under the federal Clean Water Act. The plan has since been finalized and approved by the state and federal government.
American Iron and Steel MassDEP has incorporated the American Iron and Steel (AIS) requirements into its Loan Application and Plans and Specifications Package. The necessary language has also been added into the Project Regulatory Agreement and the Financing Agreement. AIS reviews are being conducted as part of routine construction inspections and are being documented in inspection reports.
Federal Funding Accountability and Transparency Act In compliance with the Federal Funding Accountability and Transparency Act (FFATA), the Trust reports recipient or sub-recipient awards for any amount equaling $25,000 or greater in the FFATA Subaward Reporting System (FSRS) at www.fsrs.gov. The loans used by the Trust for FFATA Reporting can be found in the Appendices to this report.
Green Project Reserve For the 2014 CWSRF Federal Grant, the Trust was required to provide $4.8 million in financing to projects that were identified as Green Projects. In its 2014 IUP, MassDEP identified 15 projects totaling $171.6 million that are considered to be either entirely or partially Green. Since all of the Green Projects that advanced to construction are only partially green and have just recently started construction, MassDEP is now working with the project consultants to review the schedules of values to extract the green portions of the projects. Once these values are calculated, they will be entered into the Clean Water Benefits Reporting System (CBR).
For the 2013 grant, $4.5 million was required for the Green Project Reserve. To date, a total of $3.6 million or 7.9% of the grant has been reported in the CBR. A significant number of projects from the 2013 Intended Use Plan (IUP) that were identified as Green, did not proceed to construction, resulting in this reduced dollar value of Green projects. There are several projects from the 2013 IUP that are proceeding that may be considered Green with a business case. MassDEP is evaluating these projects further to see if they qualify as Green projects. If they qualify as Green, they will be entered into CBR. MassDEP will update this section of the Annual Report in 2016 to reflect any changes that may occur to the Green Project Reserve numbers for the 2013 grant.
2015 SRF ANNUAL REPORT | 4
2014 Federal Grant Projects Receiving Additional Subsidy
Borrower Project Loan # Project CostPrincipal
ForgivenessExpended
Amount
Boston Gardner St. Landfill Closure CWP-14-02 $15,777,800 $412,532 $412,532
Saugus SSO Reduction Subsystem 5 CWP-14-08 2,109,614 74,267 55,159
Revere Collection System Improvements
CWP-14-12 10,982,142 287,143 287,143
Haverhill CSO Improvements, WWTF and Sewer System
CWP-14-15 6,464,500 169,023 -
New Bedford CSO Abatement CWP-14-19 8,279,605 216,481 216,481
Falmouth WWTF Upgrade CWP-14-22 4,400,000 115,044 115,044
Falmouth Sewer Extension and New Recharge Site
CWP-14-23 32,869,482 859,417 859,417
Taunton SSES Phases 10-12 CWP-14-26 4,129,082 107,960 107,960
Springfield WSC Dickinson Siphon/Main Interceptor Rehab
CWP-14-27 20,148,628 526,813 -
Montague Pump Station Replacements CWP-14-28 1,951,059 51,013 -
Brockton Sewer System Rehab CWP-14-30 1,750,000 45,756 45,756
Middleborough WWTF Upgrades CWP-14-32 25,000,000 653,659 653,659
Total $133,861,912 $3,500,000 $2,753,151
Additional Subsidy Massachusetts provided $3.5 million in additional subsidy from the 2014 grant, which is within the $2.6 to $3.9 million range required by the federal grant. This additional subsidy is dedicated to communities that would not otherwise be able to afford the projects. Massachusetts chose to apply these funds to communities that meet the Environmental Justice (EJ) income threshold of below 65% of the state’s median household income and for renewable energy projects. This targets the subsidy to lower income communities across the Commonwealth as well as providing subsidy for renewable energy projects that would typically have lengthy payback periods without the subsidy. Massachusetts provides the subsidy to the communities in the form
of principal forgiveness. During the reporting period, the subsidy was given to twelve Clean Water projects. Each project received an equivalent of 2.6% of the project cost as additional subsidy.
The funds used as additional subsidy are the first dollars drawn against the project. As of the date of this report, $2.7 million of the additional subsidy from the 2014 grant has been disbursed. The remaining funds should be disbursed within the next few months. As a follow up to 2014 Annual Report, all of the additional subsidy funds from the 2013 grant have been fully expended.
2015 SRF ANNUAL REPORT | 5
2015 Clean Water Leveraged Program The Trust program is leveraged by issuing bonds to increase capacity to be able to issue more loans. Federal and state grants are pledged to secure the bonds by either funding reserve funds or pledged direct loans or a combination of both. Since 2002, the Trust has provided loans to communities at a 2% interest rate. As the effective market interest rate on the bonds is higher than the 2% loan rate, borrowers receive a subsidy equal to the difference between the rates. Debt service on the Trust’s SRF Bonds is paid from a combination of three sources: borrower loan principal and interest repayments, interest earnings on the debt service reserve funds, and subsidy payments provided by the Commonwealth, known as contract assistance. Further discussion of the trust’s leveraged financing program can be found in the “The Financial Summary” sections.
Borrower Repayments Each borrower is obligated to repay the principal amount of its loan at a subsidized interest rate of 2% or less. However, those with extended term financing, greater than 20 years, may have a subsidized interest rate somewhat higher than 2%. In SYF 2015, borrower principal and interest loan repayments accounted for approximately 69.1% of debt service, totaling $200.8 million. Since 2012, the Trust has pledged certain direct loans that it makes from its program equity funds as additional security for its series of revenue bonds, rather than utilizing a traditional reserve fund. The interest the Trust receives from the pledged direct loans is used to pay a portion of debt service, while the principal payments received are available as additional security and recycled back to SRF program funds
after debt service obligations have been met. As of June 30, 2015, the Trust has $228.6 million of pledged direct loans outstanding.
Reserve Fund Interest Earnings Reserve funds, or pledged direct loans, are held as security for all Trust bonds at an amount between 33% and 50% of the outstanding principal. As of June 2015, the Trust held $745.0 million in Clean Water reserve funds invested in guaranteed investment contracts (GIC), and US Treasury and Agency obligations. Earnings on these investments are applied to pay a portion of the debt service on the related series of SRF Bonds. In SFY 2015, reserve fund earnings applied to current debt service payments accounted for 13.7% of debt service, totaling $39.9 million. As bonds are repaid, reserve funds are released and returned to the Clean Water Equity Fund. In SFY 2015, $74.7 million was released to the Clean Water Equity Fund, and made available for new loans.
Commonwealth Contract Assistance The Commonwealth has entered into an agreement with the Trust for contract assistance payments to subsidize debt service on the SRF Bonds. Contract assistance is appropriated annually in the Commonwealth’s operating budget. To date the Trust has received $910.1 million in Clean Water contract assistance with a future commitment of $285.8 million, for a total commitment by the Commonwealth of $1.2 billion. In SFY 2015 Commonwealth contract assistance accounted for approximately 17.2% of debt service, totaling $49.8 million in assistance applied.
2015 SRF ANNUAL REPORT | 6
Boston – Gardner Street Landfill ClosureThis project completes the closure of the former Gardner Street Landfill located in the West Roxbury neighborhood of Boston. The project includes the construction of a landfill cap and gas collection system, which allows for the site to be re-used by the West Roxbury Education Complex as an athletic field. The construction of the landfill cap will help reduce rainwater infiltration, which should lessen the generation of leachate under the site and help reduce the exposure of groundwater to buried wastes. The Trust provided nearly $15.8 million in project financing including $412,000 in principal forgiveness.
Clean WaTeR PRojeCTs
Great Barrington - Wastewater Treatment Facility Upgrade and I/I RemovalThis $4 million project includes upgrades to the Wastewater Treatment Facility (WWTF) and improvements to the collection system to reduce Inflow and Infiltration (I/I). The treatment plant upgrades are replacing or repairing aging equipment, improving system reliability, achieving higher levels of phosphorus removal, and preparing for nitrogen removal upgrades. The WWTF upgrade includes installation of a reliable system to reduce total phosphorus loads to the Housatonic River, resulting in a reduction of eutrophication potential in the river and its ultimate receiving body, Long Island Sound.
The Massachusetts SRF program continues to meet the goals established in the annual IUP. As outlined in the IUP, all SRF projects are subject to the rigorous environmental review procedures of the Massachusetts Environmental Policy Act.
The Clean Water SRF provides loans for a wide variety of projects. The primary recipients of Clean Water loans have been combined sewer overflow, wastewater treatment and wastewater collection projects. Although other projects such as drainage improvements, landfill closures, brownfields remediation, renewable energy projects, and other non-point source projects are eligible for funding.
2015 SRF ANNUAL REPORT | 7
Middleborough – Wastewater Treatment Facility UpgradeThis $25 million project is to upgrade the Wastewater Treatment Facility to address more stringent discharge permit limits, reduce nutrient discharges and protect the impaired receiving water downstream, specifically impacts to the Taunton River estuary as well as Mount Hope Bay and Narragansett Bay. The current plant was constructed in 1977 and has not undergone a major upgrade since then. This project is eligible to receive 0% interest rate financing for the nutrient reduction portion of the project and is also receiving nearly $654,000 in principal forgiveness.
Dracut – Sewer ExtensionsThis project involves the construction of new sanitary sewers that will mitigate the migration of leachate from failing septic systems into tributaries of the Merrimack River. In addition, the project will eliminate several direct sewage connections to the local stormwater system and mitigate impacts to natural resources, town conservation land and private drinking water supplies. The project will install approximately 11,000 linear feet of 8-inch diameter gravity sewer, approximately 1,000 linear feet of small diameter pressure sewers, approximately 2,100 linear feet of force mains and two submersible pumping stations within town roads and cross country areas. $4.7 million in project financing is being provided by the Clean Water Trust to the Town of Dracut.
2015 SRF ANNUAL REPORT | 8
dRInkInG WaTeR sRf annual suMMaRy
2015 Drinking Water Program Results In 2015, the Trust continued to expand its program by providing new commitments of approximately $81.0 million in funding for 25 loans to communities across the Commonwealth.
Interim Loans The Trust makes funds available to eligible projects on the IUP through the Interim Loan Program year round. Borrowers can enter into short term loans that enables projects to proceed during the time prior to a Trust bond sale. The Trust is capable of funding a project prior to a bond sale by extending the use of program equity funds as a source of capital. The interest is accrued monthly on the basis of the balance drawn on the construction account. The interest rate is set at one-half of the one year Massachusetts Municipal Depository Trust (MMDT) rate. The average interest rate charged in SFY 2015, accruing only on drawn funds, was 0.10%. During SFY 2015, 33 projects had drawn $58.5 million of interim loan funds.
Disbursements During 2015, the Trust disbursed $82.8 million for Drinking Water projects to various local governmental entities through the program project funds and interim loans. Of this
Massachusetts continues to support protection of public health by ensuring that all its Public Water Suppliers have the necessary technical, financing and managerial capacity to maintain compliance with the current and foreseeable Safe Drinking Water Act requirements. The program continues to promote the completion of cost-effective projects that maximize protection of public heath.
Drinking Water Grant Awards
SFY 2015 Grant Awards
Program to date Grant Awards
Federal $16,441,000 $478,868,100
State 3,288,200 85,294,020
Total $19,729,200 $563,980,120
amount, $3.9 million was disbursed in the form of additional subsidy with repayment not required to either “Renewable Energy” projects or “Environmental Justice” communities.
American Iron and Steel As with the Clean Water Program, MassDEP has incorporated the American Iron and Steel (AIS) requirements into its Loan Application and Plans and Specifications Package. The necessary language has also been added into the Project Regulatory Agreement and the Financing Agreement. AIS reviews are being conducted as part of routine construction inspections and are being documented in inspection reports.
Federal Funding Accountability and Transparency ActIn compliance with the Federal Funding Accountability and Transparency Act (FFATA), the Trust reports recipient or sub-recipient awards for any amount equaling $25,000 or greater in the FFATA Subaward Reporting System (FSRS) at www.fsrs.gov. The loans used by the Trust for FFATA Reporting can be found in the Appendices to this report.
SFY 2015 Drinking Water Disbursements
Amount# of
Loans
Interim Loans $58,547,738 33
Program Project Funds 24,227,038 47
Total $82,774,776 80
2015 SRF ANNUAL REPORT | 9
year period. This should provide Massachusetts with a cushion to meet the small system requirement for the next several years.
Absent a large project like this, Massachusetts will almost always have difficulty meeting the small systems requirement. A survey of small systems indicated that federal cross cutting requirements such as Davis Bacon, American Iron and Steel and Disadvantaged Business Enterprise rules discourage them from coming to the SRF for financing unless the project is of sufficient size to overcome these additional costs. In addition, the current low interest rate environment has borrowers opting to get their own financing rather than meeting SRF requirements. Even if Massachusetts is able to include the requisite amount of projects in the IUP, there is no guarantee the projects will ultimately be built. Often times a community is unable to secure debt authorization, identifies another source of financing (such as rural development) or otherwise determines that a project should not go forward resulting in a high level of project attrition.
Going forward, the Trust will attempt to comply with the new interpretation of the small systems requirement. The MassDEP Drinking Water program does significant outreach to small systems throughout the Commonwealth through the 2% Small Systems Technical Assistance set aside, which stresses the availability and use of the SRF as a low cost source of financing. In the last year, the Drinking Water program held a series of workshops for small systems to identify grant and loan opportunities for those systems. Even with these efforts to reach and recruit small systems, the Trust is concerned that in many years, there may not be sufficient applications to make up 15% of the total assistance provided.
Small SystemsFor a number of years, the Trust has been providing financing to small systems in the amount of at least 15% of the federal grant, with the concurrence of EPA Region 1. During 2014, the EPA changed its interpretation of the small systems requirement from 15% of the federal grant to 15% of the total amount of assistance provided. This change in interpretation has a large effect on the Massachusetts program. When the 2014 IUP was prepared, MassDEP was working under the earlier interpretation of 15% of the grant amount. The IUP identified $3.6 million of small system projects, with 15% of the grant amount totaling $3.2 million. With an IUP in excess of $126.0 million, 15% of the total assistance comes to $19.0 million. In response to this change, MassDEP elevated all of the small systems on the Project Priority List to the IUP, which still only resulted in a total of $5.0 million. Of those projects, only two proceeded to construction totaling $3.0 million, well below the required $19.0 million.
For the 2015 IUP, MassDEP received small system applications from 7 communities totaling $20.0 million. One large project (Eastham) made up $16.0 million of this total. 15% of the $106.0 million IUP is just under $16.0 million. Based on this calculation Massachusetts should meet the 15% threshold for the 2015 IUP, however, at this point, it is unclear how many of the projects will proceed towards construction. The Eastham project has started construction and is expected to reach the $16.0 million cap established in the IUP, so that project alone should satisfy the small system requirement.Eastham is establishing a water distribution system for the first time, with an expected overall cost in excess of $125.0 million. The first phase of this project is $45.0 million to be funded over a three
2015 SRF ANNUAL REPORT | 10
2014 Federal Grant Projects Receiving Additional SubsidyBorrower Project Loan # Cost
Principal Forgiveness
Expended Amount
Falmouth Long Pond WTF DWP-14-04 $43,258,900 $2,473,793 $2,473,793
New Bedford Transmission Main Improvements DWP-14-05 9,323,792 533,188 533,188
Fall River Water Main Improvements PH 14 DWP-14-08 3,361,301 192,219 192,219
Barnstable Pipe Replacement and Maher WTP Upgrade
DWP-14-09 1,556,339 89,000 -
Total $57,500,332 $3,288,200 $3,199,200
Additional Subsidy Massachusetts was required to provide a minimum of $3.3 million in additional subsidy from the 2014 grant. This additional subsidy is provided to communities that would not otherwise be able to afford the project. Massachusetts chose to apply these funds to projects in communities that meet the Environmental Justice (EJ) income threshold of below 65% of the state’s median household income and for renewable energy projects. This targets the subsidy to lower income communities across the Commonwealth as well as providing subsidy for renewable energy projects that would typically have lengthy payback periods without the subsidy.
Massachusetts provides the subsidy to the communities in the form of principal forgiveness. During this reporting period, Massachusetts provided the required minimum amount of subsidy to four drinking water projects. Each project received an equivalent of about 5.7% of the project cost as additional subsidy.The funds used as additional subsidy are the first dollars drawn against the project. As of the date of this report, $3.2 million of the additional subsidy from the 2014 grant has been disbursed. The remaining funds should be disbursed within the next few months. As a follow up to 2014 Annual Report, all of the additional subsidy funds from the 2013 grant have been fully expended.
2015 SRF ANNUAL REPORT | 11
2015 Drinking Water Leveraged Program The Trust program is leveraged by issuing bonds to increase capacity to be able to issue more loans. Federal and state grants are pledged to secure the bonds by either funding reserve funds or pledged direct loans or a combination of both. Since 2002, the Trust has provided loans to communities at a 2% interest rate. As the interest rate on the bonds is higher than the 2% loan rate, borrowers receive a subsidy equal to the difference between the rates. Debt service on the Trust’s SRF Bonds is paid from a combination of three sources: borrower loan principal and interest repayments, interest earnings on the debt service reserve funds, and subsidy payments provided by the Commonwealth, known as contract assistance. Currently, all Drinking Water loans have a maximum term of 20 years; however, the Trust is working to implement an extended term financing program similar to the Clean Water program. The extended term financing is expected to be in place by the end of the calendar year.
Borrower Repayments Each borrower is obligated to repay the principal amount of its loan at a subsidized interest rate of 2% or less. In SFY 2015, borrower principal and interest loan repayments accounted for approximately 77.4% of debt service, totaling $65.6 million. Since 2012, the Trust has pledged certain direct loans that it makes from its program equity funds as additional security for its series of revenue bonds, rather than utilizing a traditional reserve fund. The interest the Trust receives from the pledged direct loans is used to pay a portion of debt service, while the principal payments received are available as additional
security and recycled back to SRF program funds after debt service obligations have been met. As of June 30, 2015, the Trust has $81.3 million of pledged direct loans outstanding.
