Binding Finisher MB-1000C-NA MB-1000C-EU Installation Procedure When installing this product, follow these instructions. (Make sure to perform the actual work with at least 2 people.) NOTE : THE FINISHER MUST BE INSTALLED BY A CUSTOMER SERVICE REPRESENTATIVE WHO HAS COMPLETED THE TRAINING COURSES ON THE BASE COPIER AND THE UNIT.

Upload: others

Post on 20-Apr-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

Binding FinisherMB-1000C-NAMB-1000C-EU

Installation Procedure When installing this product, follow these instructions.

(Make sure to perform the actual work with at least 2 people.)

NOTE : THE FINISHER MUST BE INSTALLED BY A CUSTOMER SERVICE REPRESENTATIVE WHO HAS COMPLETED THE TRAINING COURSES ON THE BASE COPIER AND THE UNIT.

C03030
Typewritten Text
April 18, 2014
C03030
Typewritten Text
Revision 1
C03030
Typewritten Text
Page 2: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

Read this first

1

These Installation Procedure instructions use indications to help you safely perform installation. The meaning of each indication is explained below.

Indicates a potentially hazardous situation which, if not avoided, could result in death or serious injury.

Emphasizes essential information.

Indicates a potentially hazardous situation which, if not avoided, may result in minor or moderate injury.

WARNING

CAUTION

About indications

Page 3: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

Ring opener

Rebinding board

Interface cable

Upper side cover

Lower side cover

Slope

Finisher door cover

Tapping screw 3x6

Spanner 24-19

Equipment/Accessories Equipment/AccessoriesNo. No.

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

Warranty/Guarantee card (NA only)

DFD docking bracket for upstream

DFD docking bracket for down

Operation manual

+Screw 4×6

Installation procedure

AC power cord

Cartridge label

Cartridge

CD (Operation manual)

1

1

1

1

1

2

1

11

1

1

1

1

1

7

1

1

1

1

1

Checking supplied items

7

11

19

10

1 2

4

6

5

18

98

13

16

12

3

17

14 15

2

* This is already installedin the unit.

20

Safety information20 1

* NA only

Page 4: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

Installation space

The dimensions in the diagram below indicate the minimum amount of space that is necessary.

300mmor

more

900mmor

more

DOWN UP

(860mm)

3

If this unit is the last downstream unit, leave the space indicated below open.

UP

30mm or more

Page 5: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

(2) Remove the included items.

(1) Remove the cover of the cardboard box.

Cut the plastic band and remove the cover of the cardboard box.

(3) Remove the side cover of the cardboard box, and then remove the upper cover of the cardboard box.

(4) Remove the tape at the top of the plastic cover, and then open and pull down the plastic cover.

Remove all of the included items.

Remove the side cover of the cardboard box.Remove the upper cover of the cardboard box

Directions for opening the cardboard box

4

Page 6: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

(5) Cut the tape at the bottom 4 corners of the cardboard box and open the corners.

(6) Extend the length of the 4 casters at the bottom.

(7) Secure the casters into place.

When the base of the product is 100 mm from the base of the cardboard box, secure the upper nut by rotating it anticlockwise.

Position after unboxing Extend the caster by rotating the lower nut clockwise.

Use the supplied spanner to loosen the upper nut by rotating it clockwise. (View from the top)

100mm

5

Page 7: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

(9) Remove the cardboard from the upper side.

(10) Place the supplied slopes at the 2 locations on the upper side indicated in the illustration.

Remove the cardboard from the upstream side by cutting at the locations indicated with dotted lines.

There are no dotted lines on the actual cardboard box.

Slope

(8) Remove the 2 pieces of cardboard packaging from the bottom center of the product.

There two locations are at the front and back.

Align the edge of the slope with the position indicated by the arrow.

6

Page 8: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

(11) Lower the product from the upper side.

(12) Check that the heights of the entrance and exit are 860 mm from the floor.

Make sure to hold the product by the locations indicated with dotted lines.

If the heights are not 860 mm, perform steps (6) and (7).

Perform adjustments based on the floor of the installation area.

860mm

860mm

CAUTION

7

Page 9: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

(3) Remove the tape.

(1) Remove the 2 brackets from the upstream side.

(2) Remove the bracket from below the right door.

Remove the 4 screws.Remove the 4 screws.

Remove the 2 screws.

(4) Open the right door, and remove the bracket from the bottom of the right door.

Check that all connected devices are turned OFF, and that the power plug is disconnected from the power outlet.

Directions for installing the Binding Finisher

Remove the 2 screws.

WARNING

8

Page 10: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

(5) Open the doors and remove the tape and cushion.

(6) Attach the Upper side cover to the upper side.

· Remove the binder unit. (A)· Remove each piece of tape.· Open the door and pull out thecartridge. (B)

· Remove the cushion inside.

· Tighten the upper-right screw first.Tapping screw 3×6

A

B

9

Page 11: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

(7) Attach the Lower side cover to the downstream side.

(8) Open the supplied cardboard box.

(9) Attach the DFD docking bracket for upstream to the bottom of the upper side.

Tighten the screws in the order indicated above.

Secure these 4 locations with screws.

Insert this into the holes in the top. Hang it on the hooks.

Tapping screw 3×6

screw 4×6

Base

(1)

(3)

(4)(2)

· Tighten the upper-right screw first.

10

Page 12: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

(10) Insert the Cartridge label into the cartridge.

11

Page 13: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

If there are devices connected to the downstream unit side (refer to the installation manual of the downstream unit)

Secure these 3 locations with screws.

(1) If using a DFD-specification downstream unit, attach the DFD docking bracket for down to the bottom of the downstream side.

