Changeover Key Inspection Key Part # P=Product A=Automatic Customer Part # MXP1002-01 T=Tooling M=Manual Product: RH Pad - I/P Upper Trim S=Software V=Visual Rev Date: 04/22/11 D=Dunnage Q=Quality Audit Prepared By: L=Label Op- Seq Fab Move Store/Get Inspect Rework Scrap/ Contain Changeover Operation Description Class (KPC, QCI) Significant Product Characteristics (Outputs) Class (KCC, QCC) Significant Process Characteristics (Inputs) 010 b b b b Receive Raw Resin 12 Molded Part Appearance 010 b b b b Receive Raw Resin 100 Bassell r Receiving Inspection 012 b b b b Receive Components 6 Visual Inspection SOP-117 (Indentification, Process Flow Diagram A 012 b b b b Receive Components 6 Visual Inspection Traceability and Staus) 012 b b b b Receive Components 6 Visual Inspection Incoming Inspection 013 b b b b Receive Packaging 6 Visual Inspection Receiving Log 013 b b b b Receive Packaging 6 Visual Inspection SOP-117 (Indentification, Traceability and Staus) 013 b b b b Receive Packaging 6 Visual Inspection Incoming Inspection 030 e e e e Lab Inspection/Resin Verification 5 Material Sample Retain r Lab Records 030 e e e e Lab Inspection/Resin Verification 46 Receive Material r PPAP 031 e e e e Component Inspection 6 Visual Inspection Receiving Inspection 031 e e e e Component Inspection 6 Visual Inspection Incoming Inspection 031 e e e e Component Inspection 6 Visual Inspection Visual to Master Sample 031 e e e e Component Inspection 10 Component Appearance 033 n n n n Segregate Defective Received Components 18 Per Manufacturers Support Instructions Incoming Inspection 041 n n n n Return Defective 108 Shipping Documentation Inspector Verifcation Page 1 of 4

Upload: doankien

Post on 09-May-2019

222 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Changeover Key Process Flow Diagram Part # P=Product A ... · QCC) Significant Process Characteristics (Inputs) Process Flow Diagram 201 e Label Container 101 Tracibility, Material

Changeover Key Inspection Key Part #

P=Product A=Automatic Customer Part # MXP1002-01

T=Tooling M=Manual Product: RH Pad - I/P Upper Trim

S=Software V=Visual Rev Date: 04/22/11

D=Dunnage Q=Quality Audit Prepared By:L=Label

Op-

Seq Fab

Mo

ve

Sto

re/G

et

Insp

ect

Rew

ork

Scra

p/

Co

nta

in

Ch

an

geo

ver

Operation Description

Cla

ss

(KP

C,

QC

I)

Significant Product

Characteristics

(Outputs)

Class

(KCC,

QCC)

Significant Process

Characteristics

(Inputs)

010 bbbb                     Receive Raw Resin 12 Molded Part Appearance

010 bbbb                     Receive Raw Resin 100 Bassell r Receiving Inspection

012 bbbb                     Receive Components 6 Visual InspectionSOP-117 (Indentification,

Process Flow Diagram

A

012 bbbb                     Receive Components 6 Visual InspectionTraceability and Staus)

012 bbbb                     Receive Components 6 Visual Inspection Incoming Inspection

013 bbbb                     Receive Packaging 6 Visual Inspection Receiving Log

013 bbbb                     Receive Packaging 6 Visual InspectionSOP-117 (Indentification,

Traceability and Staus)

013 bbbb                     Receive Packaging 6 Visual Inspection Incoming Inspection

030 eeee                     Lab Inspection/Resin Verification 5 Material Sample Retain r Lab Records

030 eeee                     Lab Inspection/Resin Verification 46 Receive Material r PPAP

031 eeee                     Component Inspection 6 Visual Inspection Receiving Inspection

031 eeee                     Component Inspection 6 Visual Inspection Incoming Inspection

031 eeee                     Component Inspection 6 Visual Inspection Visual to Master Sample

031 eeee                     Component Inspection 10 Component Appearance

033 nnnn                    Segregate Defective Received

Components18

Per Manufacturers Support

InstructionsIncoming Inspection

041 nnnn                     Return Defective 108 Shipping Documentation Inspector Verifcation

Page 1 of 4

Page 2: Changeover Key Process Flow Diagram Part # P=Product A ... · QCC) Significant Process Characteristics (Inputs) Process Flow Diagram 201 e Label Container 101 Tracibility, Material

Changeover Key Inspection Key Part #

P=Product A=Automatic Customer Part # MXP1002-01

T=Tooling M=Manual Product: RH Pad - I/P Upper Trim

S=Software V=Visual Rev Date: 04/22/11

D=Dunnage Q=Quality Audit Prepared By:L=Label

Op-

Seq Fab

Mo

ve

Sto

re/G

et

Insp

ect

Rew

ork

Scra

p/

Co

nta

in

Ch

an

geo

ver

Operation Description

Cla

ss

(KP

C,

QC

I)

Significant Product

Characteristics

(Outputs)

Class

(KCC,

QCC)

Significant Process

Characteristics

(Inputs)

Process Flow Diagram

050 nnnn                     Move Accepted to Warehouse 7 Store Product Until NeededSOP-117 (Identification,

Traceability and Status)

