delivering operational excellence - investerare -...
Embed Size (px)
TRANSCRIPT

Delivering operational
excellence
Jan Moström, President Boliden Mines
Capital Markets Day 2014
10 November 2014
2014-11-10 42 CMD 2014

Delivering operational excellence
Operational excellence
Productivity - availability
Metallurgy
Tara transformation
Project management
Focusing on profitable growth
Organic expansion
2014-11-10 CMD 2014 43
M&A

Environmental excellence is a key focus
Water treatment
‒ Fenton
‒ Biological process for nitrogen
removal
Reclamation
‒ Tailings facilities
‒ Waste rock
‒ Sites
TMF, Operational performance
2014-11-10 44 CMD 2014

Acid mine water – oxidation of Pyrite
2014-11-10 CMD 2014 45
Pyrite -
Sulfide ore

5
High level of productivity but more to be
achieved
2014-11-10 CMD 2014 46
Citronen project (Grönland)
Pyhäsalmi (Finland)
777 (Kanada)
Doe Run (USA)
Aguas Tenidas (Spanien) Tayahua Project
(Mexiko) Cerro Lindo
(Peru) Kazakhmys (Kazahstan)
Garpenberg
Boliden-området Tara
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
4.5
5.0
0 1 2 3 4 5 6
tonne per man hour
Million tonne ore production per year
Zinc - underground mines 2016
Mineral Park (USA)
Gibraltar (Kanada) Mount Milligan
(Kanada) Boddington (Australien) Butte (USA)
Highland Valley (Kanada) Sierrita (USA)
Bingham Canyon (USA)
Antamina (Peru)
Cerro Verde (Peru) Los Pelambres (Chile)
Collahuasi (Chile) Escondida (Chile)
Aitik
0
5
10
15
20
25
30
35
0 20 40 60 80 100
tonne per man hour
Million tonne ore production per year
Copper - open pit with mill 2014

Aitik – no 1 productivity
2014-11-10
Open pit Cu mines Percentile **
Head grade % Cu 99
Mine t ore/hour 1
Mill t ore/hour 0
G&A t ore/hour 0
Overall t ore/hour 0
Wage rate $/hour 87
Labour cost $/t 12
Cash cost, Normal C1* - All
mines
c/lb Cu 42
* Cash cost Normal C1, Wood Mackenzie Q3 2014 estimate for 2014
** All mines in Woodmackenzie model, Q2 2014 estimates for 2014
CMD 2014 47

World-class design
Fundamentals
‒ Geological target, conceptual study
‒ Mineral resource, pre feasibility
‒ Mineral reserve, feasibility study
Mine
‒ Interaction infrastructure – production
areas – stopes
Concentrator
‒ Mill
‒ Flotation
‒ Dewatering
‒ TMF
2014-11-10 48 CMD 2014

Increasing performance at mine and mill
2014-11-10 CMD 2014 49
Key productivity drivers at mine Minimizing lead time between work
processes at faces/stopes/benches
Key drivers for the concentrator Optimizing availability of
mill/flotation/dewatering and
metallurgical performance

Integrated control system drives efficiency
Integrated control system for mine and mill
‒ Increased efficiency
‒ Lower costs
Mobile control room
‒ Enables operators to monitor and adjust in
real time
Control system integrated with
maintenance system
‒ Only one original document
‒ All share same info
‒ Improved surveillance
‒ Easier to spot errors
‒ Diary improves visibility over time
WLan
‒ Enable status control and operational
guidance
2014-11-10 50 CMD 2014

Wlan Enable status control and operational guidance
2014-11-10 CMD 2014 51

2014-11-10 CMD 2014 52
Leading expertise in handling complex ore
90 years of mining complex ore
Complex deposits with increasing
grades of penalty elements
Case: Kankberg Kylylahti
Cu, Au, Zn, Ni, Co

