  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    1/70

    Common Wealth

    Games

    Congress Wealth

    Games

    means

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    2/70

    Collapsing bridges.

    Chaos & corruption

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    3/70

    Commonwealth Games Delhi 2010 is one of the biggest scams India has seen. Rs 389 crores budget

    proposed in 2003-04 went up to Rs.70,000 crores in the name of CWG. A study says GOI, Delhi State Govt.

    & other Govt. Agencies have spent Rs 1,02,079 crores for & in the name of CWG.

    BJP National President, Shri Nitin Gadkari has asked for Joint Parliamentary Committee to investigate the

    CWG Scam. Shri Gadkari says guilty should be punished.

    Thousands of crores of Govt. money is lost in leakages and corruption. Comptroller & Auditor General,

    Chief Vigilance Commissioner, Central Bureau of Investigation, Enforcement Directorate, Delhi Police,Income Tax Dept. are investigating.

    A dozen Govt. agencies/Ministries found involved. Cost escalation were done dozens times.

    It is the Govt. money tax-payers money which could have been used for development, social welfare, for

    up liftment of downtrodden, has gone into the pockets of corrupt leaders/officials/contractors.

    Congress Govt. has diverted hundreds of crores of Rupees meant for Scheduled Caste and has paid to CWG

    contractors.

    Here is a compilation of manipulation, corruption, cartoons on Commonwealth Games Ghotala.

    Vijay Goyal Dr. Kirit SomaiyaBJP Gen. Secretary BJP National Secretary

    2 November 2010

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    4/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    5/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    6/70

    BJP congratulates Indian players for winning record number

    of medals and bringing glory to the nation during

    Commonwealth Games 2010

    The Games which were budgeted/projected in 2003 asRs.1,899 crore WENT UPTO Rs.70,000 crore in 2010 !

    Out of Rs.70,000 crores, only Rs.350 crores actually spent forIndian sportspersons

    Heritage Gaities study says total amount spent by Govts inthe name of CWG gone upto Rs 1,02,079 crores

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    7/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    8/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    9/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    10/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    11/70

    All Govt. major investigative agencies CBI, Enforcement Directorate, CVC, CAG,Police, Supreme Court are investigating/processing corruption in CWG.

    A new stadium can be constructed at Rs.100 crores but CWG spent Rs.961 croresin the renovation of Nehru Stadium.

    Corruption money was passed on to benami companies, relatives ofMinisters/organizers through Swiss Bank A/c, Tax Havens, MauritiusRoute

    Private builders and corporates were given bail out packages of hundreds ofcrores

    CVC says all Govt. departments/contractors jacked up prices by multiple times.

    CAG says, multiple agencies multiple corruption.

    It is windfall for the members and relatives of OC. 38 relatives were paid

    Rs.50,000 to Rs.2 lacs p.m. as consultancy. 4 nephews of OC Vice Chairman were hired

    Rent of 1000 special chairs paid at Rs.8,378 for each chair.

    Buying a roll of Toilet Tissue paper for Rs.4,100 per roll

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    12/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    13/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    14/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    15/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    16/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    17/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    18/70

    Even the Supreme Court had remarked that the Commonwealth Gamesproject has spawned unbridled corruption and is meant for public

    purpose only till October 14 the closing day of the Games after

    which everything will be used for private purpose.

    Declaring that the Supreme Court cannot shut its eyes on the rampant

    corruption, the court criticized the Central Government on its shoddy

    preparations for the international sporting event.

    But now the time has come to ask some serious questions over rampant

    bungling surrounding the Games.

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    19/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    20/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    21/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    22/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    23/70

    Smam Co Sponsorship Scam Rs.213 crores were setaside for Smam Co. for Sponsorship deals. Irrespective of

    whether the sponsors come or not the company shall get15 to 23% commission. Following the uproar, the contractwas cancelled.

    A M Films Scam Over 450,000 pounds weretransferred through a British Bank to A M Films, a one manfirm.

