2015 Annual Report Office of the State Treasurer Executive Office of Administration and Finance Massachusetts Department of Environmental Protection

Upload: khangminh22

Post on 19-Jan-2023

1 views

Category:

Documents


0 download

TRANSCRIPT

2015 Annual Repor t

Office of the State TreasurerExecutive Office of Administration and Finance

Massachusetts Department of Environmental Protection

Table of ConTenTs

Message from the Chair.........………………………………….....................i

Introduction…………………………………………………………..................1

Clean Water SRF Annual Summary…………………………......................2

Drinking Water SRF Annual Summary…………………….........................8

SRF Financial Summary……………………………………….......................16

Appendices………………………………………………………….................20

September 30, 2015

The Massachusetts Clean Water Trust (the Trust) is pleased to submit its Clean Water and Drinking Water State Revolving Fund (SRF) Annual Report for State Fiscal Year (SFY) 2015.

The Trust is a collaborative effort between the Treasurer’s Office, the Executive Office for Administration and Finance, and the Massachusetts Department of Environmental Protection (MassDEP). Our leveraged financing program enables us to maximize the impact of our efforts throughout the Commonwealth. To date, the Trust has used approximately $2.2 billion in federal grants and state matching funds to finance nearly $6.3 billion in clean water and drinking water construction projects.

As our water infrastructure continues to age, now is the time for municipalities to invest in protecting both the health of their citizens and the environment, while supporting economic development in their communities. Easy access to financing is essential in order to achieve these goals. The Trust continues to do its part by providing subsidized loans backed by its AAA credit. In SFY 2015 the Trust provided approximately $327.0 million in commitments for low interest rate loans to cities and towns across the state. The commitment amount will support an estimated 1,960 construction and engineering jobs. This financing provides vast benefits to the quality of the state’s waterways. The funding also protects public health through projects such as combined sewer overflow removal, wastewater treatment plant upgrades, sewer system construction and rehabilitation, septic system repairs, drinking water treatment facilities, treated water storage and water main replacement and rehabilitation.

The Trust continues to be a leader in the SRF arena. In January, the Trust was one of the first SRFs to issue Green Bonds. The sale of $228 million of Green Bonds went to finance water and wastewater projects and provided the Trust with an opportunity to showcase the vital work being done by our cities and towns. The Trust led the SRF industry with its Green Bond disclosure, which has been used by other SRFs that issued Green Bonds. The Annual Report provides an update to the disclosure in the Appendix as to the use of proceeds.

I would like to thank the staff of the Trust and our partners at MassDEP. We wish to also acknowledge the excellent work of everyone at the Environmental Protection Agency Region One for all of their efforts this year. Without the combined efforts of these organizations, our state’s innovative economic and environmental initiatives would not be possible.

Finally, I would like to thank our borrowers, the cities and towns within the Commonwealth. Their dedication to protecting the environment and the public health of their citizens drives our program’s success. My office looks forward to serving as an accessible partner in this vital work.

Sincerely,

Deborah B. GoldbergChairMassachusetts Clean Water Trustwww.mass.gov/treasury

M e s s a G efRoM THe CHaIR

2015 SRF ANNUAL REPORT | 1

InTRoduCTIonThe Massachusetts Clean Water Trust (the Trust), in partnership with the Massachusetts Department of Environmental Protection (MassDEP) provides cities and towns of the Commonwealth with low interest rate loans for water infrastructure projects. MassDEP manages project development and approval while the Trust manages the flow of money to the communities. Each year, MassDEP prepares the Intended Use Plan (IUP) of projects as required by the Environmental Protection Agency (EPA). The IUP establishes the Commonwealth’s project priorities for the upcoming year. This is accomplished through two programs – the Clean Water State Revolving Fund (SRF) and the Drinking Water SRF. The EPA requires reporting on both of the programs through the Clean Water SRF Annual Report and the Drinking Water SRF Biennial Report. These reports have been combined into this report, which covers the State Fiscal Year (SFY) ending June 30, 2015.

An estimated 97% of Massachusetts citizens have benefited from these essential projects. In SFY 2015, the Trust provided binding commitments for 40 clean water projects, including the Community Septic Management Program (CSMP), totaling over $246.2 million and 25 drinking water projects totaling $81.0 million.

The SRF loan program receives funding from the EPA in the form of an annual grant, supplemented

by state matching grants and the repayment of loans from borrowers. In addition, the Trust issues bonds guaranteed by pledged assets that are funded by federal and state grants. The Trust’s lending and bond issuance programs are structured in such a way that ensure adequate cash flows to fund its loans and to repay its bonds to maturity. The Trust’s bonds are secured by a

combination of pledged sources which include loan repayments, contract assistance from the Commonwealth and interest earnings on debt service reserve funds. The “Financial Summary” section provides additional details on the financial management activities and most recent bond issue of the SRF program.

Since its inception in 1989, the SRF loan program has provided over $6 billion in loans to nearly 300 borrowers to improve and maintain the quality of water in the Commonwealth.

The Clean Water SRF provided $246.2 million of project financing to create an estimated

1,477 construction and engineering jobs.

The Drinking Water SRF provided $81.0 million of project financing to create an estimated 486 construction and

engineering jobs.

This report covers the State Fiscal Year ending June 30, 2015

2015 SRF ANNUAL REPORT | 2

 Extended Term Financing As in previous years, the Trust continues to offer extended term financing up to 30 years to its participants. Extended term financing is available for Clean Water projects that can demonstrate that the project’s useful life is at least as long as the term of the loan. The term can be extended to a maximum of thirty years.

DisbursementsDuring 2015, the Trust disbursed $207.2 million for Clean Water projects to various local governmental entities through the program project funds and interim loans. Of this amount, $0.9 million was disbursed in the form of additional subsidy with repayment not required, to either “Renewable Energy” projects or projects in “Environmental Justice” communities. These projects have already received $2.7 million in subsidies.

Administrative Expenses For SFY 2015, $1.4 million of annual Clean Water SRF grant administration funds were spent by MassDEP. This consisted of $1.0 million in federal funds and $0.4 million in state matching funds. These costs were associated with construction management of the Clean Water SRF program. An additional amount of $4.3 million was spent from the Trust’s Administrative Fund to supplement MassDEP administrative costs for both the Clean

2015 Clean Water Program ResultsIn 2015, the Trust continued to expand its program by providing new commitments of over $246.2 million in financing for 40 loans to communities across the Commonwealth. Of the 40 loans, 4 were provided to the Community Septic Management Program (CSMP). The CSMP provides low interest financing to Massachusetts’ cities and towns to assist homeowners in the repair of failed septic systems.

Interim Loans The Trust makes funds available to eligible projects on the IUP through its Interim Loan Program year round. Borrowers can enter into a short term loan that enables projects to proceed prior to a Trust bond sale. The Trust is capable of funding a project prior to a bond sale by extending the use of program equity funds as a source of capital. The interest is accrued monthly on the basis of the balance drawn on the construction account. The interest rate is set at one-half of the one year Massachusetts Municipal Depository Trust (MMDT) rate. The average interest rate charged in SFY 2015, accruing only on drawn funds, was 0.10%. During SFY 2015, 97 projects had drawn $119.5 million of interim loan funds.

Clean WaTeR sRf annual suMMaRy

SFY 2015 Clean Water Disbursements

Amount# of

Loans

Interim Loans $119,450,441 97

Program Project Funds 87,772,403 57

Total $207,222,844 154

Clean Water Grant Awards

SFY 2015 Grant Awards

Program to date Grant Awards

Federal $47,603,000 $1,373,250,761

State 9,520,600 248,038,692

Total $57,123,600 $1,621,289,453

Massachusetts continues to finance projects that focus on rehabilitation of wastewater infrastructure which promotes sustainability and smart growth principles. The SRF program provides additional subsidy to designated low income Environmental Justice Communities and continues to perform outreach activities to help borrowers realize opportunities to implement energy efficiency/alternative energy projects.

2015 SRF ANNUAL REPORT | 3

and Drinking Water programs as well as fund the administrative costs of the Trust. The Trust also provided the final payment of the total $3.5 million commitment, funding $0.5 million to the Cape Cod Commission in SFY 2015 to help with the overall costs in developing a regional wastewater management plan called for under the federal Clean Water Act. The plan has since been finalized and approved by the state and federal government.

American Iron and Steel MassDEP has incorporated the American Iron and Steel (AIS) requirements into its Loan Application and Plans and Specifications Package. The necessary language has also been added into the Project Regulatory Agreement and the Financing Agreement. AIS reviews are being conducted as part of routine construction inspections and are being documented in inspection reports.

Federal Funding Accountability and Transparency Act In compliance with the Federal Funding Accountability and Transparency Act (FFATA), the Trust reports recipient or sub-recipient awards for any amount equaling $25,000 or greater in the FFATA Subaward Reporting System (FSRS) at www.fsrs.gov. The loans used by the Trust for FFATA Reporting can be found in the Appendices to this report.

Green Project Reserve For the 2014 CWSRF Federal Grant, the Trust was required to provide $4.8 million in financing to projects that were identified as Green Projects. In its 2014 IUP, MassDEP identified 15 projects totaling $171.6 million that are considered to be either entirely or partially Green. Since all of the Green Projects that advanced to construction are only partially green and have just recently started construction, MassDEP is now working with the project consultants to review the schedules of values to extract the green portions of the projects. Once these values are calculated, they will be entered into the Clean Water Benefits Reporting System (CBR).

For the 2013 grant, $4.5 million was required for the Green Project Reserve. To date, a total of $3.6 million or 7.9% of the grant has been reported in the CBR. A significant number of projects from the 2013 Intended Use Plan (IUP) that were identified as Green, did not proceed to construction, resulting in this reduced dollar value of Green projects. There are several projects from the 2013 IUP that are proceeding that may be considered Green with a business case. MassDEP is evaluating these projects further to see if they qualify as Green projects. If they qualify as Green, they will be entered into CBR. MassDEP will update this section of the Annual Report in 2016 to reflect any changes that may occur to the Green Project Reserve numbers for the 2013 grant.

2015 SRF ANNUAL REPORT | 4

2014 Federal Grant Projects Receiving Additional Subsidy

Borrower Project Loan # Project CostPrincipal

ForgivenessExpended

Amount

Boston Gardner St. Landfill Closure CWP-14-02 $15,777,800 $412,532 $412,532

Saugus SSO Reduction Subsystem 5 CWP-14-08 2,109,614 74,267 55,159

Revere Collection System Improvements

CWP-14-12 10,982,142 287,143 287,143

Haverhill CSO Improvements, WWTF and Sewer System

CWP-14-15 6,464,500 169,023 -

New Bedford CSO Abatement CWP-14-19 8,279,605 216,481 216,481

Falmouth WWTF Upgrade CWP-14-22 4,400,000 115,044 115,044

Falmouth Sewer Extension and New Recharge Site

CWP-14-23 32,869,482 859,417 859,417

Taunton SSES Phases 10-12 CWP-14-26 4,129,082 107,960 107,960

Springfield WSC Dickinson Siphon/Main Interceptor Rehab

CWP-14-27 20,148,628 526,813 -

Montague Pump Station Replacements CWP-14-28 1,951,059 51,013 -

Brockton Sewer System Rehab CWP-14-30 1,750,000 45,756 45,756

Middleborough WWTF Upgrades CWP-14-32 25,000,000 653,659 653,659

Total $133,861,912 $3,500,000 $2,753,151

Additional Subsidy Massachusetts provided $3.5 million in additional subsidy from the 2014 grant, which is within the $2.6 to $3.9 million range required by the federal grant. This additional subsidy is dedicated to communities that would not otherwise be able to afford the projects. Massachusetts chose to apply these funds to communities that meet the Environmental Justice (EJ) income threshold of below 65% of the state’s median household income and for renewable energy projects. This targets the subsidy to lower income communities across the Commonwealth as well as providing subsidy for renewable energy projects that would typically have lengthy payback periods without the subsidy. Massachusetts provides the subsidy to the communities in the form

of principal forgiveness. During the reporting period, the subsidy was given to twelve Clean Water projects. Each project received an equivalent of 2.6% of the project cost as additional subsidy.

The funds used as additional subsidy are the first dollars drawn against the project. As of the date of this report, $2.7 million of the additional subsidy from the 2014 grant has been disbursed. The remaining funds should be disbursed within the next few months. As a follow up to 2014 Annual Report, all of the additional subsidy funds from the 2013 grant have been fully expended.

2015 SRF ANNUAL REPORT | 5

2015 Clean Water Leveraged Program The Trust program is leveraged by issuing bonds to increase capacity to be able to issue more loans. Federal and state grants are pledged to secure the bonds by either funding reserve funds or pledged direct loans or a combination of both. Since 2002, the Trust has provided loans to communities at a 2% interest rate. As the effective market interest rate on the bonds is higher than the 2% loan rate, borrowers receive a subsidy equal to the difference between the rates. Debt service on the Trust’s SRF Bonds is paid from a combination of three sources: borrower loan principal and interest repayments, interest earnings on the debt service reserve funds, and subsidy payments provided by the Commonwealth, known as contract assistance. Further discussion of the trust’s leveraged financing program can be found in the “The Financial Summary” sections.

Borrower Repayments Each borrower is obligated to repay the principal amount of its loan at a subsidized interest rate of 2% or less. However, those with extended term financing, greater than 20 years, may have a subsidized interest rate somewhat higher than 2%. In SYF 2015, borrower principal and interest loan repayments accounted for approximately 69.1% of debt service, totaling $200.8 million. Since 2012, the Trust has pledged certain direct loans that it makes from its program equity funds as additional security for its series of revenue bonds, rather than utilizing a traditional reserve fund. The interest the Trust receives from the pledged direct loans is used to pay a portion of debt service, while the principal payments received are available as additional security and recycled back to SRF program funds

after debt service obligations have been met. As of June 30, 2015, the Trust has $228.6 million of pledged direct loans outstanding.

Reserve Fund Interest Earnings Reserve funds, or pledged direct loans, are held as security for all Trust bonds at an amount between 33% and 50% of the outstanding principal. As of June 2015, the Trust held $745.0 million in Clean Water reserve funds invested in guaranteed investment contracts (GIC), and US Treasury and Agency obligations. Earnings on these investments are applied to pay a portion of the debt service on the related series of SRF Bonds. In SFY 2015, reserve fund earnings applied to current debt service payments accounted for 13.7% of debt service, totaling $39.9 million. As bonds are repaid, reserve funds are released and returned to the Clean Water Equity Fund. In SFY 2015, $74.7 million was released to the Clean Water Equity Fund, and made available for new loans.

Commonwealth Contract Assistance The Commonwealth has entered into an agreement with the Trust for contract assistance payments to subsidize debt service on the SRF Bonds. Contract assistance is appropriated annually in the Commonwealth’s operating budget. To date the Trust has received $910.1 million in Clean Water contract assistance with a future commitment of $285.8 million, for a total commitment by the Commonwealth of $1.2 billion. In SFY 2015 Commonwealth contract assistance accounted for approximately 17.2% of debt service, totaling $49.8 million in assistance applied.

2015 SRF ANNUAL REPORT | 6

Boston – Gardner Street Landfill ClosureThis project completes the closure of the former Gardner Street Landfill located in the West Roxbury neighborhood of Boston. The project includes the construction of a landfill cap and gas collection system, which allows for the site to be re-used by the West Roxbury Education Complex as an athletic field. The construction of the landfill cap will help reduce rainwater infiltration, which should lessen the generation of leachate under the site and help reduce the exposure of groundwater to buried wastes. The Trust provided nearly $15.8 million in project financing including $412,000 in principal forgiveness.

Clean WaTeR PRojeCTs

Great Barrington - Wastewater Treatment Facility Upgrade and I/I RemovalThis $4 million project includes upgrades to the Wastewater Treatment Facility (WWTF) and improvements to the collection system to reduce Inflow and Infiltration (I/I). The treatment plant upgrades are replacing or repairing aging equipment, improving system reliability, achieving higher levels of phosphorus removal, and preparing for nitrogen removal upgrades. The WWTF upgrade includes installation of a reliable system to reduce total phosphorus loads to the Housatonic River, resulting in a reduction of eutrophication potential in the river and its ultimate receiving body, Long Island Sound.

The Massachusetts SRF program continues to meet the goals established in the annual IUP. As outlined in the IUP, all SRF projects are subject to the rigorous environmental review procedures of the Massachusetts Environmental Policy Act.

The Clean Water SRF provides loans for a wide variety of projects. The primary recipients of Clean Water loans have been combined sewer overflow, wastewater treatment and wastewater collection projects. Although other projects such as drainage improvements, landfill closures, brownfields remediation, renewable energy projects, and other non-point source projects are eligible for funding.

2015 SRF ANNUAL REPORT | 7

Middleborough – Wastewater Treatment Facility UpgradeThis $25 million project is to upgrade the Wastewater Treatment Facility to address more stringent discharge permit limits, reduce nutrient discharges and protect the impaired receiving water downstream, specifically impacts to the Taunton River estuary as well as Mount Hope Bay and Narragansett Bay. The current plant was constructed in 1977 and has not undergone a major upgrade since then. This project is eligible to receive 0% interest rate financing for the nutrient reduction portion of the project and is also receiving nearly $654,000 in principal forgiveness.

Dracut – Sewer ExtensionsThis project involves the construction of new sanitary sewers that will mitigate the migration of leachate from failing septic systems into tributaries of the Merrimack River. In addition, the project will eliminate several direct sewage connections to the local stormwater system and mitigate impacts to natural resources, town conservation land and private drinking water supplies. The project will install approximately 11,000 linear feet of 8-inch diameter gravity sewer, approximately 1,000 linear feet of small diameter pressure sewers, approximately 2,100 linear feet of force mains and two submersible pumping stations within town roads and cross country areas. $4.7 million in project financing is being provided by the Clean Water Trust to the Town of Dracut.

2015 SRF ANNUAL REPORT | 8

dRInkInG WaTeR sRf annual suMMaRy

2015 Drinking Water Program Results In 2015, the Trust continued to expand its program by providing new commitments of approximately $81.0 million in funding for 25 loans to communities across the Commonwealth.

Interim Loans The Trust makes funds available to eligible projects on the IUP through the Interim Loan Program year round. Borrowers can enter into short term loans that enables projects to proceed during the time prior to a Trust bond sale. The Trust is capable of funding a project prior to a bond sale by extending the use of program equity funds as a source of capital. The interest is accrued monthly on the basis of the balance drawn on the construction account. The interest rate is set at one-half of the one year Massachusetts Municipal Depository Trust (MMDT) rate. The average interest rate charged in SFY 2015, accruing only on drawn funds, was 0.10%. During SFY 2015, 33 projects had drawn $58.5 million of interim loan funds.

Disbursements During 2015, the Trust disbursed $82.8 million for Drinking Water projects to various local governmental entities through the program project funds and interim loans. Of this

Massachusetts continues to support protection of public health by ensuring that all its Public Water Suppliers have the necessary technical, financing and managerial capacity to maintain compliance with the current and foreseeable Safe Drinking Water Act requirements. The program continues to promote the completion of cost-effective projects that maximize protection of public heath.

