    SmartSmartSmartSmartMMMMeteringeteringeteringeteringWANWANWANWANCCCCommunicationsommunicationsommunicationsommunicationsRRRRequirementsequirementsequirementsequirements

    Author(s)Author(s)Author(s)Author(s) AlastairManson

    DocumentDocumentDocumentDocumentStatusStatusStatusStatus

    Draft

    DocumentRef.DocumentRef.DocumentRef.DocumentRef.No.No.No.No.

    WANCOMMSRQTS

    DocumentDocumentDocumentDocumentVersionVersionVersionVersion

    0_2

  • 8/14/2019 BERR WAN Comms requirements 0 2

    2/32

    WANCommunications Version0_2

    TableofContentsTableofContentsTableofContentsTableofContentsTableofContents.............................................................................................2 DocumentControl ............................................................................................31.1 VersionHistory .................................................................................. 31.2 RelatedDocuments ........................................................................... 31.3 IntellectualPropertyRightsandCopyright.........................................3 1.4 Disclaimer..........................................................................................3

    2 ExecutiveSummaryandIntroduction .......................................................42.1 ExecutiveSummary...........................................................................4 2.2 Purpose .............................................................................................42.3 Scope ................................................................................................52.4 Objective............................................................................................6 2.5 FutureDevelopment .......................................................................... 6

    3 Glossary&Conventions ...........................................................................73.1 DocumentConventions&Assumptions.............................................7 3.1.1 ConventionsforDiagrams .......................................................... 73.1.2 MarketSegments .......................................................................73.1.3 MeterFunctionality .....................................................................73.1.4 MeterLocation............................................................................8 3.1.5 MeterandMeteringSystem........................................................8 3.1.6 CommunicationsforEachFuel.................................................10 3.1.7 TwoTypesofCommunicationforSmartMetering?..................10

    3.2 Glossary ..........................................................................................123.3 Assumptions .................................................................................... 15

    4 ApproachandScope ..............................................................................164.1 Approach .........................................................................................164.2

    Actors ..............................................................................................16

    4.3 Scopeofsolution ............................................................................. 18

    5 GeneralRequirements............................................................................20 6 RequirementsofActors ..........................................................................236.1 Supplier ...........................................................................................236.2 Consumer ........................................................................................276.3 Network/DistributerUse.................................................................28 6.4 3rdpartyserviceprovider .................................................................296.5 Microgeneration...............................................................................29 6.6 Appliances .......................................................................................306.7 Display.............................................................................................30 6.8 Installer/Maintainer ........................................................................30

    7 TrafficFlowDescription .......................................................................... 30

  • 8/14/2019 BERR WAN Comms requirements 0 2

    3/32

    WANCommunications Version0_2

    DocumentControlDocumentControlDocumentControlDocumentControl

    1.11.11.11.1 VersionHistoryVersionHistoryVersionHistoryVersionHistoryVersion Date Author Description

    0_1 14July2008 AlastairManson Initialdraft

    0_2 24July2008 AlastairManson UpdatedfollowingBERRsWANcommunicationsworkshop22July2008.

    1.21.21.21.2 RelatedDocumentsRelatedDocumentsRelatedDocumentsRelatedDocumentsDocumentTitle Version Author Date

    SmartMeteringOperationalFramework,proposalsandoptions

    V1 ERASRSMProject

    August2008

    WANCommunicationsOptionsDefinition

    ERASRSMProjectforBERR

    July2008

    1.31.31.31.3 IntellectualPropertyRIntellectualPropertyRIntellectualPropertyRIntellectualPropertyRightsandCopyrightightsandCopyrightightsandCopyrightightsandCopyrightAllrightsincludingcopyrightinthisdocumentortheinformationcontainedinitareownedbytheEnergyRetailAssociationanditsmembers.Allcopyrightandothernoticescontainedintheoriginalmaterialmustberetainedonanycopythatyoumake.Allotheruseisprohibited.AllotherrightsoftheEnergyRetailAssociationanditsmembersarereserved.

    1.41.41.41.4 DisclaimerDisclaimerDisclaimerDisclaimerThisdocumentpresentstheRequirementsofWANcommunicationsforsmartmeteringinGreatBritainfordiscussion.Itdoesnotrepresentafinalstatementofrequirements.Wehaveusedreasonableendeavourstoensuretheaccuracyofthecontentsofthedocumentbutoffernowarranties(expressorimplied)inrespectofitsaccuracyorthattheproposalsoroptionswillwork.Totheextentpermittedbylaw,theEnergyRetailAssociationanditsmembersdo

    notacceptliabilityforanylosswhichmayarisefromrelianceuponinformationcontainedinthisdocument.Thisdocumentispresentedforinformationpurposesonlyandnoneoftheinformation,proposalsandoptionspresentedhereinconstitutesanoffer.

  • 8/14/2019 BERR WAN Comms requirements 0 2

    4/32

    WANCommunications Version0_2

    2222 EEEExecutiveSummaryandxecutiveSummaryandxecutiveSummaryandxecutiveSummaryandIntroductionIntroductionIntroductionIntroduction

    2.12.12.12.1 ExecutiveSummaryExecutiveSummaryExecutiveSummaryExecutiveSummaryThisdocumentisaproductoftheWideAreaNetwork(WAN)Communicationsworkstream,partofthewiderprojectundertakenbyBERRtoconsidersmartmetering.TheProjectInitiationDocumentforthisworkstreamstatedthatAbetterdescriptionofthecommunicationsoptionsandtheirrequirementswillenable

    theimpactonmarketmodelsforeachoptiontobebetterunderstood,e.g.constraints,drivers,issues,risks.ThisdocumentcollatesthegeneralrequirementsofsmartmeteringWANcommunicationsalongwiththerequirementsofkeypartiesthatwilluseorinteractwiththesmartmeteringWANcommunications.Theapproachhasbeentoconsidertherequirementsofsuppliersandthentolookatotherpartiesinturnforwhethertheyhaveadditionalrequirementsorcanrefinethoseofthesupplier.Anumberofpartiesneedtoexchangedatawithsmartmetersanddeviceslocaltothosemeters.Therearerequirementsforaccesstothatdataexchangetobecontrolledandsecureandforstandardsofservicetobeagreed.PartiesotherthansupplierswillgenerallyhavesimilarrequirementsofWANcommunicationsbutmayinsomecasesrequiregreaterperformance.Partiesthatinstallandmaintaincomponentsofthesmartmeteringsystemwill

    haverequirementsthatdifferfromthosewhopurelyusethecommunications.ConsumerswillhaveadditionalrequirementsthatsmartmeteringWANcommunicationshavenodetrimentaleffectonthem.ThekeypurposeistohelpprogresstowardacommonunderstandingandtofacilitatediscussionbetweenpartiesinterestedintheuseofsmartmeteringinGB.

