bounty oil and gas nl excellence in oil &...
TRANSCRIPT
Bounty Oil and Gas NLyExcellence in Oil &
GasGasSydney, March 2, 2011
Philip F Kelso – CEO
DISCLAIMER
This presentation contains forward looking statements that are subject to riskf t i t d ith th il d i d t It i b li d th t thfactors associated with the oil and gas industry. It is believed that theexpectations reflected in these statements are reasonable but they may beaffected by a range of variables which could cause actual results or trends todiffer materially, including but not limited to: product price fluctuations, actualdemand, currency fluctuations, geotechnical factors, drilling and productionresults, oil and gas commercialisation, development progress, operating results,engineering estimates, reserve estimates, loss of market, industry competition,environmental risks, physical risks, legislative, fiscal and regulatory, p y , g , g ydevelopments, economic and financial markets conditions in various countries,approvals and cost estimates.
All references to dollars, cents or $ in this document are Australian currency,unless otherwise stated
2
Bounty – Core growth in 2011y g
• BUY has a strong balance sheet with $ 6 million cash at 31 December 2010
• BUY’s Core Strategy lifted gross revenue to $ 1 million for the Half Year to 31 December 2010
• With Tapis around US$ 100 per bbl oil revenues will help fund further • With Tapis around US$ 100 per bbl oil revenues will help fund further development and near field oil drilling in its oil proven Cooper Blocks planned for 2011
• Utopia 3D Surveys completed with U11 H to drill in April 2011
• 2 more wells in Naccowlah Block
3
BUY growth in 2011
BUY Fundamentals on Upward Pathp
500,0000.14
0.16
0.18
Bounty Closing Price
200,000
250,000
300,000
350,000
400,000
450,000
Bounty Quarterly Revenue
$
0.06
0.08
0.10
0.12
$
‐‐‐
50,000
100,000
150,000
1 Dec 05 1 Jun 06 1 Dec 06 1 Jun 07 1 Dec 07 1 Jun 08 1 Dec 08 1 Jun 09 1 Dec 09 1 Jun 10 1 Dec 10
0.00
0.02
0.04
26 May 06 26 May 07 26 May 08 26 May 09 26 May 10
50
60
70
600
700
800
50
60
70
600
700
800 Bounty Market Capitalisation
• Bounty’s focus on Core and Growth Assets in Australia is providing a platform for future reserve and revenue growth
20
30
40
200
300
400
500
Millionsof
Shares Issued Shares
Market Cap
20
30
40
200
300
400
500
$Millions
Millionsof
Shares Issued Shares
Market Cap
revenue growth 10
‐
10
‐
100
4
BUY Fundamentals Platform
Bounty – Foundations for Reserve Growth beyond 20112011
• BUY’s Growth Strategy this year will start in April 2011 with participation in the Nyuni 2 well in Tanzania targeting 8 MMBOE’s net to BUYBUY
• If successful Nyuni 2 will push the Block along the commercialisation path
• Azalea Prospect – AC 32P offshore Vulcan Graben, major 3D reprocessing project completed and targeting 27 MMbbl oil net to Bounty up dip from oil in the Puffin Field drilling 2012Bounty up dip from oil in the Puffin Field, drilling 2012
5
BUY growth beyond 2011
PEP 11 – Still a Major Growth Asset
• PEP 11 – BUY was free carried through New Seaclem 1 with around $20 ll d b d d
j
million invested by Advent Energy Ltd
• BUY has reduced to a 15 % interest
S ill l d i h SC ll d b i l d d• Still early days with NSC 1 well data being analysed, and
• Multi TCF gas in the Fish - Baleen structures has yet to be tested
Bl k d d f 3 • Block extended for 3 years
• 2D and 3D seismic surveys in 2011-2012
N ll lik l i 2013• Next well likely in 2013
6
PEP 11 Sydney Basin - a Growth Asset
BUY Projects and 2011 Projectsj j
AC/P 32
NyuniTanzania
ATP 789EP 359,412 & 435
Naccowlah
ProductionExploration
UtopiaSuratPEL 218
Naccowlah
pHigh Impact ExplorationOffshore WellExploration WellDevelopment Well
PEP 11
• Wet conditions have curtailed activities in inland eastern Australia
• However still proposed to participate in up to 8 wells in 2011
7
However, still proposed to participate in up to 8 wells in 2011
BUY Projects
Steady growth in oil assetsy g
70
80
90Nacccowlah Purchase
her
Bounty MonthlyAverage Production
d
Oil Production – provides underlying supportfor Bounty’s higher risk operations
Bounty has been pursuing oil development and30
40
50
60
Boe
pd
Dow
nlan
ds C
lose
d Wea
t h
Dow
nlan
ds C
lose
d
appraisal through Utopia oil field development,Naccowlah acquisition and exploration in theSurat basin western oil fairway.