Drinking Water Grant Awards

SFY 2015 Grant Awards

Program to date Grant Awards

Federal $16,441,000 $478,868,100

State 3,288,200 85,294,020

Total $19,729,200 $563,980,120

amount, $3.9 million was disbursed in the form of additional subsidy with repayment not required to either “Renewable Energy” projects or “Environmental Justice” communities.

American Iron and Steel As with the Clean Water Program, MassDEP has incorporated the American Iron and Steel (AIS) requirements into its Loan Application and Plans and Specifications Package. The necessary language has also been added into the Project Regulatory Agreement and the Financing Agreement. AIS reviews are being conducted as part of routine construction inspections and are being documented in inspection reports.

Federal Funding Accountability and Transparency ActIn compliance with the Federal Funding Accountability and Transparency Act (FFATA), the Trust reports recipient or sub-recipient awards for any amount equaling $25,000 or greater in the FFATA Subaward Reporting System (FSRS) at www.fsrs.gov. The loans used by the Trust for FFATA Reporting can be found in the Appendices to this report.

SFY 2015 Drinking Water Disbursements

Amount# of

Loans

Interim Loans $58,547,738 33

Program Project Funds 24,227,038 47

Total $82,774,776 80

2015 SRF ANNUAL REPORT | 9

year period. This should provide Massachusetts with a cushion to meet the small system requirement for the next several years.

Absent a large project like this, Massachusetts will almost always have difficulty meeting the small systems requirement. A survey of small systems indicated that federal cross cutting requirements such as Davis Bacon, American Iron and Steel and Disadvantaged Business Enterprise rules discourage them from coming to the SRF for financing unless the project is of sufficient size to overcome these additional costs. In addition, the current low interest rate environment has borrowers opting to get their own financing rather than meeting SRF requirements. Even if Massachusetts is able to include the requisite amount of projects in the IUP, there is no guarantee the projects will ultimately be built. Often times a community is unable to secure debt authorization, identifies another source of financing (such as rural development) or otherwise determines that a project should not go forward resulting in a high level of project attrition.

Going forward, the Trust will attempt to comply with the new interpretation of the small systems requirement. The MassDEP Drinking Water program does significant outreach to small systems throughout the Commonwealth through the 2% Small Systems Technical Assistance set aside, which stresses the availability and use of the SRF as a low cost source of financing. In the last year, the Drinking Water program held a series of workshops for small systems to identify grant and loan opportunities for those systems. Even with these efforts to reach and recruit small systems, the Trust is concerned that in many years, there may not be sufficient applications to make up 15% of the total assistance provided.

Small SystemsFor a number of years, the Trust has been providing financing to small systems in the amount of at least 15% of the federal grant, with the concurrence of EPA Region 1. During 2014, the EPA changed its interpretation of the small systems requirement from 15% of the federal grant to 15% of the total amount of assistance provided. This change in interpretation has a large effect on the Massachusetts program. When the 2014 IUP was prepared, MassDEP was working under the earlier interpretation of 15% of the grant amount. The IUP identified $3.6 million of small system projects, with 15% of the grant amount totaling $3.2 million. With an IUP in excess of $126.0 million, 15% of the total assistance comes to $19.0 million. In response to this change, MassDEP elevated all of the small systems on the Project Priority List to the IUP, which still only resulted in a total of $5.0 million. Of those projects, only two proceeded to construction totaling $3.0 million, well below the required $19.0 million.

For the 2015 IUP, MassDEP received small system applications from 7 communities totaling $20.0 million. One large project (Eastham) made up $16.0 million of this total. 15% of the $106.0 million IUP is just under $16.0 million. Based on this calculation Massachusetts should meet the 15% threshold for the 2015 IUP, however, at this point, it is unclear how many of the projects will proceed towards construction. The Eastham project has started construction and is expected to reach the $16.0 million cap established in the IUP, so that project alone should satisfy the small system requirement.Eastham is establishing a water distribution system for the first time, with an expected overall cost in excess of $125.0 million. The first phase of this project is $45.0 million to be funded over a three

2015 SRF ANNUAL REPORT | 10

2014 Federal Grant Projects Receiving Additional SubsidyBorrower Project Loan # Cost

Principal Forgiveness

Expended Amount

Falmouth Long Pond WTF DWP-14-04 $43,258,900 $2,473,793 $2,473,793

New Bedford Transmission Main Improvements DWP-14-05 9,323,792 533,188 533,188

Fall River Water Main Improvements PH 14 DWP-14-08 3,361,301 192,219 192,219

Barnstable Pipe Replacement and Maher WTP Upgrade

DWP-14-09 1,556,339 89,000 -

Total $57,500,332 $3,288,200 $3,199,200

Additional Subsidy Massachusetts was required to provide a minimum of $3.3 million in additional subsidy from the 2014 grant. This additional subsidy is provided to communities that would not otherwise be able to afford the project. Massachusetts chose to apply these funds to projects in communities that meet the Environmental Justice (EJ) income threshold of below 65% of the state’s median household income and for renewable energy projects. This targets the subsidy to lower income communities across the Commonwealth as well as providing subsidy for renewable energy projects that would typically have lengthy payback periods without the subsidy.

Massachusetts provides the subsidy to the communities in the form of principal forgiveness. During this reporting period, Massachusetts provided the required minimum amount of subsidy to four drinking water projects. Each project received an equivalent of about 5.7% of the project cost as additional subsidy.The funds used as additional subsidy are the first dollars drawn against the project. As of the date of this report, $3.2 million of the additional subsidy from the 2014 grant has been disbursed. The remaining funds should be disbursed within the next few months. As a follow up to 2014 Annual Report, all of the additional subsidy funds from the 2013 grant have been fully expended.

2015 SRF ANNUAL REPORT | 11

2015 Drinking Water Leveraged Program The Trust program is leveraged by issuing bonds to increase capacity to be able to issue more loans. Federal and state grants are pledged to secure the bonds by either funding reserve funds or pledged direct loans or a combination of both. Since 2002, the Trust has provided loans to communities at a 2% interest rate. As the interest rate on the bonds is higher than the 2% loan rate, borrowers receive a subsidy equal to the difference between the rates. Debt service on the Trust’s SRF Bonds is paid from a combination of three sources: borrower loan principal and interest repayments, interest earnings on the debt service reserve funds, and subsidy payments provided by the Commonwealth, known as contract assistance. Currently, all Drinking Water loans have a maximum term of 20 years; however, the Trust is working to implement an extended term financing program similar to the Clean Water program. The extended term financing is expected to be in place by the end of the calendar year.

Borrower Repayments Each borrower is obligated to repay the principal amount of its loan at a subsidized interest rate of 2% or less. In SFY 2015, borrower principal and interest loan repayments accounted for approximately 77.4% of debt service, totaling $65.6 million. Since 2012, the Trust has pledged certain direct loans that it makes from its program equity funds as additional security for its series of revenue bonds, rather than utilizing a traditional reserve fund. The interest the Trust receives from the pledged direct loans is used to pay a portion of debt service, while the principal payments received are available as additional

security and recycled back to SRF program funds after debt service obligations have been met. As of June 30, 2015, the Trust has $81.3 million of pledged direct loans outstanding.

Reserve Fund Interest Earnings Reserve funds, or pledged direct loans, are held as security for all Trust bonds at an amount between 33% and 50% of the outstanding principal. As of June 2015, the Trust held $178.6 million in Drinking Water reserve funds invested in guaranteed investment contracts and US Treasury and Agency obligations. Earnings on these investments are applied to pay a portion of the debt service on the related series of SRF Bonds. In SFY 2015 reserve fund earnings applied to current debt service payments accounted for 11.1% of debt service, totaling $9.4 million. As bonds are repaid, reserve funds are released and returned to the Drinking Water Equity Fund. In SFY 2015, $20.9 million was released to the Drinking Water Equity Fund, and made available to be applied to new loans.

Commonwealth Contract AssistanceThe Commonwealth has entered into an agreement with the Trust for contract assistance payment to subsidize debt service on the SRF Bonds. Contract assistance is appropriated annually in the Commonwealth’s budget. To date the Trust has received $127.0 million in Drinking Water contract assistance with a future commitment of $80.5 million, for a total commitment by the Commonwealth of $207.5 million. In SFY 2015, Commonwealth contract assistance accounted for approximately 11.5% of debt service, totaling $9.7 million in assistance applied.

2015 SRF ANNUAL REPORT | 12

Sanitary Survey Program – MassDEP Drinking Water staff is responsible for evaluating the technical, financial and managerial capability of Community, Non-Transient Non-Community and Transient Non-Community PWS. During the last year the Drinking Water staff has completed 387 evaluations on existing systems. See Figure 1 below for breakdown of system types.

Operator Certification - MassDEP has a very active operator certification program. The program activities have been integrated into daily activities of staff. Program activities range from chairing the Board of Certification of Drinking Water Operators to providing general and specialized training of and guidance for drinking water operators at all levels.

Wellhead Protection Program – Technical assistance was provided to water supply systems for wellhead protection compliance, the development of protection plans, and for determining monitoring waiver eligibility.

Capacity Development - During the course of conducting sanitary surveys on public water systems, MassDEP staff identified 1,337 technical, financial or managerial deficiencies and provided corrective action assistance to ensure compliance. MassDEP’s Capacity Development strategy focuses on improving the technical, financial, and managerial operations of both new and existing public water systems in the Commonwealth.

Drinking Water Set-Asides MassDEP continues to use set-aside funds as outlined in the annual IUP. The following sections describe the basic programs and accomplishments.

4% Set-Aside: Administration MassDEP uses eight (8) full time equivalent (FTE) staff members to administer the Drinking Water SRF program. These FTEs utilize 4% set-aside funding to accomplish the following tasks: developing program selection criteria, application ranking and rating, project development, construction inspections, invoice payment, data management and administrative support functions.

2% Set-Aside: Small System Technical Assistance Municipal Services Support - MassDEP uses two (2) FTEs to support Municipal Services. These FTEs provide training and technical assistance (compliance and operational issues) to small systems throughout Massachusetts. During this past year MassDEP also worked with training and technical assistance providers; Massachusetts Rural Water Association, United States Department of Agriculture, (Rural Development), US EPA Environmental Finance Center (New Mexico), Texas A & M Engineering Extension School (TEEX) to provide trainings to Public Water System (PWS). Topics included leak detection, pump and motor maintenance, rate setting, board training, public relations, disinfection, sampling and exam review.

10% Set-Aside: State Program Management MassDEP used approximately nineteen (19) FTEs to administer the state Drinking Water program. These FTEs utilize 10% set-aside funding for Public Water System support including the following programs: Sanitary Survey, Source & Wellhead Protection, Emergency Response, Capacity Development, Operator Certification, Consumer Confidence Report assistance, adoption and implementation of new regulations, evaluation and maintenance of existing federal rules, planning, outreach, data management, engineering and construction supervision, compliance supervision and other drinking water program activities. Some highlights of the programs in SFY 2015 includes:

MassDEP Sanitary Surveys Completed SFY 2015Type of Public Water System Total # of

Surveys Completed

Community Systems 186Non-Transient Non Community Systems 37Transient Non Community System 164

Totals 387

Figure 1:

2015 SRF ANNUAL REPORT | 13

15% Set-Aside: Local AssistanceMassDEP used seventeen (17) FTEs from the 15% local assistance set-aside to support the Public Water System Supervision programs including; sanitary surveys, adoption and implementation of new regulations, registration of new systems, evaluation and maintenance of existing federal rules, planning, outreach, data management, engineering and construction supervision etc. Some highlights of the programs in 2015 include:

Source Protection Support - Work includes the registration of new public water systems (see Figure 2), implementing and monitoring the chemical monitoring waiver program which provides incentive to do source protection as well as promoting preparedness and sustainability. Source protection technical assistance is provided during the 448 sanitary surveys that were completed throughout the year.

MassDEP Registration of New Small Public Water Systems SFY 2015

Type of Public Water System Total # of Systems

Community Systems 1Non-Transient Non Community Systems 0Transient Non Community System 16Totals 17

Figure 2:

Contract Services - MassDEP has contracted fund Information Technology (IT) staff to assist with data management support for public water systems and implementation of the Safe Drinking Water Act programs. Key activities include reporting, program evaluation and database maintenance and improvement.

2015 SRF ANNUAL REPORT | 14

dRInkInG WaTeR PRojeCTsThe Massachusetts Drinking Water SRF program continues to meet the goals established in the annual IUP. As outlined in the IUP, all SRF projects are subject to the rigorous environmental review procedures of the Massachusetts Environmental Policy Act. Drinking Water projects typically involve construction and, or, rehabilitation of drinking water treatment plants, replacement of aging water mains and the construction of drinking water storage facilities.

Eastham – Water Supply SystemThe Town of Eastham does not currently have a public water supply system. Drinking water is supplied by small community public water systems and individual private wells. A number of private wells near the closed town landfill were found to be contaminated with 1,4-dioxane and there is an ongoing problem with nitrate concentrations in drinking water wells throughout town. Due to these contamination issues and their associated public health concerns, the town decided to pursue the construction of a town-wide water distribution system. This $45 million project is the first phase of the water distribution system consisting of the construction of two well fields, a water storage tank and 45 miles of water distribution piping.

Paxton – Maple Street Elevated TankThis $1.4 million project involves the replacement of the Maple Street elevated water tank with a new 210,000 gallon glass fused steel water storage tank and the demolition of the existing storage tank. Paxton has two water storage tanks, and the replacement of the Maple Street tank provides the necessary redundancy in the system that allows the town to take one tank offline for routine or emergency maintenance and still have adequate storage for the system. In addition to providing redundant storage, the new tank will be equipped with a booster chlorination system to improve water quality. Paxton is considered a small system as it serves a population of less than 10,000. The EPA requires that at least 15% of the assistance provided by the Drinking Water SRF go to small systems.

2015 SRF ANNUAL REPORT | 15

MWRA – Low Service StorageThis project is for the construction of a 20 million gallon potable water storage tank in the Town of Stoneham at its terminal reservoir at the northeastern extremity of the MWRA water service to metropolitan Boston. The project will provide not only improved storage but will also provide surge relief, protecting MWRA and community mains; allow more efficient use of the existing MWRA distribution system; and, provide emergency backup to 21 communities in the Northern Intermediate High and Northern High systems. The total project cost is $67.9 million. The Trust has provided $10.5 million in project financing over the last three years

2015 SRF ANNUAL REPORT | 16

sRf fInanCIal suMMaRy

Leveraged Financing ModelThe Trust’s SRF loan program receives funding from the EPA in the form of an annual grant, supplemented by state matching grants and the repayment of funds from previous borrowers (“SRF Program Funds”). The Trust’s SRF Program utilizes a “leveraged” financing model, under which federal grants and state matching grants are used as a source of security for revenue bonds (“SRF Bonds”) issued by the Trust. The proceeds from the SRF Bonds are used to fund loans to local governmental units for eligible project costs.

The leveraged structure of the Trust’s program permits the Commonwealth to substantially increase the amounts available to fund eligible project costs. Each federal grant and associated state matching grant dollar contributed to the program results in at least two to three dollars of project cost financing while assuring the perpetual nature of the revolving fund.

The Trust’s lending and bond issuance programs are structured to ensure adequate cash flows to fund its loans and to repay its bonds to maturity. Depending on the type of projects being financed, the terms of the loans to borrowers, and the subsidy levels to which the borrowers are entitled, the Trust applies its SRF Program Funds to fund either direct loans to local governmental units or, invest in reserve funds, or a combination of both, which are then pledged as a source of payment and security for the SRF Bonds.

Pledged Direct LoansUnder the pledged direct loan approach, the Trust pledges as additional security for a series of its SRF Bonds, direct loans (“Pledged Direct Loans”) that it has made or is making concurrently with the issuance of such SRF Bonds from its SRF Program Funds to eligible borrowers for Clean Water and Drinking Water projects. The Trust applies the interest payments on such Pledged Direct Loans to pay a portion of the debt service on the related series of SRF Bonds, thereby supplementing the loan repayment obligations of the borrowers of the Leveraged Loans funded by such SRF Bonds. Principal payments on the Pledged Direct Loans are pledged as further security for the related series of SRF Bonds. The Trust used the Pledged Direct Loan approach for its Series 18 SRF Bonds. The bonds are the third series of Trust SRF Bonds issued under the Pledged Direct Loan approach. As of June 30, 2015, the Trust has $310.0 million in Pledged Direct Loans.

The following discussion provides additional details on the financing management activities of the SRF loan program.

2015 SRF ANNUAL REPORT | 17

Reserve FundsIn the past, the Trust has applied a portion of its Program Equity Funds to establish reserve funds to secure a series of its SRF Bonds. Those investment earnings are then applied to pay a portion of the debt service on the related SRF Bonds, thereby supplementing the loan repayment obligation of the borrowers of the Leveraged Loans funded by such SRF Bonds. As of June 30, 2015, the Trust has $923.6 million in DSRF reserve funds invested in guaranteed investment contracts (GIC) and US Treasury and Agency Obligations.

SRF Bonds Sources of RepaymentPrincipal and interest payments on the Trust’s SRF Bonds are made from the following sources: (1) loan repayments from borrowers (2) earnings on the federal grants and state matching grants pledged as security to the SRF Bonds, including, as applicable, interest earning on reserve funds and interest payments on direct loans pledged to secure such bonds and (3) subsidy payments provided by the Commonwealth, known as contract assistance.

Commonwealth Contract Assistance PaymentsThe Commonwealth makes assistance payments on behalf of certain loans to borrowers to be used to pay a portion of debt service on the related series of the Trust’s SRF Bonds, thereby reducing the borrower’s loan repayment obligation. The obligation of the Commonwealth to make such payments to the Trust is a general obligation of the Commonwealth, for which its full faith and credit are pledged.

The Commonwealth has pledged over $430.1 million in current and future assistance payments on behalf of

program borrowers. The Commonwealth is currently rated “AA+/Aa1/AA+”.

* based on highest rating

2015 SRF ANNUAL REPORT | 18

Deallocation of FundsFor all bond series issued prior to Series 18, on each date that the Trust pays down the principal amount of a series of SRF Bonds, or borrowers pay down the principal amount of the related pledged loans, the amount held in the related reserve fund is reduced proportionately. The amounts released from each reserve fund are transferred either to the Pool Program Reserve Fund and then to the Deficiency Fund or directly to the Deficiency Fund. These funds are available to cure shortfalls in any bond series. If not needed to cure a shortfall, the released funds are transferred to the Program Equity Funds which assures the perpetual nature of the revolving fund.

Beginning with Series 18, the Bonds will be governed by the new Master Trust Agreement (MTA). The MTA simplifies the flow and deallocation of funds. As depicted on the chart above, the MTA deallocates funds in the same method as prior bond series but when the funds release they flow directly to the Program Equity Fund. The Program Equity Fund is then available to cure shortfalls in all bond series governed by the MTA and prior bond series. Once it has been determined there no shortfalls, the funds are then available to be disbursed

to new loans, thus assuring the perpetual nature of the revolving fund.

