contract change order no. 16 redacted
TRANSCRIPT
-
8/20/2019 Contract Change Order No. 16 Redacted
1/20
Citv of Carmel-bv-the-SeaPUBLIC WORKS DEPARTMENT
POST OFFICE BOX CC, CARMEL-BY-THE-SEA, CA 93921(83 1) 620-2070
CONTRACT CHANGE ORDER NO. 16CONTRACT AWARDEDBY: City Council DATE OF AWARD Apr 7, 2015
~ ~R~O~ J ~ EC~T ~: ~ ~o ~r e~s ~ t ~ T~h~e~a ~ t e ~ r ~ R ~ e ~ n ~ o ~ v ~ a ~ t i ~ o ~ n_________________________________________ SHEET ____ 1 ~ o ~ fPROJECT 10# : 13-70903 Purchase Order# : 76-004428TO : Otto Construction Company; 2150 Garden Road, Suite A-1, Monterey, CA 94940 ,CONTRACTOR
You ar e hereby requested to make the he r ein described changes from the plans and specif cation s or do thefollowing described work not included in the plans and spe cifications on this con tra ct .
NOTE: THIS CHANGE IS NOT EFFECTIVE UNTIL FULLY EXECUTED. CDescription:
1 CHANGES TO CONTRACT PLANS AND SPECIFICATIONS.
Addition: Supply all labor and materials necessary to complete the fo llow ing: Reference RFP#24, Bulletins 16, 16.1, and 16 .2, and PC0#41 rev1 (Otto's track ing number ). Summary ofWork; Electrical Closest Revisions
Agreed Lump Sum ...... .. . .. ....... .. ..... .... ....... ... ..... ... . ..... . .. . ....... .... .... ...... ... .... .
2 CONTRACT PRICE
Total Increase in contract price
3 CONTRACT TIMEThree (3) days
$ 14,230.00 Increase
Sum net change in Contract Price is
$ 1,462,236 .00$ 86,312.00
542 .00
of the original Contract Price 6.9
778 .00
Decrease
We the undersigned contractor have given c areful cons iderat ion to the change proposed and hereby ag ree if h is proposa l isapproved that we will provide all eq uipment furnish all ma t eria ls except as may o therwis e be noted above and perform al l serv icesnecessary for th e work a bo v e specified and will acce pt as full payment therefore th e price shown above .
$ 14,230 .0
$ 14,230 .0
3
Accepted Date ~ : J = ~ ~ : : : : : ; ; ; ~ ~ == ===- -Signed By:
Contractor : Otto Construction CompanyTitle: s ~ v yd f¥( -,/ _[ ·} j1 J ecf C?A,vi-\ G E:fZ.
order his attention is directed to the requirements of hC Jf the o n • t£ : 1 1 J . ~ f f 0~ 9 S
Submi tte d By: Andy VanderfordProject Manager
Approved : [RJ Pub lic Wor ks Di rectorRob Mullane
Autho rized : liD City Adm inistrator
Authorized : [RJ City Co uncil
Attachments: Contractor Proposal (9 pages total)Bulletins 16 , 16.1, 16 .2RFP 24
Approval
Recommended b9
:::::Z:: :;
Minutes o f Meeting Dated : Cont ract Awarded o n April 7, 2015 .
Da te / / 7 5'
Dte_ l-+ _q+-J_
Date tL/;JhC
Note to Contracts and Budgets Office : Council awarded a 10% construction contingency In the amount of $146,224 .00 and the cost ofceo 4 i.e. the Terraced Step design at a Not to Exceed amount of $45,000.00 (actual cost@ $21,346 .00) . Thus $167,570.00 is theadjusted total amount of all change orders which the City Administrator has authority, or 11.46% of the Original Contract Price .
-
8/20/2019 Contract Change Order No. 16 Redacted
2/20
DATE:
REQUEST FOR PROPOSAL
City ofCarmel by the SeaPUBLIC WORKS DEPARTMENT
POST OFFICE BOX CCCARMEL-BY-THE-SEA, CA 93921
(831) 620-2070 OFFICE
September 16, 2015 PROPOSAL
PROJECT 1 .CONTRACT : Forest Theater Renovation
TO : John Garayalde FROM : Andy Vanderford
24
13-70904
Otto Construction City of Carmel-by-the-Sea
2150 Garden Road , Suite A-1
Monterey, CA 94940
SUBJECT
escription o f Proposed Changes
Location: Electrical ClosetScope of work: Change floor plan pursuant to Bulletin 16 .