Reserve Fund Interest Earnings Reserve funds, or pledged direct loans, are held as security for all Trust bonds at an amount between 33% and 50% of the outstanding principal. As of June 2015, the Trust held $178.6 million in Drinking Water reserve funds invested in guaranteed investment contracts and US Treasury and Agency obligations. Earnings on these investments are applied to pay a portion of the debt service on the related series of SRF Bonds. In SFY 2015 reserve fund earnings applied to current debt service payments accounted for 11.1% of debt service, totaling $9.4 million. As bonds are repaid, reserve funds are released and returned to the Drinking Water Equity Fund. In SFY 2015, $20.9 million was released to the Drinking Water Equity Fund, and made available to be applied to new loans.
Commonwealth Contract AssistanceThe Commonwealth has entered into an agreement with the Trust for contract assistance payment to subsidize debt service on the SRF Bonds. Contract assistance is appropriated annually in the Commonwealth’s budget. To date the Trust has received $127.0 million in Drinking Water contract assistance with a future commitment of $80.5 million, for a total commitment by the Commonwealth of $207.5 million. In SFY 2015, Commonwealth contract assistance accounted for approximately 11.5% of debt service, totaling $9.7 million in assistance applied.
2015 SRF ANNUAL REPORT | 12
Sanitary Survey Program – MassDEP Drinking Water staff is responsible for evaluating the technical, financial and managerial capability of Community, Non-Transient Non-Community and Transient Non-Community PWS. During the last year the Drinking Water staff has completed 387 evaluations on existing systems. See Figure 1 below for breakdown of system types.
Operator Certification - MassDEP has a very active operator certification program. The program activities have been integrated into daily activities of staff. Program activities range from chairing the Board of Certification of Drinking Water Operators to providing general and specialized training of and guidance for drinking water operators at all levels.
Wellhead Protection Program – Technical assistance was provided to water supply systems for wellhead protection compliance, the development of protection plans, and for determining monitoring waiver eligibility.
Capacity Development - During the course of conducting sanitary surveys on public water systems, MassDEP staff identified 1,337 technical, financial or managerial deficiencies and provided corrective action assistance to ensure compliance. MassDEP’s Capacity Development strategy focuses on improving the technical, financial, and managerial operations of both new and existing public water systems in the Commonwealth.
Drinking Water Set-Asides MassDEP continues to use set-aside funds as outlined in the annual IUP. The following sections describe the basic programs and accomplishments.
4% Set-Aside: Administration MassDEP uses eight (8) full time equivalent (FTE) staff members to administer the Drinking Water SRF program. These FTEs utilize 4% set-aside funding to accomplish the following tasks: developing program selection criteria, application ranking and rating, project development, construction inspections, invoice payment, data management and administrative support functions.
2% Set-Aside: Small System Technical Assistance Municipal Services Support - MassDEP uses two (2) FTEs to support Municipal Services. These FTEs provide training and technical assistance (compliance and operational issues) to small systems throughout Massachusetts. During this past year MassDEP also worked with training and technical assistance providers; Massachusetts Rural Water Association, United States Department of Agriculture, (Rural Development), US EPA Environmental Finance Center (New Mexico), Texas A & M Engineering Extension School (TEEX) to provide trainings to Public Water System (PWS). Topics included leak detection, pump and motor maintenance, rate setting, board training, public relations, disinfection, sampling and exam review.
10% Set-Aside: State Program Management MassDEP used approximately nineteen (19) FTEs to administer the state Drinking Water program. These FTEs utilize 10% set-aside funding for Public Water System support including the following programs: Sanitary Survey, Source & Wellhead Protection, Emergency Response, Capacity Development, Operator Certification, Consumer Confidence Report assistance, adoption and implementation of new regulations, evaluation and maintenance of existing federal rules, planning, outreach, data management, engineering and construction supervision, compliance supervision and other drinking water program activities. Some highlights of the programs in SFY 2015 includes:
MassDEP Sanitary Surveys Completed SFY 2015Type of Public Water System Total # of
Surveys Completed
Community Systems 186Non-Transient Non Community Systems 37Transient Non Community System 164
Totals 387
Figure 1:
2015 SRF ANNUAL REPORT | 13
15% Set-Aside: Local AssistanceMassDEP used seventeen (17) FTEs from the 15% local assistance set-aside to support the Public Water System Supervision programs including; sanitary surveys, adoption and implementation of new regulations, registration of new systems, evaluation and maintenance of existing federal rules, planning, outreach, data management, engineering and construction supervision etc. Some highlights of the programs in 2015 include:
Source Protection Support - Work includes the registration of new public water systems (see Figure 2), implementing and monitoring the chemical monitoring waiver program which provides incentive to do source protection as well as promoting preparedness and sustainability. Source protection technical assistance is provided during the 448 sanitary surveys that were completed throughout the year.
MassDEP Registration of New Small Public Water Systems SFY 2015
Type of Public Water System Total # of Systems
Community Systems 1Non-Transient Non Community Systems 0Transient Non Community System 16Totals 17
Figure 2:
Contract Services - MassDEP has contracted fund Information Technology (IT) staff to assist with data management support for public water systems and implementation of the Safe Drinking Water Act programs. Key activities include reporting, program evaluation and database maintenance and improvement.
2015 SRF ANNUAL REPORT | 14
dRInkInG WaTeR PRojeCTsThe Massachusetts Drinking Water SRF program continues to meet the goals established in the annual IUP. As outlined in the IUP, all SRF projects are subject to the rigorous environmental review procedures of the Massachusetts Environmental Policy Act. Drinking Water projects typically involve construction and, or, rehabilitation of drinking water treatment plants, replacement of aging water mains and the construction of drinking water storage facilities.
Eastham – Water Supply SystemThe Town of Eastham does not currently have a public water supply system. Drinking water is supplied by small community public water systems and individual private wells. A number of private wells near the closed town landfill were found to be contaminated with 1,4-dioxane and there is an ongoing problem with nitrate concentrations in drinking water wells throughout town. Due to these contamination issues and their associated public health concerns, the town decided to pursue the construction of a town-wide water distribution system. This $45 million project is the first phase of the water distribution system consisting of the construction of two well fields, a water storage tank and 45 miles of water distribution piping.
Paxton – Maple Street Elevated TankThis $1.4 million project involves the replacement of the Maple Street elevated water tank with a new 210,000 gallon glass fused steel water storage tank and the demolition of the existing storage tank. Paxton has two water storage tanks, and the replacement of the Maple Street tank provides the necessary redundancy in the system that allows the town to take one tank offline for routine or emergency maintenance and still have adequate storage for the system. In addition to providing redundant storage, the new tank will be equipped with a booster chlorination system to improve water quality. Paxton is considered a small system as it serves a population of less than 10,000. The EPA requires that at least 15% of the assistance provided by the Drinking Water SRF go to small systems.
2015 SRF ANNUAL REPORT | 15
MWRA – Low Service StorageThis project is for the construction of a 20 million gallon potable water storage tank in the Town of Stoneham at its terminal reservoir at the northeastern extremity of the MWRA water service to metropolitan Boston. The project will provide not only improved storage but will also provide surge relief, protecting MWRA and community mains; allow more efficient use of the existing MWRA distribution system; and, provide emergency backup to 21 communities in the Northern Intermediate High and Northern High systems. The total project cost is $67.9 million. The Trust has provided $10.5 million in project financing over the last three years
2015 SRF ANNUAL REPORT | 16
sRf fInanCIal suMMaRy
Leveraged Financing ModelThe Trust’s SRF loan program receives funding from the EPA in the form of an annual grant, supplemented by state matching grants and the repayment of funds from previous borrowers (“SRF Program Funds”). The Trust’s SRF Program utilizes a “leveraged” financing model, under which federal grants and state matching grants are used as a source of security for revenue bonds (“SRF Bonds”) issued by the Trust. The proceeds from the SRF Bonds are used to fund loans to local governmental units for eligible project costs.
The leveraged structure of the Trust’s program permits the Commonwealth to substantially increase the amounts available to fund eligible project costs. Each federal grant and associated state matching grant dollar contributed to the program results in at least two to three dollars of project cost financing while assuring the perpetual nature of the revolving fund.
The Trust’s lending and bond issuance programs are structured to ensure adequate cash flows to fund its loans and to repay its bonds to maturity. Depending on the type of projects being financed, the terms of the loans to borrowers, and the subsidy levels to which the borrowers are entitled, the Trust applies its SRF Program Funds to fund either direct loans to local governmental units or, invest in reserve funds, or a combination of both, which are then pledged as a source of payment and security for the SRF Bonds.
Pledged Direct LoansUnder the pledged direct loan approach, the Trust pledges as additional security for a series of its SRF Bonds, direct loans (“Pledged Direct Loans”) that it has made or is making concurrently with the issuance of such SRF Bonds from its SRF Program Funds to eligible borrowers for Clean Water and Drinking Water projects. The Trust applies the interest payments on such Pledged Direct Loans to pay a portion of the debt service on the related series of SRF Bonds, thereby supplementing the loan repayment obligations of the borrowers of the Leveraged Loans funded by such SRF Bonds. Principal payments on the Pledged Direct Loans are pledged as further security for the related series of SRF Bonds. The Trust used the Pledged Direct Loan approach for its Series 18 SRF Bonds. The bonds are the third series of Trust SRF Bonds issued under the Pledged Direct Loan approach. As of June 30, 2015, the Trust has $310.0 million in Pledged Direct Loans.
The following discussion provides additional details on the financing management activities of the SRF loan program.
2015 SRF ANNUAL REPORT | 17
Reserve FundsIn the past, the Trust has applied a portion of its Program Equity Funds to establish reserve funds to secure a series of its SRF Bonds. Those investment earnings are then applied to pay a portion of the debt service on the related SRF Bonds, thereby supplementing the loan repayment obligation of the borrowers of the Leveraged Loans funded by such SRF Bonds. As of June 30, 2015, the Trust has $923.6 million in DSRF reserve funds invested in guaranteed investment contracts (GIC) and US Treasury and Agency Obligations.
SRF Bonds Sources of RepaymentPrincipal and interest payments on the Trust’s SRF Bonds are made from the following sources: (1) loan repayments from borrowers (2) earnings on the federal grants and state matching grants pledged as security to the SRF Bonds, including, as applicable, interest earning on reserve funds and interest payments on direct loans pledged to secure such bonds and (3) subsidy payments provided by the Commonwealth, known as contract assistance.
Commonwealth Contract Assistance PaymentsThe Commonwealth makes assistance payments on behalf of certain loans to borrowers to be used to pay a portion of debt service on the related series of the Trust’s SRF Bonds, thereby reducing the borrower’s loan repayment obligation. The obligation of the Commonwealth to make such payments to the Trust is a general obligation of the Commonwealth, for which its full faith and credit are pledged.
The Commonwealth has pledged over $430.1 million in current and future assistance payments on behalf of
program borrowers. The Commonwealth is currently rated “AA+/Aa1/AA+”.
* based on highest rating
2015 SRF ANNUAL REPORT | 18
Deallocation of FundsFor all bond series issued prior to Series 18, on each date that the Trust pays down the principal amount of a series of SRF Bonds, or borrowers pay down the principal amount of the related pledged loans, the amount held in the related reserve fund is reduced proportionately. The amounts released from each reserve fund are transferred either to the Pool Program Reserve Fund and then to the Deficiency Fund or directly to the Deficiency Fund. These funds are available to cure shortfalls in any bond series. If not needed to cure a shortfall, the released funds are transferred to the Program Equity Funds which assures the perpetual nature of the revolving fund.
Beginning with Series 18, the Bonds will be governed by the new Master Trust Agreement (MTA). The MTA simplifies the flow and deallocation of funds. As depicted on the chart above, the MTA deallocates funds in the same method as prior bond series but when the funds release they flow directly to the Program Equity Fund. The Program Equity Fund is then available to cure shortfalls in all bond series governed by the MTA and prior bond series. Once it has been determined there no shortfalls, the funds are then available to be disbursed
to new loans, thus assuring the perpetual nature of the revolving fund.
Series 18 Green BondsOn January 7, 2015 the Trust issued $228.0 million in Green Bonds to fund 78 loans to 45 unique borrowers which was secured by 38 pledged direct loans totaling $108.0 million to an additional 33 borrowers. The Trust was able to borrow these funds at the true interest cost of 3.20% due to its AAA rating by all three rating agencies and the credit strength of its borrowers. The bond series was also one of the first Green Bonds issued by a SRF program in the nation and the Green Bond disclosure has since been used by other SRF programs. By designating the bond series as Green Bonds the Trust was able to attract nine new investors in Trust bonds and five new investors to the Green Bond market. In the Appendix to the Annual Report the Trust is providing an update to the Green Bond Disclosure in the Series 18 Official Statement as to the use of Green Bond proceeds. The Trust will continue to report on the use of proceeds until the full amount has been expended.