    2.22.22.22.2 PurposePurposePurposePurposeThisdocumentdescribesrequirementsoftheWANcommunicationsforsmartmeteringinBritain.Itskeypurposeistohelpprogresstowardacommonunderstandingandtofacilitatediscussionbetweenpartiesinterestedinthe

  • 8/14/2019 BERR WAN Comms requirements 0 2

    5/32

    WANCommunications Version0_2

    Itisnotabnormalwhenpurchasingratherthanbuildingcomplexsolutionsthattheoptionsneedtobeweighedupagainstcostforhowwelltheydeliverorconstraintherequirements.

    Prematurespecificationisundesirableinanycaseasitislikelytocreatefalseconstraints.ThispapercollectstheWANcommunicationsrequirementsintoasingledocument.Theconsolidatedstatementofrequirementsistobeusedasthebasisfordiscussionandisexpectedtoberefinedinfuturework.The objective is to promote a broad common level of understanding ratherthan to nail down a technical specification. This document avoids usingtechnical jargon as these are requirements that need to be understandable toa wide range of stakeholders.

    2.32.32.32.3 ScopeScopeScopeScopeThescopeofthisdocumentconsistsoftherequirementsfortwoway

    communicationsbetweensmartgasandelectricitymetersandauthorisedpartiesinGreatBritainandtherequirementsofthosepartiesthatmaybeaffectedbythoseWANcommunications.Thisincludeswherethecommunicationsmaybefortheultimatepurposeofcommunicatingwithanotherdevicelocaltothemeter.ThediagrambelowshowstheSRSMviewofthescopeofsmartmetering,andtheplaceofWANCommunicationswithinthatscope:

    DataTranspo

    rt

    (internet)

    Industry

    Interf

    aces

  • 8/14/2019 BERR WAN Comms requirements 0 2

    6/32

    WANCommunications Version0_2

    Itisnotedthattherequirementsandavailableoptionsarelikelytoflexovertimeastechnologyandcommercialarrangementsadapttowhatisessentially

    anewGBmarketformeteringcommunications.Thisdocumentdoesnotconsiderthecommercialorcontractingarrangementsorimplicationsfortheprovisionofsmartmeteringcommunicationsservices.

    2.42.42.42.4 ObjectiveObjectiveObjectiveObjectiveTheobjectivesoftheWANCommunicationsworkstreamaspartofthewiderBERRactivitieshavebeenagreedasfollows::

    TheobjectiveoftheWANCommunicationsworkstreamofworkistodeliverabetterunderstandingoftheWANCommunicationsoptionsandtheirpotentialimpactonmarketmodelstofeedintoPhase2evaluationofmarketmodels.

    Abetterdescriptionofthecommunicationsoptionsandtheirrequirementswillenabletheimpactonmarketmodelsforeachoptiontobebetterunderstood,e.g.constraints,drivers,issues,risks.

    Whatarethepracticalimplicationsofoperatingdifferentcommunications

    optionswithinthedifferentmarketmodels?ThisisaquestionthatcanbestartedinPhase1,butwillhavetobeansweredinmoredetailinPhase2.

    TheoutputfromthisworkstreamwillfeedintothemarketmodelevaluationplannedforPhase2.

    Akeyobjectiveofthisworkstreamistobringallstakeholderstoacommonlevelofunderstanding.

    2.52.52.52.5 FutureFutureFutureFutureDevelopmentDevelopmentDevelopmentDevelopmentItisexpectedthattherequirementsexpressedinthisdocumentwillberefinedaspartiesotherthansuppliersexpresstheirexpectationofusingsmartmeteringcapabilities.Therequirementswillbeinfluencedbytheactualcapabilitiesofsolutionsandthismayintroduceconstraints.

  • 8/14/2019 BERR WAN Comms requirements 0 2

    7/32

    WANCommunications Version0_2

    3333 GlossaryGlossaryGlossaryGlossary&Conventions&Conventions&Conventions&Conventions

    3.13.13.13.1 DocumentConventionsDocumentConventionsDocumentConventionsDocumentConventions&Assumptions&Assumptions&Assumptions&AssumptionsTheERASRSMprojecthasbeenrunningsinceSeptember2006,andhasestablishedanumberofpracticalconventionsandassumptionswithregardtosmartmetering.TheprojectpublishedProposalsandOptionsforaSmartMeteringOperationalFrameworkinAugust2007thisdocumentisover300pagesin

    lengthandpresentscomprehensiveproposalstomeetthepracticalitiesofoperatingsmartmeteringinacompetitiveretailenvironment.Thefollowingsubsectionsgiveabriefoverviewofanumberofthesetopics.ForamorecompletesummaryoftheSmartMeteringOperationalFramework,pleasevisithttp://www.energy-retail.org.uk/smartmetersThroughoutthisdocumentmaterialsfromspecificserviceprovidersorexistingimplementationsareused.Thisistoillustratetheconceptsorcontextunderconsideration,andinnowayadvocatestheseapproachesandproductsaspreferredsolutionsorapplications.Theuseofsuchillustrationsissimplytomeetakeyobjectiveofestablishingacommonunderstandingoftheoptionstosupportfurtherdiscussion.

    3.1.13.1.13.1.13.1.1 ConventionsforDiagramsConventionsforDiagramsConventionsforDiagramsConventionsforDiagramsAlongsidetheconventionslistedbelow,thefollowingstandardapproacheshavebeenusedwithindiagrams.

    Wiredphysicalconnectionsareshownusingasolidline Wirelessphysicalconnectionsareshownusingadottedline

    Alldiagramswithinthisdocumentareillustrativeofthesubjectunderconsiderationandarenotintendedtorepresenttechnical,architecturalorschematicdepictionsofactualsituations.

    3.1.23.1.23.1.23.1.2 MarketSegmentsMarketSegmentsMarketSegmentsMarketSegments

    TheOperationalFrameworkhasbeenwrittentoaddresstherequirementsofenergySuppliersinthedomesticretailmarkets.However,itrecognisesthatmetersusedinhomescanactuallybeexactlythesameasmetersusedinbusinesses,andthereforetheOperationalFrameworkproposalscouldapply.Therefore,withinthisdocument,thecommunicationsoptionsdiscussedcould

  • 8/14/2019 BERR WAN Comms requirements 0 2

    8/32

    WANCommunications Version0_2

    electricitysmartmeters.TheserequirementsdonotrepresentfinalproposalsandarepresentedheretogivecontexttotheWANCommunicationsdiscussions.