This request for proposal is neither a change in the subject Contract, nor an order to the Contractor toperform any work . However, it pertains to certain proposed modifications to the work covere d by saidcontract. The provisions , drawings and specifications of said Co ntract and previous mod ifications theretowill apply, as applicable, unless specifically indicated otherwise herein.
The City of Carmel-by-the-Sea hereby requests that the Contractor submit with in ten (10) working daysafter receipt of this request a proposal to make the changes described herein. All changes to the ContractPrice and Contract Time should be detailed for each separate item listed. Detailed breakdown must include
deductive or added cost for all labor, equipment, materials and all applica ble mark-ups.
Nothing written in this Request for Proposal will obligate the C ity of Carmel-by-the-Sea to incur any costs norchange the Contract Time unless such changes are includ ed in an app roved Contract Change Order.
Signed
Enclosure :
Distribution:
Bulletin 8
C WJoe Headley , Build ing OfficialMatt Wetmore, OttoOscar Cisneros, OttoScott Vander Heyden, Otto
-
8/20/2019 Contract Change Order No. 16 Redacted
3/20
Potentia l Change Order (PCO) Cost Breakdown & Summary
ProjectForest Theater Renovation
Description of Change
Project15-3141-00
Below costs are associated with PCO 41 - RFP #24 , #29 & #34/Bulletin fJ6 , #16 ,#16.1 & #16 . Electrical Closet Revisions . Costs are for mater ial , labor, eq u ipmentand subcontracts.E xcludes engineering , design and permits . Roof is a non-walk on roof. Double doorframe & non-active HM leaf are non-returnable. City to own as additional in ve ntory.
CHANGE ESTIMATE ITEM COST M/U % MIU TOTAL
GC DIRECT COSTS
GC D RECT LABORGC DIREC T MATERIALSGC DIRECT EQUIPMENTGC OTHERIINDIRECTS
GC MARKUP ON DIRECT COST
GC MARKUP ON DIRECT LABORGC MARKUP ON DIRE CT MATERI ALGC MARKUP ON DIRE CT E QUIPME NTGC MARKUP ON DIRECT OTHERIINDIRECTS
GC SUBCONTRACT(S) OR 'OTHERS'
Brady CompanyScudder Roofing on Walk-On Roof Midsta te Specialties
GC FEE ON SUBCONTRACT(S)
ADDITIONAL TIME REQUIRED
$7,349$2,333
$201163
$ 7, 3492 ,333$201$163
1 ,476998354
2 ,828
3
10.0%10 .0%10 .0%10 .0%
5 .0%
DAY(S)FOR CONTRA CT COMPLETION._ .
COMPLETED BY: S c ott Vand er Heyden
$ 735233$20$ 16
$141
PCO :
R e la te d R FP :
Related BU L II:
Related RFI
41 rev124
6& 16N/A
DATE: 11 /16/1 5
TOTAL L, M, & E DIRECT COST $10,046
TOTAL MARKUP ON DIRECT COST 1,005
TOTAL SUBCONTRACT COST 2,828
TOTAL GC FEE ON SUBCONTR ACT(S) $141
TOTAL UNAV O IDABLE DELAY COSTS $0
TOTAL CONS TR UCTION COSTS $14,020
BOND AND INSURANCE (1 112%) 2 10
TOTA L COST OF CHANGE ORDER $14 ,23 0
-
8/20/2019 Contract Change Order No. 16 Redacted
4/20
Otto Construction2150 Garden Road , Suite A-1Monterey , CA 93940TEL 831.657.9805 FAX 831 .657 .9820License #178809
OTTO ESTIM TE SUMM RY SHEET
ID
124
5
Belowcosts
are associatedwith
PCO41
-RFP
#24 , #29 "/Bullet in #06, #16, 16.1 & #16.2 - Electrical Closet Revisions.Costs are for material , labor, equipment and subcontracts.Excludes engineering, design and permits. Roof is a non-walk onroof. Double door frame & non-active HM leaf are non-returnable.City to own as additional inventory.
Description Hrs Rate Labor
Self-Perform, Concrete, Rebar,'
0Framing, Insulation & Trim 4,677(See Attached Break-Out) 0
0- 6 Hand Excavation & Export 0
? (Expansion of slab on grade 40 .0 59 2,3608 /retaining wall) 0
9 0
10 Self-Perform , install (2) louvers and 0.11 sheet meta l plenum lined with 4 .0 78 312
12 insulation 013 0
14 015 0
16 0
17 0
18 0
19 020 021 0- ..22 0-- 23 0. - 24 0.25 0
26 0. ..27 0-·28 0
29 0
30 031 0
- .32 01- ..33 034 0
Totals 44 .0 7,3 49
"CH ECK L,M,E,S": 10,046Notes :
Matl
1,838
- .