Security and Structure
Single Obligor Programs*# of Recipients: 3
# of Loans: 30Loan Principal Outstanding: $400M*Bond Principal Outstanding: $65M*
Reserve Balance: $121M*Final Maturity: 8/1/2032
Master Trust Agreement (MTA) # of Recipients: 68
# of Loans: 116Loan Principal Outstanding: $377MBond Principal Outstanding: $228M
Reserve Balance: $0Final Maturity: 2/1/2045
Pool SRF Program# of Recipients: 291
# of Loans: 1,598Loan Principal Outstanding: $3.1B*Bond Principal Outstanding: $3.0B*
Reserve Balance: $803M*Final Maturity: 2/1/2043
Single Obligor SRF Bonds
Commonwealth Assistance Payments
Individual DSRFs
Loan Repayments
Pool Program Reserve Fund
Pool SRF Bonds
Commonwealth Assistance Payments
Loan Repayments
Individual DSRFs
DEFICIENCY FUND
MTA Debt ServiceReserve Fund
(not funded for Series 18)
MTA Bonds
Commonwealth Assistance Payments
Loan Repayments
EQUITY FUNDS(approx. $350m) *
Excess coverage
Reserve De-allocation and Excess Coverage1 1
2
Receives periodic releases from the Deficiency FundSecures all MTA Bonds issued by the Trust on a parity basisAvailable to cure Prior Program Bonds
Prior Program Bonds
* As of June 30, 2015
2015 SRF ANNUAL REPORT | 20
Clean Water SRF 2015 2014
Annual Grant Awards
Federal Clean Water SRF Grant $47,603,000 $45,328,000
State Matching Funds 9,520,600
9,065,600
Total Federal & State Grant Awards
$57,123,600 $54,393,600
Annual Binding Commitments
$ Committed # of Loans $ Committed # of Loans
Binding Loan Commitments Issued $246,200,432 40 $175,348,175 38
Interest Earnings not for bond repayments
$1,116,496 $1,119,428
Annual Disbursements
$ Disbursed # of Loans $ Disbursed # of Loans
Clean Water Interim Loans $119,450,441 97 $124,091,583 83
Pool Program Project Loans 87,772,403 57 44,024,128 47
Total Disbursements $207,222,844 154 $168,115,711 130
Financial Results From Program Inception
Federal Clean Water SRF Grant $1,373,250,761 $1,325,647,761
State Matching Funds 248,038,692 238,518,092
Total Federal & State Grant Awards $1,621,289,453 $1,564,165,853
TOTAL Clean Water Assets $4,396,020,000 $4,360,261,000
TOTAL Loans Financed $4,984,826,956 $4,702,806,493
2015 SRF ANNUAL REPORT | 21
Drinking Water SRF 2015 2014
Annual Grant Awards
Federal Drinking Water SRF Grant $16,441,000 $15,699,000
State Matching Funds 3,288,200 3,139,800
Total Federal & State Grant Awards $19,729,200 $18,838,800
Annual Binding Commitments
$ Committed # of Loans $ Committed # of Loans
Binding Loan Commitments Issued $81,034,279 25 $118,696,488 28
Interest Earnings not for bond repayments
$187,348 $148,392
Annual Disbursements
$ Disbursed # of Loans $ Disbursed # of Loans
Drinking Water Interim Loans $58,547,738 33 $44,343,676 27
Pool Program Project Loans 24,227,038 47 22,130,322 29
Total Disbursements $ 82,774,776 80 $66,473,998 56
Financial Results From Program Inception
Federal Drinking Water SRF Grant $478,686,100 $462,245,100
State Matching Funds 85,294,020 82,005,820
Total Federal & State Grant Awards $563,980,120 $544,250,920
TOTAL Drinking Water Assets $1,256,933,000 $1,217,177,000
TOTAL Loans Financed $ 1,337,244,100 $ 1,248,875,836
2015 SRF ANNUAL REPORT | 22
SFY 2015 Clean Water CommitmentsPRA# Government Entity Agreement
DateProject Description Commitment Amount
CW-12-18-B BILLERICA 05/01/2015 WWTF Improvements $ 160,182
CW-14-20 BILLERICA 06/01/2015 Contract 35 Sewers 4,826,666
CWP-14-02 BOSTON 07/01/2014 Gardner St. Landfill Closure 15,777,800
CW-12-06 BRIDGEWATER 12/01/2014 Water Resource Management Plan 181,190
CWP-14-30 BROCKTON 04/01/2015 Sewer System Rehab 1,750,000
CW-12-21-A CHATHAM 01/01/2015 Collection System Extension and Improvements 133,464
CW-13-10 CHATHAM 07/01/2014 Collection System Extension and Improvements 3,336,119
CW-14-05* CHICOPEE 09/01/2014 CSO 25,478,178
CW-13-24 DRACUT 02/01/2015 Contract #32 Sewer Extensions 4,693,582
CW-14-13 EASTHAMPTON 03/01/2015 IWRMP 1,100,000
CW-14-24 EVERETT 12/01/2014 Storm Water/Sewer Evaluation 500,000
CW-14-14 FALL RIVER 12/01/2014 Integrated Wastewater & Stormwater Plan 2,999,619
CWP-14-22 FALMOUTH 04/01/2015 WWTF Upgrades 4,400,000
CWP-14-23 FALMOUTH 04/01/2015 Sewer Extensions and New Recharge Site 32,869,482
CW-12-23 GREAT BARRINGTON
07/01/2014 WWTF Upgrade and I/I Removal 3,930,130
CW-14-18 HAVERHILL 05/01/2015 Revised PH 2 CSO LCTP (Planning Project) 3,283,090
CWP-14-15 HAVERHILL 04/01/2015 CSO Improvements, WWTF and Sewer System 6,464,500
CW-13-13 LAWRENCE 08/01/2014 CMOM and SSES 3,840,000
CW-10-41-A LEOMINSTER 11/01/2014 WPCF Upgrades 2,500,000
CW-14-29 LUNENBURG 06/01/2015 Sewer Extensions 1,521,653
CWP-15-01 LWSC 06/01/2015 WWTP Incinerator Upgrade & Chlorine Gas Conversion
5,268,266
CW-14-31 MANCHESTER-BY-THE-SEA
05/01/2015 CWMP 250,000
CW-11-21-B MARLBOROUGH 07/01/2014 Marlborough Easterly WWTP Upgrades 12,681,920
CWP-14-32 MIDDLEBOROUGH 04/01/2015 WWTF Upgrades 25,000,000
CWP-14-28 MONTAGUE 04/01/2015 Pump Station Replacements 1,951,059
CW-13-30 MWRA 10/01/2014 Nut Island Headworks Electrical & Conveyor Improvement
840,982
CW-13-32 MWRA 10/01/2014 CSO Phase 14 21,000,000
CW-11-11-A NEEDHAM 08/01/2014 Replacement of Reservoir B Sewer Pump Station 175,004
CWP-14-19 NEW BEDFORD 04/01/2015 CSO Abatement 8,279,605
CW-14-11 REVERE 05/01/2015 CWMP/CSMP Supplemental Plan 1,200,000
CW-14-25 REVERE 02/01/2015 Collection System Improvements 700,000
CWP-14-12* REVERE 04/01/2015 Illicit Connection Detection Program (Planning Project)
10,982,142
CWP-14-08 SAUGUS 12/01/2014 Marblehead Replacement Crossing Sewer 2,109,614
CW-13-33 SESD 12/01/2014 SSO Reduction Subsystem 5 10,588,475
CWP-14-27* SPRINGFIELD WSC 04/01/2015 Dickinson Siphon/Main Interceptor Rehab 20,148,628
CWP-14-26 TAUNTON 04/01/2015 SSES Phases 10-12 4,129,082
CWT-14-07 ATHOL Board of Health 08/06/2014 Community Septic Management Program 200,000
CWT-14-09 MIDDLEBOROUGH 08/28/2014 Community Septic Management Program 400,000
CWT-14-10 PLYMOUTH 08/28/2014 Community Septic Management Program 300,000
CWT-15-05 TAUNTON 05/27/2015 Community Septic Management Program 250,000
Total $ 246,200,432 *Loans used for FFATA Reporting
2015 SRF ANNUAL REPORT | 23
SFY 2015 Drinking Water CommitmentsPRA# Government Entity Agreement
DateProject Description Commitment
AmountDW-14-01 AUBURN WATER
DISTRICT01/01/2015 West Street WTF Upgrade $2,688,952
DWP-14-09 BARNSTABLE 04/01/2015 Pipe Replacement and Maher WTP Upgrade 1,556,339 DWP-12-26A BROCKTON 06/01/2015 Water System Improvement Program 275,500
DWP-15-01 EASTHAM 05/01/2015 Water System Phase 1 2,979,493 DWP-14-08* FALL RIVER 04/01/2015 Water Main Improvements and WTP Residual
Handling 3,361,301
DWP-14-04 FALMOUTH 04/01/2015 Long Pond WTF 18,600,000 DWP-15-02 FALMOUTH 04/01/2015 Long Pond WTF 16,000,000
DWP-11-19A GLOUCESTER 01/01/2015 Water System Improvements 173,574DWP-12-02A GLOUCESTER 01/01/2015 Water Treatment Plant Upgrade 474,127
DW-13-12 HOLDEN 07/01/2014 Water Main Installation and SCADA Improvements 525,000DW-10-08A IPSWICH 07/01/2014 Water Main Replacement 1,581,427
DW-13-19 LWSC 06/01/2015 Low Service Reservoir Improvements 1,398,337DW-14-02* MARLBOROUGH 01/01/2015 Millham WTP Improvements 4,809,184
DW-13-13A MEDWAY 05/01/2015 Water Main Replacement 1,722,600DW-12-14 MERRIMAC WATER
DEPARTMENT10/01/2014 Water Main Replacement 981,402
DW-13-21 MWRA 10/01/2014 Southern Spine Distribution Mains 3,000,000DW-13-22 MWRA 10/01/2014 Lower Hultman Aqueduct Rehabilitation 1,800,000 DW-13-23 MWRA 10/01/2014 New Connecting Mains 666,666 DW-13-24 MWRA 10/01/2014 Low Service Storage 2,500,000 DW-13-20 MWRA 10/01/2014 Blue Hills Covered Storage 1,800,000
DWP-14-05 NEW BEDFORD 04/01/2015 Transmission Main Improvements 5,000,000DWP-15-03 NEW BEDFORD 04/01/2015 Transmission Main Improvements 4,323,792
DW-14-07 PAXTON 05/01/2015 Maple Street Elevated Tank 1,434,000 DW-14-12 UXBRIDGE 06/29/2015 Rt. 122 Water Main Replacement 3,186,000
DWP-13-15A WEBSTER 05/01/2015 Water Main 196,585 DWP-13-15 WEBSTER 4/1/2014 Water Main 1,729,415
DWP-11-23-A
WEST SPRINGFIELD 9/1/2013 Water Transmission Main and Wellfield 566,384
Total $ 81,034,279
*Loans used for FFATA Reporting
2015 SRF ANNUAL REPORT | 24
Seri
es 1
8 G
reen
Bon
d Pr
ojec
t Des
crip
tions
Proj
ects
Fin
ance
d w
ith G
reen
Bon
d Pr
ocee
ds
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
Tow
n of
Bar
reD
W$6
3,80
0W
ell #
3 Ev
alua
tion-
The
proj
ect i
s a p
lann
ing
stud
y to
pro
vide
the
Tow
n of
Bar
re w
ith m
ore
flexi
bilit
y in
ope
ratin
g th
eir w
ater
supp
ly sy
stem
. W
hile
the
tow
n is
not
look
ing
to in
crea
se th
eir
Wat
er M
anag
emen
t Act
(WM
A) a
ppro
ved
rate
, the
y ar
e lo
okin
g to
incr
ease
thei
r with
draw
al ra
te
from
Wel
l #3.
In
Sprin
g 20
10, W
ell #
1 te
sted
pos
itive
for c
olifo
rm b
acte
ria a
nd th
e to
wn
was
is
sued
a N
ON
by
DEP
to b
egin
per
man
ent d
isin
fect
ion
at W
ell #
1. B
ecau
se th
e w
ater
from
Wel
l #1
has
a h
igh
iron
conc
entra
tion,
inst
allin
g di
sinf
ectio
n at
the
site
will
like
ly re
sult
in o
ther
wat
er
qual
ity p
robl
ems.
Wel
l #3
does
not
hav
e a
high
iron
con
cent
ratio
n.
94.4
8%
Tow
n of
Bel
mon
tC
W2,
300,
000
Illic
it C
onne
ctio
n El
imin
atio
n-Th
is p
roje
ct w
ill e
limin
ate
sani
tary
sew
er il
licit
conn
ectio
ns
ente
ring
the
stor
m d
rain
sys
tem
’s tr
ibut
ary
to A
lew
ife B
rook
, Litt
le P
ond
and
Bla
ir Po
nd. T
he
obje
ctiv
e of
this
pro
ject
is to
pro
tect
pub
lic h
ealth
and
impr
ove
wat
er q
ualit
y in
are
a br
ooks
and
po
nds i
n th
e M
ystic
Riv
er W
ater
shed
.
95.7
2%
Tow
n of
Bill
eric
aC
W1,
515,
186
Phas
e I P
ump
Stat
ion
Upg
rade
-Thi
s pro
ject
will
resu
lt in
sew
er p
ump
stat
ion
impr
ovem
ents
/upg
rade
s to
all o
f the
pum
p st
atio
ns in
the
tow
n th
at a
re in
imm
edia
te n
eed
of
repa
ir or
repl
acem
ent d
ue to
imm
inen
t fai
lure
or s
afet
y ha
zard
. Th
e pu
mp
stat
ion
impr
ovem
ents
ar
e th
e re
sult
repa
irs n
eces
sary
for o
pera
tor s
afet
y, p
rope
r ala
rms a
nd b
ack-
up p
ower
be
impl
emen
ted.
The
elim
inat
ion
of th
e B
erth
a C
ircle
and
Poe
Roa
d Pu
mp
Stat
ions
and
byp
ass
with
gra
vity
sew
er w
ill b
e do
ne a
s par
t of P
hase
I. I
n ad
ditio
n to
the
Cat
egor
y 3
repa
irs, P
hase
I in
clud
es in
stitu
ting
a SC
AD
A s
yste
m, c
ompl
etio
n of
the
rem
aini
ng u
pgra
des t
o th
e R
oger
and
B
row
n Pu
mp
Stat
ions
and
com
pete
upg
rade
to th
e M
iddl
esex
Tur
npik
e Pu
mp
Stat
ion.
98.8
5%
Tow
n of
Bill
eric
aC
W9,
000,
000
Sew
er E
xten
sion
and
Pum
p St
atio
n Im
prov
emen
ts-T
his p
roje
ct in
clud
es a
sew
er e
xten
sion
in
East
Bill
eric
a an
d im
prov
emen
ts, u
pgra
des,
and/
or e
limin
atio
n of
seve
ral s
ewer
pum
p st
atio
ns in
th
e to
wn.
The
pro
ject
incl
udes
inst
alla
tion
of a
ppro
xim
atel
y 5
mile
s of s
ewer
in th
e hi
ghes
t pr
iorit
y ar
ea id
entif
ied
in th
e C
ompr
ehen
sive
Was
tew
ater
Man
agem
ent P
lan.
The
pum
p st
atio
n im
prov
emen
t pro
ject
incl
udes
elim
inat
ion
of th
e B
erth
a C
ircle
, Poe
Roa
d an
d M
arsh
all S
treet
Pu
mp
Stat
ions
and
impr
ovem
ents
to th
e N
ashu
a R
oad,
Ilfo
rd R
oad
and
Mon
son
Pum
p St
atio
n.
78.4
8%
Tow
n of
Bill
eric
aC
W4,
468,
535
Was
te W
ater
Tre
atm
ent F
acili
ties (
WW
TF) I
mpr
ovem
ents
-Thi
s pro
ject
will
incr
ease
the
phys
ical
and
bio
logi
cal c
apac
ity o
f the
Let
chw
orth
Ave
nue
WW
TF, w
hich
is v
ery
clos
e to
re
liabl
y tre
atin
g w
aste
wat
er.
The
proj
ect w
ill a
chie
ve th
is th
roug
h th
e im
plem
enta
tion
of th
e po
rtion
s of t
he C
apita
l Im
prov
emen
ts P
lan
(CIP
) whi
ch a
ddre
sses
cap
acity
con
cern
s.
Impr
ovem
ents
to th
e W
WTF
will
hel
p re
med
iate
wel
l doc
umen
ted
envi
ronm
enta
l im
pact
s to
the
Con
cord
Riv
er.
88.9
7%
2015 SRF ANNUAL REPORT | 25
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
To
wn
of B
iller
ica
CW
6,89
2,82
9W
aste
Wat
er T
reat
men
t Fac
ilitie
s (W
WTF
) Im
prov
emen
ts-T
his p
roje
ct w
ill in
crea
se th
e ph
ysic
al a
nd b
iolo
gica
l cap
acity
of t
he L
etch
wor
thA
venu
e W
WTF
, whi
ch is
ver
y cl
ose
to
relia
bly
treat
ing
was
tew
ater
. Th
e pr
ojec
t will
ach
ieve
this
thro
ugh
the
impl
emen
tatio
n of
the
porti
ons o
f the
Cap
ital I
mpr
ovem
ents
Pla
n (C
IP) w
hich
add
ress
es c
apac
ity c
once
rns.
Im
prov
emen
ts to
the
WW
TF w
ill h
elp
rem
edia
te w
ell d
ocum
ente
d en
viro
nmen
tal i
mpa
cts t
o th
e C
onco
rd R
iver
.
100.
00%
City
of B
rock
ton
DW
1,91
2,31
2W
ater
Sys
tem
Impr
ovem
ent P
rogr
am-T
his p
roje
ct in
clud
es m
ultip
le c
ontra
cts.
The
pro
ject
in
clud
es a
con
tract
whi
ch w
ill re
plac
e re
side
ntia
l wat
er m
eter
s and
impl
emen
t city
-wid
e A
utom
atic
Met
er R
eadi
ng (A
MR
). A
n ad
ditio
nal c
ontra
ct w
ill e
limin
ate
lead
serv
ice
conn
ectio
ns o
n W
est E
lm S
treet
whi
le a
noth
er c
ontra
ct w
ill u
pdat
e G
IS p
rogr
am fo
r im
plem
enta
tion
of A
MR
; rep
lace
air
relie
f val
ves o
n 24
" tra
nsm
issi
on m
ains
from
Silv
er L
ake;
W
est E
lm S
treet
serv
ice
conn
ectio
ns u
pgra
de; i
nsta
ll so
lar p
hoto
volta
ic c
ells
at S
ilver
Lak
e w
ater
tre
atm
ent f
acili
ty a
nd u
pgra
de o
rigin
al 1
950'
s boo
ster
stat
ion.
A m
ajor
reas
on fo
r the
met
er w
ork
is a
n ef
fort
to c
ompl
y w
ith a
n In
terb
asin
Tra
nsfe
r Act
requ
irem
ent t
o re
duce
una
ccou
nted
-for
-w
ater
to 1
0% o
r les
s.
79.7
6%
Tow
n of
Cha
tham
CW
3,84
7,85
3C
olle
ctio
n Sy
stem
Ext
ensi
on a
nd Im
prov
emen
ts-T
his s
ewer
Col
lect
ion
Syst
em E
xten
sion
and
Im
prov
emen
t Pro
ject
will
add
ress
nitr
ogen
load
ing
conc
erns
by
furth
er e
xten
ding
the
was
tew
ater
co
llect
ion
syst
em.
The
proj
ect i
s the
third
pha
se o
f im
plem
entin
g ni
troge
n m
itiga
tion
effo
rts th
at
bega
n in
201
0. T
he p
roje
ct w
ill in
clud
e se
wer
ing
addi
tiona
l sec
tions
of C
hath
am a
nd
cons
truct
ing
two
pum
p st
atio
ns c
apab
le o
f han
dlin
g a
tota
l of 6
8,00
0 ga
llons
per
day
of s
ewag
e.
The
miti
gatio
n of
nitr
ogen
will
hel
p pr
otec
t the
hea
lth o
f sal
t and
fres
h w
ater
bod
ies i
n th
e to
wn.
100.
00%
Che
rry
Val
ley
&
Roc
hdal
e
Wat
er D
istri
ct
DW
556,
038
Mod
ifica
tions
to W
ater
Tre
atm
ent P
lant
-Thi
s pro
ject
will
be
done
in tw
o ph
ases
. Th
e w
ork
in
Phas
e I c
onsi
sts o
f rep
laci
ng v
alve
s and
sand
med
ia a
t the
Grin
dsto
ne W
TF.
Phas
e I a
lso
incl
udes
a p
ilot s
tudy
for t
he p
ropo
sed
upgr
ades
to th
e W
TF, a
n up
date
toth
e ex
istin
g fe
asib
ility
st
udy
and
a C
apac
ity A
sses
smen
t Rep
ort.
Pha
se 2
con
sist
s of t
he c
onst
ruct
ion
of m
odifi
catio
ns
to th
e ex
istin
g W
TF.
Mod
ifica
tions
will
incl
ude
inst
allin
g a
Mie
x sy
stem
for T
OC
rem
oval
, a
cont
inuo
us m
onito
ring
syst
em fo
r the
Gro
undw
ater
rule
, re-
pipi
ng o
f the
bac
kwas
h sy
stem
, sp
illw
ay m
odifi
catio
ns a
nd re
plac
emen
t of h
igh
lift p
umps
in th
e ex
istin
g cl
earw
ell.
The
co
mpl
etio
n of
this
pro
ject
will
sign
ifica
ntly
impr
ove
the
qual
ity o
f wat
er su
pplie
d to
the
Che
rry
Val
ley
and
Roc
hdal
e W
ater
Dis
trict
incl
udin
g th
e ch
ief g
oal o
f rem
oval
of T
OC
's.
74.4
2%
2015 SRF ANNUAL REPORT | 26
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
C
ity o
f Chi
cope
eC
W14
,845
,991
Com
bine
d Se
wer
Ove
rflo
w (C
SO)-
This
pro
ject
incl
udes
CSO
sepa
ratio
n of
Cal
l Stre
et a
rea
and
Mon
tgom
ery
Stre
et/S
herid
an S
treet
. Th
ese
area
s rep
rese
nt P
hase
2 o
f the
eig
ht p
hase
pla
n pr
esen
ted
in C
hico
pee’
s Fin
al L
ong
Term
Con
trol P
lan
and
Fina
l Env
ironm
enta
l Im
pact
Rep
ort
(FLT
CP/
FEIR
).Th
e pr
ojec
t will
sepa
rate
ove
r 400
acr
es a
nd e
limin
ate
the
CSO
’s in
thes
e ar
eas.
In
mos
t cas
es se
wer
sepa
ratio
n fo
r the
se se
wer
sepa
ratio
n pr
ojec
ts w
ill b
e ac
hiev
ed b
y pr
ovid
ing
a ne
w sa
nita
ry se
wer
pip
e an
d ut
ilizi
ng th
e ex
istin
g co
mbi
ned
sew
er p
ipe
fort
he c
onve
yanc
e of
st
orm
wat
er.