    2WayCommunicationsWANandLocal(seebelow)

    Intervalmeasurementandstorageofconsumptiondata

    Supportforflexibleandconfigurableenergytariffs

    Interoperabledataexchangeandprotocols

    Remoteconnection/disconnection1

    Supportforprepayment/payasyougooperation(subjecttothefootnoteabove)

    Supportformicrogeneration Provisionofconsumptioninformation

    Remoteconfigurationoftariffs,meteroperations,upgradeablefirmwareetc.

    3.1.43.1.43.1.43.1.4 MeterLocationMeterLocationMeterLocationMeterLocationThroughout,thisdocumentrefersmainlytotheHomeandusesillustrationsofhousestorepresentlocationsformeterpoints.However,smartmetersand

    thecommunicationssolutionoptionslistedherecouldapplyequallytootherdomesticandnon-domesticpremisestypes.

    Figure2:SmartMeterLocationsTheERASmartMeteringOperationalFrameworkdocumentationspecifiesdomestic-sizedmetering,andsuchmeterscouldbeinstalledinanytypeofpropertywhereenergyconsumptioniswithintheload/capacitycapabilityofsuchmeters.TheOperationalFrameworkincludesanumberofMeterVariants,usuallyto

    accommodatespecificenergysupplyrequirementsofameteringpointe.g.polyphaseelectricitysupplyorasemiconcealedgasmeterlocation(seedefinitionofMeterVariantbelow).Itisalsothecasethattheplacementandlocationofmetersasshownindiagramsisillustrative.

  • 8/14/2019 BERR WAN Comms requirements 0 2

    9/32

    WANCommunications Version0_2

    ofthefunctionalityiscontainedwithinonebox.ThereisregularuseofapictureofanelectricitysmartmetertorepresentsmartMeteringSystems.

    Smart Metering

    Systems, with all

    the functionality,

    includingcommunications

    under the glass

    Metering System

    using a separate

    black box (or

    boxes) to deliverfunctionality

    Metering System

    using a separate

    black box and

    external antennato deliver

    functionality

    Illustration of how fuels could share

    (with suitable commercial

    arrangements) a single set of black

    box(es) to deliver functionality

    Smart Metering Systems Illustration of Flexible Approaches

    In all cases, the metrology functions must be delivered by a regulated measuring instrument.

    The required functionality could be delivered by components:

    - within the meter casing;

    - through the use of one or more new hardware components (in conjunction with new meters

    or retrofitted to existing); or

    - external hardware components shared between fuels.

    Generally, no component of the smart Metering System will be reliant upon equipment

    owned by the customer (e.g. broadband router), or services under the control of the

    customer (e.g. telephony provider). There may be individual circumstances where use of the

    customers equipment is unavoidable (customer chooses to own the meter, or particularly

    within a non-domestic context where additional energy supply contractual terms can be

    applied).

    Software

    + +

    +

    +

    +

    Figure3:SmartMeteringSystems,IllustrationofFlexibleApproaches

    Asdefinedbelow,asmartmeteringsystemcouldcompriseanumberofphysicaldevices(externalmodems,antennasetc.)todeliverthesmartfunctionalityrequirements.Thepotentialvarietyofphysicallocationsandconditionsofmeteringpointscould result in smart metering systems where components are not located

  • 8/14/2019 BERR WAN Comms requirements 0 2

    10/32

    WANCommunications Version0_2

    3.1.63.1.63.1.63.1.6 CommunicationsforEachFuelCommunicationsforEachFuelCommunicationsforEachFuelCommunicationsforEachFuel

    ThereareanumberofpotentialapproachestodeliveringWANinfrastructurestobothgasandelectricitymetering.Asdiscussedabove,thismayinvolve

    additionalcommunicationsequipment.Shownbelowarethetwobasicapproachesautonomyandthepiggy-back,bothofwhichareequallyvalidwhenconsideringWANcommunicationsoptions.Someoftheoptionspresentednaturallyfavouroneorotheroftheseapproaches,somecanbeagnostic.Thepiggy-backapproachpresentsadvantagestokeyconcernswithgasmeterpowerconsumption,butcreatesinteroperability,datastorageandnetworkoperationchallengesforelectricity

    meters.Inthepiggy-backoption,theelectricitymeteriseffectivelypartofthegasmeteringsystem.

    Figure4WANConnectionsforBothFuels

    3.1.73.1.73.1.73.1.7 TwoTypesofCommunicationforSmartMetering?TwoTypesofCommunicationforSmartMetering?TwoTypesofCommunicationforSmartMetering?TwoTypesofCommunicationforSmartMetering?ThisdocumentspecificallyaddressestheoptionsforWANcommunications,i.e.fromthemetertoaremoteparty.Therearerequirementsandexpectationsofsmartmeterstodelivercommunicationsfunctionalitylocally,

    i.e.fromthemetertoahomedisplay,ormicrogenerationdevice,orameterfromadifferentutility.

  • 8/14/2019 BERR WAN Comms requirements 0 2

    11/32

  • 8/14/2019 BERR WAN Comms requirements 0 2

    12/32

    WANCommunications Version0_2

    TheERASRSMProjecthasbeenfacilitatingaworkstreamtospecificallyconsidertheoptionsforLocalCommunicationsforSmartMetering.This

    workstreamincludesexpertsfrommeteringandcommunicationsorganisationsandisexpectedtodeliveranevaluationandrecommendationreportinSeptember2008.Detailsonthisworkstreamareavailablefromhttp://www.srsmlocalcomms.wetpaint.comWhilstitmayseemtobetheoptimumapproachtohaveonecommunicatingcomponentwithinasmartmeter,forexampleWANandLocalCommunicationsaredeliveredusinglowpowerradiohardwarewithinthemeter,unlessthesolutionoptionmeetsalloftherequirementsforbothapplications,theremaybeanargumentforincludingtwocommunicatingcomponents.ThishasbeentheapproachinsomeinternationalexamplesrequiringLocalCommunicationsconnectivity.However,theseexampleshavetendedtoseetheLocalelementaddedaftertheWANspecificationhasbeenset.

    3.23.23.23.2 GlossaryGlossaryGlossaryGlossaryAnumberofthesedefinitionsaresimilartothoseusedwithintheOperationalFramework.