    Multi-crore Medical Equipment Scam CWG Cellof Directorate of Health Services (DHS), Government ofNCT of Delhi sought to buy basic medical equipment atexorbitant prices of Rs.1,94,040 lakhs for the first 45 AEDmachines.

    Tender for Overlays Rs.687 crores (Rs.300 crores ascommission)

    Time, Scoring & Results Tender Rs.109 crores

    (market cost less than Rs.30 crores. Cleaning & Waste ManagementRs.60 crores

    (market cost Rs.10-15 crores)

    Synthetic Hova Courts from Yonex Rs.156crores (market cost Rs.26 lakhs)

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    24/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    25/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    26/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    27/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    28/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    29/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    30/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    31/70

    Several relatives of the members of theOrganising Committee were appointed as

    employees/consultants

    Father and daughter, uncle & nephew, etc., etc.,list of employees of the OC includes 38 personsof the top brass who are related to each other.

    Their per monthly salaries:

    CEO Rs.2.12 lakhs

    DG/Joint DG Rs.1.6 lakhs

    ADG Rs.1.31 lakhs

    DDG Rs.1.05 lakhs

    Director Rs.79,000

    Project Officer Rs.50,000

    APO Rs.40,000

    Administrative Assistant Rs.33,500

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    32/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    33/70

    CWG spent: Cost on renovation

    Indira Gandhi stadium Rs.669 crore

    Dhyan Chand hockey stadium Rs.262 crore

    Karni Singh shooting ranges Rs.149 crore

    Jawaharlal Nehru stadium Rs.961 crore

    Interesting to note that the cost incurred in the renovation by variousassociations is

    Ferozeshah Kotla cricket stadium in Delhi was Rs.85 crore

    Lal Bahadur Shastri stadium in Hyderabad was Rs.80 crore

    Construction of a new stadium in Nagpur cost Rs.84 crore

    While CWG spent 961 crore in the name of renovation of Nehru Stadium Thousand crores ghotala on stadium by CWG.

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    34/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    35/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    36/70

    Globally, the big picture shows India as a major success story. In fact, it is

    largely a story of private sector success and government failure. Many Indian

    companies have emerged as world class, but government services and

    corporations have, with some honourable exceptions, remained ridden with

    waste, corruption and callous inefficiency. The Commonwealth Games

    accurately mirror this reality. - Swaminathan S. Anklesaria Aiyar

    Delhi filthier than before. When money is spent in

    massive volumes, the goals are dishonest. They create

    gravy trains for Commonwealth crooks. - Ashok Malik

    There are different explanations as to why the Government of India spentRs.70,000 crore or more to host the Commonwealth Games (CWG). To the

    cynical, it was an incentive package for the countrys burgeoning, public sector -

    driven cash and carry economy. To political animals, it was aimed at boosting

    the prospects of Sheila Dikshit, the Delhi Chief Minister. - Swapan Das Gupta

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    37/70

    The Great Day Light Roberry of 2010

    I am not going to harp on about how messed up the Commonwealth Gamesare. Enough has been written. The CWG 2010 is, by far, the biggest and

    most blatant, exercise in corruption in independent Indias history. Not only

    have they stolen public money, theyve made a mess of the job at hand.

    Delhi is dug up and the official anthem (and ringtone) of the Games should

    be the never-ending sound of drilling. Chetan Bhagat

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    38/70

    Govt. of India, Urban Development

    Ministry, Delhi Development Authority(DDA) signed agreement with privatecorporate Emmar-MGF under PPP todevelop CWG Village. Under originalagreement the Govt. was supposed to getRs.321 and 389 flats from Emmar-MGF

    In the name of urgency a big scam of morethan hundreds of crores took placeamongst the Govt. authorities UrbanDevelopment Ministry, Govt. of India,Delhi State Govt. and Delhi DevelopmentAuthority (DDA).

    In the name of Commonwealth Games,the Congress Govt. agreed to purchaseflats from this private company at the rateof Rs.11,000/- per sq.ft.