The
elim
inat
ion
of C
SO d
isch
arge
to th
e C
hico
pee
Riv
er a
nd th
e cr
eatio
n of
ad
ditio
nal i
nter
cept
or c
apac
ity d
owns
tream
to a
ccom
mod
ate
com
bine
d se
wer
flow
s fro
m o
ther
ar
eas w
ithin
the
city
will
con
tribu
te to
impr
ove
wat
er q
ualit
y.
92.0
2%
City
of C
hico
pee
CW
3,00
8,86
0W
aste
wat
er, W
aste
Wat
er T
reat
men
t Fac
ility
(WW
TF)
and
Stor
mw
ater
Impr
ovem
ents
-The
In
tegr
ated
Mun
icip
al S
torm
wat
eran
d W
aste
wat
er R
esou
rce
Man
agem
ent P
lan
will
serv
e as
a
plan
ning
bas
is fo
r fut
ure
phas
es o
f CSO
aba
tem
ent a
nd in
fras
truct
ural
rene
wal
wor
k. S
igni
fican
t po
rtion
s of t
he In
tegr
ated
Pla
n w
ill b
e de
vote
d to
col
lect
ing
data
and
mod
elin
g to
doc
umen
t the
ac
tual
CSO
redu
ctio
n pr
ogre
ss th
at h
as b
een
mad
e by
the
alre
ady
com
plet
ed se
wer
sepa
ratio
n pr
ojec
ts, e
valu
atin
g th
e ef
fect
iven
ess o
f tho
se p
roje
cts a
nd re
-ass
essi
ng w
heth
er o
r not
to
cont
inue
full
impl
emen
tatio
n of
the
curr
ently
pro
pose
d C
SO L
ong
Term
Con
trol P
lan
reco
mm
enda
tions
.
80.9
9%
Tow
n of
Clin
ton
CW
120,
000
Stor
mw
ater
Man
agem
ent P
lan-
The
proj
ect i
s a p
lann
ing
stud
y to
dev
elop
spec
ific
reco
mm
enda
tions
and
impr
ovem
ents
for t
he st
orm
dra
in s
yste
m in
fras
truct
ure
and
asso
ciat
ed
surf
ace
wat
ers u
nder
the
Phas
e II
NPD
ES re
quire
men
ts fo
r the
Tow
n of
Clin
ton.
The
pro
ject
w
ill su
bsta
ntia
lly m
itiga
te p
robl
ems a
ssoc
iate
d w
ith st
orm
wat
er c
onta
min
atio
n.
100.
00%
Tow
n of
Dar
tmou
thC
W28
8,05
7In
flow
and
Infil
tratio
n (I
/I) a
nd S
ewer
Sys
tem
Eva
luat
ion
Surv
ey (S
SES)
-Thi
s pro
ject
will
co
nsis
t of I
/I an
d SS
ES fo
r are
as o
f tow
n th
at a
re tr
ibut
ary
to th
e So
uth
Dar
tmou
th a
nd C
lare
nce
pum
ping
stat
ions
. Th
ese
area
s of t
he to
wn
have
bee
n ex
perie
ncin
g ex
cess
ive
infil
tratio
n an
d in
flow
lead
ing
to se
wer
bac
k-up
s and
sani
tary
sew
er o
verf
low
. The
pro
ject
will
be
cond
ucte
d in
ac
cord
ance
with
DEP
s 199
3 G
uide
lines
for p
erfo
rmin
g (I
/I) a
nd S
SES.
The
pro
ject
will
iden
tify
the
sour
ces o
f the
exc
essi
ve I/
I and
reco
mm
end
mea
sure
s to
addr
ess t
he d
efic
ienc
ies.
100.
00%
Tow
n of
Dar
tmou
thC
W9,
847,
478
Was
te W
ater
Tre
atm
ent F
acili
ties (
WW
TF) U
pgra
des-
This
pro
ject
incl
udes
upg
rade
s and
im
prov
emen
ts to
the
(WW
TF) a
nd fo
ur p
ump
stat
ions
. M
ost o
f the
faci
litie
s/pr
oces
ses a
re 2
0 ye
ars o
ld a
nd u
pgra
des w
arra
nted
to c
ontin
ue to
mee
t the
cur
rent
and
futu
re N
PDES
per
mit.
U
pgra
des w
ill in
clud
e od
or c
ontro
l upg
rade
s, ad
ditio
n of
terti
ary
filtra
tion
syst
em a
nd
repl
acem
ent o
f pum
ping
syst
ems.
The
com
plet
ed p
roje
ct w
ill e
limin
ate
sew
er sy
stem
ove
rflo
ws
at so
uth
mai
n pu
mpi
ng st
atio
n, e
limin
ate
odor
rela
ted
com
plai
nts f
rom
resi
dent
s, de
crea
se fe
cal
colif
orm
and
ent
eroc
occi
con
cent
ratio
ns a
nd T
SS in
the
efflu
ent.
The
pro
ject
will
impr
ove
wat
er
qual
ity d
isch
arge
d to
the
wat
ersh
ed a
rea
and
to th
e B
uzza
rds B
ay a
rea.
94.8
6%
2015 SRF ANNUAL REPORT | 27
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
T
own
of D
racu
tC
W9,
559,
545
Col
lect
ion
Sew
ers-
The
obje
ctiv
e of
the
proj
ect i
s to
impr
ove
wat
er q
ualit
y in
the
area
by
redu
cing
the
amou
nt o
f unt
reat
ed w
aste
wat
er e
nter
ing
the
envi
ronm
ent f
rom
faile
d se
ptic
sy
stem
s and
dire
ct se
wer
age
conn
ectio
ns to
the
loca
l sto
rm w
ater
syst
em. T
hisp
roje
ct w
ill
prov
ide
sew
er se
rvic
e to
the
Met
huen
Stre
et a
nd W
heel
er R
oad
Are
as w
hich
are
loca
ted
in th
e ea
ster
n an
d so
uthe
aste
rn se
ctio
ns o
f Dra
cut.
The
pro
ject
incl
udes
the
cons
truct
ion
of
appr
oxim
atel
y 40
,000
lf o
f san
itary
gra
vity
sew
er, f
orce
mai
n an
d pr
essu
re se
wer
and
one
pu
mpi
ng st
atio
n.
94.4
9%
City
of E
vere
ttC
W66
1,96
7St
orm
wat
er/W
aste
wat
er C
apita
l Im
prov
emen
t-Th
e ob
ject
ive
of th
e Ev
eret
t and
Che
lsea
St
orm
wat
er/W
aste
wat
er C
apita
l Im
prov
emen
ts P
roje
ct is
to a
ddre
ss th
e cr
itica
l nee
d fo
r re
plac
emen
t of t
he fa
iling
Mar
ket S
treet
cul
vert
and
the
regu
lato
ry re
quire
men
ts fo
r re
habi
litat
ion/
repl
acem
ent o
f the
Beh
an S
treet
are
a w
aste
wat
er a
nd st
orm
wat
er in
fras
truct
ure.
U
ltim
atel
y th
ese
proj
ects
will
serv
e to
pro
tect
the
wat
er b
odie
s in
the
Mys
tic R
iver
and
Bos
ton
Har
bor b
asin
s. T
he M
arke
t Stre
et c
ulve
rt ha
s exp
erie
nced
seve
ral f
ailu
res s
ince
198
4 w
ith
vario
us se
ctio
ns o
f the
cul
vert
bein
g re
paire
d an
d/or
repl
aced
ove
r the
last
25
year
s. C
urre
ntly
, th
ere
is a
larg
e se
ctio
n of
the
culv
ert t
hat h
as p
artia
lly c
olla
psed
and
ther
e is
a si
gnifi
cant
con
cern
th
at th
e cu
lver
t may
com
plet
ely
fail.
Thi
s pro
ject
will
impl
emen
t an
inve
stig
atio
n an
d pl
anni
ng
effo
rt fo
cuse
d on
iden
tifyi
ng th
e fin
anci
al a
nd te
chni
cal r
equi
rem
ents
for r
ehab
ilita
tion
and/
or
repl
acem
ent o
f the
cul
vert.
The
Beh
an S
treet
are
a is
the
subj
ect o
f an
Adm
inis
trativ
e C
onse
nt
Ord
er is
sued
to th
e C
ity o
f Eve
rett
by M
assD
EP to
add
ress
seve
ral s
anita
ry se
wer
ove
rflo
ws i
n th
ese
area
s. T
he C
ity o
f Eve
rett
is c
urre
ntly
und
erta
king
an
inve
stig
atio
n of
this
are
a to
de
term
ine
the
natu
re a
nd e
xten
t of t
he re
quire
d co
rrec
tive
actio
ns.
Due
to th
e di
ffic
ultie
s en
coun
tere
d du
ring
the
clea
ning
and
CC
TV in
spec
tions
, the
eng
inee
r is e
valu
atin
g th
e fo
llow
ing
four
opt
ions
for p
ipel
ine
reha
bilit
atio
n/re
plac
emen
t: cu
red-
in-p
lace
pip
e lin
ing,
in-in
repl
acem
ent
(pip
e bu
rstin
g), s
liplin
ing
and
exca
vatio
n an
d re
plac
emen
t.
100.
00%
Fair
have
nD
W78
9,84
6B
osto
n H
ill T
ank
Reh
ab a
nd M
ain
Rep
lace
men
t-Th
e pr
ojec
t is f
or th
e pa
intin
g, c
lean
ing
and
reha
bilit
atio
n of
the
Bos
ton
Hill
Wat
er S
tora
ge T
ank.
Ins
talla
tion
of a
new
mix
ing
syst
em in
the
tank
will
enh
ance
wat
er q
ualit
y an
d m
inim
ize
the
form
atio
n se
dim
ent a
t the
bot
tom
of t
he ta
nk.
The
addi
tion
of se
curit
y m
easu
res w
ill re
duce
una
utho
rized
acc
ess t
o th
e ta
nk a
nd p
oten
tial
cont
amin
atio
n.
93.8
3%
2015 SRF ANNUAL REPORT | 28
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
C
ity o
f Fal
l Riv
erC
W12
,668
,331
Com
bine
d Se
wer
Ove
rflo
ws (
CSO
) Aba
tem
ent P
rogr
am-T
he o
bjec
tive
of th
is p
roje
ct is
to
abat
eCSO
’sin
Fal
l Riv
er in
ord
er to
ach
ieve
com
plia
nce
with
stat
e an
d fe
dera
l CSO
regu
latio
ns
and
to c
ompl
y w
ith a
Fed
eral
Cou
rt O
rder
. Th
e w
ork
invo
lves
the
cons
truct
ion
of C
SO c
ontro
ls
for t
he P
resi
dent
Ave
nue
CSO
out
fall
and
othe
r CSO
out
falls
to th
e Ta
unto
n R
iver
and
Mt.
Hop
e B
ay.
This
pro
ject
is p
art o
f a m
ulti-
year
und
erta
king
. Pl
anne
d C
SO c
ontro
l pro
ject
s inc
lude
se
vera
l add
ition
al C
SO sc
reen
ing
and
disi
nfec
tion
faci
litie
s and
/or s
ewer
sepa
ratio
n pr
ojec
ts T
he
City
of F
all R
iver
has
a c
ombi
ned
syst
em w
ith 1
9 C
SO o
utfa
lls th
at d
isch
arge
to th
e M
t. H
ope
Bay
, Tau
nton
Riv
er o
r Que
quec
han
Riv
er. T
hese
CSO
out
falls
dis
char
ge u
ntre
ated
stor
mw
ater
ru
noff
and
sew
age
with
ass
ocia
ted
feca
l col
iform
, flo
atab
les,
susp
ende
d so
lids,
nutri
ents
, and
ot
her c
onta
min
ants
dur
ing
wet
wea
ther
to th
eir r
espe
ctiv
e re
ceiv
ing
wat
ers.
81.7
4%
City
of F
all R
iver
DW
112,
499
Wat
er S
yste
m M
aste
r Pla
n U
pdat
e-Th
is p
roje
ct w
ill u
pdat
e th
e 20
02 W
ater
Sys
tem
Mas
ter P
lan.
Th
e pl
an w
ill a
ddre
ss sy
stem
impr
ovem
ents
com
plet
ed si
nce
2002
. Th
e H
ydra
ulic
Mod
el w
ill b
e up
date
d an
d re
com
men
datio
ns w
ill b
e m
ade
for c
ontin
ued
syst
em im
prov
emen
ts.
Upd
atin
g th
e pl
an w
ill in
clud
e an
alyz
ing
the
over
all s
yste
m in
clud
ing
wat
er m
ains
, tan
ks a
nd w
ater
trea
tmen
t pl
ants
the
Wat
er S
yste
m M
aste
r Pla
n w
ill h
elp
assi
st th
e ci
ty in
pla
nnin
g, fu
ture
fund
ing
and
prio
ritiz
atio
n of
pro
ject
s as w
ell a
s ide
ntify
ing
any
exis
ting
env
ironm
enta
l or p
ublic
hea
lth
issu
es in
the
wat
er sy
stem
.
100.
00%
City
of F
all R
iver
DW
2,40
3,94
0W
ater
Mai
n Im
prov
emen
ts, P
hase
12-
This
pro
ject
is fo
r the
repl
acem
ent o
f wat
er m
ains
and
le
ad se
rvic
es o
n va
rious
stre
ets i
n Fa
ll R
iver
and
for w
ater
mai
n im
prov
emen
ts a
t Wat
tupp
a Po
nd. T
he p
roje
ct in
clud
es th
e ev
alua
tion
and
refu
rbis
hmen
t of t
he tr
ansm
issi
on m
ains
bet
wee
n th
e w
ater
trea
tmen
t pla
nt a
nd th
e B
edfo
rd S
treet
Tan
ks. T
he w
ork
will
als
o in
clud
e ne
w d
rain
age
infr
astru
ctur
e al
ong
Bed
ford
Stre
et in
the
vici
nity
of t
he W
ater
Dep
artm
ent f
acili
ties t
o be
tter
prot
ect N
orth
Wat
tupp
a Po
nd fr
om w
asho
uts o
fsur
roun
ding
road
way
s. Th
e ci
ty is
cur
rent
ly
unde
r Adm
inis
tratio
n O
rder
due
to v
iola
tions
of t
he le
ad a
nd c
oppe
r rul
e. T
he w
ater
mai
n im
prov
emen
ts a
t Wat
tupp
a Po
nd w
ill h
elp
cont
inue
pro
tect
ion
of th
e w
ater
supp
ly a
nd c
ontin
ue
to p
rovi
de sa
fe a
nd re
liabl
e w
ater
supp
ly to
the
city
.
99.1
7%
City
of F
itchb
urg
CW
5,57
5,79
9C
ombi
ned
Sew
er S
epar
atio
n (C
SS)-
This
pro
ject
is th
e co
ntin
uatio
n of
the
city
’s p
rogr
am to
se
para
te c
ombi
ned
sew
ers t
o el
imin
ate
raw
sew
age
disc
harg
es d
urin
g st
orm
eve
nts.
The
pro
ject
el
imin
ates
com
bine
d se
wer
s by
cons
truct
ing
new
dra
inag
e pi
pes a
djac
ent t
o se
wer
pip
es to
co
nvey
stor
mw
ater
, whi
ch w
ill a
llow
the
city
to c
lose
seve
ral C
ombi
ned
Sew
er O
verf
low
s (C
SOs)
. Th
e pr
ojec
t will
real
ize
heal
th a
nd sa
fety
ben
efits
from
redu
ced
odor
s, im
prov
ed
aest
hetic
s and
bet
ter w
ater
qua
lity
in th
e N
ashu
a R
iver
and
aff
ecte
d tri
buta
ries,
and
allo
w th
e ci
ty
to c
ompl
y w
ith th
e A
dmin
istra
tive
Con
sent
Ord
er is
sued
by
the
EPA
.
98.0
1%
2015 SRF ANNUAL REPORT | 29
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
C
ity o
f Fitc
hbur
gC
W7,
143,
406
Che
mic
ally
Enh
ance
d Pr
imar
y Tr
eatm
ent U
pgra
de-T
his p
roje
ct is
the
upgr
ade
of th
e Ea
ster
ly
Was
tew
ater
Tre
atm
ent F
acili
ty (W
WTF
) to
add
chem
ical
ly e
nhan
ced
prim
ary
treat
men
t. T
he
faci
lity
rece
ives
all
the
was
tew
ater
flow
s fro
m th
e ci
ty a
s wel
l as c
ontri
butio
ns fr
om W
estm
inst
er
and
Lune
nbur
g. T
he fa
cilit
y di
scha
rges
its t
reat
ed e
fflu
ent t
o th
e N
orth
Bra
nch
of th
e N
ashu
a R
iver
. Th
e fa
cilit
y ha
s exc
eede
d its
allo
wab
le d
isch
arge
lim
its u
nder
its N
PDES
per
mit,
pa
rticu
larly
in th
e am
ount
of p
hosp
horo
us a
nd a
mm
onia
dis
char
ged.
The
EPA
has
issu
ed a
n A
dmin
istra
tive
Ord
er fo
r Com
plia
nce
to th
e ci
ty fo
r the
vio
latio
n of
the
efflu
ent l
imits
in th
e pe
rmit.
Thi
s pro
pose
d w
ork
will
sign
ifica
ntly
impr
ove
disc
harg
e pe
rmit
com
plia
nce
and
will
im
prov
e th
e w
ater
qua
lity
of th
e N
ashu
a R
iver
.
100.
00%
Tow
n of
Fr
amin
gham
CW
3,51
5,99
8Ea
st F
ram
ingh
am S
ewer
Impr
ovem
ents
-Pha
se 1
of t
his p
roje
ct in
clud
es th
e el
imin
atio
n of
thre
e ex
istin
g pu
mpi
ng st
atio
ns a
nd a
ppro
xim
atel
y 22
,000
feet
of e
xist
ing
forc
e m
ain
by c
ombi
ning
tw
o se
para
te m
ajor
pum
ping
stat
ions
into
one
and
by
redi
rect
ing
flow
by
grav
ity fr
om th
e tri
buta
ry a
reas
of t
wo
othe
r pum
ping
stat
ions
to a
new
inte
rcep
tor s
ewer
inst
alle
d at
a lo
wer
de
pth.