-495
- --
.
.
-- ..
.
-
2,333
Job No.: 15-3141-00
Project: Forest Theater Renovation
PCO# 41rev1
Date: 11116/2015
Equip Sub/Mise TOTAL
-201 36 6,752
-- - - ·-
67 2,427
-- -
60 867·
-.-
·· -
- -
·
-. ..- - .
~ -- - - - - .. -
-- -
--
- - ---·---
.. - • ·-- I · ~ 1 · .. . - ~. ·--
-
201 163 10,046
-
8/20/2019 Contract Change Order No. 16 Redacted
5/20
TT
Item O n rrtpt J:I1 T ;ak e :ffety
24
5 i S. . I0 2 S i t l r C 0 < ' 1c ' t c W~ II
~ -\"Pffl PV rP ipo f> l' ) l F3\J 4" G ) £ ~H ·~ ~ ~ ( { I v12 '.i ' l"•e l t 73 TNt = F ~t t r Or& \l,. d C>'91 S f:l f -o r m~ ; ,~ o~e o J sF4 ~ T r ~ f c. 1 ( H . l ~ WI) II Gtl 1 ,:'2 1\ LI ) ~" ' " ' U: I 4bC () S FA4 Rl '(l c"cr \1 15 0) l f1 C :1 4" 88 S :tt V AI ~ · O fm P' f ' M .~ 800 :J ;1G Dlt1efIN)rr FOMl l V lr ~ c t,. > :.tt ~ 6 0 ' 1 u
iSC C CIJO: • .JG 1Z UO $f.:.i t fo' t1Va pM£1QTo; 1H O SF
Sl.; k nG t11d • rv1 32 l .9 t ~ ... t..n'J3 ll E·tJIPffiV rlo\As
o .o n 2X4 W U J en• s " "'
0 .17 , t , f I ,, & SF4*"' : F m ': ' ~ t.F )8 ~ ~ € .4 1 \ . F
f .J ') , r.J. ,. 1 . S , ,;I"~ f -1 ;SF n (; 61 JB;:
H. 1l JCV 11 2\lilO IC f " 31 72 IC YJ J (f: t: 'r - - ~ t ~ r ( ' IC r ~ ~ 1 ~ i X J I C1 '1,475 ~ "
0 1 r, ,s,. ' 6 15 /S F. 2 ~ 4 &.'t V ' oo-::c;c v r 8G4 1( , ( 1 S2
-
8/20/2019 Contract Change Order No. 16 Redacted
6/20
October 12, 2015 Control No . 75
Otto Construction2180 Ga rden Rd . Suite A-1Monterey, CA 93940
Attention: Matt Wetmore
Project: Forest Theater Renovation
,? {( \ / ) } ( / t ~ \ }
: r. R i 1 1 · 1 J l\ 1 \ 1 ·, , · • ·
Re : Bulletin 16 .1 -Electrical room revis ions Hang and tape walls and c e ilings of electr icalroom.
Our analysis of the refe rence re quest results in:
X Addition of 1476.00-------- - - - - - - - - - - - - -
- - - -No affect and no chang e in contract price.
- - - -Affects our work but no change in contract priceis required.
_ _ _ _ _Required time extension of _ _ __ ay s.
Wo rk has proceeded and we await check and/o r changeorder in the amount req uested.
x W o rk will proceed upon receipt of WRITTEN approval.
_ _ _ _ See page 2 for notes and clar ifications
This proposal is based on the trmely issuance of a wntten response so the scope change and af f ectedwork adjacent to the area can be completed within a normal sequence. Failure to recei ve a timelywrrtten response could result in addit ion a l costs and delay the completion date.
If further informatron is required, please contact the unde rsigned.
Respectfu lly submitted: Approved by:
Authorrzed SignatureDate:
ll f ( \ f i t t \ 1/ ' 1 \ : c I \ \ /. 1 / l / U N \ / \ \' 1 ./. l . /1 1 f ' , , ·A ,, J< .. • ( ., . • /1,· ( A \J IJI · ~ t • ,
-
8/20/2019 Contract Change Order No. 16 Redacted
7/20
October 12, 2015Page 2 of 3
Brady Company/Central California Inc.
Pro ject: Fores t Theater Renovation
Control No. 7504/ 0001
Re : Bulletin 16 .1 - Electrical room revi si ons. Hang and tape walls and ceilings of electricalroom.