Series 18 Green BondsOn January 7, 2015 the Trust issued $228.0 million in Green Bonds to fund 78 loans to 45 unique borrowers which was secured by 38 pledged direct loans totaling $108.0 million to an additional 33 borrowers. The Trust was able to borrow these funds at the true interest cost of 3.20% due to its AAA rating by all three rating agencies and the credit strength of its borrowers. The bond series was also one of the first Green Bonds issued by a SRF program in the nation and the Green Bond disclosure has since been used by other SRF programs. By designating the bond series as Green Bonds the Trust was able to attract nine new investors in Trust bonds and five new investors to the Green Bond market. In the Appendix to the Annual Report the Trust is providing an update to the Green Bond Disclosure in the Series 18 Official Statement as to the use of Green Bond proceeds. The Trust will continue to report on the use of proceeds until the full amount has been expended.

Security and Structure

Single Obligor Programs*# of Recipients: 3

# of Loans: 30Loan Principal Outstanding: $400M*Bond Principal Outstanding: $65M*

Reserve Balance: $121M*Final Maturity: 8/1/2032

Master Trust Agreement (MTA) # of Recipients: 68

# of Loans: 116Loan Principal Outstanding: $377MBond Principal Outstanding: $228M

Reserve Balance: $0Final Maturity: 2/1/2045

Pool SRF Program# of Recipients: 291

# of Loans: 1,598Loan Principal Outstanding: $3.1B*Bond Principal Outstanding: $3.0B*

Reserve Balance: $803M*Final Maturity: 2/1/2043

Single Obligor SRF Bonds

Commonwealth Assistance Payments

Individual DSRFs

Loan Repayments

Pool Program Reserve Fund

Pool SRF Bonds

Commonwealth Assistance Payments

Loan Repayments

Individual DSRFs

DEFICIENCY FUND

MTA Debt ServiceReserve Fund

(not funded for Series 18)

MTA Bonds

Commonwealth Assistance Payments

Loan Repayments

EQUITY FUNDS(approx. $350m) *

Excess coverage

Reserve De-allocation and Excess Coverage1 1

2

Receives periodic releases from the Deficiency FundSecures all MTA Bonds issued by the Trust on a parity basisAvailable to cure Prior Program Bonds

Prior Program Bonds

* As of June 30, 2015

Appendices

2015 SRF ANNUAL REPORT | 20

Clean Water SRF 2015 2014

Annual Grant Awards

Federal Clean Water SRF Grant $47,603,000 $45,328,000

State Matching Funds 9,520,600

9,065,600

Total Federal & State Grant Awards

$57,123,600 $54,393,600

Annual Binding Commitments

$ Committed # of Loans $ Committed # of Loans

Binding Loan Commitments Issued $246,200,432 40 $175,348,175 38

Interest Earnings not for bond repayments

$1,116,496 $1,119,428

Annual Disbursements

$ Disbursed # of Loans $ Disbursed # of Loans

Clean Water Interim Loans $119,450,441 97 $124,091,583 83

Pool Program Project Loans 87,772,403 57 44,024,128 47

Total Disbursements $207,222,844 154 $168,115,711 130

Financial Results From Program Inception

Federal Clean Water SRF Grant $1,373,250,761 $1,325,647,761

State Matching Funds 248,038,692 238,518,092

Total Federal & State Grant Awards $1,621,289,453 $1,564,165,853

TOTAL Clean Water Assets $4,396,020,000 $4,360,261,000

TOTAL Loans Financed $4,984,826,956 $4,702,806,493

2015 SRF ANNUAL REPORT | 21

Drinking Water SRF 2015 2014

Annual Grant Awards

Federal Drinking Water SRF Grant $16,441,000 $15,699,000

State Matching Funds 3,288,200 3,139,800

Total Federal & State Grant Awards $19,729,200 $18,838,800

Annual Binding Commitments

$ Committed # of Loans $ Committed # of Loans

Binding Loan Commitments Issued $81,034,279 25 $118,696,488 28

Interest Earnings not for bond repayments

$187,348 $148,392

Annual Disbursements

$ Disbursed # of Loans $ Disbursed # of Loans

Drinking Water Interim Loans $58,547,738 33 $44,343,676 27

Pool Program Project Loans 24,227,038 47 22,130,322 29

Total Disbursements $ 82,774,776 80 $66,473,998 56

Financial Results From Program Inception

Federal Drinking Water SRF Grant $478,686,100 $462,245,100

State Matching Funds 85,294,020 82,005,820

Total Federal & State Grant Awards $563,980,120 $544,250,920

TOTAL Drinking Water Assets $1,256,933,000 $1,217,177,000

TOTAL Loans Financed $ 1,337,244,100 $ 1,248,875,836

2015 SRF ANNUAL REPORT | 22

SFY 2015 Clean Water CommitmentsPRA# Government Entity Agreement

DateProject Description Commitment Amount

CW-12-18-B BILLERICA 05/01/2015 WWTF Improvements $ 160,182

CW-14-20 BILLERICA 06/01/2015 Contract 35 Sewers 4,826,666

CWP-14-02 BOSTON 07/01/2014 Gardner St. Landfill Closure 15,777,800

CW-12-06 BRIDGEWATER 12/01/2014 Water Resource Management Plan 181,190

CWP-14-30 BROCKTON 04/01/2015 Sewer System Rehab 1,750,000

CW-12-21-A CHATHAM 01/01/2015 Collection System Extension and Improvements 133,464

CW-13-10 CHATHAM 07/01/2014 Collection System Extension and Improvements 3,336,119

CW-14-05* CHICOPEE 09/01/2014 CSO 25,478,178

CW-13-24 DRACUT 02/01/2015 Contract #32 Sewer Extensions 4,693,582

CW-14-13 EASTHAMPTON 03/01/2015 IWRMP 1,100,000

CW-14-24 EVERETT 12/01/2014 Storm Water/Sewer Evaluation 500,000

CW-14-14 FALL RIVER 12/01/2014 Integrated Wastewater & Stormwater Plan 2,999,619

CWP-14-22 FALMOUTH 04/01/2015 WWTF Upgrades 4,400,000

CWP-14-23 FALMOUTH 04/01/2015 Sewer Extensions and New Recharge Site 32,869,482

CW-12-23 GREAT BARRINGTON

07/01/2014 WWTF Upgrade and I/I Removal 3,930,130

CW-14-18 HAVERHILL 05/01/2015 Revised PH 2 CSO LCTP (Planning Project) 3,283,090

CWP-14-15 HAVERHILL 04/01/2015 CSO Improvements, WWTF and Sewer System 6,464,500

CW-13-13 LAWRENCE 08/01/2014 CMOM and SSES 3,840,000

CW-10-41-A LEOMINSTER 11/01/2014 WPCF Upgrades 2,500,000

CW-14-29 LUNENBURG 06/01/2015 Sewer Extensions 1,521,653

CWP-15-01 LWSC 06/01/2015 WWTP Incinerator Upgrade & Chlorine Gas Conversion

5,268,266

CW-14-31 MANCHESTER-BY-THE-SEA

05/01/2015 CWMP 250,000

CW-11-21-B MARLBOROUGH 07/01/2014 Marlborough Easterly WWTP Upgrades 12,681,920

CWP-14-32 MIDDLEBOROUGH 04/01/2015 WWTF Upgrades 25,000,000

CWP-14-28 MONTAGUE 04/01/2015 Pump Station Replacements 1,951,059

CW-13-30 MWRA 10/01/2014 Nut Island Headworks Electrical & Conveyor Improvement

840,982

CW-13-32 MWRA 10/01/2014 CSO Phase 14 21,000,000

CW-11-11-A NEEDHAM 08/01/2014 Replacement of Reservoir B Sewer Pump Station 175,004

CWP-14-19 NEW BEDFORD 04/01/2015 CSO Abatement 8,279,605

CW-14-11 REVERE 05/01/2015 CWMP/CSMP Supplemental Plan 1,200,000

CW-14-25 REVERE 02/01/2015 Collection System Improvements 700,000

CWP-14-12* REVERE 04/01/2015 Illicit Connection Detection Program (Planning Project)

10,982,142

CWP-14-08 SAUGUS 12/01/2014 Marblehead Replacement Crossing Sewer 2,109,614

CW-13-33 SESD 12/01/2014 SSO Reduction Subsystem 5 10,588,475

CWP-14-27* SPRINGFIELD WSC 04/01/2015 Dickinson Siphon/Main Interceptor Rehab 20,148,628

CWP-14-26 TAUNTON 04/01/2015 SSES Phases 10-12 4,129,082

CWT-14-07 ATHOL Board of Health 08/06/2014 Community Septic Management Program 200,000

CWT-14-09 MIDDLEBOROUGH 08/28/2014 Community Septic Management Program 400,000

CWT-14-10 PLYMOUTH 08/28/2014 Community Septic Management Program 300,000

CWT-15-05 TAUNTON 05/27/2015 Community Septic Management Program 250,000

Total $ 246,200,432 *Loans used for FFATA Reporting

2015 SRF ANNUAL REPORT | 23

SFY 2015 Drinking Water CommitmentsPRA# Government Entity Agreement

DateProject Description Commitment

AmountDW-14-01 AUBURN WATER

DISTRICT01/01/2015 West Street WTF Upgrade $2,688,952

DWP-14-09 BARNSTABLE 04/01/2015 Pipe Replacement and Maher WTP Upgrade 1,556,339 DWP-12-26A BROCKTON 06/01/2015 Water System Improvement Program 275,500

DWP-15-01 EASTHAM 05/01/2015 Water System Phase 1 2,979,493 DWP-14-08* FALL RIVER 04/01/2015 Water Main Improvements and WTP Residual

Handling 3,361,301

DWP-14-04 FALMOUTH 04/01/2015 Long Pond WTF 18,600,000 DWP-15-02 FALMOUTH 04/01/2015 Long Pond WTF 16,000,000

DWP-11-19A GLOUCESTER 01/01/2015 Water System Improvements 173,574DWP-12-02A GLOUCESTER 01/01/2015 Water Treatment Plant Upgrade 474,127

DW-13-12 HOLDEN 07/01/2014 Water Main Installation and SCADA Improvements 525,000DW-10-08A IPSWICH 07/01/2014 Water Main Replacement 1,581,427

DW-13-19 LWSC 06/01/2015 Low Service Reservoir Improvements 1,398,337DW-14-02* MARLBOROUGH 01/01/2015 Millham WTP Improvements 4,809,184

DW-13-13A MEDWAY 05/01/2015 Water Main Replacement 1,722,600DW-12-14 MERRIMAC WATER

DEPARTMENT10/01/2014 Water Main Replacement 981,402

DW-13-21 MWRA 10/01/2014 Southern Spine Distribution Mains 3,000,000DW-13-22 MWRA 10/01/2014 Lower Hultman Aqueduct Rehabilitation 1,800,000 DW-13-23 MWRA 10/01/2014 New Connecting Mains 666,666 DW-13-24 MWRA 10/01/2014 Low Service Storage 2,500,000 DW-13-20 MWRA 10/01/2014 Blue Hills Covered Storage 1,800,000

DWP-14-05 NEW BEDFORD 04/01/2015 Transmission Main Improvements 5,000,000DWP-15-03 NEW BEDFORD 04/01/2015 Transmission Main Improvements 4,323,792

DW-14-07 PAXTON 05/01/2015 Maple Street Elevated Tank 1,434,000 DW-14-12 UXBRIDGE 06/29/2015 Rt. 122 Water Main Replacement 3,186,000

DWP-13-15A WEBSTER 05/01/2015 Water Main 196,585 DWP-13-15 WEBSTER 4/1/2014 Water Main 1,729,415

DWP-11-23-A

WEST SPRINGFIELD 9/1/2013 Water Transmission Main and Wellfield 566,384

Total $ 81,034,279

*Loans used for FFATA Reporting

2015 SRF ANNUAL REPORT | 24

Seri

es 1

8 G

reen

Bon

d Pr

ojec

t Des

crip

tions

Proj

ects

Fin

ance

d w

ith G

reen

Bon

d Pr

ocee

ds

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

Tow

n of

Bar

reD

W$6

3,80

0W

ell #

3 Ev

alua

tion-

The

proj

ect i

s a p

lann

ing

stud

y to

pro

vide

the

Tow

n of

Bar

re w

ith m

ore

flexi

bilit

y in

ope

ratin

g th

eir w

ater

supp

ly sy

stem

. W

hile

the

tow

n is

not

look

ing

to in

crea

se th

eir

Wat

er M

anag

emen

t Act

(WM

A) a

ppro

ved

rate

, the

y ar

e lo

okin

g to

incr

ease

thei

r with

draw

al ra

te

from

Wel

l #3.

In

Sprin

g 20

10, W

ell #

1 te

sted

pos

itive

for c

olifo

rm b

acte

ria a

nd th

e to

wn

was

is

sued

a N

ON

by

DEP

to b

egin

per

man

ent d

isin

fect

ion

at W

ell #

1. B

ecau

se th

e w

ater

from

Wel

l #1

has

a h

igh

iron

conc

entra

tion,

inst

allin

g di

sinf

ectio

n at

the

site

will

like

ly re

sult

in o

ther

wat

er

qual

ity p

robl

ems.

Wel

l #3

does

not

hav

e a

high

iron

con

cent

ratio

n.

94.4

8%

Tow

n of

Bel

mon

tC

W2,

300,

000

Illic

it C

onne

ctio

n El

imin

atio

n-Th

is p

roje

ct w

ill e

limin

ate

sani

tary

sew

er il

licit

conn

ectio

ns

ente

ring

the

stor

m d

rain

sys

tem

’s tr

ibut

ary

to A

lew

ife B

rook

, Litt

le P

ond

and

Bla

ir Po

nd. T

he

obje

ctiv

e of

this

pro

ject

is to

pro

tect

pub

lic h

ealth

and

impr

ove

wat

er q

ualit

y in

are

a br

ooks

and

po

nds i

n th

e M

ystic

Riv

er W

ater

shed

.

95.7

2%

Tow

n of

Bill

eric

aC

W1,

515,

186

Phas

e I P

ump

Stat

ion

Upg

rade

-Thi

s pro

ject

will

resu

lt in

sew

er p

ump

stat

ion

impr

ovem

ents

/upg

rade

s to

all o

f the

pum

p st

atio

ns in

the

tow

n th

at a

re in

imm

edia

te n

eed

of

repa

ir or

repl

acem

ent d

ue to

imm

inen

t fai

lure

or s

afet

y ha

zard

. Th

e pu

mp

stat

ion

impr

ovem

ents

ar

e th

e re

sult

repa

irs n

eces

sary

for o

pera

tor s

afet

y, p

rope

r ala

rms a

nd b

ack-

up p

ower

be

impl

emen

ted.

The

elim

inat

ion

of th

e B

erth

a C

ircle

and

Poe

Roa

d Pu

mp

Stat

ions

and

byp

ass

with

gra

vity

sew

er w

ill b

e do

ne a

s par

t of P

hase

I. I

n ad

ditio

n to

the

Cat

egor

y 3

repa

irs, P

hase

I in

clud

es in

stitu

ting

a SC

AD

A s

yste

m, c

ompl

etio

n of

the

rem

aini

ng u

pgra

des t

o th

e R

oger

and

B

row

n Pu

mp

Stat

ions

and

com

pete

upg

rade

to th

e M

iddl

esex

Tur

npik

e Pu

mp

Stat

ion.

98.8

5%

Tow

n of

Bill

eric

aC

W9,

000,

000

Sew

er E

xten

sion

and

Pum

p St

atio

n Im

prov

emen

ts-T

his p

roje

ct in

clud

es a

sew

er e

xten

sion

in

East

Bill

eric

a an

d im

prov

emen

ts, u

pgra

des,

and/

or e

limin

atio

n of

seve

ral s

ewer

pum

p st

atio

ns in

th

e to

wn.

The

pro

ject

incl

udes

inst

alla

tion

of a

ppro

xim

atel

y 5

mile

s of s

ewer

in th

e hi

ghes

t pr

iorit

y ar

ea id

entif

ied

in th

e C

ompr

ehen

sive

Was

tew

ater

Man

agem

ent P

lan.

The

pum

p st

atio

n im

prov

emen

t pro

ject

incl

udes

elim

inat

ion

of th

e B

erth

a C

ircle

, Poe

Roa

d an

d M

arsh

all S

treet

Pu

mp

Stat

ions

and

impr

ovem

ents

to th

e N

ashu

a R

oad,

Ilfo

rd R

oad

and

Mon

son

Pum

p St

atio

n.

78.4

8%

Tow

n of

Bill

eric

aC

W4,

468,

535

Was

te W

ater

Tre

atm

ent F

acili

ties (

WW

TF) I

mpr

ovem

ents

-Thi

s pro

ject

will

incr

ease

the

phys

ical

and

bio

logi

cal c

apac

ity o

f the

Let

chw

orth

Ave

nue

WW

TF, w

hich

is v

ery

clos

e to

re

liabl

y tre

atin

g w

aste

wat

er.

The

proj

ect w

ill a

chie

ve th

is th

roug

h th

e im

plem

enta

tion

of th

e po

rtion

s of t

he C

apita

l Im

prov

emen

ts P

lan

(CIP

) whi

ch a

ddre

sses

cap

acity

con

cern

s.

Impr

ovem

ents

to th

e W

WTF

will

hel

p re

med

iate

wel

l doc

umen

ted

envi

ronm

enta

l im

pact

s to

the

Con

cord

Riv

er.

88.9

7%

2015 SRF ANNUAL REPORT | 25

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

To

wn

of B

iller

ica

CW

6,89

2,82

9W

aste

Wat

er T

reat

men

t Fac

ilitie

s (W

WTF

) Im

prov

emen

ts-T

his p

roje

ct w

ill in

crea

se th

e ph

ysic

al a

nd b

iolo

gica

l cap

acity

of t

he L

etch

wor

thA

venu

e W

WTF

, whi

ch is

ver

y cl

ose

to

relia

bly

treat

ing

was

tew

ater

. Th

e pr

ojec

t will

ach

ieve

this

thro

ugh

the

impl

emen

tatio

n of

the

porti

ons o

f the

Cap

ital I

mpr

ovem

ents

Pla

n (C

IP) w

hich

add

ress

es c

apac

ity c

once

rns.

Im

prov

emen

ts to

the

WW

TF w

ill h

elp

rem

edia

te w

ell d

ocum

ente

d en

viro

nmen

tal i

mpa

cts t

o th

e C

onco

rd R

iver

.

100.

00%

City

of B

rock

ton

DW

1,91

2,31

2W

ater

Sys

tem

Impr

ovem

ent P

rogr

am-T

his p

roje

ct in

clud

es m

ultip

le c

ontra

cts.

The

pro

ject

in

clud

es a

con

tract

whi

ch w

ill re

plac

e re

side

ntia

l wat

er m

eter

s and

impl

emen

t city

-wid

e A

utom

atic

Met

er R

eadi

ng (A

MR

). A

n ad

ditio

nal c

ontra

ct w

ill e

limin

ate

lead

serv

ice

conn

ectio

ns o

n W

est E

lm S

treet

whi

le a

noth

er c

ontra

ct w

ill u

pdat

e G

IS p

rogr

am fo

r im

plem

enta

tion

of A

MR

; rep

lace

air

relie

f val

ves o

n 24

" tra

nsm

issi

on m

ains

from

Silv

er L

ake;

W

est E

lm S

treet

serv

ice

conn

ectio

ns u

pgra

de; i

nsta

ll so

lar p

hoto

volta

ic c

ells

at S

ilver

Lak

e w

ater

tre

atm

ent f

acili

ty a

nd u

pgra

de o

rigin

al 1

950'

s boo

ster

stat

ion.