Thi
s pro
ject
repr
esen
ts th
e ce
ntra
l pro
ject
in a
serie
s of p
ropo
sed
proj
ects
that
are
re
com
men
ded
in th
e re
cent
ly c
ompl
eted
CW
MP.
100.
00%
City
of G
louc
este
rD
W4,
482,
909
Wat
er T
reat
men
t Pla
nt (W
TP) U
pgra
de-T
he p
urpo
se o
f the
WTP
Upg
rade
s is t
o im
prov
e re
liabi
lity,
redu
ndan
cy a
nd e
nerg
y ef
ficie
ncy
at th
e ci
ty's
Wes
t Glo
uces
ter f
acili
ty.
Prop
osed
im
prov
emen
ts in
clud
e re
plac
emen
t of m
uch
of th
e m
echa
nica
l and
ele
ctric
al e
quip
men
t whi
ch
has r
each
ed th
e en
d of
its u
sefu
l life
and
is a
lso
inef
ficie
nt.
The
upgr
ade
will
incl
ude
a ba
ckw
ash
wat
er re
cycl
e sy
stem
whi
ch w
ill si
gnifi
cant
ly re
duce
was
tew
ater
dis
char
ged
to th
e G
louc
este
r se
wer
syst
em (s
peci
fical
ly th
e Es
sex
Ave
Sew
er a
nd B
anjo
Pum
p St
atio
n) p
oten
tially
redu
cing
th
e fr
eque
ncy
and
seve
rity
of p
oten
tial f
utur
e SS
O's.
In
addi
tion,
safe
ty e
quip
men
t will
be
upda
ted
and/
or in
stal
led
at b
oth
the
Wes
t Glo
uces
ter a
nd B
abso
n W
TP's.
All
the
impr
ovem
ents
at
the
Wes
t Glo
uces
ter W
TP w
ill im
prov
e re
liabi
lity
of th
e W
TP's
abili
ty to
pro
vide
a c
onst
ant
supp
ly o
f drin
king
wat
er e
spec
ially
if th
ere
is ra
w w
ater
con
tam
inat
ion
and/
or m
echa
nica
l fai
lure
at
the
Bab
son
WTP
.
100.
00%
City
of G
louc
este
rD
W9,
866,
524
Wat
er S
yste
m Im
prov
emen
ts-T
he p
roje
ct is
split
into
thre
e co
ntra
cts.
Con
tract
1 is
for t
he
clea
ning
and
pai
ntin
g of
the
0.6
MG
Bla
ckbu
rn W
ater
Sto
rage
Tow
er a
nd th
e 1.
0 M
G P
lum
C
ove
Wat
er S
tora
ge T
ank.
The
re w
ill a
lso
be th
e in
still
atio
n of
hyd
raul
ic m
ixin
g sy
stem
s for
th
ese
tank
s and
the
6.0
MG
Bon
d H
ill R
eser
voir.
Thi
s con
tract
will
als
o in
clud
e op
erat
iona
l up
date
s to
the
Fulle
r Boo
ster
Pum
p St
atio
n. C
ontra
ct 2
will
incl
ude
repl
acin
g ap
prox
imat
ely
2-1/
2 m
iles o
f cas
t iro
n w
ater
mai
n al
ong
Wes
tern
Ave
nue.
Con
tract
3 in
clud
es re
plac
ing
appr
oxim
atel
y 4
mile
s of w
ater
mai
n in
the
Com
mon
wea
lth A
venu
e ne
ighb
orho
od.
100.
00%
2015 SRF ANNUAL REPORT | 30
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
C
ity o
f Glo
uces
ter
DW
2,52
2,36
8W
ater
Tra
nsm
issi
on Im
prov
emen
ts-T
his p
roje
ct c
onsi
sts o
f rel
ocat
ing
appr
oxim
atel
y 2,
100
feet
of
20-
inch
wat
er m
ain
from
the
Bon
d H
ill T
ank
to W
este
rn A
venu
e to
mak
e it
acce
ssib
le fo
r ro
utin
e an
d em
erge
ncy
mai
nten
ance
. A
seco
nd a
spec
t of t
he p
roje
ct is
to re
loca
te th
e tw
o 20
-in
ch w
ater
mai
ns u
nder
the
Bly
man
Can
al fr
om th
e W
este
rn A
venu
e ut
ility
tunn
el to
the
area
di
rect
ly u
nder
Ann
esqu
am R
iver
.
82.7
4%
Gre
ater
Law
renc
e Sa
nita
ry D
istr
ict
CW
2,29
6,51
5W
aste
Wat
er T
reat
men
t Pla
nt Im
prov
emen
ts-T
he p
roje
ct is
Pha
se 1
of t
he D
istri
ct’s
“Fi
nal L
ong
Term
Com
bine
d Se
wer
Ove
rflo
w (C
SO) C
ontro
l Pla
n an
d En
viro
nmen
tal I
mpa
ct R
epor
t” a
nd
incl
udes
: prim
ary
clar
ifier
enh
ance
men
ts to
impr
ove
rem
oval
eff
icie
ncy
unde
r hig
h flo
w
cond
ition
s, ad
ditio
n of
a fi
fth a
erat
ion
blow
er a
nd a
dditi
onal
aer
atio
n ta
nk d
iffus
ers,
mod
ifica
tions
and
impr
ovem
ents
to th
e se
cond
ary
treat
men
t sys
tem
influ
ent f
low
gat
es a
nd
aera
tion
syst
em, r
eloc
atio
n of
the
exis
ting
ferr
ic c
hlor
ide
syst
em to
allo
w e
xpan
sion
of t
he p
lant
so
dium
hyp
ochl
orite
syst
em a
nd fu
rther
stud
y of
pro
pose
d im
prov
emen
ts to
the
Riv
ersi
de P
ump
Stat
ion
and
forc
e m
ain.
The
dis
trict
ant
icip
ates
the
proj
ect w
ill fu
rther
redu
ce th
e nu
mbe
r of
CSO
ove
rflo
ws a
nd in
crea
se c
aptu
re o
f wet
wea
ther
flow
s.
86.2
3%
Gre
ater
Law
renc
e Sa
nita
ry D
istri
ctC
W72
1,41
5N
ew F
orce
Mai
n fo
r Riv
ersi
de P
ump
Stat
ion-
The
proj
ect i
s Pha
se 3
of t
he D
istri
ct's
"Fin
al L
ong
Term
Com
bine
d Se
wer
Ove
rflo
w (C
SO) C
ontro
l Pla
n an
d En
viro
nmen
tal I
mpa
ct R
epor
t" a
nd
incl
udes
con
stru
ctio
n of
app
roxi
mat
ely
1/2
mile
s of n
ewfo
rce
mai
n fr
om th
e R
iver
side
Pum
p (th
e D
istri
ct's
mai
n pu
mpi
ng s
tatio
n) to
the
Dis
trict
's w
aste
wat
er tr
eatm
ent f
acili
ty (W
WTF
) and
m
odifi
catio
ns to
the
forc
e m
ain
head
er.
The
exis
ting
forc
e m
ain
has b
een
iden
tifie
d as
subj
ect t
o pr
emat
ure
failu
re d
ue to
brea
kage
of t
he p
re-s
tress
ing
wire
. A
cous
tic m
onito
ring
of th
e pi
pe
conf
irms t
hat t
he w
ire b
reak
s are
occ
urrin
g on
this
pip
e. R
epla
cem
ent w
ill e
limin
ate
the
thre
at o
f a
cata
stro
phic
pip
e fa
ilure
whi
ch p
oses
a d
irect
thre
at to
the
Mer
rimac
k R
iver
, nea
rby
resi
dent
s, an
d th
e ad
jace
nt M
BTA
railr
oad
line.
The
Dis
trict
ant
icip
ates
that
this
pro
ject
will
pro
vide
the
conv
eyan
ce c
apac
ity n
eces
sary
to fu
lly im
plem
ent t
he d
istri
ct's
CSO
Con
trol P
lan.
Ful
l im
plem
enta
tion
of th
e pl
an w
ill re
duce
the
num
ber o
f CSO
ove
rflo
ws a
nd w
ill in
crea
se c
aptu
re
of w
et w
eath
er fl
ows.
76.0
9%
City
of H
aver
hill
CW
5,17
6,67
1C
ombi
ned
Sew
er O
verf
low
/Flo
od C
ontro
l Im
prov
emen
ts-T
he p
roje
ct in
clud
es th
e pu
rcha
sing
of
thre
e m
obile
10.
5 M
GD
trai
ler m
ount
ed p
umps
and
impr
ovem
ents
to th
e se
wer
col
lect
ion
syst
em, o
n th
e M
errim
ack
Riv
er F
lood
wal
l and
the
Littl
e R
iver
Con
duit.
The
trai
ler m
ount
ed
pum
ps w
ill b
e us
ed a
s a b
acku
p to
the
Mar
gina
l Pum
p St
atio
n du
ring
high
flow
eve
nts.
C
olle
ctio
n sy
stem
impr
ovem
ents
incl
ude
upgr
ades
to se
ven
dive
rsio
n ga
tes t
o al
low
flow
to b
e di
verte
d aw
ay fr
om th
e m
iddl
e se
wer
inte
rcep
tor a
nd M
argi
nal P
ump
Stat
ion.
Im
prov
emen
ts to
th
e M
errim
ack
Floo
dwal
l con
sist
of r
epai
rs to
the
exis
ting
flood
wal
l; im
prov
emen
ts to
the
Littl
e R
iver
Con
duit
incl
ude
conc
rete
repa
irs, r
epai
ring
expa
nsio
n jo
ints
, re-
poin
ting
pier
s, an
d re
late
d w
ork
to m
itiga
te st
orm
wat
er im
pact
s on
the
cond
uit.
74.4
0%
2015 SRF ANNUAL REPORT | 31
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
To
wn
of H
ollis
ton
DW
2,50
0,00
0W
ell N
o. 4
Rep
lace
men
t and
Tre
atm
ent P
lant
Upg
rade
-The
Tow
n of
Hol
listo
n W
ell N
o. 4
cu
rren
tly e
xper
ienc
es e
valu
ated
con
cent
ratio
ns o
f iro
n, m
anga
nese
and
org
anic
mat
eria
l. T
his
proj
ect w
ill re
duce
the
amou
nt o
f org
anic
mat
eria
l in
the
raw
wat
er th
roug
h th
e in
stal
latio
n of
a
repl
acem
ent w
ell.
The
exi
stin
g W
ell 4
Wat
er T
reat
men
t Fac
ility
will
be
upgr
aded
to a
ddre
ss th
e ne
w w
ater
qua
lity
from
the
repl
acem
ent w
ell.
The
upg
rade
to th
e W
ater
Tre
atm
ent f
acili
ty w
ill
rem
ove
one
of th
e pr
ecur
sors
of d
isin
fect
ion
by p
rodu
cts (
DB
Ps).
DB
Ps a
re th
e re
sult
of th
e co
mbi
natio
n of
the
orga
nic
mat
eria
l and
dis
infe
ctan
t. T
he w
ell u
ses s
odiu
m h
ypoc
hlor
ite fo
r di
sinf
ectio
n in
the
finis
hed
wat
er o
f the
trea
tmen
t pla
nt a
nd w
ith th
e el
evat
ed c
once
ntra
tions
of
orga
nic
mat
eria
lDB
Ps e
xcee
ding
the
regu
lato
ry li
mits
may
form
in th
e di
strib
utio
n sy
stem
. Th
e el
evat
ed le
vels
of i
ron
in th
e di
strib
utio
n sy
stem
may
als
o le
ad to
iron
bac
teria
cre
atin
g a
publ
ic
heal
th th
eat.
The
pro
ject
upg
rade
s will
redu
ce th
e am
ount
of i
ron
in th
e fin
ishe
d w
ater
pr
even
ting
the
form
atio
n of
iron
bac
teria
.
100.
00%
Tow
n of
Ipsw
ich
CW
2,24
6,79
1W
aste
wat
er S
olid
s &U
V D
isin
fect
ion
Upg
rade
s-Th
is p
roje
ct w
ill re
habi
litat
e an
d im
prov
e th
e ex
istin
g so
lids h
andl
ing
equi
pmen
t and
the
exis
ting
UV
dis
infe
ctio
n sy
stem
. The
solid
s han
dlin
g sy
stem
upg
rade
s are
inte
nded
to re
plac
e w
orn
out e
quip
men
t, im
prov
e so
lids h
andl
ing
syst
em
perf
orm
ance
and
cap
acity
and
impr
ove
effic
ienc
y. Im
prov
ed so
lids h
andl
ing
syst
ems w
ill a
lso
redu
ce p
erfo
rman
ce im
pact
s on
the
ultra
viol
et li
ght d
isin
fect
ion
syst
em. T
he U
V D
isin
fect
ion
Syst
em u
pgra
des a
re in
tend
ed to
pro
mot
e co
mpl
ianc
e w
ith th
e ef
fluen
t cha
ract
eris
tics l
iste
d un
der t
he N
PDES
Per
mit,
exp
ress
ly re
late
d to
feca
l col
iform
exc
eeda
nces
. Bas
ed o
n th
e 20
09
Was
tew
ater
Sol
ids H
andl
ing
Stud
y, th
e pr
opos
ed so
lids h
andl
ing
upgr
ades
incl
ude
a ne
w 4
0 fo
ot
diam
eter
thic
kene
r, re
furb
ishe
d sl
udge
stor
age
tank
, new
cen
trifu
ge, n
ew d
ewat
erin
g so
lids
conv
eyor
s, ne
w tr
uck
load
ing
hopp
er, a
nd n
ew se
ptag
e re
ceiv
ing
syst
em.
100.
00%
Tow
n of
Kin
gsto
nD
W4,
482,
474
Trac
kle
Pond
Wat
er T
reat
men
t Fac
ility
(WTF
)-Th
is p
roje
ct in
clud
es th
e co
nstru
ctio
n of
a n
ew
WTF
to re
duce
man
gane
se c
once
ntra
tions
at t
he T
rack
le P
ond
Wel
l. T
he n
ew W
TF w
ill in
clud
e La
yneO
x Fi
ltrat
ion
Syst
em, U
V d
isin
fect
ion,
PLC
and
SC
AD
A s
yste
m, s
olar
pan
el in
stal
latio
n,
and
repl
acem
ent o
f exi
stin
g w
ell p
umps
. T
he c
ompl
eted
pro
ject
will
redu
ce h
igh
man
gane
se
conc
entra
tions
that
are
aff
ectin
g ta
ste
and
colo
r of t
he d
rinki
ng w
ater
. Th
e pr
ojec
t will
als
o el
imin
ate
heal
th c
once
rn fo
r inf
ants
and
you
ng c
hild
ren.
95.5
9%
City
of L
awre
nce
DW
1,58
9,82
7V
alve
Rep
lace
men
t-Th
is p
roje
ct w
ill re
pair
and
repl
ace
brok
en a
nd m
alfu
nctio
ning
val
ves i
n a
sign
ifica
nt n
umbe
r of l
ocat
ions
in th
e La
wre
nce
Wat
er D
istri
butio
n Sy
stem
. Ove
r 90
valv
es,
rang
ing
in si
ze fr
om 6
" to
12"
, hav
e be
en id
entif
ied
need
ing
repa
ir or
repl
acem
ent i
n th
e di
strib
utio
n sy
stem
. As a
resu
lt of
this
pro
ject
, the
city
will
be
able
to im
plem
ent a
uni
dire
ctio
nal
flush
ing
prog
ram
and
a v
alve
exe
rcis
e pr
ogra
m w
hich
will
allo
w th
e ci
ty to
isol
ate
wat
er m
ain
sect
ions
dur
ing
repa
irs o
r in
the
case
of e
mer
genc
ies.
99.3
2%
2015 SRF ANNUAL REPORT | 32
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
C
ity o
f Law
renc
eD
W3,
318,
458
Wat
er M
eter
Rep
lace
men
t-Th
is p
roje
ct in
volv
es re
plac
ing
appr
oxim
atel
y 10
,700
exi
stin
g m
eter
s in
resi
dent
ial,
com
mer
cial
and
mun
icip
al st
ruct
ures
and
impl
emen
ting
a m
eter
read
ing
syst
em.
The
proj
ect w
ill e
nabl
e th
e ci
ty to
reco
ver c
osts
of u
nder
-reg
iste
ring
met
ers a
nd re
duce
the
amou
nt o
f una
ccou
nted
for w
ater
.
88.1
2%
Lynn
Wat
er a
nd
Sew
er C
omm
issi
onC
W90
7,37
4W
ind
Turb
ine
Proj
ect-
The
proj
ect w
ill c
onst
ruct
a w
ind
turb
ine
with
a m
inim
um ra
ted
capa
city
of
600
kW
at t
he R
egio
nal W
ater
Pol
lutio
n C
ontro
l Fac
ility
in L
ynn.
The
LW
SC W
WTF
co
nsum
es a
ppro
xim
atel
y 12
,000
,000
kW
h of
ele
ctric
ity p
er y
ear a
nd th
e es
timat
ed n
et e
nerg
y pr
oduc
tion
for t
he tu
rbin
e is
993
,400
kW
h an
nual
ly.
100.
00%
City
ofM
alde
nC
W3,
844,
078
Sew
er Im
prov
emen
ts-T
his s
ewer
line
impr
ovem
ent p
roje
ct w
as in
itiat
ed in
resp
onse
to a
n A
dmin
istra
tive
Con
sent
Ord
er n
egot
iate
d w
ith M
assD
EP a
nd th
e U
S EP
A.
The
cons
truct
ion
proj
ect w
ill re
duce
infil
tratio
n an
d in
flow
(I/I)
and
sani
tary
sew
er o
verf
low
s fro
m o
ccur
ring
with
in th
e C
ity o
f Mal
den'
s was
tew
ater
col
lect
ion
syst
em w
hich
is b
eing
trea
ted
at th
e D
eer
Isla
nd S
ewag
e Tr
eatm
ent P
lant
unn
eces
saril
y. T
he p
roje
ct in
clud
es c
ured
-in-p
lace
pip
e lin
er
(CIP
PL) f
or a
ppro
xim
atel
y 28
,000
feet
of 8
-inch
to 1
0-in
ch p
ipe.