To tal Materials (see Page 3 of 3) 148.70Sales Tax 8.625% 12.83Labor Add ed 12.00 manhours x 98.35 per manhour 1 '180 .20
Total Lab or & Materials 1,341.73
Equipment & services (see Pag e 3 of 3) 0.00
Subtotal 1,341 .73
Overhead & Profit 10% 134.17
S ubt otal 1475.90
Sub-su bcon tract work (see Page 3 of 3) 0.00
Overhead & Profit 5% 0.00
Subtotal 1475 .90
Bond 0% 0.00
Total Price 1475.90
Net ddition 1476 .00
CL RIFIC TIONS
-
8/20/2019 Contract Change Order No. 16 Redacted
8/20
October 12, 2015Page 3 of 3
Brady Company/Central California Inc.
Contro l No. 7504/ Q001
Project : Forest Theater Renovation
Re: Bulle tin 16 1 - Electrical room revisions . Hang a nd tape walls and ceilings of e lectrical room.
MATERIALDescription Quantity UOM Unit P rice5/8 Drywall 335 SF 0 32Joint Tape 2 RL 8.00J oint Compound 3 CT 8.50
Total mate rial
EQUIPMENT & SERVICESDescript ion Quan tity UOM Unit Price
Total equipment and services
SUB-SUBCONTRACT WORKDe scription Quantity UOM Unit Pric e
Total equipment a nd services
Total$107.20
$16.00$25.50
$148.70
Total
$0.00
Total
$0.00
-
8/20/2019 Contract Change Order No. 16 Redacted
9/20
Scudder Roofing ompanyCalifornia Contractor's Lie . #445118
P.O. Box 2596 Monterey , CA 93942e lephone : (831) 373-7212 Fax : (831) 883-2453
Visit our website at: www .scudde rr oofing.com
P roposal/Contract
October 30 , 2015
Roofing Proposal For : Forest Theater Renovation
From:
Mountain View Avenue & Santa Rita StCarmel-By-The-Sea , CA
Peter Scudderpete@scudderroofinq. comPh : (831) 384-1500 Fax : (831) 883 -2453Cell : (831) 595-3212
Change order to original proposal dated March 30 2015
Proposal or new roof installation at specified new construction locations
Scope of WorkPrices listed in this proposal are to be used for budgetary purposes only and are subject to changeupon acceptance. Budget pricing includes all the required materials which we guarantee will be asspecified , and performance of all the labor required for the completion of the roof work as follows .
Built up roof system at electrical control room only
Install a new class 'A' fire-rated built up roof system consisting of one nailed 28-lb . base sheet andthree 11-lb . ply sheets with a gravel surface to match existing as close as possible. Install system andtum up at curb locations. All plies to be solid mopped using type 3 asphalt at a rate of 30 -lb. per 1 00square feet per each layer of membrane, forming a four ply hot mopped fiberglass built-up roof system.Install sloping cant strips at all raised curb details. Install 3 x3 galvanized gravel stop edge metal atroof perimeter details .
Total for additional roof area :
Materials : $Labor : $
(-$600.00) by Genera l ContractorTotal : $ 1 ,698 .00
Total 599 8 00 (
Page 1 of 2 Initial,_ _ _
-
8/20/2019 Contract Change Order No. 16 Redacted
10/20
October 30, 2015 Scudder Roofing Company Forest Theater-Carmel
GuaranteePer specification
Note: All terms and conditions apply as outlined in original proposal
Terms and conditionsDeposit of 10% up to $1,000.00 due upon signing of proposal with payments made per progress billing cyclebased upon the percentage of job completed at the end of each regular work week with final payment due at thecompletion of the project OR 6 months same as cash. For 12 month no money down terms and no payment for364 days add 3 of bid price to project total. All additional pre -a pproved change order or project improvemenfwork above the contract price will be billed on an individual basis with payment to be made in full upon completionof the agreed upon improvement work .
cceptance of proposalThe above prices, specifications and conditions are satisfactory and are hereby accepted . You are authorized to do the workas speci fied . Payment wi ll be made as outlined above. It is understood and agreed that this is wor k not provided for in anyother agreement and no contractual rights arise until this proposal is accepted in writing . This contract is only valid whensig ned by an officer of Scudder Roofing. Scudder Roofing has the right o f refusal on this project prior to officer's signature.
A c c e p t e d Date _ _ _ _ _ _ _ _ _ _Sign and print name)
E-Mail address if applicable -
ut hor ized Signature : = : : : : :- - - - : - : : - - . - - - - - D a t e - e ter H. Scudder, President
We would like to thank you in advance for this opportunity to review and propose a bid for your project. We are striving for100% customer sa t isfaction and have worked very diligently to make sure this proposal is suited to meet your needs for now ,and in the future . Please call me if you have any que stions. We look forward to working with you.