    TermTermTermTerm MeaningMeaningMeaningMeaning

    AccessControl ThemethodbywhichtheOperationalFrameworkcontrolsaccesstosmartMeteringSystems,smartmeteringdataandassociateddevices.

    AuthorisedParty MeanstheSupplieroranotherpersonauthorisedbyconfigurationoftheAccessControlsecuritypoliciesintheMeteringSystemtointerrogateorconfiguretheMeteringSystem.

    AuthorisedPartiescouldincludeacommunicationsserviceprovider,ameteroperator,anetworkoperatoretc.

    DataExchange ElectronicinteractionsincludingthetransmissionofdatabetweenMeteringSystemsandAuthorisedPartiesorMeteringSystemsandLocalDevices

    DLMS DeviceLanguageMessageSpecificationEuropeandata

    protocolformetercommunications

    ERA EnergyRetailAssociation,thetradeassociationrepresentingthesixmajorenergySuppliersinBritain.

    ETSI EuropeanTelecommunicationsStandardsInstituteinternationalstandardsbody

    IEEE Institute of Electrical and Electronics Engineers

  • 8/14/2019 BERR WAN Comms requirements 0 2

    13/32

    WANCommunications Version0_2

    TermTermTermTerm MeaningMeaningMeaningMeaning

    LocalCommunications

    CommunicationsbetweenaMeteringSystemandLocalDeviceswithinthepremisesinwhichtheMeteringSystemis

    installed.LocalDevice ALocalDevicecanbeanypieceofequipmentwithin

    premisesthatcommunicatesdirectlywiththeMeteringSystemusingLocalCommunications.

    MeteringSystem Asingledeviceormeter,oracombinationofdevicesusedtodelivertheLowestCommonDenominatorasdefinedintheOperationalFramework-SmartMeterFunctionalSpecification.

    MeterVariant ClassificationofmetertypeundertheOperationalFramework.AStandardvariantissuitableforinstallationatthemajorityofmeterpointsinGreatBritain.Othervariantsexisttocoverspecificsupply,circuitorcustomerissuesatasite.

    ExamplesincludePolyphase,Semi-Concealedor5Terminalvariants.

    ThefulltableofMeterVariantscanbefoundintheSmartMeterFunctionalSpecification.

    MeterWorker AgenericOperationalFrameworktermreferringtoanypersonattendingameteringpointforthepurposesofinstallation,maintenance,investigation,replacementorremovaloftheMeteringSystem.

    IncludesexistingenergyindustrydefinedrolesofMeterOperator,MeterAssetMaintainer,MeterReader,DataRetrieveretc.

    OpenStandard TheEuropeanUniondefinitionofanopenstandard(taken

    fromEuropeanInteroperabilityFrameworkforpan-EuropeaneGovernmentServices)is:

    Thestandardisadoptedandwillbemaintainedbyanot-for-profitorganisation,anditsongoingdevelopmentoccursonthebasisofanopendecision-makingprocedureavailabletoallinterestedparties(consensusormajoritydecisionetc.).

    Thestandardhasbeenpublishedandthestandardspecificationdocumentisavailableeitherfreelyorata

    nominalcharge.Itmustbepermissibletoalltocopy,distributeanduseitfornofeeoratanominalfee.

    Theintellectualproperty-i.e.patentspossiblypresent-of(partsof)thestandardismadeirrevocablyavailableonaroyalty-freebasis.

    Therearenoconstraintsonthere-useofthestandard.

  • 8/14/2019 BERR WAN Comms requirements 0 2

    14/32

    WANCommunications Version0_2

    TermTermTermTerm MeaningMeaningMeaningMeaning

    OperationalFramework.

    Ongoingatthetimeofdevelopingthisdocument

    Supplier Meansanenergyretailbusiness

    WAN(WideAreaNetwork)Communications

    CommunicationsbetweenaMeteringSystemandaremoteAuthorisedParty

  • 8/14/2019 BERR WAN Comms requirements 0 2

    15/32

    WANCommunications Version0_2

    3.33.33.33.3 AssumptionAssumptionAssumptionAssumptionssssWhilstdefiningtheWANCommunicationsoptions,anumberofassumptionshavebeenused.Thesearepresentedbelow:A.1. Allcommunicationsoptionsare(orwillbe)compliantwithrelevant

    legislationandregulationsA.2. SmartmeterfunctionalityisbroadlyequivalenttotheSRSMSmart

    MeterSpecificationA.3. WANCommunicationsoptionsaredefinedonlysofarastoreacha

    connectiontotheinternet.Architecturesandsystemsupstream,i.e.howanenergySupplieraccessesmeteringdata,aresubjectto

    separateconsiderationA.4. WANCommunicationsserviceprovisionwillincludenetwork

    managementactivitysuitabletothatnetwork,i.e.trafficandoutagemanagement,scheduling,faultresolution.

    A.5. Smartmeterswillallhaveunique(fixedordynamic)networkaddressesinaccordancewiththeprotocolstobeused

  • 8/14/2019 BERR WAN Comms requirements 0 2

    16/32

    WANCommunications Version0_2

    4444 ApproachApproachApproachApproachandScopeandScopeandScopeandScope

    4.14.14.14.1 ApproachApproachApproachApproachTheapproachtocollatingtheserequirementshasbeentoconsidertherequirementsofthewholeSmartmeteringsolutionforGreatBritain,thentoconsidertherequirementsfromthepointofviewofthedifferentpartiesordevicesthatmayuseorinteractwiththeSmartMeteringWANcommunications.

    Thesupplierrequirementsareconsideredfirst,asthisisapartywithknownexpectationsofusingsmartmeteringandthereareestablishedanddocumentedrequirementsofthisparty.Theotherpartieshavethenbeenconsideredinturnforwhethertheyhaveadditionalrequirementsorcanelaborateonthoseofthesuppliers.

