building information modeling [bim]
DESCRIPTION
Final set of documents for the Building Information Modeling class. Software: Archicad 2011TRANSCRIPT
Views
SiteAverage Temperatures
Sensory
Traffic Direction
Best views are to the northwest side of the site
Current view of the site
Major traf�c happens at Broadway street. this results in undesirable traf�c noises.
Parking StructureFood
ChurchCare Facilities
Site
Law Of�cesCommercial/ Of�ces
Site
B R
O A
D W
A Y
S
T.
M A
I N
S
T. A V E L
A V E M
A V E k
A V E j
1 3
t h
S T
R E
E T
1 4
t h
S T
R E
E T
1 5
t h
S T
R E
E T
N N NSun Analysis
Trafic & Vegetation Diagram
Occupancy classi�cattion:“CB-2” central business district, broadway/13th/main.Business B: Of�ces; 100 ft. per occupantAssembly A-2: Restaurant; 15 ft. per occupantMercantile M: Retail or wholesale store; 60 ft. per occupantResidential R: Living space; 200 ft. per occupant
Building area and height:Total building area is 34,100 sqft.Minimum �ve levels in height. There should be not a height limit, except when the property is adjacent to any"R-1" or "R-2" zoned property, even if separated by a street or alley, the maximum height shall be twenty-four (24) feet with no windows above ten (10) feet. Provided, however, that buildings may be erected to a height of seventy-�ve (75) feet when the front, side and rear yards are increased two (2) additional feet for each foot such buildings exceed twenty-four (24) feet. Windows may be permitted when the additional setback is imposed.
Egress:In the international building code Groups: A, B, and M require at least two exit access was leading to two independent exits.The building needs to be sprinkled, with:a. Maximum travel distance of 300 ft.b. 100 Ft. Maximum common path of Egress travel c. 49 occupants max. in largest room or area that may have only one means of Egress.d. Minimum length of a dead end corridor of 50ft.
Building Setbacks:The front yard setback for structures and outdoor dining areas/patios shall be no less than the average setback established by the development on the adjacent lot or lots. On corner lots, the front setback shall be no less than zero (0) feet and no greater than the setback established by the development on the adjacent lot.On development tracts adjacent to vacant land, the minimum setback shall meet the average established setback in the immediate vicinity. In no event, however, shall any garage have less than a twenty (20) foot front setback.
Landscaping Requirements:No less than ninety (90) percent of the required front yard excluding paved curb returns or driveways up to a minimum of �ve (5) percent of the total development lot area shall be landscaped and permanently maintained, except that:a. Interior courtyards shall not be included in any required landscaping.b. Buildings with zero (0) front and side setback shall not be required to have any on-site landscaping except that when a structure with zero (0) setback has adjacent parking �ve (5) percent of that parking area must belandscaped.The parkway areas of adjacent rights-of-way, excluding paved curb cuts and driveways shall be landscaped and permanently maintained. This shall be in addition to the landscaping required above. Any landscaping placed in the parkway must be in compliance with section 29-30(b)(6)i.3. of the zoning ordinance.All required landscaping must be visible from the public right-of-way and placed for maximum enhancement of the property. Landscaping shall meet the requirements of section 29-3(62).
Parking Requirements:Residential units - One space for each ef�ciency unit, one and one half (1 1/2) spaces for each one bedroom unit, two (2) spaces for each unit with two (2) or more bedrooms, plus one additional space for each four (4) units in the development. Townhomes, garden homes, duplexes and single family shall comply with the "R-1" and "R-2" parking standards.Restaurants serving or not serving mixed alcoholic beverages - One space for each one hundred (100) square feet of gross �oor area, except that outside dining areas/patios with fewer than two hundred �fty (250)square feet shall not be included in the gross square footage. Any outside dining areas/patios larger than two hundred �fty (250) square feet shall have the entire area included in the gross square footage.Shared or leased parking shall be subject to approval by the zoningboard of adjustment under section 29-19(d)(1).
SIT
E A
NA
LYS
IS
Preliminary Design 3 | 7 stories high
OFFICE
LIVE
LOBBY
RESTAURANT
LD/WASTEt
Preliminary Design 2 | 7 stories high
Broadw
ay Avenue L
Broadw
ay Avenue L
Preliminary Design 1 | 10 stories high
Broadw
ay Avenue L
PR
OG
RA
M B
LOC
KS
North West View Zones Service Core
North West ViewPreliminary design 1
Preliminary design 2
Preliminary design 3
Zones Service Core
North West View Zones Service Core
The design attempts to combine the program requirements in to two major spaces; a horizontal space which consists of the restaurant and retail space and a vertical one that encloses the rest of the program. The vertical Space is divided into two zones (north and South) to take advantage for natural lighting. The two major spaces are interconnected at ground level to create a uni�ed whole space.The energy challenge for this particular design is to reduce the cost of items such as cooling, heating, lighting and other energy consumption problems.The building is oriented towards the north. This gives an opportunity to use natural light to help reduce energy consumption. The building uses a curtain wall system on the north side of the building (the main access) to take advantage of the natural light. On the south side the amount of glazing is reduced to allow for the control of direct sun light.The core is designed as a double core placed on the east and west of the build-ing, multiple cores work well for low rise buildings. A double core placed in a building facing north has a low annual cooling load.
