an iso 9001 & 14001 company tender...

25
AN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction of 4 ST Hostel (2 Nos. of 300 Bedded Boys Hostel + 1 No. 300 Bedded Girls Hostel & 1 No. 200 Bedded Girls Hostel) under ANWESHA Scheme at Paralakhemundi, Dist. Gajapati Odisha. VOLUME II ADDITIONAL CONDITIONS OF CONTRACT (ACC), TECHNICAL SPECIFICATION, APPROVED MAKES, DRAWINGS

Upload: others

Post on 20-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

AN ISO 9001 & 14001 COMPANY

TENDER DOCUMENT

TENDER No: DLI/CON/763-D/588

FOR

Construction of 4 ST Hostel (2 Nos. of 300 Bedded Boys Hostel + 1 No. 300 Bedded Girls Hostel & 1 No. 200 Bedded Girls Hostel) under ANWESHA Scheme at

Paralakhemundi, Dist. Gajapati – Odisha.

VOLUME – II

ADDITIONAL CONDITIONS OF CONTRACT (ACC),

TECHNICAL SPECIFICATION, APPROVED MAKES, DRAWINGS

Page 2: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

ADDITIONAL CONDITIONS OF CONTRACT (ACC)

1. GENERAL

The Additional Conditions shall be read in conjunction with General Conditions of Contract. Where the provision of these Additional Conditions is at variance with the provision of the General Conditions of Contract, the provisions of these Additional Conditions shall take precedence.

2. COMMENCEMENT AND COMPLETION OF PROJECT:

The contractual completion period for the entire work shall be 12 months from 10th day of issue of LOI.

3 TAXES AND DUTIES

The following shall be also read with clause no 13 of GCC:

1. The bidder/Contractor must be registered with GST and should have valid GSTIN number.

2. The bidder/contractor must submit as an compliances of GST Act, the invoices in GST compliant format failing which the GST amount shall be recovered/ adjusted by EPI without any prior notice from the next invoices or available dues with EPI.

3.The bidders/contractors are requested to update/upload the GST/Taxes data periodically so as to avail ITC credit by EPI failing which it shall be recovered/ adjusted by EPI without any prior notice from the next invoices or available dues with EPI.

4. Rates to be quoted in this tender all inclusive with all taxes and duties etc. including GST.

5. Bidder while quoting the rates in the tender must also consider the ITC credit applicable for the works, if any.

VARIATION IN TAXES, DUTIES, LEVIES AND IMPOSITION OF NEW TAXES ETC.

Any new taxes introduce by Central Govt / State Govt or variation in taxes is payable to contractor subject to reimbursement of same from client. If client has not reimbursed any new taxes and variation in taxes contractor does not have any claim on this and are not payable. Contractors are requested to submit the proof of deposit of taxes claimed failing which it shall not be reimbursed.

Page 3: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

4 FURNISHED OFFICE ACCOMMODATION & MOBILITY AND COMMUNICATION TO BE PROVIDED BY THE CONTRACTOR TO EPI

From clause 28.3 of GCC providing of vehicle for EPI staff is deleted and other requirements shall be as follows. The temporary furnished office measuring min. 500 sq.ft with false ceiling for staff and Engineer In-Charge shall be provided at Site along with unisex toilet (1 No.) with required basic facility as per approval of Engineer In-Charge. This office shall have basic amenities like electricity connections along with light & fan in each room. The office furniture is as follows:

1. Executive table – 2 Nos 2. Side Table with Drawer – 2 Nos 3. Computer Table – 1 No. 4. Executive Chairs – 2 Nos 5. Visitor Chair – 4 Nos 6. Steel Almeria (big Size) – 1 No.

Note: - 1. The make of furniture shall be decided by the Engineer-in charge. 2. On completion of work, the contractor dismantle the temporary

shed and take the dismantled material. 3. Above Accommodation and furniture is required till completion of

the project including Defect liability period. Against the above facilities, EPI shall pay an amount of Rs.3,50,000/- for office & Rs.65,000/- for furniture to the Contractor against submission of certified bill from Engineer In-Charge.