    4.24.24.24.2 ActorsActorsActorsActorsTheSmartMeteringWANcommunicationsrequirementsarethoseofpartiesthatwillusethiscommunicationorwhomaybeaffectedbyit.Inusecasemethodologythetermactorisusedtodescribeparties,peopleorsystemsthatinteractwithasystem.Anactorisatypeofpartythatinteractswithasystemtheremayanynumberofinstancesofthatparty.ThefollowingactorshavebeenconsideredashavingkeyinteractionwithsmartmeteringandthereforebeinglikelytosetrequirementsoftheWANcommunications:

    Consumer

    Remotepartieso Suppliero Networkoperatoro 3rdpartyservice

    LocalDeviceso Homeapplianceso Displayo Microgeneration

    Installer/maintenance

    General or industry requirements

  • 8/14/2019 BERR WAN Comms requirements 0 2

    17/32

    WANCommunications Version0_2

    WAN Communications

    Supplier

    Network

    3rd party service provider

    Consumer

    Meter

    Appliances

    Communications Installer and Maintenance

    Microgeneration

    General

    Display

    Figure7ContextofActorsandWANComms

    ThecThecThecTheconsumeronsumeronsumeronsumerTheconsumermayinteractwiththemeterorlocaldevicesinactivitiesthat

    resultinWANdataexchange,theymayalsobeaffectedbytheWANcommunications,thefacilitiesthatsmartmeteringwillenableareoftenforthebenefitoftheconsumer.RemotepartiesRemotepartiesRemotepartiesRemotepartiesTheseinclude:

    AllSuppliersThesupplierforeachmeterchangesovertimewhenconsumersswitch

    Networkoperatorsthismaybefixedforanyonemeter

    3rdpartyserviceprovidersThisisacategorythatcoversanumberofservicesthatmaybechosenbythecustomersuchasenergymanagementservices,thesuppliersuchasmeterdataprocessingoranotherpartysuchasDNOorGT.

    These parties may exchange data with meters including data that may

  • 8/14/2019 BERR WAN Comms requirements 0 2

    18/32

    WANCommunications Version0_2

    Thesearedeviceslocaltothemeter,normallyinthesamepremises.Thesedevicesmayalsohavesomerelationshiptoaremoteparty.Thesedevicesareexpectedtoincludeameansofdisplayingenergyuseinformationbutmay

    alsoinclude: Appliances

    Microgenerationfacilitiesbutmayovertimeincludeahostofotherdevicesincludingpotentiallywatermetering.LocaldevicesmayhaveanumberofdifferentcommunicationsrelationshipswiththemeteringsystemTheoreticallytheymay:

    havetwowaycommunicationwiththemeteringsystem

    onlyreceivedatafromthemeteringsystem

    onlysenddatatothemeteringsystem

    CommunicatewithanotherpartyviathemeteringsystemGeneralGeneralGeneralGeneralAgeneralactorisincluded.Thisistoallowrequirementsthatdontbelongtoaspecificparticipantorofthosestakeholdersthatwillnotusethesystem

    directlytobecaptured.ThismayrepresentforexamplewherenationalorlocalGovernmentintendforpoliciestoberealisedviasmartmetering.Thisactormayimplementrequirementsbyobligationsplacedonotherparties.Newactorsshouldbedistinguishedwhenclearrequirementsareidentified.

    4.34.34.34.3 ScopeScopeScopeScopeofsolutionofsolutionofsolutionofsolutionThewholesolutionmustprovidetheWANcommunicationsbetweenthemeterpopulationandremoteauthorisedparties,includingwherethosecommunicationsareusedforthepurposeofdataexchangebetweenlocaldevices.RemotepartiesRemotepartiesRemotepartiesRemoteparties

    ThesearepartieswithsuitableauthorisationwhowillusetheWANcommunicationsfordataexchangewiththemeterorviathemetertootherdevices.Thenumberofauthorisedpartiesisnotknown,foreachmetering

    systemtheauthorisedpartieswillincludeasuccessionofsuppliers(oragentsactingontheirbehalf),itmayincludeindustrypartiesandagentschosenbythesupplierorconsumer.

    ThemeterpopulationThemeterpopulationThemeterpopulationThemeterpopulation

    ThisisprimarilythepopulationofdomesticGasandElectricitymeters

  • 8/14/2019 BERR WAN Comms requirements 0 2

    19/32

    WANCommunications Version0_2

    Note:metersmaybeconsideredalocaldevicetoanothermeter;thiscouldbemultiplemetersforthesameutilityinthesamepremisesor

    metersforanotherutility.Forexampleagasmeter(orwatermeter)mayhavenoWANcommunicationscapabilityofitsownandrelyontheelectricitymetertoprovideitsWANcommunications.Thesedevicesarenormallyinthesamepremisesasthemeteralthoughthelocalcommunicationsmechanismmaybeusedtoprovidecommunicationtodataconcentratorsoutsidethepremises.

  • 8/14/2019 BERR WAN Comms requirements 0 2

    20/32

    WANCommunications Version0_2

    5555 GeneralReGeneralReGeneralReGeneralRequirementsquirementsquirementsquirementsThissectionreflectstherequirementsofthewholesmartmeteringsolutionforGreatBritainratherthanthoseofaspecificparticipanttype.

    RefRefRefRef RequirementRequirementRequirementRequirement DetailsDetailsDetailsDetailsWG1 TheWANcommunicationsolutionmust

    providefordataexchangebetweensuitablyauthorisedpartiesandgasandelectricitymeteringsystemsofdomesticsizeintheGB

    population.Theremaybeanumberofpartiescontemporaneouslyauthorisedtoexchangedatawitheachmeteringsystem.

    WG2 TheWANcommunicationsolutionmustprovidefordataexchangebetweensuitably

    authorisedpartiesanddeviceslocaltothegasandelectricitymeteringsystemsintheGBpopulationviathosemeteringsystems.

    WG3 AccessControlItisessentialthatallinteractionwitheachsmartmeteringsystemviaWANCommunicationsberestrictedtothosewithsuitablerightstodoso.Theaccesscontrolmechanismmustmanage::

    WhocaninteractwitheachmeteringsystemusingWANcommunications(includingwherethisisdonetointeractwithlocaldevices)atanypointintime,

    Whatfunctionsapartyisallowedtouseand

    Whatdataapartymayread,writeordelete.

    Thismechanismmustexcludeaccesstothosewithoutsuitablerightsincludingwhererightshaveexpired.

    Itisnotedthatasolutioncould have nodespassing on informationpackets without the needto read those packets

    WG4 Interoperability Interoperability will need

  • 8/14/2019 BERR WAN Comms requirements 0 2

    21/32

    WANCommunications Version0_2

    RefRefRefRef RequirementRequirementRequirementRequirement DetailsDetailsDetailsDetails

    WG5 Utility robustAnytechnologyoptionthathasthepotentialfor

    customerinterferenceoradependencyonacustomerprovidedserviceisnotarobustutilitysolution.Itisessentialtohaveahighreliabilitysolutionforaservicethatistheresponsibilityoftheutilityserviceprovider,notthecustomer.Utilitiescouldnotbedependentonalevelofserviceforcommunicationsdeterminedby,ordrivenfor,thecustomer.Itislikelythatutilitieswouldhavetoconsideradditionalcommercial

    arrangementstomeetutility-robuststandardsofservice.Thereisnotarequirementforcommunicationstobecontinuouslyonbutthereislikelytobearequirementforveryhighavailability.