Oil revenue aimed to reach $2 million in 2011
0
10
20
Feb-
09
Mar
-09
Apr-0
9
May
-09
Jun-
09
Jul-0
9
Aug-
09
Sep
-09
Oct
-09
Nov
-09
Dec
-09
Jan-
10
Feb-
10
Mar
-10
Apr-1
0
May
-10
Jun-
10
Jul-1
0
Aug-
10
Sep
-10
Oct
-10
Nov
-10
Dec
-10
Oil revenue aimed to reach $2 million in 2011
Interests in 1 MMbo of low risk drilling targetsin Surat Basin western oil fairway, for drilling2011 – 12.2
2.5
Bounty Reserves
2011 12.
1
1.5
2
MMboe
2007 2008 2009 20100
0.5
8
BUY Australian Oil
2011 Drilling - Nyuni Tanzania – Targeting 1.2 TCF Gas
• Proven hydrocarbon systemBewara West
Bewara East
Okuza
• All projects within 20 km of gas plant and pipeline
• Increasing local demand from both power Nyuni West
Bewara West
Nyuni
0.87 Tcf
0.49 Tcf
generators (3 new plants planned) and industrial end users, commercialisation closer
• Kiliwani North proven 40 Bcf gas 3 5 km
To Dar es Salaam Songo Songo East
Nyuni EastAmina
Imbi
• Kiliwani North proven 40 Bcf gas 3.5 km from gas plant
• Drilling Nyuni 2 in March/April 2011 targeting 0.87 Tcf up dip from known gas in
Songo Songo South
Songo SongoKiliwani North
Fanjove North
0.3 Tcf
targeting 0.87 Tcf up dip from known gas in Nyuni 1
• Fanjove North next well subject to successful transition zone seismic
Fanjove South
Deep South
programme defining top of structure
• All targets accessible from Islands0 5 10
Kilometres
Gas AccumulationLeadExploration Block f E
dge
9
Nyuni Block Tanzania
Exploration BlockDevelopment BlockOil SeepGas Pipeline
Shel
f
BUY 5%
Nyuni 2 - Targety g
_-2200
Nyuni 1 Nyuni 2
Albian Aptian
A B
___
-2300
-2400
-2500
Albian AptianNeocomianGas
15 m Gas Column in Albian Aptian Nyuni 1S
L ___
-2600
-2700
-2800
Gas Down to in Nyuni 1
Lowest Closing Contour
Albian Aptian Nyuni 1
met
res
AS
Substantial structure with four __
-2900
-3000
Lowest Closing ContourSubstantial structure, with four way dip closure
• Albian/Aptian age sands proven reservoir in Nyuni 1 and Neocomian age sands tested 40 MMcfg/day in Kiliwani North 1
• Neocomian main reservoir in Songo Songo Gas Field
• 20 km from Songo Songo Gas Plant
10
Success will add 8 MMboe to Bounty’s contingent resources
2011 Drilling - Utopia Developmentg p pWarragon
Kenmore
Black Stump0 5 10
Kilometres Utopia 1Utopia 2
Utopia 3
Utopia 5
Utopia 6Utopia 7
Utopia 8Utopia 9
Finnish 1
Monler North 1
Thunbunnee 1Cranstoun
Endeavour
Glenvale
Monler
KooyongUtopia 11H
Ufouria 1
Utopia 10
Utopia 8
• Utopia 10 successfully intersected the reservoir but the stimulation
Sirius (Qld) 1
Toolerah Creek 1
Nudgee 1
Talgeberry
Minni Ritchi
Tintaburra
Marcoola
Tarbat/Ipundu
Gimboola
Mulberry
Ballera
Utopia 11H
the reservoir but the stimulation caused high water cut.
