arlington public schools and arlington county government ......all arlington public schools (aps)...
TRANSCRIPT
Arlington Public Schools and Arlington County Government
Collaboration and Data Sharing to Inform Schools Projections
Joint School Board/County Board Work SessionDecember 3, 2019
Community Facilities Study (2015-2017)
Community Facilities Study (CFS), 2015 – 2017https://commissions.arlingtonva.us/community-facilities-study/
The CFS reviewed the ACG Forecast and APS Projections Methods: Consultants reviewed County population and employment
forecasts and APS student projections
The review reinforced validity of methods This confirmed the need for two different methodologies and
projections for two different purposes Recommended short and long-term improvements for data
sharing, collaboration, trend monitoring, and methodology
2
Collaboration between APS and ACG
3
Community Facilities Study
July 1, 2017ACG Forecast Round 9.1
2015-2017
September 30, 2017APS Projections
July 1, 2015ACG Forecast Round 9.0
2015 20202016 2017 2018 2019
EnhancementAnnual Housing Unit ForecastMaster Housing Unit DatabaseProjected Births
September 30, 2018APS Projections
ACG Data UpdateSeptember 30, 2018
AddedEnhancementAffordability
September 30, 2019
AddedEnhancementRecalibrate Birth Projections
ACG Data Update
September 30, 2019APS Projections
September 30, 2016APS Projections
September 30, 2015APS Projections
ACG Forecast
Land Use Model
4
“The housing unit method is an acceptable methodology and is especially effective in areas with high quality data on housing development and changes.”
---- RLS Demographics, A Review of Projection Methodologies for the Arlington County Government and Arlington Public Schools , April 2, 2015.
ACG Forecast
Land Use Model
• Forecast of housing units, households, population, and jobs for a 30-year period and broken down in to 5-year increments.
• Population forecast is based on the 2010 Census total population count.
• Future population is estimated by applying occupancy and households statistics to projects under construction or approved (not yet under construction) and areas which could be redeveloped with greater development potential and/or change in land use.
5
ACG Forecast
6
• Housing unit occupancy and average household size are derived from 2010 Census data.
• Each variable is derived for the areas listed below, and for the balance of the County outside of these areas.
• Density and land use is determined by County Board adopted/approved documents:
• General Land Use Plan (GLUP)• Zoning Ordinance• Sector and Small Area Plans
1. Rosslyn2. Courthouse3. Clarendon4. VA Square5. Ballston 6. Crystal City
7. Pentagon City8. Columbia Pike9. Shirlington10. Cherrydale11. Nauck12. East Falls Church
VariablesGuidance
GuidanceGuidance
ACG Development Tracking
0
200
400
600
800
1,000
1,200
1,400
1,600
1,800
2,000
2010 2011 2012 2013 2014 2015 2016 2017 2018
Net New Housing Units
Net New Housing Units
7
Guidance
Collaboration between APS and ACG
8
ACG and APS implemented a methodology that links population forecasts to student projections through housing units and births.
Data Shared Between ACG and APS
9
Master Housing Unit Database (MHUD)
Combines administrative data from multiple sources to create one database of all housing units.
Housing Unit Forecast
ACG creates a modified housing unit forecast, which breaks down anticipated housing unit growth on an annual basis for the next 10-years.
Actual and Projected Births
Births that have occurred to Arlington residents and projected births based on the population forecast.
Master Housing Unit Database (MHUD)
• First developed in 2015
• Updated annually as of July 1st
• Combines data from Real Estate Assessments, Housing Division (Apartments), and development tracking to create a database of all housing units in the County
• Designates apartment complexes by affordability type: market rate, CAF Only, or mixed (market and CAF)
• APS uses MHUD to calculate student generation factors by housing type which are applied to future housing to estimate student yield
10
2018 Master Housing Unit Database (MHUD)
Housing Unit Forecast
• ACG participates in the MWCOG Cooperative Forecasting Process.