    WG6 GeographiccoverageTheWANcommunicationssolutionmust

    providecoverageforthewholeoftheGBarea.TheWANcommunicationssolutionmustprovidecoverageforcloseto100%ofpropertytypesandtopographicalvariations.

    ItisacknowledgedthattheWAN

    communicationsmaynotbedeliveredbyasinglesolutionornetworknationallyorinlocalareasbuttheoverallcoveragemustbecloseto100%,failureisonlyacceptableintrulyexceptionalcircumstances.

    WG7 PremisetypecoverageTheWANcommunicationssolutionmustprovidecoverageforcloseto100%ofpropertytypesandtopographicalvariations.

    ItisacknowledgedthattheWANcommunicationsmaynotbedeliveredbyasinglesolutionornetworkforallpropertytypesbutthe

    overallcoveragemustbecloseto100%,failureisonlyacceptableintrulyexceptionalcircumstances.

  • 8/14/2019 BERR WAN Comms requirements 0 2

    22/32

    WANCommunications Version0_2

    RefRefRefRef RequirementRequirementRequirementRequirement DetailsDetailsDetailsDetails

    mechanismscannotchangeinthattimebut

    wouldnotbeacceptableforthisnewgenerationofmeterstoneedreplacementbecausetheCommunicationsbecomesobsolete.Thesolutionmaybedesignedsuchthat

    shouldacomponentpartoftheWANcommunicationsbecomeobsolete,itcanbeupdatedwithoutthereplacementofmeteringsystems.

    Therewouldbearequirementfornewcommunicationssolutionstobebackwardlycompatiblewithexistingmeterswithouttheneedtovisitthosemetersforupgrade.

    WG9 GrowthofUseTherequirementsforuseoftheWANcommunicationsareexpectedtogrowovertimehencethereisarequirementforthesolutionstohavesparecapacityandorscalability.

    WG10 ReasonablecostThewholesolutionmustbeprovidedatreasonablecost,thisistrueoftheWANCommunicationselement.

    WG11 InitiationofCommunicationWANcommunicationsmaybeinitiatedby

  • 8/14/2019 BERR WAN Comms requirements 0 2

    23/32

    WANCommunications Version0_2

    6666 RequirementsofActorsRequirementsofActorsRequirementsofActorsRequirementsofActors

    6.16.16.16.1 SupplierSupplierSupplierSupplierIt is stressed that the metering system is a utilities solution. Although it isexpected that the WAN communications will be used by other parties, thesupplier to customer relationship provided by metering communications isessential and must not be compromised by other use.

    Suppliers expect to carry out activities with the meter including the following:

    Meter reading

    Meter configuration eg Tariff setting

    Alerts

    Credit updates

    Access control

    Meter data retrieval

    Software/firmware upgrade

    Additionally, suppliers may expect to update information to a display that islocal to the metering system.

    The suppliers requirements for smart metering WAN communications arecollated in a specific schedule of the SMOF (reference 1), this section extractsthose requirements (note the requirements reference use of TCP/IP and XML

    however these solutions are proposals rather than completely fixedrequirements).

    Ref Requirement Mandatory/HighlyDesirable/Desirable

    WS1 Thecommunicationssolution(s)willbecompliantwith M

  • 8/14/2019 BERR WAN Comms requirements 0 2

    24/32

    WANCommunications Version0_2

    Ref Requirement Mandatory/HighlyDesirable/

    Desirable

    relevantlegislationandregulations.

    WS2 Thereisarequirementforintermittent22waycommunicationofdatabetweentheMeteringSystemandAuthorisedParties.

    Thecommunicationsabilityofthemeteringsystemmaycreateexpectationsofveryshortlatencyandtheserequirementswillneedtobeestablished.Forexample,theremaybeadesireforcustomerserviceadvisorstointerrogatethemeterduringaphonecallwiththecustomer,thiswouldcreaterequirementsforlatencytobeintherangeofoneminute.

    M

    WS3 Thecommunicationssolution(s)willsupportaminimumstandardofservice3forthecompletionofallData

    ExchangesbetweenMeteringSystemsandAuthorisedParties4.

    Thisstandardofservicewillbeexpressedintime.ItwillnotbeprescriptiveaboutthenumberofretriesrequiredallDataExchangeswillcomplete.5

    M

    WS4 Thecommunicationssolution(s)willsupportaprioritised6standardofserviceforthecompletionof

    HD

    2ThereisnorequirementforcontinuouscommunicationbetweenaMeteringSystemandAuthorisedParties,e.g.alwaysonline.Thecommunicationssolutionshouldsupportintermittent(asopposedtocontinuous)serviceavailableondemand.Thisofcourse,doesnot,precludethattherequirementcouldbefulfilledbycontinuousserviceavailability,subjecttocostandthepotentialimpactonbatterylifeofgasmeters.ThelimitingfactorwouldbethosecomponentsoftheWANcommunicationsthatarebatterypowered,namelythegasmeters.Sendingandreceivingmessagesorlistening(beingavailabletoreceive)takespowerhencetheoverallrequirementisforintermittentcommunications.

    Itisexpectedthatthemajorityofthecommunicationssolutionwillbeavailablevirtuallyconstantly,butthatgasmetersparticularlymayhavecommunicationsregimesthatusepowereconomically.3AnyintroductionofastandardofservicesintroducesparallelrequirementsforOperationalFrameworkparticipantsforunilateralormultilateralmonitoringofperformanceagainstthestandard Whilst this may be vested in the service provider(s) themselves some form of

    WAN C i i V i 0 2

  • 8/14/2019 BERR WAN Comms requirements 0 2

    25/32

    WANCommunications Version0_2

    Ref Requirement Mandatory/HighlyDesirable/

    Desirable

    DataExchangesbetweenMeteringSystemsandAuthorisedParties.

    PrioritieswithinthestandardofservicewillbeexpressedinthetimetakentocompletetheDataExchangesuggestedexample

    HighestPriority=wheretimelinessofcompletingData

    Exchangeiscriticaltocompletionofabusinessprocesse.g.addingemergencycredittoMeteringSystemoralertinganAuthorisedPartyofaseriousfault/tamper.

    StandardPriority=assumedtobemostcommonclassificationusedforthemajorityofDataExchanges.