5 PAYMENT: The following is added to Clause No.37 of GCC

i) Each RA Bill must be accomplish by progress photos, all other terms of GCC Cl no 37.2 remains same.

ii) GCC Cl no 37.4 revised as under All payment shall be released by NEFT/RTGS only from the available client funds with EPI.

6 BAR CHART

GCC Clause no 43.2 is modified as under The Contractor shall also furnish within 10 days from the date of letter of Intent, a MSP Bar Chart for completion of work within stipulated time. This will be duly got approved from EPI. This approved MSP Chart shall form a part of the agreement. Achievement of milestones as well as total completion has to be within the time period allowed.

Page 4: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

7 OPC CEMENT

OPC Cement only is to be used to this work, however in case any crisis for OPC Cement, the party shall submit the documentary proof in support , in such case the difference of cost of OPC and PPC cement shall be recovered from the party. (An amount of Rs. 20 per bag shall be recovered)

Contractor shall make proper arrangements for the storage of cement at site as per standard practices.

8 WORKS TO BE OPEN TO INSPECTION

All works executed or under the course of execution in pursuance of this contract shall at all times be open to inspection and supervision of EPI. The work during its progress or after its completion may also be inspected, by Chief Technical Examiner of Government of India (CTE) and/ or an inspecting authority of State Government of State in which work is executed and/or by third party checks by Owner/ Clients. The compliance of observations/ improvements as suggested by the inspecting officers of EPI/CTE/ State authorities/ Owners shall be obligatory on the part of the Contractor at the cost of Contractor. Any recovery, penalty imposed by CTE due to non-performance, non-compliance of agreed condition or otherwise whatsoever the same shall be recovered from RA Bill of contractor

9 MATERIALS PROCURED WITH THE ASSISTANCE OF EPI

If any material for the execution of this contract is procured with the assistance of EPI either by issue from its stores or purchase made under orders or permits or licences obtained by EPI, the Contractor shall hold and use the said materials economically and solely for the purpose of this contract and shall not dispose them without the written permission of Engineer-In-Charge. The Contractor, if required by EPI, shall return all such surplus or unserviceable materials that may be left with him after the completion of the contract or at its termination on whatsoever reason, on being paid or credited such price as EPI shall determine having due regard to the conditions of materials.

All the materials are deemed to be in scope of contractor and shall be arranged by him, however if any such material is procured with assist of EPI, a handling charges of 10% on actual purchase cost shall be levied and recovered from RA bills of contractors.

Page 5: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

10 DEFECT LIABILITY PERIOD

Defect Liability Period is 24 (Twenty Four) Months. The commencement date of this “Defect Liability Period” shall be from the date when client certifies to EPIL in writing that the project has been 100% completed. A “Certificate of Initial Hand – Over” shall be issued by EPIL to the contractor after receiving the same from client. Until a “Certificate of Final Hand-Over” is issued by the client to EPIL at the end of Defect Liability Period, the contractor shall continue to be bounded by this contract. All other condition of GCC Clause No 74 is remains same.

11 STEEL

Thermo Mechanically Treated bars conforming to IS:1786, Fe 500 grade as required, from approved manufacturers viz SAIL/RINL/Jindal/TISCO shall be used. In case of non-availability of steel of these makes, TMT bars of other manufacturers as per IS1 786, Fe 500 grade as required, may be allowed to be used with the prior approval of Engineer-in-charge. In case TMT bars from manufacturer other than SAIL/RINL/TISCO/Jindal is allowed to be used, a deduction of Rs. 4 (four) per Kg shall be made from the bills of the contractor. The other provisions of clause of G.C.C. remain unchanged".

12 SIGNBOARDS

Contractor will arrange to fabricate and erect sign board at his own cost showing name of work, name of CLIENT, name of Architect/Consultants, name of EPI, date of commencement and completion etc of size and design as approved by EPI/CLIENT. Typical drawing is enclosed.