(2) If using a Canon V-series FINISHER

(1)(2) (3)

Tapping screw 4×6

Align the unit embossment and the holes of the FINISHER Door Cover, and secure the 3 locations with screws.

Tapping screw 3×6

Secure these 3 locations with screws.

Align this with the holes in the embossment.

12

Insert this into the holes in the top. Hang it on the hooks.

Base

Page 14: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

(1) Remove the screw from the DFD docking bracket.

(2) Connect the unit to the upstream unit.

(3) Lock the connector and secure it.

Remove the screw.Pull it forward.

Push the lever all the way inward. Secure it with a screw.

Connecting the Binding Finisher to the upstream unit

13

Page 15: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

(4) From behind the unit, connect the power cord and the cable for the upstream unit.

Check that the ground fault breaker switch is set to the right position, and connect the power cord.

Connect the power cord.

Secure these 2 locationswith screws.

Connection with upstream unit

Connection with downstream unit

Object/part No. technical data

Power Supply Cord (for EU) Detachable SVT type, maximum 4.5 m long, minimum 125V, 10A. One end terminates in parallel-blade (NEMA 5-15P) attachment plug, other end in appliance coupler.

CAUTIONThe soket-outlet shall be installed near the equipment and be easily accesible.

14

Page 16: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

If there is any downstream finishing unit after the Max binder, it is imperative that you perform the following procedure.(1) Press the power switch to turn on the power and close the front door.

(3) If "Pass Code?" is displayed, press the SET key, enter 5050 for the number area currently displayed as 0000 by using the arrow keys, and press the SET key.

(4) Press the up and down arrow keys to select "Bypass Speed", and press the SET key.

If the cursor is displayed in the number area, enter values based on the downstream unit by using the arrow keys, and press the SET key. (The unit of speed is mm/sec.)

Adjust the bypass speed setting depend on the main printer device.

Refer to “LCD Display and Special operation” in the service manual for more information on connectable devices and the value of the bypass speed.

LCD

Set this to the up position.

(2) Press the left key when "Bind", "Bypass" or "Punch" is displayed in the operation panel's LCD.

15

Page 17: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

(7) Press the ESC key 2 times, and check if "Bind", "Bypass" or "Punch" is displayed in the LCD to complete the procedure.

CAUTIONInput values by following the settings of the downstream unit.

· To update the software version, refer to the service manual.· If the punch location and the ring location are not aligned, refer to the side register adjustment in

the service manual.

(5)Press the up and down arrow keys to select “Bypass Type?” and press the SET key.(6) Press the up and down arrow keys to select “Non-DFD” and press the SET key. If this is set to any other selection you will get a message on the varioPRINT UI “Check Max Binder”

If the center of the upstream unit transfer and the center of the Binding Finisher transfer are unaligned, paper jams or binding problems may occur. Perform the following check and adjust the unaligned equipment.How to Check the Alignment(1) If the Binding Finisher is the unit fartherst downstream, go to (3).(2) Separate the unit on the downstream side and check from the downstream side of the Binding

Finisher.(3) When using the Binding Finisher's "Bind" or "Punch" to print or bind, the paper should be visible

as in the illustration below. (The mark for A4 size paper is on the left and the mark for LT size paper is on the right.)

When using A4 paper, if the edge of the paper is off of the center baseline by two marks, as in the illustration below, the center of the transfer is off of the baseline by 4 mm, towards the back.

Center baseline

Center baseline

LT size paper mark A4 size paper mark

16

Page 18: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

17

How to Adjust the Alignment(1) Separate the upstream unit and the Binding Finisher. (See page 13.)(2) Remove screw 1 from the DFD docking bracket and loosen screws 2, 3, and 4.

(3) Slide the DFD docking bracket to the back side and the front side, and align it with the center.

(4) Tighten 3 screws (screw 2, 3, and 4), and see page 13 to connect the unit to the upstream unit.

As a screw will be leftover, be sure to keep it in storage.

2

3

4

2

3

4

1

If the Binding Finisher is set up to eject finished documents to the rightWith some copiers, the Binding Finisher can be set up to eject finished documents to the right.This requires changes to parts and the control software.

Documents ejected to the left Documents ejected to the right

Afterchanges

Page 19: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

― 18 ―

The Bypass mode cannot be used when the Binding Finisher is set up to eject finished documents to the right.

Caution

Comparison of specifications

Document ejection direction

Incoming sheet rate

Internal feeding rate (Bypass)

Internal feeding rate (Binding/Punching)

Upstream unit

Max. supported printing speed

Downstream unit

Availablemodes

Bypass

Binding

Punching

Document ejection to left

To left

920

105

950-1600

1030

Stacker

None or finisher

To right

920

105

1030

Stacker

None

Document ejection to right

mm/s

ppm

mm/s

mm/s

Page 20: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

― 19 ―

Parts for conversion to document ejection to the right

Parts to be changed out or added

Safety precaution

The Finisher must be installed by a customer service representative who has completed the training courses on the base copier and the unit.

Right side cover

Docking bracket

Docking bracket

Top transfer guide

Bottom transfer guide

Add because FB is farthest downstream unit

Change because upstream unit is on other side

Install because documents are transferred in opposite direction

Install because documents are transferred in opposite direction

Right side cover

Top transfer guide

Bottom transfer guide

Part Note

Page 21: Binding Finisher - Canon Globaldownloads.canon.com/isg_manuals/Max_Ring_Binder_Installation_Procedure... · (1) If the Binding Finisher is the unit fartherst downstream, go to (3)

N1212G0000 PRINTED IN JAPAN

This instruction manual is subject to change without notice due to functional enhancement.