S incerely,Peter H. Scudder
Page 2 of 2 Initial,_ _ _
-
8/20/2019 Contract Change Order No. 16 Redacted
11/20
idstate SpecialtiesYour Source For Doors, Frames, & Hardware
CHANGE ORDER QUOTATION 1
Date: 9/25/2015
CONTRACTOR: Otto Construction
ATTN: Matt Wetmore
PROJECT: Forest Theater
PROJECT NO.
SUBJECT:
NE cnr Mtn. View & Santa RitaCarmel-by -the-Sea, CA 93921
1505 -01 -056
CHANGE ORDER 1
Change order quote 1 is for a 3-0 x 7-0 HM frame to replace the double-door frame ato ening #13 . The active leaf for the air of doors will work in this frame.
LINE QTY DESCRIPTION SELL PRICE EXT PRICE1 1 3-0 x 7-(J x 6-1/4 RHR Hollow Metal frame $243 .00 $243 .00
8.625% tax $21 .00 $21.00freight $90 .00 $90.00
TOTAL 354.00
Mark Hilton 9/25/2015Printed Name Date
CONTRACTOR ACKNOWLEDGEMENT
Midstate Specialties, Inc. will not order or proceed with this change order until we receive either a signed copy of thisquote or a written change order. Verbal authorizations will not be accepted
Approved: Print ed Name Date
-
8/20/2019 Contract Change Order No. 16 Redacted
12/20
COOV NOERSON W SNEV RCHITEC T
ULLETIN
BULLETINNO.: 16 Electrical Closet Revision ISSUE DATE 9/14/15
PROJECT NAME Carmel Forest Theate r RFI No.:
PROJECT No.:
ISSUED TO14017
Oto Construc t ion
2150 Garde n Road, Suite A-1
Monterey, CA 93940
ISSUED BY·
CC
Jilian Cadouri
Andrew Vanderford
All materials and workhereinafter shalf conform to all the requirements of he project Drawingsa nd Specifications. except as otherwise described.Choose one of he following)
Exec ute promptlythe ins tructions given herein, which nterpret the Contract Documents or order minorchanges in theWork without change in Contrac t Sum or Contract Time. Ifyou consider that a change in Contract Sum or Contract Time
is requ ired. submit an itemized proposal to the Architect immediately and before proceeding with this Work. Ifyourproposal is found to be sa tisfactory and in proper order, th is Bulletinwill be superseded by a Change Order.
II. Changes described herein are being conside red for incorporation into the Work. Submit an itemized quota tion, informat requi red by the Contract Documents, indicating your proposed chang es to he Contract Sum or Contract Time.Do not proceed with the changes desc ribed herein until further written instructions are ssued by the Architect.
Ill. In order to expedite the Work and avod or minimize de lays in the Work which may affect Contract Sum or ContractTime, the Contract Documents are hereby amended as described be low. Proceed with this workpromptlyand submi tfinal costs for Work involved and change in Contract Time ifany), for inclusion in a subseq uent Change Order.
DESC R PTION:
Item No. 1 Electrical closet plan revised. See attac hed CA-31. Allpane ls an d boxes to be laid out with required access
clearance.
REVIEWEBy ndy Vanderford at 11:01 am Sep 16 2015
Cody Anderson Wasn ey Archite cts Inc. • 455 Lambert Avenue • Palo Alto, CA 94306 • 650.328.1 818 • Fax 650.328.1888 • wvvwcawarchitccts.c om
-
8/20/2019 Contract Change Order No. 16 Redacted
13/20
~ (--
-
8/20/2019 Contract Change Order No. 16 Redacted
14/20
CODY ANDERSON W SNEY ARCHITECTS
ULLETIN
BULLETINNO 16.2 Electrical Closet Revision -Ventilation ISSUEDATE: 10/28/15
PROJECT NAME Carmel Forest Theater RFI No
PROJECT No.
ISSUED TO:14017
Otto Construction
2150 Garden Road, Suite A 1
Monterey, CA 93940
ISSUEDBY·
CC:
Jilian Cadouri
AndrewVanderford
All materials and workhereinaftershall conform to all the requirements of he project Drawings and Specifications, except as otherwise described.Choose one of he following)
D
D
DESCRIPTION:
Item No. 01
I. Execute promptlythe instructions given herein, which interpret the Contract Documents or order minorchanges in theWork withoutchange in Contract Sum or Contract Time. It you cons ider that a change in Contract Sum or Contract Time
is required, submit an itemized proposal to the Architect immediately and before proceeding with this Work. It yourproposal is found to be satisfactory and in proper order, this Bulletinwill be superseded by a Change Order.