13 ARBITRATION

General Conditions of Contract (GCC) Sub Clause no.76.1 and 76.3 of ArbitrationClause no.76.0 are amended as given below. Sub Clause no.76.2 will remain thesame. 76.0 ARBITRATION 76.1 Before resorting to arbitration as per the clause given below, the parties ifthey so agree may explore the possibility of conciliation as per the provisions ofPart III of the Arbitration and Conciliation Act, 1996 as amended by Arbitrationand Conciliation (Amendment) Act, 2015.When such conciliation has failed, the parties shall adopt the following procedurefor arbitration: i) Except where otherwise provided for in the contract, any disputes anddifferences relating to the meaning of the Specifications, Design, Drawing and Instructions herein before mentioned and as to the quality of workmanship or materials used in the work or as to any other questions, claim, right, matter or things whatsoever in any way arising out of or relating to the Contract, Designs,Drawings, Specifications, Estimates, Instructions, or these conditions or otherwiseconcerning the works of the execution or failure to execute the same whetherarising during the progress of the work or after the completion or abandonmentthereof shall be referred to the Sole Arbitrator appointed by

Page 6: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

the Chairman &Managing Director (CMD) of Engineering Projects (India) Limited (EPI) or anyother person discharging the functions of CMD of EPI. The person approached forappointment as Arbitrator shall disclose in writing circumstances, in terms of Sub-Section (1) of Section (12) of the Arbitration and Conciliation Act, 1996 asamended by Arbitration and Conciliation (Amendment) Act, 2015 as follows: a) such as the existence either direct or indirect, of any past or present relationship with or interest in any of the parties or in relation to the subjectmatterin dispute, whether financial, business, professional or other kind, which islikely to give rise to justifiable doubts as to his independence or impartiality; and b) Which are likely to affect his ability to devote sufficient time to the arbitrationand in particular his ability to complete the entire arbitration within a period ofTwelve months. The Arbitrator shall be appointed within 30 days of the receipt ofletter of invocation of arbitration duly satisfying the requirements of this clause. ii) if the arbitrator so appointed resigns or is unable or unwilling to act due to anyreason whatsoever, or dies, the Chairman & Managing Director aforesaid or in hisabsence the person discharging the duties of the CMD of EPI may appoint a newarbitrator in accordance with these terms and conditions of the contract, to act inhis place and the new arbitrator so appointed may proceed from the stage atwhich it was left by his predecessor. iii) It is a term of the contract that the party invoking the arbitration shall specifythe dispute/ differences or questions to be referred to the Arbitrator under thisclause together with the amounts claimed in respect of each dispute. iv) The Arbitrator may proceed with the arbitration ex-parte, if either party, in spite of a notice from the arbitrator, fails to take part in the proceedings. v) The work under the contract shall continue as directed by the Engineer-In- Charge, during the arbitration proceedings. vi) Unless otherwise agreed, the venue of arbitration proceedings shall be at thevenue given in the „Memorandum‟ to the „Form of Tender”. vii) The award of the Arbitrator shall be final, conclusive and binding on both theparties. viii)Subject to the aforesaid, the provisions of the Arbitration and Conciliation Act, 1996 as amended by Arbitration and Conciliation (Amendment) Act, 2015 orany statutory modifications or re-enactment thereof and the Rules made thereunder and for the time being in force shall apply to the arbitration proceedingsand Arbitrator shall publish his Award accordingly.

Page 7: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

76.3 JURISDICTION: The courts in Delhi alone will have jurisdiction to deal with matters arising fromthe contract.

14 REQUIREMENT OF TECHNICAL STAFF FOR THE WORK

Contract period (Months)

Requirement of Technical Staff Minimum Experience (Years)

Designation

Recovery in case of Non Compliance (per month in Rs.)

Qualification Nos.

12

(i) Project Manager with degree in Civil Engineering Degree

(ii) Diploma Engineer in

Civil – 1, Electrical– 1, Discipline

(iii) Planning Engineer & Billing Engineer

(iv) Quality Assurance

& Quality Control Diploma Engineers

v) Supervisors

1 2 1 1 As Reqd.