050 nnnn                     Move Accepted to Warehouse 102 Inventory ControlSOP-130 (Storage and

Inventory Control)

061 nnnn                     Print Work Order/Labels 21 Bill of Materials First Shot Approval Procedure061 nnnn                     Print Work Order/Labels 21 Bill of Materials First Shot Approval Procedure

071 nnnn                     Set Up Work Station 11 Process Set Up Inspector Verifcation

071 nnnn                     Set Up Work Station 44 RedbookSOP-119 (Production Process)

Redbook

072 bbbb                     Move Material to Work Station 21 Bill of MaterialsSOP-120 (Production Process)

Redbook

072 bbbb                     Move Material to Work Station 44 Redbook Inspector Verifcation

073 bbbb                     Move Components to Work Station 21 Bill of MaterialsSOP-120 (Production Process)

Redbook

073 bbbb                     Move Components to Work Station 44 Redbook Inspector Verifcation

074 eeee                     Move Packaging to Work Station 21 Bill of MaterialsSOP-120 (Production Process)

Redbook

074 eeee                     Move Packaging to Work Station 44 Redbook Inspector Verifcation

075 bbbb                     Move Labels to Work Station 21 Bill of Materials Inspector Verifcation

075 bbbb                     Move Labels to Work Station 44 RedbookSOP-120 (Production Process)

Redbook

079 eeee                     First Shot Molding Approval 12 Molded Part Appearance First Shot Approval Procedure

Page 2 of 4

Page 3: Changeover Key Process Flow Diagram Part # P=Product A ... · QCC) Significant Process Characteristics (Inputs) Process Flow Diagram 201 e Label Container 101 Tracibility, Material

Changeover Key Inspection Key Part #

P=Product A=Automatic Customer Part # MXP1002-01

T=Tooling M=Manual Product: RH Pad - I/P Upper Trim

S=Software V=Visual Rev Date: 04/22/11

D=Dunnage Q=Quality Audit Prepared By:L=Label

Op-

Seq Fab

Mo

ve

Sto

re/G

et

Insp

ect

Rew

ork

Scra

p/

Co

nta

in

Ch

an

geo

ver

Operation Description

Cla

ss

(KP

C,

QC

I)

Significant Product

Characteristics

(Outputs)

Class

(KCC,

QCC)

Significant Process

Characteristics

(Inputs)

Process Flow Diagram

079 eeee                     First Shot Molding Approval 12 Molded Part Appearance QF-084 - Daily Process Report

079 eeee                     First Shot Molding Approval 110 Date Code First Shot Approval Procedure

079 eeee                     First Shot Molding Approval 112 Mold DamageFirst Shot Approval Procedure

/ SOP-121 PM079 eeee                     First Shot Molding Approval 112 Mold Damage

/ SOP-121 PM

081 nnnn                     Mold Parts 13 Molding Defects In-Process Inspection

082 eeee                     Op. Molding Inspection 6 Visual InspectionSOP-120 (Production Process)

Redbook

082 eeee                     Op. Molding Inspection 103 Operator Instructions Inspector Verifcation

090 nnnn                     Assembly 104Assemble (3) Clips (P/N

11519745)

Audit Report / Scrap Tally

Sheet

090 nnnn                     Assembly 105 Assemble Plug (Mold 1976)Audit Report / Scrap Tally

Sheet

090 nnnn                     Assembly 106 Identification Label rAudit Report / Scrap Tally

Sheet

090 nnnn                     Assembly 109 Gate RemovalAudit Report / Scrap Tally

Sheet

091 eeee                     Op. Assy Inspection 6 Visual InspectionSOP-120 (Production Process)

Redbook

200 eeee                     Pack Part 44 Redbook Packaging Instructions

094 eeee                     Quality Assy Insp. 6 Visual Inspection In-Process Inspection

094 eeee                     Quality Assy Insp. 107 SPC Length Per SPC Work Instructions WI-

119 / MIU Mattec

Page 3 of 4

Page 4: Changeover Key Process Flow Diagram Part # P=Product A ... · QCC) Significant Process Characteristics (Inputs) Process Flow Diagram 201 e Label Container 101 Tracibility, Material

Changeover Key Inspection Key Part #

P=Product A=Automatic Customer Part # MXP1002-01

T=Tooling M=Manual Product: RH Pad - I/P Upper Trim

S=Software V=Visual Rev Date: 04/22/11

D=Dunnage Q=Quality Audit Prepared By:L=Label

Op-

Seq Fab

Mo

ve

Sto

re/G

et

Insp

ect

Rew

ork

Scra

p/

Co

nta

in

Ch

an

geo

ver

Operation Description

Cla

ss

(KP

C,

QC

I)

Significant Product

Characteristics

(Outputs)

Class

(KCC,

QCC)

Significant Process

Characteristics

(Inputs)

Process Flow Diagram

201 eeee                     Label Container 101Tracibility, Material

Identification

SOP-120 (Production Process)

Redbook

182 eeee                     Final Quality Inspection 6 Visual Inspection Inspector Verification on Label

126 eeee                     Segregate Defective 44 Redbook Inspector Verifcation                   

135 nnnn                     Disposition Nonconforming Product 18Per Manufacturers Support

InstructionsInspector Verifcation

110 bbbb                     Move Accepted to Warehouse 19 StorageSOP-117 (Identification,

Traceability and Status)

Page 4 of 4