A m

ajor

reas

on fo

r the

met

er w

ork

is a

n ef

fort

to c

ompl

y w

ith a

n In

terb

asin

Tra

nsfe

r Act

requ

irem

ent t

o re

duce

una

ccou

nted

-for

-w

ater

to 1

0% o

r les

s.

79.7

6%

Tow

n of

Cha

tham

CW

3,84

7,85

3C

olle

ctio

n Sy

stem

Ext

ensi

on a

nd Im

prov

emen

ts-T

his s

ewer

Col

lect

ion

Syst

em E

xten

sion

and

Im

prov

emen

t Pro

ject

will

add

ress

nitr

ogen

load

ing

conc

erns

by

furth

er e

xten

ding

the

was

tew

ater

co

llect

ion

syst

em.

The

proj

ect i

s the

third

pha

se o

f im

plem

entin

g ni

troge

n m

itiga

tion

effo

rts th

at

bega

n in

201

0. T

he p

roje

ct w

ill in

clud

e se

wer

ing

addi

tiona

l sec

tions

of C

hath

am a

nd

cons

truct

ing

two

pum

p st

atio

ns c

apab

le o

f han

dlin

g a

tota

l of 6

8,00

0 ga

llons

per

day

of s

ewag

e.

The

miti

gatio

n of

nitr

ogen

will

hel

p pr

otec

t the

hea

lth o

f sal

t and

fres

h w

ater

bod

ies i

n th

e to

wn.

100.

00%

Che

rry

Val

ley

&

Roc

hdal

e

Wat

er D

istri

ct

DW

556,

038

Mod

ifica

tions

to W

ater

Tre

atm

ent P

lant

-Thi

s pro

ject

will

be

done

in tw

o ph

ases

. Th

e w

ork

in

Phas

e I c

onsi

sts o

f rep

laci

ng v

alve

s and

sand

med

ia a

t the

Grin

dsto

ne W

TF.

Phas

e I a

lso

incl

udes

a p

ilot s

tudy

for t

he p

ropo

sed

upgr

ades

to th

e W

TF, a

n up

date

toth

e ex

istin

g fe

asib

ility

st

udy

and

a C

apac

ity A

sses

smen

t Rep

ort.

Pha

se 2

con

sist

s of t

he c

onst

ruct

ion

of m

odifi

catio

ns

to th

e ex

istin

g W

TF.

Mod

ifica

tions

will

incl

ude

inst

allin

g a

Mie

x sy

stem

for T

OC

rem

oval

, a

cont

inuo

us m

onito

ring

syst

em fo

r the

Gro

undw

ater

rule

, re-

pipi

ng o

f the

bac

kwas

h sy

stem

, sp

illw

ay m

odifi

catio

ns a

nd re

plac

emen

t of h

igh

lift p

umps

in th

e ex

istin

g cl

earw

ell.

The

co

mpl

etio

n of

this

pro

ject

will

sign

ifica

ntly

impr

ove

the

qual

ity o

f wat

er su

pplie

d to

the

Che

rry

Val

ley

and

Roc

hdal

e W

ater

Dis

trict

incl

udin

g th

e ch

ief g

oal o

f rem

oval

of T

OC

's.

74.4

2%

2015 SRF ANNUAL REPORT | 26

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

C

ity o

f Chi

cope

eC

W14

,845

,991

Com

bine

d Se

wer

Ove

rflo

w (C

SO)-

This

pro

ject

incl

udes

CSO

sepa

ratio

n of

Cal

l Stre

et a

rea

and

Mon

tgom

ery

Stre

et/S

herid

an S

treet

. Th

ese

area

s rep

rese

nt P

hase

2 o

f the

eig

ht p

hase

pla

n pr

esen

ted

in C

hico

pee’

s Fin

al L

ong

Term

Con

trol P

lan

and

Fina

l Env

ironm

enta

l Im

pact

Rep

ort

(FLT

CP/

FEIR

).Th

e pr

ojec

t will

sepa

rate

ove

r 400

acr

es a

nd e

limin

ate

the

CSO

’s in

thes

e ar

eas.

In

mos

t cas

es se

wer

sepa

ratio

n fo

r the

se se

wer

sepa

ratio

n pr

ojec

ts w

ill b

e ac

hiev

ed b

y pr

ovid

ing

a ne

w sa

nita

ry se

wer

pip

e an

d ut

ilizi

ng th

e ex

istin

g co

mbi

ned

sew

er p

ipe

fort

he c

onve

yanc

e of

st

orm

wat

er.

The

elim

inat

ion

of C

SO d

isch

arge

to th

e C

hico

pee

Riv

er a

nd th

e cr

eatio

n of

ad

ditio

nal i

nter

cept

or c

apac

ity d

owns

tream

to a

ccom

mod

ate

com

bine

d se

wer

flow

s fro

m o

ther

ar

eas w

ithin

the

city

will

con

tribu

te to

impr

ove

wat

er q

ualit

y.

92.0

2%

City

of C

hico

pee

CW

3,00

8,86

0W

aste

wat

er, W

aste

Wat

er T

reat

men

t Fac

ility

(WW

TF)

and

Stor

mw

ater

Impr

ovem

ents

-The

In

tegr

ated

Mun

icip

al S

torm

wat

eran

d W

aste

wat

er R

esou

rce

Man

agem

ent P

lan

will

serv

e as

a

plan

ning

bas

is fo

r fut

ure

phas

es o

f CSO

aba

tem

ent a

nd in

fras

truct

ural

rene

wal

wor

k. S

igni

fican

t po

rtion

s of t

he In

tegr

ated

Pla

n w

ill b

e de

vote

d to

col

lect

ing

data

and

mod

elin

g to

doc

umen

t the

ac

tual

CSO

redu

ctio

n pr

ogre

ss th

at h

as b

een

mad

e by

the

alre

ady

com

plet

ed se

wer

sepa

ratio

n pr

ojec

ts, e

valu

atin

g th

e ef

fect

iven

ess o

f tho

se p

roje

cts a

nd re

-ass

essi

ng w

heth

er o

r not

to

cont

inue

full

impl

emen

tatio

n of

the

curr

ently

pro

pose

d C

SO L

ong

Term

Con

trol P

lan

reco

mm

enda

tions

.

80.9

9%

Tow

n of

Clin

ton

CW

120,

000

Stor

mw

ater

Man

agem

ent P

lan-

The

proj

ect i

s a p

lann

ing

stud

y to

dev

elop

spec

ific

reco

mm

enda

tions

and

impr

ovem

ents

for t

he st

orm

dra

in s

yste

m in

fras

truct

ure

and

asso

ciat

ed

surf

ace

wat

ers u

nder

the

Phas

e II

NPD

ES re

quire

men

ts fo

r the

Tow

n of

Clin

ton.

The

pro

ject

w

ill su

bsta

ntia

lly m

itiga

te p

robl

ems a

ssoc

iate

d w

ith st

orm

wat

er c

onta

min

atio

n.

100.

00%

Tow

n of

Dar

tmou

thC

W28

8,05

7In

flow

and

Infil

tratio

n (I

/I) a

nd S

ewer

Sys

tem

Eva

luat

ion

Surv

ey (S

SES)

-Thi

s pro

ject

will

co

nsis

t of I

/I an

d SS

ES fo

r are

as o

f tow

n th

at a

re tr

ibut

ary

to th

e So

uth

Dar

tmou

th a

nd C

lare

nce

pum

ping

stat

ions

. Th

ese

area

s of t

he to

wn

have

bee

n ex

perie

ncin

g ex

cess

ive

infil

tratio

n an

d in

flow

lead

ing

to se

wer

bac

k-up

s and

sani

tary

sew

er o

verf

low

. The

pro

ject

will

be

cond

ucte

d in

ac

cord

ance

with

DEP

s 199

3 G

uide

lines

for p

erfo

rmin

g (I

/I) a

nd S

SES.

The

pro

ject

will

iden

tify

the

sour

ces o

f the

exc

essi

ve I/

I and

reco

mm

end

mea

sure

s to

addr

ess t

he d

efic

ienc

ies.

100.

00%

Tow

n of

Dar

tmou

thC

W9,

847,

478

Was

te W

ater

Tre

atm

ent F

acili

ties (

WW

TF) U

pgra

des-

This

pro

ject

incl

udes

upg

rade

s and

im

prov

emen

ts to

the

(WW

TF) a

nd fo

ur p

ump

stat

ions

. M

ost o

f the

faci

litie

s/pr

oces

ses a

re 2

0 ye

ars o

ld a

nd u

pgra

des w

arra

nted

to c

ontin

ue to

mee

t the

cur

rent

and

futu

re N

PDES

per

mit.

U

pgra

des w

ill in

clud

e od

or c

ontro

l upg

rade

s, ad

ditio

n of

terti

ary

filtra

tion

syst

em a

nd

repl

acem

ent o

f pum

ping

syst

ems.

The

com

plet

ed p

roje

ct w

ill e

limin

ate

sew

er sy

stem

ove

rflo

ws

at so

uth

mai

n pu

mpi

ng st

atio

n, e

limin

ate

odor

rela

ted

com

plai

nts f

rom

resi

dent

s, de

crea

se fe

cal

colif

orm

and

ent

eroc

occi

con

cent

ratio

ns a

nd T

SS in

the

efflu

ent.

The

pro

ject

will

impr

ove

wat

er

qual

ity d

isch

arge

d to

the

wat

ersh

ed a

rea

and

to th

e B

uzza

rds B

ay a

rea.

94.8

6%

2015 SRF ANNUAL REPORT | 27

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

T

own

of D

racu

tC

W9,

559,

545

Col

lect

ion

Sew

ers-

The

obje

ctiv

e of

the

proj

ect i

s to

impr

ove

wat

er q

ualit

y in

the

area

by

redu

cing

the

amou

nt o

f unt

reat

ed w

aste

wat

er e

nter

ing

the

envi

ronm

ent f

rom

faile

d se

ptic

sy

stem

s and

dire

ct se

wer

age

conn

ectio

ns to

the

loca

l sto

rm w

ater

syst

em. T

hisp

roje

ct w

ill

prov

ide

sew

er se

rvic

e to

the

Met

huen

Stre

et a

nd W

heel

er R

oad

Are

as w

hich

are

loca

ted

in th

e ea

ster

n an

d so

uthe

aste

rn se

ctio

ns o

f Dra

cut.

The

pro

ject

incl

udes

the

cons

truct

ion

of

appr

oxim

atel

y 40

,000

lf o

f san

itary

gra

vity

sew

er, f

orce

mai

n an

d pr

essu

re se

wer

and

one

pu

mpi

ng st

atio

n.

94.4

9%

City

of E

vere

ttC

W66

1,96

7St

orm

wat

er/W

aste

wat

er C

apita

l Im

prov

emen

t-Th

e ob

ject

ive

of th

e Ev

eret

t and

Che

lsea

St

orm

wat

er/W

aste

wat

er C

apita

l Im

prov

emen

ts P

roje

ct is

to a

ddre

ss th

e cr

itica

l nee

d fo

r re

plac

emen

t of t

he fa

iling

Mar

ket S

treet

cul

vert

and

the

regu

lato

ry re

quire

men

ts fo

r re

habi

litat

ion/

repl

acem

ent o

f the

Beh

an S

treet

are

a w

aste

wat

er a

nd st

orm

wat

er in

fras

truct

ure.

U

ltim

atel

y th

ese

proj

ects

will

serv

e to

pro

tect

the

wat

er b

odie

s in

the

Mys

tic R

iver

and

Bos

ton

Har

bor b

asin

s. T

he M

arke

t Stre

et c

ulve

rt ha

s exp

erie

nced

seve

ral f

ailu

res s

ince

198

4 w

ith

vario

us se

ctio

ns o

f the

cul

vert

bein

g re

paire

d an

d/or

repl

aced

ove

r the

last

25

year

s. C

urre

ntly

, th

ere

is a

larg

e se

ctio

n of

the

culv

ert t

hat h

as p

artia

lly c

olla

psed

and

ther

e is

a si

gnifi

cant

con

cern

th

at th

e cu

lver

t may

com

plet

ely

fail.

Thi

s pro

ject

will

impl

emen

t an

inve

stig

atio

n an

d pl

anni

ng

effo

rt fo

cuse

d on

iden

tifyi

ng th

e fin

anci

al a

nd te

chni

cal r

equi

rem

ents

for r

ehab

ilita

tion

and/

or

repl

acem

ent o

f the

cul

vert.

The

Beh

an S

treet

are

a is

the

subj

ect o

f an

Adm

inis

trativ

e C

onse

nt

Ord

er is

sued

to th

e C

ity o

f Eve

rett

by M

assD

EP to

add

ress

seve

ral s

anita

ry se

wer

ove

rflo

ws i

n th

ese

area

s. T

he C

ity o

f Eve

rett

is c

urre

ntly

und

erta

king

an

inve

stig

atio

n of

this

are

a to

de

term

ine

the

natu

re a

nd e

xten

t of t

he re

quire

d co

rrec

tive

actio

ns.

Due

to th

e di

ffic

ultie

s en

coun

tere

d du

ring

the

clea

ning

and

CC

TV in

spec

tions

, the

eng

inee

r is e

valu

atin

g th

e fo

llow

ing

four

opt

ions

for p

ipel

ine

reha

bilit

atio

n/re

plac

emen

t: cu

red-

in-p

lace

pip

e lin

ing,

in-in

repl

acem

ent

(pip

e bu

rstin

g), s

liplin

ing

and

exca

vatio

n an

d re

plac

emen

t.

100.

00%

Fair

have

nD

W78

9,84

6B

osto

n H

ill T

ank

Reh

ab a

nd M

ain

Rep

lace

men

t-Th

e pr

ojec

t is f

or th

e pa

intin

g, c

lean

ing

and

reha

bilit

atio

n of

the

Bos

ton

Hill

Wat

er S

tora

ge T

ank.

Ins

talla

tion

of a

new

mix

ing

syst

em in

the

tank

will

enh

ance

wat

er q

ualit

y an

d m

inim

ize

the

form

atio

n se

dim

ent a

t the

bot

tom

of t

he ta

nk.

The

addi

tion

of se

curit

y m

easu

res w

ill re

duce

una

utho

rized

acc

ess t

o th

e ta

nk a

nd p

oten

tial

cont

amin

atio

n.

93.8

3%

2015 SRF ANNUAL REPORT | 28

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

C

ity o

f Fal

l Riv

erC

W12

,668

,331

Com

bine

d Se

wer

Ove

rflo

ws (

CSO

) Aba

tem

ent P

rogr

am-T

he o

bjec

tive

of th

is p

roje

ct is

to

abat

eCSO

’sin

Fal

l Riv

er in

ord

er to

ach

ieve

com

plia

nce

with

stat

e an

d fe

dera

l CSO

regu

latio

ns

and

to c

ompl

y w

ith a

Fed

eral

Cou

rt O

rder

. Th

e w

ork

invo

lves

the

cons

truct

ion

of C

SO c

ontro

ls

for t

he P

resi

dent

Ave

nue

CSO

out

fall

and

othe

r CSO

out

falls

to th

e Ta

unto

n R

iver

and

Mt.

Hop

e B

ay.

This

pro

ject

is p

art o

f a m

ulti-

year

und

erta

king

. Pl

anne

d C

SO c

ontro

l pro

ject

s inc

lude

se

vera

l add

ition

al C

SO sc

reen

ing

and

disi

nfec

tion

faci

litie

s and

/or s

ewer

sepa

ratio

n pr

ojec

ts T

he

City

of F

all R

iver

has

a c

ombi

ned

syst

em w

ith 1

9 C

SO o

utfa

lls th

at d

isch

arge

to th

e M

t. H

ope

Bay

, Tau

nton

Riv

er o

r Que

quec

han

Riv

er. T

hese

CSO

out

falls

dis

char

ge u

ntre

ated

stor

mw

ater

ru

noff

and

sew

age

with

ass

ocia

ted

feca

l col

iform

, flo

atab

les,

susp

ende

d so

lids,

nutri

ents

, and

ot

her c

onta

min

ants

dur

ing

wet

wea

ther

to th

eir r

espe

ctiv

e re

ceiv

ing

wat

ers.

81.7

4%

City

of F

all R

iver

DW

112,

499

Wat

er S

yste

m M

aste

r Pla

n U

pdat

e-Th

is p

roje

ct w

ill u

pdat

e th

e 20

02 W

ater

Sys

tem

Mas

ter P

lan.

Th

e pl

an w

ill a

ddre

ss sy

stem

impr

ovem

ents

com

plet

ed si

nce

2002

. Th

e H

ydra

ulic

Mod

el w

ill b

e up

date

d an

d re

com

men

datio

ns w

ill b

e m

ade

for c

ontin

ued

syst

em im

prov

emen

ts.

Upd

atin

g th

e pl

an w

ill in

clud

e an

alyz

ing

the

over

all s

yste

m in

clud

ing

wat

er m

ains

, tan

ks a

nd w

ater

trea

tmen

t pl

ants

the

Wat

er S

yste

m M

aste

r Pla

n w

ill h

elp

assi

st th

e ci

ty in

pla

nnin

g, fu

ture

fund

ing

and

prio

ritiz

atio

n of

pro

ject

s as w

ell a

s ide

ntify

ing

any

exis

ting

env

ironm

enta

l or p

ublic

hea

lth

issu

es in

the

wat

er sy

stem

.

100.

00%

City

of F

all R

iver

DW

2,40

3,94

0W

ater

Mai

n Im

prov

emen

ts, P

hase

12-

This

pro

ject

is fo

r the

repl

acem

ent o

f wat

er m

ains

and

le

ad se

rvic

es o

n va

rious

stre

ets i

n Fa

ll R

iver

and

for w

ater

mai

n im

prov

emen

ts a

t Wat

tupp

a Po

nd. T

he p

roje

ct in

clud

es th

e ev

alua

tion

and

refu

rbis

hmen

t of t

he tr

ansm

issi

on m

ains

bet

wee

n th

e w

ater

trea

tmen

t pla

nt a

nd th

e B

edfo

rd S

treet

Tan

ks. T

he w

ork

will

als

o in

clud

e ne

w d

rain

age

infr

astru

ctur

e al

ong

Bed

ford

Stre

et in

the

vici

nity

of t

he W

ater

Dep

artm

ent f

acili

ties t

o be

tter

prot

ect N

orth

Wat

tupp

a Po

nd fr

om w

asho

uts o

fsur

roun

ding

road

way

s. Th

e ci

ty is

cur

rent

ly

unde

r Adm

inis

tratio

n O

rder

due

to v

iola

tions

of t

he le

ad a

nd c

oppe

r rul

e. T

he w

ater

mai

n im

prov

emen

ts a

t Wat

tupp

a Po

nd w

ill h

elp

cont

inue

pro

tect

ion

of th

e w

ater

supp

ly a

nd c

ontin

ue

to p

rovi

de sa

fe a

nd re

liabl

e w

ater

supp

ly to

the

city

.

99.1

7%

City

of F

itchb

urg

CW

5,57

5,79

9C

ombi

ned

Sew

er S

epar

atio

n (C

SS)-

This

pro

ject

is th

e co

ntin

uatio

n of

the

city

’s p

rogr

am to

se

para

te c

ombi

ned

sew

ers t

o el

imin

ate

raw

sew

age

disc

harg

es d

urin

g st

orm

eve

nts.