10 5 5 5

Project In-Charge Project Supervisors Planning Engineer QA/QC Engineer

1.0 lacs 0.4lacs 0.4 lacs 0.5 lacs

15 The clause no 35.0 of GCC shall stands deleted: No Secured advance shall be paid to the contractor.

16 The Clause No.8.2 of GCC of recovery of mobilization advance stands modified as under: Recovery of such sums advanced shall be made by the deduction from the contractors bills commencing after first ten per cent of the gross value of the work is executed and paid, on pro-rata percentage basis to the gross value of the work billed beyond 10% in such a way that the entire advance is recovered by the time eighty percent of the gross value of the contract is executed and paid, together with interest due on the entire outstanding amount up to the date of recovery of the installment.

17 Physical Milestones:

Page 8: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

Milestone

Completion Schedule

Sl. No.

Period from the date of Start

Cumulative value as a percentage of total value of work to be

completed, till the end of period specified under column no. 2

Description of work to be completed during the period specified under

column no. 2

1 2 3 4

1.

From the date of start up to the end of 1st month

15%

Site Leveling and Grading , Completion of foundation and plinth

2.

From the start of 2nd to month upto the end of 4th month

25%

Completion of GF slab and FF slab ,start of brick work in super structure

3.

From the start of 5thmonth upto the end of 7th month 25%

Completion of structure work brick work,Start of Flooring work, Electrical Work ,joinery and Plumbing work including fire fighting.

4.

From the start of 8thmonth to end of 10th month 20%

Completion of plastering, Flooring, Electrical ,Plumbing .Start of painting and water proofing of building

5.

From the start of 11thmonth to end of 12th month

15%

Completion of work, painting and water proofing work including handing over the building to client.

Page 9: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction
Page 10: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

Technical Specification

The work in general shall be carried out as per Odisha PWD specifications. (Updated

with correction slips issued upto last date of submission of tender)

For items not covered under Odisha SOR & specification, the work shall be done as per

latest CPWD specifications and for Items not covered under both then as per latest

relevant BIS codes of practice..

In case of non-availability of any specification in the above paras or any overlapping

provisions, non-clarity on any issue, applicability of particular provision out of above,

shall be decided by Engineer-in-Charge whose decision shall be final & binding on the

contractor.

