an integrated cba of a photovoltaic noise barrier ellen de schepper steven van passel jean manca...

27
An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

Upload: shon-hardy

Post on 13-Dec-2015

216 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

An integrated CBA of a Photovoltaic Noise BarrierEllen De SchepperSteven Van PasselJean MancaTheo Thewys

1

Page 2: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

Photovoltaic Noise Barrier (PVNB)

2

Page 3: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

1. Introduction2. Methodology3. Case Study4. Results5. Conclusion6. Discussion

Overview

3

Page 4: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

1. Introduction

4

Page 5: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

Issue: limited available area

Denholm and Margolis, 2008; de Vries et al., 2007; Dijkman and Benders, 2010; Fthenakis and Kim, 2009; Graebig et al., 2010; Love et al., 2003; Nonhebel, 2005; Turner, 1999

Alternative PV applications that do not require “additional” space

1. Introduction

5

Page 6: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

Location PVNB: highway or railway, densely populated area

On those locations, noise barrier needed

Advantages of decentralized electricity generationKarger and Hennings, 2009

Limited area available to install ground mounted PV, constraints regarding rooftop PV

Barkaszi and Dunlop, 2001; Farhar and Buhrmann, 1998; Izquierdo et al., 2008; Ordóñez et al., 2010; Wiginton et al., 2010; Yamawaki et al., 2001

1. Introduction

6

Page 7: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

Introduced in 1989

2010: total capacity in Europe 7000kWp

Studies about technical insightsGrottke et al., 2003; Nordmann and Clavadetscher, 2004, 2006; van der Borg and Jansen, 2001

Studies about the potentialGoetzberger, 1999

Studies about economic aspects???

1. Introduction

7

Page 8: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

Cost Benefit Analysis (CBA) including a Monte Carlo sensitivity analysis

Also ecological aspects

2. Methodology

Ecological Benefit Valuation

Avoided CO2 emission Tol, 2008

Reduced noise nuisance Noise Sensitivity Depreciation Index (NSDI) applied to real estate prices

8

Page 9: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

2. Methodology

9

Distinction PV array - Noise Barrier - PVNB

Page 10: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

Figure 1 Orientation of the case study

3. Case Study

HighwayE313

PV - array

-45 � (azimuth)

ResidentialArea Tuilt

NB

N

E

S

W

10

Data

Length NB 747m

# PV panels 1867

Lifetime PVNB 20yrs

Total power 429kWp

NSDI 0.5%/dB

Inv cost PV €1,202,670

Inv cost NB €896,400

Page 11: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

3. Case Study

Highway(E313)

Noise BarrierHeight 4m

2.82m

1.18m

4m

PV panels 4 rows

1.6m*1m

2.83m

45� (inclination)

Figure 2 Design of the case study

11

Page 12: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

4. Results

12

+5%

Page 13: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

4. Results

13

Page 14: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

4. Results

14

Page 15: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

4. Results

15

Page 16: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

4. Results

16

Page 17: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

4. Results

17

Page 18: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

4. Results

18

Page 19: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

4. Results

19

Page 20: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

4. Results

20

Page 21: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

4. Results

21

Page 22: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

4. Results

22

Page 23: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

4. Results

23

Page 24: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

5. Conclusion

Stakeholder Benefit

Government Motivate private sector to invest in PVExtra amount of renewable energy

No additional space

Private investor Profitable investment

Residents Less noise nuisanceIncrease in real estate prices

PVNB could be a fruitful public – private partnership for the government, residents as well as private investors. Consequently, it would be beneficial to promote the technological development and the installation of PVNBs for example via implementation of

flexible governmental legislation regarding investment conditions of PV sound barriers.

24

Page 25: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

5. Conclusion

Figure 3 The impact of variations in the NSDI - value on the NPV

25

Case study

Page 26: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

Complete public ownership

Ecological benefit of CO2 reduction

Economies of scope

6. Discussion

26

Page 27: An integrated CBA of a Photovoltaic Noise Barrier Ellen De Schepper Steven Van Passel Jean Manca Theo Thewys 1

Questions?

27