The

pro

ject

el

imin

ates

com

bine

d se

wer

s by

cons

truct

ing

new

dra

inag

e pi

pes a

djac

ent t

o se

wer

pip

es to

co

nvey

stor

mw

ater

, whi

ch w

ill a

llow

the

city

to c

lose

seve

ral C

ombi

ned

Sew

er O

verf

low

s (C

SOs)

. Th

e pr

ojec

t will

real

ize

heal

th a

nd sa

fety

ben

efits

from

redu

ced

odor

s, im

prov

ed

aest

hetic

s and

bet

ter w

ater

qua

lity

in th

e N

ashu

a R

iver

and

aff

ecte

d tri

buta

ries,

and

allo

w th

e ci

ty

to c

ompl

y w

ith th

e A

dmin

istra

tive

Con

sent

Ord

er is

sued

by

the

EPA

.

98.0

1%

2015 SRF ANNUAL REPORT | 29

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

C

ity o

f Fitc

hbur

gC

W7,

143,

406

Che

mic

ally

Enh

ance

d Pr

imar

y Tr

eatm

ent U

pgra

de-T

his p

roje

ct is

the

upgr

ade

of th

e Ea

ster

ly

Was

tew

ater

Tre

atm

ent F

acili

ty (W

WTF

) to

add

chem

ical

ly e

nhan

ced

prim

ary

treat

men

t. T

he

faci

lity

rece

ives

all

the

was

tew

ater

flow

s fro

m th

e ci

ty a

s wel

l as c

ontri

butio

ns fr

om W

estm

inst

er

and

Lune

nbur

g. T

he fa

cilit

y di

scha

rges

its t

reat

ed e

fflu

ent t

o th

e N

orth

Bra

nch

of th

e N

ashu

a R

iver

. Th

e fa

cilit

y ha

s exc

eede

d its

allo

wab

le d

isch

arge

lim

its u

nder

its N

PDES

per

mit,

pa

rticu

larly

in th

e am

ount

of p

hosp

horo

us a

nd a

mm

onia

dis

char

ged.

The

EPA

has

issu

ed a

n A

dmin

istra

tive

Ord

er fo

r Com

plia

nce

to th

e ci

ty fo

r the

vio

latio

n of

the

efflu

ent l

imits

in th

e pe

rmit.

Thi

s pro

pose

d w

ork

will

sign

ifica

ntly

impr

ove

disc

harg

e pe

rmit

com

plia

nce

and

will

im

prov

e th

e w

ater

qua

lity

of th

e N

ashu

a R

iver

.

100.

00%

Tow

n of

Fr

amin

gham

CW

3,51

5,99

8Ea

st F

ram

ingh

am S

ewer

Impr

ovem

ents

-Pha

se 1

of t

his p

roje

ct in

clud

es th

e el

imin

atio

n of

thre

e ex

istin

g pu

mpi

ng st

atio

ns a

nd a

ppro

xim

atel

y 22

,000

feet

of e

xist

ing

forc

e m

ain

by c

ombi

ning

tw

o se

para

te m

ajor

pum

ping

stat

ions

into

one

and

by

redi

rect

ing

flow

by

grav

ity fr

om th

e tri

buta

ry a

reas

of t

wo

othe

r pum

ping

stat

ions

to a

new

inte

rcep

tor s

ewer

inst

alle

d at

a lo

wer

de

pth.

Thi

s pro

ject

repr

esen

ts th

e ce

ntra

l pro

ject

in a

serie

s of p

ropo

sed

proj

ects

that

are

re

com

men

ded

in th

e re

cent

ly c

ompl

eted

CW

MP.

100.

00%

City

of G

louc

este

rD

W4,

482,

909

Wat

er T

reat

men

t Pla

nt (W

TP) U

pgra

de-T

he p

urpo

se o

f the

WTP

Upg

rade

s is t

o im

prov

e re

liabi

lity,

redu

ndan

cy a

nd e

nerg

y ef

ficie

ncy

at th

e ci

ty's

Wes

t Glo

uces

ter f

acili

ty.

Prop

osed

im

prov

emen

ts in

clud

e re

plac

emen

t of m

uch

of th

e m

echa

nica

l and

ele

ctric

al e

quip

men

t whi

ch

has r

each

ed th

e en

d of

its u

sefu

l life

and

is a

lso

inef

ficie

nt.

The

upgr

ade

will

incl

ude

a ba

ckw

ash

wat

er re

cycl

e sy

stem

whi

ch w

ill si

gnifi

cant

ly re

duce

was

tew

ater

dis

char

ged

to th

e G

louc

este

r se

wer

syst

em (s

peci

fical

ly th

e Es

sex

Ave

Sew

er a

nd B

anjo

Pum

p St

atio

n) p

oten

tially

redu

cing

th

e fr

eque

ncy

and

seve

rity

of p

oten

tial f

utur

e SS

O's.

In

addi

tion,

safe

ty e

quip

men

t will

be

upda

ted

and/

or in

stal

led

at b

oth

the

Wes

t Glo

uces

ter a

nd B

abso

n W

TP's.

All

the

impr

ovem

ents

at

the

Wes

t Glo

uces

ter W

TP w

ill im

prov

e re

liabi

lity

of th

e W

TP's

abili

ty to

pro

vide

a c

onst

ant

supp

ly o

f drin

king

wat

er e

spec

ially

if th

ere

is ra

w w

ater

con

tam

inat

ion

and/

or m

echa

nica

l fai

lure

at

the

Bab

son

WTP

.

100.

00%

City

of G

louc

este

rD

W9,

866,

524

Wat

er S

yste

m Im

prov

emen

ts-T

he p

roje

ct is

split

into

thre

e co

ntra

cts.

Con

tract

1 is

for t

he

clea

ning

and

pai

ntin

g of

the

0.6

MG

Bla

ckbu

rn W

ater

Sto

rage

Tow

er a

nd th

e 1.

0 M

G P

lum

C

ove

Wat

er S

tora

ge T

ank.

The

re w

ill a

lso

be th

e in

still

atio

n of

hyd

raul

ic m

ixin

g sy

stem

s for

th

ese

tank

s and

the

6.0

MG

Bon

d H

ill R

eser

voir.

Thi

s con

tract

will

als

o in

clud

e op

erat

iona

l up

date

s to

the

Fulle

r Boo

ster

Pum

p St

atio

n. C

ontra

ct 2

will

incl

ude

repl

acin

g ap

prox

imat

ely

2-1/

2 m

iles o

f cas

t iro

n w

ater

mai

n al

ong

Wes

tern

Ave

nue.

Con

tract

3 in

clud

es re

plac

ing

appr

oxim

atel

y 4

mile

s of w

ater

mai

n in

the

Com

mon

wea

lth A

venu

e ne

ighb

orho

od.

100.

00%

2015 SRF ANNUAL REPORT | 30

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

C

ity o

f Glo

uces

ter

DW

2,52

2,36

8W

ater

Tra

nsm

issi

on Im

prov

emen

ts-T

his p

roje

ct c

onsi

sts o

f rel

ocat

ing

appr

oxim

atel

y 2,

100

feet

of

20-

inch

wat

er m

ain

from

the

Bon

d H

ill T

ank

to W

este

rn A

venu

e to

mak

e it

acce

ssib

le fo

r ro

utin

e an

d em

erge

ncy

mai

nten

ance

. A

seco

nd a

spec

t of t

he p

roje

ct is

to re

loca

te th

e tw

o 20

-in

ch w

ater

mai

ns u

nder

the

Bly

man

Can

al fr

om th

e W

este

rn A

venu

e ut

ility

tunn

el to

the

area

di

rect

ly u

nder

Ann

esqu

am R

iver

.

82.7

4%

Gre

ater

Law

renc

e Sa

nita

ry D

istr

ict

CW

2,29

6,51

5W

aste

Wat

er T

reat

men

t Pla

nt Im

prov

emen

ts-T

he p

roje

ct is

Pha

se 1

of t

he D

istri

ct’s

“Fi

nal L

ong

Term

Com

bine

d Se

wer

Ove

rflo

w (C

SO) C

ontro

l Pla

n an

d En

viro

nmen

tal I

mpa

ct R

epor

t” a

nd

incl

udes

: prim

ary

clar

ifier

enh

ance

men

ts to

impr

ove

rem

oval

eff

icie

ncy

unde

r hig

h flo

w

cond

ition

s, ad

ditio

n of

a fi

fth a

erat

ion

blow

er a

nd a

dditi

onal

aer

atio

n ta

nk d

iffus

ers,

mod

ifica

tions

and

impr

ovem

ents

to th

e se

cond

ary

treat

men

t sys

tem

influ

ent f

low

gat

es a

nd

aera

tion

syst

em, r

eloc

atio

n of

the

exis

ting

ferr

ic c

hlor

ide

syst

em to

allo

w e

xpan

sion

of t

he p

lant

so

dium

hyp

ochl

orite

syst

em a

nd fu

rther

stud

y of

pro

pose

d im

prov

emen

ts to

the

Riv

ersi

de P

ump

Stat

ion

and

forc

e m

ain.

The

dis

trict

ant

icip

ates

the

proj

ect w

ill fu

rther

redu

ce th

e nu

mbe

r of

CSO

ove

rflo

ws a

nd in

crea

se c

aptu

re o

f wet

wea

ther

flow

s.

86.2

3%

Gre

ater

Law

renc

e Sa

nita

ry D

istri

ctC

W72

1,41

5N

ew F

orce

Mai

n fo

r Riv

ersi

de P

ump

Stat

ion-

The

proj

ect i

s Pha

se 3

of t

he D

istri

ct's

"Fin

al L

ong

Term

Com

bine

d Se

wer

Ove

rflo

w (C

SO) C

ontro

l Pla

n an

d En

viro

nmen

tal I

mpa

ct R

epor

t" a

nd

incl

udes

con

stru

ctio

n of

app

roxi

mat

ely

1/2

mile

s of n

ewfo

rce

mai

n fr

om th

e R

iver

side

Pum

p (th

e D

istri

ct's

mai

n pu

mpi

ng s

tatio

n) to

the

Dis

trict

's w

aste

wat

er tr

eatm

ent f

acili

ty (W

WTF

) and

m

odifi

catio

ns to

the

forc

e m

ain

head

er.

The

exis

ting

forc

e m

ain

has b

een

iden

tifie

d as

subj

ect t

o pr

emat

ure

failu

re d

ue to

brea

kage

of t

he p

re-s

tress

ing

wire

. A

cous

tic m

onito

ring

of th

e pi

pe

conf

irms t

hat t

he w

ire b

reak

s are

occ

urrin

g on

this

pip

e. R

epla

cem

ent w

ill e

limin

ate

the

thre

at o

f a

cata

stro

phic

pip

e fa

ilure

whi

ch p

oses

a d

irect

thre

at to

the

Mer

rimac

k R

iver

, nea

rby

resi

dent

s, an

d th

e ad

jace

nt M

BTA

railr

oad

line.

The

Dis

trict

ant

icip

ates

that

this

pro

ject

will

pro

vide

the

conv

eyan

ce c

apac

ity n

eces

sary

to fu

lly im

plem

ent t

he d

istri

ct's

CSO

Con

trol P

lan.

Ful

l im

plem

enta

tion

of th

e pl

an w

ill re

duce

the

num

ber o

f CSO

ove

rflo

ws a

nd w

ill in

crea

se c

aptu

re

of w

et w

eath

er fl

ows.

76.0

9%

City

of H

aver

hill

CW

5,17

6,67

1C

ombi

ned

Sew

er O

verf

low

/Flo

od C

ontro

l Im

prov

emen

ts-T

he p

roje

ct in

clud

es th

e pu

rcha

sing

of

thre

e m

obile

10.

5 M

GD

trai

ler m

ount

ed p

umps

and

impr

ovem

ents

to th

e se

wer

col

lect

ion

syst

em, o

n th

e M

errim

ack

Riv

er F

lood

wal

l and

the

Littl

e R

iver

Con

duit.

The

trai

ler m

ount

ed

pum

ps w

ill b

e us

ed a

s a b

acku

p to

the

Mar

gina

l Pum

p St

atio

n du

ring

high

flow

eve

nts.

C

olle

ctio

n sy

stem

impr

ovem

ents

incl

ude

upgr

ades

to se

ven

dive

rsio

n ga

tes t

o al

low

flow

to b

e di

verte

d aw

ay fr

om th

e m

iddl

e se

wer

inte

rcep

tor a

nd M

argi

nal P

ump

Stat

ion.

Im

prov

emen

ts to

th

e M

errim

ack

Floo

dwal

l con

sist

of r

epai

rs to

the

exis

ting

flood

wal

l; im

prov

emen

ts to

the

Littl

e R

iver

Con

duit

incl

ude

conc

rete

repa

irs, r

epai

ring

expa

nsio

n jo

ints

, re-

poin

ting

pier

s, an

d re

late

d w

ork

to m

itiga

te st

orm

wat

er im

pact

s on

the

cond

uit.

74.4

0%

2015 SRF ANNUAL REPORT | 31

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

To

wn

of H

ollis

ton

DW

2,50

0,00

0W

ell N

o. 4

Rep

lace

men

t and

Tre

atm

ent P

lant

Upg

rade

-The

Tow

n of

Hol

listo

n W

ell N

o. 4

cu

rren

tly e

xper

ienc

es e

valu

ated

con

cent

ratio

ns o

f iro

n, m

anga

nese

and

org

anic

mat

eria

l. T

his

proj

ect w

ill re

duce

the

amou

nt o

f org

anic

mat

eria

l in

the

raw

wat

er th

roug

h th

e in

stal

latio

n of

a

repl

acem

ent w

ell.

The

exi

stin

g W

ell 4

Wat

er T

reat

men

t Fac

ility

will

be

upgr

aded

to a

ddre

ss th

e ne

w w

ater

qua

lity

from

the

repl

acem

ent w

ell.

The

upg

rade

to th

e W

ater

Tre

atm

ent f

acili

ty w

ill

rem

ove

one

of th

e pr

ecur

sors

of d

isin

fect

ion

by p

rodu

cts (

DB

Ps).

DB

Ps a

re th

e re

sult

of th

e co

mbi

natio

n of

the

orga

nic

mat

eria

l and

dis

infe

ctan

t. T

he w

ell u

ses s

odiu

m h

ypoc

hlor

ite fo

r di

sinf

ectio

n in

the

finis

hed

wat

er o

f the

trea

tmen

t pla

nt a

nd w

ith th

e el

evat

ed c

once

ntra

tions

of

orga

nic

mat

eria

lDB

Ps e

xcee

ding

the

regu

lato

ry li

mits

may

form

in th

e di

strib

utio

n sy

stem

. Th

e el

evat

ed le

vels

of i

ron

in th

e di

strib

utio

n sy

stem

may

als

o le

ad to

iron

bac

teria

cre

atin

g a

publ

ic

heal

th th

eat.

The

pro

ject

upg

rade

s will

redu

ce th

e am

ount

of i

ron

in th

e fin

ishe

d w

ater

pr

even

ting

the

form

atio

n of

iron

bac

teria

.

100.

00%

Tow

n of

Ipsw

ich

CW

2,24

6,79

1W

aste

wat

er S

olid

s &U

V D

isin

fect

ion

Upg

rade

s-Th

is p

roje

ct w

ill re

habi

litat

e an

d im

prov

e th

e ex

istin

g so

lids h

andl

ing

equi

pmen

t and

the

exis

ting

UV

dis

infe

ctio

n sy

stem

. The

solid

s han

dlin

g sy

stem

upg

rade

s are

inte

nded

to re

plac

e w

orn

out e

quip

men

t, im

prov

e so

lids h

andl

ing

syst

em

perf

orm

ance

and

cap

acity

and

impr

ove

effic

ienc

y. Im

prov

ed so

lids h

andl

ing

syst

ems w

ill a

lso

redu

ce p

erfo

rman

ce im

pact

s on

the

ultra

viol

et li

ght d

isin

fect

ion

syst

em. T

he U

V D

isin

fect

ion

Syst

em u

pgra

des a

re in

tend

ed to

pro

mot

e co

mpl

ianc

e w

ith th

e ef

fluen

t cha

ract

eris

tics l

iste

d un

der t

he N

PDES

Per

mit,

exp

ress

ly re

late

d to

feca

l col

iform

exc

eeda

nces

. Bas

ed o

n th

e 20

09

Was

tew

ater

Sol

ids H

andl

ing

Stud

y, th

e pr

opos

ed so

lids h

andl

ing

upgr

ades

incl

ude

a ne

w 4

0 fo

ot

diam

eter

thic

kene

r, re

furb

ishe

d sl

udge

stor

age

tank

, new

cen

trifu

ge, n

ew d

ewat

erin

g so

lids

conv

eyor

s, ne

w tr

uck

load

ing

hopp

er, a

nd n

ew se

ptag

e re

ceiv

ing

syst

em.

100.

00%

Tow

n of

Kin

gsto

nD

W4,

482,

474

Trac

kle

Pond

Wat

er T

reat

men

t Fac

ility

(WTF

)-Th

is p

roje

ct in

clud

es th

e co

nstru

ctio

n of

a n

ew

WTF

to re

duce

man

gane

se c

once

ntra

tions

at t

he T

rack

le P

ond

Wel

l. T

he n

ew W

TF w

ill in

clud

e La

yneO

x Fi

ltrat

ion

Syst

em, U

V d

isin

fect

ion,

PLC

and

SC

AD

A s

yste

m, s

olar

pan

el in

stal

latio

n,

and

repl

acem

ent o

f exi

stin

g w

ell p

umps

. T

he c

ompl

eted

pro

ject

will

redu

ce h

igh

man

gane

se

conc

entra

tions

that

are

aff

ectin

g ta

ste

and

colo

r of t

he d

rinki

ng w

ater

. Th

e pr

ojec

t will

als

o el

imin

ate

heal

th c

once

rn fo

r inf

ants

and

you

ng c

hild

ren.

95.5

9%

City

of L

awre

nce

DW

1,58

9,82

7V

alve

Rep

lace

men

t-Th

is p

roje

ct w

ill re

pair

and

repl

ace

brok

en a

nd m

alfu

nctio

ning

val

ves i

n a

sign

ifica

nt n

umbe

r of l

ocat

ions

in th

e La

wre

nce

Wat

er D

istri

butio

n Sy

stem

. Ove

r 90

valv

es,

rang

ing

in si

ze fr

om 6

" to

12"

, hav

e be

en id

entif

ied

need

ing

repa

ir or

repl

acem

ent i

n th

e di

strib

utio

n sy

stem

. As a

resu

lt of

this

pro

ject

, the

city

will

be

able

to im

plem

ent a

uni

dire

ctio

nal

flush

ing

prog

ram

and

a v

alve

exe

rcis

e pr

ogra

m w

hich

will

allo

w th

e ci

ty to

isol

ate

wat

er m

ain

sect

ions

dur

ing

repa

irs o

r in

the

case

of e

mer

genc

ies.