Page 11: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

LIST OF MAKES / BRANDS FOR CIVIL WORKS

S.No Item Makes / Brands

1 CEMENT (ORDINARY PORTLAND / PORTLAND POZZOLANA)

ACC / GRASIM / AMBUJA / BIRLA / ULTRA TECH. / LAFARGE/KONARK/RAMCO

2 TMT / TOR STEEL SAIL / TISCO / RINL/JINDAL

3 STRUCTURAL STEEL SAIL / TISCO / RINL/JINDAL

4 CERAMIC TILES NITCO / ORIENT / SOMANY / KAJARIA /

ANGEL // NAVEEN / EVRO

5 VITRIFIED TILES NITCO / SOMANY / KAJARIA / NAVEEN / EURO

6 RCC PIPES AKSHAY/KK/HINDUSTAN/PRAGATI/ANY OTHER MAKE LOCALLY AVAILABLE APPROVED BY ENGINEER IN CHARGE

7 MANHOLE COVERS (SFRC) KK / HINDUSTAN/ ANY OTHER MAKE LOCALLY AVAILABLE APPROVED BY ENGINEER IN CHARGE

8 KERB STONE (PRECAST CC)

NIMCO PREFAB/ SUBHASH FERRO CONCRETE/

HINDUSTAN TILES/ ANY OTHER MAKE LOCALLY AVILABLE DULY APPROVED BY ENGINEER IN CHARGE

9 CHAINLINKWIREMESH MITTAL/SHAKTI –WELD MESH/ ANY OTHER MAKE APROVED BY ENGINEER IN CHARGE

10 PVC PIPES/ FITTINGS SUPREME/ PRAKASH /ORI PLAST/ FINOLEX/ PRINCE

11 FLOAT GLASS AND MIRROR MODIGUARD /ASAHI /SAINT GOBAIN/ GUARDIAN

12 WATER-PROOFING COMPOUND CICO / CHEMISTIK/ FOSROC/MBT/ DEGUSSA/ CONCARE/PIDILITE

13 CEMENT/ CONCRETE ADHESIVES CICO / CHEMISTIK/ FOSROC/MBT/ DEGUSSA/ FOSROC/ SIKA / ARALDOTE/PIDILITE

14 DISTEMPER-DRY/ OIL BOUND/PAINT ICI /ASIAN / BERGER/ NEROLAC

15 ALUMINIUM SECTIONS FOR DOORS/ WINDOWS

HINDALCO / JINDAL/ INDAL/ BANCO/INDOALUSIS(MAHAVIR)

Page 12: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

16 FLOOR HARDNER CHEMISTIK/FOSROC/SIKA

17 CEMENT PAINT SNOWCEM / ICI/NEROLAC/ BERGER / ASIAN

18 PRIMER FOR STEEL ICI /ASIAN / BERGER/ NEROLAC

19 SYNTHETIC ENAMEL PAINT .ICI / ASIAN / BERGER / NEROLAC

20 PLASTIC EMULSION ICI/ASIAN/BERGER/NEROLAC

21 WATERPROOF PLY& BOARD DURO / GREENPLY/ CENTURY/ KITPLY/ ANY OTHER MAKE LOCALLY AVAILABLE APPROVED BY ENGINEER IN CHARGE