• Utopia 11H is a short leg horizontal from Ufouria 1 to Utopia 1. Drilling
PL 214ATP 560P
U
Ufouria 1
Seagoon 1
g y
Toobunyah
Kooroopa
Kooroopa North
Takyah Utopia
Ballera
MoombaJackson
Utopia 10delayed by wet weather – April 2011
• Completed 3D to give framework for further development wells later
Minedella 1 Utopia 4
Hakheem 1
Currawinya 1 Muginanullah 1
ZenoniOil FieldLeadGas PipelineOil Pi li
Utopia 11H
11
for further development wells later in 2011
Targeting wells with 100 – 150 bopd production
Aros 1 & 2
Oil Pipeline
2011 Drilling Naccowlahg
259P N PL 87PL 182
82
• Two successful wells drilled in 2010, Watson West 1 and Irtalie East 1.
• One exploration and one development PitcheryPL 25
PL 62
79 105PL 109PL 175
181
PL 189
107149 ATP 259P N
well planned for 2012
• Two new completions and three new connections will ensure production (weather permitting) at a substantially
Bogala
GunnaJackson
KarriNaccowlah West
Pitchery
TinpillaWilson
Naccowlah South
PL 23PL 26
ATP 259P N (weather permitting) at a substantially higher rate than in 2010
• Naccowlah will provide revenue in excess of $1 million per annum
Cooroo North
C ll
Jackson South Koora
Nockatunga
Thungo
Wallawanny NorthWinna
Kihee
JarrarDilkera
PL 24
PL 76
77
ATP 259P N
PL 36
I t li E t 1 excess of $1 million per annumCorella
Echuburra
Maxwell
0 10 20
Kilometres
78133
Irtalie East 1
Wandilo
G N th
Minos
TennaperraTennaperra
Watson
Kilometres
PL 35Watson West 1
12
Naccowlah acquisition adds oil reserves
Genoa
Genoa NorthWatson South
2011 Drilling - Surat Basin QLD Oil Fairway
• Developing seriatim of oil
g Q yGas FieldOil FieldGas Prospect/LeadOil Prospect/LeadBoxvale Prospect/LeadP d ti Li
p gprospects in the southern Surat Basin
• Ewokk and Eluanbrook are up
SuratProduction LicenceGas PipelineOil PipelineWell with Oil ShowWell With Oil and Gas Show
dip from hydrocarbons in the Showgrounds Sandstone
• Mardi is migration focus in Boxvale Sandstone up dip from WaggambaMardi 0.33 MMbo
Bellbird Oil FieldTwo wells oil to surfacepossibly 2 MMbOIP
Ungabilla 1
Boxvale Sandstone up dip from Showgrounds zero edge, surrounded by oil fields
• Acquiring 3D seismic over
Oil Fairway
Waggamba
Alton
Mardi 0.33 MMbo
Bellbird
Acquiring 3D seismic over Ewokk to define drilling target for later 2011
• Bellbird Oil Field, two wells
Eluanbrook 0.3 MMboEwokk 0.36 MMbo
Cockatoo 1Fairymount
flowed oil to surface, unconventional reservoir
ATP754P
13
Over 1 MMbblo recoverable in targets identified to date
2011 Drilling – Bee Eaterg
Gearle Siltstone
R diolarite
Bee Easter ProspectSchematic
RivoliWindalia Radiolarite
Muderong Shale
Trap
tion -lt Birdrong SandstoneOil migration
inception post fault
pre Rough Range Anticline
Rough RangeBee Eater
EP 435 - 10%EP 359 - 10%
• Drilling Bee Eater 1 in 2011 ? ?
• 5MMbbl oil target with structure timed for oil chargeOil Field
Gas Field
Rough Range
PL L16 - 10%
• Success would mean early production through granted production licence
• Possible shale gas play in Patterson Trough
Lead
EP 412 - 65%EP 359 - 10%
west of Rough Range
0 10 20
14
Carnarvon Basin onshore targeting 5 MMbblo
Kilometres
BUY will see Ongoing Growth and Core Developmentp
2012
AC/P 322011
ATP 789
NyuniTanzania
EP 359,412 & 435
2011
2011/12
2012
ATP 789
ProductionExplorationHigh Impact Exploration
PEP 11
412 & 435
UtopiaSurat
PEL 218Naccowlah
2011
Ongoing
2012/13
• Growth Project high impact drilling will continue through to 2013, each with company making targets
PEP 11Ongoing
• Core oil development, appraisal and near field exploration will continue with steady revenue increases and drilling through and to 2012-13
• Basics will drive BUY Share Price Growth
15
BUY looking to Price Growth