Page 2: BRP Road Patch Application Procedure & Equipment

Step 1: PrepPrepare the Area and the BRP Road Patch.• The surface to be sealed should be brought up to the same level as the surrounding pavement.

• Base course areas should be compacted to provide a tight stone

mosaic surface.

• Sweep application area free from all loose particles.

• Ensure area is dry and not polluted with oil, grease, diesel etc.

• Mark out the area to be sealed with chalk or crayon. Note the BRP

Road Patch should extend 100mm beyond the edge of the defect or

area requiring sealing.

• Cut the BRP Road Patch to match the marked out area by scoring the

paper side with a suitable scoring tool eg Dressmakers Tracing Wheel

or Safety knife. Fold the sheet together on the stone side and pull the

sheets apart along the open joint.

Page 3: BRP Road Patch Application Procedure & Equipment

Step 2: Adhesion• Use a Cationic Emulsion (60%+) or Anionic Emulsion (grade 65%) • Agitate the emulsion (shake the container), to ensure it is mixed well.• Apply the emulsion evenly to the marked out area & the back of the BRP Road Patch using a block brush, broom, roller or squegee.• Ensure coverage is even, leaving no uncovered areas or puddles of emulsion.• Check the edges to ensure that they are evenly covered. The approximate emulsion quantity is 0.75ℓ/m², but varies due the variable nature of the surface being sealed•Allow the emulsion to break on the pavement & the back of the BRP Road Patch i.e. emulsion turns from brown to black and becomes very tacky.

YesHigh Temperature Conditions

YesInclement weather

YesHigh stress areas

YesLow Temperatures (less than 12 Dec Celsius)

YesNormal Conditions

Apply emulsion to the road surface and the back of the

BRP Road Patch.Apply emulsion to the

road surface only.Conditions

Table 1. Emulsion Application Chart.

Page 4: BRP Road Patch Application Procedure & Equipment

Step 3: Position• Place the first BRP Road Patch onto the emulsion treated area. BRP Road Patch to be paper side down, aggregate side upwards. • If further BRP Road Patches are required simply butt the edges of the BRP Road Patch tightly together by pushing (kneading) the BRP Road Patch with your foot to ensure a neat/tight fit. Do not overlap the BRP Road Patches at the joins. • Repeat the process until all the patches have been placed.• If layering the BRP Road Patch e.g. BRP Rumble Humps, install the first layer as per normal, but for the next layers paint the paper side only i.e. do not apply the emulsion to the top of the underlying layer. (This already has bitumen pre-coat so does not need emulsion.)

Page 5: BRP Road Patch Application Procedure & Equipment

Step 4: Seal• To ensure a waterproof seal all edges and joins require the application of a small amount of emulsion and sand • Simply

• apply a small quantity of emulsion to the edges and joints using a brush.• Blind the edges and joints with crusher dust or sand.

• When installing traffic calming features i.e. BRP Rumble Humps and BRP Rumble Strips, and if you are not trying to water proof the pavement, the edge sealing is not required. Remember to blind off any excess emulsion with sand before rolling.

Page 6: BRP Road Patch Application Procedure & Equipment

Step 5: Roll• Rolling of the patch is done to remove any air pockets and ensure maximum contact between the BRP Road Patch and the surface.• Simply Roll the BRP Road Patch with a rubber tyred vehicle. • Ensure the full width of the BRP Road Patch surface is rolled using the number of passes recommended in table 2.• Open the road to traffic.• Note; if physical obstructions mean that you cannot get the vehicle close enough to roll the BRP Road Patch then use a plate compactor with a rubber mat (e.g. section of discarded conveyor belt) between the plate and the BRP Road Patch to protect the Patch from damage.

Increase rolling, up to 10 passes

High Stress i.e. at intersections or under turning traffic. In a vehicles heavy breaking zone. On a flush surface. Cold Weather <15 Deg C. Hot Weather >25 Deg C. Low traffic volumes. If rain imminent. If in doubt…

2 to 3 passesNormal application

Number of passes

Table 2. Compaction / Rolling requirements.

Page 7: BRP Road Patch Application Procedure & Equipment

Other Tips:• Store and transport the BRP Road Patch on a flat surface, aggregate side up.

• On site, do not leave the BRP Road Patch aggregate side down for extended periods, especially in high temperatures as this may cause aggregate loss.