-The building is a small re�ection of the buildings close to the site. -The design demonstrates simplicity and easy understanding.-It is a 10 story structure with at least 12’ ft high on each �oor. A hole in the middle of the structure let the sunlight re�ect into the building. -The structure has a split core in which the vertical shafts stand against the south wall; each shaft locates in both east and west directions. -The cladding on the building is horizontal strips of concrete and glazing running from top to bottom along the building. -Each �oor has approximately 30% of glaz-ing which helps sun light to provide enough illumination for the working, and living activi-ties during the most part of the day.
PR
ELIM
INA
RY
DES
IGN
_ A
NAL
YSIS
Preliminary design 2
Preliminaryv design 3Preliminary design 1
Chosen Design :Preliminary Design 1
This proposal represents best what the intention of the design is and also works better energy wise and also more economic for the region of lub-bock, it helps to conserve more energy than the other two designs.
-The main idea in the proposal 3 was to get a more private view in every �oor, divide the whole square footage into what it would look like 5 diferent small buildings, by pulling volumes out and pushing others in, getting or alternating the volumes in the building, this would allow protection from the sun to the windows in the other stories, helping with the reduction in energy cost.-There were some variations in the model, different cladding, variationsin where the win-dows were positioned, but there was not a very drastic change in the energy consumption.-The different areas of the building are distributed in 7 �oors, and it helps to maxize space and area.-The building is oriented towards north, this helps to use better the light and help with the energy costs.The building is a steel frame, concrete and glass.
PR
ELIM
INA
RY
DES
IGN
_ A
NAL
YSIS
3D DOCUMENT
13'-0"
23'-0"
1'-0"
1'-0"
1'-0"
13'-10"
16'-6 3/4"6'-5 1/4"
20'-0"
13'-6"
13'-0"
13'-0"
13'-0"
13'-0"
13'-0"
13'-0"
2'-0"
2'-0"
2'-0"
2'-0"
23'-1"
13'-0"
13'-0"
13'-0"
13'-0"
Basement
Egress StairsOpen Office Space
Open Office Space
Open Office Space
Open Office Space
Living Space
Open Office Space
Elevators
Restaurant / Lobby
Courtain Wall
2'x2' Precast Column
1'x2' Precast Beam
Construction Type: “CB-2” central business district, broadway/3th/main.Business B: Of_ces; 100 ft. per occupantAssembly A-2: Restaurant; 15 ft. per occupantMercantile M: Retail or wholesale store; 60 ft. per occupantResidential R: Living space; 200 ft. per occupant
Structural system:We decided to use precast concrete for the structural system of our building. Precast concrete systems are characterized by reduced depths and de�ections for spanning members, faster construction and increased quality and durability.
Con�guration of Structural Systems:24” x 24” Precast Columns for heights of 24’ We are using these columns mainly for the �rst �oor of our building which includes the restaurant, lobby and the retail areas. 12” x 12” precast columns for heights of 12’ we are using these columns for the rest of the building since all the �oor distances are the same 12’.12” x 24” precast beams for spans of 30’ we decided to have spacing between columns of 30’, for this reason the use of this beams are apropiate. 9” thick precast solid topped slab for spans of 30’
Fire Resistance:The building needs to be sprinkled, with:a. Maximum travel distance of 300 ft.b. 100 Ft. Maximum common path of Egress travelc. 49 occupants max. in largest room or area that may have only one means of Egress.d. Minimum length of a dead end corridor of 50ft.S
TRU
CTU
RE_
_
ZON
ING
+CO
DE
STRU
CTUR
AL
PRECAST DOUBLE TEESLAB CAN SPAN MORETHAN 60’
PRECAST CONCRETE COLUMN16”X16”
PRECAST CONCRETE SLAB16”X16”
WE USED PRECAST CONCRETE DOUBLE TEE SLABS FOR THE TWO TOP FLOORS IN ORDER TO SPAN LONGER DISTANCES AND HAVE OPEN SPACE TO DESIGN THE APARTMENT LAYOUT.