• Most recent: Forecast Round 9.1
• Produced by ACG as of July 1, 2017
• Adopted by MWCOG Fall 2018
• ACG produces a special housing forecast for APS:
• Update based on development changes between the latest forecast round (July 1, 2017) and the current year
• Breaks down 5-year incremental forecast to a 1-year forecast for a 10-year period
• Every September, ACG reviews the annual housing unit forecast and provides an update to APS
• The forecast includes affordable housing units in site plans/use permits approved by the County Board
11
2018 Housing Unit Forecast 10-Year
Actual and Projected Births
• Data about actual births (those that have occurred to Arlington residents) are purchased from the Virginia Department of Health by ACG
• Projected births are estimated by integrating a cohort component population model and the five-year population forecasts: - Updated annually- Model recalibration
12
Improvements to Forecast County Births
• The cohort component model used to project births is being recalibrated to include updates:-ACG Round 9.1 population forecast- Fertility rates-Migration rates
• Updated birth forecasts, reflecting the recalibrated model, will be available in October 2019
• Updated birth forecasts will be used in the upcoming 2020-21 to 2029-30 enrollment projections
13
All Arlington Public Schools (APS) budget and operations decisions are based on the best information available at the time. Staff and community members are reminded that funding forecasts from Arlington County and the state may change, based on many external factors. Similarly, student enrollment and projections are based on the best available information, but are also subject to change due to employment, housing and other economic factors. For these reasons, APS and the Arlington School Board may adjust future budget allocations, staffing and other operations decisions to reflect the existing community and operating landscape.
Factors Contributing to Enrollment Growth
14
Factors Contributing to Enrollment Growth
All Arlington Public Schools (APS) budget and operations decisions are based on the best information available at the time. Staff and community members are reminded that funding forecasts from Arlington County and the state may change, based on many external factors. Similarly, student enrollment and projections are based on the best available information, but are also subject to change due to employment, housing and other economic factors. For these reasons, APS and the Arlington School Board may adjust future budget allocations, staffing and other operations decisions to reflect the existing community and operating landscape.
Larger kindergarten cohorts entering APS elementary
schools
Smaller 12th grade cohorts graduating
from APS high schools
Projected Arlington County “resident”
births
Residential housing growth
Migration of families into and out of Arlington
County
15
All Arlington Public Schools (APS) budget and operations decisions are based on the best information available at the time. Staff and community members are reminded that funding forecasts from Arlington County and the state may change, based on many external factors. Similarly, student enrollment and projections are based on the best available information, but are also subject to change due to employment, housing and other economic factors. For these reasons, APS and the Arlington School Board may adjust future budget allocations, staffing and other operations decisions to reflect the existing community and operating landscape.
Factors Contributing to Enrollment Growth
16
* Source: Fall 2018 10-Year Projections** Source: Membership reports for 2019 and previous years www.apsva.us/statistics/monthly-enrollment/
2,4482,337 2,283 2,231
2,320 2,2682,144 2,145 2,156 2,135 2,108
1,8762,081
1,9011,779 1,762 1,782
1,631 1,565 1,492
0
500
1,000
1,500
2,000
2,500
3,000
K 2022-23
K 2021-22
K 2020-21
K 1st 2nd 3rd 4th 5th 6th 7th 8th 9th 10th 11th 12th 12th,Sept. '18
12th,Sept. '17
12th,Sept. '16
12th,Sept. '15
APS Student Enrollment Snapshot Fall 2019
Projected Kindergarten Students *Current Students (Sept. 30, 2019) **Recent Grade 12 Cohorts (Sept. of each year) **
Factors Contributing to Enrollment Growth
All Arlington Public Schools (APS) budget and operations decisions are based on the best information available at the time. Staff and community members are reminded that funding forecasts from Arlington County and the state may change, based on many external factors. Similarly, student enrollment and projections are based on the best available information, but are also subject to change due to employment, housing and other economic factors. For these reasons, APS and the Arlington School Board may adjust future budget allocations, staffing and other operations decisions to reflect the existing community and operating landscape.