II. Changes described herein are being considered tor incorporation into the Work. Submit an itemized quotation. informat required by the Contract Documents, indicating your proposed changes to the Contract Sum or Contract Time.Do not proceed with the changes desc ribed herein until further written instructions are issued by the Architect.
Ill. In order to expedi te the Work and avo id or minimize delays in the Work which may affect Contract Sum or ContractTime. the Contract Documents are hereby amended as described below. Proc eed with this work promptlyand submitfinal cos ts for Work involved and change in Contract Time (ifany), tor inclusion in a subsequent Change Order.
See a ttached MSK-1 and louver spec sheet for ventilation provisions at electrical closet.Louver to be pa inted to match adjacent walls.Line sheet meta l plenum with Thermafiber Ra inbarrier 45 insulat ion 2 thick.
Cody Anderson Wasney Architects. Inc. • 455 Lambert Avenue • Palo Alto, CA 94306 • 650.328.1818 • Fax 650.328.1888 • wwwcawarchitects.com
-
8/20/2019 Contract Change Order No. 16 Redacted
15/20
LOCATION OF DRIVERS . REFER TO 2C/E0.03
SHE ET METAL PLENUM SLOPED TOWARDS
LOUVER WITH OPENINGON
END
12x12 LOUVER HIGH WITH S H E E T -METAL PLENUM BEHIND THELOUVER TO REDUCE LIN E OF SIGHTNOISE DUE TO DRIVERS/INVERTER
FOREST THEATERNE CORNER OF MOUNTAIN VIEW SANTA RITACARMEL BY THE SEA. CA 93923Revis ion : X Scale : 1/4 = 1'-0
EXISTING PANEL 'B .
LU TRON CONTROLSTATION
INV1 -3VIA D1-13
'B2A'
8 4'
~ S 1 N TE R F c Ee b= E N G I N E E R I N G
717 Market Street , u ~ e5 0San Francisc o , CA 94103TEL 41 5.489 .72 40FAX 41 5.489.7289\VWW.i nt erfaceengineerin g.com
INV1-2 VIAL C P 1 9
Date: 10/28/201 5Project No .: 2014-041 4Co ntact: CONTAC TSheet Ref .: SHEET E2. 1Sheet:
MSK 1
-
8/20/2019 Contract Change Order No. 16 Redacted
16/20
RUSK N®3900 Dr. Greaves Ad. Kansas City, MO 64030 (816) 761-7476 FAX (816) 765-8955
L330 STATIONARY LOUVERFORMED STEEL
STANDARD CONSTRUCTIONFRAME
16 (1.6) gage galvanized steel framedepth is 4 (102).
BLADES
18 1 .2) gage galvanized steel, J-styleblades (formerly weatherproof ) positioned at 30 ' angle and spaced approxima tely 4 (102) center to center.
SCREEN19 gage galvanized, W' mesh screen inremovable frame . Screen adds approximately W' to louver depth .
FINISHMill.
MINIMUM SIZE
12 w X 12 h (305 X 305).MAXIMUM FACTO RY ASSEMBLY SIZE
60 sq. ft . (5.6m ) per section not toexceed 120 x 72 (3048 x 1829) or 72 X 120 {1829 X 3048) .Louver s larger than the maximum factory assembly size will require fieldassembly of smaller sections .
SUPPORTS
Louv ers may be provided with rearmounted blade supports that increa seoverall louver depth depending on lou versize, assembly configuration or windload.
Dimensions in parenth esis ( ) indicatemillimeters.
FRAME CONSTRUCTION
STANDARD INTEGRALFLANGE
Dimensions in parenthesis ( ) indicate millimeters .
SIZETAG QTY. FRAME
A -WIDE B -HIGH
PROJECT
ARCHJENGR.
REPRESENTATIVE
Dim.
Varies
Lr
L 4 J102)
FEATURES
The L330 offers :• High free area, low pressure drop.• Economical galvanized steel construc
tion .VARIATIONS
Variations to the basic design of this louverare available at additional cost. Theyinclude:
Extended sill .Hinged frame .Front or re ar security bars .Filter racks .
• A variety of bird and insect screens.
• Selection of finishes: baked enamel(modified fluoropolymer), epoxy, Kynar,Pearledize and prime coat.
Consult Ruskin for other special requirements.
·uni ts furnished W' (6) smaller th an given opening dimensions .