    LowPriority=informationisnotcriticaltoSupplierorcustomerprocesse.g.downloadingnewsoftwareversiontoMeteringSystem.

    Itispossiblethatsuchprioritisationmaynotbeneededforsometimebutitisconsideredessentialtomakeprovisionforthistobeabletobeactivatedlater.

    WS5 Thecommunicationssolution(s)willrequirethenumberofsitevisitstoaMeteringSystemtoaddressissuesor

    failuresofthecommunicationssolution(s)tobekepttoaminimum.

    HD

    WS6 AllcommunicationsbetweenaMeteringSystemandAuthorisedPartywillbesecure.7

    Ifcommunicationssecuritydoesnotformpartofthecommunicationsprotocols,thesolutionwillincludesecuritymeasuresandcontrolsasfollows8:

    Cryptosecuritye.g.atleast128bitencryptionusingAdvancedEncryptionStandard(AES).

    Emissionsecurityprotectinginformationemanatingfrom the Metering System from intercept andanalysis

    M

    WAN C i ti V i 0 2

  • 8/14/2019 BERR WAN Comms requirements 0 2

    26/32

    WANCommunications Version0_2

    Ref Requirement Mandatory/HighlyDesirable/

    Desirable

    Traffic Flowsecurity concealing thepresenceandpropertiesofvalidmessagesonthenetwork

    Transmission security measures to protectinformation from interception and exploitation bymeans other than decryption e.g. jamming,frequencyhoppingetc.

    WS7 CommunicationtoandfromaMeteringSystemwillberesistanttoinappropriateinterferencebyanypartyincludingthecustomer.9

    M

    WS8 Thecommunicationssolutionsshallberesistanttovirusesandothermalicioussoftware.

    M

    WS9 Thecommunicationssolution(s)willcomplywith

    ScheduleIProtocolSpecification.(notethisschedulespecifiestheuseofinternetprotocolaspartoftheTCP/IPinternetprotocolstack)

    M

    WS10 Thecommunicationssolution(s)willcomplywithScheduleJDataExchangeFormatSpecification.

    (notethisschedulespecifiestheuseofXML)

    M

    WS11 Thecommunicationssolutionwillnotalter,corruptorpermanentlystoreanydataittransports.

    M

    WS12 Thecommunicationssolution(s)underreasonableusageprofiles,willnotcriticallyaffectthepowerconsumption10orbatterylifeofaMeteringSystem.

    M

    WS13 Thecommunicationssolution(s)willbecapableof

    meetingthedatatrafficrequirementsoftheOperationalFramework.11

    M

    9Inappropriatehere,meansinadvertentordeliberateactionsthatwouldcompromisetheotherrequirements.Abalancewillneedtobemaintainedbetweentherequirementforsecurecommunications with Local Devices as defined in Schedule F Access Control Specification

    WAN Communications Version 0 2

  • 8/14/2019 BERR WAN Comms requirements 0 2

    27/32

    WANCommunications Version0_2

    6.26.26.26.2 ConsumerConsumerConsumerConsumer

    The majority of the consumer requirements of Smart metering WANcommunications (reliable, secure communications) will be covered by thesupplier requirements). However, the consumer has requirements of theWAN communications solution in addition to those of the supplier.

    WC1 SafetyThe WAN communications solution shall not be harmful to residents.

    WC2 Interference caused to existing networksThe WAN communications solution shall not materially interfere withconsumers existing networks (as isthecaseforallconsumerelectronics).

    WC3 Minimal DisruptionThe consumer has a requirement that the installation and operation ofsmart metering causes minimal disruption. The requirement forminimal disruption includes disruption to the persons schedule such asaccess to the premises or supply off during work and disruption causedby physical device(s).

    WC4 Latency in CommunicationConsumers will carry out activities that use the metering system WANcommunications, where these activities involve a customer activity anda response (update to the metering system) the consumer will normally

    require the operation to complete in a short space of time.A clear example where a short latency in messages is required iswhere the meter is operating in prepayment mode. It is expected thatmeters will hold the balance, credit payments may be made at a vendorand that the credit is updated to the meter by the vendor or supplier.The consumer will require that this operation complete in a short time.As a guideline, it would be unlikely to be acceptable for the smartmetering process to take significantly longer than a normal time for

    the current process.The current process for a prepayment customer when they need toupdate credit is that they go to a vendor, purchase credit which is heldon a key or token, return to the meter and transfer the credit to themeter, the credit is immediately updated to the meter. This activitymight reasonably be assumed to take about 20 - 30 minutes. There is

    WAN Communications Version 0 2

  • 8/14/2019 BERR WAN Comms requirements 0 2

    28/32

    WANCommunications Version0_2

    The customer has a requirement that the whole of the smart meteringsystem is at reasonable cost, this is true of the WAN communicationselement.

    WC6 Not IntrusiveThe customer has a requirement that the WAN communications are notinvasive. There is a balance to be struck between providing usefulservices and those that may be seen as invasive.

    6.36.36.36.3 Network/DistributerUseNetwork/DistributerUseNetwork/DistributerUseNetwork/DistributerUse

    There are no firm requirements of Network operators or distributors asyet. However the potential requirements of these parties can beestimated by considering a range of benefits these parties may expectto realise from use of smart metering facilities. Examples of thesebenefits have been identified in the ERA response to BERRs AMMimpact assessment as follows:

    BenefitsenabledwithERAspecification:

    LossManagement Restorationverification

    Emergencyresponse

    Loadforecastingandscheduling

    Benefitsthatwouldrequireadditionalfunctionality

    Powerqualitymonitoring

    PhaseBalancing

    LoadBalancing

    Outagenotification

    These and others have been agreed as potential benefits for networks load

    management, in particular, has been discussed as a likely use. However,none of these requirements are firm. It is unknown if each network operatorwould be likely to adopt the same set of functionality although there should besimilar benefits cases for each.

    The activities to achieve the benefits that are recognised for networks would

    WAN Communications Version 0 2

  • 8/14/2019 BERR WAN Comms requirements 0 2

    29/32

    WANCommunications Version0_2

    WN1 Latency of Communications-somenetworkrequirementsmightneedverybrieflatency.Forexampleanetworkusingsmartmeteringforoutageorrestorationmanagementmaywishtoknowoftheseeventswithinafewminutes.WN2 BroadcastSome of the activities may require the ability to send a message to groups ofmetering systems. This may be true for example where there is a need tocheck the status of supply in an area. Hence there may be a requirement forthe ability to send broadcast messages. This may be a requirement of otherparticipants including suppliers.