22 FLUSH DOOR SHUTTER

KITPLY / SWASTIK / DURO / GURJAN / UNNPLY / SITAPUR OR ANY OTHER MAKE LOCALLY AVAILABLE APPROVED BY ENGINEER IN CHARGE

23 ROLLING SHUTTER DIANA/ RAYMUS / RAMA/ANY OTHER MAKE LOCALLY AVAILABLE APPROVED BY ENGINEER IN CHARGE

24 BITUMENOUS SEALENT STP / LLOYD/ANY OTHER MAKE LOCALLY AVAILABLE APPROVED BY ENGINEER IN CHARGE

25 PVC DOOR SHUTTER RAJSHRI/SINTEX/ ANY OTHER MAKE LOCALLY AVAILABLE APPROVED BY ENGINEER IN CHARGE

26 PVC TANK SINTEX/ ELECTROPLAST/ STAR / LOTUS

27 WC/WASH BASIN CERA/PARRYWARE/HINDUSTAN

28 C.P. FITTINGS PARKO / HINDUSTAN / SEIKO / ORIENT/ JAQUAR

29 S.C.I. PIPES RIF / NICCO / BENGAL IRON / IISCO

30 WHITECEMENT BIRLAWHITE/JKWHITE/ASIAN

31 OXIDIZED ALUMINIUM FITTINGS EBCO / DOOR LINE/ ANY OTHER MAKE LOCALLY AVAILABLE APPROVED BY ENGINEER IN CHARGE

32 GYPSUM FALSE CEILING INDIAGYPSUM / BORAL/ ANY OTHER MAKE LOCALLY AVAILABLE APPROVED BY ENGINEER IN CHARGE

33 FUSION BONDED EPOXY COATINGS(FBEC) TO BE APPROVED BY ENGINEER INCHARGE

34 IRONMONGERY AS PER ARCHITECTURAL DRAWINGS / BOQ &SUBJECT TO PRIOR APPROVAL FROMENGINEER INCHARGE

Page 13: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

35 HYDRULIC DOOR CLOSER HARDWYN / TRIUM / EGL / EVERITE

36 FLOOR SPRING HARDWYN / GARNISH / TRIUM /OMEGA /EVERITE

37 UNPLASTICISED PVC ORIPLAST/ONPLAST/SUPREME/ ANY OTHER MAKE LOCALLY AVAILABLE APPROVED BY ENGINEER IN CHARGE

38 ANCHOR FASTENERS HILTI / FISCHER/ANY OTHER MAKE LOCALLY AVAILABLE APPROVED BY ENGINEER IN CHARGE

39 WATER HEATER (GEYSER) TO BE APPROVED BY ENGINEER IN-CHARGE

40 WATER PURIFIER TO BE APPROVED BY ENGINEER IN-CHARGE

41 STEAM – AERATED CONCRETE BLOCK. SIPOREX / BILTACH OR ITS EQUIVALENT TO BE

APPROVED BY ENGINEER IN-CHARGE

42 POLY CARBONATE SHEETS

LEXAN OR ITS EQUIVALENT TO BE APPROVED BY ENGINEER IN-CHARGE

43 PE-AL-PE PIPE KITEC OR EQUIVALENT TO BE APPROVED BY ENGINEER-IN-CHARGE.

Page 14: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

LIST OF MAKES / BRANDS

SANITARY AND PLUMBING WORKS

S.No Item Makes / Brands

1 Vitreous china andfire clay Hindustan/Neycer/Parryware/Cera

2 Plastic w.c. seats Commander/ Diplomat/Admiral

3 Stainless steel sinks

Prestige/A.M.C./Jayna/Kingston/ Neelkanth/ ANY OTHER MAKE LOCALLY

AVAILABLE APPROVED BY ENGINEER IN CHARGE

4 C.P. fittings & accessories& flush valves Gem/Parko/Jaquar/ Kingston/Hindware/Cera/Parry Ware

5 C.P. Waste, Spreaders, urinal Orient/Parko/Jaquar/ Hindustan/Parryware

6 Liquid soap dispenser Chilly/Euronics/ ANY OTHER MAKE LOCALLY

AVAILABLE APPROVED BY ENGINEER IN CHARGE

7 Sensor operated auto flushing system urinals AOS systems / Angash / Euronics

8 Water heater Racold/Venus/Kingston/ ANY OTHER MAKE LOCALLY AVAILABLE APPROVED BY ENGINEER IN CHARGE

9 Soil, waste & rain water pipes & fittings

(a) Cast Iron Pipes Neco/B. C./Rif/Hepco/ ANY OTHER MAKE

LOCALLY AVAILABLE APPROVED BY ENGINEER

IN CHARGE (is:3989)

(b) Centrifugally cast spun cast iron pipes (is: 1536)

Electrosteel/Kesoram/iisco/any other eq make approved by engineer in charge

10 RCC Pipes approved by engineer in charge

11 G . I . P i p e s Tata/ Jindal hissar/ Prakashsurya/ ANY OTHER

MAKE LOCALLY AVAILABLE APPROVED BY ENGINEER IN CHARGE

12 G . I . f i t t i n g s ( M a l l e a b l e C a s t I r o n s )

R/KS/Unik/any other make locally available approved by engineer in charge

13 Gun m eta l va l ves (fullway, check and globe valves)

Zoloto / Leader / Sant/ any other make locally available approved by engineer in charge

14 C.IValves(fullway, check and globe valves)

Kirloskar / Sant / Castle // any other make locally available approved by engineer in charge

15 Water meters

Capstan/Kranti/Anand// any other make locally available approved by engineer in charge