    The Controller & Auditor General of Indiain its report No.CA 23 of 2009-10 haspassed strictures against thismanipulation.

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    39/70

    Costing at the time of Bidding in 2003:

    Total Estimated Amount to be spent on Stadiums Rs 238.00 Cr

    Total Amount spent on Stadiums today Rs 3,389.44 Cr

    CWG OC Chairman Suresh Kalmadi had boasted ``Stadiums are already built in New

    Delhi, there will be no expenditure.

    Now why such huge cost? Paisa kidhar gaya????

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    40/70

    S.No. Expenditures Estimate Rs. (in crores)1 As per Mr. Suresh Kalmadi, estimated expenditure

    presented in 2003 3992 At the time of bids for the Commonwealth Games

    2003

    1,8993 The estimated budget for the Games approved by the

    Cabinet in April 2007 3,5664 By a reply in Parliament on 16 July, 2009 the estimate

    given was

    9,8655 As per estimate of

    i) Ministry of Youth Affairs & Sports 11,494

    ii) Govt. of Delhi 16,56028,054

    6 As per Tourism Ministry Report 87,000

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    41/70

    All the main bodies, Govt. of India, Delhi Govt. & Organising Committee,

    Supervising Committee of CWG headed by Congress Leaders For the CWG mess and mismanagement OC Chairman, Mr. Suresh Kalmadi has

    faced the maximum flak.

    Kalmadi , OC, Delhi CM Mrs. Sheila Dikshit , Govt of India, DDA around dozen

    agencies responsible for the CWG chaos & corruption.

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    42/70

    Major Scam, e.g.

    Repairing of Nehru Stadium at Rs.961 crores Private builders and corporates were given bail out packages of hundreds

    of crores It is windfall for the members and relatives of OC. 38 relatives were paid

    Rs.50,000 to Rs.2 lacs p.m. as consultancy.

    Rent of 1000 special chairs paid at Rs.8,378 for each chair. Buying a roll of Toilet Tissue paper for Rs.4,100 per roll

    Corruption money was passed on to benami companies, relatives ofMinisters/organizers through Swiss Bank A/c, Tax Havens, Mauritius Route

    Joint Director Generals T.S. Darbari and M. Jeyachandran and Dy. Director

    General Sanjay Mohindroo were suspended after a committee submittedits report on alleged charges of corruption during last years QueensBaton Relay launch in London

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    43/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    44/70

    OC Chairman, Suresh Kalmadi stoutly defended his decision to :

    Rent 1500 Treadmills for Rs 9.7 lakhs each for 45 days. Rent 1000``special Chairs for Rs 8,378 each chair.

    Rent thousands of `Corporate Umbrellas for Rs 6,308 per umbrella.

    Renting a 100 liter Refrigerator for Rs 42,000 per refrigerator.

    Buying a roll of Toilet Tissue paper for Rs 4,100 per roll.

    Time, Scoring & Results (TSR) Tender was given to Swiss Timing (Omega /Longines) for Rs 109 Cr. Total cost of this work as per international market involves

    not more than Rs 30 Cr.

    Tendering for Cleaning and Waste Management Work awarded for Rs 60 Cr,

    whereas the work could have been done within Rs 10 to Rs 15 Cr.

    Tendering for Image and Look Work was estimated at Rs 30 Cr, whereas thiscould have been done for hardly Rs 10 Cr.

    26 Synthetic Hova courts from Yonex purchased at Rs 6 lakhs each, totalling Rs

    156 Cr, whereas these could have been purchased for hardly Rs 26 lakhs.

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    45/70

    Commonwealth Games Ghotala

    Minister/leader responsible Suresh Kalmadi Chairman - IOA

    Mrs. Sheila Dikshit Chief Minister Delhi Govt.

    Jaipal Reddy Minister Urban Development

    M.S. Gill Minister Youth Affairs & Sports

    Ms. Ambika Soni Minister Information & Broadcasting

    Home Ministry

    Finance Ministry

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    46/70

    Three senior Delhi Commonwealth Games officials have been suspended overfinancial irregularities and the case has been handed to the governmentsfinancial anti-corruption watchdog.