2’X1’ BEAMS
14'-0"
14'-0"
14'-0"
14'-0"
14'-0"
14'-0"
24'-0"
13'-0"
24'-0"
2'-0"
88'-3 1/4"
72'-6"
PRECAST CONCRETE COLUMN2’X2’
TOP VIEW
COOLING TOWER
BOILER AND CHILLER
ANALYSISBased on the occupancy level, we identi�ed three di�erent zones in our design:Zone One: the �rst �oor is is divided into two subzones; the restaurant and the lobby space.Zone Two: the o�ce space. Zone Three: the living space. vBased on the three di�erent zones, we choose a Multizone Heating and Cooling System. To be more speci�c we are using a Central Air System: Single Duct, Constant Air Volume (CAV).In the Multizone System, several ducts from a central fan serve several zones. This system blend hot and cold air at the fan to send air into each duct at the temperature requested byy the thermostat in that speci�c zone.
The major components for this MEP system are: a boiler and chimney, chilled water plant, cooling tower, fan room, outdoor fresh air and exhaust louvers, vertical supply and return ducts, supply di�users, and return grilles.
The sizing of the major equipment spaces such as the boiler and chiller room, fan room, electrical and commu-nication room and the water pump rooms are illustrated in �gure 1 with their correspondent sizes.The size of the duct work is 2’x1’ and the di�users are 1'-9" in diameter.
MEC
HA
NIC
AL
PLU
MB
ING
BASINCABINET
URINAL
TOILET
COOLINGPIPE
HEATINGPIPE
DRINKINGFOUNTAIN
The plumbing wall is large enough to house the supplu, waste, and vent piping necessary to serve the fixtures.Based on the occupant level which is 50 people, we need 2 rest-room for men and 2 restroom for women. One accesible ADA fixture of each type is required to provide acces for disabled persons. In toilet rooms with partitioned water closet compartments, at elast one such compartment must be wheelchair accesible.
WATERPUMPS
Waste
Cooling
Heating
1 1/4” IPS PLUMINGPIPES
4 31/64" IPS PLUMINGPIPES
SINK
URINAL
ADA WOMEN'S TOILET
ADA MENS' TOILET
DRINKING WATER FOUNTAIN
1 1/4" IPS WATER WASTE
1 1/4" IPS WATER SUPPLY
CLOSET BEND
TOILET WATER SUPPLY
DRAINS
HEATING WATER SUPPLY
COOLING WATER SUPPY
SINK WATERWASTE
PLUM
BING
125'-7 3/4"
112'-2 1/4"
2'-1"
2'-1"
2'-0"
2'-0"
2'-0"
2'-0"
2'-0"
6'-0"
10'-5"
20'-5"
CABLE TRAY2’X6”
VERTICAL SHAFT WHERE THE ELECTRICAL TRAY RUNS VERTICAL RUNNING FROM BASEMENTTO THE TOP CEILING OF LAST FLOOR AND EXTEND-ING INTO EACH FLOOR
DRY TYPE TRANSFORMERELEC
TRIC
AL
11
07
10
05
32
24
x 6
1/2"
= 1
3'-0
"
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
MEC
HANI
CAL P
LAN
BOILER AND CHILLER800 sq.ft. REQ.
ADDITIONAL INFORMATION:
EXHAUST AIR LOUVERREQ. AREA MUST BE 80’
FRESH AIR LOUVERREQ. AREA MUST BE 100’
SPACE FOR COOLING TOWERMUST BE 150 sq. ft.
CHIMNEY MUST BE 2’x2’
SIZE OF DUCT WORK IS 2’x1’
CHIMNEY AND COOLING TOWER CONNECTOR SHAFT2’-2”x6’-10”
FAN ROOM1000 sq.ft. REQ.
DOMESTIC AND FIRE WATER PUMPS200 sq.ft. REQ.
ELEC./TELECOM.ROOM 150 sq.ft. REQ.