99.3

2%

2015 SRF ANNUAL REPORT | 32

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

C

ity o

f Law

renc

eD

W3,

318,

458

Wat

er M

eter

Rep

lace

men

t-Th

is p

roje

ct in

volv

es re

plac

ing

appr

oxim

atel

y 10

,700

exi

stin

g m

eter

s in

resi

dent

ial,

com

mer

cial

and

mun

icip

al st

ruct

ures

and

impl

emen

ting

a m

eter

read

ing

syst

em.

The

proj

ect w

ill e

nabl

e th

e ci

ty to

reco

ver c

osts

of u

nder

-reg

iste

ring

met

ers a

nd re

duce

the

amou

nt o

f una

ccou

nted

for w

ater

.

88.1

2%

Lynn

Wat

er a

nd

Sew

er C

omm

issi

onC

W90

7,37

4W

ind

Turb

ine

Proj

ect-

The

proj

ect w

ill c

onst

ruct

a w

ind

turb

ine

with

a m

inim

um ra

ted

capa

city

of

600

kW

at t

he R

egio

nal W

ater

Pol

lutio

n C

ontro

l Fac

ility

in L

ynn.

The

LW

SC W

WTF

co

nsum

es a

ppro

xim

atel

y 12

,000

,000

kW

h of

ele

ctric

ity p

er y

ear a

nd th

e es

timat

ed n

et e

nerg

y pr

oduc

tion

for t

he tu

rbin

e is

993

,400

kW

h an

nual

ly.

100.

00%

City

ofM

alde

nC

W3,

844,

078

Sew

er Im

prov

emen

ts-T

his s

ewer

line

impr

ovem

ent p

roje

ct w

as in

itiat

ed in

resp

onse

to a

n A

dmin

istra

tive

Con

sent

Ord

er n

egot

iate

d w

ith M

assD

EP a

nd th

e U

S EP

A.

The

cons

truct

ion

proj

ect w

ill re

duce

infil

tratio

n an

d in

flow

(I/I)

and

sani

tary

sew

er o

verf

low

s fro

m o

ccur

ring

with

in th

e C

ity o

f Mal

den'

s was

tew

ater

col

lect

ion

syst

em w

hich

is b

eing

trea

ted

at th

e D

eer

Isla

nd S

ewag

e Tr

eatm

ent P

lant

unn

eces

saril

y. T

he p

roje

ct in

clud

es c

ured

-in-p

lace

pip

e lin

er

(CIP

PL) f

or a

ppro

xim

atel

y 28

,000

feet

of 8

-inch

to 1

0-in

ch p

ipe.

App

roxi

mat

ely

80 m

anho

les

have

als

o be

en id

entif

ied

as b

eing

in n

eed

of m

onol

ithic

cem

entit

ious

line

r. F

urth

er,

appr

oxim

atel

y 1,

200

serv

ice

late

ral l

iner

s are

pro

pose

d to

miti

gate

infil

tratio

n fr

om e

nter

ing

the

sew

er m

ains

at s

ervi

ce la

tera

l con

nect

ions

.

88.0

8%

City

of M

alde

nD

W27

0,89

9Th

e pr

ojec

t will

upd

ate

the

lead

serv

ice

line

repl

acem

ent p

rogr

am re

quire

d as

par

t of t

he

adm

inis

trativ

e co

nsen

t ord

er (A

CO

-BO

-06-

5D00

1) to

rem

ove

lead

serv

ices

thro

ugho

ut th

e sy

stem

. Thi

s pla

nnin

g pr

ojec

t con

sist

s of a

new

wat

er d

istri

butio

n m

odel

and

Cap

ital

Impr

ovem

ents

Pla

n (C

IP) a

nd w

ill a

llow

the

City

to d

evel

op a

com

pute

r mod

el th

at w

ill h

elp

stim

ulat

e ex

istin

g co

nditi

ons o

f the

sys

tem

and

eva

luat

e th

e co

nditi

ons o

f the

syst

em. T

he C

IP b

e ba

sed

on sy

stem

def

icie

ncie

s ide

ntifi

ed in

the

hydr

aulic

mod

el. T

he p

roje

ct w

ill p

rovi

de th

e ci

ty

with

tech

nica

l res

ourc

es to

com

plet

e de

velo

pmen

t of G

IS d

ata

and

base

for t

he e

xist

ing

Drin

king

W

ater

dis

tribu

tion

syst

em.

100.

00%

City

of M

alde

nD

W6,

065,

116

Wat

er D

istri

butio

n Sy

stem

Pla

nnin

g-Th

e pr

ojec

t will

upd

ate

the

lead

serv

ice

line

repl

acem

ent

prog

ram

requ

ired

as p

art o

f the

adm

inis

trativ

e co

nsen

t ord

er to

rem

ove

lead

serv

ices

thro

ugho

ut

the

syst

em. T

his p

lann

ing

proj

ect c

onsi

sts o

f a n

ew w

ater

dis

tribu

tion

mod

el a

nd C

apita

l Im

prov

emen

ts P

lan

(CIP

) and

will

allo

w th

e ci

ty to

dev

elop

a c

ompu

ter m

odel

that

will

hel

p st

imul

ate

exis

ting

cond

ition

s of t

he s

yste

m a

nd e

valu

ate

the

cond

ition

s of t

he sy

stem

. The

CIP

be

base

d on

syst

em d

efic

ienc

ies i

dent

ified

in th

e hy

drau

lic m

odel

. The

pro

ject

will

pro

vide

the

city

w

ith te

chni

cal r

esou

rces

to c

ompl

ete

deve

lopm

ent o

f GIS

dat

a an

d ba

se fo

r the

exi

stin

g D

rinki

ng

Wat

er d

istri

butio

n sy

stem

.

95.7

5%

2015 SRF ANNUAL REPORT | 33

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

C

ity o

f Mal

den

DW

918,

658

This

pro

ject

will

incl

ude

the

repl

acem

ent o

f old

unl

ined

cas

t iro

n w

ater

mai

ns w

ith la

rger

cem

ent

lined

duc

tile

iron

wat

er m

ains

to e

nhan

ce th

e ca

rryi

ng c

apac

ity a

nd q

ualit

y of

wat

er. T

he p

roje

ct

will

als

o in

clud

e th

e re

mov

al o

f sev

eral

lead

serv

ice

lines

in c

ompl

ianc

e w

ith a

n A

CO

issu

ed b

y th

e st

ate

in re

spon

se to

drin

king

wat

er sa

mpl

es th

at e

xcee

ded

the

actio

n le

vel f

or le

ad.

38.5

5%

Tow

n of

Mar

ion

CW

3,14

7,40

0W

aste

wat

er a

nd S

torm

wat

erIm

prov

emen

t-Th

e ob

ject

ive

of th

is W

aste

wat

er C

olle

ctio

n Sy

stem

an

d D

rain

age

Syst

em Im

prov

emen

ts p

roje

ct is

to im

prov

e w

ater

qua

lity

in c

oast

al re

ceiv

ing

wat

ers a

nd to

impr

ove

the

oper

atio

ns o

f the

Tow

n's w

aste

wat

er c

olle

ctio

n sy

stem

and

trea

tmen

t pl

ant b

y re

duci

ng th

e vo

lum

e of

infil

tratio

n an

d in

flow

(I/I)

ent

erin

g th

e co

llect

ion

syst

em, a

nd

impr

ovin

g th

e w

ater

qua

lity

of st

orm

wat

er d

isch

arge

s thr

ough

the

rem

oval

of i

llici

t con

nect

ions

to

the

sew

er sy

stem

and

thro

ugh

the

cons

truct

ion

of B

est M

anag

emen

t Pra

ctic

es. T

he p

roje

ct w

ill

prov

ide

the

foun

datio

n fo

r the

redu

ctio

n of

pat

hoge

n di

scha

rges

to S

ippi

can

Har

bor a

nd

Buz

zard

s Bay

as w

ell a

s sig

nific

antly

redu

ce th

e vo

lum

e of

pub

lic a

nd p

rivat

e I/I

ent

erin

g th

e co

llect

ion

syst

em.

76.1

1%

City

of

Mar

lbor

ough

CW

20,0

00,0

00M

arlb

orou

gh E

aste

rly W

aste

Wat

er T

reat

men

t Pla

nt (W

WTP

) Upg

rade

s-Th

ese

proj

ects

con

sist

of

the

impr

ovem

ents

to th

e Ea

ster

ly W

WTP

to re

duce

eff

luen

t pho

spho

rus,

repl

ace

agin

g in

fras

truct

ure

and

impr

ove

ener

gy e

ffic

ienc

y an

d se

cond

ly to

con

duct

an

infil

tratio

n/in

flow

stud

y of

the

was

tew

ater

col

lect

ion

syst

em to

iden

tify,

cha

ract

eriz

e an

d pr

iorit

ize

defic

ienc

ies i

n th

e sy

stem

to re

duce

pea

k flo

ws.

The

upg

rade

s are

prim

arily

inte

nded

to re

duce

the

phos

phor

us

load

s dis

char

ged

from

the

faci

lity

to h

elp

rem

edia

te d

ocum

ente

d nu

trien

t enr

ichm

ent o

f the

re

ceiv

ing

wat

ers a

nd th

e do

wns

tream

Sud

bury

Riv

er.

The

proj

ect i

s con

sist

ent w

ith th

e C

ompr

ehen

sive

Was

tew

ater

Man

agem

ent P

lan

and

regi

onal

nut

rient

redu

ctio

n go

als.

The

pr

ojec

t will

als

o im

prov

e th

een

ergy

eff

icie

ncy

of th

e fa

cilit

y an

d is

exp

ecte

d to

incl

ude

the

inst

alla

tion

of re

new

able

ene

rgy

syst

ems a

t the

site

.

100.

00%

Tow

n of

Med

way

DW

1,50

1,10

2W

ater

Mai

n R

epla

cem

ent-

This

pro

ject

add

ress

es th

e re

plac

emen

t of a

ging

wat

er m

ains

and

ap

purte

nanc

es in

var

ious

stre

ets i

n th

e co

mm

unity

. Th

e re

plac

emen

t of t

hese

old

mai

ns w

ill h

elp

impr

ove

wat

er q

ualit

y w

ith re

spec

t to

disi

nfec

tion,

circ

ulat

ion,

vol

ume

and

fire

prot

ectio

n.

75.3

9%

Tow

n of

Mon

roe

CW

200,

000

Was

te W

ater

Tre

atm

ent F

acili

ty (W

WTF

) Rep

airs

-As a

resu

lt of

dam

age

sust

aine

d by

the

WW

TF d

urin

g th

e w

inte

r of 2

010,

the

tow

n ha

s req

uest

ed a

nd re

ceiv

ed a

ppro

val f

or u

se o

f em

erge

ncy

fund

s to

mak

e te

mpo

rary

em

erge

ncy

repa

irs/m

odifi

catio

ns to

the

exis

ting

faci

lity

and

to st

art d

esig

n of

a re

plac

emen

t WW

TF. T

he d

esig

n w

ill b

e do

ne in

acc

orda

nce

with

the

reco

mm

enda

tions

out

lined

in a

n ap

prov

ed e

ngin

eerin

g re

port

date

d D

ecem

ber 2

010.

79.7

3%

2015 SRF ANNUAL REPORT | 34

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

M

assa

chus

etts

W

ater

Res

ourc

es

Aut

hori

ty

CW

2,00

0,00

0N

ut Is

land

Hea

dwor

ks &

Con

very

orIm

prov

emen

ts-T

he p

roje

ct w

ill re

plac

e al

l em

bedd

ed

elec

trica

l com

pone

nts b

elow

hig

h-tid

e le

vel a

nd w

ill re

plac

e ke

y co

mpo

nent

s of t

he sc

reen

ing

and

grit

conv

eyor

syst

em a

t the

Nut

Isla

nd H

eadw

orks

(NIH

). T

idal

ly-in

fluen

ced

grou

ndw

ater

in

filtra

tion

has c

ause

d co

rros

ion

of th

e el

ectri

cal w

iring

, con

duits

and

pan

els t

hat a

re e

mbe

dded

in

or m

ount

ed o

n th

e w

alls

and

/or s

labs

and

this

pro

ject

will

cor

rect

the

prob

lem

with

cei

ling-

and

surf

ace-

mou

nted

com

pone

nts a

nd h

ave

conc

rete

surf

aces

trea

ted

to p

reve

nt in

filtra

tion.

To

impr

ove

the

oper

atio

n of

the

girt

and

scre

enin

gs c

onve

yor,

the

proj

ect w

ill re

plac

e th

e be

lt sc

rape

rs, e

nclo

se th

e ve

rtica

l bel

ts w

ith c

over

s, ad

d a

redu

ndan

t scr

eeni

ngs c

onve

yor,

and

inst

all

wid

er d

rip p

ans.

The

pro

ject

will

sign

ifica

ntly

impr

ove

the

oper

atio

ns, r

elia

bilit

y, a

nd e

ffic

ienc

y of

thes

e sy

stem

s, pa

rticu

larly

dur

ing

wet

wea

ther

and

mai

ntai

n th

e pe

rfor

man

ce a

nd re

liabi

lity

of

the

NIH

as a

n im

porta

nt c

ompo

nent

of M

WR

S’s l

ong-

term

ass

et p

rote

ctio

n in

itiat

ives

and

m

anag

emen

t pro

ject

s to

pres

erve

ope

ratin

g as

sets

.

100.

00%

Mas

sach

uset

ts

Wat

er R

esou

rces

A

utho

rity

CW

1,97

7,80

2El

ectri

cal U

pgra

des-

The

Dee

r Isl

and

Sew

er T

reat

men

t Pla

nt, w

hich

trea

ts se

wag

e fr

om 4

3 co

mm

uniti

es in

clud

ing

Bos

ton,

was

aff

ecte

d by

two

pow

er o

utag

es a

t NST

AR

subs

tatio

ns th

at

prov

ide

pow

er to

trea

t sew

age.

The

out

ages

occ

urre

d on

Apr

il 3,

200

4 an

d A

pril

11, 2

004,

as a

re

sult

of c

ontro

l pro

blem

s with

the

Dee

r Isl

and

elec

trica

l bac

kup

syst

ems a

ppro

xim

atel

y 2

½

hour

s and

2 h

ours

del

ay b

efor

e po

wer

was

fully

rest

ored

. B

oth

thes

e ev

ents

resu

lted

in sa

nita

ry

sew

er o

verf

low

s; th

e la

rges

t of t

he s

yste

m o

verf

low

s las

ted

for s

ever

al h

ours

on

Apr

il 11

th.

MW

RA

als

o co

nduc

ted

ongo

ing

cond

ition

mon

itorin

g as

sess

men

t wor

k to

iden

tify

equi

pmen

t re

plac

emen

t nee

ds.

The

elec

trica

l sys

tem

relia

bilit

y pr

ojec

t will

incl

ude

the

repl

acem

ent o

f tra

nsfo

rmer

s, bu

s duc

t with

cab

le d

uct,

and

varia

ble

freq

uenc

y dr

ive

units

. Th

e el

ectri

cal

relia

bilit

y pr

ojec

t is d

esig

ned

to o

verh

aul,

upgr

ade,

or r

epla

ce e

quip

men

t sys

tem

s and

is n

ot

rout

ine

CEP

pla

nt o

pera

tions

and

mai

nten

ance

nee

ds.

100.

00%

Mas

sach

uset

ts

Wat

er R

esou

rces

A

utho

rity

CW

2,91

2,18

8W

aste

wat

er T

reat

men

t Pla

nt a

nd S

ewer

Impr

ovem

ents

-Thi

s pro

ject

incl

udes

upg

rade

s to

the

Dee

r Isl

and

Trea

tmen

t Pla

nt a

utom

atio

n an

d ce

ntra

l con

trol s

yste

ms a

s wel

l as i

mpr

ovem

ents

an

d up

grad

es to

seve

ral e

xist

ing

inte

rcep

tors

and

pum

p st

atio

ns th

at a

re in

nee

d of

repl

acem

ent

and/

or m

oder

niza

tion.

The

pro

ject

is in

tend

ed to

ext

end

curr

ent a

sset

life

and

impr

ove

syst

em

oper

abili

ty.

100.

00%

Mas

sach

uset

ts

Wat

er R

esou

rces

A

utho

rity

CW

5,11

3,81

2D

eer I

slan

d Tr

eatm

ent P

lant

Impr

ovem

ents

-Thi

s pro

ject

is in

clud

ed in

the

Dee

r Isl

and

Trea

tmen

t Pla

nt A

sset

Pro

tect

ion

Prog

ram

, in

orde

r to

ensu

re th

at a

ll of

the

stru

ctur

es a

nd

equi

pmen

t ins

talle

d at

Dee

r Isl

and

rem

ain

in g

ood

wor

king

con

ditio

n an

d/or

are

repl

aced

with

ne

eded

.

100.

00%

2015 SRF ANNUAL REPORT | 35

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

M

assa

chus

etts

W

ater

Res

ourc

es

Aut

hori

ty

CW

840,

982

Nut

Isla

nd H

eadw

orks

Ele

ctric

al &

Con

veyo

r Im

prov

emen

t-Th

e pr

ojec

t will

repl

ace

all

embe

dded

ele

ctric

al c

ompo

nent

s bel

ow h

igh-

tide

leve

l and

will

repl

ace

key

com

pone

nts o

f the

sc

reen

ings

and

grit

con

veyo

r sys

tem

at t

he N

ut Is

land

Hea

dwor

ks (N

IH).

Tid

ally

-influ

ence

d gr

ound

wat

er in

filtra

tion

has c

ause

d co

rros

ion

of th

e el

ectri

cal w

iring

, con

duits

and

pan

els t

hat

are

embe

dded

in o

r mou

nted

on

the

wal

ls a

nd/o

r sla

bs a

nd th

is p

roje

ct w

ill c

orre

ct th

e pr

oble

m

with

cei

ling-

and

surf

ace-

mou

nted

com

pone

nts a

nd h

ave

conc

rete

surf

aces

trea

ted

to p

reve

nt

infil

tratio

n. T

o im

prov

e th

e op

erat

ion

of th

e gr

it an

d sc

reen

ings

con

veyo

rs,t

he p

roje

ct w

ill

repl

ace

the

belt

scra

pers

, enc

lose

the

verti

cal b

elts

with

cov

ers,

add

a re

dund

ant s

cree

ning

s co

nvey

or a

nd in

stal

l wid

er d

rip p

ans.

The

pro

ject

will

sign

ifica

ntly

impr

ove

the

oper

atio

ns,

relia

bilit

y, a

nd e

ffici

ency

of t

hese

syst

ems,

parti

cula

rly d

urin

g w

et w

eath

er a

nd m

aint

ain

the

perf

orm

ance

and

relia

bilit

y of

the

NIH

as a

n im

porta

nt c

ompo

nent

of M

WR

A's

long

-term

ass

et

prot

ectio

n in

itiat

ives

and

man

agem

ent p

roje

cts t

o pr

eser

ve o

pera

ting

asse

ts.

100.

00%

Mas

sach

uset

ts

Wat

er R

esou

rces

A

utho

rity

CW

15,0

00,0

00C

ombi

ned

Sew

er O

verf

low

(CSO

) Pha

se 1

4-Th

e pr

imar

y ob

ject

ive

of th

e C

SO c

ontro

l pla

n is

to

brin

g C

SO d

isch

arge

s in

Bos

ton

Har

bor a

nd it

s trib

utar

ies i

nto

com

plia

nce

with

stat

e an

d fe

dera

l re

quire

men

ts.