    Joint Director Generals T.S. Darbari and M. Jeyachandran and Dy. Director General SanjayMohindroo were suspended after a committee submitted its report on alleged charges ofcorruption during last years Queens Baton Relay launch in London

    The Sports Ministry has formally asked Kalmadi to dismiss them on the grounds thast theyare linked to two major financial scandals.

    An email from Mohindroo showed himdictating taxi rates to a vendor in London who

    was hired to provide cars and other servicesduring the Queens Baton Relay function inLondon last year

    The vendor in question Ashish Patel and hisfirm, AM Cars have a dubious financialrecord. Instead of asking him for rates,Mohindroo states what fares Patel shouldcharge. 450 pounds a day. Exorbitant even

    when compared to hiring a BMW or Mercedeswith a driver in London.

    Darbari is ast the centre of a Customs casewhich accuses him of illegally trying to importa ring worth nearly 20 lakhs from Dubai intoKerala. He was also sent to Australia for theQueens Baton Relay there.

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    47/70

    The Stadium that we bid for in 2003 at Rs 326 Cr, the total bid was of Rs 1,566 Cr. During the tenure of

    then Sports Minister during UPA-I regime, total budget approval received was Rs 3,566 Cr, which is 100 %

    more.

    What should have been priced at say Rs 1, the price of the same was hiked 10 fold and tenders called for.

    The work that should have been done in Rs 1, tenders at the rate of Rs 10 were called for the same. The

    Wealth is missing out of these Common Wealth Games.

    Jawaharlal Nehru Stadium seating capacity was 73,000, was reduced to 65,000. If this stadium were to be

    rebuilt on lines of the modern state of these art stadiums, then the cost has been raised manifold from 90

    to 180, then 180 to 270 and from 270 to Rs 300 Cr ! But Rs 961 Crs have been spent on Renovation of JLN.

    Only renovation has taken place. The infrastructure was already there since 1982, Synthetic track was to

    be laid, Lights were already there, even then one would have considered a expenditure of not more than

    say Rs 100 Cr.

    Cycling Velodrome was to be made. Events here are mandatory. Velodrome surface was made of Cement !

    When people shouted in aghast as to what had been done. Kalmadi knew it is not made of Cement but of

    Wood. Then it was made of Wood !

    Funding For Civic Infrastructure in Delhi, Central Government / State Government Rs. 770 Cr in May

    2007, Rs. 770 Cr in December 2008, Rs 4,720 Cr in May 2009, which means 513 % increase. Besides this,

    Overlays and in between Miscellaneous expenses which are not accounted for which are in excess of Rs 10

    to Rs 100 Cr.

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    48/70

    Almost all the organizations executing works for Common Wealth Games have

    considered inadmissible factors to jack-up the reasonable price to justify award of

    work at quoted rates citing urgent/emergent circumstances. Despite higher rates

    poor site management, delays and quality compromises have been observed.

    Thirty items, which were not part of the Notice Inviting Tender (NIT) were

    incorporated in the Contract at higher rates after opening in order to increase the

    quoted amount to avail the difference of Rs.362,72,229/- between the next higher

    quoted amounts without changing the overall status.

    Two separate line items for imported & indigenous HPSV fitting of same technical

    specification and other performance parameters taken BOQ with wide variation in

    rates, i.e. more than three times. No logical reasoning could be given byorganization to go in for imported Luminaries at such exorbitant prices, whereas

    the luminaries of same specification, manufactured by the same vendor are also

    available at lower prices, which has caused in extra burden of Rs.1.52 crore.

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    49/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    50/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    51/70

    It is criminal that money reserved for the most marginalised sectors of society

    under the Scheduled Caste Sub Plan

    2009-10 (Special Component Plan), which is already an exceedingly low

    percentage of the budget, is diverted for

    Commonwealth Games related expenditures.

    This information is neither made public, nor are the decision-making

    processes that sanction such misuse of public money.