Patented process with high recoveries Kankberg – leaching of gold and tellurium from goldtellurides
2014-11-10 53 CMD 2014
Conceptual study initiated 2008
‒ Conventional leaching plant, method not an option
‒ A hot leaching process developed
‒ Boliden patent
‒ Gold recovery 85% (without 45%)
‒ Tellurium leaching process developed
‒ Tellurium recovery 65%
New process commissioned 2011

Restructuring Tara for improved profitability
2014-11-10 54 CMD 2014
Lowering headcount
2013 700
2014 Q3 620
2015 590
Decrease mobile fleet
Optimization on-going

Future growth based on solid project pipeline
2014-11-10 55
Au
Cu
Zn
Aitik
45
Projects may loop, may be rejected
or may be executed due to
market conditions and project conditions
Laver
Future options Conceptual study Pre feasibility study feasibility study execution
Garpenberg
2,5
CMD 2014

In-house project management a success factor
General design by in-house resources
Project management all disciplines with in-house personnel
Suppliers used in parts of the project but no large turn-key assignments
Standardized process - Project manual with continuous improvements from
previous projects A36. BoRe, Garpen, A45.
Key individuals assures continuity and experience sharing
Conceptual
Study
Pre-
feasibility
Study
Feasibility
study Implementation
2014-11-10 CMD 2014 56

Garpenberg – Set for 2.5 Mtonnes
2014-11-10 CMD 2014 57

Aitik45
45 (38) mton annually, +20%
Reserve grade 0.22 (0.24)
‒ Reserves 1 085 (633) mtonnes
‒ Life of mine 2040 (2030) years
‒ Copper life of mine 2 348 (1 471) ktonnes
Capex
‒ New crushers with improved reliability
‒ Lower stripping, approx. 0.5
‒ TMF
-10% costs per ton of ore
‒ Economies of scales
New environmental permit
‒ In all, in according to our application
2014-11-10 58 CMD 2014

2014-11-10 59
Sa2
Ö
Managing pushbacks to optimize financial
performance
CMD 2014

Adjusted mine plan Aitik
New environmental permit fall 2014
45 Mton 2017
Production 2015, 40 Mton
Life of mine Cu grade unchanged 0.22%
Cu grade 2015 and 2016 0.21%
2017-2019 over average grade
2014-11-10 60 CMD 2014

Increased production with new crusher Improved reliability – proven design
2014-11-10 61 CMD 2014
Existing with
reinforcements
New

Further growth options
Kylylahti
‒ Near mine
‒ Depth
‒ Satelites
‒ Outokumpu Field
Laver
‒ Application for mine concession
Q3 2014
‒ Next step, pre feasibility
2014-11-10 62 CMD 2014
Laver

Bergslagen
Skellefte field
Outokumpu field
2014-11-10 63 CMD 2014
Exploration, an unique opportunity
”Malmfälten”

Kylylahti – near mine exploration
64 CMD 2014 2014-11-10

Outokumpu Area – Copper and Nickel Deposits
Kylylahti
Keretti Hautalampi
Vuonos
Perttilahti
Luikonlahti
Riihilahti
Saramäki
Kokka
65 CMD 2014 2014-11-10

Delivering operational excellence
Operational excellence
Productivity - availability
Metallurgy
Tara transformation
Project management
Focusing on profitable growth
Organic expansion
2014-11-10 CMD 2014 66
M&A

Disclaimer
This presentation has been prepared by Boliden for information purposes only and as per the indicated date. Boliden does not undertake any obligation to correct or update the information or any statements made therein. Certain statements in this presentation are forward-looking and are subject to risks and uncertainties.
Nothing contained herein shall constitute any representation or warranty as to accuracy or completeness. Boliden has not made any independent verification of the information obtained from third parties.
Nothing in this material shall be construed as an offer or solicitation to buy or sell any security or product, or to engage in or refrain from engaging in any transaction.
Boliden does not accept any liability whatsoever arising from or in connection with the use of this information.
Save as by prior approval in writing, this material may not be copied, transmitted or disclosed, whether in print, electronic or any other format. All rights to the material are reserved.
2014-11-10 CMD 2014

Capital Markets Day 90 years of knowledge
delivering today’s value