VARIATIONS
LOCATION
CONTRACTOR
DATE
Spec L331).1 007/Replaces l330/L633 0· 492 AU STATED SPEC/FICA nONS ARE SUBJECT TO CHANGE WITHOUT NOTICE OR OBLIGATION u s k i n2007
-
8/20/2019 Contract Change Order No. 16 Redacted
17/20
-
8/20/2019 Contract Change Order No. 16 Redacted
18/20
12.3018
.4624
.6130.7636.9142
1.0748
1 .2254
1.3760
1.5 266
1.6872
1.8378
1.9884
2.1390
2.2996
2.44
1.00 25.40).90 22.86).80 20.32).70 17. 78).60 15 .24 )
.50 {12.70)
E .40 10.16)_§_
tl .30 7.62)ccoen
.20 5.08)
llQ)r:
,)
££ .10 12.54la. .09 2.290 .08 2 .03)
.07 1.7 8)0Q) .06 1.52)
l.05 1.27)ll
llQ)
0...04 1 .02)
~.03 .76)
~U)
.02 .51)
.01 .2 5)
0: .
8-
FREE RE GUIDEFree Area Guide shows free area in ft 2 and m 2 for various sizes of L330.
Width - Inches and Meters
~ ~ ~ ~ ~ ~ ~ ~7 ~ 2 1517 ~ 2 72 ~ g s 2~ 3.83. 24 .39 .53 .68 .82 .96 1.11 1.25 1.40 1.54 1.69 1. 83 1.98
.02 .04 .05 .06 .0 8 .09 .10 .12 .1 3 .1 4 .16 .17 .18.54 .86 1.18 1.50 1.83 2.15 2.47 2.79 3 .11 3.44 3.76 4 .08 4.40.05 .08 .1 1 .1 4 .17 .20 .23 .26 .29 .32 .35 .38 .4 1.78 1.24 1.71 2 .18 2.65 3.11 3 .58 4.05 4.51 4 .98 5.45 5 .91 6 .38
.07 .12 .16 .20 .25 .29 .33 .38 .42 .46 .51 .55 .591.09 1 .74 2 .39 3.04 3.70 4 .35 5 .00 5 .65 6.30 6.96 7.61 8 .2 6 8 .91
.10 .16 .22 .28 .34 .40 .46 .52 .59 .65 .71 .77 .831.31 2.10 2.89 3.68 4.47 5 .26 6 .05 6.84 7.63 8 .4 2 9.20 9 .99 10 .78.12 .20 .27 .34 .42 .49 .56 .64 .71 .78 .85 .93 1.00
1.64 2.62 3 .60 4.58 5.57 6.55 7 .53 8 .51 9 .49 10 .48 11 .46 12 .44 13 .42.15 .2 4 .33 .4 3 .52 .61 .7 0 .79 .8 9 .97 1.06 1.16 1 .25
1.85 2.96 4.07 5 .18 6.30 7.41 8 .52 9.63 10 .74 11.85 12 .96 14.07 15. 18.17 .27 .38 .48 .59 .69 79 .89 1.00 1.10 1.20 1.31 1.41
2.19 3.50 4.81 6 .12 7.44 8.75 10 .06 11.37 12 .68 14 .00 15 .31 16 . 62 17 .93.2 0 .33 .45 .57 .69 .8 1 .93 1.06 1.18 1.30 1.42 1.54 1.67
2 .43 3.88 5.34 6.80 8 .25 9.71 11 .17 12.62 14 .08 15 .54 16 .99 18.45 19.91. 23 .36 .50 .6 3 .77 .90 1.04 1.17 1 .31 1.44 1 .58 1.71 1 .85
2. 74 4 .38 6.02 7.66 9 .31 10 .95 12 .59 14.23 15 .87 17.52 19 .16 20.80 22 .44.25 .41 .56 .71 .86 1.02 1 .1 7 1.32 1.47 1.63 1.78 1.93 2.08
2.98 4 .76 6 .55 8 .33 10 .1 2 11 .90 13 .69 15 .47 17 .26 19 .04 20 .83 22 .61 24 .40.28 .44 .6 1 .77 .94 1.11 1.27 1.44 1.60 1.77 1.94 2.10 2.27
3.28 5 .25 7 .22 9.19 11 . 16 13 .13 15 .10 17.07 19 .04 21.01 22 .98 24 .95 26. 92.30 .49 .67 .85 1 .04 1.22 1.40 1.59 1.77 1.95 2.13 2.32 2.50
3.52 5.64 7 .75 9.87 11 .98 14.10 16.21 18.32 20 .44 22 .55 24 .67 26.78 28 .90.33 .52 .72 .92 1.11 1.31 1.51 1.70 1.90 2.09 2.29 2.49 2.68
3 .82 6.11 8 .40 10 .70 12 .99 15.28 17 .57 19.87 22 .16 24 .45 26.74 29.03 31.33.35 .57 .76 .99 1.21 1.42 1 .63 1 .65 2 .06 2 .27 2.46 2.70 2.91
4.07 6.52 8 .96 11 .40 13 .84 16 .29 18 .73 21.17 23 .62 26.06 28 .50 30 .95 33.39.36 .61 .83 1.06 1.29 1.51 1 .74 1.97 2.19 2.42 2 .65 2.88 3 .10
PRESSURE DROP
l/
1~ /
~
v
1/
~ ~ N' NM t? : ; ;r n 0 a ~ i ~~ w
"' coT ..... ~ ~ (;i N::. ::..£: . ' o . _ v o::. : : : ~ ~ ~ ~8 ~ 0 ~ ~ ~ g§g 0 0 0 0 ~ ~ ~ § ~"' ~ 8 ~ 8 ~"' 0-