    Who authorises such reallocation of funds? Is it legal,constitutional, and

    ethical?

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    52/70

    Is the whole cabinet not responsible for cwg chaos & corruption ?

    Congress is ruling at the centre and in Delhi & controlling the CWG. Thenwho was Monitoring the Committees ?

    Are the Ministries of Urban Development, Sports, Home, Finance,

    Tourism, Civil Aviation, and I & B not involved & responsible ?

    Did the Dehli Govt not spend more than Rs. 20,000 cores in the name of

    CWG ?

    Were thousands of crores earmarked for schedule caste and down

    trodden not diverted to CWG ?

    Can you deny that thanks to the CAG & CTEO(CVC) that your govt was

    compelled to enquire into the scam.

    Were You, your senior colleagues & GOM not directly monitoring &

    supervising the cwg work ?

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    53/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    54/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    55/70

    According to a 2009 report by the Comptroller and Auditor General of

    India (CAG), the budget for the Commonwealth Games 2010 underwentseveral revisions.

    Originally in May 2003, when the Government of India allowed the Indian Olympic

    Association (IOA) to bid for the CWG, an expenditure ofRs. 296 crore was indicated towards

    upgradation of sports infrastructure and conduct of the Games, with expenditure on security

    and the Games Village to be incurred by the government and Delhi Development Authority(DDA).

    The updated Bid Document of December 2003, however, estimated:

    Operating expenditure alone at Rs. 635 crore.

    Total expenditure (other than Games operating expenses) at Rs. 1,200 crore.

    Government grants at Rs. 518 crore.

    The first budget for the Games approved by the Cabinet in April 2007 estimated

    the total expenditure of the Games at Rs. 3,566 crore Rs. 300 crore.

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    56/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    57/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    58/70

    Several Benami transactions have taken place in CWG

    Use of Mauritius Route

    Tax havens are used to avoid the actual identity & transparency

    Your one time senior colleague & former sports minister has

    alleged about corrupt practices & uncalled for expenses of cwg

    All these were going on for couple of years & you say you areignorant ?

    Ministers, Congress Leaders, Delhi CM are talking about corrupt

    officials. What about corrupt Ministers ?

    Are you not directly responsible for all this mess ?

    Sanctioned additional budget without proper evaluation of

    expenditure and estimates, which would have put halt to

    corruption.

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    59/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    60/70

    CWG investigations must cover all the agencies including

    state and central involved in implementing CWG Delhi2010.

    Files, papers, notes relating to all the work/projects of all

    the agencies involved in CWG should be siezed.

    All the Ministers, Officers and Organising CommitteeMembers connected with above should be relieved from

    CWG work immediately and should be asked to stay away

    from all CWG files etc.

    Full-fledged probe by/through Joint ParliamentaryCommittee (JPC)

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    61/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    62/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    63/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    64/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    65/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    66/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    67/70

    Action and investigation against involved Govt. agencies

    i) Urban Ministry Govt. of India (GOI) ii) Sports Ministry GOI

    iii) Tourism Ministry GOI iv) Finance Ministry - GOI

    v) Home Ministry GOI vi) Delhi Development Authority

    vii) Delhi State Govt. viii) Organizing Committee of CWG

    ix) Responsible officials and Ministers x) Others

    CVC investigation without waiting for a complaint

    CAG to complete full-fledged investigation in a time bound manner and issue directives toCBI to initiate action

    Delhi Police should act quickly in all cases of corruption connected with CWG

    GOI should take up with the Swiss Govt., find out and seize Swiss Bank accounts of allinvolved in CWG corruption

    Enforcement Directorate should act immediately to complete investigation in a month of allthe FERA violations, etc.

    All benami accounts/benami companies who used tax havens should be investigated CBI should complete probe in 3 months, register cases and seize properties of all corrupt

    officials, Ministers and OC members

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    68/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    69/70

  • 8/4/2019 CWG New Book Kirit Somaiya-01.11.10

    70/70