Enrollment projections rely on assumptions for future kindergarten students:• Kindergarten
projections from 2019-20 to 2021-22 are based on actual births from 2014 to 2016
• Kindergarten projections starting in 2022-23 are based on county birth forecasts
2,139 2,196 2,152 2,1272,253 2,293 2,279 2,283 2,337
2,4482,536 2,570 2,621 2,676 2,737 2,803
0
500
1,000
1,500
2,000
2,500
3,000
Ente
ring
Kind
erga
rten
Coh
ort
Schooll Year
Projected kindergarten enrollment, Fall 2018 10-Year Projections Actual kindergarten enrollment
Based on actual births
Based on forecasted births
17
Source: Fall 2018 10-Year Projections
All Arlington Public Schools (APS) budget and operations decisions are based on the best information available at the time. Staff and community members are reminded that funding forecasts from Arlington County and the state may change, based on many external factors. Similarly, student enrollment and projections are based on the best available information, but are also subject to change due to employment, housing and other economic factors. For these reasons, APS and the Arlington School Board may adjust future budget allocations, staffing and other operations decisions to reflect the existing community and operating landscape.
18
Factors Contributing to Enrollment Growth
• In Fall 2019, RLS Demographics was contracted to update the Arlington County births forecast model, the Cohort Projection System, last updated in 2016
• Comparisons of forecasted and actual births for 2017 and 2018 showed that births were over-estimated in the forecast model
• RLS Demographics’ update of the birth forecasts includes:• The latest AGC population forecast (Round 9.1)• Updated analysis of age-specific fertility rates using 2010 to 2018 historical birth data and US
Census bureau estimates of the distribution of the female population by age• Updated analysis of age-specific migration using US Census Bureau estimates up to July 1, 2018
• Some key findings that informed the updated births model:• It was found that the Total Fertility Rate (TFR) from 2010 to 2015 was 1.44 and is estimated to
decline to 1.34 in the 2015 to 2020 period*
• There is a reduced level of in-migration for the 20 to 24 and 25 to 29 age groups, compared with the 2016 model
* The updated migration uses the latest Census estimates extrapolated to 2020
All Arlington Public Schools (APS) budget and operations decisions are based on the best information available at the time. Staff and community members are reminded that funding forecasts from Arlington County and the state may change, based on many external factors. Similarly, student enrollment and projections are based on the best available information, but are also subject to change due to employment, housing and other economic factors. For these reasons, APS and the Arlington School Board may adjust future budget allocations, staffing and other operations decisions to reflect the existing community and operating landscape.
19
By 2023, the latest birth forecast is 964 births lower than previously assumed
Source: APS, Planning & Evaluation. RLS Demographics, Oct. 2019. ACG, CPHD, Sept. 2018 and Sept. 2019.
Factors Contributing to Enrollment Growth
3,4083,750
2,786
2,934
0
500
1,000
1,500
2,000
2,500
3,000
3,500
4,000
Actu
al a
nd F
orec
aste
d Bi
rths
Comparison of Actual Births and Births Used in the Fall 2018 and Fall 2019 10-Year Enrollment Projections
Births (used in Fall 2018 projections) Updated births (for Fall 2019 projections) Actual births
Factors Contributing to Enrollment Growth
All Arlington Public Schools (APS) budget and operations decisions are based on the best information available at the time. Staff and community members are reminded that funding forecasts from Arlington County and the state may change, based on many external factors. Similarly, student enrollment and projections are based on the best available information, but are also subject to change due to employment, housing and other economic factors. For these reasons, APS and the Arlington School Board may adjust future budget allocations, staffing and other operations decisions to reflect the existing community and operating landscape.
• Enrollment projections also rely on assumptions of future residential construction from the county
• Future housing accommodates new households and students
20
Net New Housing Unit Forecast for 2019 to 2029Projection
YearMulti-family
GardenMulti-family
HighriseSingle-family
DetachedTownhome Total
Net New Units2019 - 1,275 - - 1,275 2020 12 2,188 - 3 2,203 2021 36 1,230 - - 1,266 2022 - 1,234 - 27 1,261 2023 172 1,167 3 57 1,400 2024 12 1,325 - 86 1,423 2025 32 1,324 - 45 1,401 2026 - 1,379 - - 1,379 2027 - 1,379 - - 1,379 2028 85 1,232 - - 1,317 2029 99 1,178 - - 1,277 Total 448 14,911 3 218 15,581
Source: ACG, CPHD, Sept. 2019.