Air Velocity in feet and (meters) per minute through Free Area
2sg9 ; s : 42 .12 2.27.20 .214.73 5.05.44 .476.85 7.31
.64 .689 .57 10 .22
.89 .9511 .57 12 .3 61.07 1.15
14 .41 15 .391.34 1.43
16 .30 17 .411.51 1.62
19 .25 20 .561 .79 1.91
21 .36 22 .821.98 2 .12
24 .09 25 .732.24 2.39
26.19 27.972.43 2.60
28.89 30.862.68 2 . 8 ~
31.01 33 .122.88 3.08
33 .62 35.913.12 3.34
35 .83 38 .283 .33 3.56
Ra tings do not include theeffect of a bird screen.
-
8/20/2019 Contract Change Order No. 16 Redacted
19/20
TYPICAL INSTALLATION DETAILS
Louver
ExtendedS ill
MasonryWall
FlangeMount
RUSK N®
Metal PanelWall
ExtendedSill
ngleSubframe
.,ngle
Louv e r _ . 1 fFrame
Louver
3900 Dr. Greaves Rd.Kansas City, MO 64030816) 761-7476FAX 8 16 765 -8955
WNW.ruskin.com
STANDARD CONSTRUCTIONDETAILS
Hidden Vertical Blade Support{HVBS)
Continuous Blade Appearance atMultiple Section Junctions
-
8/20/2019 Contract Change Order No. 16 Redacted
20/20
CODY NDERSON W SNEY ARCHITECTS
ULLETIN
BULLETINNO.: 16.1 Electrical Closet Revision -Acoustics
PROJECT NAME: Carmel Forest Theater
ISSUE DATE 10 8 15
RFI No.·
PROJECT No.:
ISSUED TO14017
Otto Construction
215 Garden Road, Suite A-1
Monterey, CA 93940
ISSUED BY·
CC
Jilian Cadouri
AndrewVanderford
ll materials and work hereinafter shall conform to all he requirements of he project Drawingsand Specifications, excep t as otherwise des cribed.Choose one of he following)
D
D
DESCRIPTION:
Item No. 1
I. Execute promptly the instructions given herein. which interpret the Contract Documents or order mnor changes in theWork withoutchange in Contract Sum or Contract Time. Ifyou consider tha t a change in Contract Sum or Contract Time
is required, subm it an itemized proposal to the Architect immediately and before proceeding with this Work. Ifyourproposal is found to be satisfactory and in proper order, this Bulletinwill be superseded by a Change Order
II Changes described herein are being considered for incorporation into the Work Submit an itemized quotation. informa t required by the Contract Documents. indicating your proposed changes to the Contract Sum or Contract Tme Do not proceed with the changes described here in until further written instructions are issued by the Architect.
11. In order to expedite the Work and avoid or minimize delays in the Work which may affect Contract Sum or ContractTime the Contract Documents are he reby amended as described be low. Proceed with this work promptlyand submitfinal costs for Work involvedand change in Contract Time if any . for inclusion in a subsequent Change Ordor.
Install batt insulation in new framed wal ls above concrete stem walls as approved in submittal. Provide alayer of gypsum board, in addition to plywood, at interior of framed wall.
Door to be acoust ically sealed as currently shown in hardware schedule.
Provisions for ventilationforthcoming.
Cody Anderson Wasney Architects. Inc. • 455 lambert Avenue • Palo Alto, CA 94306 • 650.328 1818 • Fax 650.328.1888 • a wa r i t e c t scom