ELEVATOR
RESTROOMWET WALL16”x14’-9”
PIPE SHAFT1’-8”x15’-10”WIRING SHAFT 2’-5”x13’-5”
DUCT WORKSHAFT 3’-8”x13’-2”
11
07
10
05
32
24
x 6
1/2"
= 1
3'-0
"
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
D
C
B
A
1 2 3 4 5
28'-8
1/4
"27
'-1/4
"30
'-2 1
/4"
23'-1/4" 22'-11 3/4" 29'-9" 25'-3"
101'-0"
BASE
MEN
T
1’ 5’ 10’
1. BOILER AND CHILLER ROOM2. FAN ROOM3. ELECTRICAL AND TELECOM. ROOM4. WATER PUMP ROOM5. ELEVATORS
EAST ELEVATION
2
1
34
1’ 5’ 10’
GROU
ND FL
OOR P
LAN
23
12
38
07
39
39
23
x 6"
= 1
1'-6
"
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
22
x 6
1/4"
= 1
1'-6
"
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
1. RESTAURANT AREA2. RETAIL AREA3. LOBBY AREA4. ELEVATOR LOBBY5. RESTROOMS6. STAIRS7. ENTRANCE8. ELEC.\COM. CLOSET9. KITCHEN
NORTH ELEVATION
1
9
2
7
4
3
6
6
58
1’ 5’ 10’
OFFIC
E FLO
OR PL
AN
24
16
07
25
x 6
3/4"
= 1
4'-0
"
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
24
x 6
1/2"
= 1
3'-0
"
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
x 6
3/4"
= 1
4'-0
"
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
24
x 6
1/2"
= 1
3'-0
"
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
1. OFFICE AREA2. ELEVATORS3. STAIRS4. RESTROOMS5. ELEC.\COM. CLOSET
WEST ELEVATION
1
4
2
5
3
3
1’ 5’ 10’
LIVIN
G FL
OOR P
LAN
28
21
07
42
40
25
x 6
3/4"
= 1
4'-0
"
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
25
x 6
3/4"
= 1
4'-0
"
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
1. LIVING SPACE2. ELEVATORS3. STAIRS4. ELEC.\COM. CLOSET
PERSPECTIVE
1
2
3
3
1
4
SEC
TIO
N_
ALL
SYS
TEM
S
Basement
Egress StairsOpen Office Space
Open Office Space
Open Office Space
Open Office Space
Living Space
Open Office Space
Elevators
Restaurant / Lobby
Courtain Wall
2'x2' Precast Column
1'x2' Precast Beam
DET
AIL
ED S
ECTI
ON
_ E
NVE
LOPE 13'-0"
13'-0"
1'-0"
13'-0"
13'-0"
Concrete Slab
Cable Ladder
HVAC System
Courtain Wall
16" x16"StructuralConcreteColumn
Offices
Aluminum Panels
Mullions
2’ x 1’ Precast ConcreteStructural Beams
Energy Balance Evaluation
ArchiCAD Educational version, not for resale. Courtesy of Graphisoft.
Key Values
General project dataLocation: lubbock, texasActivity Type: MultipleEvaluation Date: 11/28/2011 8:13 PM
Building geometry dataTreated floor area: 36785.85 sq ftBuilding shell area: 57207.54 sq ftVentilated volume: 551243.66 cu ftGlazing ratio: 13 %
Building shell performance dataAir leakage: 1.29 ACHOuter heat capacity: 14.62*10-4 Btu/sq ft,F
Heat transfer coefficientsBuilding shell average:Roofs:External walls:Basement walls:Openings:
U value0.240.44 - 0.440.14 - 0.480.14 - 0.140.23 - 0.50
Specific annual demandsNet heating energy: 15.03Net cooling energy: 79.35
Energy consumption: 185.07Primary energy: 179.11Operation cost: 0.48CO2 emission: 10.05
[Btu/sq ft,F,hr]
kBtu/sq ftakBtu/sq fta
kBtu/sq fta
kBtu/sq fta
USD/sq fta
lb/sq fta
Energy Consumption by Sources
OCygrenE 2 emissionSource type Source name Quantity Cost
MBtu/a USD/a lb/a
0034.1Solar collector004125.7Environment
992826254710.8Natural gas270220113491934.7Electricity
369502*176036805.4Sum:
Renewable
FossilSecondary
61
28
10
Energy quantities
[%]62
28
10
73
27
CO2 emission
[%]
73
27
64
36
Energy costs
[%]64
36
* This amount of CO2 is absorbed in oneyear by 2.1 acres (roughly equivalentto 1.5 football fields) of tropical forest.
Page 1 of 2
Energy Balance Evaluation
ArchiCAD Educational version, not for resale. Courtesy of Graphisoft.
Energy Consumption by Targets
OCygrenE 2
Target name Quantity Cost Primary Emission
MBtu/a USD/a MBtu/a lb/a
Heating 562.5 4621 599.6 73802Cooling 5332.2 7077 3619.6 168513Hot water generation 192.1 1690 211.3 26830Ventilation fans 259.0 1519 777.0 36174Lighting & appliances 459.5 2695 1378.6 64181
Sum: 6805.4 17603 6586.1 369502
EnergySource name QuantitySolar collectorEnvironment
73%Natural gas63% 24%Electricity
[MBtu] 0 1000 2000 3000 4125.7
78
8743
Energy quantities
[%]
40
2615
10
9
Energy costs
[%]
46
2017
10
7
CO2 emission
[%]
Monthly Energy Balance
Supplied energy
Emitted energy
806.2
500
250
0Solar gainGreen energyHuman heat gainMechanical heatingHot water generationLighting and equipment
750
500
250
0TransmissionInfiltrationMechanical ventilationHot waterMechanical cooling
[MBtu]Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
Page 2 of 2
ECO
DES
IGN
ER A
NAL
YSIS
Avg. Temperature Avg. Rainfall
Avg. Humidity Avg. Wind Temperature
January April
June October
Shadow StudyWeather Data
ECO
TEC
AN
ALY
SIS