All Arlington Public Schools (APS) budget and operations decisions are based on the best information available at the time. Staff and community members are reminded that funding forecasts from Arlington County and the state may change, based on many external factors. Similarly, student enrollment and projections are based on the best available information, but are also subject to change due to employment, housing and other economic factors. For these reasons, APS and the Arlington School Board may adjust future budget allocations, staffing and other operations decisions to reflect the existing community and operating landscape.
21
• The greatest number of residential units are delivered in 2020
• Unit deliveries are evenly distributed from 2021 to 2029
Source: ACG, CPHD, Housing Unit Forecast, Sept. 2018 and Sept. 2019, Development Tracking Report, 3Q2018 and 4Q2018, https://projects.arlingtonva.us/data-research/development/quarterly-tracking-report/.
127
1,275
2,203
1,266 1,2611,400 1,423 1,401 1,379 1,379 1,317 1,277
0
500
1,000
1,500
2,000
2,500
2018 * 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029
Net
New
Uni
ts
Comparison of Future Residential Units Assumed in the 10-Year Fall 2018 and Fall 2019 Enrollment Projections
Net new units (used in Fall 2018) Net new units (used in Fall 2019)Net new units (3Q2018 and 4Q2018)
Factors Contributing to Enrollment Growth
All Arlington Public Schools (APS) budget and operations decisions are based on the best information available at the time. Staff and community members are reminded that funding forecasts from Arlington County and the state may change, based on many external factors. Similarly, student enrollment and projections are based on the best available information, but are also subject to change due to employment, housing and other economic factors. For these reasons, APS and the Arlington School Board may adjust future budget allocations, staffing and other operations decisions to reflect the existing community and operating landscape.
22
Source:* Rates are based on September 30, 2019 APS Enrollments (Grades K-12) and July 1, 2019 Master Housing Unit Database (MHUD) from Arlington County Government, CPHD, Planning Division.** Rates are based on September 30, 2018 APS Enrollments (Grades K-12) and July 1, 2018 Master Housing Unit Database (MHUD) from Arlington County Government, CPHD, Planning Division.
GradesK to 12
SingleFamilyDetached
Single FamilyDetached withAccessory Dwelling
Townhome DuplexMarketRate
MixedIncome
CAFOnly 1
MarketRate
MixedIncome
CAFOnly
Elevator GardenTotal bySchool
DRAFT - Fall 2019Student Generation Rates * 0.498 N/A 0.214 0.345 0.066 0.127 0.656 0.254 0.383 0.632 0.055 0.113 0.232
Fall 2018Student Generation Rates ** 0.497 N/A 0.194 0.358 0.061 0.126 0.617 0.258 0.380 0.584 0.054 0.110 0.229
Difference 0.001 N/A 0.020 (0.013) 0.005 0.001 0.039 (0.004) 0.003 0.048 0.001 0.003 0.003
2019 Master Housing Unit Database (MHUD) housing by type shares 1
24.09% 0.03% 3.77% 2.27% 25.24% 7.86% 0.53% 8.55% 1.88% 2.99% 12.78% 10.00% 100.00%
1 Excludes Apartment Elevator Senior Housing
Multi-family Elevator Multi-family Garden Condo
To each new unit is a applied a Student Generation Rate (SGR) to estimate the number of students from new residential development.
Comparison of Draft Fall 2019 and Fall 2018 SGR
Factors Contributing to Enrollment Growth
14,191 14,667 14,800 14,981 15,307 15,589 15,835 16,161 16,534 16,919 17,271
-869-593 -726
-182 -508 -790 -1,036 -1,362 -1,735 -2,120 -2,472
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
18,000
20,000
Elem
enta
ry S
choo
l Enr
ollm
ent (
PreK
to G
rade
s 5)
School Year
Factors Contributing to Enrollment Growth – Elementary School
Starting in 2024-25, the Kindergarten to Grade 5 elementary school enrollment projections are completely based on assumptions from:• Births• Future construction• Past cohort
transition rates continuing into the future
All Arlington Public Schools (APS) budget and operations decisions are based on the best information available at the time. Staff and community members are reminded that funding forecasts from Arlington County and the state may change, based on many external factors. Similarly, student enrollment and projections are based on the best available information, but are also subject to change due to employment, housing and other economic factors. For these reasons, APS and the Arlington School Board may adjust future budget allocations, staffing and other operations decisions to reflect the existing community and operating landscape.