• If the risks are high. i.e. high stress sites, (Roundabouts and intersections), cold weather or if rain is forecast in the next 12 hours more rolling should be applied as referred to in table 2, before opening to traffic.

• Ensure tool that you apply emulsion with is ‘solvent free’ before using them to spread the emulsion.

• Helpful Hints: • If using a brush/broom to spread emulsion intermittently all day, leave it in the

emulsion bucket with the bristles covered in emulsion. At the end of the day rinse the brush/broom out with water, clean in solvent, shake in cold soapy water and again in cold water. Leave the brush/broom in clean water until required again.

• To avoid cleaning tools use low cost rollers or brushes and dispose of them at the completion of the job.

Page 8: BRP Road Patch Application Procedure & Equipment

BRP Road Patch Equipment,

& Equipment Maintenance

Tips

Page 9: BRP Road Patch Application Procedure & Equipment

Equipment Required for a BRP Road Patch Repair• PPE as required • Hot mix, Cold Mix or Aggregate/Emulsion mix to complete any defect reinstatement • Sweeping Broom for Sweeping area to be covered by BRP Road Patch• Chalk for outlining area to be covered• Tape Measure to measure area to be covered and patch• Cutting Tool to cut BRP Road Patch to required dimensions/shape Eg Dressmakers Tracing Wheel• Emulsion to adhere BRP Road Patch to surface and to seal patch edges• Bottle/Bucket/ Watering can to pour emulsion• Emulsion Broom/Roller/Sqeegee to apply emulsion• Emulsion Brush to apply emulsion• Sand/Crusher Dust to blind the edges and joints• Rubber Tyre for Rolling BRP Road Patch to ensure maximum contact of BRP Road Patch to surface• Emulsion Bucket to store emulsion broom/brush/roller in between the days repairs• Gloves to protect hands from emulsion contact• Solvent for cleaning emulsion broom/brush• Dishwashing Liquid for cleaning the emulsion broom/brush/roller• Water Bucket to clean & store emulsion broom/brush/roller at the end of the day

Page 10: BRP Road Patch Application Procedure & Equipment

Emulsion application:

Before using the Emulsion it is best to stir or shake in order to ensure it is blended and has not settled or broken.

Emulsion application can be done by either • Bottle• Bucket• Watering Can• Hand Lance @ low pressure – to avoid overspray ensure hand lance is at

low pressure and/or concentrated spray and only apply in centre of area to be covered and patch. Then spread the emulsion to the required are with the Emulsion broom/brush.

Page 11: BRP Road Patch Application Procedure & Equipment

Emulsion Broom/Brush maintenance:In between repairs1. leave the Emulsion Broom/Brush immersed in water with the bristles

covered in emulsion. 2. Shake excess water off broom/brush prior to next use with emulsion

At the end of the day follow these steps with your Emulsion Broom/Brush If using again the next day1. leave the Emulsion Broom/Brush immersed in water with the bristles

covered in emulsion.

If not using again for spreading emulsion1. Rinse out the Emulsion Broom/Brush with water2. Clean the Emulsion Broom/Brush with solvent,3. Shake the Emulsion Broom/Brush in cold soapy water 4. Shake the Emulsion Broom/Brush in cold water. 5. Store the Emulsion Broom/Brush in clean water until required again.

Before Spreading Emulsion, ensure the Emulsion Broom/Brush is ‘solvent free’ to avoid undermining the Emulsion

Page 12: BRP Road Patch Application Procedure & Equipment

Emulsion Roller maintenance:In between repairs leave the Emulsion Roller immersed in emulsion to

ensure the roller remains in a workable condition.

At the end of the day you can either 1. Dispose of the roller and use a fresh roller the next day

or 2. Follow these following steps to clean the Emulsion Roller

1. Rinse out the Emulsion Roller with water2. Clean the Emulsion Roller with solvent,3. Shake the Emulsion Roller in cold soapy water 4. Shake the Emulsion Roller in cold water. 5. Store the Emulsion Roller in clean water until required again.

Before Spreading Emulsion, ensure the Emulsion Roller is ‘solvent free’ to avoid undermining the Emulsion

Page 13: BRP Road Patch Application Procedure & Equipment

Emulsion Squeegee maintenance:After a repair is completed wipe the Emulsion Squeegee with a solvent to remove any excess

emulsion.Before Spreading Emulsion, ensure the Emulsion Squeegee is ‘solvent free’ to avoid undermining

the Emulsion