Page 15: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

16 Ball cocks GPA/Sant/L&K// any other make locally available approved by engineer in charge

17 Stoneware pipes & gully traps Perfect/Burn/RK // any other make locally available approved by engineer in charge

18 C.I. manholescovers and frames Neco / R.I.F / B.C / / any other make locally available approved by engineer in charge

19 Horizontal centrifugal /monoblock pumps Kirloskar/Hbd-bombay/Crompton/CRI

20 electric motors Kirsloskar/GEC/Siemens

21 Electrical switchgear & starters Siemens/L&T/Schneider/ABB

22 Electrical panel Siemens(Siepan)/L&T(Ti)/Schneider(Blockset)/ ABB(Arkut)

23 Cables National/Havells/Polycab/Ekta/Finolex/RR Kabel

24

Liquid level controllers

Liquid level indicators

Minilec / Radar

25 Filtration plant/ Ion exchange / Thermax / Softening plant Bikon

26 Chlorine dosing system Toshcon / Chloromax

27 Sfrc manhole covers KK / S k precast concrete

28 UPVC pipes/ fittings Supreme/ Prince / Finolex

29 Mirror Atul/ Modiflaot/Golden fish

Page 16: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

LIST OF MAKES/BRANDS OF ELECTRICAL ITEMS

S.No Item Makes / Brands

1 Steel Conduit BEC /AKG / PRECISION /ATUL

2 PVC Conduit BEC / PRECISION /ATUL/AKG/KINJAL

3

PVC Insulated CU. Conductor FRLS Wires/Cables

Skytone / RR Kabel / NICCO / L&T / Havells / National / Ecko / KET / Finolex / Polycab/ANCHOR

4 Modular Type Switches and Socket Outlet - 6/16A

Clipsal / Legrand(Arteor/Myrius/Mylinc)/ Crabtree (Havell's) / Wipro/MK/Anchor/Roma/HPL

5 Step Type Electronic Regulators Clipsal/Legrand/Crabtree(Havells)/WIPRO

6 Single Phase Industrial Type Socket Outlet Legrand / Siemens / GE / ABB

7 LT Panel / M.V. Cubicles Boards L&T (Ti) /Siemens (Siepan) /Scheneider (Blockset) / Legrand (XL

3 )/ ABB (ARKUT)

8 Air Circuit Breaker Siemens / ABB / Schneider (M&G) / L&T

9 MCB, MCB DB (Pre-wired type) ABB / Legrand / Siemens/L&T

10 MCCB Siemens /ABB /Schneider (M&G)/ L&T (DSIN)/ SENTRON/LEGRAND

11 Protection Relays L&T/Areva/ABB/Siemens/Schneider

12 Fuse Disconnector Switch/ SFU/Fuse L&T/Siemens/ABB

13 Ammeters, Voltmeters, CT's Enercon /AE / IMP

14 Thimbles / Lugs Dowells / Jainsons

15 Cables Gland Comet/ NMI / Jainsons

16 M.S. Cable Tray Stelco / Steelways / Pilco / Patny/Legrand

17 PVC Insulated PVC Sheathed AL. Conductor 1.1 KV Grade Armoured Cable

Polycab / Universal / Havells / CCI/RR Kabel/Finolex

18 Rising Mains Tricolite / L&T / Zeta / C & S/Schneider/Legrand

19 Mineral / Rock wool UP Twiga / FGP / Reared Sell.

20 Acoustic Enclosure Jakson / Sudhir / Super Nova / Reliable / Equivalent

21 Anti Vibration Mountings Dunlop / Resistoflex

22 Response Indicator Minimax / Agni

23 Exit Signs Hilite / Legrand

24 Conventional Light Fittings/ LED Light Fittings Philips / Bajaj / Wipro/HAVELLS

25 Ceiling fans BAJAJ / Crompton / Havells/ Khaitan / Polar / Usha

26 Exhaust fans Areva / BAJAJ/ Crompton / Havells/ Khaitan / Polar / Usha

Page 17: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

27 Poles Reputed (As per IS and subject to approval from Engineer – in – Charge

28 Motor Siemens /ABB / BB / Crompton

29 Data and Voice Networking Cable AMP / Systimax/D-link/Legrand/Molex

30 Patch Panel AMP / Systimax/ D-link/Legrand/Molex

31 Information Outlets AMP / Systimax/ D-link/Legrand/Molex

32 Patch Cords AMP / Systimax/ D-link/Legrand/Molex

33 Pipes Jindal Hissar / Tata / BST

34 Polymeric Corrosion (Protection Tape 4 MM X 500 MM Wide)

Pypkote / Equiv.