App
roxi
mat
ely
80 m
anho
les
have
als
o be
en id
entif
ied
as b
eing
in n
eed
of m
onol
ithic
cem
entit
ious
line
r. F
urth
er,
appr
oxim
atel
y 1,
200
serv
ice
late
ral l
iner
s are
pro
pose
d to
miti
gate
infil
tratio
n fr
om e
nter
ing
the
sew
er m
ains
at s
ervi
ce la
tera
l con
nect
ions
.
88.0
8%
City
of M
alde
nD
W27
0,89
9Th
e pr
ojec
t will
upd
ate
the
lead
serv
ice
line
repl
acem
ent p
rogr
am re
quire
d as
par
t of t
he
adm
inis
trativ
e co
nsen
t ord
er (A
CO
-BO
-06-
5D00
1) to
rem
ove
lead
serv
ices
thro
ugho
ut th
e sy
stem
. Thi
s pla
nnin
g pr
ojec
t con
sist
s of a
new
wat
er d
istri
butio
n m
odel
and
Cap
ital
Impr
ovem
ents
Pla
n (C
IP) a
nd w
ill a
llow
the
City
to d
evel
op a
com
pute
r mod
el th
at w
ill h
elp
stim
ulat
e ex
istin
g co
nditi
ons o
f the
sys
tem
and
eva
luat
e th
e co
nditi
ons o
f the
syst
em. T
he C
IP b
e ba
sed
on sy
stem
def
icie
ncie
s ide
ntifi
ed in
the
hydr
aulic
mod
el. T
he p
roje
ct w
ill p
rovi
de th
e ci
ty
with
tech
nica
l res
ourc
es to
com
plet
e de
velo
pmen
t of G
IS d
ata
and
base
for t
he e
xist
ing
Drin
king
W
ater
dis
tribu
tion
syst
em.
100.
00%
City
of M
alde
nD
W6,
065,
116
Wat
er D
istri
butio
n Sy
stem
Pla
nnin
g-Th
e pr
ojec
t will
upd
ate
the
lead
serv
ice
line
repl
acem
ent
prog
ram
requ
ired
as p
art o
f the
adm
inis
trativ
e co
nsen
t ord
er to
rem
ove
lead
serv
ices
thro
ugho
ut
the
syst
em. T
his p
lann
ing
proj
ect c
onsi
sts o
f a n
ew w
ater
dis
tribu
tion
mod
el a
nd C
apita
l Im
prov
emen
ts P
lan
(CIP
) and
will
allo
w th
e ci
ty to
dev
elop
a c
ompu
ter m
odel
that
will
hel
p st
imul
ate
exis
ting
cond
ition
s of t
he s
yste
m a
nd e
valu
ate
the
cond
ition
s of t
he sy
stem
. The
CIP
be
base
d on
syst
em d
efic
ienc
ies i
dent
ified
in th
e hy
drau
lic m
odel
. The
pro
ject
will
pro
vide
the
city
w
ith te
chni
cal r
esou
rces
to c
ompl
ete
deve
lopm
ent o
f GIS
dat
a an
d ba
se fo
r the
exi
stin
g D
rinki
ng
Wat
er d
istri
butio
n sy
stem
.
95.7
5%
2015 SRF ANNUAL REPORT | 33
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
C
ity o
f Mal
den
DW
918,
658
This
pro
ject
will
incl
ude
the
repl
acem
ent o
f old
unl
ined
cas
t iro
n w
ater
mai
ns w
ith la
rger
cem
ent
lined
duc
tile
iron
wat
er m
ains
to e
nhan
ce th
e ca
rryi
ng c
apac
ity a
nd q
ualit
y of
wat
er. T
he p
roje
ct
will
als
o in
clud
e th
e re
mov
al o
f sev
eral
lead
serv
ice
lines
in c
ompl
ianc
e w
ith a
n A
CO
issu
ed b
y th
e st
ate
in re
spon
se to
drin
king
wat
er sa
mpl
es th
at e
xcee
ded
the
actio
n le
vel f
or le
ad.
38.5
5%
Tow
n of
Mar
ion
CW
3,14
7,40
0W
aste
wat
er a
nd S
torm
wat
erIm
prov
emen
t-Th
e ob
ject
ive
of th
is W
aste
wat
er C
olle
ctio
n Sy
stem
an
d D
rain
age
Syst
em Im
prov
emen
ts p
roje
ct is
to im
prov
e w
ater
qua
lity
in c
oast
al re
ceiv
ing
wat
ers a
nd to
impr
ove
the
oper
atio
ns o
f the
Tow
n's w
aste
wat
er c
olle
ctio
n sy
stem
and
trea
tmen
t pl
ant b
y re
duci
ng th
e vo
lum
e of
infil
tratio
n an
d in
flow
(I/I)
ent
erin
g th
e co
llect
ion
syst
em, a
nd
impr
ovin
g th
e w
ater
qua
lity
of st
orm
wat
er d
isch
arge
s thr
ough
the
rem
oval
of i
llici
t con
nect
ions
to
the
sew
er sy
stem
and
thro
ugh
the
cons
truct
ion
of B
est M
anag
emen
t Pra
ctic
es. T
he p
roje
ct w
ill
prov
ide
the
foun
datio
n fo
r the
redu
ctio
n of
pat
hoge
n di
scha
rges
to S
ippi
can
Har
bor a
nd
Buz
zard
s Bay
as w
ell a
s sig
nific
antly
redu
ce th
e vo
lum
e of
pub
lic a
nd p
rivat
e I/I
ent
erin
g th
e co
llect
ion
syst
em.
76.1
1%
City
of
Mar
lbor
ough
CW
20,0
00,0
00M
arlb
orou
gh E
aste
rly W
aste
Wat
er T
reat
men
t Pla
nt (W
WTP
) Upg
rade
s-Th
ese
proj
ects
con
sist
of
the
impr
ovem
ents
to th
e Ea
ster
ly W
WTP
to re
duce
eff
luen
t pho
spho
rus,
repl
ace
agin
g in
fras
truct
ure
and
impr
ove
ener
gy e
ffic
ienc
y an
d se
cond
ly to
con
duct
an
infil
tratio
n/in
flow
stud
y of
the
was
tew
ater
col
lect
ion
syst
em to
iden
tify,
cha
ract
eriz
e an
d pr
iorit
ize
defic
ienc
ies i
n th
e sy
stem
to re
duce
pea
k flo
ws.
The
upg
rade
s are
prim
arily
inte
nded
to re
duce
the
phos
phor
us
load
s dis
char
ged
from
the
faci
lity
to h
elp
rem
edia
te d
ocum
ente
d nu
trien
t enr
ichm
ent o
f the
re
ceiv
ing
wat
ers a
nd th
e do
wns
tream
Sud
bury
Riv
er.
The
proj
ect i
s con
sist
ent w
ith th
e C
ompr
ehen
sive
Was
tew
ater
Man
agem
ent P
lan
and
regi
onal
nut
rient
redu
ctio
n go
als.
The
pr
ojec
t will
als
o im
prov
e th
een
ergy
eff
icie
ncy
of th
e fa
cilit
y an
d is
exp
ecte
d to
incl
ude
the
inst
alla
tion
of re
new
able
ene
rgy
syst
ems a
t the
site
.
100.
00%
Tow
n of
Med
way
DW
1,50
1,10
2W
ater
Mai
n R
epla
cem
ent-
This
pro
ject
add
ress
es th
e re
plac
emen
t of a
ging
wat
er m
ains
and
ap
purte
nanc
es in
var
ious
stre
ets i
n th
e co
mm
unity
. Th
e re
plac
emen
t of t
hese
old
mai
ns w
ill h
elp
impr
ove
wat
er q
ualit
y w
ith re
spec
t to
disi
nfec
tion,
circ
ulat
ion,
vol
ume
and
fire
prot
ectio
n.
75.3
9%
Tow
n of
Mon
roe
CW
200,
000
Was
te W
ater
Tre
atm
ent F
acili
ty (W
WTF
) Rep
airs
-As a
resu
lt of
dam
age
sust
aine
d by
the
WW
TF d
urin
g th
e w
inte
r of 2
010,
the
tow
n ha
s req
uest
ed a
nd re
ceiv
ed a
ppro
val f
or u
se o
f em
erge
ncy
fund
s to
mak
e te
mpo
rary
em
erge
ncy
repa
irs/m
odifi
catio
ns to
the
exis
ting
faci
lity
and
to st
art d
esig
n of
a re
plac
emen
t WW
TF. T
he d
esig
n w
ill b
e do
ne in
acc
orda
nce
with
the
reco
mm
enda
tions
out
lined
in a
n ap
prov
ed e
ngin
eerin
g re
port
date
d D
ecem
ber 2
010.
79.7
3%
2015 SRF ANNUAL REPORT | 34
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
M
assa
chus
etts
W
ater
Res
ourc
es
Aut
hori
ty
CW
2,00
0,00
0N
ut Is
land
Hea
dwor
ks &
Con
very
orIm
prov
emen
ts-T
he p
roje
ct w
ill re
plac
e al
l em
bedd
ed
elec
trica
l com
pone
nts b
elow
hig
h-tid
e le
vel a
nd w
ill re
plac
e ke
y co
mpo
nent
s of t
he sc
reen
ing
and
grit
conv
eyor
syst
em a
t the
Nut
Isla
nd H
eadw
orks
(NIH
). T
idal
ly-in
fluen
ced
grou
ndw
ater
in
filtra
tion
has c
ause
d co
rros
ion
of th
e el
ectri
cal w
iring
, con
duits
and
pan
els t
hat a
re e
mbe
dded
in
or m
ount
ed o
n th
e w
alls
and
/or s
labs
and
this
pro
ject
will
cor
rect
the
prob
lem
with
cei
ling-
and
surf
ace-
mou
nted
com
pone
nts a
nd h
ave
conc
rete
surf
aces
trea
ted
to p
reve
nt in
filtra
tion.
To
impr
ove
the
oper
atio
n of
the
girt
and
scre
enin
gs c
onve
yor,
the
proj
ect w
ill re
plac
e th
e be
lt sc
rape
rs, e
nclo
se th
e ve
rtica
l bel
ts w
ith c
over
s, ad
d a
redu
ndan
t scr
eeni
ngs c
onve
yor,
and
inst
all
wid
er d
rip p
ans.
The
pro
ject
will
sign
ifica
ntly
impr
ove
the
oper
atio
ns, r
elia
bilit
y, a
nd e
ffic
ienc
y of
thes
e sy
stem
s, pa
rticu
larly
dur
ing
wet
wea
ther
and
mai
ntai
n th
e pe
rfor
man
ce a
nd re
liabi
lity
of
the
NIH
as a
n im
porta
nt c
ompo
nent
of M
WR
S’s l
ong-
term
ass
et p
rote
ctio
n in
itiat
ives
and
m
anag
emen
t pro
ject
s to
pres
erve
ope
ratin
g as
sets
.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
CW
1,97
7,80
2El
ectri
cal U
pgra
des-
The
Dee
r Isl
and
Sew
er T
reat
men
t Pla
nt, w
hich
trea
ts se
wag
e fr
om 4
3 co
mm
uniti
es in
clud
ing
Bos
ton,
was
aff
ecte
d by
two
pow
er o
utag
es a
t NST
AR
subs
tatio
ns th
at
prov
ide
pow
er to
trea
t sew
age.
The
out
ages
occ
urre
d on
Apr
il 3,
200
4 an
d A
pril
11, 2
004,
as a
re
sult
of c
ontro
l pro
blem
s with
the
Dee
r Isl
and
elec
trica
l bac
kup
syst
ems a
ppro
xim
atel
y 2
½
hour
s and
2 h
ours
del
ay b
efor
e po
wer
was
fully
rest
ored
. B
oth
thes
e ev
ents
resu
lted
in sa
nita
ry
sew
er o
verf
low
s; th
e la
rges
t of t
he s
yste
m o
verf
low
s las
ted
for s
ever
al h
ours
on
Apr
il 11
th.
MW
RA
als
o co
nduc
ted
ongo
ing
cond
ition
mon
itorin
g as
sess
men
t wor
k to
iden
tify
equi
pmen
t re
plac
emen
t nee
ds.
The
elec
trica
l sys
tem
relia
bilit
y pr
ojec
t will
incl
ude
the
repl
acem
ent o
f tra
nsfo
rmer
s, bu
s duc
t with
cab
le d
uct,
and
varia
ble
freq
uenc
y dr
ive
units
. Th
e el
ectri
cal
relia
bilit
y pr
ojec
t is d
esig
ned
to o
verh
aul,
upgr
ade,
or r
epla
ce e
quip
men
t sys
tem
s and
is n
ot
rout
ine
CEP
pla
nt o
pera
tions
and
mai
nten
ance
nee
ds.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
CW
2,91
2,18
8W
aste
wat
er T
reat
men
t Pla
nt a
nd S
ewer
Impr
ovem
ents
-Thi
s pro
ject
incl
udes
upg
rade
s to
the
Dee
r Isl
and
Trea
tmen
t Pla
nt a
utom
atio
n an
d ce
ntra
l con
trol s
yste
ms a
s wel
l as i
mpr
ovem
ents
an
d up
grad
es to
seve
ral e
xist
ing
inte
rcep
tors
and
pum
p st
atio
ns th
at a
re in
nee
d of
repl
acem
ent
and/
or m
oder
niza
tion.
The
pro
ject
is in
tend
ed to
ext
end
curr
ent a
sset
life
and
impr
ove
syst
em
oper
abili
ty.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
CW
5,11
3,81
2D
eer I
slan
d Tr
eatm
ent P
lant
Impr
ovem
ents
-Thi
s pro
ject
is in
clud
ed in
the
Dee
r Isl
and
Trea
tmen
t Pla
nt A
sset
Pro
tect
ion
Prog
ram
, in
orde
r to
ensu
re th
at a
ll of
the
stru
ctur
es a
nd
equi
pmen
t ins
talle
d at
Dee
r Isl
and
rem
ain
in g
ood
wor
king
con
ditio
n an
d/or
are
repl
aced
with
ne
eded
.
100.
00%
2015 SRF ANNUAL REPORT | 35
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
M
assa
chus
etts
W
ater
Res
ourc
es
Aut
hori
ty
CW
840,
982
Nut
Isla
nd H
eadw
orks
Ele
ctric
al &
Con
veyo
r Im
prov
emen
t-Th
e pr
ojec
t will
repl
ace
all
embe
dded
ele
ctric
al c
ompo
nent
s bel
ow h
igh-
tide
leve
l and
will
repl
ace
key
com
pone
nts o
f the
sc
reen
ings
and
grit
con
veyo
r sys
tem
at t
he N
ut Is
land
Hea
dwor
ks (N
IH).
Tid
ally
-influ
ence
d gr
ound
wat
er in
filtra
tion
has c
ause
d co
rros
ion
of th
e el
ectri
cal w
iring
, con
duits
and
pan
els t
hat
are
embe
dded
in o
r mou
nted
on
the
wal
ls a
nd/o
r sla
bs a
nd th
is p
roje
ct w
ill c
orre
ct th
e pr
oble
m
with
cei
ling-
and
surf
ace-
mou
nted
com
pone
nts a
nd h
ave
conc
rete
surf
aces
trea
ted
to p
reve
nt
infil
tratio
n. T
o im
prov
e th
e op
erat
ion
of th
e gr
it an
d sc
reen
ings
con
veyo
rs,t
he p
roje
ct w
ill
repl
ace
the
belt
scra
pers
, enc
lose
the
verti
cal b
elts
with
cov
ers,
add
a re
dund
ant s
cree
ning
s co
nvey
or a
nd in
stal
l wid
er d
rip p
ans.
The
pro
ject
will
sign
ifica
ntly
impr
ove
the
oper
atio
ns,
relia
bilit
y, a
nd e
ffici
ency
of t
hese
syst
ems,
parti
cula
rly d
urin
g w
et w
eath
er a
nd m
aint
ain
the
perf
orm
ance
and
relia
bilit
y of
the
NIH
as a
n im
porta
nt c
ompo
nent
of M
WR
A's
long
-term
ass
et
prot
ectio
n in
itiat
ives
and
man
agem
ent p
roje
cts t
o pr
eser
ve o
pera
ting
asse
ts.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
CW
15,0
00,0
00C
ombi
ned
Sew
er O
verf
low
(CSO
) Pha
se 1
4-Th
e pr
imar
y ob
ject
ive
of th
e C
SO c
ontro
l pla
n is
to
brin
g C
SO d
isch
arge
s in
Bos
ton
Har
bor a
nd it
s trib
utar
ies i
nto
com
plia
nce
with
stat
e an
d fe
dera
l re
quire
men
ts.
This
com
pone
nt o
f the
pla
n w
ill in
volv
e ni
ne se
wer
sepa
ratio
n pr
ojec
ts.
All
the
proj
ects
will
be
acco
mpl
ishe
d by
con
stru
ctin
g ne
w st
orm
dra
ins a
nd a
llow
ing
the
exis
ting
com
bine
sew
ers t
o fu
nctio
n as
sepa
rate
sani
tary
sew
ers,
or b
y co
nstru
ctin
g ne
w sa
nita
ry se
wer
s an
d al
low
ing
the
exis
ting
com
bine
d se
wer
to se
rve
as st
orm
dra
ins.
The
pro
ject
will
resu
lt in
the
elim
inat
ion
of C
SO d
isch
arge
s at s
ever
al o
utfa
lls.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
5,00
0,00
0Lo
w S
ervi
ce S
tora
ge-T
his p
roje
ct is
for t
he c
onst
ruct
ion
of a
20
mill
ion
gallo
n po
tabl
e w
ater
st
orag
e ta
nk in
the
Tow
n of
Sto
neha
m a
t its
term
inal
rese
rvoi
r at t
he n
orth
east
ern
extre
mity
of
the
MW
RA
wat
er se
rvic
e to
met
ropo
litan
Bos
ton.