This

com

pone

nt o

f the

pla

n w

ill in

volv

e ni

ne se

wer

sepa

ratio

n pr

ojec

ts.

All

the

proj

ects

will

be

acco

mpl

ishe

d by

con

stru

ctin

g ne

w st

orm

dra

ins a

nd a

llow

ing

the

exis

ting

com

bine

sew

ers t

o fu

nctio

n as

sepa

rate

sani

tary

sew

ers,

or b

y co

nstru

ctin

g ne

w sa

nita

ry se

wer

s an

d al

low

ing

the

exis

ting

com

bine

d se

wer

to se

rve

as st

orm

dra

ins.

The

pro

ject

will

resu

lt in

the

elim

inat

ion

of C

SO d

isch

arge

s at s

ever

al o

utfa

lls.

100.

00%

Mas

sach

uset

ts

Wat

er R

esou

rces

A

utho

rity

DW

5,00

0,00

0Lo

w S

ervi

ce S

tora

ge-T

his p

roje

ct is

for t

he c

onst

ruct

ion

of a

20

mill

ion

gallo

n po

tabl

e w

ater

st

orag

e ta

nk in

the

Tow

n of

Sto

neha

m a

t its

term

inal

rese

rvoi

r at t

he n

orth

east

ern

extre

mity

of

the

MW

RA

wat

er se

rvic

e to

met

ropo

litan

Bos

ton.

The

pro

ject

will

pro

vide

impr

oved

stor

age

(16-

20 m

illio

n ga

llons

) but

will

als

o pr

ovid

e su

rge

relie

f, pr

otec

ting

MW

RA

and

com

mun

ity

mai

ns; a

llow

mor

e ef

ficie

nt u

se o

f the

exi

stin

g M

WR

A d

istri

butio

n sy

stem

; and

, pro

vide

em

erge

ncy

back

up to

21

com

mun

ities

in th

e N

orth

ern

Inte

rmed

iate

Hig

h an

d N

orth

ern

Hig

h sy

stem

s.

100.

00%

Mas

sach

uset

ts

Wat

er R

esou

rces

A

utho

rity

DW

600,

000

Nor

ther

n H

igh

Serv

ice(

NH

S)-R

ever

e &

Mal

den

Pipe

line-

The

proj

ect w

ork

incl

udes

the

NH

S im

prov

emen

ts in

Rev

ere

and

Mal

den.

100.

00%

2015 SRF ANNUAL REPORT | 36

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

M

assa

chus

etts

W

ater

Res

ourc

es

Aut

hori

ty

DW

600,

000

Nor

ther

n Lo

w S

ervi

ce (N

LS) A

rea

Reh

abili

tatio

n-Th

is p

roje

ct in

volv

es th

e re

habi

litat

ion

of th

e N

LS a

rea,

whi

ch c

onsi

sts o

f the

repl

acem

ent o

f a p

ortio

n of

Sec

tion

8; re

habi

litat

ion

of S

ectio

ns

37 a

nd 4

6; a

nd c

onst

ruct

ion

of S

ectio

n 97

A.

Sect

ion

8, a

n un

lined

pip

elin

e w

as in

stal

led

betw

een

1897

and

192

0 an

d is

curr

ently

func

tioni

ng a

t app

roxi

mat

ely

45%

of i

ts o

rigin

al

capa

city

due

to th

e bu

ild-u

p of

rust

dep

osits

and

oth

er m

atte

r alo

ng th

e pi

pelin

e w

all a

nd h

as

expe

rienc

ed le

aks a

t an

abov

e av

erag

e ra

te.

Exca

vatio

ns fo

r the

inst

alla

tion

of n

ew v

alve

s alo

ng

porti

ons o

f sec

tion

8 ha

ve in

dica

ted

poss

ible

seve

re e

xter

nal c

orro

sion

on

the

pipe

wal

l, w

hich

co

uld

affe

ct th

e st

ruct

ural

stab

ility

of t

he p

ipel

ine.

Reh

abili

tatio

ns o

f Sec

tions

37

and

46 w

ill

impr

ove

the

serv

ice

to E

ast B

osto

n an

d w

ill a

llow

the

shut

dow

n of

Sec

tion

8 fo

r reh

abili

tatio

n.

100.

00%

Mas

sach

uset

ts

Wat

er R

esou

rces

A

utho

rity

DW

1,00

0,00

0N

ew C

onne

ctin

g M

ains

-Thi

s pro

ject

invo

lves

the

cons

truct

ion

of n

ew c

onne

ctin

g m

ains

with

in

the

MW

RA

Dis

tribu

tion

Syst

em b

etw

een

Wes

ton

Aqu

educ

t Sup

ply

Mai

ns 3

and

4 a

nd th

e C

ity

Tunn

el. T

hese

con

nect

ing

mai

ns in

the

Inte

rmed

iate

Hig

h, N

orth

ern

Hig

h, N

orth

ern

Extra

Hig

h an

d So

uthe

rn H

igh

serv

ice

area

s pro

vide

tran

spor

t of w

ater

from

the

City

Tun

nel a

nd th

e C

ity

Tunn

el E

xten

sion

to m

unic

ipal

met

ers a

long

an

11-m

ile p

ipel

ine,

whi

ch c

urre

ntly

has

no

conn

ectin

g m

ains

and

no

othe

r mea

ns a

vaila

ble

to a

dequ

atel

y su

pply

com

mun

ities

.

100.

00%

Mas

sach

uset

ts

Wat

er R

esou

rces

A

utho

rity

DW

1,60

0,00

0Lo

wer

Hul

tman

Aqu

educ

t Reh

abili

tatio

n-Th

e w

ork

incl

udes

the

cons

truct

ion

of

inte

rcon

nect

ions

bet

wee

n th

e M

etro

Wes

t Tun

nel a

nd th

e H

ultm

an A

qued

uct;

as w

ell a

s re

habi

litat

ion

of th

e aq

uedu

ct th

at in

clud

es re

plac

emen

t or r

epai

r of a

ir re

lief s

truct

ures

, blo

w-o

ff

valv

es, c

ulve

rts b

enea

th th

e aq

uedu

ct; a

nd re

plac

emen

t of e

xist

ing

valv

es.

100.

00%

Mas

sach

uset

ts

Wat

er R

esou

rces

A

utho

rity

DW

240,

342

Sout

hern

Spi

ne D

istri

butio

n M

ains

-Thi

s pro

ject

requ

ires c

lean

ing,

reha

bilit

atio

n an

d re

pair

of

the

20 m

iles o

f old

wat

er m

ains

whi

ch a

re c

urre

ntly

func

tioni

ng a

t 50%

of t

heir

orig

inal

cap

acity

. In

add

ition

, the

re is

nee

d to

repl

ace

man

y in

oper

able

val

ues i

n th

e sy

stem

. Th

e m

ains

beg

in in

B

rook

line

and

end

at th

e B

lue

Hill

s Res

ervo

ir in

Qui

ncy.

The

mai

ns se

rve

the

Sout

hern

Hig

han

d So

uthe

rn E

xtra

Hig

h Sy

stem

com

mun

ities

of B

osto

n, B

rook

line,

Milt

on, Q

uinc

y, N

orw

ood

and

Can

ton.

100.

00%

Mas

sach

uset

ts

Wat

er R

esou

rces

A

utho

rity

DW

1,80

0,00

0Lo

wer

Hul

tman

Aqu

educ

t Reh

abili

tatio

n-Th

is w

ork

incl

udes

con

stru

ctio

n of

inte

rcon

nect

ions

be

twee

n th

e M

etro

Wes

t Tun

nel a

nd th

e H

ultm

an A

qued

uct,

as w

ell a

s reh

abili

tatio

n of

the

aque

duct

that

incl

udes

repl

acem

ent o

r rep

air o

f air

relie

f stru

ctur

es, b

low

-off

valv

es, c

ulve

rts

bene

ath

the

aque

duct

; and

the

repl

acem

ent o

f exi

stin

g va

lves

.

100.

00%

Mas

sach

uset

ts

Wat

er R

esou

rces

A

utho

rity

DW

666,

666

New

Con

nect

ing

Mai

ns-T

his p

roje

ct in

volv

es th

e co

nstru

ctio

n of

new

con

nect

ing

mai

ns w

ithin

th

e M

WR

A D

istri

butio

n Sy

stem

bet

wee

n W

esto

n A

qued

uct S

uppl

y M

ains

3 a

nd 4

and

the

City

Tu

nnel

. The

se c

onne

ctin

g m

ains

in th

e In

term

edia

te H

igh,

Nor

ther

n H

igh,

Nor

ther

n Ex

tra H

igh

and

Sout

hern

Hig

h se

rvic

e ar

eas p

rovi

de tr

ansp

ort o

f wat

er fr

om th

e C

ity T

unne

l and

the

City

Tu

nnel

Ext

ensi

on to

mun

icip

al m

eter

s alo

ng a

n 11

-mile

pip

elin

e, w

hich

cur

rent

ly h

as n

o co

nnec

ting

mai

ns a

nd n

o ot

her m

eans

ava

ilabl

e to

ade

quat

ely

supp

ly c

omm

uniti

es.

100.

00%

2015 SRF ANNUAL REPORT | 37

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

M

assa

chus

etts

W

ater

Res

ourc

es

Aut

hori

ty

DW

2,50

0,00

0Lo

w S

ervi

ce S

tora

ge-T

his p

roje

ct is

fort

he c

onst

ruct

ion

of a

20

mill

ion

gallo

n po

tabl

e w

ater

st

orag

e ta

nk in

the

Tow

n of

Sto

neha

m a

t its

term

inal

rese

rvoi

r at t

he n

orth

east

ern

extre

mity

of

the

MW

RA

wat

er se

rvic

e to

met

ropo

litan

Bos

ton.

The

pro

ject

will

pro

vide

impr

oved

stor

age

(16-

20 m

illio

n ga

llons

) but

will

als

o pr

ovid

e su

rge

relie

f, pr

otec

ting

MW

RA

and

com

mun

ity

mai

ns, a

llow

mor

e ef

ficie

nt u

se o

f the

exi

stin

g M

WR

A d

istri

butio

n sy

stem

and

pro

vide

em

erge

ncy

back

up to

21

com

mun

ities

in th

e N

orth

ern

Inte

rmed

iate

Hig

h an

d N

orth

ern

Hig

h sy

stem

s.

100.

00%

Tow

n of

Nan

tuck

etC

W4,

999,

200

Sew

er R

epla

cem

ent f

or In

flow

and

Infil

tratio

n (I

/I) R

emov

al-T

his p

roje

ct is

for t

he

reha

bilit

atio

n of

a p

ortio

n of

Nan

tuck

et’s

sew

er sy

stem

in d

ownt

own

Nan

tuck

et to

rem

ove

exce

ssiv

e in

filtra

tion.

Thi

s por

tion

of th

e se

wag

e co

llect

ion

syst

em is

a si

gnifi

cant

con

tribu

tor o

f th

e st

orm

wat

er in

flow

and

gro

undw

ater

infil

tratio

n fo

und

thro

ugho

ut th

e co

llect

ion

syst

em.

Illic

it co

nnec

tions

to th

e sa

nita

ry se

wer

syst

em, b

acku

ps, a

nd o

verf

low

s are

all

prob

lem

s cau

sed

by I/

I. A

s a d

irect

resu

lt of

ove

rload

in th

e Su

rfsi

de W

aste

wat

er T

reat

men

t Fac

ility

, pla

nt

efflu

ent m

ay n

egat

ivel

y af

fect

are

a pa

rkla

nds,

beac

hes a

nd o

ther

coa

stal

loca

tions

. Th

e pr

ojec

t in

clud

es in

still

atio

n of

sew

ers,

inst

alla

tion

of d

ead

end

man

hole

s and

inst

alla

tion

of in

-line

m

anho

les.

The

reha

bilit

atio

n w

ork

will

ass

ist i

n m

aint

aini

ng c

ompl

ianc

e le

vels

at t

he W

WTF

an

d fu

lfill

the

com

men

datio

ns in

the

Com

preh

ensi

ve W

aste

wat

er M

anag

emen

t Pla

n.

99.6

5%

City

of

New

bury

port

DW

300,

000

Wat

er T

reat

men

t Fac

ility

(WTF

) Upg

rade

and

Wat

er D

istri

butio

n Sy

stem

-The

pro

ject

, whi

ch

incl

udes

thre

e co

ntra

cts,

will

upg

rade

the

New

bury

port

WTP

by

cons

truct

ing

a ne

w W

TP w

ith

diss

olve

d ai

r flo

atat

ion

clar

ifica

tion

and

will

inst

all n

ew w

ater

mai

ns to

add

ress

low

pre

ssur

e ar

eas a

nd d

ead

ends

with

in th

e w

ater

dis

tribu

tion

syst

em. T

he n

ew W

TP w

ill a

llow

the

plan

t to

bette

r mee

t the

pea

k flo

w ra

te fo

r whi

ch th

e pl

ant i

s cap

able

and

to m

eet t

he tu

rbid

ity

requ

irem

ents

. WTP

impr

ovem

ents

als

o in

clud

e up

grad

e of

the

exis

ting

WTP

bui

ldin

g,

cons

truct

ion

of a

new

cle

arw

ell a

nd p

ump

stat

ion

to h

ouse

the

finis

hed

wat

er a

nd b

ackw

ash

wat

er p

umps

, and

upg

rade

of t

he re

sidu

als h

andl

ing

syst

em to

pro

vide

recy

cle

of th

e fil

ter

back

was

h w

ater

and

dis

char

ge o

f res

idua

ls to

the

exis

ting

lago

on. T

he W

ater

Dis

tribu

tion

Syst

em Im

prov

emen

ts p

roje

ct w

ould

add

ress

low

pre

ssur

e pr

oble

ms i

n tw

o lo

catio

ns: t

he st

reet

s su

rrou

ndin

g th

e in

terc

onne

ctio

n be

twee

n th

e C

ity o

f New

bury

port

and

the

Tow

n of

Wes

t N

ewbu

ry b

y re

plac

ing

the

exis

ting

forc

e m

ain

cros

sing

ove

r Rou

te 9

5 an

d th

e po

rtion

of t

he

syst

em th

at su

pplie

s wat

er to

the

Tow

n of

New

bury

by

repl

acin

g ap

prox

imat

ely

one-

mile

of

forc

e m

ain

with

an

incr

ease

d si

ze p

ipe.

The

Wat

er D

istri

butio

n pr

ojec

t will

als

o ad

dres

s the

el

imin

atio

n of

dea

d-en

ds b

y in

stal

ling

new

forc

e m

ains

on

five

stre

ets i

nclu

ding

Bow

len

Ave

nue,

Fi

nnig

an W

ay, G

olds

mith

Driv

e, H

ope

Ave

nue,

and

Tra

cey

Stre

et.

84.8

2%

2015 SRF ANNUAL REPORT | 38

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

To

wn

of N

orth

A

ttle

boro

ugh

CW

11,4

16,0

00

Was

te W

ater

Tre

atm

ent F

acili

ty (W

WTF

) Upg

rade

and

Inflo

w a

nd In

filtra

tion

(I/I)

Rem

oval

- W

WTF

will

be

upgr

aded

to re

mov

e ni

troge

n an

d ph

osph

orus

in re

spon

se to

a n

ew N

PDES

pe

rmit

and

EPA

Adm

inis

trativ

e O

rder

. Th

e w

ork

will

impr

ove

the

disc

harg

e to

the

Ten

Mile

R

iver

to im

prov

e w

ater

qua

lity.

The

pro

ject

als

o in

itiat

es a

five

-yea

r (I/I

) rem

oval

pro

gram

th

roug

hout

the

city

. Th

e I/I

pro

ject

incl

udes

col

lect

ion

syst

em re

habi

litat

ion

and

repl

acem

ent

and

disc

onne

ctin

g st

orm

syst

em c

onne

ctio

ns fo

rm th

e se

wer

syst

em.

Red

ucin

g I/I

from

the

treat

men

t pla

nt w

ill re

duce

the

volu

me

of w

ater

to b

e tre

ated

, res

ultin

g in

ope

ratio

nal a

nd e

nerg

y sa

ving

s.

93.8

1%

Tow

n of

Pem

brok

eC

W98

,393

C

appi

ng o

f Hob

onoc

k St

reet

Lan

dfill

- The

pro

pose

d pr

ojec

t con

sist

s of p

rope

rly c

appi

ng th

e H

obom

ock

Stre

et L

andf

ill to

pre

vent

the

spre

ad o

f hea

vy m

etal

s and

oth

er p

ollu

tant

s int

o th

e gr

ound

wat

er a

nd n

eigh

borin

g w

ater

way

s. T

he c

ompl

eted

pro

ject

will

pro

vide

a lo

catio

n fo

r re

new

able

ene

rgy

faci

lity.

100.

00%

City

of P

ittsf

ield

C

W4,

100,

000

Ener

gy E

ffic

ienc

y, P

hoto

volta

ic &

Com

bine

d H

eat a

nd P

ower

(CH

P) In

stal

latio

n- T

he C

ity o

f Pi

ttsfie

ld o

pera

tes a

n ad

vanc

ed, n

utrie

nt-r

emov

al tr

eatm

ent f

acili

ty th

at p

roce

sses

app

roxi

mat

ely

10.8

mill

ion

gallo

ns o

f was

tew

ater

per

day

. The

faci

lity

treat

s mun

icip

al a

nd in

dust

rial w

aste

s fr

om P

ittsf

ield

, Dal

ton,

Hin

sdal

e, L

anes

boro

ugh

and

Nor

th L

enox

. The

gre

en e

nerg

y up

grad

es to

th

e pl

ant w

ill in

clud

e:

U

pgra

ding

the

exis

ting

sing

le-s

peed

mec

hani

cal m

ixin

g sy

stem

to a

fine

bub

ble

aera

tion

syst

em,

perf

orm

ing

heat

ing

and

light

ing

upgr

ades

; U

pgra

ding

the

exis

ting

anae

robi

c sl

udge

dig

estio

n sy

stem

by

inst

allin

g a

195

kW b

iom

ass

(slu

dge)

cog

ener

atio

n sy

stem

for o

n-si

te e

lect

ric p

ower

gen

erat

ion;

In

stal

ling

up to

a 1

,575

kW

sola

r pho

tovo

ltaic

syst

em (r

oof a

nd g

roun

d-m

ount

ed);

In to

tal,

over

$64

7,00

0 (8

9%) i

n an

nual

ene

rgy

savi

ngs,

1,77

0 kW

of g

reen

pow

er g

ener

atio

n (s

olar

pho

tovo

ltaic

& C

HP)

, and

app

roxi

mat

ely

3,25

2 to

ns o

f car

bon

diox

ide

emis

sion

re

duct

ions

will

resu

lt an

nual

ly fr

om th

ese

gree

n in

vest

men

ts.