    WN3 PrioritisationThe ability to prioritise data exchanges by type has been recognised asdesirable by suppliers. Collections of functions that could be used bynetworks would be expected to contribute to the security of supply. As such,this collection of functions might warrant the highest priority.

    6.46.46.46.4 3333rdrdrdrdpartyserviceproviderpartyserviceproviderpartyserviceproviderpartyserviceprovider

    Although 3rd party uses of the WAN communications are anticipated, there areno known uses. Anticipated uses such as energy management services orappliance maintenance should not exceed supplier requirements for accesscontrol, security and performance.

    3rd party uses are expected and an amount of data traffic must be allowed foraccordingly.

    It is possible that there may be 3rd party uses of smart metering WANcommunications that would have high performance requirements but any suchrequirements are secondary to the utility requirements and might be taken upsuitable capacity and performance is available rather than making anadditional requirement.

    6.56.56.56.5 MicrogenMicrogenMicrogenMicrogeneeeerationrationrationrationThe term Microgeneration is used here to represent the whole cycle ofmicrogeneration, from the device or devices that may be generating for thepremises to the market participants who may need to know of generation andexport to the grid.

    There are participants who will need to know the amounts and times ofl t i it t d t d th b d f fi ti f

    WAN Communications Version 0 2

  • 8/14/2019 BERR WAN Comms requirements 0 2

    30/32

    WANCommunications Version0_2

    6.66.66.66.6 AppliancesAppliancesAppliancesAppliancesThe requirements of appliances which may communicate with 3 rd parties viathe metering system WAN communications have been covered within the

    requirements of suppliers and 3rd parties and no additional requirements areidentified.

    6.76.76.76.7 DisplayDisplayDisplayDisplayOne or more suppliers may communicate via the metering system with one ormore in home displays. The display may be used to carry out many actionsthat are, by default, actions that belong to the meter.Authorised parties may carry out dialogues with the consumer using thedisplay rather than the meter as the interface. However the requirements ofthe supplier should already cover this interface and no additional requirementsare identified.

    6.86.86.86.8 InstalleInstalleInstalleInstallerrrr////MaintainerMaintainerMaintainerMaintainer

    The parties responsible for installing and maintaining the metering systemshave a different relationship with the WAN communications the other actors inthat they are not using the WAN communications for their own sake.As the relationship is different installers have requirements in addition to thoseof suppliers. This party requires:

    WI1 Repeatable processesInstallation of metering systems, including the commissioning of WANcommunications, and maintenance activities must be simple and routineactivities.

    WI2 Avoidance of meter visits through remote diagnosticsThe vast majority of current reasons for meter visits must be avoided asthis avoidance is a major benefit in the case for smart metering. Meteringsystems should provide information about faults automatically and shouldalso report maintenance requirements (such as low batteries) so thatmeter visits can be targeted when needed. It is particularly important that

    the state of the metering systems can be sufficiently assured that thecurrent need for inspection visits can be avoided.

    7777 TrafficFlowDescriptionTrafficFlowDescriptionTrafficFlowDescriptionTrafficFlowDescription

    WANCommunications Version0_2

  • 8/14/2019 BERR WAN Comms requirements 0 2

    31/32

    _

    Numberofmetersinvolved

    Frequency

    Profileofuse

    Theconcurrentuseandtopologywilldrivethesizeofthebandwidthrequirements.However,itisprematuretoundertakedetaileddatatrafficanalysis.Thereareenoughunknownssuchanalysishaslimitedvalueandmayactuallybemisleading.AnumberofpartiesareexpectedtousetheWANcommunicationsfordata

    exchangewiththemeteringsystemandlocaldevicesbutthepartywithknownrequirementsisthesupplier.Eachadditionalpartywouldaddtothedatatrafficrequirementsbuttheextentwoulddependontheirinteractionwiththemeteringsystem.Itisreasonabletoassumethattheusemaygrowsignificantlyovertime.Thevastmajorityofmessagesinasuppliersdataexchangesarelikelytobereasonablysmall(suchasmeterreadings,logs,tariffupdates,creditupdates,

    alerts,etc)itwouldbepossibletoestimatethesealthoughthislesslikelytobetheareathatwillstretchthesolution.Themajorityofmessagesofotherpartiesarelikelytobesimilarlysmallalthoughuntilthoseusesareidentifiedthisisspeculativedifferentpartiesmayhavecompletelydifferentuseprofiles.Thelargestmessagesarelikelytobesoftwareorfirmwareupgradesalthoughitisimpossibletoestimatethesizeofthesewhenthesoftwaresolutionisunknown.ThesoftwaredevelopmentwillneedtoaccountforconstraintsoftheneedtoprovideupgradeovertheWAN.AnearlyexampleofhowtrafficanalysismaylookisprovidedinAppendixA.Itisstressedthoughthatallvaluesgivenareestimatesthatwouldneedtobere-evaluatedwithexpertsinalltherelevantfields.

  • 8/14/2019 BERR WAN Comms requirements 0 2

    32/32

    APPENDIX A: EXAMPLE Traffic Flow Analysis Model

    1 The table below shows an example of traffic flow that could be modelled to meet Operational Framework requirements.

    2 Due to the incremental nature of any implementation of smart metering, and the potential variety of data requirements by customer or Supplier segments, any model willneed to use a number of assumptions and profiles to determine the traffic capacity requirements of smart metering.

    3 All sizes used in this table are in bytes and are estimations.

    MessageOverhead Fuel MessageContent

    ExampleUsage

    Interaction Header Footer NetworkAck

    Gas Elec Elements Size TotalPerMeter

    FrequencyofActivity

    %ofPortfolio

    MeterReading(non-interval,simpletariff)

    100B 100B 15B Yes Yes 10Bperreadingandregisteridentifier

    40B 255B Daily 100%

    MeterReading(intervaldata)

    100B 100B 15B Yes Yes 10Bperhalfhouradvance

    240B 455B Daily 100%

    TariffSetting 100B 100B 15B Yes Yes 50Bpertariffset 100B 315B Monthly 25%

    Meteralerts 100B 100B 15B Yes Yes 20Bperalert 20B 235B Daily 5%

    Debitbalances 100B 100B 15B Yes Yes 50Bperbalancedebt,credit,recoveryrate,emergencycredit

    200B 415B Weekly 20%

    AccessControlPolicies 100B 100B 15B Yes Yes 250Bperpolicy 250B 465B Monthly 50%

    Softwareapplication 100B 100B 15B Yes Yes 15000Bperapplication

    15000B 15215B Monthly 10%