The
pro
ject
will
pro
vide
impr
oved
stor
age
(16-
20 m
illio
n ga
llons
) but
will
als
o pr
ovid
e su
rge
relie
f, pr
otec
ting
MW
RA
and
com
mun
ity
mai
ns; a
llow
mor
e ef
ficie
nt u
se o
f the
exi
stin
g M
WR
A d
istri
butio
n sy
stem
; and
, pro
vide
em
erge
ncy
back
up to
21
com
mun
ities
in th
e N
orth
ern
Inte
rmed
iate
Hig
h an
d N
orth
ern
Hig
h sy
stem
s.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
600,
000
Nor
ther
n H
igh
Serv
ice(
NH
S)-R
ever
e &
Mal
den
Pipe
line-
The
proj
ect w
ork
incl
udes
the
NH
S im
prov
emen
ts in
Rev
ere
and
Mal
den.
100.
00%
2015 SRF ANNUAL REPORT | 36
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
M
assa
chus
etts
W
ater
Res
ourc
es
Aut
hori
ty
DW
600,
000
Nor
ther
n Lo
w S
ervi
ce (N
LS) A
rea
Reh
abili
tatio
n-Th
is p
roje
ct in
volv
es th
e re
habi
litat
ion
of th
e N
LS a
rea,
whi
ch c
onsi
sts o
f the
repl
acem
ent o
f a p
ortio
n of
Sec
tion
8; re
habi
litat
ion
of S
ectio
ns
37 a
nd 4
6; a
nd c
onst
ruct
ion
of S
ectio
n 97
A.
Sect
ion
8, a
n un
lined
pip
elin
e w
as in
stal
led
betw
een
1897
and
192
0 an
d is
curr
ently
func
tioni
ng a
t app
roxi
mat
ely
45%
of i
ts o
rigin
al
capa
city
due
to th
e bu
ild-u
p of
rust
dep
osits
and
oth
er m
atte
r alo
ng th
e pi
pelin
e w
all a
nd h
as
expe
rienc
ed le
aks a
t an
abov
e av
erag
e ra
te.
Exca
vatio
ns fo
r the
inst
alla
tion
of n
ew v
alve
s alo
ng
porti
ons o
f sec
tion
8 ha
ve in
dica
ted
poss
ible
seve
re e
xter
nal c
orro
sion
on
the
pipe
wal
l, w
hich
co
uld
affe
ct th
e st
ruct
ural
stab
ility
of t
he p
ipel
ine.
Reh
abili
tatio
ns o
f Sec
tions
37
and
46 w
ill
impr
ove
the
serv
ice
to E
ast B
osto
n an
d w
ill a
llow
the
shut
dow
n of
Sec
tion
8 fo
r reh
abili
tatio
n.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
1,00
0,00
0N
ew C
onne
ctin
g M
ains
-Thi
s pro
ject
invo
lves
the
cons
truct
ion
of n
ew c
onne
ctin
g m
ains
with
in
the
MW
RA
Dis
tribu
tion
Syst
em b
etw
een
Wes
ton
Aqu
educ
t Sup
ply
Mai
ns 3
and
4 a
nd th
e C
ity
Tunn
el. T
hese
con
nect
ing
mai
ns in
the
Inte
rmed
iate
Hig
h, N
orth
ern
Hig
h, N
orth
ern
Extra
Hig
h an
d So
uthe
rn H
igh
serv
ice
area
s pro
vide
tran
spor
t of w
ater
from
the
City
Tun
nel a
nd th
e C
ity
Tunn
el E
xten
sion
to m
unic
ipal
met
ers a
long
an
11-m
ile p
ipel
ine,
whi
ch c
urre
ntly
has
no
conn
ectin
g m
ains
and
no
othe
r mea
ns a
vaila
ble
to a
dequ
atel
y su
pply
com
mun
ities
.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
1,60
0,00
0Lo
wer
Hul
tman
Aqu
educ
t Reh
abili
tatio
n-Th
e w
ork
incl
udes
the
cons
truct
ion
of
inte
rcon
nect
ions
bet
wee
n th
e M
etro
Wes
t Tun
nel a
nd th
e H
ultm
an A
qued
uct;
as w
ell a
s re
habi
litat
ion
of th
e aq
uedu
ct th
at in
clud
es re
plac
emen
t or r
epai
r of a
ir re
lief s
truct
ures
, blo
w-o
ff
valv
es, c
ulve
rts b
enea
th th
e aq
uedu
ct; a
nd re
plac
emen
t of e
xist
ing
valv
es.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
240,
342
Sout
hern
Spi
ne D
istri
butio
n M
ains
-Thi
s pro
ject
requ
ires c
lean
ing,
reha
bilit
atio
n an
d re
pair
of
the
20 m
iles o
f old
wat
er m
ains
whi
ch a
re c
urre
ntly
func
tioni
ng a
t 50%
of t
heir
orig
inal
cap
acity
. In
add
ition
, the
re is
nee
d to
repl
ace
man
y in
oper
able
val
ues i
n th
e sy
stem
. Th
e m
ains
beg
in in
B
rook
line
and
end
at th
e B
lue
Hill
s Res
ervo
ir in
Qui
ncy.
The
mai
ns se
rve
the
Sout
hern
Hig
han
d So
uthe
rn E
xtra
Hig
h Sy
stem
com
mun
ities
of B
osto
n, B
rook
line,
Milt
on, Q
uinc
y, N
orw
ood
and
Can
ton.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
1,80
0,00
0Lo
wer
Hul
tman
Aqu
educ
t Reh
abili
tatio
n-Th
is w
ork
incl
udes
con
stru
ctio
n of
inte
rcon
nect
ions
be
twee
n th
e M
etro
Wes
t Tun
nel a
nd th
e H
ultm
an A
qued
uct,
as w
ell a
s reh
abili
tatio
n of
the
aque
duct
that
incl
udes
repl
acem
ent o
r rep
air o
f air
relie
f stru
ctur
es, b
low
-off
valv
es, c
ulve
rts
bene
ath
the
aque
duct
; and
the
repl
acem
ent o
f exi
stin
g va
lves
.
100.
00%
Mas
sach
uset
ts
Wat
er R
esou
rces
A
utho
rity
DW
666,
666
New
Con
nect
ing
Mai
ns-T
his p
roje
ct in
volv
es th
e co
nstru
ctio
n of
new
con
nect
ing
mai
ns w
ithin
th
e M
WR
A D
istri
butio
n Sy
stem
bet
wee
n W
esto
n A
qued
uct S
uppl
y M
ains
3 a
nd 4
and
the
City
Tu
nnel
. The
se c
onne
ctin
g m
ains
in th
e In
term
edia
te H
igh,
Nor
ther
n H
igh,
Nor
ther
n Ex
tra H
igh
and
Sout
hern
Hig
h se
rvic
e ar
eas p
rovi
de tr
ansp
ort o
f wat
er fr
om th
e C
ity T
unne
l and
the
City
Tu
nnel
Ext
ensi
on to
mun
icip
al m
eter
s alo
ng a
n 11
-mile
pip
elin
e, w
hich
cur
rent
ly h
as n
o co
nnec
ting
mai
ns a
nd n
o ot
her m
eans
ava
ilabl
e to
ade
quat
ely
supp
ly c
omm
uniti
es.
100.
00%
2015 SRF ANNUAL REPORT | 37
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
M
assa
chus
etts
W
ater
Res
ourc
es
Aut
hori
ty
DW
2,50
0,00
0Lo
w S
ervi
ce S
tora
ge-T
his p
roje
ct is
fort
he c
onst
ruct
ion
of a
20
mill
ion
gallo
n po
tabl
e w
ater
st
orag
e ta
nk in
the
Tow
n of
Sto
neha
m a
t its
term
inal
rese
rvoi
r at t
he n
orth
east
ern
extre
mity
of
the
MW
RA
wat
er se
rvic
e to
met
ropo
litan
Bos
ton.
The
pro
ject
will
pro
vide
impr
oved
stor
age
(16-
20 m
illio
n ga
llons
) but
will
als
o pr
ovid
e su
rge
relie
f, pr
otec
ting
MW
RA
and
com
mun
ity
mai
ns, a
llow
mor
e ef
ficie
nt u
se o
f the
exi
stin
g M
WR
A d
istri
butio
n sy
stem
and
pro
vide
em
erge
ncy
back
up to
21
com
mun
ities
in th
e N
orth
ern
Inte
rmed
iate
Hig
h an
d N
orth
ern
Hig
h sy
stem
s.
100.
00%
Tow
n of
Nan
tuck
etC
W4,
999,
200
Sew
er R
epla
cem
ent f
or In
flow
and
Infil
tratio
n (I
/I) R
emov
al-T
his p
roje
ct is
for t
he
reha
bilit
atio
n of
a p
ortio
n of
Nan
tuck
et’s
sew
er sy
stem
in d
ownt
own
Nan
tuck
et to
rem
ove
exce
ssiv
e in
filtra
tion.
Thi
s por
tion
of th
e se
wag
e co
llect
ion
syst
em is
a si
gnifi
cant
con
tribu
tor o
f th
e st
orm
wat
er in
flow
and
gro
undw
ater
infil
tratio
n fo
und
thro
ugho
ut th
e co
llect
ion
syst
em.
Illic
it co
nnec
tions
to th
e sa
nita
ry se
wer
syst
em, b
acku
ps, a
nd o
verf
low
s are
all
prob
lem
s cau
sed
by I/
I. A
s a d
irect
resu
lt of
ove
rload
in th
e Su
rfsi
de W
aste
wat
er T
reat
men
t Fac
ility
, pla
nt
efflu
ent m
ay n
egat
ivel
y af
fect
are
a pa
rkla
nds,
beac
hes a
nd o
ther
coa
stal
loca
tions
. Th
e pr
ojec
t in
clud
es in
still
atio
n of
sew
ers,
inst
alla
tion
of d
ead
end
man
hole
s and
inst
alla
tion
of in
-line
m
anho
les.
The
reha
bilit
atio
n w
ork
will
ass
ist i
n m
aint
aini
ng c
ompl
ianc
e le
vels
at t
he W
WTF
an
d fu
lfill
the
com
men
datio
ns in
the
Com
preh
ensi
ve W
aste
wat
er M
anag
emen
t Pla
n.
99.6
5%
City
of
New
bury
port
DW
300,
000
Wat
er T
reat
men
t Fac
ility
(WTF
) Upg
rade
and
Wat
er D
istri
butio
n Sy
stem
-The
pro
ject
, whi
ch
incl
udes
thre
e co
ntra
cts,
will
upg
rade
the
New
bury
port
WTP
by
cons
truct
ing
a ne
w W
TP w
ith
diss
olve
d ai
r flo
atat
ion
clar
ifica
tion
and
will
inst
all n
ew w
ater
mai
ns to
add
ress
low
pre
ssur
e ar
eas a
nd d
ead
ends
with
in th
e w
ater
dis
tribu
tion
syst
em. T
he n
ew W
TP w
ill a
llow
the
plan
t to
bette
r mee
t the
pea
k flo
w ra
te fo
r whi
ch th
e pl
ant i
s cap
able
and
to m
eet t
he tu
rbid
ity
requ
irem
ents
. WTP
impr
ovem
ents
als
o in
clud
e up
grad
e of
the
exis
ting
WTP
bui
ldin
g,
cons
truct
ion
of a
new
cle
arw
ell a
nd p
ump
stat
ion
to h
ouse
the
finis
hed
wat
er a
nd b
ackw
ash
wat
er p
umps
, and
upg
rade
of t
he re
sidu
als h
andl
ing
syst
em to
pro
vide
recy
cle
of th
e fil
ter
back
was
h w
ater
and
dis
char
ge o
f res
idua
ls to
the
exis
ting
lago
on. T
he W
ater
Dis
tribu
tion
Syst
em Im
prov
emen
ts p
roje
ct w
ould
add
ress
low
pre
ssur
e pr
oble
ms i
n tw
o lo
catio
ns: t
he st
reet
s su
rrou
ndin
g th
e in
terc
onne
ctio
n be
twee
n th
e C
ity o
f New
bury
port
and
the
Tow
n of
Wes
t N
ewbu
ry b
y re
plac
ing
the
exis
ting
forc
e m
ain
cros
sing
ove
r Rou
te 9
5 an
d th
e po
rtion
of t
he
syst
em th
at su
pplie
s wat
er to
the
Tow
n of
New
bury
by
repl
acin
g ap
prox
imat
ely
one-
mile
of
forc
e m
ain
with
an
incr
ease
d si
ze p
ipe.
The
Wat
er D
istri
butio
n pr
ojec
t will
als
o ad
dres
s the
el
imin
atio
n of
dea
d-en
ds b
y in
stal
ling
new
forc
e m
ains
on
five
stre
ets i
nclu
ding
Bow
len
Ave
nue,
Fi
nnig
an W
ay, G
olds
mith
Driv
e, H
ope
Ave
nue,
and
Tra
cey
Stre
et.
84.8
2%
2015 SRF ANNUAL REPORT | 38
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
To
wn
of N
orth
A
ttle
boro
ugh
CW
11,4
16,0
00
Was
te W
ater
Tre
atm
ent F
acili
ty (W
WTF
) Upg
rade
and
Inflo
w a
nd In
filtra
tion
(I/I)
Rem
oval
- W
WTF
will
be
upgr
aded
to re
mov
e ni
troge
n an
d ph
osph
orus
in re
spon
se to
a n
ew N
PDES
pe
rmit
and
EPA
Adm
inis
trativ
e O
rder
. Th
e w
ork
will
impr
ove
the
disc
harg
e to
the
Ten
Mile
R
iver
to im
prov
e w
ater
qua
lity.
The
pro
ject
als
o in
itiat
es a
five
-yea
r (I/I
) rem
oval
pro
gram
th
roug
hout
the
city
. Th
e I/I
pro
ject
incl
udes
col
lect
ion
syst
em re
habi
litat
ion
and
repl
acem
ent
and
disc
onne
ctin
g st
orm
syst
em c
onne
ctio
ns fo
rm th
e se
wer
syst
em.
Red
ucin
g I/I
from
the
treat
men
t pla
nt w
ill re
duce
the
volu
me
of w
ater
to b
e tre
ated
, res
ultin
g in
ope
ratio
nal a
nd e
nerg
y sa
ving
s.
93.8
1%
Tow
n of
Pem
brok
eC
W98
,393
C
appi
ng o
f Hob
onoc
k St
reet
Lan
dfill
- The
pro
pose
d pr
ojec
t con
sist
s of p
rope
rly c
appi
ng th
e H
obom
ock
Stre
et L
andf
ill to
pre
vent
the
spre
ad o
f hea
vy m
etal
s and
oth
er p
ollu
tant
s int
o th
e gr
ound
wat
er a
nd n
eigh
borin
g w
ater
way
s. T
he c
ompl
eted
pro
ject
will
pro
vide
a lo
catio
n fo
r re
new
able
ene
rgy
faci
lity.
100.
00%
City
of P
ittsf
ield
C
W4,
100,
000
Ener
gy E
ffic
ienc
y, P
hoto
volta
ic &
Com
bine
d H
eat a
nd P
ower
(CH
P) In
stal
latio
n- T
he C
ity o
f Pi
ttsfie
ld o
pera
tes a
n ad
vanc
ed, n
utrie
nt-r
emov
al tr
eatm
ent f
acili
ty th
at p
roce
sses
app
roxi
mat
ely
10.8
mill
ion
gallo
ns o
f was
tew
ater
per
day
. The
faci
lity
treat
s mun
icip
al a
nd in
dust
rial w
aste
s fr
om P
ittsf
ield
, Dal
ton,
Hin
sdal
e, L
anes
boro
ugh
and
Nor
th L
enox
. The
gre
en e
nerg
y up
grad
es to
th
e pl
ant w
ill in
clud
e:
U
pgra
ding
the
exis
ting
sing
le-s
peed
mec
hani
cal m
ixin
g sy
stem
to a
fine
bub
ble
aera
tion
syst
em,
perf
orm
ing
heat
ing
and
light
ing
upgr
ades
; U
pgra
ding
the
exis
ting
anae
robi
c sl
udge
dig
estio
n sy
stem
by
inst
allin
g a
195
kW b
iom
ass
(slu
dge)
cog
ener
atio
n sy
stem
for o
n-si
te e
lect
ric p
ower
gen
erat
ion;
In
stal
ling
up to
a 1
,575
kW
sola
r pho
tovo
ltaic
syst
em (r
oof a
nd g
roun
d-m
ount
ed);
In to
tal,
over
$64
7,00
0 (8
9%) i
n an
nual
ene
rgy
savi
ngs,
1,77
0 kW
of g
reen
pow
er g
ener
atio
n (s
olar
pho
tovo
ltaic
& C
HP)
, and
app
roxi
mat
ely
3,25
2 to
ns o
f car
bon
diox
ide
emis
sion
re
duct
ions
will
resu
lt an
nual
ly fr
om th
ese
gree
n in
vest
men
ts.
Con
stru
ctio
n of
the
CH
P pr
ojec
t rev
eale
d si
gnifi
cant
ele
ctric
al o
verlo
ad c
ondi
tions
in th
e M
otor
C
ontro
l Cen
ter (
MC
C) a
nd a
ssoc
iate
d tra
nsfo
rmer
, and
non
-com
plia
nt e
lect
rical
and
bui
ldin
g co
de c
ondi
tions
. Th
e re
plac
emen
t of t
he e
xist
ing
MC
C, t
rans
form
er, s
tand
-by
pow
er sy
stem
s an
d as
soci
ated
ele
ctric
al u
pgra
des a
re n
eces
sary
to e
nsur
e th
e sa
fe, u
nint
erru
pted
ope
ratio
n of
the
Was
te W
ater
Tre
atm
ent P
lant
.
100.
00%
Tow
n of
Ran
dolp
hD
W2,
933,
623
Wat
er S
yste
m Im
prov
emen
ts- T
his p
roje
ct a
ddre
sses
the
requ
irem
ents
set f
orth
in th
e co
nsen
t or
der,
by id
entif
ying
and
repa
iring
wat
er m
ains
in n
eed
of re
habi
litat
ion,
to p
rovi
de
impr
ovem
ents
to th
e w
ater
dis
tribu
tion
syst
em.
