banner installation project 2011
DESCRIPTION
KEVCO installed Banners on the exterior of The World Bank for the 2011 World Bank/International Monetary Fund World ConferenceTRANSCRIPT
- 1. Banner Installation Project
World Bank / International Monetary Fund Conference September2011 Washington D.C.
2. It takes a village..
Banner Installation Team Assembles to get the Project
started.
3. 8 Panels, two 135ft lifts, 6 stories & a 10 man team will
get the job done
Banner is rolled out completely to insure proper folding.
4. Expert careis taken to protect Banners
Tarps are in place to protect the Banner Panels.
5. Crews equipped with specialty gloves make smoothing out wrinkles
an easier process.
6. Safety is always Priority #1 at KEVCO
Permits for Public Road closures, consulting with construction
company engineers & Banner Designers, proper placement of
safety cones, Safety Barricades and safety tape are all a part of
pre- planning for a Banner Installation project of this magnitude,
where precision is key.
7. Banners are folded & ready to go to the top of The World
Bank.
With safety harnesses in place and banners loaded on lifts, the
banners are getting prepped for their assent to the top of the
building. KEVCO Supervisor, Joel Hernandez boards the lift for the
ride up.
8. Crew unloads Banner to install cables & tie-backs to attach
the Banner to buildings exterior framework.
9. The first Banner panel goes up on the lift
Galvanized aircraft cable is threaded through banner to insure
stability
10. Panels go up according to plan
Lift crew secures panels as CDE crew appliesheavy duty tie-backs to
sides of each panel for added security and stability .
11. 2 lifts at a time and 2 CDE tie-back crews get the job
proceeding as planned
12. Banner installation nears completion
13. What a masterpiece !KEVCOs Banner Installation Team adds
another successful job to their portfolio