+752 seats, Fleet E.S.
+725 seats, Reed E.S.
Projection completely based on assumptions
2018 Enrollment
School Seats
Projected Enrollment (No.)
23
Factors Contributing to Enrollment Growth – Middle School
Starting in 2027-28, the Grade 6 to 8 middle school enrollment projections are completely based on assumptions from:• Births• Future construction• Past cohort
transition rates continuing into the future
All Arlington Public Schools (APS) budget and operations decisions are based on the best information available at the time. Staff and community members are reminded that funding forecasts from Arlington County and the state may change, based on many external factors. Similarly, student enrollment and projections are based on the best available information, but are also subject to change due to employment, housing and other economic factors. For these reasons, APS and the Arlington School Board may adjust future budget allocations, staffing and other operations decisions to reflect the existing community and operating landscape.
5,950 6,204 6,532 6,628 6,609 6,697 6,854 6,989 7,002 6,995 7,103
-639
129 -199 -295 -276 -364 -521 -656 -669 -662 -770
0
1,000
2,000
3,000
4,000
5,000
6,000
7,000
8,000
Mid
dle
Scho
ol E
nrol
lmen
t (G
rade
s 6 to
8)
School Year
+1,022 seats, Hamm M.S.The Heights
(Gr. 6-8)Projection completely based on assumptions
2018 Enrollment
School Seats
Projected Enrollment (No.)
24
7,181 7,527 7,818 8,297 8,741 8,996 9,310 9,366 9,478 9,613 9,715
542 433 262463
69 -186 -500244 132 -3 -105
-1,000
1,000
3,000
5,000
7,000
9,000
11,000
High
Sch
ool E
nrol
lmen
t (G
rade
s 9 to
12)
School Year
Factors Contributing to Enrollment Growth – High School
Starting in 2028-29, the Grade 9 high school enrollment projections are completely based on assumptions from:• Births• Future construction• And past cohort
transition rates continuing into the future
All Arlington Public Schools (APS) budget and operations decisions are based on the best information available at the time. Staff and community members are reminded that funding forecasts from Arlington County and the state may change, based on many external factors. Similarly, student enrollment and projections are based on the best available information, but are also subject to change due to employment, housing and other economic factors. For these reasons, APS and the Arlington School Board may adjust future budget allocations, staffing and other operations decisions to reflect the existing community and operating landscape.
+237 seats, Arl. Tech
The Heights(Gr. 9-12)
+680 seats, Arl. TechEd Center
+50 seats, Arl. Tech
+800 seats, Arl. Career Ctr.
+120 seats, Arl. Tech
Projection for Grade 9 based on assumptions
2018 Enrollment
School Seats
Projected Enrollment (No.)
25
Click to add text
All Arlington Public Schools (APS) budget and operations decisions are based on the best information available at the time. Staff and community members are reminded that funding forecasts from Arlington County and the state may change, based on many external factors. Similarly, student enrollment and projections are based on the best available information, but are also subject to change due to employment, housing and other economic factors. For these reasons, APS and the Arlington School Board may adjust future budget allocations, staffing and other operations decisions to reflect the existing community and operating landscape.
26
APS Enrollment Projections Timeline
Timeframe Topic
Mid December 2019 APS publishes 2019 10-Year Projections for 2020-21 through 2028-29
January 2020 Update to permanent seat capacity inventory reflecting refinements to schools’ permanent seat capacity and the 2019 10-Year Projections
February 11, 2020 School Board Work Session: 10-Year Projections update for the 2021-30 Capital Improvement Plan (CIP)
Arlington Public Schools and Arlington County Government
Collaboration and Data Sharing to Inform Schools Projections
Joint School Board/County Board Work SessionDecember 3, 2019