Con

stru

ctio

n of

the

CH

P pr

ojec

t rev

eale

d si

gnifi

cant

ele

ctric

al o

verlo

ad c

ondi

tions

in th

e M

otor

C

ontro

l Cen

ter (

MC

C) a

nd a

ssoc

iate

d tra

nsfo

rmer

, and

non

-com

plia

nt e

lect

rical

and

bui

ldin

g co

de c

ondi

tions

. Th

e re

plac

emen

t of t

he e

xist

ing

MC

C, t

rans

form

er, s

tand

-by

pow

er sy

stem

s an

d as

soci

ated

ele

ctric

al u

pgra

des a

re n

eces

sary

to e

nsur

e th

e sa

fe, u

nint

erru

pted

ope

ratio

n of

the

Was

te W

ater

Tre

atm

ent P

lant

.

100.

00%

Tow

n of

Ran

dolp

hD

W2,

933,

623

Wat

er S

yste

m Im

prov

emen

ts- T

his p

roje

ct a

ddre

sses

the

requ

irem

ents

set f

orth

in th

e co

nsen

t or

der,

by id

entif

ying

and

repa

iring

wat

er m

ains

in n

eed

of re

habi

litat

ion,

to p

rovi

de

impr

ovem

ents

to th

e w

ater

dis

tribu

tion

syst

em.

66.8

7%

2015 SRF ANNUAL REPORT | 39

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

C

ity o

f Rev

ere

CW

1,27

3,77

4SS

ES P

hase

3 a

nd S

torm

Wat

er S

yste

m M

anag

emen

t Pla

n (S

WSM

P)-T

he p

roje

ct in

clud

es

plan

ning

iden

tifie

d an

d re

quire

d by

a c

onse

nt d

ecre

e. T

he p

roje

ct sc

ope

will

incl

ude

the

follo

win

g: se

wer

flow

met

erin

g, fl

ow is

olat

ion,

tele

visi

on in

spec

tion,

dye

test

ing,

and

smok

e te

stin

g (a

s req

uire

d) to

com

plet

e th

e ev

alua

tion

ofth

e w

aste

wat

er c

olle

ctio

n sy

stem

alo

ng w

ith

supp

ort f

or o

ngoi

ng a

sses

smen

t of t

he st

orm

wat

er sy

stem

incl

udin

g ill

icit

disc

harg

e un

derw

ay in

th

e ci

ty.

100.

00%

City

of R

ever

eC

W5,

856,

307

Sew

er S

yste

m C

onst

ruct

ion-

The

proj

ect c

onsi

sts o

f the

impr

ovem

ents

to th

e m

ost d

efic

ient

se

wer

pip

ing

in th

e Ph

ase

3 ar

ea, a

s wel

l as i

mpr

ovem

ents

iden

tifie

d du

ring

prev

ious

in

vest

igat

ions

. Th

e pr

ojec

t will

prim

arily

redu

ce in

filtra

tion

and

sour

ces o

f ext

rane

ous i

nflo

w

and

will

als

o re

duce

the

amou

nt o

f sto

rm w

ater

ent

erin

g th

e ci

ty’s

was

tew

ater

col

lect

ion

syst

em,

cont

ribut

ing

to sa

nita

ry se

wer

ove

rflo

ws (

SSO

’s) t

hat a

re u

nnec

essa

rily

bein

g tre

ated

at t

he D

eer

Isla

nd W

aste

wat

er T

reat

men

t Pla

nt.

93.0

7%

City

of R

ever

eC

W1,

891,

406

Win

thro

p A

ve E

mer

genc

y Se

wer

Rep

lace

men

t-O

n A

ugus

t 28,

201

3 du

ring

the

proc

ess o

f pe

rfor

min

g m

aint

enan

ce o

n th

e W

inth

rop

Ave

nue

trunk

sew

er, a

n ap

prox

imat

e 20

foot

long

se

ctio

n of

sew

er c

olla

psed

. The

col

laps

e oc

curr

ed a

t the

app

roxi

mat

e m

id-p

oint

of a

160

foot

lo

ng, 1

8 fo

ot d

eep,

vitr

ified

cla

y (V

C) s

ewer

segm

ent,

loca

ted

belo

w tw

o M

WR

A w

ater

mai

ns

runn

ing

from

the

Elm

Stre

et in

ters

ectio

n ea

ster

ly to

the

dow

nstre

am m

anho

le.

Seve

ral

alte

rnat

ives

to a

ddre

ss th

e co

llaps

ed p

ipe

have

bee

n co

nsid

ered

. Pre

viou

s per

form

ed h

ydra

ulic

m

odel

ing

show

ed th

at th

e ex

istin

g 18

-inch

trun

k se

wer

in W

inth

rop

Ave

nue

is u

nder

size

d an

d sh

ould

be

repl

aced

with

a 3

6-in

ch se

wer

to a

ddre

ss su

rcha

rgin

g/flo

odin

g is

sues

in th

is a

rea

rela

ted

to c

apac

ity o

f the

trun

k se

wer

. Si

nce

the

colla

psed

trun

k se

wer

is sc

hedu

led

for e

vent

ual

repl

acem

ent/u

psiz

ing

in th

e ne

xt fe

w y

ears

and

sew

er se

gmen

ts u

pstre

am a

nd d

owns

tream

of t

he

colla

pse

are

in p

oor c

ondi

tion,

the

city

inte

nds t

o in

stal

l app

roxi

mat

ely

900

feet

of 3

6-in

ch

repl

acem

ent s

ewer

from

the

inte

rcep

tor i

n R

ever

e B

each

Par

kway

up

to V

icto

ria A

venu

e.

92.1

6%

Tow

n of

Sau

gus

CW

439,

369

Sew

er S

yste

m R

ehab

ilita

tion-

This

pro

ject

incl

udes

sew

er sy

stem

reha

bilit

atio

n in

subs

yste

m 6

B,

whi

ch re

pres

ents

con

tinue

d w

ork

to re

duce

ext

rane

ous w

ater

in th

e w

aste

wat

er sy

stem

to

decr

ease

the

likel

ihoo

d of

syst

em su

rcha

rges

. R

ehab

ilita

tion

of su

bsys

tem

6B

incl

udes

ap

prox

imat

ely

3-1/

2 m

iles o

f CIP

P lin

ing,

inst

alla

tion

of a

ppro

xim

atel

y 25

0 lin

ing

syst

ems t

o im

prov

e se

rvic

e to

mai

nlin

e co

nnec

tions

, reh

abili

tatio

n of

app

roxi

mat

ely

150

man

hole

s, an

d re

mov

al a

nd/o

r re-

dire

ctin

g pr

ivat

e in

flow

bas

e on

thos

e pr

oper

ties c

onfir

med

to h

ave

inflo

w

sour

ces d

urin

g th

e to

wn-

wid

e ho

use-

to-h

ouse

insp

ectio

n pr

ogra

m.

This

pro

ject

als

o in

clud

es

upgr

ades

and

reha

bilit

atio

n to

the

Linc

oln

Ave

nue

Pum

p St

atio

n.

82.4

9%

2015 SRF ANNUAL REPORT | 40

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

To

wn

of S

augu

sC

W1,

543,

200

Sew

er S

yste

m O

verf

low

(SSO

) Red

uctio

n Su

bsys

tem

6-T

his p

roje

ct in

volv

es th

e re

habi

litat

ion

of p

ipel

ines

, man

hole

s and

the

rem

oval

of p

rivat

e in

flow

sour

ces i

n Su

bsys

tem

6 o

f the

Sau

gus

Sew

er S

yste

m a

s a m

eans

to e

limin

ate

infil

tratio

n an

d in

flow

(I/I)

from

the

syst

em a

nd

sign

ifica

ntly

redu

ce o

r elim

inat

e se

wer

syst

em o

verf

low

s at t

he L

inco

ln A

venu

e Pu

mpi

ng

Stat

ion.

The

pro

ject

als

o in

clud

es th

e in

stal

latio

n of

a w

et w

eath

er p

ump

stat

ion

(Sav

ille

Stre

et

pum

ping

Sta

tion)

to m

itiga

te th

e SS

O’s

in th

e In

nis a

nd E

lm S

treet

are

a. T

his p

roje

ct is

par

t of

an o

ngoi

ng p

rogr

am to

elim

inat

e ex

cess

ive

I/I in

the

Saug

us S

ewer

Sys

tem

from

cau

sing

sew

er

over

flow

s to

Rum

ney

Mar

sh a

nd th

e Sa

ugus

Riv

er a

nd su

rcha

rgin

g to

the

Lynn

Sew

er S

yste

m.

89.0

1%

Tow

n of

Sh

rew

sbur

yC

W4,

146,

710

Sew

er In

terc

epto

r and

Pum

p St

atio

n-Th

is p

roje

ct is

a th

ree-

phas

ed c

onst

ruct

ion

to re

plac

e or

lin

e Sh

rew

sbur

y se

wer

Inte

rcep

tor,

and

upgr

ade

exis

ting

six

pum

p st

atio

ns.

The

prop

osed

pr

ojec

t will

elim

inat

e se

wer

bac

k-up

s and

ove

rflo

ws.

87.7

2%

City

of T

aunt

onC

W4,

688,

669

Phas

es 8

-9 S

ewer

Sys

tem

Eva

luat

ion

Surv

ey (S

SES)

and

Pum

p St

atio

n U

pgra

des -

This

pro

ject

is

for r

epai

r and

repl

acem

ent o

f sew

er m

ains

and

serv

ice

late

rals

, rem

oval

of s

torm

wat

er

conn

ectio

ns to

the

sani

tary

sew

er, r

emov

al o

f roo

f lea

ders

and

sum

p pu

mp

conn

ectio

ns fr

om th

e se

wer

syst

em, s

epar

atio

n of

com

bine

d m

anho

les,

and

upgr

ade

of v

ital p

ump

stat

ions

. Th

e pr

ojec

t will

elim

inat

e po

tent

ial p

ublic

hea

lth th

reat

s and

nui

sanc

es re

sulti

ng fr

om se

wag

e di

scha

rge

to th

e re

ceiv

ing

wat

ers a

nd re

duce

the

risk

of se

wer

ove

rflo

ws.

100.

00%

City

of T

aunt

onC

W55

2,88

1W

inth

rop

St. S

ewer

Ext

ensi

ons -

The

proj

ect w

ill e

xten

d se

wer

serv

ice

to n

eeds

are

as id

entif

ied

by th

e ci

ty's

Com

preh

ensi

ve W

aste

wat

er M

anag

emen

t Pla

n (C

WM

P).

The

proj

ect i

nclu

des

cons

truct

ing

a ne

w se

wag

e pu

mpi

ng st

atio

n. T

he w

ork

will

allo

w b

alan

cing

of f

low

s bet

wee

n pu

mp

stat

ions

to p

reve

nt o

verta

xing

the

War

ner B

oule

vard

pum

p st

atio

n.

90.9

9%

Tow

n of

Web

ster

DW

1,65

7,26

7W

ater

Mai

n C

onst

ruct

ion-

The

proj

ect i

nclu

des t

he c

onst

ruct

ion

of a

ppro

xim

atel

y 4,

500

feet

new

w

ater

mai

n al

ong

Raw

son

Roa

d R

eser

voir

Acc

ess R

oad,

Raw

son

Roa

d to

Gor

e R

oad,

and

se

ctio

n of

Gor

e R

oad,

inst

alla

tion

of a

ppro

xim

atel

y 75

line

ar fe

et c

ured

-in-p

ipe

liner

, and

in

stal

ling

a Ti

defle

x M

ixin

g Sy

stem

for t

he R

awso

n R

oad

Wat

er T

ank.

The

pro

ject

will

redu

ce

the

prob

abili

ty o

f fut

ure

failu

res a

nd th

us re

duce

the

risk

of s

yste

m c

onta

min

atio

n, ir

on a

nd

man

gane

se w

ater

qua

lity

dist

urba

nces

and

the

loss

of w

ater

from

stor

age.

100.

00%

Tow

n of

Wel

lflee

tC

W20

0,00

0C

ompr

ehen

sive

Was

tew

ater

Man

agem

ent P

lan

(CW

MP)

-The

Tow

n of

Wel

lflee

t pro

pose

s to

crea

te a

CW

MP

to a

ddre

ss to

wn-

wid

e w

aste

wat

er m

anag

emen

t con

cern

s. M

uch

of th

e to

wn'

s C

entra

l Dis

trict

has

smal

l lot

s with

sept

ic s

yste

ms t

hat h

ave

led

to d

ocum

ente

d el

evat

ed n

itrat

e le

vels

in th

e gr

ound

wat

er a

nd W

ellfl

eet H

arbo

r. T

he p

lan

will

iden

tify

the

optio

ns a

vaila

ble

to

redu

ce th

e po

llutio

n an

d im

prov

e w

ater

qua

lity

in th

e ar

ea.

100.

00%

2015 SRF ANNUAL REPORT | 41

Bor

row

erPr

ogra

mA

mou

nt to

be

Fina

nced

Pr

ojec

t Des

crip

tion

Perc

enta

ge

of L

oan

Dra

wn

To

wn

of W

est

Spri

ngfie

ldD

W56

6,38

4W

ater

Tra

smis

sion

Mai

n an

d W

ellfi

eld-

The

proj

ect i

nvol

ves t

he c

ompl

ete

repl

acem

ent (

abou

t 5

mile

s) o

f the

tran

smis

sion

mai

n fr

om W

ell #

4 at

the

Sout

hwic

k W

ellfi

eld

to a

n ex

istin

g m

ain

loca

ted

on D

ewey

Stre

et in

Wes

t Spr

ingf

ield

's di

strib

utio

n sy

stem

. The

exi

stin

g tra

nsm

issi

on

mai

n is

unr

elia

ble

(inst

alle

d in

193

8), u

nder

size

d, a

nd fo

llow

s a m

ostly

cro

ss-c

ount

ry ro

ute

that

gr

eatly

lim

its a

cces

sibi

lity.

Due

to th

is, t

he T

own

is n

ot a

ble

to u

tiliz

e th

e So

uthw

ick

Wel

lfiel

d to

its

per

mitt

ed c

apac

ity. T

he S

outh

wic

k W

ellfi

eld

prov

ides

app

roxi

mat

ely

80%

of t

he T

own'

s w

ater

supp

ly. D

ue to

the

incr

ease

d ca

rryi

ng c

apac

ity o

f the

pro

pose

d tra

nsm

issi

on m

ain,

the

proj

ect w

ill a

lso

nece

ssita

te im

prov

emen

ts a

t the

Sou

thw

ick

Wel

lfiel

d, in

clud

ing

new

wel

l sc

reen

s, in

stal

latio

n of

VFD

s, an

d th

e in

stal

latio

n of

two

addi

tiona

l car

bon

abso

rber

s at t

he

treat

men

t fac

ility

. Im

prov

ing

the

carr

ying

cap

acity

of t

he tr

ansm

issi

on m

ain

from

the

Sout

hwic

k W

ellfi

eld

will

redu

ce th

e To

wn'

s rel

ianc

e on

the

Bea

r Hol

e R

eser

voir,

whi

ch is

the

Tow

n's o

ther

so

urce

of w

ater

. The

Tow

n ha

s had

pas

t epi

sode

s of t

aste

and

odo

r pro

blem

s res

ultin

g fr

om a

lgae

an

d tu

rnov

er is

sues

in th

e re

serv

oir.

The

Bea

r Hol

e R

eser

voir

WTP

util

izes

ope

n sl

ow sa

nd

filte

rs th

at h

ave

no b

ackw

ash

capa

bilit

y. T

he p

roje

ct w

ill a

lso

inst

all v

aria

ble

freq

uenc

y dr

ives

at

each

of t

he w

ells

.

92.7

3%

Tow

n of

W

estb

orou

ghC

W98

,280

An

Infil

tratio

n/In

flow

(I/I)

Ana

lysi

s and

Sew

er S

yste

m E

valu

atio

n Su

rvey

(SSE

S) w

ill a

ttem

pt to

re

duce

the

volu

me

of I/

I in

the

Wes

tbor

ough

Sew

erag

e Sy

stem

, to

the

Wes

tbor

ough

WW

TF, a

nd

final

ly to

the

Ass

abet

Riv

er; t

here

by a

ttem

ptin

g to

pro

tect

the

river

from

neg

ativ

e im

pact

s. Th

e To

wn

of W

estb

orou

gh p

ropo

ses t

o pe

rfor

m th

e I/I

Ana

lysi

s and

SSE

S in

the

dow

ntow

n ar

ea, t

he

wes

t end

of T

own,

the

east

end

of T

own,

the

form

er L

yman

Sch

ool f

or B

oys,

and

the

Stat

e H

ospi

tal.

Thes

e ar

eas a

re th

e m

ost d

ense

ly p

opul

ated

and

old

est a

reas

of t

he se

wer

syst

em.

100.

00%

City

of W

estf

ield

DW

2,35

2,24

8W

ater

Mai

n R

epla

cem

ent-

This

pro

ject

repl

aces

an

unde

rsiz

ed d

eter

iora

ted

14-in

ch ra

w w

ater

tra

nsm

issi

on m

ain

inst

alle

d in

189

5. T

he p

ipel

ine's

hyd

raul

ic c

apac

ity h

as d

eclin

ed to

less

than

3

MG

D, w

hich

pre

vent

s the

City

of W

estfi

eld

from

util

izin

g th

e fu

ll ca

paci

ty o

f 4 M

GD

from

the

Sack

ett W

ater

Tre

atm

ent P

lant

. Th

e ne

w tr

ansm

issi

on m

ain

will

rest

ore

long

-term

sys

tem

re

liabi

lity

and

full

use

of th

e tre

atm

ent p

lant

. Th

e pr

ojec

t als

o in

corp

orat

es o

n-si

te e

nerg

y ge

nera

tion

usin

g an

in-li

ne tu

rbin

e to

cap

ture

exc

ess h

ydra

ulic

hea

d to

gen

erat

e m

uch

of th

e en

ergy

nee

ded

to ru

n th

e pl

ant.

96.4

9%

City

of W

orce

ster

CW

561,

500

Lake

Ave

Sew

er In

flow

and

Infil

tratio

n (I

/I)-T

his p

roje

ct w

ill im

plem

ent t

he re

com

men

datio

ns

from

the

Lake

Ave

nue

Are

a Se

wer

Sys

tem

Eva

luat

ion

Surv

ey (S

SES)

to re

mov

e co

st e

ffec

tive

I/I fr

om th

e La

ke A

venu

e A

rea

that

con

tribu

tes t

o su

rcha

rgin

g an

d ov

erflo

ws i

nto

Lake

Q

uins

igam

ond.

100.

00%

2015 SRF ANNUAL REPORT | 42

ConTaCT InfoRMaTIonMassachusetts Clean Water Trust

3 Center Plaza, Suite 430Boston, MA 02108

Susan E. Perez, Executive Director(617) 367-9333 Ext. [email protected]

Nathaniel Keenan, Deputy Director(617) 367-9333, x508

[email protected]

My T. Tran, Trust Treasurer(617) 367-9333 Ext. [email protected]

Massachusetts Department of Environmental ProtectionDivision of Municipal Services

One Winter Street, 5th FloorBoston, MA 02108

Steven McCurdy, DirectorDivision of Municipal Services

(617) [email protected]

Joseph Delaney, Deputy DirectorDivision of Municipal Services

(617) [email protected]

3 Center Plaza, Suite 430 Boston, MA 02108

www.mass.gov/treasury

1 Winter Street Boston, MA 02108 www.mass.gov/dep