35 Fire Hose Firechief / Newage / Vijay

36 Sluice & Non-Return Valves Kirloskar/Zoloto/Leader/Crescent

37 Terrace Pumps (Electric and Diesel Driven) Kirloskar / Beacon / KSB / M&P

38 Pumping Set Kirloskar / Beacon / KSB / M&P

39 Butterfly Valves Audio / Crescent / Fouress

40 Single Headed Hyderant Valves, Four Way Fire Brigade Inlet

Minimax / New age / Steelage / Tyco

41 Branch Pipe New age / Steelage / Minimax

42 Pressure Gauges Manometer / H Guru / GIC /AN Instrument

43 Pressure Switch Indfoss / Switcher / VexmaTrafag

44 First aid Hose Reel Drum Newage / Minimax / Vijay

45 20MM Dia Rubber Pipe for Hose Reel Steelage / Dunlop newage

46 Starters Group Schneider / L&T / BCH / SIEMENS

47 Flow Switches TRAC / Levecon / Switchgear

48 Fire Extinguishers Minimax / Excel / Newage/ Vijay/ Cease fire / Superax / Safex

49 Changeover HPL/L&T/ABB/SIEMENS/SCHNEIDER

50 Air-Conditioners (3 to 5 star rated rated) VOLTAS/CARRIER/HITACHI/DAIKIN

51 DG Sets JAKSON/KIRLOSKAR/CUMMINS

52 UPS APLAB/EMERSON/SU-KAM/APC

53 OCCUPANCY SENSOR WIPRO/PHILIPS

54 APFC PANEL L&T/LEGRAND/SCHNEIDER/SIEMENS/ABB

55 ATS L&T/LEGRAND/SCHNEIDER/SIEMENS/ABB

56 TRANSFORMER ALFA/OTPL/OMEGA/ABB

Page 18: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

LIST OF MAKES / BRANDS FOR

FIRE PROTECTION WORKS & LIFT

S.No Item Makes / Brands

1 Pipes ( M S / G I) Tata / Jindal / Prakash Surya.

2 Gun metal valves Leader / Sant / Zoloto.

3 Single headed Hydrant valves, four wayFire Brigade inlet &shut off nozzle

Newage / Superex / Venus.

4 Pipe for hose reel Padmini / Maruti// any other make locally available approved by engineer in charge

5 Sluice & non return valves. Kirloskar / Venus / Kalpana.

6 Pressure switch. Indfoss / Switzer

7 Pressure Gauges. BRC / HD / Waree.

8 Pump. Kirloskar / KSB / Mather & Platt.

9 Motor. ABB /Siemens/CromptonGreaves / Kirloskar.

10 Enamel Painting of pipes etc. Asian / GoodlasNerolac / ICI / Berger.

11 Paint Primer. Asian /Jenson Nicholson/ Berger.

12 Fasteners. Hilti / Fischer./ / any other make locally available approved by engineer in charge

13 Weld Rods. Advani/Esab.

14 Ball Valves. RB (Italy) / Bugatti / Zoloto/ Cim.

15 Butterfly Valve. Audco / C & R/ Danfoss / AIP.

16 Fire Extinguishers. Minimax / Firequip / Lifeguard.

17 RRL Hose. Newage Premier Extra / PadminiAqua Dura.

18 Rubber Gaskets C I C / Varuna.

19 Hose Drum. Newage / Superex

Page 19: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction

FIRE ALARM & P A SYSTEMS

1 PVC insulated copper cables(armoured or otherwise).

As given in Electrical works

2 PVC insulated copper wire. As given in Electrical works

3 Fire Alarm Panel Honeywall( Notifier)/ BOSCH / Simplex/Tyco

4 Speaker Box GAC.

5 Manual Call Box Bosch/ Honeywall(NotIifier) Tyco / Simplex

6 Amplifier, LMT & Speaker Philips /Ahuja. / Bosch/Bose

7 Conduit ERW (ISI marked). BEC /AKG / ATUL.

8 Detectors Honeywall(notifier)/Simplex/Bosch / Edwards

Page 20: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction
Page 21: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction
Page 22: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction
Page 23: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction
Page 24: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction
Page 25: AN ISO 9001 & 14001 COMPANY TENDER …engineeringprojects.com/Tender/UploadFiles/3384_Vol-II.pdfAN ISO 9001 & 14001 COMPANY TENDER DOCUMENT TENDER No: DLI/CON/763-D/588 FOR Construction