66.8
7%
2015 SRF ANNUAL REPORT | 39
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
C
ity o
f Rev
ere
CW
1,27
3,77
4SS
ES P
hase
3 a
nd S
torm
Wat
er S
yste
m M
anag
emen
t Pla
n (S
WSM
P)-T
he p
roje
ct in
clud
es
plan
ning
iden
tifie
d an
d re
quire
d by
a c
onse
nt d
ecre
e. T
he p
roje
ct sc
ope
will
incl
ude
the
follo
win
g: se
wer
flow
met
erin
g, fl
ow is
olat
ion,
tele
visi
on in
spec
tion,
dye
test
ing,
and
smok
e te
stin
g (a
s req
uire
d) to
com
plet
e th
e ev
alua
tion
ofth
e w
aste
wat
er c
olle
ctio
n sy
stem
alo
ng w
ith
supp
ort f
or o
ngoi
ng a
sses
smen
t of t
he st
orm
wat
er sy
stem
incl
udin
g ill
icit
disc
harg
e un
derw
ay in
th
e ci
ty.
100.
00%
City
of R
ever
eC
W5,
856,
307
Sew
er S
yste
m C
onst
ruct
ion-
The
proj
ect c
onsi
sts o
f the
impr
ovem
ents
to th
e m
ost d
efic
ient
se
wer
pip
ing
in th
e Ph
ase
3 ar
ea, a
s wel
l as i
mpr
ovem
ents
iden
tifie
d du
ring
prev
ious
in
vest
igat
ions
. Th
e pr
ojec
t will
prim
arily
redu
ce in
filtra
tion
and
sour
ces o
f ext
rane
ous i
nflo
w
and
will
als
o re
duce
the
amou
nt o
f sto
rm w
ater
ent
erin
g th
e ci
ty’s
was
tew
ater
col
lect
ion
syst
em,
cont
ribut
ing
to sa
nita
ry se
wer
ove
rflo
ws (
SSO
’s) t
hat a
re u
nnec
essa
rily
bein
g tre
ated
at t
he D
eer
Isla
nd W
aste
wat
er T
reat
men
t Pla
nt.
93.0
7%
City
of R
ever
eC
W1,
891,
406
Win
thro
p A
ve E
mer
genc
y Se
wer
Rep
lace
men
t-O
n A
ugus
t 28,
201
3 du
ring
the
proc
ess o
f pe
rfor
min
g m
aint
enan
ce o
n th
e W
inth
rop
Ave
nue
trunk
sew
er, a
n ap
prox
imat
e 20
foot
long
se
ctio
n of
sew
er c
olla
psed
. The
col
laps
e oc
curr
ed a
t the
app
roxi
mat
e m
id-p
oint
of a
160
foot
lo
ng, 1
8 fo
ot d
eep,
vitr
ified
cla
y (V
C) s
ewer
segm
ent,
loca
ted
belo
w tw
o M
WR
A w
ater
mai
ns
runn
ing
from
the
Elm
Stre
et in
ters
ectio
n ea
ster
ly to
the
dow
nstre
am m
anho
le.
Seve
ral
alte
rnat
ives
to a
ddre
ss th
e co
llaps
ed p
ipe
have
bee
n co
nsid
ered
. Pre
viou
s per
form
ed h
ydra
ulic
m
odel
ing
show
ed th
at th
e ex
istin
g 18
-inch
trun
k se
wer
in W
inth
rop
Ave
nue
is u
nder
size
d an
d sh
ould
be
repl
aced
with
a 3
6-in
ch se
wer
to a
ddre
ss su
rcha
rgin
g/flo
odin
g is
sues
in th
is a
rea
rela
ted
to c
apac
ity o
f the
trun
k se
wer
. Si
nce
the
colla
psed
trun
k se
wer
is sc
hedu
led
for e
vent
ual
repl
acem
ent/u
psiz
ing
in th
e ne
xt fe
w y
ears
and
sew
er se
gmen
ts u
pstre
am a
nd d
owns
tream
of t
he
colla
pse
are
in p
oor c
ondi
tion,
the
city
inte
nds t
o in
stal
l app
roxi
mat
ely
900
feet
of 3
6-in
ch
repl
acem
ent s
ewer
from
the
inte
rcep
tor i
n R
ever
e B
each
Par
kway
up
to V
icto
ria A
venu
e.
92.1
6%
Tow
n of
Sau
gus
CW
439,
369
Sew
er S
yste
m R
ehab
ilita
tion-
This
pro
ject
incl
udes
sew
er sy
stem
reha
bilit
atio
n in
subs
yste
m 6
B,
whi
ch re
pres
ents
con
tinue
d w
ork
to re
duce
ext
rane
ous w
ater
in th
e w
aste
wat
er sy
stem
to
decr
ease
the
likel
ihoo
d of
syst
em su
rcha
rges
. R
ehab
ilita
tion
of su
bsys
tem
6B
incl
udes
ap
prox
imat
ely
3-1/
2 m
iles o
f CIP
P lin
ing,
inst
alla
tion
of a
ppro
xim
atel
y 25
0 lin
ing
syst
ems t
o im
prov
e se
rvic
e to
mai
nlin
e co
nnec
tions
, reh
abili
tatio
n of
app
roxi
mat
ely
150
man
hole
s, an
d re
mov
al a
nd/o
r re-
dire
ctin
g pr
ivat
e in
flow
bas
e on
thos
e pr
oper
ties c
onfir
med
to h
ave
inflo
w
sour
ces d
urin
g th
e to
wn-
wid
e ho
use-
to-h
ouse
insp
ectio
n pr
ogra
m.
This
pro
ject
als
o in
clud
es
upgr
ades
and
reha
bilit
atio
n to
the
Linc
oln
Ave
nue
Pum
p St
atio
n.
82.4
9%
2015 SRF ANNUAL REPORT | 40
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
To
wn
of S
augu
sC
W1,
543,
200
Sew
er S
yste
m O
verf
low
(SSO
) Red
uctio
n Su
bsys
tem
6-T
his p
roje
ct in
volv
es th
e re
habi
litat
ion
of p
ipel
ines
, man
hole
s and
the
rem
oval
of p
rivat
e in
flow
sour
ces i
n Su
bsys
tem
6 o
f the
Sau
gus
Sew
er S
yste
m a
s a m
eans
to e
limin
ate
infil
tratio
n an
d in
flow
(I/I)
from
the
syst
em a
nd
sign
ifica
ntly
redu
ce o
r elim
inat
e se
wer
syst
em o
verf
low
s at t
he L
inco
ln A
venu
e Pu
mpi
ng
Stat
ion.
The
pro
ject
als
o in
clud
es th
e in
stal
latio
n of
a w
et w
eath
er p
ump
stat
ion
(Sav
ille
Stre
et
pum
ping
Sta
tion)
to m
itiga
te th
e SS
O’s
in th
e In
nis a
nd E
lm S
treet
are
a. T
his p
roje
ct is
par
t of
an o
ngoi
ng p
rogr
am to
elim
inat
e ex
cess
ive
I/I in
the
Saug
us S
ewer
Sys
tem
from
cau
sing
sew
er
over
flow
s to
Rum
ney
Mar
sh a
nd th
e Sa
ugus
Riv
er a
nd su
rcha
rgin
g to
the
Lynn
Sew
er S
yste
m.
89.0
1%
Tow
n of
Sh
rew
sbur
yC
W4,
146,
710
Sew
er In
terc
epto
r and
Pum
p St
atio
n-Th
is p
roje
ct is
a th
ree-
phas
ed c
onst
ruct
ion
to re
plac
e or
lin
e Sh
rew
sbur
y se
wer
Inte
rcep
tor,
and
upgr
ade
exis
ting
six
pum
p st
atio
ns.
The
prop
osed
pr
ojec
t will
elim
inat
e se
wer
bac
k-up
s and
ove
rflo
ws.
87.7
2%
City
of T
aunt
onC
W4,
688,
669
Phas
es 8
-9 S
ewer
Sys
tem
Eva
luat
ion
Surv
ey (S
SES)
and
Pum
p St
atio
n U
pgra
des -
This
pro
ject
is
for r
epai
r and
repl
acem
ent o
f sew
er m
ains
and
serv
ice
late
rals
, rem
oval
of s
torm
wat
er
conn
ectio
ns to
the
sani
tary
sew
er, r
emov
al o
f roo
f lea
ders
and
sum
p pu
mp
conn
ectio
ns fr
om th
e se
wer
syst
em, s
epar
atio
n of
com
bine
d m
anho
les,
and
upgr
ade
of v
ital p
ump
stat
ions
. Th
e pr
ojec
t will
elim
inat
e po
tent
ial p
ublic
hea
lth th
reat
s and
nui
sanc
es re
sulti
ng fr
om se
wag
e di
scha
rge
to th
e re
ceiv
ing
wat
ers a
nd re
duce
the
risk
of se
wer
ove
rflo
ws.
100.
00%
City
of T
aunt
onC
W55
2,88
1W
inth
rop
St. S
ewer
Ext
ensi
ons -
The
proj
ect w
ill e
xten
d se
wer
serv
ice
to n
eeds
are
as id
entif
ied
by th
e ci
ty's
Com
preh
ensi
ve W
aste
wat
er M
anag
emen
t Pla
n (C
WM
P).
The
proj
ect i
nclu
des
cons
truct
ing
a ne
w se
wag
e pu
mpi
ng st
atio
n. T
he w
ork
will
allo
w b
alan
cing
of f
low
s bet
wee
n pu
mp
stat
ions
to p
reve
nt o
verta
the
War
ner B
oule
vard
pum
p st
atio
n.
90.9
9%
Tow
n of
Web
ster
DW
1,65
7,26
7W
ater
Mai
n C
onst
ruct
ion-
The
proj
ect i
nclu
des t
he c
onst
ruct
ion
of a
ppro
xim
atel
y 4,
500
feet
new
w
ater
mai
n al
ong
Raw
son
Roa
d R
eser
voir
Acc
ess R
oad,
Raw
son
Roa
d to
Gor
e R
oad,
and
se
ctio
n of
Gor
e R
oad,
inst
alla
tion
of a
ppro
xim
atel
y 75
line
ar fe
et c
ured
-in-p
ipe
liner
, and
in
stal
ling
a Ti
defle
x M
ixin
g Sy
stem
for t
he R
awso
n R
oad
Wat
er T
ank.
The
pro
ject
will
redu
ce
the
prob
abili
ty o
f fut
ure
failu
res a
nd th
us re
duce
the
risk
of s
yste
m c
onta
min
atio
n, ir
on a
nd
man
gane
se w
ater
qua
lity
dist
urba
nces
and
the
loss
of w
ater
from
stor
age.
100.
00%
Tow
n of
Wel
lflee
tC
W20
0,00
0C
ompr
ehen
sive
Was
tew
ater
Man
agem
ent P
lan
(CW
MP)
-The
Tow
n of
Wel
lflee
t pro
pose
s to
crea
te a
CW
MP
to a
ddre
ss to
wn-
wid
e w
aste
wat
er m
anag
emen
t con
cern
s. M
uch
of th
e to
wn'
s C
entra
l Dis
trict
has
smal
l lot
s with
sept
ic s
yste
ms t
hat h
ave
led
to d
ocum
ente
d el
evat
ed n
itrat
e le
vels
in th
e gr
ound
wat
er a
nd W
ellfl
eet H
arbo
r. T
he p
lan
will
iden
tify
the
optio
ns a
vaila
ble
to
redu
ce th
e po
llutio
n an
d im
prov
e w
ater
qua
lity
in th
e ar
ea.
100.
00%
2015 SRF ANNUAL REPORT | 41
Bor
row
erPr
ogra
mA
mou
nt to
be
Fina
nced
Pr
ojec
t Des
crip
tion
Perc
enta
ge
of L
oan
Dra
wn
To
wn
of W
est
Spri
ngfie
ldD
W56
6,38
4W
ater
Tra
smis
sion
Mai
n an
d W
ellfi
eld-
The
proj
ect i
nvol
ves t
he c
ompl
ete
repl
acem
ent (
abou
t 5
mile
s) o
f the
tran
smis
sion
mai
n fr
om W
ell #
4 at
the
Sout
hwic
k W
ellfi
eld
to a
n ex
istin
g m
ain
loca
ted
on D
ewey
Stre
et in
Wes
t Spr
ingf
ield
's di
strib
utio
n sy
stem
. The
exi
stin
g tra
nsm
issi
on
mai
n is
unr
elia
ble
(inst
alle
d in
193
8), u
nder
size
d, a
nd fo
llow
s a m
ostly
cro
ss-c
ount
ry ro
ute
that
gr
eatly
lim
its a
cces
sibi
lity.
Due
to th
is, t
he T
own
is n
ot a
ble
to u
tiliz
e th
e So
uthw
ick
Wel
lfiel
d to
its
per
mitt
ed c
apac
ity. T
he S
outh
wic
k W
ellfi
eld
prov
ides
app
roxi
mat
ely
80%
of t
he T
own'
s w
ater
supp
ly. D
ue to
the
incr
ease
d ca
rryi
ng c
apac
ity o
f the
pro
pose
d tra
nsm
issi
on m
ain,
the
proj
ect w
ill a
lso
nece
ssita
te im
prov
emen
ts a
t the
Sou
thw
ick
Wel
lfiel
d, in
clud
ing
new
wel
l sc
reen
s, in
stal
latio
n of
VFD
s, an
d th
e in
stal
latio
n of
two
addi
tiona
l car
bon
abso
rber
s at t
he
treat
men
t fac
ility
. Im
prov
ing
the
carr
ying
cap
acity
of t
he tr
ansm
issi
on m
ain
from
the
Sout
hwic
k W
ellfi
eld
will
redu
ce th
e To
wn'
s rel
ianc
e on
the
Bea
r Hol
e R
eser
voir,
whi
ch is
the
Tow
n's o
ther
so
urce
of w
ater
. The
Tow
n ha
s had
pas
t epi
sode
s of t
aste
and
odo
r pro
blem
s res
ultin
g fr
om a
lgae
an
d tu
rnov
er is
sues
in th
e re
serv
oir.
The
Bea
r Hol
e R
eser
voir
WTP
util
izes
ope
n sl
ow sa
nd
filte
rs th
at h
ave
no b
ackw
ash
capa
bilit
y. T
he p
roje
ct w
ill a
lso
inst
all v
aria
ble
freq
uenc
y dr
ives
at
each
of t
he w
ells
.
92.7
3%
Tow
n of
W
estb
orou
ghC
W98
,280
An
Infil
tratio
n/In
flow
(I/I)
Ana
lysi
s and
Sew
er S
yste
m E
valu
atio
n Su
rvey
(SSE
S) w
ill a
ttem
pt to
re
duce
the
volu
me
of I/
I in
the
Wes
tbor
ough
Sew
erag
e Sy
stem
, to
the
Wes
tbor
ough
WW
TF, a
nd
final
ly to
the
Ass
abet
Riv
er; t
here
by a
ttem
ptin
g to
pro
tect
the
river
from
neg
ativ
e im
pact
s. Th
e To
wn
of W
estb
orou
gh p
ropo
ses t
o pe
rfor
m th
e I/I
Ana
lysi
s and
SSE
S in
the
dow
ntow
n ar
ea, t
he
wes
t end
of T
own,
the
east
end
of T
own,
the
form
er L
yman
Sch
ool f
or B
oys,
and
the
Stat
e H
ospi
tal.
Thes
e ar
eas a
re th
e m
ost d
ense
ly p
opul
ated
and
old
est a
reas
of t
he se
wer
syst
em.
100.
00%
City
of W
estf
ield
DW
2,35
2,24
8W
ater
Mai
n R
epla
cem
ent-
This
pro
ject
repl
aces
an
unde
rsiz
ed d
eter
iora
ted
14-in
ch ra
w w
ater
tra
nsm
issi
on m
ain
inst
alle
d in
189
5. T
he p
ipel
ine's
hyd
raul
ic c
apac
ity h
as d
eclin
ed to
less
than
3
MG
D, w
hich
pre
vent
s the
City
of W
estfi
eld
from
util
izin
g th
e fu
ll ca
paci
ty o
f 4 M
GD
from
the
Sack
ett W
ater
Tre
atm
ent P
lant
. Th
e ne
w tr
ansm
issi
on m
ain
will
rest
ore
long
-term
sys
tem
re
liabi
lity
and
full
use
of th
e tre
atm
ent p
lant
. Th
e pr
ojec
t als
o in
corp
orat
es o
n-si
te e
nerg
y ge
nera
tion
usin
g an
in-li
ne tu
rbin
e to
cap
ture
exc
ess h
ydra
ulic
hea
d to
gen
erat
e m
uch
of th
e en
ergy
nee
ded
to ru
n th
e pl
ant.
96.4
9%
City
of W
orce
ster
CW
561,
500
Lake
Ave
Sew
er In
flow
and
Infil
tratio
n (I
/I)-T
his p
roje
ct w
ill im
plem
ent t
he re
com
men
datio
ns
from
the
Lake
Ave
nue
Are
a Se
wer
Sys
tem
Eva
luat
ion
Surv
ey (S
SES)
to re
mov
e co
st e
ffec
tive
I/I fr
om th
e La
ke A
venu
e A
rea
that
con
tribu
tes t
o su
rcha
rgin
g an
d ov
erflo
ws i
nto
Lake
Q
uins
igam
ond.
100.
00%
ConTaCT InfoRMaTIonMassachusetts Clean Water Trust
3 Center Plaza, Suite 430Boston, MA 02108
Susan E. Perez, Executive Director(617) 367-9333 Ext. [email protected]
Nathaniel Keenan, Deputy Director(617) 367-9333, x508
My T. Tran, Trust Treasurer(617) 367-9333 Ext. [email protected]
Massachusetts Department of Environmental ProtectionDivision of Municipal Services
One Winter Street, 5th FloorBoston, MA 02108
Steven McCurdy, DirectorDivision of Municipal Services
(617) [email protected]
Joseph Delaney, Deputy DirectorDivision of Municipal Services
(617) [email protected]